Anda di halaman 1dari 43

GAMBAR KERJA ARSITEKTUR

PERIJINAN BANGUNAN GEDUNG RUMAH TINGGAL 1 LANTAI


DAFTAR GAMBAR ARSITEKTUR

NO. KODE NAMA GAMBAR SKALA KETERANGAN

- - COVER GAMBAR NTS


- - DAFTAR GAMBAR NTS
1 ARS SITUASI 1 : 800
2 ARS SITEPLAN 1 : 300
3 ARS DENAH RUANG 1 : 100
4 ARS TAMPAK DEPAN & SAMPING KIRI BANGUNAN 1 : 100
5 ARS TAMPAK BELAKANG & SAMPING KANAN BANGUNAN 1 : 100
6 ARS POTONGAN A - A 1 : 100
7 ARS POTONGAN B - B 1 : 100
8 ARS POTONGAN C - C 1 : 100
9 ARS DENAH PENEMPATAN KUSEN 1 : 100
10 ARS DETAIL KUSEN PINTU P1 & PINTU PJ1 1 : 25
11 ARS DETAIL KUSEN PINTU P2 & JENDELA J1 1 : 25
12 ARS DETAIL KUSEN JENDELA J2 & BOVEN BV 1 : 25
13 ARS DENAH POLA LANTAI 1 : 100
14 ARS DENAH PLAFOND 1 : 100
15 ARS DETAIL PLAFOND 1 : 10
U

T B

JALAN RAYA PATI - TAYU


LAHAN KOSONG

RUMAH WARGA RUMAH WARGA

RUMAH WARGA RUMAH WARGA

RUMAH WARGA RUMAH WARGA

RUMAH WARGA RUMAH WARGA

JALAN LINGKUNGAN SEKUNDER

JALAN LINGKUNGAN SEKUNDER

JALAN LINGKUNGAN SEKUNDER


LOKASI
BANGUNAN RUMAH WARGA RUMAH WARGA
LAHAN KOSONG
RUMAH WARGA RUMAH WARGA
LAHAN KOSONG
RUMAH WARGA RUMAH WARGA

RUMAH WARGA RUMAH WARGA


JALAN RAYA PATI - TAYU

TOKO RUMAH WARGA


RUMAH WARGA RUMAH WARGA
TOKO
RUMAH WARGA RUMAH WARGA
TOKO LAHAN KOSONG
RUMAH WARGA RUMAH WARGA
TOKO
RUMAH WARGA RUMAH WARGA

JALAN LINGKUNGAN SEKUNDER

TOKO

JALAN LINGKUNGAN SEKUNDER

JALAN LINGKUNGAN SEKUNDER


RUMAH WARGA
JALAN RAYA PATI - TAYU

RUMAH WARGA

JALAN LINGKUNGAN SEKUNDER


RUMAH WARGA
TOKO RUMAH WARGA RUMAH WARGA RUMAH WARGA
TOKO LAHAN KOSONG

TOKO
LAHAN KOSONG LAHAN KOSONG

TOKO

(-6.58185,110.004414)
SITUASI
SKALA 1 : 800
U

LAHAN KOSONG
T B

TOKO RUMAH WARGA

JALAN LINGKUNGAN SEKUNDER


El. -0.05El.FL-0.07 FL

JALAN LINGKUNGAN SEKUNDER


TERAS KM/WC

El. ±0.00 FL El. ±0.00RGA


FL

FL
TIDUR 1 R. TAMU
TIDUR 2 R. KELUA

El. -0.10 FL
300

El. ±0.00 FL El. ±0.00

El. -0.02 FL

El. -0.20 FL TAMAN


TERAS
BELAKANG
El. -0.10 FL
TAMAN
TOKO

600

600
KAMAR

KAMAR

CARPORT
300
450 550 170 330 200 200
TOKO 1500 400 LAHAN KOSONG
450
650

TOKO

JALAN LINGKUNGAN SEKUNDER

JALAN LINGKUNGAN SEKUNDER

TOKO JALAN LINGKUNGAN SEKUNDER

JALAN LINGKUNGAN SEKUNDER


RUMAH WARGA
RUMAH WARGA

No. Uraian Keterangan


TOKO
1. Ruang Terbuka Hijau
(Taman) Luas = 57,91% @Luas Tanah RUMAH WARGA
RUMAH WARGA

