KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT NOMOR RUAS 004 KONSULTAN JUDUL : NO.

LEMBAR
(PR-02)
D I R EK T O R A T J E N DE R A L B I N A M A R GA PERENCANAAN TEKNIK (DED)
NAMA RUAS TERBANGGI BESAR - GUNUNG SUGIH
DIGAMBAR DIRENCANA DIPERIKSA
PETA LOKASI AMP DAN STONE CRUSHER SKALA
BALAI BESAR PELAKSANAAN JALAN NASIONAL V JEMBATAN DI PROVINSI LAMPUNG
JEMBATAN WAY PENGUBUAN KRISMAN ARIS MUNANDAR DAMIRI, S.T. Ir. NAPOLI SITUMORANG
S A T U A N K ER J A P ER EN CA N A A N & P EN G A W A S A N J A L A N N A S I ON A L P RO V I N S I L A M P U N G
PROV./KAB./KODYA LAMPUNG / LAMPUNG TENGAH TAHUN 2018
Ja lan Wo lt er M on go n si di No . 22 0 Te lu k Be tu n g B an da r L am pu n g Tel ep on / Fax . 07 21 -4 7 25 91
DRAFTMAN BRIDGE ENGINEER TEAM LEADER

L E G E N D A
PROVINSI SUMATERA SELATAN LOKASI AMP DAN STONE CRUSHER

: IBU KOTA PROVINSI

: IBU KOTA KABUPATEN


LOKASI AMP :
Wiralaga
: KOTA LAIN Mesuji Sp. Pematang
Pematang Panggang 1. PT. MAYANG SARI PRIMA
Sp. Mesuji
: BATAS PROVINSI 2. PT. SUCI KARYA BADINUSA (SUBANUS)
Sp. Mesuji D
Mesuji E 3. PT. ADIGUNA ANUGRAH ABADI
: BATAS KABUPATEN
4. PT. SATRIA SUKARSO WAWAY
Sp. Asahan Rawa Jitu

: JALAN NASIONAL 5. PT. KUMITA KARYA MANDIRI


Sp. Gd. Aji
Gd. Aji Baru 6. PT. F. SYUKRI BALAK
: JALAN PROVINSI Sp. Penawar
7. PT. TRI CITRA PERDANA
Mesir Ilir Pakuan Ratu Gedung Aji
Sp. Talang Randu
Tajab 8. PT. YASA PATRIA PERKASA
9. PT. 9 NAGA EMAS
Way tuba BLAMBANGAN UMPU Sri Rejeki Sp. Unit VIII
Serupa Indah 10. PT. WAHANA JAYA PRIMA
MENGGALA
Panaragan KABUPATEN TULANG BAWANG
Sp.Way Tuba
11. PT. RINDANG TIGA SATU PRATAMA
KABUPATEN WAY KANAN Sp. Panaragan
Bujung Tenuk
Panaragan Jaya 12. PT. INFRATEKNO SARANA JAYA
Sp. Tujok
Simpang Empat

LAUT JAWA
Negara Ratu Gunung Batin Sadewa
Seputih Surabaya
Baradatu
Kasui Daya Murni
Giham Banjar Negara Mandala
Dandar Abung
Sp. Asem Ketapang Rumbia
PROVINSI BENGKULU KABUPATEN LAMPUNG TENGAH LOKASI STONE CRUSHER :
Banjit Sp. Gunung Katun
1. PT. SINAR BATU CAKRAWALA
KABUPATEN LAMPUNG UTARA Sp. Kotabumi Seputih Mataram
Benglay KOTABUMI Terbanggi Besar 2. PT. SINAR BATU SAKTI LESTARI
DANAU RANAU
Bukit Kemuning
Kota Batu Aji Kagungan
Kelapa Tujuh
3. PT. SUMBER BATU BERKAH
Lemong Sp. Gunung Sugih
Pager Dewa Raman Utara
Molesom
Purbolinggo 4. PT. GUNUNG BATU BERKAH
Sp. Gn. Kemala
Lombok
Selagai
GUNUNG SUGIH Raman Raya 5. PT. SURENTO NUSANTARA
Sumber Jaya
Pugung Tampak Sukabumi Sp. Tebu
LIWA Mutar Alam Taman Sari Padang Ratu
Penawar
Padang Tambak Pura Mekar Sp. Kuripan SUKADANA
Sp. Gn. Kemala Hadimulyo

Bungin METRO
Sp. Gn. Kemala Ganjar Agung KABUPATEN LAMPUNG TIMUR
Tri Murjo Sp. Tanjung Kari
Krui Kalirejo Bantul
KABUPATEN LAMPUNG BARAT Tegineneng
Suoh Ulu Semung Air Naningan Kibang
Sp. Sribawono
Bandar Baru Branti
Sri Bawono
Sukoharjo Jatimulyo Labuhan Maringgai
Biha Ulu Belu Talang Padang
Pringsewu Pugung Raharjo Warna
Tekad Gading Rejo Sp. Kemuning
Padang Tampak
KABUPATEN TANGGAMUS Rantau Tijang
Gedong Tataan Way Galih
Talang Ali
Sanggi KABUPATEN LAMPUNG SELATAN
Wonosobo BANDAR LAMPUNG
Tebakak Sukarame Kedondong
Pardasuka Jabung
Siging KOTA AGUNG Tarahan
Tanjung Sari Asahan
Wates
TELUK SEMANGKA Padang Cermin

U Bengkunat
Way Nipah
Putih Doh
Sp. Kuripan Sp. Babatan 2
3
Sidomulyo
Kota Dalam Bunut
Pertiwi Beringin TELUK LAMPUNG
Umbar Paku 4 Palas
Way Haru Tebakak 1 5
Karang Berak Bawang
Kelumbayan KALIANDA Ketapang
Tiram
Randu Blambangan Gayam
Batu Lunik Soka
Tataharta Way Bakak
Tampang
Belimbing Kunyit
SELAT SUNDA Bakauheni

SAMUDERA INDONESIA
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT NOMOR RUAS 004 KONSULTAN JUDUL : NO. LEMBAR B - 01.2
(PR-02)
D I R EK T O R A T J E N DE R A L B I N A M A R GA PERENCANAAN TEKNIK (DED)
NAMA RUAS TERBANGGI BESAR - GUNUNG SUGIH
DIGAMBAR DIRENCANA DIPERIKSA
SITUASI RENCANA JEMBATAN WAY PENGUBUAN SKALA 1 : 1500
BALAI BESAR PELAKSANAAN JALAN NASIONAL V JEMBATAN DI PROVINSI LAMPUNG
JEMBATAN WAY PENGUBUAN KRISMAN ARIS MUNANDAR DAMIRI, S.T. Ir. NAPOLI SITUMORANG
S A T U A N K ER J A P ER EN CA N A A N & P EN G A W A S A N J A L A N N A S I ON A L P RO V I N S I L A M P U N G
PROV./KAB./KODYA LAMPUNG / LAMPUNG TENGAH TAHUN 2018
Ja lan Wo lt er M on go n si di No . 22 0 Te lu k Be tu n g B an da r L am pu n g Tel ep on / Fax . 07 21 -4 7 25 91
DRAFTMAN BRIDGE ENGINEER TEAM LEADER

0
.00
P.3

0
6.0

3.0
+ 85
+8

+8
.83
5 1.00
85 +8
2 4 0 5
P.3 85. 0 0 3.0
0
5 .08 8 2.0 + 8
73 6 8 + 0
85. 585 4.0
82. +8

0
205

1.0
.P 31 . 5 0

+8
5 8
8
78.
6 5.0
U 5 5.010 4 45 +8
8
85.
38 55 78.
0 81.0 0 785
8 4 .83
. 8 9 78. 5
0 78 09
84.
38
. 96
5 84. 85
P.3 8 0
0 5 3 7
95 85.
81.0 5 0.4

070
0 4 8
79. .510

03
84.
955 83 25

4
50
85.
8 . 4
84.

5
7

865
84.
.510
80

440
80.
010

79.
X = 9975.7

210
84. 05

79.
BM.1 Y = 10042.4

05
.7
.00 4

81.1
8

95
+ 86 P.29 Z = + 85.245

84.150
83.995
87.300

81.030

1
5
86.460

84.
00

79.590
86.410

4.72
.

