Anda di halaman 1dari 17

17-Apr-23

3:21:42 PM

STRUCTURE DRAWING

VILA KABIN TYPE 3


Hotel & Fasilitasnya
Cipayung Girang, Jawa Barat

CIPTA SUKSES, PT.


ENGINEERING CONSULTANT & CONTRACTOR
Phone: 021-55963655, fax: 021-55958211
Email : engineering@ciptasukses.com
KETERANGAN

1. SEMUA DIMENSI DALAM


MILIMETER KECUALI YANG
TERCANTUM DALAM GAMBAR
2. BETON.
MUTU BETON f'c = 20 MPa

DAFTAR GAMBAR 3. BAJA TULANGAN.


- ULIR : S f ' y = 420 MPa
4. KONSTRUKSI BAJA.
NOMOR JUDUL KETERANGAN BAJA PROFIL : ASTM - A36
BAUT STRUKTUR : A-325 & A-307
MUTU LAS : E - 70 XX

S-0000 COVER
S-0001 DAFTAR GAMBAR
S-0101 STANDARD DRAWING #1
S-0102 STANDARD DRAWING #2
S-0103 STANDARD DRAWING #3
S-0104 STANDARD DRAWING #4
PROYEK
S-0105 STANDARD DRAWING #5
S-0106 STANDARD DRAWING #6 VILA KABIN TYPE 3
S-0107 STANDARD DRAWING #7
Hotel & Fasilitasnya
S-0108 STANDARD DRAWING #8 Cipayung Girang, Jawa Barat
S-1001 DENAH PONDASI
PEMOHON
S-3001 DENAH LANTAI 1
S-3002 DENAH LANTAI 2
PT. TUMBUH SEMANGAT MAKMUR
S-3003 DENAH ATAP
S-4001 POTONGAN
S-5001 DETAIL CONCRETE
S-5002 DETAIL SAMBUNGAN BAJA PERENCANA ARSITEKTUR

INDOCAM
ARSITEKTUR
INTERIOR
iai.design.project@gmail.com
(021)5810014 . 08119304350

Lydia Surianata, S.T


No. SKA : 1.1.101.2.158.18.1938356
PERENCANA STRUKTUR

CIPTA SUKSES, PT.


ENGINEERING CONSULTANT & CONTRACTOR
Phone: 021-55963655, fax: 021-55958211
Email : engineering@ciptasukses.com

Anwar Susanto
No. SKA : 1.2.201.1.025.09.1940039
PERENCANA MEKANIKAL & ELEKTRIKAL

Rommel Sitorus
No. SKA : 1.4.405.2.175.28.1918806
JUDUL GAMBAR :

VILA KABIN TYPE 3


DAFTAR GAMBAR

SKALA :

CATATAN
NO REVISI TANGGAL DISETUJUI

DIGAMBAR :
ENG PERSETUJUAN :
ENG
DIPERIKSA : ENG TANGGAL :

TANGGAL : PARAF :

REVISI NO :

KODE GAMBAR / NO LEMBAR

- S-0001
KETERANGAN

1. SEMUA DIMENSI DALAM


MILIMETER KECUALI YANG
TERCANTUM DALAM GAMBAR

I. UMUM (GENERAL) 2. BETON.


MUTU BETON f'c = 20 MPa

LINGKUP DOKUMEN JARAK BERSIH ANTAR TULANGAN PENUMPU TULANGAN 3. BAJA TULANGAN.
I.1 (SCOPE OF DOCUMENT) I.2 (CLEAR SPACING BETWEEN REINFORCEMENT BARS)
I.3 - ULIR : S f ' y = 420 MPa
(REINFORCEMENT CHAIRS)
4. KONSTRUKSI BAJA.
BALOK (BEAM) BAJA PROFIL : ASTM - A36
1. DOKUMEN INI HARUS DIPERGUNAKAN SEBAGAI STANDARD UNTUK FABRIKASI BAUT STRUKTUR : A-325 & A-307
DAN PEMASANGAN TULANGAN DARI PEKERJAAN STRUKTUR BETON BERTULANG. b1
MUTU LAS : E - 70 XX
1. b1 = JARAK BERSIH ANTARA TULANGAN (CLEAR SPACING BETWEEN REBARS)
(THIS DOCUMENT SHALL BE USED AS A STANDARD FOR THE FABRICATION > 1.5 d
AND FIXING OF REINFORCEMENT IN REINFORCED CONCRETE WORKS.) H > 1.25 d DARI UKURAN AGREGAT MAKSIMUM

ds
> 25 mm
2. TUJUAN DARI DOKUMEN INI ADALAH MEMBERI PETUNJUK ATAU INSTRUKSI
UNTUK PEKERJAAN YANG BERSIFAT UMUM, PEKERJAAN-PEKERJAAN YANG MEMPUNYAI b1 2. DIPAKAI TULANGAN TAMBAHAN SEBAGAI KAIT UNTUK MENJAGA JARAK ANTARA
KEKHUSUSAN TERSENDIRI DALAM STRUKTUR HARUS DISESUAIKAN DENGAN GAMBAR- BATANG TULANGAN DI BAWAH INI
GAMBAR RENCANA DAN / ATAU PETUNJUK YANG DIBERIKAN OLEH PERENCANA.

ds
(USE ADDITIONAL REBARS TO MAINTAIN CLEAR SPACING BETWEEN LONGITUDINAL
BARS AS SHOWN BELOW)
b1 b1
(THE INSTRUCTIONS IN THIS DOCUMENT GIVE DIRECTIONS AND INSTRUCTIONS
TULANGAN TAMBAHAN
FOR WORKS OF A GENERAL NATURE, WORKS THAT HAVE A SPECIFIC PURPOSE IN ( SENGKANG ) REINFORCING BAR SUPPORT SPACING
THE STRUCTURE ARE DESCRIBED IN THE DRAWINGS AND / OR INSTRUCTIONS SUPPORT DIAMETER PROYEK
TO BE SUPPORTED ( mm )
ISSUED BY THE DESIGNER.)

3. BILA TIDAK ADA KESESUAIAN ANTARA DETAIL STANDARD INI DENGAN GAMBAR- Ø8 700 VILA KABIN TYPE 3
b1
GAMBAR RENCANA MAKA GAMBAR RENCANA HARUS DIPAKAI SEBAGAI PEDOMAN. D10
Ø10 OR D10 800

(IF THERE IS NO CONFORMITY BETWEEN THESE STANDARD DETAILS AND THE


135°
Hotel & Fasilitasnya
Ø10 OR D10 800
PROJECT DRAWINGS THEN THE PROJECT DRAWINGS ARE TO BE USED AS THE GUIDE.) Cipayung Girang, Jawa Barat
D13
D13 1000
PEMOHON
KOLOM (COLUMN) D13 1250
D16
s ADALAH YANG TERBESAR DARI D16 1500
s ( SHALL BE AT LEAST THE GREATEST OF)
PT. TUMBUH SEMANGAT MAKMUR
D16 1500
(a) 40 mm
D19

s
(b) 1,5 db D19 1750
(c) 4/3 d agg
s
D19 1750
D22 PERENCANA ARSITEKTUR
D22 2000
PELAT (SLAB) INDOCAM
D25 D25 2000 ARSITEKTUR
s INTERIOR
iai.design.project@gmail.com
(021)5810014 . 08119304350
D32 D32 2000

h
RAFT FOUNDATION D25 1000

s ADALAH YANG TERKECIL DARI


s (IS TAKEN LESS THAN THE LEAST OF) Lydia Surianata, S.T
(a) 3 h No. SKA : 1.1.101.2.158.18.1938356
(b) 300 mm
PERENCANA STRUKTUR

KAIT STANDARD UNTUK TULANGAN UTAMA, SENGKANG DAN KAIT PENGIKAT SELIMUT BETON UNTUK TULANGAN CIPTA SUKSES, PT.
I.4 (STANDARD HOOK FOR MAIN REINFORCEMENT, STIRRUPS AND TIES) I.5 ENGINEERING CONSULTANT & CONTRACTOR
(CONCRETE COVER FOR REINFORCEMENT) Phone: 021-55963655, fax: 021-55958211
Email : engineering@ciptasukses.com
SNI 2847:2019 TABEL 20.6.1.3.1 (ACI 318M-14 TABEL 20.6.1.3.1) SNI 2847:2019 TABEL 20.6.1.3.1 (ACI 318M-14 TABEL 20.6.1.3.1)

TYPE KAIT STANDAR TIPE BATANG UKURAN BATANG


DIAMETER BENGKOKAN KOMPONEN STRUKTUR KONDISI EKSPOSUR DIAMETER TULANGAN SELIMUT BETON, do Anwar Susanto
SISI DALAM MINIMUM PERPANJANGAN LURUS (STRUCTURAL COMPONENT) (EXPOSURE CONDITION) (REINFORCEMENT DIAMETER) (CONCRETE COVER, do)
(TYPE OF STANDARD HOOK) (BAR TYPE) (BAR SIZE) (MINIMUM INSIDE BEND (STRAIGHT EXTENSION) ILUSTRASI
(mm) (mm)
No. SKA : 1.2.201.1.025.09.1940039
DIAMETER) [mm] [mm] (SHAPE)
PERENCANA MEKANIKAL & ELEKTRIKAL
D10, D13, D16, DICOR LANGSUNG DAN SECARA PERMANEN
6db KONTAK DENGAN TANAH SEMUA
D19, D22, D25 75
(CAST AGAINST AND PERMANENTLY (ALL)
D29, D32, D36 IN CONTACT WITH GROUND)
TULANGAN UTAMA (MAIN REBAR) 8db 12db SEMUA
90° Bengkokan
(90-degre bend) (ALL)
TERPAPAR CUACA ATAU ≥ D 19 50
D43, D57 db KONTAK DENGAN TANAH
10d b
KAIT 90° (90° HOOK)
lext (EXPOSED TO WEATHER OR
TERBESAR DARI 6db DAN 75mm IN CONTACT WITH GROUND) ≤ D 16 40
D10, D13, D16 4db
SENGKANG, IKAT SILANG, DAN (GREATER OF 6db AND 75mm) r
te
SENGKANG PENGEKANG me TIDAK TERPAPAR CUACA ATAU
(STIRRUPS, TIES, AND HOOPS) D19, D22, D25 6db 12db Dia PELAT DAN DINDING KONTAK DENGAN TANAH
≥ D 43 40
Rommel Sitorus
(SLABS AND WALLS) (NOT EXPOSED TO WEATHER OR
≤ D 36 20
No. SKA : 1.4.405.2.175.28.1918806
IN CONTACT WITH GROUND)
135° Bengkokan JUDUL GAMBAR :
SENGKANG, IKAT SILANG, DAN D10, D13, D16 4db db BALOK, KOLOM, DINDING GESER
(135-degre bend) SEMUA (ALL) 40
TERBESAR DARI 6db DAN 75mm (BEAMS, COLUMNS, SHEAR WALLS)
KAIT 135° (135° HOOK) SENGKANG PENGEKANG
(STIRRUPS, TIES, AND HOOPS)
D19, D22, D25
(GREATER OF 6db AND 75mm) VILA KABIN TYPE 3
6db
r STANDARD DRAWING #1
te lext
me
D10, D13, D16, Dia
6db
D19, D22, D25

do
D29, D32, D36 TERBESAR DARI 4db DAN 65mm SKALA :
TULANGAN UTAMA (MAIN REBAR) 8db
(GREATER OF 4db AND 65mm)

KAIT 180° (180 HOOK) D43, D57 10d b db 180° Bengkokan CATATAN
Diameter
(180-degre bend)

do
NO REVISI TANGGAL DISETUJUI

SENGKANG, IKAT SILANG, DAN D10, D13, D16 4db do


TERBESAR DARI 4db DAN 65mm lext
SENGKANG PENGEKANG
(GREATER OF 4db AND 65mm)
(STIRRUPS, TIES, AND HOOPS) D19, D22, D25 6db do

do

DIGAMBAR :
ENG PERSETUJUAN :
ENG
DIPERIKSA : ENG TANGGAL :

