Autocad Rafli
Autocad Rafli
SELASAR
- 0.05
R.DAPUR
“ R.TIDUR
“
A WC/KM
- 0.05
A
R. TAMU
“
R.TIDUR
“
TERAS
- 0.05
B
DENAH
1:100
KETERANGAN
RUMAH TINGGAL tipe 45
ELV + 6,03
ELV + 5,05
ELV + 3,80
ELV± 0,00
ELV-0,45
ELV-1,20
POTONGAN A-A
1:100
KETERANGAN
RUMAH TINGGAL tipe 45
KETERANGAN
RUMAH TINGGAL tipe 45
ELV + 5,92
ELV + 3,80
DETAIL A
(/9 “
ELV ± 0,00
ELV -0.05 ELV -0.05
ELV-0,45
SL. 18/20
PONDS. Batu kali
ELV-1,20
POTONGAN B-B
1:100
KETERANGAN
RUMAH TINGGAL tipe 45
ELV + 5,92
ELV + 3,80
DETAIL A
(/9 “
ELV ± 0,00
ELV -0.05 ELV -0.05
ELV-0,45
SL. 18/20
PONDS. Batu kali
ELV-1,20
POTONGAN B-B
1:100
KETERANGAN
RUMAH TINGGAL tipe 45
KETERANGAN
RUMAH TINGGAL tipe 45
Sloof 18/20
2,35
3,25
1,40
KP KP KP
II
3,00
I
III
3,00
1,20
pas, batu-bata 1:2
KT
DENAH PONDASI
1:100
KETERANGAN
RUMAH TINGGAL tipe 45
40
ANSTAMPING
20 20
PASIR URUG
18
35 20
60
39
10
5
60
70
DETAIL PONDASI I
1:20
KETERANGAN
RUMAH TINGGAL tipe 45
4,98
8,48
4,20
0,70
DETAIL ATAP
1:100
KETERANGAN
RUMAH TINGGAL tipe 45
0.60
0.70
0,05
0,05
0.20
0.20
SELASAR
- 0.05
j.2
2.15
2.10
R.DAPUR p.2 j.2
“ R.TIDUR
“
WC/KM p.2
v
- 0.05 p.3
detail kosen p.1 detail kosen p.2
1:50 1:50
R. TAMU
p.2 5 Cm
“
p.1
R.TIDUR 70 Cm
“
20
70 Cm 70 Cm
Cm
j.1
TERAS
j.2 - 0.05 20 Cm
160
Cm
120 Cm
Oleh
210110112
A6
2022
BACK UP DATA/PERHITUNGAN VOLUME
1 2 3 4 5
I PEKERJAAN PERSIAPAN
1 Pekerjaan Pembersihan Lapangan
Volume = P x L
= 9.45 x 9.50
9.5000
89.78 m²
9.4500
2 Pengukuran Bowplank
Volume = P1 + P2 + P3 + P4 + L1 + L2 + L3 + L4
= + 3.20 + 1.20 + 7.45 + 7.50 + 1.25 + 3.25 + 3.00
7.5000
3.25
3.2500
6.7500
30.10 m²
4.2000
22.63 m³
0.7500 0.7000
2 Urugan Pasir Alas Pondasi
Volume = P x L x T
43.10 x 0.70 x 0.05
1.51 m³
0.7000
0.0500
0,70
4 Pasangan Pondasi Batu kali
Volume = P x L x T
43.10 x (0.1+0.3/2) x 0.75
0,75
8.08 m³
0.10
0,30
1.55 m³
20
2Ø12
18
IV PEKERJAAN KOSEN KAYU PINTU & JENDELA
1 Kusen Pintu
Type P1 + Ventilasi
Volume = P x L x T
= 2.10 x 1.00 x 0.05
= 0.11 0,05
0.20
100 Cm
Ventilasi 5 Cm 5 Cm
Volume = P x L x T 0,05
0.60
2.10
Jumlah Unit = 2.00
0,05
= 2.00 x 0.14
0.20
= 0.27
- Type Pintu P2
Volume = P x L x T
= 2.15 x 1.00 x 0.20
= 0.43
0.20
Ventilasi
Volume = P x L x T
= 0.70 x 1.00 x 0.20
2.15
0.70
= 0.14 1.71 m³
Jumlah Unit = 3.00
= 3.00 x 0.57
0.20
= 1.71
2 Jendela
Jendela J2 + Ventilasi
Volume = P x L x T
1.20 x 2.30 x 0.20
= 0.55 70 Cm
Ventilasi 20 Cm
Volume = P x L x T 2.62 m³
= 0.70 x 2.30 x 0.20
= 0.32
120 Cm
Volume = P x L x T
= 1.60 x 2.30 x 0.20
= 0.74 5 Cm
Ventilasi 70 Cm
= P x L x T 1.06 m³
= 0.70 x 2.30 x 0.20 20 Cm
= 0.32
