MUSHOLLA AL IKHLASH
BINTARA JAYA, BEKASI
104 272.5 252.5 272.5
RUANG DKM / KESEKRETARIATAN
217.25
T. WUDHU
±00.00
-00.15
MIHROB
TOILET
-00.15
275
TERAS
-00.05
RUANG SHOLAT
±00.00
275
DENAH LANTAI 1
T. WUDHU
-00.15
275
-00.05 ke Lantai 2
252.5 155
C
K2
K2
K2
K2
272.5 272.5 176.25
375
TERAS
-00.05
B
K2
K2
PERLUASAN MASJID
375
K2
K2
K2
K2
A
80
104
+03.55 +03.55 +03.55 +03.55 +03.55
K1 KP K1 KP K1 KP
1
272.5
272.5
272.5
K1
2
RUANG SERBAGUNA
LANTAI 2
+03.60
252.5
252.5
252.5
VOID
±00.00
K1
3
272.5
272.5
272.5
4
K1 KP K1 KP K1 KP
ke Lantai 1
104
+03.55 +03.55
15
Turun
BALKON BALKON
218.5
218.5
DENAH LANTAI 2 10
81.25
81.25
DAK TALANG DAK TALANG
+07.20 +07.20
1
+07.20
88.75
272.5
272.5
DAK TALANG
DAK TALANG
+07.20
2
VOID
782.5
252.5
252.5
ATAP
EKSISTING
3
DAK TALANG
DAK TALANG
+07.20
272.5
272.5
88.75
+07.20
4
+07.20 +07.20
DAK TALANG DAK TALANG
218.5
81.25
137.25
AL IKHLASH
Bintara Jaya, Bekasi
TAMPAK DEPAN
SKALA : 1 : 100 (A4)
PERSPEKTIF
SKALA : NTS (A4)
PERSPEKTIF
SKALA : NTS (A4)
PERSPEKTIF
SKALA : NTS (A4)
104 272.5 252.5 272.5
RUANG DKM / KESEKRETARIATAN
217.25
T. WUDHU
±00.00
-00.15
MIHROB
TOILET
-00.15
275
TERAS
-00.05
RUANG SHOLAT
±00.00
275
T. WUDHU
-00.15
275
DENAH PONDASI
1
TERAS Naik
205.25
-00.05 ke Lantai 2
252.5
P2
P2
P2
C
TERAS
P1
P1
-00.05
B
PERLUASAN MASJID
375
P2
P2
P2
P2
A
80
Screeding Screeding
Wire mesh M6 single layer Wire mesh M6 single layer
Lantai kerja t=5 cm Lantai kerja t=5 cm
Urugan pasir t=10 cm LANTAI EKSISTING Urugan pasir t=10 cm LANTAI EKSISTING
FFL. ±00.00 FFL. ±00.00
TOP SLOOF S1 TOP SLOOF S3
FFL. -00.20 FFL. -00.20
BOTTOM SLOOF S1
FFL. -00.45
Pondasi P1
f'c 20.75 MPa (K250) BOTTOM SLOOF S3
FFL. -00.70
Lantai kerja t=5 cm
10
BOTTOM PILE P1
25
Urugan pasir FFL. -01.00 Pondasi P2
t=10 cm f'c 20.75 MPa (K250)
10 5
FFL. -01.20
80
Lantai kerja t=5 cm
120 Urugan pasir t=10 cm BOTTOM PILE P2
30
FFL. -01.50
10 5
POTONGAN A-A P1
120
150
POTONGAN B-B P2
A B
D16-150
D13-150
120
80
D13-150
80 D16-150
120
T. WUDHU
±00.00
-00.15
MIHROB
TOILET
-00.15
275
TERAS
-00.05
RUANG SHOLAT
±00.00
275
5
1
TERAS Naik
205.25
-00.05 ke Lantai 2
252.5
K2
K2
K2
K2
272.5 272.5 272.5 176.25 127.5
375
TERAS
-00.05
K3
K3
B
PERLUASAN MASJID
375
K2
K2
K2
K2
A
80
T. WUDHU
±00.00
-00.15
MIHROB
TOILET
-00.15
275
TERAS
-00.05
RUANG SHOLAT
±00.00
275
T. WUDHU
-00.15
275
DENAH SLOOF
1
TERAS Naik
205.25
-00.05 ke Lantai 2
K2
K2
PERLUASAN MASJID
S2 (20/30)
S2 (20/30)
S2 (20/30)
375
K3 (40X40) K3 (40X40)
B
S3 (25/50) S3 (25/50)
PERLUASAN MASJID S3 (25/50)
S2 (20/30)
S2 (20/30)
S2 (20/30)
S2 (20/30)
375
K2
K2
K2
K2
S1 (15/25) S1 (15/25) S1 (15/25)
A
BL