2. Jarak As Jalan Terhadap


Bangunan Panjang = 6,5 M
(-6.58185,110.004414)
SITEPLAN 3.
Garis Sempadan Bangunan
SKALA 1 : 300 Terhadap Jalan= 4,5 m
(LINGKUNGAN SEKUNDER)
A B C
600
300 300

140
B III C

6 6

340
TAMAN BELAKANG

450
El. -0.10 FL

5'

KM/WC

160
TERAS El. -0.07 FL
5 El. -0.05 FL
4'

300
KAMAR TIDUR 2
IV II

275
El. ±0.00 FL
R. KELUARGA
El. ±0.00 FL
1500

1500
4
A A

KAMAR TIDUR 1
250

El. ±0.00 FL
R. TAMU

275
El. ±0.00 FL

3
50

2'
TERAS
120

120
El. -0.02 FL
2 2

CARPORT
El. -0.20 FL
TAMAN
330

330
El. -0.10 FL

1 1

B I C
200
300 300
600 DENAH RUANG
A B C SKALA 1 : 100
TAMPAK DEPAN (I)
SKALA 1 : 100

TAMPAK SAMPING KIRI (II)


SKALA 1 : 100
TAMPAK BELAKANG (III)
SKALA 1 : 100

TAMPAK SAMPING KANAN (IV)


SKALA 1 : 100
69 69 69 69

Bubungan Genteng Mantili


Atap Genteng Mantili
+6.01
Lisplank GRC 8x200 mm
Atap Genteng Mantili

79
+5.22 Balok Gewel (12x15)

22
+5.00 Reng Baja Ringan R.40.60 mm
Kuda-Kuda Baja Ringan 2
C.75-0,75 mm (lihat detail)

150
Kuda-Kuda Baja Ringan 1
C.75 - 0,75 mm (lihat detail)
+3.50 Balok B1 (10x20)
Talang Beton (lihat detail)
601

Plafond Gypsum Board Plafond Gypsum Board


+3.30 FL +3.30 FL Ring Balok RB (12 x 15)

Plafond Gypsum Board (lihat detail)

Pas. Dinding Bata Putih 1pc : 6ps


350

Kusen Pintu PJ1 (lihat detail)

+0.80 Lantai Granit 60 x 60 cm'


Rabat Beton K-100 t=5cm'
Kamar Tidur 1 R. Tamu Pasir Urug t=5cm'
±0.00 ±0.00 FL ±0.00 FL
Sloof S1 (15X20)
40

El. Mt. -0.40


Urugan Tanah Padas Peninggian Bangunan
110
70

Pas. Pondasi Batu Belah (Lihat Detail)


-1.10
Pondasi Footplat (Lihat Detail)

300 300
600
A B C

POTONGAN A-A
SKALA 1 : 100
Bubungan Genteng Mantili
+5.22 Atap Genteng Mantili
22

+5.00

Reng Baja Ringan R.40.60 mm


150

Kuda-Kuda Baja Ringan 1


C.75 - 0,75 mm (lihat detail)
+3.50
Lisplank GRC (8x200) mm
Plafond Gypsum Plafond Gypsum Ring Balok RB (12 x 15)
+3.30 FL +3.30 FL Plafond Gypsum Board(lihat detail)
522
270

Pas. Dinding Bata Putih 1pc : 6ps

Pas. Dinding Bata Putih 1pc : 6ps


Lantai Granit 60 x 60 cm'
+0.80

185
Rabat Beton K-100 t=5cm'
Pasir Urug t=5cm'
Kamar Tidur 1 Kamar Tidur 2
80

100

Carport Halaman Belakang


±0.00 ±0.00 FL ±0.00 FL -0.10 FL
-0.20 FL Sloof S1 (15X20)
70 20 20

-0.20
El. Mt. -0.40
Urugan Tanah Padas Peninggian Bangunan
110

Pas. Pondasi Batu Belah (Lihat Detail)


-1.10
Pondasi Footplat (Lihat Detail)

500 250 300 450


1500
1 3 4 5 6

POTONGAN B-B
SKALA 1 : 100
89 89 89 89 89 89

Bubungan Genteng Mantili


+6.01 Atap Genteng Mantili
46

+5.55
Balok Gewel (12x15)

Kuda-Kuda Baja Ringan 2


155

C.75 - 0,75 mm (lihat detail)

+4.00
2212 66

Ring Balok RB (12 x 15)