TANGGAL : PARAF :

REVISI NO :

KODE GAMBAR / NO LEMBAR

- S-0101
KETERANGAN

1. SEMUA DIMENSI DALAM


MILIMETER KECUALI YANG
TERCANTUM DALAM GAMBAR
2. BETON.
MUTU BETON f'c = 20 MPa

PANJANG PENYALURAN, ld[mm] PANJANG PENYALURAN MINIMUM WIREMESH DENGAN SPASI 100 mm, l d[mm] 3. BAJA TULANGAN.
I.6 I.7 (DEVELOPMENT LENGTH OF WIREMESH WITH REBAR SPACING OF 100 mm, l d[mm] - ULIR : S f ' y = 420 MPa
(DEVELOPMENT LENGTH, ld[mm])
SNI 2847:2019 PASAL 25.4.2.2 (ACI 318M-14 SECTION 25.4.2.2) SNI 2847:2019 PASAL 25.4.7.2 (ACI 318M-14 SECTION 25.4.7.2)
4. KONSTRUKSI BAJA.
BAJA PROFIL : ASTM - A36
50mm BAUT STRUKTUR : A-325 & A-307
min MUTU LAS : E - 70 XX
PENAMPANG db
KRITIS f'c (MPa) WM U50 fy=500 MPa spasi = 100 mm
(CRITICAL
SECTION) DIAMETER(mm) f'c=20 f'c=25 f'c=30 f'c=35 f'c=40 f'c=45 f'c=50
6 150 150 150 150 150 150 150
1,3 l ᵈ≥ 150 mm
7 150 150 150 150 150 150 150

ld 8
10
190
290
170
260
160
240
150
220
150
210
150
200
150
190
13 490 440 400 380 350 330 310

PENEMPATAN A (DESIGNATION A)
f'c (MPa) BjTS 420B (ASTM 615 GRADE 60) fy=420 MPa BjTS 520B (ASTM 615 GRADE 75) fy=520 MPa
PROYEK
DIAMETER(mm) f'c=20 f'c=25 f'c=30 f'c=35 f'c=40 f'c=45 f'c=50 f'c=20 f'c=25 f'c=30 f'c=35 f'c=40 f'c=45 f'c=50 f'c (MPa) WM U50 fy=500 MPa spasi = 150 mm
10 590 520 480 440 420 390 370 720 650 590 550 510 480 460 1,3 l ᵈ≥ 50 mm
13 760 680 620 580 540 510 480 940 840 770 710 670 630 600 DIAMETER(mm) f'c=20 f'c=25 f'c=30 f'c=35 f'c=40 f'c=45 f'c=50 VILA KABIN TYPE 3
16 940 840 760 710 660 630 590 1160 1040 950 880 820 770 730 6 200 200 200 200 200 200 200
19 1110 990 910 840 790 740 700 1370 1230 1120 1040 970 920 870 7 200 200 200 200 200 200 200
22 1580 1420 1300 1200 1120 1060 1000 1960 1750 1600 1480 1390 1310 1240 8 200 200 200 200 200 200 200

25 1800 1610 1470 1360 1270 1200 1140 2230 1990 1820 1690 1580 1490 1410
10 200 200 200 200 200 200 200 Hotel & Fasilitasnya
29 2090 1870 1710 1580 1480 1390 1320 2580 2310 2110 1950 1830 1720 1640 13 330 300 270 250 240 220 210
Cipayung Girang, Jawa Barat
32 2300 2060 1880 1740 1630 1540 1460 2850 2550 2330 2160 2020 1900 1800
36 2590 2320 2120 1960 1830 1730 1640 3210 2870 2620 2420 2270 2140 2030
PEMOHON
* CATATAN (NOTE)
PENEMPATAN A ADALAH TULANGAN YANG DIPASANG PADA KONDISI BERIKUT:
(DESIGNATION A IS APPLICABLE FOR THE REINFORCEMENT PLACED IN THE FOLLOWING CONDITIONS) : f'c (MPa) WM U50 fy=500 MPa spasi = 200 mm PT. TUMBUH SEMANGAT MAKMUR

SPASI, S
SEMUA TULANGAN HORIZONTAL DENGAN LEBIH DARI 300 mm BETON SEGAR DICOR DIBAWAHNYA, TERMASUK :
(ALL HORIZONTAL REINFORCEMENT WITH MORE THAN 300 mm OF FRESH CONCRETE CASTED BENEATH IT, INCLUDING) : DIAMETER(mm) f'c=20 f'c=25 f'c=30 f'c=35 f'c=40 f'c=45 f'c=50
1. TULANGAN ATAS DAN SAMPING UNTUK BALOK (TERMASUK BALOK KOPEL) 6 250 250 250 250 250 250 250
TOP AND SKIN REINFORCEMENT IN BEAMS (INCLUDING COUPLING BEAMS) 7 250 250 250 250 250 250 250
2. TULANGAN ATAS DAN SAMPING UNTUK PELAT TEBAL ≥ 300 mm (TERMASUK PILE CAP, PONDASI RAFT, DAN DROP PANEL)
8 250 250 250 250 250 250 250
TOP AND SIDE REINFORCEMENT FOR SLABS WITH A THICKNESS ≥ 300 mm (INCLUDING PILE CAPS, RAFT FOUNDATIONS, AND DROP PANELS)
3. TULANGAN HORISONTAL UNTUK DINDING (TERMASUK DINDING GESER, DINDING PENAHAN TANAH, DAN DINDING UNTUK PIT) 10 250 250 250 250 250 250 250
HORIZONTAL REINFORCEMENT IN WALLS (INCLUDING SHEAR WALLS, RETAINING WALLS, AND PIT WALLS) 13 250 250 250 250 250 250 250
4. TULANGAN DIAGONAL UNTUK BALOK KOPEL PERENCANA ARSITEKTUR
DIAGONAL REINFORCEMENT IN COUPLING BEAMS

INDOCAM
PENEMPATAN B (DESIGNATION B) ARSITEKTUR
INTERIOR
SAMBUNGAN LEWATAN TULANGAN
I.8 iai.design.project@gmail.com

(LAP SPLICING OF REINFORCEMENT)


(021)5810014 . 08119304350

f'c (MPa) BjTS 420B (ASTM 615 GRADE 60) fy=420 MPa BjTS 520B (ASTM 615 GRADE 75) fy=520 MPa

DIAMETER(mm) f'c=20 f'c=25 f'c=30 f'c=35 f'c=40 f'c=45 f'c=50 f'c=20 f'c=25 f'c=30 f'c=35 f'c=40 f'c=45 f'c=50
10 450 400 370 340 320 300 290 560 500 460 420 400 370 360
13 590 520 480 440 420 390 370 720 650 590 550 510 480 460
16 720 640 590 550 510 480 460 890 800 730 670 630 600 570
Lydia Surianata, S.T
19 850 760 700 650 610 570 540 1060 950 860 800 750 710 670
22 1220 1090 1000 920 860 820 770 1510 1350 1230 1140 1070 1010 960
No. SKA : 1.1.101.2.158.18.1938356
25 1390 1240 1130 1050 980 930 880 1710 1530 1400 1300 1210 1140 1090 PERENCANA STRUKTUR
29 1610 1440 1310 1220 1140 1070 1020 1990 1780 1620 1500 1410 1330 1260
32 1770 1590 1450 1340 1260
1410
1180
1330
1120
1260
2190 1960 1790 1660 1550
1750
1460
1650
1390
1560
CIPTA SUKSES, PT.
36 1990 1780 1630 1510 2470 2210 2020 1870 ENGINEERING CONSULTANT & CONTRACTOR
BALOK KOLOM Phone: 021-55963655, fax: 021-55958211
* CATATAN (NOTE) Email : engineering@ciptasukses.com
PENEMPATAN B ADALAH SEMUA TULANGAN YANG TIDAK TERMASUK PENEMPATAN A
(BEAM) (COLUMN) 1.3 ld
(DESIGNATION B APPLIES TO ALL OTHER REINFORCEMENT NOT CLASSIFIED AS DESIGNATION A)

db1 db2 db1 db2

PANJANG PENYALURAN TULANGAN DENGAN KAIT STANDAR, l [mm] 1.3 ld 0.5 ld 1.3 ld Anwar Susanto
I.9 ᵈ +- 50mm
5db~10db 1.3 ld
No. SKA : 1.2.201.1.025.09.1940039
(DEVELOPMENT LENGTH OF REINFORCEMENT TERMINATING IN A STANDARD HOOK,ᵈ l [mm]
SNI 2847:2019 PASAL 25.4.3 (ACI 318M-14 SECTION 25.4.3) PERENCANA MEKANIKAL & ELEKTRIKAL

CATATAN (NOTES) :
db
PENAMPANG PENAMPANG
KRITIS
db 1. PANJANG SAMBUNGAN LEWATAN PADA TABEL DIATAS HARUS DITAMBAH 20% UNTUK SUATU BERKAS TIGA BATANG DAN DITAMBAH 33% UNTUK SUATU
KRITIS
12db

(CRITICAL (CRITICAL BERKAS EMPAT BATANG.


4db atau D
SECTION) SECTION) >65mm (THE SPLICE LENGTHS LISTED IN THE TABLE SHALL BE INCREASED BY 20% FOR A 3 BAR BUNDLE AND BY 33% FOR A 4 BAR BUNDLE.)

Rommel Sitorus
/ MAKA PANJANG l MINIMUM DITETAPKAN BERDASARKAN DIAMETER TERBESAR.
2. BILA db1 = db2
ldh ≥50mm ldh ≥50mm (IF db1 = db2
/ THEN THE MINIMUM LENGTH l SHALL BE BASED ON THE BIGGER DIAMETER.) No. SKA : 1.4.405.2.175.28.1918806
≥2/3 W ≥2/3 W
JUDUL GAMBAR :
w w 3. SAMBUNGAN TIDAK BOLEH DITEMPATKAN PADA DAERAH TEGANGAN MAKSIMUM DAN DALAM JOINT BALOK - KOLOM DAN JARAK 2X TINGGI BALOK DARI
MUKA KOLOM
(LAP SPLICES CANNOT BE PLACED IN AREAS OF MAXIMUM STRESSES AND IN BEAM-COLUMN JOINT AND A DISTANCE OF 2 X BEAM DEPTH FROM THE VILA KABIN TYPE 3
COLUMN FACE)
f'c (MPa) BjTS 420B (ASTM 615 GRADE 60) fy=420 MPa BjTS 520B (ASTM 615 GRADE 75) fy=520 MPa STANDARD DRAWING #2
4. UNTUK TULANGAN DIAMETER > 32 mm, HARUS DIGUNAKAN SAMBUNGAN MEKANIK (COUPLER)
DIAMETER(mm) f'c=20 f'c=25 f'c=30 f'c=35 f'c=40 f'c=45 f'c=50 f'c=20 f'c=25 f'c=30 f'c=35 f'c=40 f'c=45 f'c=50
(FOR REINFORCEMENT BARS WITH A DIAMETER > 32 mm, A COUPLER CONNECTION MUST BE USED)
10 230 210 200 200 200 200 200 280 250 230 230 230 230 230
13 300 270 240 240 240 240 240 370 330 300 300 300 300 300 SKALA :
16 370 330 300 290 290 290 290 450 400 370 360 360 360 360
5. LIHAT DETAIL III.4 UNTUK LETAK SAMBUNGAN PADA BALOK
19 430 390 350 350 350 350 350 540 480 440 430 430 430 430
(SEE DETAIL III.4 FOR LAP SPLICE LOCATIONS FOR BEAMS)
CATATAN
22 500 450 410 400 400 400 400 620 550 510 500 500 500 500
6. LIHAT DETAIL IV.3 UNTUK LETAK SAMBUNGAN PADA KOLOM NO REVISI TANGGAL DISETUJUI
25 570 510 470 460 460 460 460 700 630 570 560 560 560 560
29 660 590 540 530 530 530 530 810 730 670 650 650 650 650
(SEE DETAIL IV.3 FOR LAP SPLICE LOCATIONS FOR COLUMNS)
32 730 650 590 580 580 580 580 900 800 730 720 720 720 720
36 820 730 670 660 660 660 660 1010 900 830 810 810 810 810 5. SAMBUNGAN UNTUK DINDING HANYA BOLEH PADA JARAK > Lw DARI PERMUKAAN PONDASI RAFT DAN HARUS DI SELANG SELING
(LAP SPLICES FOR WALLS ARE PERMITTED ONLY A DISTANCE > Lw FROM THE SURFACE OF THE RAFT FOUNDATION AND MUST BE ALTERNATED)