79.420
+8 5

81.430
87.600

84.665
87.400 86.750
86.670

85.1508
87.305
89.795 89.680 87.220
+ 84.0
0 87.495 89.906 86.725 + 86.00
60 90.095 89.685 89.515 GUNUN
87.3 90.725 90.425 86.945

84.061
0 G SUGIH
5 + 87.0

83.781
88.13 89.550

81.856
4.00 91.115 90.060 89.480

79.661
52 90.412 89.600

79.771
+8 .3 + 88.00

81.871
32 0 9 1 89.515

84.731
89.920 89.525

84. 5
88. 65 91.105 89.620

85.716
9 3
0 90.390
85.00 .4 + 89.00

84.
1

720
P.28
89.540
+ 88.5 60 91.000
89.800 89.570 89.502 + 90.00

38
90.075

81.5
0
.
91 07 9 4
1.4
90.645
86.000 89.415

80.
86.100 89.510

45
280 1 5 88.080
X = 9892.4 85. 40 91.8 91.43

79.9

166
85.870 86.320
0 95 89.960 86.385 85.900 89.045
6.0BM.0 YZ == +10061.9 5

81.7
86. 35 7

07
. 76 9 1 .3 86.202
+8 88.061 91 0 86.017 86.486

86.

84.
50

20
91.8 80 8
91. 5
3 8 .3 5
7 P.14 + 8 + 89.0 + 90.00

136
810
87.
P.13 P.15 86.302 8. 0
91.9 6 .8 6
+ 8 00

207

84.
91.7 0 86

87.3
P.12 P.16
58

301
7.0

81.8
91.9 10 7.55 0

20
8 0

80.
P.17

P.27

36
0
92. 20 86.6
5 P.11

+8
236
80.

6.0
91.9 40

281
81.8

0
2 P.10
BU 85. 40

86.

21
JU 2

896
NG
84.

87.8
TEN
UK 5
8.12

41
P.26
1258 05 P.9
88. 0588.2 0 X = 10000
1 2
88. 5092.0 4

84.
BM.3 Y = 10000
082

85.
738
8 . 9 1.9 491.94 Z = + 86.630

003
8 165

82.
4
88. 15 91.6 50
+8

22
80.
091.9

8
6 .65 91.925
8.0 + 89

223
1

80.
0 9 2 9 1
0 .00

12 2 25 35
+ 87

90. 55 91.8

138
82.
+8 + 91.6 3854.4 5

85.
19
84.
8.6 5 35 .2 4.62
.00

7.0 88

8
8 1 . 8 8 4

586
8
4258 65

87.
0 .00 5 9

43
91.4 75 015 84. 3858.4
92. 45

85.
423
88.
500 91.4
RENCANA PENGGANTIAN
90. 710 88.
5

446
1

82.
.

252
0
9 55 JEMBATAN WAY PENGUBUAN
5

205
87. 0 P.2 P.8

80.
5 9 1.48 5 8 8.7 5 A

80.

166
1
91. 5 P.7
1.45 5

286
9

85.
6

82.
91.2 21
90. 55

106
135
87.
270 9.2 P.7

85.
076
88.
5 9 1 . 8
78 5

395
90. 33 1.24 0

82.
507
9

150
P.24

80.
.77
0 91.0 50
88. 60

80.

315
90 574 18 5 P.6
. 1 . 0 88.

295
82.

85.
87 274 9 68
. 6

250
.0

315
88.
9 499 0
9 828

85.
637
89. 98
88.
.
5 90

570
82.
.0 49 5 4 P.5
812
5
8
.4 4 89.

209
80.
9 .36
P.2

9 0 4
87 .160 . 3
3

420
80.

85
90 .144

.33
90 .524 X = 9887.5

385
82.
89 034

2
0 P.4 BM.2 Y = 10016 88.

150
9 .
89

85
5 0 5 39 9
89.

Z = + 88.507

.52
. 6 . 07
86
88 .340 90 .470

82

2
802

.0

.22
8 0 9 0 0 5 02

80
8 .3 2
P.2

.7

7
90 .590 89 .565 P.3

.38
2

85

80

5
90 8 9 .56

.40
5
.59 82 83 7

7
90 .520 .24 .48 87
88 .920

.9
88

90 .960 2 80 9 83 27
P.2
90 .650
87

.74

.43 .
89

89 .790 1
90 .495

80 2 67
.42

9 81.
0

8 .57 95
.77

0 83 2
7.0 80 7
P.2
90 .785

.50
+8 . 4 85
1

2 6
0

P.1 88 85 212
.
90

7
.50

.142 80
. 5 . 2
.00 89 8 1 7 2 7
0

88 .57 1.8 82
.12

.42
88 47
00

2
90

+ 7
0.0 + 89.

P.2 .10 81.


0 7 1 20
88
0

81.
P.0
0

.21 + 8 + 85
+ 90.0

88 7 015
82 4.0 .
+9

0 00

+8
.78 .59
+ 89.00

2.0
2 84 7 +8

0
P.1 .90 3.0
9 87 7 0
R

.31
SA

2
BE

87 +
.34
GI

+ 82.0
NG

0
+ 8 83.0 0
BA
TER

P.1 4 .00 0
8
+8

+8
8.0

6.0
0
0
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT NOMOR RUAS 004 KONSULTAN JUDUL : NO. LEMBAR B - 01.1
(PR-02)
D I R EK T O R A T J E N DE R A L B I N A M A R GA PERENCANAAN TEKNIK (DED)
NAMA RUAS TERBANGGI BESAR - GUNUNG SUGIH
DIGAMBAR DIRENCANA DIPERIKSA
SITUASI RENCANA RAMBU DAN CHEVRON JALAN SKALA 1 : 1500
BALAI BESAR PELAKSANAAN JALAN NASIONAL V JEMBATAN DI PROVINSI LAMPUNG
JEMBATAN WAY PENGUBUAN KRISMAN ARIS MUNANDAR DAMIRI, S.T. Ir. NAPOLI SITUMORANG
S A T U A N K ER J A P ER EN CA N A A N & P EN G A W A S A N J A L A N N A S I ON A L P RO V I N S I L A M P U N G
PROV./KAB./KODYA LAMPUNG / LAMPUNG TENGAH TAHUN 2018
Ja lan Wo lt er M on go n si di No . 22 0 Te lu k Be tu n g B an da r L am pu n g Tel ep on / Fax . 07 21 -4 7 25 91
DRAFTMAN BRIDGE ENGINEER TEAM LEADER

DETAIL 1 DETAIL 2
Skala NTS Skala NTS

RENCANA CHEVRON
LIHAT DETAIL 2

GUNUN
16
G SUGIH
99.15
7

17
16
98.8

17
1 0
100.0
BM

5
100.2

5
7

3
99.8

BM2
2

2
100.0
BM1
5

4
100.2

4
7

14
100.2
14

15
100.2
15

6
100.1

6
6

7
100.1

7
BU
JU 4

NG
11
100.0
11

TEN
UK
12
100.11
12
128,66

4
9

100.2
9

8 0
100.2
8

13
99.95
13

U
RENCANA CHEVRON
AR

LIHAT DETAIL 1
ES
G IB
NG
BA
TER
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT NOMOR RUAS 004 KONSULTAN JUDUL : NO. LEMBAR B - 03.2
(PR-02)
D I R EK T O R A T J E N DE R A L B I N A M A R GA PERENCANAAN TEKNIK (DED)
NAMA RUAS TERBANGGI BESAR - GUNUNG SUGIH
DIGAMBAR DIRENCANA DIPERIKSA
DENAH DAN TAMPAK MEMANJANG RENCANA SKALA 1 : 500
JEMBATAN WAY PENGUBUAN (PENGGANTIAN)
BALAI BESAR PELAKSANAAN JALAN NASIONAL V JEMBATAN DI PROVINSI LAMPUNG
JEMBATAN WAY PENGUBUAN KRISMAN ARIS MUNANDAR DAMIRI, S.T. Ir. NAPOLI SITUMORANG
S A T U A N K ER J A P ER EN CA N A A N & P EN G A W A S A N J A L A N N A S I ON A L P RO V I N S I L A M P U N G
PROV./KAB./KODYA LAMPUNG / LAMPUNG TENGAH TAHUN 2018
Ja lan Wo lt er M on go n si di No . 22 0 Te lu k Be tu n g B an da r L am pu n g Tel ep on / Fax . 07 21 -4 7 25 91
DRAFTMAN BRIDGE ENGINEER TEAM LEADER
X = 9892.4 X = 9975.7 85.875
BM.0 Y = 10061.9