+3.34
+3.22 Plafond Gypsum Board(lihat detail)
601

+3.00 Plafond Gypsum


+3.30 FL
Atap Plat Beton t = 12cm (lihat detail)
125

38
Pas. Dinding Bata Putih 1pc : 6ps
+1.75 Kusen Pintu P2 (Lihat Detail)
Pas. Dinding Bata Putih 1pc : 6ps
Lantai Granit 60 x 60 cm'
Rabat Beton K-100 t=5cm'
175

Pasir Urug t=5cm'


Halaman Belakang Teras R. Keluarga Teras Taman
±0.00 -0.10 FL -0.05 FL ±0.00 FL ±0.02 FL -0.10 FL Sloof S1 (15X20)
70 40

El. Mt. -0.40


Urugan Tanah Padas Peninggian Bangunan
110

Pas. Pondasi Batu Belah (Lihat Detail)


-1.10
Pondasi Footplat (Lihat Detail)

500 550 450


1500
6 4' 2' 1

POTONGAN C-C
SKALA 1 : 100
A B C
600
300 300

140

6 6

340
450
BV
5'
P2

160
5
J2 J2 PJ1
4'

300

275
P1
1500

1500
4

P1
250

275
3
J2 J2
50

2'
P1 J1 J1
120

120
2 2
330

330
1 1

200
300 300
600 DENAH PENEMPATAN KUSEN
A B C SKALA 1 : 100
+2.30 +2.30 +2.29

4
4

4
Kaca
Bening

150

142
Tempered
8 mm
230

230
226

226
+0.80

4
±0.00 ±0.00 ±0.00

4 90 4
4 42 4 90 4
DETAIL PINTU P1 DETAIL PINTU PJ1
SKALA 1 : 25 SKALA 1 : 25 145

Jumlah 3 Unit Jumlah 1 Unit


Kusen Alluminium 1,75"x4" Fabricated Color Anodized Putih Kusen Alluminium 1,75"x4" Fabricated Color Anodized Putih
Pintu Daun Pintu Lapis HPL Pintu Daun Pintu Lapis HPL
Bouven - Jendela Daun Jendela Rangka Alumunium, Kaca Bening 8mm
Engsel Pintu 3 x 3 = 6 Bh Engsel Pintu 1 x 1 = 1 Bh
Kunci Pintu Tanam 2x Putaran Komplit 1 x 3 = 3 Bh Kunci Pintu Tanam 2x Putaran Komplit 1 x 1 = 1 Bh
Handel 1 x 3 = 3 Psg Handel 1 x 1 = 1 Psg
Grendel Pintu - Grendel Pintu -
+2.05 +2.30

4
4

172
180
Kaca Bening

204
200
8 mm

+0.50

4
±0.00

4 50 4

58
DETAIL JENDELA J1
SKALA 1 : 25

Jumlah 2 Unit
Kusen Alluminium 1,75"x4" Fabricated Color Anodized Putih
Jendela Daun Jendela Alumunium, Kaca Bening 8mm

4 70 4 Bouven -
DETAIL PINTU P2 Engsel Jendela 2 x 2 = 4 Bh
SKALA 1 : 25 Kait Angin -
Gerendel Jendela 1 x 2 = 2 Bh
Jumlah 1 Unit
Kusen Alluminium 1,75"x4" Fabricated Color Anodized Putih
Pintu Daun Pintu Alumunium Strip
Bouven -
Engsel Pintu 3 x 1 = 3 Bh
Kunci Pintu Tanam 2x Putaran Komplit 1 x 1 = 1 Bh
Handel 1 x 1 = 1 Psg
Grendel Pintu -
+2.30

4
+2.30

4
Kaca Buram

40
48
6 mm
Kaca Bening

142
150
+1.82
8 mm

4
4 60 4

68

+0.80 DETAIL BOVEN BV

4
SKALA 1 : 25

Jumlah 1 Unit
Kusen Alluminium 1,75"x4" Fabricated Color Anodized Putih
Bouven Kaca Buram 6mm
4 50 4 Engsel Jendela -
58 Kait Angin -
DETAIL JENDELA J2 Gerendel Jendela -
SKALA 1 : 25

Jumlah 4 Unit
Kusen Alluminium 1,75"x4" Fabricated Color Anodized Putih
Jendela Daun Jendela Alumunium, Kaca Bening 8mm

Bouven -
Engsel Jendela 2 x 4 = 8 Bh
Kait Angin -
Grendel Jendela 1 x 4 = 4 Bh
A B C
600
300 300