DIGAMBAR :
ENG PERSETUJUAN :
ENG
DIPERIKSA : ENG TANGGAL :

TANGGAL : PARAF :

REVISI NO :

KODE GAMBAR / NO LEMBAR

- S-0102
KETERANGAN

1. SEMUA DIMENSI DALAM


MILIMETER KECUALI YANG
TERCANTUM DALAM GAMBAR

II. PELAT (SLAB)


2. BETON.
MUTU BETON f'c = 20 MPa

DETAIL PENULANGAN PELAT DENGAN TULANGAN BIASA DETAIL PENULANGAN PELAT DENGAN WIREMESH SAMBUNGAN PADA SLAB ON GRADE 3. BAJA TULANGAN.
II.1 (DETAILS OF SLAB REINFORCEMENT USING REINFORCEMENT BAR) II.2 (DETAILS OF SLAB REINFORCEMENT WITH WIREMESH) II.3 (JOINT CONNECTION FOR SLAB ON GRADE) - ULIR : S f ' y = 420 MPa
4. KONSTRUKSI BAJA.
0.25 L x 0.25 L x 0.25 L x 0.25 L x
DOWELL BAJA PROFIL : ASTM - A36
KOLOM / DINDING ASPHALT SEALANT
BAUT STRUKTUR : A-325 & A-307

75 mm
10 POLYETHILENE FORM
/JOINT FILLER MUTU LAS : E - 70 XX

0.125 L x
0.25 L x

x
0.25 L x
0.25 L x

75 mm
ATAS

> 0.3 L x

> 0.3 L x
CONSTRUCTION JOINT

0.25 L
(TOP)
ISOLATION JOINT

ldh
ldh

Lx
BAWAH BRICK WALL
Lx

CATATAN (NOTES) :
L

(BOTTOM)

x
Lx

L
L

ATAS
WIRE MESH

(TOP)
ATAS
(TOP)
ldh

ldh
1. GUNAKAN CONSTRUCTION JOINT PADA PERTEMUAN ANTAR
SLAB (USE CONSTRACTION JOINT WHERE SLABS MEET)

> 0.3 L x

> 0.3 L x

t + 50mm
PROYEK

t
0.25 L x
0.25 L x

0.25 L x
0.25 L x
ATAS 2. GUNAKAN ISOLATION JOINT PADA PERTEMUAN SLAB

50
75 mm
DENGAN KOLOM/DINDING (USE ISOLATION JOINT BEETWEEN

0.125 L x
(TOP)
SLABS AND COLUMN OR WALL)
3. BENTANG PANJANG SLAB MAKSIMUM 1.5 x BENTANG
VILA KABIN TYPE 3
150 500 D10-200
PENDEK UNTUK BENTUK MODUL PERSEGI (LONG SPAN SLAB
MAXIMUM 1.5 x SHORT SPAN, ALL PANELS SHALL BE
BRICKWALL SLAB ON GRADE RECTANGULAR)
Hotel & Fasilitasnya

75 mm
Ly
Ly Cipayung Girang, Jawa Barat
l DETAIL TULANGAN TAMBAHAN PADA SUDUT DINDING
l II.4 (ADDITIONAL SLAB REINFORCEMENT DETAIL AT WALL CORNERS)
TULANGAN HORISONTAL TAMBAHAN
MINIMUM 1 D13
TULANGAN HORISONTAL TAMBAHAN
MINIMUM 1 D13
PEMOHON
DINDING (WALL)

0.125 L x 0.125 L x
D13
SPACER @ 1000 75 mm
75 mm
0.25 L x
D13
SPACER @ 1000 PT. TUMBUH SEMANGAT MAKMUR
0.25 L x ldw ldw
0.25 L x 0.25 L x

00
OPTIONAL OPTIONAL

10
5 D10 TULANGAN ATAS TAMBAHAN
> 0.3 L x > 0.3 L x (ADDITIONAL TOP REINFORCEMENT)
> 0.33 L x > 0.33 L x LAP BARS AS NOTED
Ly UNTUK MENCEGAH TULANGAN ON SLAB PLANS UNTUK MENCEGAH TULANGAN
Ly
PELAT TURUN PELAT TURUN

* Lx ADALAH PANJANG BERSIH PELAT DALAM ARAH YANG LEBIH PENDEK (CLEAR SPAN OF THE SHORTER SIDE OF SLAB) * Lx ADALAH PANJANG BERSIH PELAT DALAM ARAH YANG LEBIH PENDEK (CLEAR SPAN OF THE SHORTER SIDE OF SLAB) PERENCANA ARSITEKTUR
DINDING (WALL)
* Ly ADALAH PANJANG BERSIH PELAT DALAM ARAH YANG LEBIH PANJANG (CLEAR SPAN OF THE LONGER SIDE OF SLAB) * Ly ADALAH PANJANG BERSIH PELAT DALAM ARAH YANG LEBIH PANJANG (CLEAR SPAN OF THE LONGER SIDE OF SLAB)

40
0
* PERIKSA GBR PRINSIP PENULANGAN PELAT UNTUK MELIHAT KEBUTUHAN AKAN TULANGAN INI * PERIKSA GBR PRINSIP PENULANGAN PELAT UNTUK MELIHAT KEBUTUHAN AKAN TULANGAN INI INDOCAM
(REFER TO MAIN SLAB REINF. DRAWING AS FOR THE REINFORCEMENT REQUIREMENTS) (REFER TO MAIN SLAB REINF. DRAWING AS FOR THE REINFORCEMENT REQUIREMENTS) ARSITEKTUR
INTERIOR
iai.design.project@gmail.com

DETAIL PENULANGAN PELAT DENGAN ELEVASI BERBEDA UNTUK TULANGAN BIASA DETAIL PENGAKHIRAN TULANGAN PELAT (FLAT SLAB) PADA TEPI
(021)5810014 . 08119304350

II.5 II.6 PANJANG PENGAKHIRAN PENULANGAN PELAT UNTUK TULANGAN BIASA II.7
(REINFORCEMENT DETAILS FOR SLABS WITH STEPS USING ORDINARY REINFORCEMENT) (TERMINATION LENGTH OF SLAB REINFORCEMENT FOR ORDINARY REINFORCEMENT) (DETAIL OF FLAT SLAB TERMINATION AT EDGE)
B
1/6h < t < h
ldh l dh
ld >50mm KOLOM Lydia Surianata, S.T
ld 1/6h < t < h
h
> 50mm ldh No. SKA : 1.1.101.2.158.18.1938356
MIN 2 TULANGAN YANG MENERUS
l dh DROP PANEL PERENCANA STRUKTUR
>50mm
CIPTA SUKSES, PT.
ld h

tp
t 1.5h >50mm ENGINEERING CONSULTANT & CONTRACTOR
ldh 1
>50mm >6 Phone: 021-55963655, fax: 021-55958211

tdp
>2B/3 Email : engineering@ciptasukses.com
>2B/3 PENAMPANG KRITIS
ld ldh (CRITICAL SECTION)
ld 1/6h < t < h B >2B/3 KOLOM

B
h >2/3B
ldh ldh
A Anwar Susanto
l dh t ldh
>50mm ld POTONGAN A-A No. SKA : 1.2.201.1.025.09.1940039
ld >50mm 1/6h < t < h
ldh
PERENCANA MEKANIKAL & ELEKTRIKAL
t 1.5h 1.5h
h
B
>50mm MIN 2 TULANGAN YANG MENERUS
h 1
ldh >6
l dh atau l d ldh
1/6h < t < h >2B/3 PENAMPANG KRITIS
l dh OR d l B

tp
(CRITICAL SECTION)
B >2B/3
ld h B
ldh
DENAH POTONGAN B-B Rommel Sitorus
l dh B No. SKA : 1.4.405.2.175.28.1918806
t

ld (PLAN)
l dh JUDUL GAMBAR :
h
>50mm
1.5h
1 PEMASANGAN TULANGAN PADA DAERAH LUBANG PELAT VILA KABIN TYPE 3
>6 II.10 (ARRANGEMENT OF REINFORCEMENT NEAR SLAB PENETRATIONS)
ldh PENAMPANG KRITIS STANDARD DRAWING #3
DETAIL PENULANGAN PADA PENANAMAN KOTAK ELEKTRIKAL & MEKANIKAL (CRITICAL SECTION)
II.8 (REINFORCEMENT DETAIL IN AREA OF ELECTRICAL & MECHANICAL BOXES)
>2B/3
* HANYA BERLAKU UNTUK LUBANG DENGAN LUAS ≤ 0.3 m²
B & PANJANG MAKSIMUM 60 cm
B C (ONLY APPLICABLE TO HOLES WITH AN AREA ≤ 0.3 m² & SKALA :
a A MAXIMUM LENGTH OF 60 cm
MIN 40d MIN 40d a

ld

ld
DETAIL PENGAKHIRAN TULANGAN PELAT PADA TEPI LUBANG CATATAN
II.9 (DETAIL OF SLAB TERMINATION AT EDGE OF OPENING) b
ld a=D13 ATAU TULANGAN PLAT YANG MANA LEBIH BESAR
ANTARA TULANGAN ATAS & BAWAH
b (D13 OR THE LARGER OF THE TOP OR BOTTOM SLAB
NO REVISI TANGGAL DISETUJUI
a REINFORCEMENT)
KOTAK (BOX) BUKAAN a

C
a
ld
(OPENING) ld b=D13 ATAU TULANGAN PLAT YANG MANA LEBIH BESAR

ld
PIPA (PIPE)

ld
ANTARA TULANGAN ATAS & BAWAH
2 D10 (D13 OR THE LARGER OF THE TOP OR BOTTOM SLAB
a D10-s ld REINFORCEMENT)
c=JIKA C < 100 mm TULANGAN DIBENGKOKAN SEPERTI
TAMPAK DALAM GAMBAR
(IF C < 100 mm THEN BEND REINFORCEMENT AS
a = SAMA DENGAN TULANGAN YANG TERPUTUS ATAU D13 KOTAK (BOX) SHOWN ON THE DRAWING)
YANG MANA YANG LEBIH BESAR
(THE LARGER OF THE CUT REINFORCEMENT OR D13) ld
Alt. 1 2 D10 Alt. 2 DIGAMBAR :
ENG PERSETUJUAN :
ENG
DIPERIKSA : ENG TANGGAL :

TANGGAL : PARAF :

REVISI NO :