Ventilasi 3
= P x L x T
0.70 x 1.20 x 0.20 0.17 m³
- 3.85 m³
= 2.10
0.20
Jumlah Unit = 1.00
= 1.00 x 2.10
2.10
- = 2.10 2.10 m²
- Pintu P2
Volume = L x T
= 1.00 x 2.15
0.20
= 2.15
2.15
= 6.45 6.45 m²
2 Daun Jendela
Daun Jendela 1
5 Cm
Volume = L x T
70 Cm
= 2.30 x 1.60
= 3.68
20 Cm
160 Cm
3.68 m²
= 3.68
Daun Jendela 2
Volume = L x T
= 2.30 x 1.30
= 2.99 70 Cm
Total 23.27 m²
VI PEKERJAAN PASANGAN DAN PLASTERAN
1 Pasangan Dinding Bata 1 : 4
1 Dinding A
Volume = P x T
= 7.50 x 4.25
= 31.88
Pintu 1 = P x T
= 1.00 x 2.10
= 2.10
Jumlah Unit = 1.00
= 1.00 x 2.10
= 2.10
Ventilasi P1 = P x T
= 1.00 x 0.60
= 0.60
Jumlah Unit = 1.00
= 1.00 x 0.60
= 0.60
23.34 m²
Jendela 1 = P x T
= 2.30 x 1.60
= 3.68
Jumlah Unit = 1.00
= 1.00 x 3.68
= 3.68
Jendela 2 = P x T
= 2.30 x 1.20
= 2.76
Jumlah Unit = 1.00
= 1.00 x 2.76
= 2.76
Pintu 2 = P x T
= 1.00 x 2.15
= 2.15
Jumlah Unit = 1.00
= 1.00 x 2.15
= 2.15
Ventilasi P2 = P x T
2 = 1.00 x 0.70
26.27 m²
= 0.70
Jumlah Unit = 1.00
= 1.00 x 0.70
= 0.70
Jendela 2 = P x T
= 2.30 x 1.20
= 2.76
3 Dinding c
Volume = P x T
= 7.45 x 4.25
= 31.66
Ventilasi 3 = P x T
= 1.20 x 0.70 30.82 m²
= 0.84
4 Dinding D
Volume = P x T
= 7.45 x 4.25
= 31.66
Jendela 2 = P x T
= 2.30 x 1.20
= 2.76
Jumlah Unit = 1.00
= 1.00 x 2.76
= 2.76
Ventilasi = P x T 27.29 m²
= 2.30 x 0.70
= 1.61
Jumlah Unit = 1.00
= 1.00 x 1.61
= 1.61
Jumlah 107.72 m²
2 Plasteran 1:2
Volume = P x T x t
= 43.10 x 0.50 x 0.02
= 0.43
0.05
0.5 0.05
3 Plasteran 1:4
Volume = P x T x t
= 43.10 x 4.25 x 0.02
= 3.66
3.66 m²
VII PEKERJAAN LANTAI
1 Urugan Pasir Bawah Lantai
Kamar Tidur 1
Volume = P x L x T
= 3.00 x 3.00 x 0.05
= 0.45
Kamar Tidur 2
Volume = P x L x T
= 3.15 x 3.25 x 0.05
= 0.51
Ruang Tamu
Volume = P x L x T
= 3.00 x 3.25 x 0.05
= 0.49
2.46 m3
Dapur
Volume = P x L x T - Volume WC
= 4.35 x 3.75 x 0.05 - 0.13
= 0.69
Teras
Volume = P x L x T
= 3.25 x 1.20 x 0.05
= 0.20
Kamar Tidur 2
40
Volume = P x L
= 3.15 x 3.25
= 10.24
45.30 m2
Keramik
40
Ruang Tamu
Volume = P x L
=
=
3.00
9.75
x 3.25
40 x 40
Dapur
Volume = P x L
= 4.35 x 3.75
= 16.31
Keramik
25
2.59 m2
25 x 25
5 Keramik Dinding 25/40 cm WC
Volume Dinding
= L x T
= 1.85 x 1.60
= 2.96
= 2.96 x 2.00
= 5.92
25
Volume Bak Mandi
= L x T
= 0.80 x 0.60
= 0.48 7.84 m2
Keramik
40
Jumlah Sisi = 4.00
=
=
4.00
1.92
x 0.48 25 x 40
Volume Top Bak Mandi
= 1.85 x 0.10
= 0.19
VII PEKERJAAN ATAP DAN PLAFOND
1 Rangka Kuda-kuda Kayu Klas I
Bentang kuda kuda = 8.50
julah kuda kuda =
Pekerja sokong
Jumlah sokong = 2.00
Dimensi kayu = 0.05 = 0.10
Panjang sokong = 1.70
