Anda di halaman 1dari 13

GAMBAR KERJA

PEKERJAAN
PEMBANGUNAN RUKO 2 PINTU
DESA SRIKATON
KEGIATAN

PEKERJAAN

PEMBANGUNAN RUKO 2
PINTU

DIKETAHUI
Jalan
Baip
as Pasa
r Ped
ati - T
ugu H
iu De DISETUJUI
sa. S
rikato
n Be
ngku
lu Te
ngah
DISETUJUI

Lokasi

PENANGGUNG JAWAB GAMBAR TANDA TANGAN

DIGAMBAR TANDA TANGAN

EKO SUPRIYANTO.,ST

GAMBAR SKALA

DENAH LOKASI
denah lokasi
KODE GAMBAR JML. LEMBAR NO. LEMBAR

ARS 12 01
KEGIATAN

PEKERJAAN

PEMBANGUNAN RUKO 2
PINTU
POT. A

JL. BAIPAS PASAR PEDATI - TUGU HIU


DIKETAHUI
12.00 3.10

3.00 4.50 4.50 1.50

DISETUJUI

4.50

PARKIRAN
9.00 POT. B DISETUJUI
3.00

1.50

12.00 13.50
PENANGGUNG JAWAB GAMBAR TANDA TANGAN

DIGAMBAR TANDA TANGAN

EKO SUPRIYANTO.,ST

DENAH GAMBAR SKALA

Skala 1 : 100
DENAH 1 : 100

KODE GAMBAR JML. LEMBAR NO. LEMBAR

ARS 12 02
KEGIATAN

PEKERJAAN

PEMBANGUNAN RUKO 2
PINTU

JALAN JALAN
DIKETAHUI

TAMPAK DEPAN DISETUJUI


Skala 1 : 100

DISETUJUI

JALAN
PENANGGUNG JAWAB GAMBAR TANDA TANGAN

DIGAMBAR TANDA TANGAN

EKO SUPRIYANTO.,ST

tAMPAK SAMPING GAMBAR SKALA


Skala 1 : 100
TAMPAK DEPAN
1 : 100
TAMPAK SAMPING

KODE GAMBAR JML. LEMBAR NO. LEMBAR

ARS 12 03
Atap Seng Gelombang
Rangka Atap Baja Ringan KEGIATAN
Balok 15 x 20 cm

Plafond gypsum

Sloof 15 x 20 cm PEKERJAAN

PEMBANGUNAN RUKO 2
PINTU

DIKETAHUI

Potongan a- a DISETUJUI
Skala 1 : 100

DISETUJUI
Balok 15 x 20 cm
Detail 1
Rangka Atap Baja Ringan
Plafond gypsum

Balok 20 x 40 cm

5.20

+ 0.80 PENANGGUNG JAWAB GAMBAR TANDA TANGAN


+ 0.50
JALAN
+ 0.00

DIGAMBAR TANDA TANGAN

EKO SUPRIYANTO.,ST

potongan b- b GAMBAR SKALA


Skala 1 : 100
Pot. A - A
1 : 100
Pot. B - B

KODE GAMBAR JML. LEMBAR NO. LEMBAR

ARS 12 04
KEGIATAN

PEKERJAAN

PEMBANGUNAN RUKO 2

JL. BAIPAS PASAR PEDATI - TUGU HIU


PINTU
Pondasi Plat Setempat
Kolom 30 x 30
Pondasi Batu Kali
Sloof 15 x 20 DIKETAHUI
Pas. Batu Bata