86.896

80.236

81.836
80.281

84.301

84.136
87.841

81.821
BM.1 Y = 10042.4

P.26
Z = + 88.061 Z = + 85.245
87.654

+87.000

+84.000
86.456 +88.00 87.325 85.280

+82.000
0

+82.000
+84
.00 .0 00 87.564
00 0 .00
0 +87
+87.0 +85 85.540

+86.000
88.165 88.105 88.205 +83 0 0
.000 +86.0

+83.0
87.750

+81.000
+81.000
00
+88.000

1730
415,82
91.455 91.615 91.950 92.020

+85.000
88.565

419,88

1476
88.835
+89.00
0
+90.000
91.475 91.822 91.644 91.944 91.980 91.810
TERBANGGI BESAR

GUNUNG SUGI
91.485 91.835 91.650 91.950 91.958 91.767 H
+89.000 91.440
+88.000
91.625 86.764 +87.000
85.985

+81.0
+82.000
+86.000

00
88.895 +84.000
84.235 84.435 00 85.436
88.875 +83.0 .000

+82.000
+85.000 +84

+88.00
85.436

+83.000
88.755 85.240 85.635

0
X = 10000
00

+81.000
88.535 86.545
7.0 BM.3 Y = 10000

+86.000
X = 9887.5 +8 +85.00
0 Z = + 86.630
P.6 P.7 BM.2 Y = 10016 P.7A P.8 P.9 P.10 P.11
Z = + 88.507

TERBANGGI BESAR 10120 GUNUNG SUGIH


5060 5060
RENCANA JEMBATAN (PENGGANTIAN)
GUARDRAIL TANGGA INSPEKSI WAY PENGUBUAN
TANGGA INSPEKSI GUARDRAIL
95.000

90.000 ABUTMENT RENCANA


ABUTMENT EKSISTING PIER EKSISTING ABUTMENT EKSISTING
DIBONGKAR MAB. +86.761 DIBONGKAR DIBONGKAR

85.000 RETAINING WALL ABUTMENT RENCANA PIER RENCANA RETAINING WALL


PASANGAN BATU BELAH MAN. +83.000 PASANGAN BATU BELAH
ABUTMENT EKSISTING
PONDASI BORE PILE Ø80 DIBONGKAR PONDASI BORE PILE Ø80
80.000 + CASING PIPA BAJA T. 6 MM PERMANEN + CASING PIPA BAJA T. 6 MM PERMANEN

PONDASI BORE PILE Ø100


75.000 +74.280 + CASING PIPA BAJA T. 6 MM PERMANEN +74.280

70.000 +68.730

65.000
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
61.000

NOMOR PROFIL
PROFILE NUMBER P.7 P.8 P.9 P.10 P.11
200.00

280.40

330.40
305.40
175.00

JARAK PROFIL
10.775 25.00 80.40 25.00 25.00
ACCUMULATED DISTANCE
91.950

91.958
91.835
91.684

91.440
91.767
TINGGI PERMUKAAN JALAN (EKSISTING)
80.360
82.960

82.360
84.360

80.160

82.910

83.710
82.710

TINGGI DASAR SUNGAI


BED LEVEL IN CENTER LINE
93.389

93.048
93.430

93.430

93.430
93.136

TINGGI PERMUKAAN JALAN (RENCANA)


KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT NOMOR RUAS 004 KONSULTAN JUDUL : NO. LEMBAR B - 04.1
(PR-02)
D I R EK T O R A T J E N DE R A L B I N A M A R GA PERENCANAAN TEKNIK (DED)
NAMA RUAS TERBANGGI BESAR - GUNUNG SUGIH
DIGAMBAR DIRENCANA DIPERIKSA
DENAH DAN TAMPAK MEMANJANG SKALA 1 : 500
TITIK DAN GRAFIK SONDIR RENCANA JEMBATAN
BALAI BESAR PELAKSANAAN JALAN NASIONAL V JEMBATAN DI PROVINSI LAMPUNG
JEMBATAN WAY PENGUBUAN KRISMAN ARIS MUNANDAR DAMIRI, S.T. Ir. NAPOLI SITUMORANG
S A T U A N K ER J A P ER EN CA N A A N & P EN G A W A S A N J A L A N N A S I ON A L P RO V I N S I L A M P U N G
PROV./KAB./KODYA LAMPUNG / LAMPUNG TENGAH TAHUN 2018
Ja lan Wo lt er M on go n si di No . 22 0 Te lu k Be tu n g B an da r L am pu n g Tel ep on / Fax . 07 21 -4 7 25 91
DRAFTMAN BRIDGE ENGINEER TEAM LEADER
X = 9892.4 X = 9975.7 85.875
BM.0 Y = 10061.9

86.896

80.236

81.836
80.281

84.301

84.136
87.841

81.821
BM.1 Y = 10042.4

P.26
Z = + 88.061 Z = + 85.245
87.654

+87.000

+84.000
86.456 +88.00 87.325 85.280

+82.000
0

+82.000
JEMBATAN WAY PENGUBUAN BARU +84
.00 .0 00 87.564
00 0 .00
0 +87
+87.0 +85 85.540

+86.000
88.165 88.105 88.205 +83 0 0
.000 +86.0

+83.0
87.750

+81.000
+81.000
00
+88.000

1730
415,82
91.455 91.615 91.950 92.020 5060 5060

+85.000
88.565

1476
88.835
+89.00
0
+90.000
91.475 91.822 91.644 91.944 91.980 91.810
TERBANGGI BESAR

GUNUNG SUGI
91.485 91.835 91.650 91.950 91.958 91.767 H
+89.000 91.440
+88.000
91.625 86.764 +87.000
85.985

+81.0
+82.000
+86.000

00
88.895 +84.000
84.235 84.435 00 85.436
88.875 +83.0 .000

+82.000
+85.000 +84

+88.00
85.436

+83.000
88.755 85.240 85.635

0
X = 10000
00

+81.000
88.535 86.545
7.0 BM.3 Y = 10000

+86.000
X = 9887.5 +8 +85.00
0 Z = + 86.630
P.6 P.7 BM.2 Y = 10016 P.7A P.8 P.9 P.10 P.11
Z = + 88.507

TERBANGGI BESAR 10120 GUNUNG SUGIH


5060 5060

GUARDRAIL TANGGA INSPEKSI TANGGA INSPEKSI GUARDRAIL


95.000 +93.430 +93.430
+91.030 +91.030 +91.030 +91.030
0 100 200 S.6 0 100 200
90.000 S.1
50 150 250 50 150 250
+87.280 0.00 0.00
1.00 C MAB. +86.761 1.00 C
2.00 F 2.00 F
85.000 3.00 0 100 200 PIER RENCANA 3.00
RETAINING WALL 4.00 S.4 4.00 RETAINING WALL
PASANGAN BATU BELAH 5.00 MAN. +83.000 50 150 250 5.00 PASANGAN BATU BELAH
6.00 0.00 6.00
7.00 1.00 C +80.730 7.00
PONDASI BORE PILE Ø80 2.00 F 8.00 PONDASI BORE PILE Ø80
80.000 + CASING PIPA BAJA T. 6 MM PERMANEN 8.00 3.00
9.00 9.00 + CASING PIPA BAJA T. 6 MM PERMANEN
10.00 4.00 10.00
11.00 5.00 11.00
12.00 6.00 12.00
13.00 7.00 PONDASI BORE PILE Ø100 13.00
75.000 +74.280 8.00 + CASING PIPA BAJA T. 6 MM PERMANEN 100 300 500 +74.280
100 300 500
9.00 0 200 400
0 200 400 10.00
11.00
12.00
70.000 13.00 +68.730
100 300 500
0 200 400
65.000
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
61.000

