Anda di halaman 1dari 5

PEMILIK PEKERJAAN

KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT


D I R E K T O R A T J E N D E R A L C I P T A K A R Y A
BALAI PRASARANA PERMUKIMAN WILAYAH JAWA TENGAH
S A TU AN K E RJA PE LAK S AN AA N P RA S AR AN A P ER M U KI M AN W IL AY AH I PR O VI N SI JA W A T EN G AH
REMARKS
PEKERJAAN
PENATAAN KAWASAN DIENG
LOKASI
DIENG, WONOSOBO-BANJARNEGARA
JAWA TENGAH
SHOP DRAWING
RENCANA SIGNAGE MENGETAHUI :
KETUA TIM TEKNIS
HERI MULYONO, S.T.
NIP. 196901122007101001
G. HENRY DIAVID, S.T., M. Eng.
TEGUH SULISTIO, S.T. M.T.
DIGAMBAR : DANI ANDRIYANTO
DIPERIKSA : A. SAICHUDIN
SITEPLAN SIGNAGE
Siteplan Signage
Skala 1 : 100 SKALA 1 : 100
KODE GAMBAR NO. GAMBAR JUMLAH LEMBAR
ARS.02-01 01 05
PEMILIK PEKERJAAN
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
D I R E K T O R A T J E N D E R A L C I P T A K A R Y A
BALAI PRASARANA PERMUKIMAN WILAYAH JAWA TENGAH
S A TU AN K E RJA PE LAK S AN AA N P RA S AR AN A P ER M U KI M AN W IL AY AH I PR O VI N SI JA W A T EN G AH
REMARKS
TANAMAN HORTENSIA
A
PEKERJAAN
B PENATAAN KAWASAN DIENG
LOKASI
DIENG, WONOSOBO-BANJARNEGARA
JAWA TENGAH
SHOP DRAWING
MENGETAHUI :
KETUA TIM TEKNIS
Denah Signage
HERI MULYONO, S.T.
NIP. 196901122007101001
PAS. BATA
RING BALK 150/150 KOLOM PRAKTIS 150/150
RING BALK 150/150 PAS. BATA PAS. BATA
PAS. BATA KOLOM PRAKTIS 150/150
BALOK LATEI 150/150 BALOK LATEI 150/150 Fin. Batu Candi uk. 300x600x30 Susun Bata
PLAT BETON
Tebal 10 cm G. HENRY DIAVID, S.T., M. Eng.
KOLOM PRAKTIS 150/150
RUMPUT
PAS. DINDING BATA
TEGUH SULISTIO, S.T. M.T.
DIGAMBAR : DANI ANDRIYANTO
SLOOF 150/200 DIPERIKSA : A. SAICHUDIN
PONDASI BATU KALI
PASIR URUG 50 mm
Potongan B
DENAH SIGNAGE
POTONGAN B SIGNAGE
SKALA 1 : 50
KODE GAMBAR NO. GAMBAR JUMLAH LEMBAR
ARS.02-01 02 05
PEMILIK PEKERJAAN
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
D I R E K T O R A T J E N D E R A L C I P T A K A R Y A
BALAI PRASARANA PERMUKIMAN WILAYAH JAWA TENGAH
S A TU AN K E RJA PE LAK S AN AA N P RA S AR AN A P ER M U KI M AN W IL AY AH I PR O VI N SI JA W A T EN G AH
PLAT BETON
Tebal 100 mm REMARKS
PAS. BATA
Fin. Batu Candi uk. 300x600x30 Susun Bata
RING BALK 150/150
HURUF TIMBUL GALVANIS
Fin. Cat Semprot Putih
Font Arial Black, tinggi 300mm, tebal 30mm PEKERJAAN
LAMPU SOROT PENATAAN KAWASAN DIENG
LOKASI
DIENG, WONOSOBO-BANJARNEGARA
JAWA TENGAH
SHOP DRAWING
MENGETAHUI :
KETUA TIM TEKNIS
BALOK LATEI 150/150
HERI MULYONO, S.T.
KOLOM PRAKTIS 150/150 NIP. 196901122007101001
RUMPUT
PAS. DINDING BATA
G. HENRY DIAVID, S.T., M. Eng.
SLOOF 150/200
PONDASI BATU KALI
TEGUH SULISTIO, S.T. M.T.
PASIR URUG 50 mm
DIGAMBAR : DANI ANDRIYANTO