140

6 6

340
450
5'
4
2

160
1 El. -0.07 FL
5 El. -0.05 FL 4 4
4'

300
1

275
El. ±0.00 FL

1
1500

1500
4 El. ±0.00 FL

1
250

El. ±0.00 FL

275
3
50

2'
1
120

120
El. -0.02 FL
2 2

3
El. -0.20 FL
330

330
Kode Keterangan
1 Lantai Granit uk. 60 x 60 cm
2 Lantai Keramik Kasar uk. 30 x 30 cm
1 1
3 Lantai Rabat Beton K-175
4 Keramik Dinding uk. 25x40 cm, t = 160 cm
200
300 300
600 DENAH POLA LANTAI
A B C SKALA 1 : 100
A B C
600
300 300

140

6 6

340
450
5'

160
2
El. 2.83 FL
5 El. 3.10 FL
4'
300

275
El. +3.30 FL
Hollow Metal Furing 40x40 mm
1500

1500
4

Hollow Metal Furing 40x40 mm


1
250

El. +3.30 FL

275
3
50

2'
2
120

120
El. +2.88 FL
2 2
330

330
Kode Keterangan
1 Plafond Gypsumboard t = 9 mm + List Gypsum Lebar 8 cm , Finish Cat
Rangka Hollow Metal Furing 40x40 mm , Modul 60x60 cm
1 1
2 Plat Beton Finish Compound

200
300 300
600 DENAH PLAFOND
A B C SKALA 1 : 100
60 60

Rangka Hollow Metal Furring


Plafond Gypsumboard t = 9 mm
List Gypsum
Pas. Dinding Hebel

Plesteran + acian + finishing cat

DETAIL PLAFOND
SKALA 1 : 10
GAMBAR KERJA STRUKTUR
PERIJINAN BANGUNAN GEDUNG RUMAH TINGGAL 1 LANTAI
DAFTAR GAMBAR STRUKTUR

NO. KODE NAMA GAMBAR SKALA KETERANGAN

- - COVER GAMBAR NTS


- - DAFTAR GAMBAR NTS
1 STR DENAH FOOTPLAT 1 : 100
2 STR DENAH PONDASI BATU BELAH 1 : 100
3 STR DETAIL FOOTPLAT FP 1 & FP 2 1 : 20
4 STR DETAIL PONDASI P1 & P2 1 : 25
5 STR DENAH RENCANA SLOOF 1 : 100
6 STR DENAH PENEMPATAN KOLOM 1 : 100
7 STR DENAH BALOK LATEU 1 : 100
8 STR DENAH RING BALOK 1 : 100
9 STR DETAIL PEMBESIAN 1 : 20
10 STR DENAH PLAT DAK 1 : 100
11 STR DENAH RANGKA ATAP 1 : 100
12 STR DETAIL KUDA-KUDA 1 1 : 40
13 STR DETAIL KUDA-KUDA 2 1 : 25
14 STR DETAIL PEMBESIAN PLAT DAK 1 : 20
A B C
600
300 300

140

6 6

340
450
5'

FP1 (70X70) FP2 (70X70)

160
5

FP2 (70X70) FP1 (70X70) 4'

FP1 (70X70) FP2 (70X70)


300

275
1500

1500
4

FP2 (70X70) FP1 (70X70)


FP2 (70X70)
250

275
3
50

FP2 (70X70) 2'


120

120
FP1 (70X70) FP2 (70X70)

2 2

FP1 (70X70) FP1 (70X70)


330

330
Kode Keterangan Jumlah
FP1 Footplat Type 1 uk. 70 x 70 cm 7 bh
FP2 Footplat Type 2 uk. 70 x 70 cm 7 bh
1 1

200
300 300
600 DENAH FOOTPLAT
A B C SKALA 1 : 100
A B C
600
300 300

140

6 Pondasi P2 6

Pondasi P2

340
Pondasi P2
450
Pondasi P1 5'

Pondasi P1

Pondasi P1
Rollag Bata Putih

160
5 Pondasi P1
Pondasi P1 Pondasi P1 4'