Total panjang = 3.40
volume 5 = 0.05 x 0.10 x 3.40
= 0.02
Gording belakang
Jumlah Gordig = 6.00
Dimensi kayu = 0.05 = 0.10
Panjang gording = 7.50 0.51 m³
Total panjang = 45.00
volume 2 = 0.05 x 0.10 x 45.00
= 0.23
Nok gording
Jumlah Nok Gordig = 1.00
Dimensi kayu = 0.05 = 0.15
Panjang gording = 7.50
Total panjang = 7.50
volume 3 = 0.05 x 0.15 x 7.50
= 0.06
3 Atap SENG
Atap sisi depan
panjang atap = 9.23
lebar sisi miring = 4.85
luas = 9.23 x 4.85 = 44.77 9,23
10.00 m
20.00 m
20.00 m
4 Kran Air
Volume = Jumlah
= 1 bh
1.00 bh
5 Westafel Keramik
Volume = Jumlah
= 1 bh
1.00 bh
6 Klosed Jongkok
Volume = Jumlah
= 1 bh
1.00 bh
Septick Tank
Volume = P x L
= 2.00 x 1.50 137 150
= 3.00 5.00 m²
SEPTICTANK
Skala 1: 25
8 Peresapan
Volume = P x L
= 2.00 x 1.00
= 2.00 80 100
2.00
200
DENAH PERESAPAN
Skala 1: 25
DAFTAR UPAH DAN BAHAN
B. BAHAN
1 Air Liter Harga Pasar
100.00
2 Atap Seng Metal Spandek t= 0,30 mm M2 Harga Toko
60,500.00
3 Atap Seng Metal Spandek t= 0,35 mm M2 Harga Toko
64,900.00
4 Atap Seng Metal Spandek t= 0,40 mm M2 Harga Toko
71,500.00
5 Seng Plat t= 0.40 mm M' Harga Toko
165,000.00
6 Baja Profil Kg Harga Toko
44,000.00
7 Baja Ringan C.75.75 Merk Taso Batang Harga Toko
130,000.00
8 Baja Ringan C.100.100 Merk Star Batang Harga Toko
190,000.00
9 Bata Merah Buah Harga Pasar
700.00
10 Batu Kali (Sungai/ Gunung) M3 Harga Pasar
300,000.00
11 Batu Pecah 2-3 cm M3 Harga Pasar
430,000.00
11 Balok Kayu Klas I M3 Harga Pasar
8,000,000.00
12 Balok Kayu Klas II M3 Harga Pasar
7,500,000.00
13 Balok Kayu Klas III M3 Harga Pasar
5,500,000.00
14 Balok Kayu Klas IV M3 Harga Pasar
4,500,000.00
14 Besi Beton Polos Kg Harga Toko
15,000.00
15 Besi Beton Ulir Kg 15,000.00 Harga Toko
16 Besi Hollow 20x40x2 mm Batang 235,000.00 Harga Toko
17 Besi Hollow 40x40x2 mm Batang 280,000.00 Harga Toko
18 Besi Hollow 60x60x2 mm Batang 365,000.00 Harga Toko
19 Blocboard t= 18 mm Uk. 120 x 240 cm Lembar Harga Toko
270,000.00
20 Cat Dasar Merk Jotun Kg Harga Toko
45,000.00
21 Cat Kayu Dasar Kg Harga Toko
45,000.00
22 Cat Meni Besi Kg Harga Toko
40,000.00
23 Cat penutup / Cat Kayu Mengkilat Kg Harga Toko
65,000.00
24 Cat Tembok Merk Jotun (Interior) Kg Harga Toko
70,000.00
25 Cat Tembok Merk Jotun (Exterior) Anti Fade Kg Harga Toko
125,000.00
26 Cat Tembok Merk Catylac Kg Harga Toko
28,000.00
27 Cat Seng/ Genteng Metal Merk Jotun Kg Harga Toko
(Jotaroof) 68,571.43
28 Closet Duduk/ Monoblock Merk American Unit Harga Toko
Standard 1,650,000.00
29 Closet Jongkok Merk American Standard Unit Harga Toko
350,000.00