DIPERIKSA : A. SAICHUDIN
POTONGAN A
POTONGAN A SIGNAGE
SKALA 1 : 20
KODE GAMBAR NO. GAMBAR JUMLAH LEMBAR
ARS.02-01 03 05
PEMILIK PEKERJAAN
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
D IR E KT OR A T J EN DER A L C IP TA KA R YA
BALAI PRASARANA PERMUKIMAN WILAYAH JAWA TENGAH
S A T U A N K E R J A P E LA K S A N A A N P R A S A R A N A P E R MU K IM A N W IL A Y A H I P RO V IN S I J A W A T E N GA H
REMARKS
PAS. BATA
JUNA
Fin. Batu Candi uk. 300x600x30 Susun Bata
HURUF TIMBUL GALVANIS
HURUF TIMBUL GALVANIS Fin. Cat Semprot Putih
Fin. Cat Semprot Putih Font Arial Black, tinggi 300mm, tebal 30mm
Font Arial Black, tinggi 300mm, tebal 30m PAS. BATA
PLAT BETON Fin. Batu Candi uk. 300x600x30mm Susun Bata PEKERJAAN
PLAT BETON
Tebal 100mm
Tebal 10 cm
PENATAAN KAWASAN DIENG
HURUF TIMBUL GALVANIS HURUF TIMBUL GALVANIS
Fin. Cat Semprot Putih Fin. Cat Semprot Putih
Font Arial, tinggi 15 cm, tebal 3 cm LOKASI
Font Arial, tinggi 15 cm, tebal 3 cm
Tampak Kanan Tampak Kiri
DIENG, WONOSOBO-BANJARNEGARA
JAWA TENGAH
SHOP DRAWING
MENGETAHUI :
KETUA TIM TEKNIS
HERI MULYONO, S.T.
NIP. 196901122007101001
CANDI ARJUNA
Tampak Depan G. HENRY DIAVID, S.T., M. Eng.
TEGUH SULISTIO, S.T. M.T.
DIGAMBAR : DANI ANDRIYANTO
DIPERIKSA : A. SAICHUDIN
Tampak Belakang
TAMPAK SIGNAGE
SKALA 1 : 50
KODE GAMBAR NO. GAMBAR JUMLAH LEMBAR
ARS.02-01 04 05
PEMILIK PEKERJAAN
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
D I R E K T O R A T J E N D E R A L C I P T A K A R Y A
BALAI PRASARANA PERMUKIMAN WILAYAH JAWA TENGAH
S A TU AN K E RJA PE LAK S AN AA N P RA S AR AN A P ER M U KI M AN W IL AY AH I PR O VI N SI JA W A T EN G AH
REMARKS
PEKERJAAN
Street Light BRP 121 - 50 Watt
Pipa Galvanis 1.5" PENATAAN KAWASAN DIENG
SEGMENT C LOKASI
SAMBUNGAN LAS DENGAN TUTUP DIENG, WONOSOBO-BANJARNEGARA
JAWA TENGAH
SHOP DRAWING
MENGETAHUI :
KETUA TIM TEKNIS
SEGMENT B Tampak Atas
Skala 1 : 40
Pipa Galvanis 4" HERI MULYONO, S.T.
NIP. 196901122007101001
Pipa Galvanis 6"
Pipa Galvanis 6"
SAMBUNGAN
G. HENRY DIAVID, S.T., M. Eng.
LUBANG KONTROL
Finish Permukaan
Pipa conduit Ø20mm
Base Plate Galvanis t : 10mm
Stiffener t : 8mm
SEGMENT A Stiffener t : 8mm
Angkur Ø16 mm
Angkur Ø16 mm
Base Plate Galvanis 30x30cm t :10mm
Lantai Beton Bertulang K-300 tebal 8cm,
Wiremesh M6 Grid 15cmx15cm
Detail Baseplate
Skala 1 : 15
Cor Beton
TEGUH SULISTIO, S.T. M.T.
Umpak Beton DIGAMBAR : DANI ANDRIYANTO
Fin. Plester cat kamprot DIPERIKSA : A. SAICHUDIN
Pasir Pasang 10 cm
Detail Pondasi Lampu
Skala 1 : 15
Tampak Lampu PJU
Skala 1 : 40
LAMPU PJU
SKALA 1 : 40
KODE GAMBAR NO. GAMBAR JUMLAH LEMBAR
ARS.02-01 05 05

Anda mungkin juga menyukai