Pondasi P1

Pondasi P1
300

275
III I
1500

1500
4 Pondasi P1
Pondasi P1

Pondasi P1

Pondasi P1
250

275
3 Pondasi P1
50

Pondasi P1 2'
Pondasi P2

Pondasi P2
120

120
II

2 Pondasi P2 2

Pondasi P2
Pondasi P2
330

330
1 1

200
300 300
600 DENAH PONDASI BATU BELAH
A B C SKALA 1 : 100
25 25

±0.00 ±0.00

40 Sloof 15/20 Sloof 15/20

40
El. MT -0.40 El. MT -0.40
100

100
3 Ø 10 3 Ø 10
60

60
Ø6 - 150 Ø6 - 150

El. MT -1.00 El. MT -1.00


Ø10 - 150 Ø10 - 150
20

20
Ø10 - 150 Ø10 - 150
30

30
-1.20 -1.20
-1.25 Lantai Kerja t = 5 cm -1.25 Lantai Kerja t = 5 cm
5 5

5 5
-1.30 Pasir Urug t = 5 cm -1.30 Pasir Urug t = 5 cm

70 70

Ø10-150
Ø10-150

Ø10-150 Ø10-150
25

25
70

70
Ø10-150 Ø10-150

Ø10-15 Ø10-150

25 25
70 70

DETAIL FOOTPLAT FP 1 (70 X 70) DETAIL FOOTPLAT FP 2 (70 X 70)


SKALA 1 : 20 SKALA 1 : 20
Lantai Granit (60x60) cm' + Spesi Lantai Granit (60x60) cm' + Spesi
Rabat Beton K-100 t=5cm' Rabat Beton K-100 t=5cm'
KAMAR TIDUR 2 R. KELUARGA Pasir Urug t=10cm' TERAS Pasir Urug t=10cm'
±0.00 ±0.00 FL ±0.00 FL ±0.00 -0.02 FL
-0.02
CARPORT

20

18
Sloof S1 (15X20) -0.20 FL Sloof S1 (15X20)
-0.20
Urugan Tanah Padas Urugan Tanah Padas
El. MT -0.40 El. MT -0.40
110

110
70

70
Pas. Pondasi Batu Belah Pas. Pondasi Batu Belah

-0.90 -0.90
Pas. Batu Kosong Pas. Batu Kosong
15

15
-1.05 -1.05
-1.10 Pasir Urug t = 5 cm -1.10 Pasir Urug t = 5 cm
5

5
30 30
60 50
70 60
DETAIL PONDASI P1 (I) DETAIL PONDASI P2 (II)
SKALA 1 : 25 SKALA 1 : 25

Rabat Beton K-100 t=5cm'


Lantai Granit (60x60) cm' + Spesi
KAMAR TIDUR 2 Pasir Urug t=10cm'
±0.00 ±0.00 FL
20

Sloof S1 (15X20)

Urugan Tanah Padas


El. MT -0.40
110
70

Pas. Pondasi Batu Kali

-0.90
Pas. Batu Kosong
15

-1.05
-1.10 Pasir Urug t = 5 cm
5

30
60
65
DETAIL PONDASI P1 (III)
SKALA 1 : 25
A B C
600
300 300

140

6 6
S1 (15 x 20)

S1 (15 x 20)
S1 (15 x 20)

340
450
5'
S1 (15 x 20)

160
5
S1 (15 x 20)
4'
S1 (15 x 20)

S1 (15 x 20)
300

275
S1 (15 x 20)

S1 (15 x 20)
1500

1500
4
S1 (15 x 20)
S1 (15 x 20)
250

275
3
50

S1 (15 x 20)
2'
S1 (15 x 20)
120

120
2 2
S1 (15 x 20)
S1 (15 x 20)

S1 (15 x 20)
330

330
Kode Keterangan Jumlah
S1 Sloof Type 1 uk. 15 x 20 cm -

1 1

200
300 300
600 DENAH SLOOF
A B C SKALA 1 : 100
A B C
600
300 300

140

6 6
Kp (12 x 12) Kp (12 x 12) Kp (12 x 12)

340
450
5'
Kp (12 x 12) Kp (12 x 12)

160
5
Kp (12 x 12) Kp (12 x 12)
4'
Kp (12 x 12) Kp (12 x 12) Kp (12 x 12)
300

275
1500

1500
4
Kp (12 x 12) Kp (12 x 12)
Kp (12 x 12)
250

275
3
50

Kp (12 x 12) Kp (12 x 12)


2'
Kp (12 x 12) Kp (12 x 12)
120

120
2 2
K1 (12 x 25) K1 (12 x 25)
330

330
Kode Keterangan Jumlah
Kp Kolom praktis uk. 12 x 12 cm 19 bh
K1 Kolom Type 1 uk. 12 x 25 cm 2 bh
1 1
Kp (12 x 12) Kp (12 x 12)