NOMOR PROFIL
PROFILE NUMBER P.7 P.8 P.9 P.10 P.11
200.00

280.40

330.40
305.40
175.00

JARAK PROFIL
10.775 25.00 80.40 25.00 25.00
ACCUMULATED DISTANCE
91.950

91.958
91.835
91.684

91.440
91.767
TINGGI PERMUKAAN JALAN (EKSISTING)
80.360
82.960

82.360
84.360

80.160

82.910

83.710
82.710

TINGGI DASAR SUNGAI


BED LEVEL IN CENTER LINE
93.389

93.048
93.430

93.430

93.430
93.136

TINGGI PERMUKAAN JALAN (RENCANA)


KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT NOMOR RUAS 004 KONSULTAN JUDUL : NO. LEMBAR B - 04.2
(PR-02)
D I R EK T O R A T J E N DE R A L B I N A M A R GA PERENCANAAN TEKNIK (DED)
NAMA RUAS TERBANGGI BESAR - GUNUNG SUGIH
DIGAMBAR DIRENCANA DIPERIKSA
DENAH DAN TAMPAK MEMANJANG
TITIK DAN GRAFIK BOR MESIN RENCANA JEMBATAN SKALA 1 : 500
BALAI BESAR PELAKSANAAN JALAN NASIONAL V JEMBATAN DI PROVINSI LAMPUNG
JEMBATAN WAY PENGUBUAN KRISMAN ARIS MUNANDAR DAMIRI, S.T. Ir. NAPOLI SITUMORANG
S A T U A N K ER J A P ER EN CA N A A N & P EN G A W A S A N J A L A N N A S I ON A L P RO V I N S I L A M P U N G
PROV./KAB./KODYA LAMPUNG / LAMPUNG TENGAH TAHUN 2018
Ja lan Wo lt er M on go n si di No . 22 0 Te lu k Be tu n g B an da r L am pu n g Tel ep on / Fax . 07 21 -4 7 25 91
DRAFTMAN BRIDGE ENGINEER TEAM LEADER
X = 9892.4 X = 9975.7 85.875
BM.0 Y = 10061.9

86.896

80.236

81.836
80.281

84.301

84.136
87.841

81.821
BM.1 Y = 10042.4

P.26
Z = + 88.061 Z = + 85.245
87.654

+87.000

+84.000
86.456 +88.00 87.325 85.280

+82.000
0

+82.000
JEMBATAN WAY PENGUBUAN BARU +84
.00 .0 00 87.564
00 0 .00
0 +87
+87.0 +85 85.540

+86.000
88.165 88.105 88.205 +83 0 0
.000 +86.0

+83.0
87.750

+81.000
+81.000
00
+88.000

1730
415,82
91.455 91.615 91.950 92.020 5060 5060

+85.000
88.565

1476
88.835
+89.00
0
+90.000
91.475 91.822 91.644 91.944 91.980 91.810
TERBANGGI BESAR

GUNUNG SUGI
91.485 91.835 91.650 91.950 91.958 91.767 H
+89.000 91.440
+88.000
91.625 86.764 +87.000
85.985

+81.0
+82.000
+86.000

00
88.895 +84.000
84.235 84.435 00 85.436
88.875 +83.0 .000

+82.000
+85.000 +84

+88.00
85.436

+83.000
88.755 85.240 85.635

0
X = 10000
00

+81.000
88.535 86.545
7.0 BM.3 Y = 10000

+86.000
X = 9887.5 +8 +85.00
0 Z = + 86.630
P.6 P.7 BM.2 Y = 10016 P.7A P.8 P.9 P.10 P.11
Z = + 88.507

TERBANGGI BESAR 10120 GUNUNG SUGIH


5060 5060

GUARDRAIL TANGGA INSPEKSI TANGGA INSPEKSI GUARDRAIL


95.000 +93.430 +93.430
+91.030 +91.030 +91.030 +91.030
10 30 50 10 30 50
90.000 BOR. 4 0 20 40 BOR. 1 0 20 40
+87.280 PIER RENCANA +87.280
-1 21 MAB. +86.761 -1 22
-2 -2
85.000 -3 18 10 30 50 -3 40
RETAINING WALL -4 -4 RETAINING WALL
22 MAN. +83.000 BOR. 2 0 20 40 PONDASI BORE PILE Ø80 -5 9 PASANGAN BATU BELAH
PASANGAN BATU BELAH -5
-6 + CASING PIPA BAJA T. 6 MM PERMANEN -6
-7 >50 +80.730 -1 16 -7 32
PONDASI BORE PILE Ø80 -2 -8
80.000 -8 + CASING PIPA BAJA T. 6 MM PERMANEN -3 24
-9 >50 -9 >50
-10 -4 -10
-11 >50 -5 26 -11 >50
-12 -6 -12
-13 >50 PONDASI BORE PILE Ø100 -7 >50 -13 >50
75.000 +74.280 + CASING PIPA BAJA T. 6 MM PERMANEN -8 +74.280
-14 -14
-15 >50 -9 >50 -15 >50
-16 -10 -16
-17 -11 >50 -17 >50
-18 -12 -18
70.000 -19 +66.730 -13 >50 -19
-20 -14 -20
-15 >50
-16
-17
65.000 -18
ELEVASI TANAH ASLI -19
ORIGINAL GROUND LEVEL -20
61.000

NOMOR PROFIL
PROFILE NUMBER P.7 P.8 P.9 P.10 P.11
200.00

280.40

330.40
305.40
175.00

JARAK PROFIL
10.775 25.00 80.40 25.00 25.00
ACCUMULATED DISTANCE
91.950

91.958
91.835
91.684

91.440
91.767
TINGGI PERMUKAAN JALAN (EKSISTING)
80.360
82.960

82.360
84.360

80.160

82.910

83.710
82.710

TINGGI DASAR SUNGAI


BED LEVEL IN CENTER LINE
93.389

93.048
93.430

93.430

93.430
93.136

TINGGI PERMUKAAN JALAN (RENCANA)


KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT NOMOR RUAS 004 KONSULTAN JUDUL : NO. LEMBAR B - 05.1
(PR-02)
D I R EK T O R A T J E N DE R A L B I N A M A R GA PERENCANAAN TEKNIK (DED)
NAMA RUAS TERBANGGI BESAR - GUNUNG SUGIH
DIGAMBAR DIRENCANA DIPERIKSA
CROSS JALAN SKALA 1 : 100
BALAI BESAR PELAKSANAAN JALAN NASIONAL V JEMBATAN DI PROVINSI LAMPUNG
JEMBATAN WAY PENGUBUAN KRISMAN ARIS MUNANDAR DAMIRI, S.T. Ir. NAPOLI SITUMORANG
S A T U A N K ER J A P ER EN CA N A A N & P EN G A W A S A N J A L A N N A S I ON A L P RO V I N S I L A M P U N G
PROV./KAB./KODYA LAMPUNG / LAMPUNG TENGAH TAHUN 2018
Ja lan Wo lt er M on go n si di No . 22 0 Te lu k Be tu n g B an da r L am pu n g Tel ep on / Fax . 07 21 -4 7 25 91
DRAFTMAN BRIDGE ENGINEER TEAM LEADER

120 720 270


92.000

BAHU EKSISTING JALAN EKSISTING BAHU EKSISTING


91.000 P.0

90.000

89.000

88.000

87.000

86.000
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
85.000

90.500

88.650
90.785

90.495
90.770
90.120

ELEVASI TANAH ASLI

87.920
ORIGINAL GROUND LEVEL

JARAK (M)
5.00 1.20 7.20 2.70 3.00 10.00
DISTANCE (M)

110 720 120


92.000

BAHU EKSISTING JALAN EKSISTING BAHU EKSISTING


91.000 P.1
BATAS

90.000

89.000

88.000

87.000

86.000
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
85.000
89.960

88.650
90.595

90.590

90.320

88.340
90.520
89.790

ELEVASI TANAH ASLI


ORIGINAL GROUND LEVEL

JARAK (M)
3.00 3.00 1.10 7.20 1.20 2.50 7.00
DISTANCE (M)
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT NOMOR RUAS 004 KONSULTAN JUDUL : NO. LEMBAR B - 05.2
(PR-02)
D I R EK T O R A T J E N DE R A L B I N A M A R GA PERENCANAAN TEKNIK (DED)
NAMA RUAS TERBANGGI BESAR - GUNUNG SUGIH
DIGAMBAR DIRENCANA DIPERIKSA
CROSS JALAN SKALA 1 : 100
BALAI BESAR PELAKSANAAN JALAN NASIONAL V JEMBATAN DI PROVINSI LAMPUNG
JEMBATAN WAY PENGUBUAN KRISMAN ARIS MUNANDAR DAMIRI, S.T. Ir. NAPOLI SITUMORANG
S A T U A N K ER J A P ER EN CA N A A N & P EN G A W A S A N J A L A N N A S I ON A L P RO V I N S I L A M P U N G
PROV./KAB./KODYA LAMPUNG / LAMPUNG TENGAH TAHUN 2018
Ja lan Wo lt er M on go n si di No . 22 0 Te lu k Be tu n g B an da r L am pu n g Tel ep on / Fax . 07 21 -4 7 25 91
DRAFTMAN BRIDGE ENGINEER TEAM LEADER