30 Dempul Kayu Kg Harga Toko
7,000.00
31 Dolken Kayu ø 8-10 Pj. 4 m Batang 15,000.00 Harga Pasar
32 Engsel Pintu Merk Dekson 4 Inch Bh 105,000.00 Harga Toko
33 Engsel Jendela Merk Dekson 3 Inch Bh 65,000.00 Harga Toko
34 Floor Drain Merk San EI Bh 260,000.00 Harga Toko
35 Granit Uk. 60 x 60 cm (Licin) Bh Harga Toko
43,750.00
36 Granit Uk. 60 x 60 cm (Kasar) Bh Harga Toko
66,250.00
37 Kait Angin Merk Muller Bh 65,000.00 Harga Toko
38 Kalsiboard 4 mm Uk. 120 x 240 cm Lembar Harga Toko
85,000.00
39 Kalsiboard 6 mm Uk. 120 x 240 cm Lembar Harga Toko
155,000.00
40 Karpet, t = 5 mm M2 Harga Toko
150,000.00
41 Kawat Beton Kg Harga Toko
25,000.00
42 Kayu Klas I M3 Harga Pasar
8,000,000.00
43 Kayu Klas II M3 Harga Pasar
7,500,000.00
44 Kayu Klas III M3 Harga Pasar
5,500,000.00
45 Kayu Klas IV M3 Harga Pasar
4,500,000.00
46 Keramik Uk. 40 x 40 cm (Licin) Merk Garuda Doos Harga Toko
65,000.00
47 Keramik Uk. 40 x 40 cm (Kasar) Merk Doos Harga Pasar
Garuda 75,000.00
48 Keramik Uk. 25 x 25 cm Merk Platinum Doos Harga Toko
80,000.00
49 Keramik Uk. 25 x 40 cm Merk Platinum Doos Harga Toko
85,000.00
50 Keramik Uk. 25 x 40 cm Merk Platinum Buah Harga Toko
8,500.00
51 Keramik Uk. 30 x 60 cm Merk Platinum Doos Harga Toko
130,000.00
52 Keramik Uk. 30 x 60 cm Merk Platinum Buah Harga Toko
26,000.00
53 Kertas Amplas Lembar Harga Toko
9,000.00
54 Kerikil Beton (Gravel) M3 Harga Pasar
260,000.00
55 Kerikil Beton (Gravel) Kg Harga Pasar
144.44
56 Kuas Cat Bh Harga Toko
30,000.00
57 Kunci Tanam (Gagang) Merk Dekson Kg Harga Pasar
600,000.00
58 Kunci Tanam (Gagang) Merk Muller Bh Harga Toko
400,000.00
59 Kunci Tanam (Gagang) Merk SES Bh Harga Toko
400,000.00
60 Kunci Slot/ Grendel Jendela Bh Harga Toko
45,000.00
61 Kran Air Merk San EI Bh Harga Toko
220,000.00
62 Kran Spray Kloset Duduk Merk American Bh Harga Toko
Standard 350,000.00
63 List Kayu Profil M' Harga Toko
15,000.00
64 Lem Kg Harga Toko
19,000.00
65 Minyak bekisting Ltr Harga Toko
16,927.00
66 Plamir Kayu Kg Harga Toko
55,000.00
67 Plamir Tembok Kg Harga Toko
35,000.00
68 Pengencer / Minyak Cat Liter Harga Toko
30,000.00
69 Paku Kayu Kg Harga Toko
20,000.00
70 Paku Kalsiboard Kg Harga Toko
30,000.00
71 Parquet Kayu M2 Harga Toko
72 Pasir Pasang /Pasir Beton M3 Harga Pasar
200,000.00
73 Pasir Pasang /Pasir Beton Kg Harga Pasar
142.86
74 Pasir Urug M3 Harga Pasar
166,000.00
75 Perlengkapan Ls
5,000.00
76 Paving Block Berwarna Tebal 6 Cm M2 Harga Toko
75,600.00
77 Pipa PVC Type AW Diameter 1/2" M' Harga Toko
6,034.48
78 Pipa PVC Type AW Diameter 3/4" M' Harga Toko
