Anda di halaman 1dari 21

GAMBAR PERENCANAAN

MUSHOLLA AL IKHLASH
BINTARA JAYA, BEKASI
104 272.5 252.5 272.5
RUANG DKM / KESEKRETARIATAN
217.25

T. WUDHU

±00.00
-00.15

MIHROB
TOILET
-00.15
275

TERAS
-00.05

RUANG SHOLAT
±00.00
275

DENAH LANTAI 1
T. WUDHU
-00.15
275

SKALA : 1 : 100 (A4)


1
TERAS Naik
205.25

-00.05 ke Lantai 2
252.5 155
C

K2

K2

K2

K2
272.5 272.5 176.25
375

TERAS
-00.05
B

K2

K2
PERLUASAN MASJID
375

K2

K2

K2

K2
A
80

104 272.5 252.5 272.5


1 2 3 4
DINDING NAMA MUSHOLLA
A B C 21.25
187.5 187.5 187.5 187.5 184 275 275 275 217.25

104 BALKON BALKON BALKON BALKON GUDANG

104
+03.55 +03.55 +03.55 +03.55 +03.55
K1 KP K1 KP K1 KP
1
272.5

272.5

272.5
K1
2

RUANG SERBAGUNA
LANTAI 2
+03.60
252.5

252.5

252.5
VOID
±00.00
K1
3
272.5

272.5

272.5
4

K1 KP K1 KP K1 KP

ke Lantai 1
104

+03.55 +03.55

15
Turun
BALKON BALKON
218.5

218.5
DENAH LANTAI 2 10

SKALA : 1 : 100 (A4)


A 36.25 B C
80 151.25 187.5 187.5 187.5 205.25 275 275 275 217.25

81.25
81.25
DAK TALANG DAK TALANG
+07.20 +07.20
1

+07.20
88.75
272.5

272.5
DAK TALANG

DAK TALANG
+07.20
2

97.5 825.25 112.5

VOID
782.5
252.5

252.5
ATAP
EKSISTING
3

DAK TALANG
DAK TALANG
+07.20
272.5

272.5
88.75

+07.20
4

+07.20 +07.20
DAK TALANG DAK TALANG

218.5
81.25

137.25

DENAH DAK TALANG


SKALA : 1 : 100 (A4)
0.0000
MUSHOLLA

AL IKHLASH
Bintara Jaya, Bekasi

TAMPAK DEPAN
SKALA : 1 : 100 (A4)
PERSPEKTIF
SKALA : NTS (A4)
PERSPEKTIF
SKALA : NTS (A4)
PERSPEKTIF
SKALA : NTS (A4)
104 272.5 252.5 272.5
RUANG DKM / KESEKRETARIATAN
217.25

T. WUDHU

±00.00
-00.15

MIHROB
TOILET
-00.15
275

TERAS
-00.05

RUANG SHOLAT
±00.00
275

T. WUDHU
-00.15
275

DENAH PONDASI
1
TERAS Naik
205.25

-00.05 ke Lantai 2
252.5

SKALA : 1 : 100 (A4)


P2

P2

P2

P2
C

272.5 272.5 176.25 127.5


375

TERAS
P1

P1
-00.05
B

PERLUASAN MASJID
375

P2

P2

P2

P2
A
80

104 272.5 252.5 272.5


1 2 3 4
PONDASI P1 - 8 TITIK PONDASI P1 - 2 TITIK

Screeding Screeding
Wire mesh M6 single layer Wire mesh M6 single layer
Lantai kerja t=5 cm Lantai kerja t=5 cm
Urugan pasir t=10 cm LANTAI EKSISTING Urugan pasir t=10 cm LANTAI EKSISTING
FFL. ±00.00 FFL. ±00.00
TOP SLOOF S1 TOP SLOOF S3
FFL. -00.20 FFL. -00.20
BOTTOM SLOOF S1
FFL. -00.45
Pondasi P1
f'c 20.75 MPa (K250) BOTTOM SLOOF S3
FFL. -00.70
Lantai kerja t=5 cm

10
BOTTOM PILE P1

25
Urugan pasir FFL. -01.00 Pondasi P2
t=10 cm f'c 20.75 MPa (K250)

10 5
FFL. -01.20
80
Lantai kerja t=5 cm
120 Urugan pasir t=10 cm BOTTOM PILE P2

30
FFL. -01.50

10 5
POTONGAN A-A P1
120
150

POTONGAN B-B P2

A B

D16-150
D13-150

120
80

D13-150

80 D16-150

120

TAMPAK ATAS P1 TAMPAK ATAS P2


DETAIL PONDASI
SKALA : 1 : 40 (A4)
104 272.5 252.5 272.5
RUANG DKM / KESEKRETARIATAN
217.25

T. WUDHU

±00.00
-00.15

MIHROB
TOILET
-00.15
275

TERAS
-00.05

RUANG SHOLAT
±00.00
275

DENAH KOLOM LANTAI 1


T. WUDHU
-00.15
275

5
1
TERAS Naik
205.25

-00.05 ke Lantai 2
252.5

SKALA : 1 : 100 (A4)