KODE GAMBAR / NO LEMBAR

- S-0103
KETERANGAN

1. SEMUA DIMENSI DALAM


MILIMETER KECUALI YANG
TERCANTUM DALAM GAMBAR

III. BALOK (BEAM)


2. BETON.
MUTU BETON f'c = 20 MPa

PENJELASAN PRINSIP PENULANGAN BALOK TULANGAN PINGGANG DETAIL SENGKANG 3. BAJA TULANGAN.
III.1 (EXPLANATION OF STANDARD BEAM REBAR DETAIL) III.2 (SKIN REINFORCEMENT) III.3 (STIRRUP DETAILS) - ULIR : S f ' y = 420 MPa
4. KONSTRUKSI BAJA.
300x600 JARAK MINIMAL ANTAR TUL. BALOK DAPAT DILIHAT PADA I.2 BAJA PROFIL : ASTM - A36

6d
6d
D10-100 D10-150 D10-100

6d
BAUT STRUKTUR : A-325 & A-307
7 3D22 7 TULANGAN PINGGANG D10 MUTU LAS : E - 70 XX
BILA TIDAK DITENTUKAN DALAM GAMBAR
H
4 5D22 4 UNTUK TULANGAN PINGGANG LIHAT III.2 TULANGAN PENGIKAT D10 @ 1000

X X X

TYPE B. 300x600 6d
PENJELASAN NOTASI SENGKANG: DUA SENGKANG DAPAT DIPASANG PADA
PENAMPANG MELINTANG BALOK BILA
TUMPUAN i LAPANGAN TUMPUAN j
DIPERLUKAN
(SUPPORT i) (MIDSPAN) (SUPPORT j)
D10-100 = SENGKANG D10 JARAK 100MM (2 KAKI) TINGGI BALOK TULANGAN PINGGANG (UMUM)

1.5 D10-100 = SENGKANG D10 JARAK 100MM (3 KAKI) H < 600 -


8d min 8d min
POTONGAN
(SECTION)

6d
600

600

600
2 D10-100 = SENGKANG D10 JARAK 100MM (4 KAKI) 600 < H < 900 2 X 1 D10

8d MIN
PROYEK
300 300 300 900 < H < 1200 2 X 2 D10

VILA KABIN TYPE 3

6d
TULANGAN ATAS (TOP REBAR) 7 D22 3 D22 7 D22 1200 < H < 1500 2 X 3 D13
TULANGAN BAWAH (BOTTOM REBAR) 4 D22 5 D22 4 D22

6d
SENGKANG (STIRRUPS) D10-100 D10-150 D10-100 1500 < H < 1800 2 X 4 D13
TUL.PINGGANG (SKIN REBAR) 2 D10 2 D10 2 D10
SEE DETAIL III.2 1800 < H < 2100 2 X 5 D13 Hotel & Fasilitasnya
SENGKANG DUA KAKI SENGKANG TIGA KAKI SENGKANG DENGAN EMPAT KAKI ALTERNATIF Cipayung Girang, Jawa Barat
* KECUALI DITENTUKAN LAIN DALAM GAMBAR DENGAN PLAT DIATAS BALOK

DETAIL PEMASANGAN TULANGAN UTAMA PADA BALOK DETAIL PEMASANGAN TULANGAN UTAMA PADA BALOK SLOOF DETAIL SPARING PIPA PADA BALOK BALOK DENGAN ELEVASI ATAU SUMBU YANG BERBEDA PEMOHON
III.4 (MAIN REINFORCEMENT INSTALLATION DETAIL FOR BEAMS) III.5 (MAIN REINFORCEMENT INSTALLATION DETAIL FOR GRADE BEAMS)
III.6 III.7 (BEAM WITH VARYING ELEVATION OR AXIS)
(PIPE PENETRATION DETAIL FOR BEAMS)
PEMASANGAN TULANGAN UTAMA UNTUK BALOK TANPA BALOK ANAK
(INSTALLATION OF MAIN REBAR FOR BEAMS NOT SUPPORTING OTHER BEAMS)
MUKA KOLOM MUKA KOLOM
1/4L n 1/2L n 1/4L n
PT. TUMBUH SEMANGAT MAKMUR
LIHAT DETAIL IV.5 ln DAERAH YANG BOLEH
(SEE DETAIL IV.5) DITEMBUS PIPA
ldh ln /4 ln /2 ln /4
(Tumpuan) (Lapangan) (Tumpuan) ld

H
15d 15d
15d 15d
ld
20d 20d hb 20d hb 20d
t <h b
Ln
hb PERENCANA ARSITEKTUR
hb
ln /4 ln /2 ln /4
MUKA PILE CAP MUKA PILE CAP INDOCAM
(Tumpuan) (Lapangan) (Tumpuan) ld ARSITEKTUR
ln INTERIOR

A
t hb
l ld iai.design.project@gmail.com

TULANGAN BALOK TULANGAN BALOK


(021)5810014 . 08119304350

MUKA KOLOM MUKA KOLOM 50 CM 2-D13


ln ATAS ld
PEMASANGAN TULANGAN UTAMA UNTUK BALOK DENGAN BALOK ANAK 1/6h < t < h
(INSTALLATION OF MAIN REBAR FOR BEAMS SUPPORTING OTHER BEAMS)
ln /4 ln /2 ln /4

1/2H

1/3H

1/2H
ld
l dh (Tumpuan) (Lapangan) (Tumpuan)

MIN 600MM
LIHAT DETAIL IV.5 hb hb

OR 0.25H

OR 0.25H
(SEE DETAIL IV.5) DETAIL A-A 15d 15d

20 CM

20 CM
MAX.

MAX.
H
BALOK ANAK ld hb
15d 15d ldh Lydia Surianata, S.T

t
20d hb 20d
No. SKA : 1.1.101.2.158.18.1938356

1/3H
2-D13 t hb hb
20d 20d hb PERENCANA STRUKTUR
2-D13 TULANGAN BALOK l dh l
atau d
PILE CAP / PONDASI PILE CAP / PONDASI 2-D13
TULANGAN BALOK BAWAH 1/6h < t < h
ld CIPTA SUKSES, PT.
l n /4 l n /2 l n /4 MUKA PILE CAP MUKA PILE CAP Potongan A ENGINEERING CONSULTANT & CONTRACTOR
(Tumpuan) (Lapangan) (Tumpuan) JARAK ANTAR SPARING PIPA MINIMUM 3 x DIAMETER SPARING
ln hb
Phone: 021-55963655, fax: 021-55958211
(SPACING BETWEEN PIPE PENETRATIONS MAXIMUM 3 x PENETRATION DIAMETER Email : engineering@ciptasukses.com
l
bw
DETAIL TULANGAN UNTUK BALOK VOUTE PENGATURAN SENGKANG UNTUK BALOK l dh

t
MINIMUM 4 SENGKANG DENGAN SPASI 100 mm III.8 (REINFORCEMENT DETAIL FOR HAUNCHED BEAMS) III.9 (INSTALLATION OF STIRRUPS IN BEAMS) ld
LIHAT DETAIL IV.5 DIPASANG SELEBAR BALOK ANAK
(SEE DETAIL IV.5) (A MINIMUM OF 4 STIRRUPS WITH A SPACING l dh
OF 100 mm MUST BE PROVIDED THROUGHOUT hb
0.33ln 25db AMBIL
YANG
25db 0.33ln THE SUPPORTED BEAM WIDTH) PENAMPANG KRITIS Anwar Susanto
DETAIL A-A No. SKA : 1.2.201.1.025.09.1940039
TERBESAR
< 50 mm
l dh
hb
l dh PENAMPANG KRITIS PERENCANA MEKANIKAL & ELEKTRIKAL
hb ld t <h b
25db 25db hb
hb
l n /4 l n /2 l n /4

8dmin
l dh hb
(Tumpuan) (Lapangan) (Tumpuan)
ln ln /4 ln /2 ln /4
ld (Tumpuan) (Lapangan) (Tumpuan)
l ln l
l dh
PEMASANGAN TULANGAN UNTUK BALOK KANTILEVER ld
(REINFORCEMENT INSTALLATION FOR CANTILEVER BEAMS) PENUMPU
l dh PENAMPANG KRITIS
50 mm Jarak sengkang adalah yang terkecil antara
ld 50 mm
h/4 atau 100 mm
t < 1/6h b
Rommel Sitorus
h No. SKA : 1.4.405.2.175.28.1918806
hb
l dh PENAMPANG KRITIS JUDUL GAMBAR :
< 50 mm dh
VILA KABIN TYPE 3
0

l n /2 l n /2 l n /2 l n /2
hb2
0

(Tumpuan jepit) (Ujung bebas) (Tumpuan jepit) (Ujung bebas) l dh


ln hb1 ln
l ld l
0

ldh
STANDARD DRAWING #4
hb
LETAK SAMBUNGAN SPLICE UNTUK BALOK
(LOCATION OF LAP SPLICES IN BEAMS)
ld hb
TIDAK DIJINKAN TIDAK DIJINKAN MUKA KOLOM MUKA KOLOM SKALA :
SPLICE SPLICE l dh ln
2hb AREA DIJINKAN SPLICE 2hb Jarak sengkang adalah yang terkecil antara ld
ln /4 ln /2 ln /4 PENUMPU
h/4 atau 100 mm
S ≤ 100 mm l dh (Tumpuan) (Lapangan) (Tumpuan) ld
CATATAN
SENGKANG TAMBAHAN 3
≤ d/4 BUAH MASUK PILE CAP
hb NO REVISI TANGGAL DISETUJUI

hb
1.3 ld
S ≤ 100 mm PILE CAP / PONDASI PILE CAP / PONDASI
≤ d/4 MUKA PILE CAP MUKA PILE CAP
* LOKASI SPLICE TIDAK DIJINKAN DI PERTEMUAN DENGAN BALOK ANAK < 50 mm
* LAP SPLICES ARE NOT PERMITTED AT INTERSECTIONS WITH OTHER BEAMS

DIGAMBAR :
ENG PERSETUJUAN :
ENG
DIPERIKSA : ENG TANGGAL :

TANGGAL : PARAF :

REVISI NO :

KODE GAMBAR / NO LEMBAR

- S-0104
KETERANGAN

1. SEMUA DIMENSI DALAM


MILIMETER KECUALI YANG
TERCANTUM DALAM GAMBAR

IV. KOLOM (COLUMN) 2. BETON.


MUTU BETON f'c = 20 MPa

KOLOM DENGAN DIMENSI ATAU SUMBU YANG BERBEDA DETAIL PENJANGKARAN KOLOM/ SHEAR WALL KE PONDASI RAFT/ PILE CAP 3. BAJA TULANGAN.
IV.1 (COLUMNS WITH VARYING DIMENSIONS OR STEPPED AXIS) IV.2 - ULIR : S f ' y = 420 MPa
(COLUMN/ SHEAR WALL ANCHORAGE TO RAFT FOUNDATION/ PILE CAP DETAIL)
4. KONSTRUKSI BAJA.
BAJA PROFIL : ASTM - A36
KASUS 1: Kemiringan tulangan yang KASUS 2: Kemiringan tulangan yang KASUS 3: Kemiringan tulangan yang BAUT STRUKTUR : A-325 & A-307
diteruskan ≤ 1:6 diteruskan > 1:6 & S ≤ 150mm diteruskan > 1:6 & S > 150mm MUTU LAS : E - 70 XX
Kolom Lantai Atas Kolom Lantai Atas
s ≤ 150 mm s > 150 mm
Kolom Lantai Atas

Balok Balok KOLOM ATAU BOUNDRY ELEMENT


KOLOM ATAU BOUNDRY ELEMENT KOLOM ATAU BOUNDRY ELEMENT YANG DEKAT DENGAN TEPI PONDASI
DI TENGAH YANG DEKAT DENGAN SUMP PIT / PIT LIFT
> ldh > ldh
1:>6