PARKIRAN
DISETUJUI

DISETUJUI

PENANGGUNG JAWAB GAMBAR TANDA TANGAN

DIGAMBAR TANDA TANGAN

EKO SUPRIYANTO.,ST

denah pondasi GAMBAR SKALA


Skala 1 : 100

DENAH PONDASI 1 : 100

KODE GAMBAR JML. LEMBAR NO. LEMBAR

ARS 12 05
KEGIATAN
KOLOM STRUKTUR 30/30

PASIR URUG

DINDING BATA 1 : 4 SPECI AD. 1:3:5

LANTAI KERAMIK
PASIR URUG
TANAH URUG PEKERJAAN

PEMBANGUNAN RUKO 2
PINTU

TANAH URUG
DIKETAHUI
PASIR URUG
PONDASI BATU KALI
AANSTAMPING

DISETUJUI
PONDASI PLAT SETEMPAT

POT. PONDASI BATU KALI


Skala 1 : 100
DISETUJUI

PENANGGUNG JAWAB GAMBAR TANDA TANGAN

DIGAMBAR TANDA TANGAN

0.50
EKO SUPRIYANTO.,ST

0.15 GAMBAR SKALA

0.05 0.20 PONDASI BATU KALI 1 : 100


0.40
Detail. pondasi batu kali
Skala 1 : 100
0.50 KODE GAMBAR JML. LEMBAR NO. LEMBAR

ARS 12 06
KEGIATAN

NOL LANTAI
±0.00
BESI Ø6 -15

6 Ø10
MUKA TANAH
-0.40
PEKERJAAN

PEMBANGUNAN RUKO 2
PINTU

BESI Ø10-15
1.00 DIKETAHUI

BESI Ø10-15

LT.KERJA AD. 1:3:5 0.20


0.25
PASIR URUG

DISETUJUI

1.00 0.30
POT. PONDASI PLAT
1.20
Skala 1 : 100
DISETUJUI

BESI Ø.10-15

BESI Ø10-15
BESI Ø10-15

0.301.00 1.20 PENANGGUNG JAWAB GAMBAR TANDA TANGAN

BESI Ø10-15
DIGAMBAR TANDA TANGAN

0.30 EKO SUPRIYANTO.,ST

1.00 GAMBAR SKALA

1.20
PONDASI PLAT 1 : 100

Detail. FOOTPLAT KODE GAMBAR JML. LEMBAR NO. LEMBAR


Skala 1 : 100

ARS 12 07
BALOK STRUKTUR 20/40 BALOK STRUKTUR 20/40
BALOK STRUKTUR 20/40

KEGIATAN
1.57
BALOK STRUKTUR 15/20 BALOK STRUKTUR 15/20
BALOK STRUKTUR 15/20

BALOK STRUKTUR 20/40 BALOK STRUKTUR 20/40


0.73 BALOK STRUKTUR 20/40

KOLOM STRUKTUR 30/30 KOLOM STRUKTUR 30/30


KOLOM STRUKTUR 30/30

6.79
A A
A A
A A
PEKERJAAN
3.10

SLOOF STRUKTUR 15/20


SLOOF STRUKTUR 15/20
SLOOF STRUKTUR 15/20
PEMBANGUNAN RUKO 2
PINTU
1.39 A A A A
A A
PONDASI PLAT SETEMPAT PONDASI PLAT SETEMPAT
PONDASI PLAT SETEMPAT
DIKETAHUI