8,103.45
79 Pipa PVC Type AW Diameter 1" M' Harga Toko
9,827.59
80 Pipa PVC Type AW Diameter 1 1/2" M' Harga Toko
18,103.45
81 Pipa PVC Type AW Diameter 2" M' Harga Toko
25,000.00
82 Pipa PVC Type AW Diameter 2 1/2" M' Harga Toko
31,896.55
83 Pipa PVC Type AW Diameter 3" M' Harga Toko
40,517.24
84 Pipa PVC Type AW Diameter 4" M' Harga Toko
60,344.83
85 Pipa PVC Type AW Diameter 6" M' Harga Toko
120,689.66
85 Sealtape Bh Harga Toko
5,000.00
86 Semen @ 40 kg Zak Harga Toko
66,000.00
87 Semen @ 40 kg Kg Harga Toko
1,650.00
88 Semen Putih Kg Harga Toko
6,000.00
89 Sirtu M3 Harga Pasar
165,000.00
90 Tanah Timbun M3 Harga Pasar
40,000.00
91 Tripleks 4 mm Lembar 135,000.00 Harga Toko
92 Tripleks 6 mm Lembar Harga Toko
165,000.00
93 Tripleks 9 mm Lembar 185,000.00 Harga Toko
94 Vertical Blind M2 125,000.00 Harga Toko
95 Wallpaper M2 Harga Toko
70,000.00
96 Wastafel Tempel Merk American Standard Unit Harga Toko
1,200,000.00
97 Molen perhari Harga Pasar
250,000.00
99 Keramik Uk. 25 x 25 cm Merk Platinum buah Harga Toko
8,000.00
DAFTAR ANALISA HARGA SATUAN
Tenaga :
0.100 OH Tukang @ Rp 140,000.00 Rp 14,000.00
0.100 OH Pekerja @ Rp 100,000.00 Rp 10,000.00
0.010 OH Kepala Tukang @ Rp 170,000.00 Rp 1,700.00
0.005 OH Mandor @ Rp 140,000.00 Rp 700.00
Jumlah Rp 36,780.00
2 PEKERJAAN TANAH
2.1.a 1 m3 Pekerjaan Galian Tanah Biasa Sedalam 1 m (Pondasi Menerus)
Tenaga :
0.750 OH Pekerja @ Rp 100,000.00 Rp 75,000.00
0.025 OH Mandor @ Rp 140,000.00 Rp 3,500.00
Jumlah Rp 78,500.00
Tenaga :
0.300 OH Pekerja @ Rp 100,000.00 Rp 30,000.00
0.010 OH Mandor @ Rp 140,000.00 Rp 1,400.00
Jumlah Rp 230,600.00
3 PEKERJAAN PONDASI
3.1.a 1 m3 Pekerjaan Pasangan Batu Kosong
Bahan :
1.200 m3 Batu Kali @ Rp 300,000.00 Rp 360,000.00
0.432 m3 Pasir Urug @ Rp 166,000.00 Rp 71,712.00
Tenaga :
0.780 OH Pekerja @ Rp 100,000.00 Rp 78,000.00
0.390 OH Tukang Batu @ Rp 140,000.00 Rp 54,600.00
0.039 OH Kepala Tukang @ Rp 170,000.00 Rp 6,630.00
0.039 OH Mandor @ Rp 140,000.00 Rp 5,460.00
Jumlah Rp 576,402.00
Tenaga :
1.500 OH Pekerja @ Rp 100,000.00 Rp 150,000.00
0.750 OH Tukang Batu @ Rp 140,000.00 Rp 105,000.00
0.075 OH Kepala Tukang @ Rp 170,000.00 Rp 12,750.00
0.075 OH Mandor @ Rp 140,000.00 Rp 10,500.00
Jumlah Rp 1,011,200.00
4 PEKERJAAN DINDING
4.1.a 1 m² Pekerjaan Pasangan Dinding 1/2 Bata Merah 1 : 2
Bahan :
60.000 bh Bata Merah @ Rp 700.00 Rp 42,000.00
18.950 kg Semen Portland @ Rp 1,650.00 Rp 31,267.50
0.038 m3 Pasir Pasang @ Rp 200,000.00 Rp 7,600.00
Tenaga :
0.300 OH Pekerja @ Rp 100,000.00 Rp 30,000.00