100 720 210

BAHU EKSISTING JALAN EKSISTING BAHU EKSISTING


91.000 PAGAR P.2

90.000

89.000

88.000

87.000

86.000

85.000
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
84.000
89.565

90.539

87.365

90.495
90.524
89.705

90.470

90.160
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL

JARAK (M)
2.00 2.00 1.00 7.20 2.10 5.00 5.00
DISTANCE (M)

130 800 320


92.000

91.000 BAHU EKSISTING JALAN EKSISTING BAHU EKSISTING


P.3
PAGAR
90.000

89.000

88.000

87.000

86.000
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
85.000
89.034

90.499
90.484
90.344

90.770
90.274

87.574
89.144

ELEVASI TANAH ASLI


ORIGINAL GROUND LEVEL

JARAK (M)
2.00 3.00 1.30 8.00 3.20 3.20 5.00
DISTANCE (M)
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT NOMOR RUAS 004 KONSULTAN JUDUL : NO. LEMBAR B - 05.3
(PR-02)
D I R EK T O R A T J E N DE R A L B I N A M A R GA PERENCANAAN TEKNIK (DED)
NAMA RUAS TERBANGGI BESAR - GUNUNG SUGIH
DIGAMBAR DIRENCANA DIPERIKSA
CROSS JALAN SKALA 1 : 100
BALAI BESAR PELAKSANAAN JALAN NASIONAL V JEMBATAN DI PROVINSI LAMPUNG
JEMBATAN WAY PENGUBUAN KRISMAN ARIS MUNANDAR DAMIRI, S.T. Ir. NAPOLI SITUMORANG
S A T U A N K ER J A P ER EN CA N A A N & P EN G A W A S A N J A L A N N A S I ON A L P RO V I N S I L A M P U N G
PROV./KAB./KODYA LAMPUNG / LAMPUNG TENGAH TAHUN 2018
Ja lan Wo lt er M on go n si di No . 22 0 Te lu k Be tu n g B an da r L am pu n g Tel ep on / Fax . 07 21 -4 7 25 91
DRAFTMAN BRIDGE ENGINEER TEAM LEADER

94.000
105 950
15 50 40 150 800
93.000 BUJUNG TENUK
RABAT BETON Fc' 20 MPa, T. 20 CM AC-WC MOD, T = 5 CM
AGREGAT BASE A, T= 30 CM AC-BC MOD, T = 7 CM
92.000 GUARDRAIL AC-BASE MOD, T = 16 CM
AGREGAT BASE A, T= 30 CM JALAN ASPAL EKSISTING
P.4 -3% -3%
PAS. LISBAN, T. 5 CM -5%
91.000

30 45 30
105
RETAINING WALL PAS. BATU BELAH
90.000

89.000 70

88.000
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
87.000

89.598

89.828

90.785
91.368

91.733
ELEVASI TANAH ASLI

91.718
ORIGINAL GROUND LEVEL

JARAK (M)
2.50 4.50 1.20 7.60 4.00
DISTANCE (M)

1281,67
181,67 1100
25 116,67 40 150 800 150

RABAT BETON Fc' 20 MPa, T. 20 CM AC-WC MOD, T = 5 CM RABAT BETON Fc' 20 MPa, T. 20 CM
AGREGAT BASE A, T= 30 CM AC-BC MOD, T = 7 CM AGREGAT BASE A, T= 30 CM
GUARDRAIL AC-BASE MOD, T = 16 CM
GUARDRAIL EKSISTING
P.5 AGREGAT BASE A, T= 30 CM JALAN ASPAL EKSISTING
-3% -3% BAHU RABAT EKSISTING
PAS. LISBAN, T. 5 CM -5%
JALAN WARGA CL EKSISTING
30

91.000 RETAINING WALL PAS. BATU BELAH


145
215

PAS. FILTER PIPA SULINGAN


TIMBUNAN PILIHAN DARI SUMBER GALIAN.
dwgmodels.com

PAS. PIPA SULINGAN 2"/2,00 METER CBR MINIMUM 10% DIPADATKAN LAPIS PER LAPIS DENGAN KETEBALAN
90.000 MAKSIMUM 20 CM HINGGA MENCAPAI KEPADATAN MAKSIMUM
40

PAGAR EKSISTING

89.000

88.000

87.000

86.000

100
85.000
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
84.000
88.500
88.560

91.520

91.632

91.664
91.265
91.270
91.245

91.377
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL

JARAK (M)
4.00 6.00 1.20 8.00 1.70 4.00 5.00 3.00
DISTANCE (M)
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT NOMOR RUAS 004 KONSULTAN JUDUL : NO. LEMBAR B - 05.4
(PR-02)
D I R EK T O R A T J E N DE R A L B I N A M A R GA PERENCANAAN TEKNIK (DED)
NAMA RUAS TERBANGGI BESAR - GUNUNG SUGIH
DIGAMBAR DIRENCANA DIPERIKSA
CROSS JALAN SKALA 1 : 100
BALAI BESAR PELAKSANAAN JALAN NASIONAL V JEMBATAN DI PROVINSI LAMPUNG
JEMBATAN WAY PENGUBUAN KRISMAN ARIS MUNANDAR DAMIRI, S.T. Ir. NAPOLI SITUMORANG
S A T U A N K ER J A P ER EN CA N A A N & P EN G A W A S A N J A L A N N A S I ON A L P RO V I N S I L A M P U N G
PROV./KAB./KODYA LAMPUNG / LAMPUNG TENGAH TAHUN 2018
Ja lan Wo lt er M on go n si di No . 22 0 Te lu k Be tu n g B an da r L am pu n g Tel ep on / Fax . 07 21 -4 7 25 91
DRAFTMAN BRIDGE ENGINEER TEAM LEADER

1463,34
181,67 1100 181,67
25 116,67 40 150 800 150 40 116,67 25

RABAT BETON Fc' 20 MPa, T. 20 CM AC-WC MOD, T = 5 CM RABAT BETON Fc' 20 MPa, T. 20 CM
AGREGAT BASE A, T= 30 CM AC-BC MOD, T = 7 CM AGREGAT BASE A, T= 30 CM
GUARDRAIL AC-BASE MOD, T = 16 CM GUARDRAIL
P.6 AGREGAT BASE A, T= 30 CM
-3% -3% GUIDE POST EKSISTING
PAS. LISBAN, T. 5 CM -5% -5%
JALAN WARGA

30

30
BAHU RABAT EKSISTING
JALAN ASPAL EKSISTING
RETAINING WALL PAS. BATU BELAH
CL EKSISTING

145

145
215

215
91.000 PAS. FILTER PIPA SULINGAN TIMBUNAN PILIHAN DARI SUMBER GALIAN.