C

K2

K2

K2

K2
272.5 272.5 272.5 176.25 127.5
375

TERAS
-00.05
K3

K3
B

PERLUASAN MASJID
375

K2

K2

K2

K2
A
80

104 272.5 252.5 272.5


1 2 3 4
104 272.5 252.5 272.5
RUANG DKM / KESEKRETARIATAN
217.25

T. WUDHU

±00.00
-00.15

MIHROB
TOILET
-00.15
275

TERAS
-00.05

RUANG SHOLAT
±00.00
275

T. WUDHU
-00.15
275

DENAH SLOOF
1
TERAS Naik
205.25

-00.05 ke Lantai 2

SKALA : 1 : 100 (A4)


K2 (30X30) K2 (30X30) K2 (30X30) K2 (30X30)
C

S1 (15/25) S1 (15/25) S1 (15/25)


K2

K2

K2
PERLUASAN MASJID

272.5 252.5 272.5 176.25 127.5


S2 (20/30)

S2 (20/30)

S2 (20/30)

S2 (20/30)
375

K3 (40X40) K3 (40X40)
B

S3 (25/50) S3 (25/50)
PERLUASAN MASJID S3 (25/50)
S2 (20/30)

S2 (20/30)

S2 (20/30)

S2 (20/30)
375

K2

K2

K2

K2
S1 (15/25) S1 (15/25) S1 (15/25)
A

K2 (30X30) K2 (30X30) K2 (30X30) K2 (30X30)


80

104 272.5 252.5 272.5


1 2 3 4
A B C
80 187.5 187.5 187.5 187.5 205.25 275 275 275 217.25
LISPLANGLISPLANG LISPLANG LISPLANG LISPLANG

BL

BL

BL

BL

BL
B1 (15/30) BALKON BALKON BALKON BALKON GUDANG
104

104
+03.55 KP K2 KP +03.55 +03.55 +03.55 +03.55
K1 K1
1

B2 B3 (25/40) B3 (25/40) B3 (25/40) B3 (25/40)


B3 (25/40)

B3 (25/40)
B4 UTAMA
B1 (15/30)

B2 (20/30)

B2 (20/30)
272.5

272.5

272.5
(35/65)

BATAS BANGUNAN EKSISTING


K1 K1
2

B3 (25/40) B3 (25/40) B3 (25/40) B3 (25/40)

RUANG SERBAGUNA
B3 (25/40)

B3 (25/40)
B4 UTAMA

LANTAI 2
B1 (15/30)

B2 (20/30)

B2 (20/30)
+03.60
252.5

252.5

252.5
(35/65)

VOID
±00.00
K1 K1
3

B3 (25/40) B3 (25/40) B3 (25/40) B3 (25/40)


B3 (25/40)

B3 (25/40)
B4 UTAMA
B1 (15/30) B1 (15/30)

B2 (20/30)

B2 (20/30)
272.5

272.5

272.5
(35/65)

B2 B3 (25/40) B3 (25/40) B3 (25/40) B3 (25/40)


4

K1 +03.55 K1 KP

ke Lantai 1
KP K2 KP
101

+03.55

15
Turun
BL

BL

BL

BL

BL

BALKON BALKON
218.5

218.5
10
LISPLANGLISPLANG LISPLANG LISPLANG LISPLANG

DENAH KOLOM DAN BALOK LANTAI 2


SKALA : 1 : 100 (A4)
104 272.5 252.5 272.5 218.5
217.25

GUDANG
+03.55
BALKON
+03.55
275

VOID
DENAH STRUKTUR BETON LANTAI 2
275

RUANG SERBAGUNA
±00.00
10
BALKON
+03.55
275

15
KP

Turun
205.25

ke Lantai 1
272.5 252.5 272.5 218.5

SKALA : 1 : 100 (A4)