200
300 300
600 DENAH KOLOM
A B C SKALA 1 : 100
A B C
600
300 300

140

6 6

340
450
5'
BL (12 x 15)

BL (12 x 15)

160
5
BL (12 x 15)
4'
BL (12 x 15)
300

BL (12 x 15)

275
1500

1500
4

BL (12 x 15)
250

275
3
BL (12 x 15)
50

2'
BL (12 x 15)
120

120
2 2
330

330
Kode Keterangan Jumlah
BL Balok Lateu uk. 12 x 15 cm -

1 1

200
300 300
600 DENAH BALOK LATEU
A B C SKALA 1 : 100
A B C
600
300 300

140

6 6

340
450
5'

160
5
RB (12 x 15)
4'
RB (12 x 15)

RB (12 x 15)
300

275
RB (12 x 15)

B1 (10 x 20)

RB (12 x 15)
1500

1500
4
RB (12 x 15)
RB (12 x 15)
250

275
3
RB (12 x 15)
50

2'
120

120
2 2
330

330
Kode Keterangan Jumlah
RB Ring Balok Type 1 uk. 12 x 15 -
B1 Balok Type 1 uk. 10 x 20 -
1 1

200
300 300
600 DENAH RING BALOK
A B C SKALA 1 : 100
POTONGAN POTONGAN POTONGAN
15 15 12 12 12 12

2.5

2.5
Ring Balok RB

2
SLOOF S1 Balok Lateu BL
20

20

15

15

15

15
2.5 2.5 2 2 2 2
UKURAN UKURAN UKURAN
(15 x 20) (12 x 15) (12 x 15)
Tulangan Atas 2Ø10 2Ø10 Tulangan Atas 2Ø10 2Ø10 Tulangan Atas 2Ø10 2Ø10
Tulangan Bawah 2Ø10 2Ø10 Tulangan Bawah 2Ø10 2Ø10 Tulangan Bawah 2Ø10 2Ø10
Sengkang/Beugel Ø8-150 Ø8-150 Sengkang/Beugel Ø8-150 Ø8-150 Sengkang/Beugel Ø8-150 Ø8-150
Peminggang - - Peminggang - - Peminggang - -
Posisi Tumpuan Lapangan Posisi Tumpuan Lapangan Posisi Tumpuan Lapangan

DETAIL SLOOF S1 DETAIL RING BALOK (RB) DETAIL BALOK LATEU (BL)
SKALA 1 : 20 SKALA 1 : 20 SKALA 1 : 20

POTONGAN POTONGAN POTONGAN


15 10 10
12

2
Balok Type 1 B1

2
KOLOM Kp KOLOM K1
2

20

20
12

25
2 UKURAN 2 2
UKURAN UKURAN 2
(10 x 20)
(12 x 12) (15 x 25) Tulangan Atas 2Ø10 2Ø10
Tulangan Utama 4Ø10 Tulangan Utama 4Ø10 Tulangan Bawah 2Ø10 2Ø10
Sengkang/Beugel Ø8-150 Ø8-150 Sengkang/Beugel Ø8-150 Ø8-150 Sengkang/Beugel Ø8-150 Ø8-150
Peminggang - Peminggang 2Ø10
- Peminggang 2Ø8 2Ø8
Posisi Tumpuan Lapangan Posisi Tumpuan Lapangan Posisi Tumpuan Lapangan

DETAIL KOLOM Kp DETAIL KOLOM K1 DETAIL BALOK TALANG (BT)


SKALA 1 : 20 SKALA 1 : 20 SKALA 1 : 20
A B C
600
300 300

140

6 6

340
450
5'

160
5
4'

t=12cm'

300
P1+3.22 FL

275
1500

1500
4
250

275
3
50

2'
120

120
2 2

t=12cm'
P2 +3.00 FL
330

330
1 1

200
300 300
600 DENAH PLAT DAK BETON
A B C SKALA 1 : 100
A B C
600
300 300

140

6 6
Genteng Mantili
Lisplank GRC (8x200) mm
Kuda-Kuda Baja Ringan 1
C.75-0,75 mm (lihat detail)
Reng Baja Ringan R.40.60

340
Kuda-Kuda Baja Ringan 2
C.75-0,75 mm (lihat detail)

450
Reng Baja Ringan R.40.60
Atap Plat Beton t=12cm
(lihat detail)
5'

160
5
4'