40

40
dwgmodels.com

PAGAR EKSISTING CBR MINIMUM 10% DIPADATKAN LAPIS PER LAPIS DENGAN KETEBALAN PAS. BATU EKSISTING
MAKSIMUM 20 CM HINGGA MENCAPAI KEPADATAN MAKSIMUM
90.000

89.000

88.000

87.000

86.000 100 1263,34 100


1463,34

85.000
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
84.000

90.938
89.255

89.255

90.215

91.395
91.485
91.455

91.455
91.475
ELEVASI TANAH ASLI

91.461
ORIGINAL GROUND LEVEL

JARAK (M)
3.50 4.00 5.00 1.35 7.60 1.20 2.25 1.75 6.00
DISTANCE (M)
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT NOMOR RUAS 004 KONSULTAN JUDUL : NO. LEMBAR B - 05.5
(PR-02)
D I R EK T O R A T J E N DE R A L B I N A M A R GA PERENCANAAN TEKNIK (DED)
NAMA RUAS TERBANGGI BESAR - GUNUNG SUGIH
DIGAMBAR DIRENCANA DIPERIKSA
CROSS JALAN SKALA 1 : 100
BALAI BESAR PELAKSANAAN JALAN NASIONAL V JEMBATAN DI PROVINSI LAMPUNG
JEMBATAN WAY PENGUBUAN KRISMAN ARIS MUNANDAR DAMIRI, S.T. Ir. NAPOLI SITUMORANG
S A T U A N K ER J A P ER EN CA N A A N & P EN G A W A S A N J A L A N N A S I ON A L P RO V I N S I L A M P U N G
PROV./KAB./KODYA LAMPUNG / LAMPUNG TENGAH TAHUN 2018
Ja lan Wo lt er M on go n si di No . 22 0 Te lu k Be tu n g B an da r L am pu n g Tel ep on / Fax . 07 21 -4 7 25 91
DRAFTMAN BRIDGE ENGINEER TEAM LEADER

1998,34
115 496,67 1100 286,67
60 55 25 183,33 40 25 183,33 40 150 800 150 40 166,67 25 55

RABAT BETON Fc' 20 MPa, T. 20 CM AC-WC MOD, T = 5 CM RABAT BETON Fc' 20 MPa, T. 20 CM
AGREGAT BASE A, T= 30 CM AC-BC MOD, T = 7 CM AGREGAT BASE A, T= 30 CM
GUARDRAIL AC-BASE MOD, T = 16 CM GUARDRAIL
P.7 AGREGAT BASE A, T= 30 CM
-3% -3%
PAS. LISBAN, T. 5 CM -5% -5%
GUIDE POST EKSISTING

30
93.000 BAHU RABAT EKSISTING
JALAN ASPAL EKSISTING
PAS. PIPA SULINGAN 2"/2,00 METER
JALAN WARGA CL EKSISTING
275

220
290
92.000
315

RETAINING WALL PAS. BATU BELAH

91.000 TIMBUNAN PILIHAN DARI SUMBER GALIAN. PAS. BATU EKSISTING


PAS. LISBAN, T. 5 CM

20 20
PAS. FILTER PIPA SULINGAN CBR MINIMUM 10% DIPADATKAN LAPIS PER LAPIS DENGAN KETEBALAN
MAKSIMUM 20 CM HINGGA MENCAPAI KEPADATAN MAKSIMUM
40

dwgmodels.com

90.000 PAGAR EKSISTING


135
315

89.000
100

88.000 PAS. FILTER PIPA SULINGAN


10 40

87.000
RETAINING WALL PAS. BATU BELAH

86.000 60 55 100 148,33 100 1380,01 100


1943,34
85.000
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
84.000

90.889
88.755

88.755

91.838

91.805
91.835
92.015
90.145

91.789
91.822
ELEVASI TANAH ASLI

91.615
ORIGINAL GROUND LEVEL

JARAK (M)
2.50 5.50 3.00 1.50 7.60 1.50 5.00 3.50 5.00
DISTANCE (M)
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT NOMOR RUAS 004 KONSULTAN JUDUL : NO. LEMBAR B - 05.6
(PR-02)
D I R EK T O R A T J E N DE R A L B I N A M A R GA PERENCANAAN TEKNIK (DED)
NAMA RUAS TERBANGGI BESAR - GUNUNG SUGIH
DIGAMBAR DIRENCANA DIPERIKSA
CROSS JALAN SKALA 1 : 100
BALAI BESAR PELAKSANAAN JALAN NASIONAL V JEMBATAN DI PROVINSI LAMPUNG
JEMBATAN WAY PENGUBUAN KRISMAN ARIS MUNANDAR DAMIRI, S.T. Ir. NAPOLI SITUMORANG
S A T U A N K ER J A P ER EN CA N A A N & P EN G A W A S A N J A L A N N A S I ON A L P RO V I N S I L A M P U N G
PROV./KAB./KODYA LAMPUNG / LAMPUNG TENGAH TAHUN 2018
Ja lan Wo lt er M on go n si di No . 22 0 Te lu k Be tu n g B an da r L am pu n g Tel ep on / Fax . 07 21 -4 7 25 91
DRAFTMAN BRIDGE ENGINEER TEAM LEADER

2419,34
276,67 705 1100 337,67
40 116,67 120 300 40 25 300 40 150 800 150 40 217,67 25 55

P.7A
RABAT BETON Fc' 20 MPa, T. 20 CM AC-WC MOD, T = 5 CM RABAT BETON Fc' 20 MPa, T. 20 CM
AGREGAT BASE A, T= 30 CM AC-BC MOD, T = 7 CM AGREGAT BASE A, T= 30 CM
GUARDRAIL AC-BASE MOD, T = 16 CM GUARDRAIL
AGREGAT BASE A, T= 30 CM
-3% -3%
PAS. LISBAN, T. 5 CM -5% -5% PAS. LISBAN, T. 5 CM
GUIDE POST EKSISTING
30

30
93.000 BAHU RABAT EKSISTING
JALAN ASPAL EKSISTING
CL EKSISTING
92.000 PAS. PIPA SULINGAN 2"/2,00 METER

297
367
TIMBUNAN PILIHAN DARI SUMBER GALIAN.
PAS. FILTER PIPA SULINGAN
420

CBR MINIMUM 10% DIPADATKAN LAPIS PER LAPIS DENGAN KETEBALAN


490

91.000
MAKSIMUM 20 CM HINGGA MENCAPAI KEPADATAN MAKSIMUM
PAS. BATU EKSISTING
RETAINING WALL PAS. BATU BELAH RETAINING WALL PAS. BATU BELAH

20 20
90.000

PAS. LISBAN, T. 5 CM
89.000
40

88.000
235

PAS. PIPA SULINGAN 2"/2,00 METER


87.000
PAS. LISBAN, T. 5 CM
490

RETAINING WALL PAS. BATU BELAH


86.000
175

85.000
40

84.000

83.000

82.000
81,67 270 265 100 1547,67 100
2364,34
81.000
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
80.000
88.535

84.235
84.425

91.935
90.158
91.650

91.950
91.625

91.644
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL

JARAK (M)
2.00 4.00 6.00 1.20 6.00 2.00 3.50 6.00 2.50
DISTANCE (M)
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT NOMOR RUAS 004 KONSULTAN JUDUL : NO. LEMBAR B - 05.7
(PR-02)
D I R EK T O R A T J E N DE R A L B I N A M A R GA PERENCANAAN TEKNIK (DED)
NAMA RUAS TERBANGGI BESAR - GUNUNG SUGIH
DIGAMBAR DIRENCANA DIPERIKSA
CROSS JALAN SKALA 1 : 100
BALAI BESAR PELAKSANAAN JALAN NASIONAL V JEMBATAN DI PROVINSI LAMPUNG
JEMBATAN WAY PENGUBUAN KRISMAN ARIS MUNANDAR DAMIRI, S.T. Ir. NAPOLI SITUMORANG
S A T U A N K ER J A P ER EN CA N A A N & P EN G A W A S A N J A L A N N A S I ON A L P RO V I N S I L A M P U N G
PROV./KAB./KODYA LAMPUNG / LAMPUNG TENGAH TAHUN 2018
Ja lan Wo lt er M on go n si di No . 22 0 Te lu k Be tu n g B an da r L am pu n g Tel ep on / Fax . 07 21 -4 7 25 91
DRAFTMAN BRIDGE ENGINEER TEAM LEADER