C

Cor Beton Lantai


BALKON
187.5

WIREMESH
+03.52

BALKON
+03.55
f'c 20.75 MPa M8-150
(K250) 1 LAYER
T = 12 cm
LANTAI 2
187.5

+03.57 LANTAI 2
+03.57
B

K2

WIREMESH
187.5

M8-150 BONDEK 0.75 mm


1 LAYER
BALKON

BALKON
+03.55

+03.55
WIREMESH
187.5

M8-150 BONDEK 0.75 mm


1 LAYER
A

104 272.5 252.5 272.5 101


1 2 3 4
A 11.25 B C
80 176.25 187.5 187.5 187.5 205.25 275 275 275 217.25

81.25
81.25
LISPLANG LISPLANG LISPLANG LISPLANG LISPLANG
DAK TALANG DAK TALANG

BT

BT

BT
BT
+07.20 +07.20
1

BT KP B1 (15/30) KP B1 (15/30) KP KP BT

88.75
LISPLANG

B1 (15/30)

B1 (15/30)
272.5

272.5
DAK TALANG

DAK TALANG
+07.20

+07.20
2

BT BT
825.25
LISPLANG

B1 (15/30)

B1 (15/30)
VOID
782.5
252.5

252.5
ATAP
EKSISTING
3

BT BT
DAK TALANG

B1 (15/30)

B1 (15/30)
LISPLANG

+07.20

DAK TALANG
272.5

272.5
+07.20
88.75

KP B1 (15/30) KP B1 (15/30) KP KP
4

BT +07.20 +07.20 BT
BT

BT

BT
BT
DAK TALANG DAK TALANG

218.5
81.25

LISPLANG LISPLANG LISPLANG LISPLANG LISPLANG

137.25

DENAH BALOK DAK TALANG


SKALA : 1 : 100 (A4)
A 36.25 B C
80 151.25 187.5 187.5 187.5 205.25 275 275 275 217.25

81.25
81.25

DAK TALANG Bondek 0.75 mm


+07.20 wiremesh m7 single layer
1

Bondek 0.75 mm
88.75

wiremesh m7
single layer
272.5

272.5
DAK TALANG
+07.20
2

97.5 825.25 112.5

VOID
782.5
252.5

252.5
DAK TALANG

+07.20
ATAP
EKSISTING
3

f'c 20.75 MPa (K250)


Cor Beton Dak
DAK TALANG

T = 10 cm
+07.20
272.5

272.5
88.75
4

Cor Beton Dak +07.20


f'c 20.75 MPa (K250), T = 10 cm DAK TALANG

218.5
81.25

137.25

DENAH STRUKTUR BETON DAK TALANG


SKALA : 1 : 100 (A4)
TIPIKAL TUMPUAN lapangan TIPIKAL TUMPUAN lapangan
15 15
25 25
SLOOF S1

25

25
150 X 250 SLOOF S3
250 X 500

50

50
TIPIKAL TUMPUAN lapangan

20 20

SLOOF S2
30

30

200 X 300

DETAIL SLOOF
SKALA : 1 : 20 (A4)
TIPIKAL TUMPUAN lapangan TIPIKAL TUMPUAN lapangan
40 40
20 20

KOLOM K1 KOLOM K3

40

40
20

20
200 X 200 400 X 400

TIPIKAL TUMPUAN lapangan TIPIKAL TUMPUAN lapangan

30 30
15 15
KOLOM K2 KOLOM KP
30

30

15

15
300 X 300 150 X 150

DETAIL KOLOM
SKALA : 1 : 20 (A4)
TIPIKAL TUMPUAN lapangan TIPIKAL TUMPUAN lapangan
15 15

12

12
12

12
BALOK B1 BALOK B3

30

30

40

40
150 X 300 250 X 400

18

18

28

28
25 25

TIPIKAL TUMPUAN lapangan


20 20
12

12

BALOK ANAK B2
30

30

200 X 300
18

18

DETAIL BALOK
SKALA : 1 : 20 (A4)
TIPIKAL TUMPUAN lapangan TIPIKAL TUMPUAN lapangan
12.5 12.5

ring balk rb

12

12

25

25
150 X 250
BALOK UTAMA B4

65

65
350 X 650

53

53
35 35

DETAIL BALOK
SKALA : 1 : 20 (A4)
2Ø 12
Ø 8 - 150
2Ø 12 2Ø 12 2Ø 12
Ø 8 - 150

55
2Ø 12
20

30
2Ø 12
40

15
20

35
TUL. PEMBAGI Ø8-200

50

30
10

15
104 1/4 L (68 cm)

10
1
TUL. PEMBAGI Ø8-200
81.25
DETAIL BALOK BL
SKALA : 1 : 20 (A4)
1

DETAIL BALOK BT
SKALA : 1 : 20 (A4)

Anda mungkin juga menyukai