89
300

275
89
89
1500

1500
4

89
250

89
275
89
3
50

2'
120

120
2 2

Atap Plat Beton t=12cm (lihat detail)


Lisplank GRC 8x200 mm
330

330
Kuda-Kuda Baja Ringan 2
C.75-0,75 mm (lihat detail)
Reng Baja Ringan R.40.60 mm

1 1

200
300 300
600 DENAH RANGKA ATAP
A B C SKALA 1 : 100
75 50 50 50 50 50 50 50 50 75

Top Bubungan Atap


+5.22 Bubungan Genteng Mantili
22

+5.00 Atap Genteng Mantili

Reng Baja Ringan R.40.60 mm


364
172

Kuda-Kuda Baja Ringan


150

C.75 - 0,75 mm
Baja Ringan C.75 - 0,75 mm

Baja Ringan C.75-0,75 mm


25°

Top Ring Balok


+3.50 Lisplank GRC (8x200) mm

Plafond Gypsum Plafond Gypsum Ring Balok RB (12 x 15)


+3.30 FL +3.30 FL
Plafond Gypsum Board(lihat detail)

250 300
550

DETAIL KUDA-KUDA 1
SKALA 1 : 40
65 47 50 50 50 55 40

Top Ring Balok


+6.01 Lisplank GRC (8x200) mm

46
Atap Genteng Mantili

Top Ring Balok Balok Gewel (12x15)

+5.55 Reng Baja Ringan R.40.60 mm


372

Baja Ringan C.75 - 0,75 mm


201

Baja Ringan C.75 - 0,75 mm


155

Baja Ringan C.75-0,75 mm

30°
Lisplank GRC (8x200) mm

Top Ring Balok


Talang Beton t =10 cm (Lihat Detail)
+4.00
Balok B1 (10x20)

Ring Balok RB (12 x 15)

Plafond Gypsum
+3.30 FL

Plafond Gypsum Board(lihat detail)

243 10 25 15
300

DETAIL KUDA-KUDA 2
SKALA 1 : 25
Plat Beton Atap Finish Waterproof
P1 (t=12cm')
Ø10-150
+3.22 Ø10-150
12

+3.10 Balok B1 (10X20)


8

+3.02

Kolom Kp (12x12) cm
+4.30

Balok B1 10/20 cm

30
Plat Talang Beton
+4.00 (t=10cm')

60
150 Ø10-150

10
Ø8-150

10
+3.80
2Ø8
DETAIL PEMBESIAN PLAT KAMAR MANDI T=12 CM' EL. +3.22 FL

10
+3.70 Balok B1 (10/20) cm
SKALA 1 : 20

2 Ø 10

Plat Beton Atap Finish Waterproof


P2 (t=12cm')
Ø10-15
+3.00 Ø10-15
DETAIL PEMBESIAN TALANG BETON T=10 CM' EL. +4.00 FL
12

SKALA 1 : 20
+2.88
Balok B1 (10X20)
8

+2.80
Kolom K1 (12X25)

120

DETAIL PEMBESIAN PLAT TERAS T=12 CM' EL. +3.00 FL


SKALA 1 : 20
GAMBAR KERJA MEKANIKAL ELEKTRIKAL
PERIJINAN BANGUNAN GEDUNG RUMAH TINGGAL 1 LANTAI
DAFTAR GAMBAR MEKANIKAL ELEKTRIKAL

NO. KODE NAMA GAMBAR SKALA KETERANGAN

- - COVER GAMBAR NTS


- - DAFTAR GAMBAR NTS
1 ME DENAH INSTALASI LISTRIK 1 : 100
2 ME DENAH INSTALASI AIR BERSIH 1 : 100
3 ME DENAH INSTALASI AIR KOTOR 1 : 100
4 ME DENAH JARINGAN AIR HUJAN ( ATAP ) 1 : 100
5 ME DENAH DETAIL SEPTICTANK & PERESAPAN 1 : 15
6 ME DETAIL A-A (SEPTICTANK & PERESAPAN) 1 : 25
7 ME DENAH PENEMPATAN APAR 1 : 100
8 ME DENAH JALUR EVAKUASI 1 : 100
A B C
600
300 300

140

6 6

340
450
5'

