KEGIATAN
Elevasi Rencana (m) Elevasi Rencana (m)
9.00
9.00
9.00
9.00
7.40
7.40
8.00
7.40
7.40
8.00
9.30
9.30
PENGELOLAAN PEMBUDIDAYAAN IKAN
9.00
8.00
8.00
8.00
9.00
9.00
9.00
8.00
8.00
8.00
9.00
PEMBANGUNAN / NORMALISASI SALURAN IRIGASI
TERSIER PEMBUDIDAYA PERIKANAN
Panjang Existing (m) Panjang Existing (m) TAHUN ANGGARAN 2023
4.00 4.00
ARIF SAIFUDIN. ST
Elevasi Rencana (m) Elevasi Rencana (m)
9.00
9.00
7.40
7.40
9.00
9.00
7.40
7.40
8.00
8.00
9.30
9.30
Direktur
9.00
8.00
8.00
8.00
9.00
9.00
9.00
8.00
8.00
8.00
9.00
Panjang Existing (m) Panjang Existing (m)
0.50 0.50
4.00 4.00
9.00
7.40
7.40
9.00
9.00
7.40
7.40
8.00
8.00
9.30
9.30
LOKASI
Panjang Rencana (m) Panjang Rencana (m)
SALURAN
DESA PASEKAN
Elevasi Existing (m) Elevasi Existing (m)
9.00
9.00
8.00
8.00
8.00
9.00
9.00
9.00
8.00
8.00
8.00
9.00
SKALA NO. LBR JML. LBR
Panjang Existing (m) Panjang Existing (m)