400 200 800 200 400 400 400 400 600 200
NO TANGGAL REVISI
B
KM/WC
360
R.PREPARASI SAMPLE MUSHOLA -0.05
±0.00 ±0.00
MEJA BETON
MEJA BETON
626
GUD.ZAT KIMIA
±0.00
+0.90
+0.90
86
PEMBERI TUGAS
296
KM/WC
210
I PANTRY -0.05
I
1310
C D
1520
285
GUD.LIMBAH
MEJA BETON
MEJA BETON
±0.00
+0.90
+0.90
R.SPEKTROMETRI
654
±0.00 R.PEGAWAI
200
KM/WC
-0.05 ±0.00
PROGRAM
400
200
KM/WC
-0.05
KEGIATAN
A
PENYIMPANAN
210
TABUNG GAS
1 2 3 4 5 6 7 8 9 10 11 MENGETAHUI
A
ii
DENAH KESELURUHAN
Skala 1 : 200
DIPERIKSA
Bantuan Teknis
KONSULTAN PERENCANA
CV. CRESTA DESIGN
DENAH KESELURUHAAN
KONSULTAN PERENCANA
CV
CRESTA
DESIGN
JL. TITIAN KENCANA E4 BANDUNG
TELP./FAX (022) 6070767
PEMBERI TUGAS
80
MEJA BETON EKSISTING
+0.90
170
R.PREPARASI SAMPLE
±0.00
555
PROGRAM
626
MEJA LAB
GUD.ZAT KIMIA
+0.90
160
±0.00 MEJA LAB
+0.90
KEGIATAN
145
SUB KEGIATAN / PEKERJAAN
1310
200
1520
MENGETAHUI
285
GUD.LIMBAH
±0.00
100
255
MEJA LAB
MEJA LAB
+0.90
R.SPEKTROMETRI
+0.90
+0.80
±0.00
KM/WC
200
525
-0.05
DIPERIKSA
MEJA LAB
80
+0.90 Bantuan Teknis
400
110
200
KM/WC
-0.05
MEJA BETON EKSISTING
80
+0.90
A
KONSULTAN PERENCANA
PENYIMPANAN
TABUNG GAS
CV. CRESTA DESIGN
210
1 2 3 4 5 KONSULTAN PERENCANA
CV
CRESTA
DENAH TAHAP 1 DESIGN
JL. TITIAN KENCANA E4 BANDUNG
TELP./FAX (022) 6070767
Skala 1 : 100
DIREKTUR Ir. Jenny Natan, IAI
BID. ARSITEK
BID. SIPIL
DIGAMBAR
SKALA NO. GAMBAR JML. LEMBAR
1 : 100
CATATAN
NO TANGGAL REVISI
PEMBERI TUGAS
PLAFOND PLAFOND
130
180
+4.30 +4.30
430
430
300
250
90
90
±0.00 ±0.00
PROGRAM
KEGIATAN
200 800 200
1 2 3 4 5 6 7 8 9 10 11
MENGETAHUI
POTONGAN I-I
Skala 1 : 150
DIPERIKSA
Bantuan Teknis
KONSULTAN PERENCANA
CV. CRESTA DESIGN
90 33
PLAFOND
57
90
+4.30
33
183
80 170 160 138 248 80 110 80
217
307
300
Direktur
JUDUL GAMBAR
124
90
±0.00
POTONGAN
KONSULTAN PERENCANA
570 200 540
1310 210
CV
CRESTA
DESIGN
1520 JL. TITIAN KENCANA E4 BANDUNG
TELP./FAX (022) 6070767
B POTONGAN II-II A
DIREKTUR Ir. Jenny Natan, IAI
Skala 1 : 150 BID. ARSITEK
BID. SIPIL
DIGAMBAR
SKALA NO. GAMBAR JML. LEMBAR
1 : 150
III II
295 100
NO TANGGAL REVISI
60
+0.80
100
I KM/WC I
200
-0.05
PEMBERI TUGAS
100
PLAFOND
+3.00
105
400
NAAT 1 cm
220
100
PROGRAM
305
KM/WC KERAMIK
200
-0.05 20x40
KEGIATAN
200
100
80
SUB KEGIATAN / PEKERJAAN
A
53
-0.05 ±0.00
PLAFOND PLAFOND
50
105
220
305
Direktur
KERAMIK KERAMIK
250
200
DETAIL TOILET
80
KONSULTAN PERENCANA