0.100 OH Tukang Batu @ Rp 140,000.00 Rp 14,000.00
0.010 OH Kepala Tukang @ Rp 170,000.00 Rp 1,700.00
0.015 OH Mandor @ Rp 140,000.00 Rp 2,100.00
Jumlah Rp 128,667.50
Tenaga :
0.300 OH Pekerja @ Rp 100,000.00 Rp 30,000.00
0.100 OH Tukang Batu @ Rp 140,000.00 Rp 14,000.00
0.010 OH Kepala Tukang @ Rp 170,000.00 Rp 1,700.00
0.015 OH Mandor @ Rp 140,000.00 Rp 2,100.00
Jumlah Rp 117,375.00
5 PEKERJAAN PLESTERAN
5.1.a 1 m2 Pekerjaan Plesteran Dinding 1 : 2
Bahan :
10.224 kg Semen Portland @ Rp 1,650.00 Rp 16,869.60
0.020 m3 Pasir Pasang @ Rp 200,000.00 Rp 4,000.00
Tenaga :
0.300 OH Pekerja @ Rp 100,000.00 Rp 30,000.00
0.150 OH Tukang Batu @ Rp 140,000.00 Rp 21,000.00
0.015 OH Kepala Tukang @ Rp 170,000.00 Rp 2,550.00
0.015 OH Mandor @ Rp 140,000.00 Rp 2,100.00
Jumlah Rp 76,519.60
5.1.b 1 m2 Pekerjaan Plesteran Dinding 1 : 4
Bahan :
6.240 kg Semen Portland @ Rp 1,650.00 Rp 10,296.00
0.024 m3 Pasir Pasang @ Rp 200,000.00 Rp 4,800.00
Tenaga :
0.300 OH Pekerja @ Rp 100,000.00 Rp 30,000.00
0.150 OH Tukang Batu @ Rp 140,000.00 Rp 21,000.00
0.015 OH Kepala Tukang @ Rp 170,000.00 Rp 2,550.00
0.015 OH Mandor @ Rp 140,000.00 Rp 2,100.00
Jumlah Rp 70,746.00
6 PEKERJAAN BETON
6.1.a 1 m3 Pekerjaan Beton Cor Bertulang Camp. (K 200)
Bahan :
352.000 kg Semen Portland @ Rp 1,650.00 Rp 580,800.00
0.522 m3 Pasir Beton @ Rp 200,000.00 Rp 104,400.00
0.736 m3 Batu pecah @ Rp 430,000.00 Rp 316,480.00
215 Lt Air @ Rp 100.00 Rp 21,500.00
Tenaga :
1.650 OH Pekerja @ Rp 100,000.00 Rp 165,000.00
0.275 OH Tukang Batu @ Rp 140,000.00 Rp 38,500.00
0.028 OH Kepala Tukang @ Rp 170,000.00 Rp 4,760.00
0.083 OH Mandor @ Rp 140,000.00 Rp 11,620.00
Jumlah Rp 1,243,060.00
Tenaga :
7.050 OH Pekerja @ Rp 75,000.00 Rp 528,750.00
0.275 OH Tukang Batu @ Rp 140,000.00 Rp 38,500.00
1.650 OH Tukang kayu @ Rp 140,000.00 Rp 231,000.00
2.100 OH Tukang Besi @ Rp 140,000.00 Rp 294,000.00
0.403 OH Kepala Tukang @ Rp 170,000.00 Rp 68,510.00
0.353 OH Mandor @ Rp 140,000.00 Rp 49,420.00
Jumlah Rp 11,902,034.00
6.1.c 1 m3 Pekerjaan Pembuatan Sloof Beton Bertulang (200 kg Besi + bekisting)
Bahan :
0.270 m3 kayu kelas III @ Rp 5,500,000.00 Rp 1,485,000.00
2.000 kg Paku 5-12 cm @ Rp 20,000.00 Rp 40,000.00
0.600 Liter Minyak Bekisting @ Rp 16,927.00 Rp 10,156.20
210.000 kg Besi Beton polos @ Rp 15,000.00 Rp 3,150,000.00
3.000 kg Kawat Beton @ Rp 25,000.00 Rp 75,000.00
336.000 kg Semen PC @ Rp 1,650.00 Rp 554,400.00
0.540 m3 Pasir Beton @ Rp 200,000.00 Rp 108,000.00
0.810 m3 Kerikil @ Rp 260,000.00 Rp 210,600.00
Tenaga :