JEMBATAN WAY PENGUBUAN BARU


1730
710
610

94.000
P.8
+93.043

93.000

92.000

91.000

90.000

89.000

88.000

87.000

86.000

85.000

84.000

83.000

82.000

81.000

80.000

79.000

78.000
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
77.000

86.540

86.540

86.540
91.980

91.980
91.958

91.835
92.010
91.920

91.920

ELEVASI TANAH ASLI


ORIGINAL GROUND LEVEL

JARAK (M)
5.40 1.00 1.40 6.00 1.40 2.20 2.70 5.00 2.50
DISTANCE (M)
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT NOMOR RUAS 004 KONSULTAN JUDUL : NO. LEMBAR B - 05.7a
(PR-02)
D I R EK T O R A T J E N DE R A L B I N A M A R GA PERENCANAAN TEKNIK (DED)
NAMA RUAS TERBANGGI BESAR - GUNUNG SUGIH
DIGAMBAR DIRENCANA DIPERIKSA
CROSS JALAN PIER SKALA 1 : 100
BALAI BESAR PELAKSANAAN JALAN NASIONAL V JEMBATAN DI PROVINSI LAMPUNG
JEMBATAN WAY PENGUBUAN KRISMAN ARIS MUNANDAR DAMIRI, S.T. Ir. NAPOLI SITUMORANG
S A T U A N K ER J A P ER EN CA N A A N & P EN G A W A S A N J A L A N N A S I ON A L P RO V I N S I L A M P U N G
PROV./KAB./KODYA LAMPUNG / LAMPUNG TENGAH TAHUN 2018
Ja lan Wo lt er M on go n si di No . 22 0 Te lu k Be tu n g B an da r L am pu n g Tel ep on / Fax . 07 21 -4 7 25 91
DRAFTMAN BRIDGE ENGINEER TEAM LEADER

RENCANA JEMBATAN WAY PENGUBUAN EKSISTING JEMBATAN WAY PENGUBUAN BARU


1615,82

415,82

CL
94.000
P.9

93.000

92.000

91.000

90.000

89.000

88.000

87.000

86.000

85.000

84.000

83.000

82.000

81.000

80.000

79.000

78.000
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
77.000

82.803

82.532

82.524
82.770

82.770

82.770

82.770

82.770

82.770

82.770

ELEVASI TANAH ASLI


ORIGINAL GROUND LEVEL

JARAK (M)
5.40 1.00 1.40 6.00 1.40 2.20 2.70 5.00 2.50
DISTANCE (M)
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT NOMOR RUAS 004 KONSULTAN JUDUL : NO. LEMBAR B - 05.8
(PR-02)
D I R EK T O R A T J E N DE R A L B I N A M A R GA PERENCANAAN TEKNIK (DED)
NAMA RUAS TERBANGGI BESAR - GUNUNG SUGIH
DIGAMBAR DIRENCANA DIPERIKSA
CROSS JALAN SKALA 1 : 100
BALAI BESAR PELAKSANAAN JALAN NASIONAL V JEMBATAN DI PROVINSI LAMPUNG
JEMBATAN WAY PENGUBUAN KRISMAN ARIS MUNANDAR DAMIRI, S.T. Ir. NAPOLI SITUMORANG
S A T U A N K ER J A P ER EN CA N A A N & P EN G A W A S A N J A L A N N A S I ON A L P RO V I N S I L A M P U N G
PROV./KAB./KODYA LAMPUNG / LAMPUNG TENGAH TAHUN 2018
Ja lan Wo lt er M on go n si di No . 22 0 Te lu k Be tu n g B an da r L am pu n g Tel ep on / Fax . 07 21 -4 7 25 91
DRAFTMAN BRIDGE ENGINEER TEAM LEADER

2208,34
415 100 231,67 1100 361,67
25 350 40 100 25 166,67 40 150 800 150 40 166,67 25 130

RABAT BETON Fc' 20 MPa, T. 20 CM AC-WC MOD, T = 5 CM RABAT BETON Fc' 20 MPa, T. 20 CM
AGREGAT BASE A, T= 30 CM AC-BC MOD, T = 7 CM AGREGAT BASE A, T= 30 CM
GUARDRAIL AC-BASE MOD, T = 16 CM GUARDRAIL
P.10 AGREGAT BASE A, T= 30 CM
-3% -3%
PAS. LISBAN, T. 5 CM -5% -5% PAS. LISBAN, T. 5 CM
GUIDE POST EKSISTING
30

30
RETAINING WALL PAS. BATU BELAH BAHU RABAT EKSISTING
JALAN ASPAL EKSISTING
220

220
CL EKSISTING
290

290
92.000 PAS. PIPA SULINGAN 2"/2,00 METER

PAS. LISBAN, T. 5 CM TIMBUNAN PILIHAN DARI SUMBER GALIAN. PAS. FILTER PIPA SULINGAN
91.000 PAS. FILTER PIPA SULINGAN CBR MINIMUM 10% DIPADATKAN LAPIS PER LAPIS DENGAN KETEBALAN PAS. BATU EKSISTING

20 20
40

MAKSIMUM 20 CM HINGGA MENCAPAI KEPADATAN MAKSIMUM


640

90.000 RETAINING WALL PAS. BATU BELAH LANTAI KERJA PASIR URUG, T. 10 CM
390
310

89.000

PAS. FILTER PIPA SULINGAN


88.000

PAS. PIPA SULINGAN 2"/2,00 METER


40

87.000

86.000

100 415 100 1363,34 100


85.000
ELEVASI TANAH ASLI 2078,34
ORIGINAL GROUND LEVEL
84.000

90.930

88.320
87.550

91.830

91.760
91.765

91.767
87.150

ELEVASI TANAH ASLI

91.727
91.810
ORIGINAL GROUND LEVEL

JARAK (M)
5.00 6.00 2.00 1.00 7.60 2.20 2.30 2.00 5.00
DISTANCE (M)
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT NOMOR RUAS 004 KONSULTAN JUDUL : NO. LEMBAR B - 05.9
(PR-02)
D I R EK T O R A T J E N DE R A L B I N A M A R GA PERENCANAAN TEKNIK (DED)
NAMA RUAS TERBANGGI BESAR - GUNUNG SUGIH
DIGAMBAR DIRENCANA DIPERIKSA
CROSS JALAN SKALA 1 : 100
BALAI BESAR PELAKSANAAN JALAN NASIONAL V JEMBATAN DI PROVINSI LAMPUNG
JEMBATAN WAY PENGUBUAN KRISMAN ARIS MUNANDAR DAMIRI, S.T. Ir. NAPOLI SITUMORANG
S A T U A N K ER J A P ER EN CA N A A N & P EN G A W A S A N J A L A N N A S I ON A L P RO V I N S I L A M P U N G
PROV./KAB./KODYA LAMPUNG / LAMPUNG TENGAH TAHUN 2018
Ja lan Wo lt er M on go n si di No . 22 0 Te lu k Be tu n g B an da r L am pu n g Tel ep on / Fax . 07 21 -4 7 25 91
DRAFTMAN BRIDGE ENGINEER TEAM LEADER

2105,28
415 100 231,67 1100 258,61
25 350 40 100 25 166,67 40 150 800 150 40 138,61 25 55

RABAT BETON Fc' 20 MPa, T. 20 CM AC-WC MOD, T = 5 CM RABAT BETON Fc' 20 MPa, T. 20 CM
AGREGAT BASE A, T= 30 CM AC-BC MOD, T = 7 CM AGREGAT BASE A, T= 30 CM
94.000 GUARDRAIL AC-BASE MOD, T = 16 CM GUARDRAIL
P.11 AGREGAT BASE A, T= 30 CM
-3% -3%
PAS. LISBAN, T. 5 CM -5% -5%
93.000 GUIDE POST EKSISTING
30

30
RETAINING WALL PAS. BATU BELAH BAHU RABAT EKSISTING
JALAN ASPAL EKSISTING
92.000

178
248
220

CL EKSISTING
290

PAS. PIPA SULINGAN 2"/2,00 METER

91.000
TIMBUNAN PILIHAN DARI SUMBER GALIAN.

20 20
PAS. LISBAN, T. 5 CM
PAS. FILTER PIPA SULINGAN CBR MINIMUM 10% DIPADATKAN LAPIS PER LAPIS DENGAN KETEBALAN
MAKSIMUM 20 CM HINGGA MENCAPAI KEPADATAN MAKSIMUM
40

