Anda di halaman 1dari 1

KETERANGAN

0.20
Muka Tanah Muka Tanah

Rabat Beton Bertulang


10.00 - 20.00 cm

1.50
1.30

Tanah Urug (Baru) Tanah Urug (Baru)


2.40

2.40
t = 210.00 cm t = 230.00 cm

DRAWING FOR TENDER


0.80

0.80
NAMA PEKERJAAN
Rencana Pemasangan Pipa
Pasir Urug t = 10.00 cm Pasir Urug t = 10.00 cm Premier IPA Pramuka ke Tugu
0.10

0.10
Tirta Dharma
0.80 0.80
NAMA GAMBAR
1.00 1.00

Konstruksi Galian Rabat Beton Konstruksi Galian Bahu Jalan Konstruksi Galian Pipa
Skala 1 : 35 Skala 1 : 35

DISETUJUI
DIREKTUR
UTAMA
0.10

Muka Tanah HRS - WC t = 4.00 cm


HRS - Base t = 6.00 cm
0.40

LPA t = 20.00 cm
LPB t = 20.00 cm MUHAMMAD AHDIAT, ST
DIKETAHUI
DIREKTUR OPERASIONAL
1.00

Tanah Urug (Baru)


2.40

t = 180.00 cm

EDWARSYAH, ST

DIPERIKSA
0.80

MANAGER ASSET

Pasir Urug t = 10.00 cm


0.10

ALI FATHIR WIBAWANE, ST


0.80 NIK : 207 01 438
1.00 DIRENCANAKAN DIPERIKSA
TEAM LEADER DIREKTUR

Konstruksi Galian Aspal Hotmix


Skala 1 : 35
IRFANI YULIAN, ST NANDA FEBRYAN PRATAMAJAYA, ST, MT

TANGGAL SKALA KODE LEMBAR NO. LEMBAR JUMLAH LEMBAR

18/01/2023 1 : 35 03 27

Anda mungkin juga menyukai