5.650 OH Pekerja @ Rp 100,000.00 Rp 565,000.00
0.275 OH Tukang Batu @ Rp 140,000.00 Rp 38,500.00
1.560 OH Tukang kayu @ Rp 140,000.00 Rp 218,400.00
1.400 OH Tukang Besi @ Rp 140,000.00 Rp 196,000.00
0.323 OH Kepala Tukang @ Rp 170,000.00 Rp 54,910.00
0.283 OH Mandor @ Rp 140,000.00 Rp 39,620.00
Jumlah Rp 6,745,586.20
Tenaga :
6.350 OH Pekerja @ Rp 100,000.00 Rp 635,000.00
0.275 OH Tukang Batu @ Rp 140,000.00 Rp 38,500.00
1.650 OH Tukang kayu @ Rp 140,000.00 Rp 231,000.00
1.400 OH Tukang Besi @ Rp 140,000.00 Rp 196,000.00
0.333 OH Kepala Tukang @ Rp 170,000.00 Rp 56,610.00
0.318 OH Mandor @ Rp 140,000.00 Rp 44,520.00
Jumlah Rp 8,813,250.00
Tenaga :
0.700 OH Pekerja @ Rp 100,000.00 Rp 70,000.00
0.350 OH Tukang Batu @ Rp 140,000.00 Rp 49,000.00
0.035 OH Kepala Tukang @ Rp 170,000.00 Rp 5,950.00
0.035 OH Mandor @ Rp 140,000.00 Rp 4,900.00
Jumlah Rp 377,730.00
Tenaga :
0.900 OH Pekerja @ Rp 100,000.00 Rp 90,000.00
0.450 OH Tukang Batu @ Rp 140,000.00 Rp 63,000.00
0.045 OH Kepala Tukang @ Rp 170,000.00 Rp 7,650.00
0.045 OH Mandor @ Rp 140,000.00 Rp 6,300.00
Jumlah Rp 422,785.00
8 PEKERJAAN KAYU
8.1.a 1 m3 Pekerjaan Kayu Kusen Pintu dan Jendela Kayu Kelas I
Bahan :
1.100 m3 Kayu Kelas I @ Rp 8,000,000.00 Rp 8,800,000.00
1.250 kg Paku10 cm @ Rp 20,000.00 Rp 25,000.00
1.000 kg Lem Kayu @ Rp 19,000.00 Rp 19,000.00
Tenaga :
7.000 OH Pekerja @ Rp 100,000.00 Rp 700,000.00
21.000 OH Tukang Kayu @ Rp 140,000.00 Rp 2,940,000.00
2.100 OH Kepala Tukang @ Rp 170,000.00 Rp 357,000.00
0.350 OH Mandor @ Rp 140,000.00 Rp 49,000.00
Jumlah Rp 12,890,000.00
8.1.b 1 m3 Pekerjaan Konstruksi Kayu Kuda - kuda
Bahan :
1.100 m3 Balok Kayu Kelas I @ Rp 8,000,000.00 Rp 8,800,000.00
15.000 kg Besi / Plat Strip tebal 5 mm @ Rp 5,000.00 Rp 75,000.00
5.600 kg Paku 12 cm @ Rp 20,000.00 Rp 112,000.00
Tenaga :
4.000 OH Pekerja @ Rp 100,000.00 Rp 400,000.00
12.000 OH Tukang Kayu @ Rp 140,000.00 Rp 1,680,000.00
1.200 OH Kepala Tukang @ Rp 170,000.00 Rp 204,000.00
0.200 OH Mandor @ Rp 140,000.00 Rp 28,000.00
Jumlah Rp 11,299,000.00
Tenaga :
0.800 OH Pekerja @ Rp 100,000.00 Rp 80,000.00
2.400 OH Tukang Kayu @ Rp 140,000.00 Rp 336,000.00
0.240 OH Kepala Tukang @ Rp 170,000.00 Rp 40,800.00
0.040 OH Mandor @ Rp 140,000.00 Rp 5,600.00
Jumlah Rp 552,100.00
Tenaga :
0.200 OH Pekerja @ Rp 100,000.00 Rp 20,000.00
0.100 OH Tukang @ Rp 140,000.00 Rp 14,000.00
0.010 OH Kepala tukang @ Rp 170,000.00 Rp 1,700.00
0.001 OH Mandor @ Rp 140,000.00 Rp 140.00
Jumlah Rp 114,770.00
Tenaga :
0.250 OH Pekerja @ Rp 100,000.00 Rp 25,000.00