Balok

1:≤6 1:≤6

Tulangan diteruskan sampai


TULANGAN PENGEKANG
SUMP PIT / PIT LIFT SEPANJANG 1.25 ld ≤ h/2

ld

lantai bawahnya
ld
PROYEK

300 mm
VILA KABIN TYPE 3

1.25 l d

1.25 l d
Hotel & Fasilitasnya

h
s≤150 mm s > 150 mm
Cipayung Girang, Jawa Barat

1.25 l d
(A) (B) (C) SAMA DENGAN TULANGAN
SENGKANG KOLOM PEMOHON

Balok Balok Balok


MINIMUM 8 TULANGAN KOLOM / WALL
DITERUSKAN SAMPAI DASAR PONDASI
PT. TUMBUH SEMANGAT MAKMUR

LETAK SAMBUNGAN SPLICE UNTUK KOLOM PENGATURAN SENGKANG UNTUK KOLOM DETAIL PEMASANGAN TULANGAN PADA HUBUNGAN BALOK-KOLOM
IV.3 (LAP SPLICE LOCATION FOR COLUMNS) IV.4 IV.5 (REINFORCEMENT INSTALLATION DETAIL FOR BEAM-COLUMN JOINTS)
(STIRRUP DETAILS FOR COLUMNS)
LETAK SAMBUNGAN SPLICE KOLOM UNTUK STRUKTUR BANGUNAN TANPA BESMEN LETAK SAMBUNGAN SPLICE KOLOM UNTUK STRUKTUR BANGUNAN DENGAN BESMEN
(LOCATION OF COLUMN LAP SPLICES FOR STRUCTURES WITHOUT BASEMENTS) (LOCATION OF COLUMN LAP SPLICES FOR STRUCTURES WITH BASEMENTS) LIHAT TULANGAN LIHAT TULANGAN Optional
PENGEKANG KOLOM PENGEKANG KOLOM PERENCANA ARSITEKTUR
≤ 50 mm
(SEE COLUMN CONFINEMENT ≥ l dh (SEE COLUMN CONFINEMENT 12 db
h1 REINFORCEMENT) REINFORCEMENT)
INDOCAM
ARSITEKTUR

≥ l dh
INTERIOR

h
≥ l dh
iai.design.project@gmail.com
Balok Balok Balok Balok (021)5810014 . 08119304350

≤ 50 mm
max 50 mm
50 mm
b > l dh
S 1 ADALAH YANG TERKECIL DARI h > l dh

.
lo
S 1 IS TAKEN AS THE LEAST OF Lydia Surianata, S.T
S1 (a) h1/4 , h2/4
No. SKA : 1.1.101.2.158.18.1938356
(b) 6 db b
1.3ld

1.3ld
H

(c) 100 mm ≤ 100 - (360-hx) mm ≤ 150 mm


3
PERENCANA STRUKTUR

LOKASI PENYAMBUNGAN TULANGAN LOKASI PENYAMBUNGAN TULANGAN LIHAT TULANGAN CIPTA SUKSES, PT.
0.5 H

0.5 H

S2 S 2 ADALAH YANG TERKECIL DARI PENGEKANG KOLOM


BISA PER 2 LANTAI ATAU PER LANTAI BISA PER 2 LANTAI ATAU PER LANTAI ENGINEERING CONSULTANT & CONTRACTOR
S 2 IS TAKEN AS THE LEAST OF (SEE COLUMN CONFINEMENT
LIHAT TULANGAN REINFORCEMENT) Phone: 021-55963655, fax: 021-55958211
(a) 6 db PENGEKANG KOLOM ≤ 50 mm Email : engineering@ciptasukses.com
LANTAI DI ATAS DASAR/GROUND LANTAI DI ATAS DASAR/GROUND
(b) 150 mm (SEE COLUMN CONFINEMENT ≤ 50 mm

lu
S1 REINFORCEMENT)

1.3 ld
.

.
LIHAT DETAIL I.8 UNTUK DETAIL SAMBUNGAN SPLICE
Balok Balok Balok Balok
(SEE DETAIL I.8 FOR LAP SPLICE DETAIL)

12 db

h
Anwar Susanto
≤ 50 mm ≤ 50 mm No. SKA : 1.2.201.1.025.09.1940039
PERENCANA MEKANIKAL & ELEKTRIKAL

0,5 ul .
TIDAK DIIJINKAN PENYAMBUNGAN TULANGAN TIDAK DIIJINKAN PENYAMBUNGAN TULANGAN b > l dh
TERBESAR DARI h > l dh
DI ATAS LEVEL GROUND / PENJEPITAN DI ATAS LEVEL GROUND / PENJEPITAN (GREATEST OF)
H

h1
S1
h2 b
lo

PILECAP / PONDASI PILECAP / PONDASI lo ≥


.

lu/6
50 mm
(460mm) ≥ l dh

LANTAI DASAR/GROUND LANTAI DASAR/GROUND


IV.6 TULANGAN SPIRAL PADA KOLOM
(SPIRAL REINFORCEMENT IN COLUMNS)
Balok Balok MIN Rommel Sitorus
(MIN 1.5d A No. SKA : 1.4.405.2.175.28.1918806
1 .5d TAU
OR 4 0mm
4 0m JUDUL GAMBAR :
m C BERSIH
L EA
R)

DETAIL TULANGAN PENGEKANG UNTUK KOLOM VILA KABIN TYPE 3


IV.7 (CONFINEMENT REINFORCEMENT DETAILS FOR COLUMNS) STANDARD DRAWING #5
1.3ld
H

MAX 150 mm
6d l
b

6d
PILECAP / PONDASI b 6d 12d sMIN l

sM °)
(13

IN
0.5 H

SKALA :

5
(90°)
6d
b
LANTAI BASEMENT 1. PADA POTONGAN UJUNG HARUS DIBERIKAN 1.5 PUTARAN 2. UNTUK PANJANG SAMBUNGAN LEWATAN TULANGAN SPIRAL TIDAK CATATAN
TAMBAHAN DAN KAIT 135 DERAJAT DENGAN PANJANG KAIT BOLEH KURANG DARI YANG TERBESAR ANTARA 300 mm DAN 50 d s NO REVISI TANGGAL DISETUJUI
MINIMUM 6d SEPERTI GAMBAR. LIHAT DETAIL I.4. (SPIRAL LAP SPLICE LENGTH (l) SHALL NOT BE LESSER THAN THE
(AT THE TOP & BOTTOM SECTIONS PROVIDE 1.5 ADDITIONAL GREATER OF 300 mm AND 50 d s
TURNS AND A 135 DEGREE HOOK WITH A MIN HOOK LENGTH
OF 6d AS PER DRAWING. SEE DETAIL I.4.)

JARAK PUSAT KE PUSAT


ANTARA SENGKANG TIDAK 6db
BOLEH LEBIH 350mm 3. PEMISAH SENGKANG SPIRAL HARUS DIGUNAKAN UNTUK MEMPERTAHANKAN JARAK SENGKANG YANG TETAP
(SPIRAL TIE FIXINGS SHALL BE USED TO MAINTAIN THE REQUIRED SPACING)
TIES/CONFINEMENT YANG MEMEGANG TULANGAN LONGITUDINAL
MEMPUNYAI KAIT 90' PADA SISI KOLOM YANG BERLAWANAN
DIGAMBAR :
ENG PERSETUJUAN :
ENG
DIPERIKSA : ENG TANGGAL :

TANGGAL : PARAF :

REVISI NO :

KODE GAMBAR / NO LEMBAR

- S-0105
KETERANGAN

1. SEMUA DIMENSI DALAM


MILIMETER KECUALI YANG
TERCANTUM DALAM GAMBAR

V. DINDING DAN BALOK KOPEL (WALL AND COUPLING BEAM) 2. BETON.


MUTU BETON f'c = 20 MPa

DETAIL PENYALURAN SHEARWALL KE BOUNDARY ELEMENT 3. BAJA TULANGAN.


V.1 V.2 DETAIL PEMASANGAN TULANGAN BALOK KOPEL
- ULIR : S f ' y = 420 MPa
(ANCHORAGE DETAIL OF SHEARWALL TO BOUNDARY ZONE) (COUPLING BEAM REINFORCEMENT DETAIL)
4. KONSTRUKSI BAJA.
BAJA PROFIL : ASTM - A36
VERTICAL REBAR BOUNDARY ZONE BAUT STRUKTUR : A-325 & A-307
BOUNDARY ZONE
MUTU LAS : E - 70 XX
Lbz1 Lbz1
150mm 150mm

A
y x x y
y

t
Lbz2

ld
1.25 PROYEK
DIAGONAL REBAR
BOUNDARY HOOPS TIES HORISONTAL REBAR TIES
ALTERNATIF 1 VILA KABIN TYPE 3
x = > ld (MUST BE EXTENDED TO y) l be SHEARWALL COUPLING BEAM SHEARWALL

Hotel & Fasilitasnya


y = 150 mm l dh
Cipayung Girang, Jawa Barat
MAX 200 mm

12db
PEMASANGAN TIES MENGIKUTI STANDAR DETAIL KOLOM,

tw
PEMOHON
LIHAT DETAIL IV.7 JIKA PENJANGKARAN DIAGONAL REBAR MELEBIHI SHEARWALL
MAKA DAPAT DITEKUK DENGAN PANJANG TETAP SAMA
(INSTALLATION OF TIES FOLLOW COLUMN DETAILS, ≤ 150 mm PT. TUMBUH SEMANGAT MAKMUR
SEE DETAIL IV.7)
ALTERNATIF 2
CATATAN (NOTES) : l be 1.5
ld
PENYALURAN BADAN SHEARWALL KE BOUNDARY ELEMENT
DAPAT MENGIKUTI SALAH SATU ALTERNATIF ld
ANCHORAGE OF THE SHEAR WALL PANEL TO THE BOUNDARY PERENCANA ARSITEKTUR
ELEMENT CAN FOLLOW ANY OF THE PROVIDED ALTERNATIVES DIAGONAL REBAR
x

INDOCAM

tw
MAX 200 mm ARSITEKTUR
INTERIOR
150 iai.design.project@gmail.com
(021)5810014 . 08119304350

≤ 150 mm
BOUNDARY ZONE BOUNDARY ZONE

t
y

POTONGAN A-A
Lydia Surianata, S.T
No. SKA : 1.1.101.2.158.18.1938356
PERENCANA STRUKTUR
DETAIL SHEARWALL KE PILECAP DETAIL PERTEMUAN SEGMEN DINDING DETAIL DINDING DENGAN PERBEDAAN TEBAL DETAIL PEMASANGAN WATERSTOP
V.3 V.4 V.5 V.6
(DETAIL JOINT SHEARWALL TO PILECAP) (DETAIL OF INTERSECTIONS OF WALL SEGMENTS) (DETAIL OF WALLS WITH VARYING THICKNESS) (WATERSTOP INSTALLATION DETAIL) CIPTA SUKSES, PT.
ENGINEERING CONSULTANT & CONTRACTOR
Phone: 021-55963655, fax: 021-55958211
t Email : engineering@ciptasukses.com
*DETAIL INI PERLU DILIHAT SECARA BERSAMAAN DENGAN DETAIL IV.2
a) b)
(THIS DETAIL MUST BE CONSIDERED IN CONJUNCTION WITH DETAIL IV.2) 1.3 ld WALL KASUS 1: KASUS 2: RETAINING WALL

KEMIRINGAN TULANGAN YANG KEMIRINGAN TULANGAN YANG


SHEAR WALL
d

BESI PENGGANTUNG D-13


DITERUSKAN ≤ 1:6 DITERUSKAN > 1:6 & S ≤ 150mm BESI Ø10-300 Anwar Susanto

h W2

h W2
WATER STOP No. SKA : 1.2.201.1.025.09.1940039
BATAS PENGECORAN
PERENCANA MEKANIKAL & ELEKTRIKAL
NOTE:
DINDING
1.3 ld

