MAPING INFRA
JUMLAH TOT
ITEM PEKERJAAN m2 REALISASI % KETERANGAN
VOLUME
SUBGRADE 14.94581 m2
Galian / Kupas Tanah 9.916 66.35%
Pemadatan 9.916 66.35%
Cerucuk Bambu 8.41802 56.32%
LAPISAN PONDASI BAWAH
Gelar Basecourse 11.87390 79.45%
Pemadatan 11.87390 79.45%
LAPISAN PONDASI ATAS
Gelar Basecourse 9.873 66%
Pemadatan 9.873 66%
Lean concrete 7,05213 47%
PERKERASAN
Pembesian / Wiremesh 6,85340 46%
Bekisting 6,85340 46%
Cor 6,771 45%