RESULT (HIGH/MEDIUM/LOW)
0 - 10 = LOW 12 MEDIUM
11 - 20 = MEDIUM 33 HIGH
>20 = HIGH 18 MEDIUM
8 LOW
21 HIGH
37 HIGH
7 LOW
Daftar Pegawai
PT. BUANA SEJAHTERA
Tabel Sumber
Gol Jabatan Gaji Tunjangan
A Manager 6200000 1000000
C Staff 2500000 500000
B Supervisor 4000000 750000
Tabel Pengisian
Tabel Sumber
Gol I III II
Jabatan Manager Staff Supervisor
Gaji 6200000 2500000 4000000
Tunjangan 1000000 500000 750000
Tabel Pengisian
No 1 2 3
Nama Riry Donny Koko
Gol I III II
Jabatan
Gaji
Tunjangan
Parts Database
Tools Quantity Cost Total Cost Retail Gross Margin
Gangley Pliers 57 $ 10.47 $ 596.79 $ 17.95 71.4%
HCAB Washer 856 $ 0.12 $ 102.72 $ 0.25 108.3%
Finley Sprocket 357 $ 1.57 $ 560.49 $ 2.95 87.9%
6" Sonotube 86 $ 15.24 $ 1,310.64 $ 19.95 30.9%
Langstrom 7" Wrench 75 $ 18.69 $ 1,401.75 $ 27.95 49.5%
Thompson Socket 298 $ 3.11 $ 926.78 $ 5.95 91.3%
S-Joint 155 $ 6.85 $ 1,061.75 $ 9.95 45.3%
LAMF Valve 482 $ 4.01 $ 1,932.82 $ 6.95 73.3%
Tools
Column
Value
Using INDEX in B15 and MATCH in B14, make it so that inputting a Tool name in B13 (list dropdown) returns the
Part-Number in B15
Tunjangan
4 5 6 7 8 9 10
Banu Ilham Ade Mina Adhi Yudo Syifa
III II I II III I III
Part Number
D-178
A-201
C-098
B-111
D-017
C-321
A-182
B-047
Loan 1
Loan 5,000,000
Rate Annual 10%
#Period (Month) 12
Monthly Payment IDR41,666.67
Loan 2
Loan IDR347,318
Rate Annual 25%
#Period (Month) 3
Monthly Payment - 1,000,000
Loan 3
Loan IDR 10,000,000
Rate Annual 10%
#Period (Month)
Monthly Payment - 2,000,000
Saving
Monthly Deposit - 1,000,000
Rate Annual 5%
#Period (Year) 10
Total Saving (IDR6,000,000.00)
Scenario Manager
Item Price (USD) Using Scenario Manager, create and summarize the
Product1 $ 37 following scenarios
Product2 $ 28 Opsi 1:
Product3 $ 45 1. Kurs turun menjadi 12.000
2. Persentase Laba Naik menjadi 11%
Persentase Laba 10%
Opsi 2:
Kurs USD 14,000 1. Kurs turun menjadi 11.000
2. Persentase Laba Naik menjadi 12%
Jumlah Laba (Rupiah) 154,000
Opsi 3:
1. Kurs naik menjadi 15.000
2. Persentase Laba tetap 10%
Scenario Manager, create and summarize the
ng scenarios
Prepare Waterfall Charts for following table data and name the chart as Asset Mutation
Using the following table data prepare pivot table for net worth & name only, and then turn it into stacked bar chart, and add slicer based on city