WATERSTOP PVC ATAU SWELLABLE


ld

DINDING LANTAI ATAS DISESUAIKAN DENGAN METODE KERJA


PILE CAP
DINDING LANTAI ATAS
s ≤ 150 mm

h W1
h W1 1.3 ld
BALOK
2d BESI PENGGANTUNG D-13
BESI Ø10-300
> ldh

1:>6
12db BALOK WATER STOP
BATAS PENGECORAN Rommel Sitorus
1:≤6
No. SKA : 1.4.405.2.175.28.1918806

250(MIN)
MENERUS SAMPAI DASAR PILE CAP

H
h W1
JUDUL GAMBAR :

1/2H
ld
12d bMIN
VILA KABIN TYPE 3
AREA UJUNG
SHEAR WALL STANDARD DRAWING #6
d

h W2
ldh
1.3 ld

SKALA :

= 8 BUAH BESI YANG MENERUS


1.3 ld
SAMPAI DASAR PILE CAP. PELAT DIATAS TANAH (SLAB ON GRADE) CATATAN
2d 2d
PILE CAP

ld

NO REVISI TANGGAL DISETUJUI


250(MIN)
KONSTRUKSI SAMBUNGAN

h W3
SHEET MEMBRANE

1000 1000 1000


PEMBESIAN UJUNG SHEAR WALL (END REBAR) TAMPAK DENAH LANTAI KERJA DARI BETON
HANYA 8 BUAH BESI PADA SUDUT-SUDUT & DIANTARANYA (PLAN VIEW) WATER STOP
YANG PERLU DITERUSKAN SAMPAI KE DASAR PILE CAP.
DIGAMBAR :
ENG PERSETUJUAN :
ENG
DIPERIKSA : ENG TANGGAL :

TANGGAL : PARAF :

REVISI NO :

KODE GAMBAR / NO LEMBAR

- S-0106
KETERANGAN

1. SEMUA DIMENSI DALAM


MILIMETER KECUALI YANG
TERCANTUM DALAM GAMBAR

VI. PONDASI (FOUNDATION) 2. BETON.


MUTU BETON f'c = 20 MPa

PENJANGKARAN TULANGAN TIANG PONDASI DAN PENULANGAN PILE CAP PENULANGAN ADDITIONAL CCONCRETE DIBAWAH TIE BEAM PADA BIDANG PILE CAP 3. BAJA TULANGAN.
VI.1 (ANCHORAGE OF PILE REINFORCEMENT AND PILE CAP REINFORCEMENT) VI.2 (ADDITIONAL CONCRETE REINFORCEMENT UNDER TIE BEAM AT TOP OF PILE CAP ) - ULIR : S f ' y = 420 MPa
4. KONSTRUKSI BAJA.
BAJA PROFIL : ASTM - A36
BAUT STRUKTUR : A-325 & A-307
MUTU LAS : E - 70 XX
TIE BEAM

B
TIE BEAM

s
p

l
A A ADDITIONAL CONCRETE
l

A A
s PROYEK

B
p
s
TIE BEAM VILA KABIN TYPE 3

B
p

TIE BEAM DENAH PILE CAP


s (PLAN OF PILE CAP)
Hotel & Fasilitasnya
DENAH PILE CAP 2TP l
(PLAN OF 2 PILE, PILE CAP) Cipayung Girang, Jawa Barat
DENAH PILE CAP 3TP
(PLAN OF 3 PILE, PILE CAP)
PEMOHON

KOLOM KOLOM KOLOM KOLOM


(COLUMN) (COLUMN) (COLUMN) (COLUMN)
p l PEIL ATAS PILE CAP TIE BEAM
PT. TUMBUH SEMANGAT MAKMUR
PEIL ATAS PILE CAP (RL OF TOP OF
(RL OF TOP OF PILE CAP) PLIE CAP)

TIE BEAM
PEIL ATAS D10-200

30d
30d

T. PANCANG
PEIL ATAS T. PANCANG (RL OF TOP OF
< 500 mm < 500 mm (RL OF TOP OF ANCHORAGE PERENCANA ARSITEKTUR
ANCHORAGE REINF.) < 500 mm REINF.)

Ho ≤ 1000 mm

Ho ≤ 1000 mm
t
t

D10-200
INDOCAM
Pemecahan kepala

75
tiang pancang

75

750
ARSITEKTUR
ld

C.O.L COL INTERIOR


(CUT OFF LEVEL.) 400
75
(CUT OFF LEVEL) iai.design.project@gmail.com
(021)5810014 . 08119304350
75

D13-100

520

520
LANTAI KERJA 1Pc : 3Ps : 5Kr D13-100
(BLINDING LAYER 1 PART CEMENT,
3 PARTS SAND, 5 PARTS LIME) LANTAI KERJA 1Pc : 3Ps : 5Kr
s (BLINDING LAYER 1 PART CEMENT
TIANG PONDASI TIANG PONDASI 3 PARTS SAND & 5 PARTS LIME)
(FOUNDATION PILE) PASIR URUG DIPADATKAN (FOUNDATION PILE)
(COMPACTED SAND) PASIR URUG DIPADATKAN
(COMPACTED SAND) Lydia Surianata, S.T
PILE CAP PILE CAP No. SKA : 1.1.101.2.158.18.1938356
POTONGAN A-A POTONGAN B-B PERENCANA STRUKTUR
(SECTION A-A) (SECTION B-B)
CIPTA SUKSES, PT.
ENGINEERING CONSULTANT & CONTRACTOR
TIANG PONDASI TIANG PONDASI
(FOUNDATION PILE) Phone: 021-55963655, fax: 021-55958211
(FOUNDATION PILE) Email : engineering@ciptasukses.com
PENJANGKARAN DAN SAMBUNGAN LEWATAN TIANG BOR COR DI TEMPAT
VI.3 (ANCHORAGE AND LAP SPLICING OF CAST-IN-SITU BORED PILE)
POTONGAN A-A POTONGAN B-B
AREA PEMBOBOKAN (SECTION A-A) (SECTION B-B)
TIANG BOR
(EXTENT OF CUT BACK Anwar Susanto
OF BORED PIER) No. SKA : 1.2.201.1.025.09.1940039
MIN
(MIN 1.5d A PENJANGKARAN TULANGAN TIANG PANCANG PERENCANA MEKANIKAL & ELEKTRIKAL
AKHIRAN PENGECORAN
TIANG BOR
1 .5d TAU
OR 4 0mm
4 0m
VI.4 (ANCHORAGE OF PRECAST PILE)
(EXTENT OF POUR m C BERSIH
L EA
OF BORED PIER) R)

BERI SENGKANG JARAK 100MM


SESUAI BOREDPILE
SENGKANG IKUT DETAIL BOPILE

MINIMUM 1.5 PUTARAN TANPA SPIRAL PEMISAH


6d
ld

6d

KOLOM
sM °)

(MIN. 1.5 TURNS WITHOUT SPIRAL TIE FIXINGS)


Ms IN
(13

IN

(13
5

l

C.O.L (CUT OFF LEVEL)


)

Rommel Sitorus
SELIMUT BETON T=70 mm
100

(CONCRETE COVER T=70 mm) No. SKA : 1.4.405.2.175.28.1918806


SENGKANG D10-100 JUDUL GAMBAR :

PILE CAP
VILA KABIN TYPE 3
1. PADA POTONGAN UJUNG HARUS DIBERIKAN 1.5 PUTARAN TAMBAHAN DAN KAIT 135 DEG. STANDARD DRAWING #7

Min ld
LANTAI KERJA
DENGAN PANJANG KAIT MINIMUM 6d SEPERTI GAMBAR. 1Pc : 3Ps : 5Kr
(AT THE TOP & BOTTOM SECTIONS PROVIDE 1.5 ADDITIONAL TURNS AND A 135 DEG. HOOK
WITH A MIN HOOK LENGTH OF 6d AS PER DRAWING) PASIR URUG DIPADATKAN
ld

2. UNTUK PANJANG SAMBUNGAN LEWATAN TARIK (ld) LIHAT TABEL SAMBUNGAN LEWATAN SKALA :
(FOR TENSION LAP SPLICE LENGTH (ld) REFER TO LAP SPLICE TABLE.)
3. PEMISAH SENGKANG SPIRAL HARUS DIGUNAKAN UNTUK MEMPERTAHANKAN JARAK CATATAN
SENGKANG YANG TETAP.
NO REVISI TANGGAL DISETUJUI
(SPIRAL TIE FIXINGS SHALL BE USED TO MAINTAIN THE REQUIRED TIE SPACING)
TIANG PANCANG (SQUARE PILE)

d b= DIAMETER TULANGAN UTAMA (DIA OF MAIN REINFORCEMENT) UNTUK SPUN PILE MENGGUNAKAN PLUGGING
d s= DIAMETER TULANGAN SPIRAL (DIA OF SPIRAL REINFORCEMENT) REFER TO GAMBAR STRUKTUR

POTONGAN UJUNG POTONGAN TENGAH POTONGAN BAWAH


(TOP SECTION) (MID SECTION) (BOTTOM SECTION) DIGAMBAR :
ENG PERSETUJUAN :
ENG
DIPERIKSA : ENG TANGGAL :

TANGGAL : PARAF :

REVISI NO :

KODE GAMBAR / NO LEMBAR

- S-0107
KETERANGAN

1. SEMUA DIMENSI DALAM


MILIMETER KECUALI YANG
TERCANTUM DALAM GAMBAR

VII. LAIN-LAIN (OTHER) 2. BETON.


MUTU BETON f'c = 20 MPa

PENULANGAN PARAPET PARKIR DAN RAMP DETAIL PENULANGAN TANGGA DETAIL TIPIKAL LISTPLANK DETAIL SEPARATOR BEAM & COLUMN 3. BAJA TULANGAN.
VII.1 VII.2 (TYPICAL DETAIL REINFORCEMENT ON STAIRS) VII.3 (LISTPLANK TYPICAL DETAIL) VII.4 (SEPARATOR BEAM & COLUMN DETAIL) - ULIR : S f ' y = 420 MPa
(PARKING PARAPET AND RAMP PARAPET TYPICAL DETAIL)
4. KONSTRUKSI BAJA.
BAJA PROFIL : ASTM - A36
BAUT STRUKTUR : A-325 & A-307
MUTU LAS : E - 70 XX
150 ANGKUR 4 Ø16 - L=18 CM
LT.ATAP BASE PLATE t=12mm

60
BALOK STRUKTUR

2000/REF.ME
MAX 1200 OR REFER ARS

60 100

220
PELAT
D13-150 ld
40 80 40
ld
160

2000/REF.ME
Ø10-150 LT TYP
ld

D10-200 ld Ø8-200
PROYEK

MAX 500mm
LISTPLANK
PELAT DIGROUTING
6 VILA KABIN TYPE 3

2000/REF.ME
BAUT 2 Ø3/4" A-325
PLATE t=10mm

Hotel & Fasilitasnya

60 60 3545
100 WF-200x100x5.5x8 Cipayung Girang, Jawa Barat

WF-200x100x5,5x8
2000/REF.ME
UNTUK LISTPLANK > 500MM HARAP MEMBERITAHU PERENCANA PEMOHON

TIPIKAL
BALOK LT DASAR
ATAU LIHAT DETAIL GAMBAR STRUKTUR 35 35
99
PT. TUMBUH SEMANGAT MAKMUR

2000/REF.ME
DINDING CORE

ALTERNATIF SEPARATOR BEAM


DENGAN BALOK BETON 200X400 PERENCANA ARSITEKTUR
KOLOM PRAKTIS DAN LINTEL BEAM NON-STRUCTURAL WALL

2000/REF.ME
VII.5
(STIFFENER COLUMN AND LINTEL BEAM FOR MASONRY WALL) TYPE 200x400 (SEPARATOR BEAM) INDOCAM
TUMPUAN LAPANGAN ARSITEKTUR
LT BSM TULANGAN ATAS 3 D16 2 D16 INTERIOR
iai.design.project@gmail.com
TULANGAN BAWAH 2 D16 3 D16 (021)5810014 . 08119304350

D10-150 D10-200
SESUAI UKURAN CORE SENGKANG
TUL.PINGGANG -

NOTE:
BALOK JARAK ANTAR SEPARATOR DISESUAIKAN DENGAN SUPPLIER

Lydia Surianata, S.T


hx max = 12m2 PEMISAHAN 3 CM / ISI SPESI UNTUK RUANG DEFLEKSI BALOK (BENTANG < 8m)
No. SKA : 1.1.101.2.158.18.1938356
200
h max = 4m KP PEMISAHAN 5 CM UNTUK RUANG DEFLEKSI BALOK (BENTANG >= 8m) PERENCANA STRUKTUR
DAPAT DIISI STEROFOAM / BAHAN LUNAK
max = 4m
CIPTA SUKSES, PT.
Hw

LT= LINTEL BEAM LT LT KOLOM SEPARATOR ENGINEERING CONSULTANT & CONTRACTOR


Phone: 021-55963655, fax: 021-55958211

400
200x400
KP= KOLOM PRAKTIS Email : engineering@ciptasukses.com
h

KP WF-200x100x5.5x8

Cek
15 15 mm CONCRETE COVER
20

TULANGAN : 6-D16
VAR.