0.150 OH Tukang @ Rp 140,000.00 Rp 21,000.00
0.015 OH Kepala tukang @ Rp 170,000.00 Rp 2,550.00
0.013 OH Mandor @ Rp 140,000.00 Rp 1,820.00
Jumlah Rp 56,270.00
10 PEKERJAAN PLAFON
10.1.a
1 m2 Plafond Asbes Super Quality + Rangka
1.000 m2 Asbes Super Quality @ Rp 17,000.00 Rp 17,000.00
0.0094 m3 Kayu Rangka @ Rp 3,000,000.00 Rp 28,200.00
0.020 Kg Paku @ Rp 30,000.00 Rp 600.00
0.500 Org Pekerja @ Rp 100,000.00 Rp 50,000.00
0.025 Org Mandor @ Rp 140,000.00 Rp 3,500.00
Jumlah Rp 99,300.00
11 PEKERJAAN SANITASI
11.1.a 1 Buah Memasang Kloset Jongkok Porselen
Bahan :
1.000 Bh Kloset Jongkok Porselen @ Rp 350,000.00 Rp 350,000.00
6.000 kg Semen Portland @ Rp 1,650.00 Rp 9,900.00
0.010 m3 Pasir Pasang Rp 200,000.00 Rp 2,000.00
Tenaga :
1.000 OH Pekerja @ Rp 100,000.00 Rp 100,000.00
1.500 OH Tukang @ Rp 140,000.00 Rp 210,000.00
1.500 OH Kepala tukang @ Rp 170,000.00 Rp 255,000.00
0.160 OH Mandor Rp 140,000.00 Rp 22,400.00
Jumlah Rp 949,300.00
11.1.b 1 M' Pipa Buangan Air Kotor PVC Type AW Dia. 3" + Aksesoris
Bahan 0.200 Btg Pipa PVC Type AW Ø 3" @ Rp 165,000.00 Rp 33,000.00
0.200 Bh Socket PVC Ø 3" @ Rp 25,000.00 Rp 5,000.00
NO
URAIAN PEKERJAAN VOLUME SAT ANALISA HARGA SATUAN JUMLAH HARGA
.
1 2 3 4 5 6 7
I PEKERJAAN PERSIAPAN
1 Pembersihan Lahan 89.78 m² 1.1.a Rp 17,000.00 Rp 1,526,175.00
2 Pengukuran dan Pemasangan Bowplank 30.10 m² 1.2.b Rp 36,780.00 Rp 1,107,078.00
Rp 2,633,253.00
II PEKERJAAN TANAH
1 Galian Tanah Pondasi 22.63 m³ 2.1.a Rp 78,500.00 Rp 1,776,258.75
2 Urugan Tanah Kembali - m³ 2.1.b Rp 32,100.00 Rp -
3 Urugan Pasir Bawah Pondasi 1.51 m³ 2.1.c Rp 57,000.00 Rp 85,984.50
4 Urugan Pasir Bawah Lantai 2.46 m³ 2.1.d Rp 230,600.00 Rp 567,276.00
Sub Jumlah Rp 2,429,519.25
III PEKERJAAN BATU, PASANGAN, & PLESTERAN
1 Pasangan Batu Kosong 3.02 m³ 3.1.a Rp 576,402 Rp 1,739,004.83
2 Pasangan Pondasi Batu Belah 8.08 m³ 3.1.b Rp 1,011,200 Rp 8,171,760.00
3 Pasangan Bata Rp -
Pasangan Bata 1:4 107.72 m² 4.1.b Rp 117,375 Rp 12,643,048.13
4 Plasteran Dinding Rp -
Plasteran 1:2 0.43 m² 5.1.a Rp 76,520 Rp 32,979.95
Plasteran 1:4 3.66 m² 5.1.b Rp 70,746 Rp 259,177.97
Sub Jumlah Rp 22,845,970.88
IV PEKERJAAN BETON BERTULANG
1 Sloof 1.55 m³ 6.1.c Rp 6,745,586.20 Rp 10,466,451.55
2 Kolom 0.07 m³ 6.1.b Rp 11,902,034.00 Rp 854,863.59
3 Ring Balok 1.12 m³ 6.1.d Rp 8,813,250.00 Rp 9,876,127.95
Sub Jumlah Rp 21,197,443.09
V PEKERJAAN KUSEN, PINTU, JENDELA & VENTILASI
1 Kusen Pintu, Jendela & Ventilasi 3.85 m³ 8.1.a Rp 12,890,000.00 Rp 49,600,720.00
2 Pasangan Pintu Kayu 23.27 m² 8.1.c Rp 552,100.00 Rp 12,847,367.00