KEGIATAN

J K L M N O P Q R S T U
57000
6000 2000 4000 6000 3000 4200 7200 7200 7200 7200 3000

13 13
GWT AIR BERSIH
(KEDALAMAN 3,5m)

5000

5000
EHP

250 m ³
JP
RSU AMANAH
12 DHP
12 PKU MUHAMMADIYAH SUMPIUH
2500 GWT HYDRANT

2500
(KEDALAMAN 3,5m)
125 m ³ PEKERJAAN
11 11
DED RSU AMANAH
PKU MUHAMMADIYAH SUMPIUH
7500

7500
LOKASI PEKERJAAN

Jl. Raya Kebokura No.37 Sumpiuh


10 ISI R. PANEL LANTAI SEMIBASEMENT
1. SDP GD A-B (80x120x30cm) +t:UMPAK
2. SDP EMERGENCY GD A-B (80x120x30cm) +t:UMPAK
1 2 10 Banyumas 53195
3. PP.PENERANGAN LT SB GD A (80x60x30cm)
4. PP.PENERANGAN LT SB GD B (80x60x30cm)
5. PP.AC LT SB GD B (80x60x30cm) 2.9400
6. PP.GAS MEDIS GD B (60x40x25cm)
6

5 4 3 MENGETAHUI
6500

6500
4.0750

KETUA YAYASAN

9 9
3950

3950
Subur Yuswanto, S.Kep

7500
8 8
MENGETAHUI
3550

7 7 DIREKTUR
850

850
6 6
65000

65000
6350

6350
dr. Sri Hidayah Nurlela Syafiie, SpPA

KETERANGAN
5 5
09 November 2022 :
-Update Denah Tahap 01
KIBLAT
7200

7200
4 4 KONSULTAN PERENCANA
7200

7200
LAYOUT MODEL B
PT. SURYA GLOBAL PRIMA
3 3
1.275

0.600
2.045
PENANGGUNG JAWAB
2.795 2.045
2.795

GENSET t:2,58m
2.350

DIMENSI RUANG GENSET 1000kVA


TIDAK IDEAL UNTUK
7.010
2 UNIT GENSET 1000kVA
7200

7200
0.400

*akses maintenance tidak


mencukupi
GENSET t:2,58m
2.350

*space bukaan pintu-pintu


1000kVA
genset tidak mencukupi (baik
antar genset maupun jarak 7.010 BARITO ADI BULDAN RAYAGANDA RITO, ST, MA,
genset dengan dinding) 0.600
IAI
1.275

2 2
YUDHA ANDRIANTO P., ST, IAI
AHLI ARSITEKTUR
Umpak
& Gutter SKA : 1.1.101.2.027.12.1901427
7200

7200
YOGA A. HARSOYO, S.T.,M.Eng
AHLI SIPIL / STRUKTUR
SKA : 1.2.201.2.025.09.1140242

BUDI TRIYONO, M.T


1 1 AHLI MEP
SKA : 1.4.401.2.056.13.1958779

EKO PUTRA WARDANA


DIGAMBAR

JUDUL GAMBAR SKALA

2000 4000
6000 6000 6000 3000 4200 7200 7200 7200 7200 3000 RENCANA
1 : NTS
POWER HOUSE
57000

J K L M N O P Q R S T U KODE GAMBAR NO. LEMBAR JML. LEMBAR

MEP M13-0001
00