BALOK SENGKANG D10-200


KOLOM PRAKTIS KOLOM SEPARATOR
. . Anwar Susanto
20

100 Lw DINDING CORE


No. SKA : 1.2.201.1.025.09.1940039
PERENCANA MEKANIKAL & ELEKTRIKAL

DOWEL (OPTIONAL)
Ø10-500

KETERANGAN
BALOK PONDASI PERALATAN M/E TRAFO, POMPA
LENGTH
Hw < 3 m
DIMENSION
100 x 100
REBAR
4Ø8
STIRRUP
Ø8-150
VII.6 (FOUNDATION FOR LIGHT M/E EQUIPMENT )
KP 3 < Hw < 4 m 100 x 150 4 Ø 10 Ø8-150

4 < Hw < 5 m 100 x 200 4 Ø 10 Ø8-150


LT
KOLOM/WALL Rommel Sitorus
<3m 100 x 150 4 Ø 10 Ø8-150 DOWELL Ø10-500 (OPTIONAL) No. SKA : 1.4.405.2.175.28.1918806
LT JUDUL GAMBAR :
Hw

OPENING
3< <4m 100 x 200 6 Ø 10 Ø8-150
LT LT
PENINGGIAN 150 mm
(STRUKTURAL) VILA KABIN TYPE 3
LT PAS. BATU BATA
KP KP

NOTE :
100 200
D10-150 STANDARD DRAWING #8
SETIAP PERTEMUAN KUSEN DAN SUDUT DINDING
DIBERI KOLOM PRAKTIS / REF ARS

150
150
SKALA :
(1) (2) (3)
Lw

t
CATATAN
STRUCTURAL SLAB
NO REVISI TANGGAL DISETUJUI

DIGAMBAR :
ENG PERSETUJUAN :
ENG
DIPERIKSA : ENG TANGGAL :

TANGGAL : PARAF :

REVISI NO :

KODE GAMBAR / NO LEMBAR

- S-0108
KETERANGAN

NOTASI TYPE DIMENSI DAYA DUKUNG JUMLAH KETERANGAN 1. SEMUA DIMENSI DALAM
MILIMETER KECUALI YANG
PANCANG TENGAH 250x250 40 TON - KEDALAMAN EFEKTIF TIANG 8 Meter/ TERCANTUM DALAM GAMBAR
SAMPAI TANAH KERAS (FINAL SET)
2. BETON.
MUTU BETON f'c = 20 MPa
3. BAJA TULANGAN.
A B C D - ULIR : S f ' y = 420 MPa
4. KONSTRUKSI BAJA.
7300 BAJA PROFIL : ASTM - A36
BAUT STRUKTUR : A-325 & A-307
PLATE T=8mm MUTU LAS : E - 70 XX
2650 2650 2000 PRESTRES PILE

DILAS KE PLATE

250
TULANGAN UTAMA

5 250

POTONGAN-01
SKALA-NTS DETAIL SAMBUNGAN
SKALA-NTS
1425

PROYEK

PC-1 PC-1 VILA KABIN TYPE 3

SP∅6-50
Lv. LANTAI

500
4 Hotel & Fasilitasnya

H
Cipayung Girang, Jawa Barat

SP∅6-100
C.O.L

500

100
PEMOHON
LT KERJA

PS URUG
TULANGAN PT. TUMBUH SEMANGAT MAKMUR
TIANG PANCANG

TIANG PANCANG
3175

DETAIL STEK TIANG PERENCANA ARSITEKTUR


SKALA-NTS

INDOCAM
01
ARSITEKTUR
INTERIOR
iai.design.project@gmail.com

SP∅6-200
LENGHT
(021)5810014 . 08119304350

PC-1 PC-1
Lydia Surianata, S.T
9200

3 No. SKA : 1.1.101.2.158.18.1938356


PERENCANA STRUKTUR

CIPTA SUKSES, PT.


ENGINEERING CONSULTANT & CONTRACTOR
Phone: 021-55963655, fax: 021-55958211
Email : engineering@ciptasukses.com

TULANGAN UTAMA

DILAS KE PLATE
Anwar Susanto

PLATE T=8mm
SP∅6-100
No. SKA : 1.2.201.1.025.09.1940039
3175

500
PERENCANA MEKANIKAL & ELEKTRIKAL

SP∅6-50
500
DETAIL TIANG PANCANG
PC-1 PC-1 SKALA NTS
Rommel Sitorus
No. SKA : 1.4.405.2.175.28.1918806
Ø 8-200
2 JUDUL GAMBAR :
Ø 8-200
VILA KABIN TYPE 3
DENAH PONDASI
HOOPS 3D10
1425

Ø 8-200

300

D13-100
D10

LD =400
Ø 8-200
SKALA :

600
D13-100

600
D13-100 CATATAN

300
NO REVISI TANGGAL DISETUJUI
1

100
D13-100
50
LT KERJA
300 300

100
PS URUG
600
TIANG PANCANG
250x250 MM

1 DENAH PONDASI DIGAMBAR :


ENG PERSETUJUAN :
ENG

S-1001 1 : 50 1 DETAIL PC.1 DIPERIKSA : ENG TANGGAL :

TANGGAL : PARAF :

S02.2B 1 : 25 REVISI NO :

KODE GAMBAR / NO LEMBAR

- S-1001
KETERANGAN

1. SEMUA DIMENSI DALAM


MILIMETER KECUALI YANG
TERCANTUM DALAM GAMBAR
2. BETON.
MUTU BETON f'c = 20 MPa
A B C D 3. BAJA TULANGAN.
- ULIR : S f ' y = 420 MPa
7300 4. KONSTRUKSI BAJA.
BAJA PROFIL : ASTM - A36
2650 2650 2000 BAUT STRUKTUR : A-325 & A-307
MUTU LAS : E - 70 XX

B.200x400 B.200x400 B.200x400


5

B.200x400

B.200x400
B.200x400

B.200x400
S1 S1 S1

1425
PROYEK

B.250x400 B.200x400 VILA KABIN TYPE 3


4
Hotel & Fasilitasnya
Cipayung Girang, Jawa Barat

PEMOHON

PT. TUMBUH SEMANGAT MAKMUR


S1 S1

B.200x400

B.200x400

B.200x400

B.200x400
S1
3175

AL±0.000 PERENCANA ARSITEKTUR


SL-0.050
INDOCAM
ARSITEKTUR
INTERIOR
iai.design.project@gmail.com
(021)5810014 . 08119304350

B.250x400 B.200x400
9200

3 Lydia Surianata, S.T


No. SKA : 1.1.101.2.158.18.1938356
PERENCANA STRUKTUR
1 CIPTA SUKSES, PT.
S-4001 ENGINEERING CONSULTANT & CONTRACTOR
Phone: 021-55963655, fax: 021-55958211
S1 Email : engineering@ciptasukses.com

B.200x400
B.200x400

B.200x400

B.200x400

B.200x400
S1
3175

Anwar Susanto
S1 No. SKA : 1.2.201.1.025.09.1940039
PERENCANA MEKANIKAL & ELEKTRIKAL

S1

B.250x400 B.200x400
Rommel Sitorus
2 No. SKA : 1.4.405.2.175.28.1918806
JUDUL GAMBAR :

VILA KABIN TYPE 3

B.200x400
B.200x400
S1 S1
B.200x400

DENAH LANTAI 1
1425

B.200x400 B.200x400 SKALA :

CATATAN
1 NO REVISI TANGGAL DISETUJUI

DIGAMBAR :
ENG PERSETUJUAN :
ENG
1 DENAH LANTAI 1 DIPERIKSA : ENG TANGGAL :

TANGGAL : PARAF :
S-3001 1 : 50
REVISI NO :

KODE GAMBAR / NO LEMBAR

- S-3001
KETERANGAN

1. SEMUA DIMENSI DALAM


MILIMETER KECUALI YANG
TERCANTUM DALAM GAMBAR
2. BETON.
MUTU BETON f'c = 20 MPa
3. BAJA TULANGAN.
A B C D - ULIR : S f ' y = 420 MPa

7300 4. KONSTRUKSI BAJA.


BAJA PROFIL : ASTM - A36
BAUT STRUKTUR : A-325 & A-307
2650 2650 2000 MUTU LAS : E - 70 XX

1425
PROYEK

WF.250x125 VILA KABIN TYPE 3


4
Hotel & Fasilitasnya
Cipayung Girang, Jawa Barat

PEMOHON

PT. TUMBUH SEMANGAT MAKMUR


AL+2.500

WF.200x100
WF.250x125

WF.250x125
3175 SL+2.450

MAX LIVE LOAD = 300 kgf/m2 PERENCANA ARSITEKTUR

PENUTUP LANTAI GRC t = 20 mm INDOCAM


ARSITEKTUR
INTERIOR
iai.design.project@gmail.com
(021)5810014 . 08119304350

WF.250x125
9200

3 Lydia Surianata, S.T


No. SKA : 1.1.101.2.158.18.1938356
PERENCANA STRUKTUR

WF.200x100
1 WF.250x125 CIPTA SUKSES, PT.
ENGINEERING CONSULTANT & CONTRACTOR
S-4001 Phone: 021-55963655, fax: 021-55958211
Email : engineering@ciptasukses.com

WF.250x125

WF.250x125
Anwar Susanto
3175

WF.200x100 No. SKA : 1.2.201.1.025.09.1940039


PERENCANA MEKANIKAL & ELEKTRIKAL
WF.200x100

WF.250x125 Rommel Sitorus


No. SKA : 1.4.405.2.175.28.1918806
2
JUDUL GAMBAR :

VILA KABIN TYPE 3


DENAH LANTAI 2
1425

SKALA :

CATATAN
1 NO REVISI TANGGAL DISETUJUI

DIGAMBAR :
ENG PERSETUJUAN :
ENG

DENAH LANTAI 2 DIPERIKSA : ENG TANGGAL :

1
TANGGAL : PARAF :

S-3002 1 : 50 REVISI NO :

KODE GAMBAR / NO LEMBAR

- S-3002
KETERANGAN

1. SEMUA DIMENSI DALAM


MILIMETER KECUALI YANG
TERCANTUM DALAM GAMBAR
2. BETON.
MUTU BETON f'c = 20 MPa
A B C D 3. BAJA TULANGAN.
- ULIR : S f ' y = 420 MPa
7300 4. KONSTRUKSI BAJA.
BAJA PROFIL : ASTM - A36
2650 2650 2000 BAUT STRUKTUR : A-325 & A-307
MUTU LAS : E - 70 XX