BL
BL
BL
BL
B1 (15/30) BALKON BALKON BALKON BALKON GUDANG
104
104
+03.55 KP K2 KP +03.55 +03.55 +03.55 +03.55
K1 K1
1
B3 (25/40)
B4 UTAMA
B1 (15/30)
B2 (20/30)
B2 (20/30)
272.5
272.5
272.5
(35/65)
RUANG SERBAGUNA
B3 (25/40)
B3 (25/40)
B4 UTAMA
LANTAI 2
B1 (15/30)
B2 (20/30)
B2 (20/30)
+03.60
252.5
252.5
252.5
(35/65)
VOID
±00.00
K1 K1
3
B3 (25/40)
B4 UTAMA
B1 (15/30) B1 (15/30)
B2 (20/30)
B2 (20/30)
272.5
272.5
272.5
(35/65)
K1 +03.55 K1 KP
ke Lantai 1
KP K2 KP
101
+03.55
15
Turun
BL
BL
BL
BL
BL
BALKON BALKON
218.5
218.5
10
LISPLANGLISPLANG LISPLANG LISPLANG LISPLANG
GUDANG
+03.55
BALKON
+03.55
275
VOID
DENAH STRUKTUR BETON LANTAI 2
275
RUANG SERBAGUNA
±00.00
10
BALKON
+03.55
275
15
KP
Turun
205.25
ke Lantai 1
272.5 252.5 272.5 218.5
WIREMESH
+03.52
BALKON
+03.55
f'c 20.75 MPa M8-150
(K250) 1 LAYER
T = 12 cm
LANTAI 2
187.5
+03.57 LANTAI 2
+03.57
B
K2
WIREMESH
187.5
BALKON
+03.55
+03.55
WIREMESH
187.5
81.25
81.25
LISPLANG LISPLANG LISPLANG LISPLANG LISPLANG
DAK TALANG DAK TALANG
BT
BT
BT
BT
+07.20 +07.20
1
BT KP B1 (15/30) KP B1 (15/30) KP KP BT
88.75
LISPLANG
B1 (15/30)
B1 (15/30)
272.5
272.5
DAK TALANG
DAK TALANG
+07.20
+07.20
2
BT BT
825.25
LISPLANG
B1 (15/30)
B1 (15/30)
VOID
782.5
252.5
252.5
ATAP
EKSISTING
3
BT BT
DAK TALANG
B1 (15/30)
B1 (15/30)
LISPLANG
+07.20
DAK TALANG
272.5
272.5
+07.20
88.75
KP B1 (15/30) KP B1 (15/30) KP KP
4
BT +07.20 +07.20 BT
BT
BT
BT
BT
DAK TALANG DAK TALANG
218.5
81.25
137.25
81.25
81.25
Bondek 0.75 mm
88.75
wiremesh m7
single layer
272.5
272.5
DAK TALANG
+07.20
2
VOID
782.5
252.5
252.5
DAK TALANG
+07.20
ATAP
EKSISTING
3
T = 10 cm
+07.20
272.5
272.5
88.75
4
218.5
81.25
137.25
25
25
150 X 250 SLOOF S3
250 X 500
50
50
TIPIKAL TUMPUAN lapangan
20 20
SLOOF S2
30
30
200 X 300
DETAIL SLOOF
SKALA : 1 : 20 (A4)
TIPIKAL TUMPUAN lapangan TIPIKAL TUMPUAN lapangan
40 40
20 20
KOLOM K1 KOLOM K3
40
40
20
20
200 X 200 400 X 400
30 30
15 15
KOLOM K2 KOLOM KP
30
30
15
15
300 X 300 150 X 150
DETAIL KOLOM
SKALA : 1 : 20 (A4)
TIPIKAL TUMPUAN lapangan TIPIKAL TUMPUAN lapangan
15 15
12
12
12
12
BALOK B1 BALOK B3
30
30
40
40
150 X 300 250 X 400
18
18
28
28
25 25
12
BALOK ANAK B2
30
30
200 X 300
18
18
DETAIL BALOK
SKALA : 1 : 20 (A4)
TIPIKAL TUMPUAN lapangan TIPIKAL TUMPUAN lapangan
12.5 12.5
ring balk rb
12
12
25
25
150 X 250
BALOK UTAMA B4
65
65
350 X 650
53
53
35 35
DETAIL BALOK
SKALA : 1 : 20 (A4)
2Ø 12
Ø 8 - 150
2Ø 12 2Ø 12 2Ø 12
Ø 8 - 150
55
2Ø 12
20
30
2Ø 12
40
15
20
35
TUL. PEMBAGI Ø8-200
50
30
10
15
104 1/4 L (68 cm)
10
1
TUL. PEMBAGI Ø8-200
81.25
DETAIL BALOK BL
SKALA : 1 : 20 (A4)
1
DETAIL BALOK BT
SKALA : 1 : 20 (A4)