Anda di halaman 1dari 1

KABUPATEN SEMARANG

DENAH RUMAH POMPA


SKALA 1:20
1 PEMERINTAH KABUPATEN SEMARANG
DINAS PEKERJAAN UMUM
JL. KH Hasyim Ashari No. 3 Ungaran

±0.000 ±0.00
6 2 3 5 KEGIATAN

80
50
A -5.00
1 2 4
PENGELOLAAN DAN PENGEMBANGAN SISTEM
PENYEDIAAN AIR MINUM (SPAM) DI DAERAH
KABUPATEN/KOTA

SUB KEGIATAN
A -10.00 80
PENINGKATAN SPAM JARINGAN PERPIPAAN DI
KAWASAN PERDESAAN
15 50 15 1
-15.00
9
PEKERJAAN
-20.00 6 2 PENINGKATAN SPAM DUSUN KALEGEN
5
DESA DERSANSARI KEC. SURUH

40
7
-25.00 1 2 3 4 LOKASI

65
8 DUSUN KALEGEN DESA DERSANSARI
KEC. SURUH
-30.00 KABUPATEN SEMARANG

25
±0.000 ±0.000
B -35.00
MENGETAHUI
KEPALA BIDANG CIPTA KARYA
DPU KAB. SEMARANG
-40.00

COR BETON 1:2:3


PENGUAT CASING
B -45.00
POT. 1 - 1 WELL COVER
PIPA HISAP GI Ø 1.5" Dr. R. AGUNG PANGARSO, ST. MT.
-50.00 SKALA 1:20 NIP. 19760608 200501 1 005

CEMENT GROUTING
MENYETUJUI
-55.00 PEJABAT PEMBUAT KOMITMEN
A
C -60.00
Keterangan : BIDANG CIPTA KARYA
DPU KAB. SEMARANG
B
A. Rumah Pompa (Tdk dikerjakan)
-65.00 PIPA CASING PVC Ø 4"
1. Pipa PVC A 1.5" DIDIK RIYADI, ST
NIP. 19780912 200501 1 007
-70.00 POMPA SUMMERSIBLE
2. Stop Kran GRAVEL PACK KAP. 3M3/JAM HEAD =78 METER DIPERIKSA
DIPASANG PADA KEDALAMAN DEBIT AIR STABIL
-75.00 TIM TEKNIS
3. Tee BIDANG CIPTA KARYA

- 80 M -80.00 4. Check Valve


5. Bend
-85.00
SCREEN PVC (6 M) KIKY FITRIANASARI, ST ELFRIEDHA PRAWINDHORA, SE
6. Water Meter Q 1.5" KETUA SEKRETARIS
-90.00 KONSULTAN PERENCANA
7. Kabel
-95.00 CV. MITRA DESIGN

8. Whell Head/Top Casing PIPA BUTA (BLANK CASING)


-100.00 PVC 4"
9. Plat Ezer Penutup + Kunci (Tdk dikerjakan)
-80.00 M MUJI PRIYONO, ST
Direktur

JUDUL GAMBAR SKALA


SUMUR BOR DETAIL SUMUR
DETAIL SUMUR
SKALA 1:100 SKALA 1:20
TANGGAL NOMOR GAMBAR JUMLAH LEMBAR
2 4

Anda mungkin juga menyukai