Sg

160
DL
5 LB
4'
ST
ST
300

DL
Sk

275
DL
1500

1500
4

Sg
Sk
250

DL
ST DL

275
SIMBOL KETERANGAN JUMLAH
3
MCB Instalasi Titik Lampu, Stop Kontak 10 Titik
50

2' Stop Kontak Standar 3 bh

SG ST Sk
ML Saklar Tunggal 2 bh
120

120
LB Saklar Ganda 2 bh
DL Downlight Inbow + Lampu Bohlam 15 Watt 5 bh
2 2 LB Lampu Bohlam 15 Watt 2 bh
ML Meteran Listrik 1 bh
MCB Panel Listrik (MCB) 1 bh

: Listrik menggunakan daya PLN 1300 VA


: Penyambungan dari Kabel PLN
330

330 Ke Meter Listrik Diteruskan ke Panel Listrik


: Tinggi Stop Kontak = 140cm dari elevasi lantai
: Tinggi Saklar = 140cm dari elevasi lantai
: Kabel : NYM 2x1,5 mm
1 1

200
300 300
600 DENAH INSTALASI LISTRIK
A B C SKALA 1 : 100
A B C
600
300 300

140

6 6

340
450
Ke Tandon Dari Tandon
5'
Pompa Air CD

160
5
PA SH
FD
4'
300

275
1500

1500
4

Air Bersih PVC Ø1"


Air Bersih PVC Ø1"
250

275
3
50

2'
120

120
SIMBOL KETERANGAN JUMLAH
2 2
WD Closet Duduk 1 bh
SH Shower 1 bh
PA Pompa Air 1 bh
Air Bersih PVC Ø1"

FD Floor Drain 1 bh
KR Kran Air 1 bh
330

330

Keterangan :
KR
- Sumber Air Bersih dari TOWER KOMUNAL disalurkan ke TANDON kapasitas 500 liter
- Pipa Kran Air 3 4 "
- Pipa Jalur Air 1"
1 1
Dari TOWER KOMUNAL

200
300 300
600 DENAH INSTALASI AIR BERSIH
A B C SKALA 1 : 100
A B C
600
300 300

140

6 6

340
450
5'

160
5
4'

300

275
Ø4"
PVC

"
Ø2.5
r
oto
1500

1500
4

PVC
Air k

otor
Air k
250

275
3
50

2'
Septictank
(Lihat Detail)
120

120
2 2

Peresapan
(Lihat Detail)
330

330
TOWER KOMUNAL disalurkan ke TANDON kapasitas 500 liter

1 1

200
300 300
600 DENAH INSTALASI AIR KOTOR
A B C SKALA 1 : 100
A B C
600
300 300

140

6 6

340
450
5'

160
5
4'

300

275
1500

1500
4
250

275
Talang Air
Hujan
3
50

2'
Roof Drain
120

120
2 2
330

330
Pipa PVC Air Hujan
Ø 2,5"

1 1
Drainase

200
300 300
600 DENAH INSTALASI AIR HUJAN
A B C SKALA 1 : 100
150

DARI KLOSET DARI SEPTICTANK

A A

100 100

LEGENDA: DENAH SAPTICTANK & PERESAPAN


SKALA 1 : 15
: Buis beton tb 4,5 cm

: Garis as

: Garis potongan

: Arah aliran air

A : Arah potongan
20
4 15 70

PLAT TUTUP BETON TEBAL 4 CM


PLAT BETON TEBAL 10 CM
BESI POLOS Ø 10 - 15
25 BESI POLOS Ø 8 - 15

10

50 50 45

20
DARI KLOSET
214 150 50 50 150
30
PIPA PVC 4"

50 50 55

15 8
5
8 URUGAN PASIR
LAPISAN IJUK
RABAT BETON K-100
URUGAN PASIR URUGAN KRICAK
TANAH ASLI PIPA PVC 4" + DILUBANGI
5 100 5 50 5 100 5
268

DETAIL A-A
SKALA 1 : 25
A B C
600
300 300

140

6 6

340
450
5'

160
5
4'

300 A

275
1500

1500
4
250

275
3
50

2'
120

120
2 2
330

330
1 1 SIMBOL KETERANGAN JUMLAH
A Apar ABC powder 3 kg 1 Bh

200
300 300
600 DENAH PENEMPATAN APAR
A B C SKALA 1 : 100
A B C
600
300 300

140

6 6

340
450
5'

160
5
4'

300

275
1500

1500
4
250

275
3
50

2'
120

120
2 2
330

330
1 1

200
300 300
600 DENAH JALUR EVAKUASI
A B C SKALA 1 : 100

Anda mungkin juga menyukai