Anda di halaman 1dari 1

NO NAMA PEKERJAAN SATUAN JUMLAH

1. Maintenaince & Repairing Old STP

1.1 Repair Pompa Equalisasi Rp3,300,000.0

1.2 Pemasangan Baru Flowmeter IN (Flowmeter 2” Flange merk OPX) Rp5,480,000.0

1.3 Pemasangan Baru Flowmeter OUT (Flowmeter 4” Flange merk OPX) Rp7,250,000.0

1.4 Repair Root Blower / Ganti Baru Ring Blower 5HP/380V Rp23,000,000.0

1.5 Cat Ulang Tangki Reaktor STP Rp4,800,000.0

Biaya maintenaince Tanki STP (Pembersihan filter, pembersihan area


1.6 Rp17,000,000.0
inlet & outlet) dan pergantian filter

TOTAL Rp60,830,000.0

2. New Instalation to BPJ

Pembuatan Line Selat/Lumpur Diarea Pabrik:

· Jarak STP dengan Area Pabrik 45m

2.1 · Jumlah Line 4 Rp19,300,000.0


· Total 4 x 45m = 180m

· Aksesoris PVC
· Dll..
2.2 Bak Selat Draying Bach (SDB) + Media Rp5,000,000.0
2.3 Sand Filter Set. Rp22,000,000.0

TOTAL Rp46,300,000.0

3. Operational (starting STP)

3.1 Pengangkutan Lumpur Tangki Kurang Lebih 11 Truck Tangki @2.000.000 Rp22,000,000.0

3.2 20 Kg Kaporit Powder Rp1,900,000.0

Total Rp23,900,000

TOTAL KESELURUHAN Rp131,030,000.0