DISETUJUI
detail struktur a - a
Skala 1 : 100

DISETUJUI
BALOK STRUKTUR 20/40

BALOK STRUKTUR 15/20 BALOK STRUKTUR 15/20 BALOK STRUKTUR 15/20 BALOK STRUKTUR 15/20

BALOK STRUKTUR 20/40

KOLOM STRUKTUR 30/30

KOLOM STRUKTUR 30/30 KOLOM STRUKTUR 30/30


KOLOM PRAKTIS
A A
A A A A

PENANGGUNG JAWAB GAMBAR TANDA TANGAN


SLOOF STRUKTUR 15/20

SLOOF STRUKTUR 15/20

A A
A A A A DIGAMBAR TANDA TANGAN
PONDASI PLAT SETEMPAT

EKO SUPRIYANTO.,ST

GAMBAR SKALA

detail struktur b- b DETAIL STRUKTUR 1 : 100


Skala 1 : 100
KODE GAMBAR JML. LEMBAR NO. LEMBAR

STR 12 08
KEGIATAN

KOLOM PRAKTIS : KP BESI POKOKSENGKANG


DINDING BATA

4Ø10 Ø8 -15 PEKERJAAN

KOLOM 30/30 BESI POKOKSENGKANG


PEMBANGUNAN RUKO 2
PINTU

DIKETAHUI
8Ø12 Ø8 -15

SLOOF 15/20 BESI POKOKSENGKANG

DISETUJUI
4Ø10 Ø8 -15

BALOK 15/20 BESI POKOKSENGKANG


DISETUJUI

4Ø10 Ø8 -15

BALOK 20/40 BESI POKOKSENGKANG

8Ø12 Ø8 -15
PENANGGUNG JAWAB GAMBAR TANDA TANGAN

DIGAMBAR TANDA TANGAN

EKO SUPRIYANTO.,ST

GAMBAR SKALA

DETAIL PEMBESIAN DETAIL PEMBESIAN 1 : 100


Skala 1 : 100
KODE GAMBAR JML. LEMBAR NO. LEMBAR

STR 12 09
KEGIATAN

PEMBANGUNAN RUKO 2
PINTU

DIKETAHUI

DISETUJUI

DISETUJUI

LEGENDA:
NO KODE KETERANGAN JUMLAH
01 JARINGAN KABEL Ls
02 LAMPU SL 9
03 SAKLAR TUNGGAL 3
PENANGGUNG JAWAB GAMBAR TANDA TANGAN
04 SAKLAR GANDA 3
DENAH INSTALASI LISTRIK 05 STOP KONTAK 3
Skala 1 : 100 06 PANEL 1
DIGAMBAR TANDA TANGAN

EKO SUPRIYANTO.,ST

GAMBAR SKALA

DENAH INSTALASI 1 : 100


LISTRIK
KODE GAMBAR JML. LEMBAR NO. LEMBAR

ELT 12 10
Balok 15 x 20 cm KEGIATAN

Rangka Atap Baja Ringan


Plafond gypsum
PEKERJAAN

Balok 20 x 40 cm PEMBANGUNAN RUKO 2


PINTU

DIKETAHUI

DISETUJUI
detail 1
Skala 1 : 100

DISETUJUI

12.59

PENANGGUNG JAWAB GAMBAR TANDA TANGAN


1.45

2.76 1.30 1.30 1.30 1.30 1.30 1.30 1.27


DIGAMBAR TANDA TANGAN

12.12
EKO SUPRIYANTO.,ST

GAMBAR SKALA

DEtail kuda - kuda


Skala 1 : 100 DETAIL ATAP 1 : 100

KODE GAMBAR JML. LEMBAR NO. LEMBAR

ARS 12 11
Pipa Hawa PVC Ø 1.25 "

KEGIATAN

A
PEKERJAAN

PEMBANGUNAN RUKO 2
PINTU

DIKETAHUI

DENAH SEPTI TANK DISETUJUI


Skala 1 : 100

MUKA TANAH
Penutup DISETUJUI
Besi Ø 10

Pipa Outlet PVC Ø 3"


Ø 8 - 20 Kemiringan 2 - 3%
Pipa PVC Ø 3 " Kemiringan 2 - 3 %
MA MA MA
Dari Closet

Knee PVC Ø 3"


Knee PVC Ø 3" Pipa PVC Ø 3"
Balok 15/20 PENANGGUNG JAWAB GAMBAR TANDA TANGAN
Pasangan Bata Pasangan Bata
DiPlester AD. 1:2 Tul. Ø 10 - SK. Ø6-15 DiPlester AD. 1:2

Lantai Kerja AD. 1:2:3


Pasir Padat DIGAMBAR TANDA TANGAN

EKO SUPRIYANTO.,ST

GAMBAR SKALA

poTONGAN A - A
Skala 1 : 100 DETAIL SEPTI TANK 1 : 100

KODE GAMBAR JML. LEMBAR NO. LEMBAR

ARS 12 12

Anda mungkin juga menyukai