1425
PROYEK

WF.250x125 WF.250x125 VILA KABIN TYPE 3


4
Hotel & Fasilitasnya
Cipayung Girang, Jawa Barat

PEMOHON

PT. TUMBUH SEMANGAT MAKMUR

3175
PERENCANA ARSITEKTUR

INDOCAM
ARSITEKTUR
INTERIOR
iai.design.project@gmail.com
(021)5810014 . 08119304350

WF.250x125 WF.250x125
9200

3 Lydia Surianata, S.T


No. SKA : 1.1.101.2.158.18.1938356
PERENCANA STRUKTUR
1
CIPTA SUKSES, PT.
S-4001 ENGINEERING CONSULTANT & CONTRACTOR
Phone: 021-55963655, fax: 021-55958211
Email : engineering@ciptasukses.com
3175

Anwar Susanto
No. SKA : 1.2.201.1.025.09.1940039
PERENCANA MEKANIKAL & ELEKTRIKAL

WF.250x125 WF.250x125
Rommel Sitorus
2 No. SKA : 1.4.405.2.175.28.1918806
JUDUL GAMBAR :

VILA KABIN TYPE 3


1425

DENAH ATAP

SKALA :

CATATAN
1
NO REVISI TANGGAL DISETUJUI

1 DENAH ATAP DIGAMBAR :


ENG PERSETUJUAN :
ENG
DIPERIKSA : ENG TANGGAL :
S-3003 1 : 50 TANGGAL : PARAF :

REVISI NO :

KODE GAMBAR / NO LEMBAR

- S-3003
KETERANGAN

1. SEMUA DIMENSI DALAM


MILIMETER KECUALI YANG
TERCANTUM DALAM GAMBAR
2. BETON.
MUTU BETON f'c = 20 MPa
3. BAJA TULANGAN.
- ULIR : S f ' y = 420 MPa
4. KONSTRUKSI BAJA.
BAJA PROFIL : ASTM - A36
BAUT STRUKTUR : A-325 & A-307
A B C D MUTU LAS : E - 70 XX

2650 2650 2000

PROYEK
DENAH ATAP
5930 VILA KABIN TYPE 3

Hotel & Fasilitasnya


Cipayung Girang, Jawa Barat

PEMOHON

PT. TUMBUH SEMANGAT MAKMUR

3480
PERENCANA ARSITEKTUR

INDOCAM
ARSITEKTUR
INTERIOR
iai.design.project@gmail.com

WF.250x125 WF.250x125
(021)5810014 . 08119304350

DENAH LANTAI 2
Lydia Surianata, S.T
2450 No. SKA : 1.1.101.2.158.18.1938356
PERENCANA STRUKTUR
WF.250x125 WF.250x125
CIPTA SUKSES, PT.
ENGINEERING CONSULTANT & CONTRACTOR
Phone: 021-55963655, fax: 021-55958211
Email : engineering@ciptasukses.com

2500
Anwar Susanto
No. SKA : 1.2.201.1.025.09.1940039
PERENCANA MEKANIKAL & ELEKTRIKAL

DENAH LANTAI 1
-50

Rommel Sitorus
B.200x400 B.200x400 B.200x400 B.200x400 No. SKA : 1.4.405.2.175.28.1918806
JUDUL GAMBAR :

2100
VILA KABIN TYPE 3
K3a3a K3a3a POTONGAN

SKALA :

JALAN CATATAN
NO REVISI TANGGAL DISETUJUI
-2150

DIGAMBAR :
ENG PERSETUJUAN :
ENG
DIPERIKSA : ENG TANGGAL :

1 POTONGAN 1
TANGGAL : PARAF :

S-4001 1 : 50 REVISI NO :

KODE GAMBAR / NO LEMBAR

- S-4001
KETERANGAN

1. SEMUA DIMENSI DALAM


MILIMETER KECUALI YANG
TERCANTUM DALAM GAMBAR
2. BETON.
MUTU BETON f'c = 20 MPa
DETAIL POTONGAN PELAT 3. BAJA TULANGAN.
- ULIR : S f ' y = 420 MPa
TULANGAN ATAS (T) TULANGAN BAWAH (B) 4. KONSTRUKSI BAJA.
BAJA PROFIL : ASTM - A36
Lx Lx BAUT STRUKTUR : A-325 & A-307
MUTU LAS : E - 70 XX
0.25 Lx 0.5 Lx 0.25 Lx 0.25 Lx 0.5 Lx 0.25 Lx

0.25 Lx
0.25 Lx

B1.y
PROYEK

T1.x VILA KABIN TYPE 3

Ly

Ly
T1.y
B1.x
Hotel & Fasilitasnya
Cipayung Girang, Jawa Barat

PEMOHON

0.25 Lx

0.25 Lx
PT. TUMBUH SEMANGAT MAKMUR

Ly > Lx Ly > Lx
PERENCANA ARSITEKTUR

INDOCAM
ARSITEKTUR
INTERIOR
iai.design.project@gmail.com
(021)5810014 . 08119304350

T TULANGAN ATAS TULANGAN BAWAH


TYPE PELAT
(tebal.mm) T1.x T1.y B1.x B1.y
Lydia Surianata, S.T
No. SKA : 1.1.101.2.158.18.1938356
PERENCANA STRUKTUR

S.1 120 Ø 8-150 Ø 8-150 Ø 8-150 Ø 8-150 CIPTA SUKSES, PT.


ENGINEERING CONSULTANT & CONTRACTOR
Phone: 021-55963655, fax: 021-55958211
Email : engineering@ciptasukses.com

Anwar Susanto
No. SKA : 1.2.201.1.025.09.1940039
PERENCANA MEKANIKAL & ELEKTRIKAL

BALOK VILA KABIN TYPE 3 KOLOM VILA KABIN TYPE 3


TYPE B. 200 x 400 B. 250 x 400 TYPE Kp. 3a3a
Rommel Sitorus
No. SKA : 1.4.405.2.175.28.1918806
CATATAN TUMPUAN LAPANGAN TUMPUAN LAPANGAN CATATAN TUMPUAN
JUDUL GAMBAR :
POTONGAN

VILA KABIN TYPE 3

POTONGAN
DETAIL CONCRETE

350
400

400

400

400
SKALA :

350 CATATAN
200 200 250 250 NO REVISI TANGGAL DISETUJUI

TUL.ATAS 4 D 13 2 D 13 6 D 13 3 D 13 DIMENSI 350x350


TUL.BAWAH 2 D 13 4 D 13 3 D 13 6 D 13 TULANGAN 20 D 13
SENGKANG D10-100 D10-100 D10-100 D10-200 SENGKANG D10-100 DIGAMBAR :
ENG PERSETUJUAN :
ENG
TUL PINGGANG - - DIPERIKSA : ENG TANGGAL :

TANGGAL : PARAF :

REVISI NO :

KODE GAMBAR / NO LEMBAR

- S-5001
KETERANGAN

1. SEMUA DIMENSI DALAM


END PLATE T=12 mm MILIMETER KECUALI YANG
BOLT M-16
TERCANTUM DALAM GAMBAR
5
10 40 40
2. BETON.
MUTU BETON f'c = 20 MPa

100

35 30
WF 250x125x6x9 3. BAJA TULANGAN.

60
100
- ULIR : S f ' y = 420 MPa

250
60
4. KONSTRUKSI BAJA.

35
100
BAJA PROFIL : ASTM - A36
BOLT M-16 BAUT STRUKTUR : A-325 & A-307

100
GUSET PLATE T=6 mm MUTU LAS : E - 70 XX
WF 250x125x6x9

70
5
COLUMN BASEPLATES

125
KH.1 (WF.250x125x6x9) WF 250x125x6x9

WF.2
x6x9
BOLT M-16

5
0x12

0x12
GUSET PLATE T=6 mm PROYEK

25

5x6x
WF 250x125x6x9

WF.

9
VILA KABIN TYPE 3
BOLT M-16
END PLATE T=12 mm SAMBUNGAN BALOK WF 250x125 Hotel & Fasilitasnya
WF.250x125x6x9 WF.250x125x6x9 - PADA BADAN BALOK WF 250x125
Cipayung Girang, Jawa Barat
SKALA 1:10
354

125

125
PEMOHON

SAMBUNGAN KOLOM WF 250x125 PT. TUMBUH SEMANGAT MAKMUR


- PADA SAYAP KOLOM WF 5
WF.250x125x6x9 SKALA 1:10 10 40 40

STIFFENER T=6 mm

30 30
ANCHOR BOLT 4 M-20 7 RIB PLATE T=8 mm WF 200x100x5,5x8 PERENCANA ARSITEKTUR

200
80
BASE PLATE T=14 mm END PLATE T=12 mm

30 30
BOLT M-16 INDOCAM
120

GROUTING T=25 mm ARSITEKTUR


INTERIOR
BOLT M-12

80 45
iai.design.project@gmail.com
(021)5810014 . 08119304350

GUSET PLATE T=6 mm


WF 250x125x6x9

250
WF.250x125x6x9
STIFENER T=6 mm

50 50 45 80
500

@ 1500
Lydia Surianata, S.T
7 No. SKA : 1.1.101.2.158.18.1938356
COLUMN STIFENER T=6 mm 5 5 PERENCANA STRUKTUR
EX. WF 250x125
CIPTA SUKSES, PT.

125
ENGINEERING CONSULTANT & CONTRACTOR
WF 200x100x5,5x8 Phone: 021-55963655, fax: 021-55958211
Email : engineering@ciptasukses.com
150 BOLT M-16 BOLT M-12
7 END PLATE T=12 mm GUSET PLATE T=6 mm
STIFFENER T=6 mm
WF.250x125x6x9 WF 250x125x6x9
COLUMN Anwar Susanto

125
25

No. SKA : 1.2.201.1.025.09.1940039


40 120 40

WF.250x125x6x9 SAMBUNGAN BALOK WF 200x100


325

PERENCANA MEKANIKAL & ELEKTRIKAL


BASEPLATE T=14 mm - PADA BADAN BALOK WF 250x125
ANCHOR BOLT 4 M-20 EX. WF 250x125 SKALA 1:10
25

SAMBUNGAN BALOK WF 250x125


63 160 50 - PADA BADAN KOLOM WF
450 SKALA 1:10
5
10 40 40 Rommel Sitorus
RIB PLATE T=8 mm No. SKA : 1.4.405.2.175.28.1918806
END PLATE T=12 mm

30 30
JUDUL GAMBAR :
BOLT M-16
WF 200x100x5,5x8

200
VILA KABIN TYPE 3

80
7

30
80 45

DETAIL SAMBUNGAN
BOLT M-12 BAJA

250
WF.250x125x6x9 GUSET PLATE T=6 mm
STIFENER T=6 mm
50 45 80

@ 1500 WF 200x100x5,5x8 SKALA :

CATATAN
STIFENER T=6 mm
COLUMN 5 NO REVISI TANGGAL DISETUJUI

5
BOLT M-16
END PLATE T=12 mm

100
WF 200x100x5,5x8
WF.250x125x6x9
BOLT M-12
COLUMN GUSET PLATE T=6 mm
DIGAMBAR :
ENG PERSETUJUAN :
ENG
125

WF 200x100x5,5x8 DIPERIKSA : ENG TANGGAL :

TANGGAL : PARAF :

SAMBUNGAN BALOK WF 250x125 SAMBUNGAN BALOK WF 200x100 REVISI NO :

- PADA SAYAP KOLOM WF - PADA BADAN BALOK WF 200x100 KODE GAMBAR / NO LEMBAR
SKALA 1:10 SKALA 1:10
- S-5002

Anda mungkin juga menyukai