PAS. BATU EKSISTING


90.000
640

LANTAI KERJA PASIR URUG, T. 10 CM

89.000 PAS. PIPA SULINGAN 2"/2,00 METER


390
310

RETAINING WALL PAS. BATU BELAH


88.000

87.000 PAS. FILTER PIPA SULINGAN


40

86.000

100 415 100 1335,28 100


85.000
ELEVASI TANAH ASLI 2050,28
ORIGINAL GROUND LEVEL
84.000

90.969
86.865

87.350

91.369
91.430
91.395

91.352
91.435

91.387
ELEVASI TANAH ASLI 91.440
ORIGINAL GROUND LEVEL

JARAK (M)
6.00 5.50 2.00 1.30 7.60 2.00 2.00 3.00 4.00
DISTANCE (M)
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT NOMOR RUAS 004 KONSULTAN JUDUL : NO. LEMBAR B - 05.10
(PR-02)
D I R EK T O R A T J E N DE R A L B I N A M A R GA PERENCANAAN TEKNIK (DED)
NAMA RUAS TERBANGGI BESAR - GUNUNG SUGIH
DIGAMBAR DIRENCANA DIPERIKSA
CROSS JALAN SKALA 1 : 100
BALAI BESAR PELAKSANAAN JALAN NASIONAL V JEMBATAN DI PROVINSI LAMPUNG
JEMBATAN WAY PENGUBUAN KRISMAN ARIS MUNANDAR DAMIRI, S.T. Ir. NAPOLI SITUMORANG
S A T U A N K ER J A P ER EN CA N A A N & P EN G A W A S A N J A L A N N A S I ON A L P RO V I N S I L A M P U N G
PROV./KAB./KODYA LAMPUNG / LAMPUNG TENGAH TAHUN 2018
Ja lan Wo lt er M on go n si di No . 22 0 Te lu k Be tu n g B an da r L am pu n g Tel ep on / Fax . 07 21 -4 7 25 91
DRAFTMAN BRIDGE ENGINEER TEAM LEADER

1763,33
265 100 198,33 1200
25 200 40 100 25 133,33 40 150 800 250

RABAT BETON Fc' 20 MPa, T. 20 CM AC-WC MOD, T = 5 CM RABAT BETON Fc' 20 MPa, T. 20 CM
AGREGAT BASE A, T= 30 CM AC-BC MOD, T = 7 CM AGREGAT BASE A, T= 30 CM
93.000 GUARDRAIL AC-BASE MOD, T = 16 CM
AGREGAT BASE A, T= 30 CM BAHU RABAT EKSISTING GUARDRAIL EKSISTING
P.12
-3% -3% JALAN ASPAL EKSISTING
PAS. LISBAN, T. 5 CM -5%
92.000
30

RETAINING WALL PAS. BATU BELAH

91.000 PAS. PIPA SULINGAN 2"/2,00 METER


170
240

PAS. LISBAN, T. 5 CM
90.000 PAS. FILTER PIPA SULINGAN
440

40

RETAINING WALL PAS. BATU BELAH


89.000 PAS. PIPA SULINGAN 2"/2,00 METER LANTAI KERJA PASIR URUG, T. 10 CM
160
240

88.000 PAS. FILTER PIPA SULINGAN


40

87.000

86.000

100 265 100


85.000
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
84.000
89.960

90.645

86.670
90.725
91.000

91.738
86.017

ELEVASI TANAH ASLI


91.105

91.701
91.115
ORIGINAL GROUND LEVEL

JARAK (M)
6.00 2.00 1.50 1.00 7.70 2.40 0.65 4.35 3.40
DISTANCE (M)
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT NOMOR RUAS 004 KONSULTAN JUDUL : NO. LEMBAR B - 05.11
(PR-02)
D I R EK T O R A T J E N DE R A L B I N A M A R GA PERENCANAAN TEKNIK (DED)
NAMA RUAS TERBANGGI BESAR - GUNUNG SUGIH
DIGAMBAR DIRENCANA DIPERIKSA
CROSS JALAN SKALA 1 : 100
BALAI BESAR PELAKSANAAN JALAN NASIONAL V JEMBATAN DI PROVINSI LAMPUNG
JEMBATAN WAY PENGUBUAN KRISMAN ARIS MUNANDAR DAMIRI, S.T. Ir. NAPOLI SITUMORANG
S A T U A N K ER J A P ER EN CA N A A N & P EN G A W A S A N J A L A N N A S I ON A L P RO V I N S I L A M P U N G
PROV./KAB./KODYA LAMPUNG / LAMPUNG TENGAH TAHUN 2018
Ja lan Wo lt er M on go n si di No . 22 0 Te lu k Be tu n g B an da r L am pu n g Tel ep on / Fax . 07 21 -4 7 25 91
DRAFTMAN BRIDGE ENGINEER TEAM LEADER

1630
265 100 165 1100
25 200 40 100 25 100 40 150 800 150

RABAT BETON Fc' 20 MPa, T. 20 CM AC-WC MOD, T = 5 CM RABAT BETON Fc' 20 MPa, T. 20 CM
AGREGAT BASE A, T= 30 CM AC-BC MOD, T = 7 CM AGREGAT BASE A, T= 30 CM
GUARDRAIL AC-BASE MOD, T = 16 CM GUARDRAIL
P.13 AGREGAT BASE A, T= 30 CM
-3% -3%
PAS. LISBAN, T. 5 CM -5% -5%
91.000
30

RETAINING WALL PAS. BATU BELAH


120
190

90.000
PAS. LISBAN, T. 5 CM
40
390

89.000
RETAINING WALL PAS. BATU BELAH
LANTAI KERJA PASIR URUG, T. 10 CM
240
160

88.000
PAS. FILTER PIPA SULINGAN
40

87.000

86.000

100 265 100


85.000

84.000

83.000

82.000
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
81.000
88.080

90.390

90.530
86.385

90.075

90.425

87.305

86.410

86.410
90.412

ELEVASI TANAH ASLI


ORIGINAL GROUND LEVEL

JARAK (M)
5.00 3.00 1.70 1.20 7.60 2.30 4.00 5.00 3.50
DISTANCE (M)
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT NOMOR RUAS 004 KONSULTAN JUDUL : NO. LEMBAR B - 05.12
(PR-02)
D I R EK T O R A T J E N DE R A L B I N A M A R GA PERENCANAAN TEKNIK (DED)
NAMA RUAS TERBANGGI BESAR - GUNUNG SUGIH
DIGAMBAR DIRENCANA DIPERIKSA
CROSS JALAN SKALA 1 : 100
BALAI BESAR PELAKSANAAN JALAN NASIONAL V JEMBATAN DI PROVINSI LAMPUNG
JEMBATAN WAY PENGUBUAN KRISMAN ARIS MUNANDAR DAMIRI, S.T. Ir. NAPOLI SITUMORANG
S A T U A N K ER J A P ER EN CA N A A N & P EN G A W A S A N J A L A N N A S I ON A L P RO V I N S I L A M P U N G
PROV./KAB./KODYA LAMPUNG / LAMPUNG TENGAH TAHUN 2018
Ja lan Wo lt er M on go n si di No . 22 0 Te lu k Be tu n g B an da r L am pu n g Tel ep on / Fax . 07 21 -4 7 25 91
DRAFTMAN BRIDGE ENGINEER TEAM LEADER

1705
340 100 165 1100
25 275 40 100 25 100 40 150 800 150

RABAT BETON Fc' 20 MPa, T. 20 CM AC-WC MOD, T = 5 CM RABAT BETON Fc' 20 MPa, T. 20 CM
AGREGAT BASE A, T= 30 CM AC-BC MOD, T = 7 CM AGREGAT BASE A, T= 30 CM
GUARDRAIL AC-BASE MOD, T = 16 CM GUARDRAIL
AGREGAT BASE A, T= 30 CM
P.14
-3% -3%
PAS. LISBAN, T. 5 CM -5% -5%
90.000
30

RETAINING WALL PAS. BATU BELAH


PAS. PIPA SULINGAN 2"/2,00 METER
120
190

89.000
PAS. LISBAN, T. 5 CM
40

88.000
465

RETAINING WALL PAS. BATU BELAH LANTAI KERJA PASIR URUG, T. 10 CM


235
315

87.000
PAS. PIPA SULINGAN 2"/2,00 METER
PAS. FILTER PIPA SULINGAN

86.000
40

85.000

84.000

100 340 100


83.000

82.000

81.000
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
80.000
86.000

89.800

90.060

90.095

87.600
89.920
82.920

85.870

89.795
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL

JARAK (M)
4.00 3.00 4.00 1.00 1.50 7.20 1.70 4.00 5.00
DISTANCE (M)
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT NOMOR RUAS 004 KONSULTAN JUDUL : NO. LEMBAR B - 05.13
(PR-02)
D I R EK T O R A T J E N DE R A L B I N A M A R GA PERENCANAAN TEKNIK (DED)
NAMA RUAS TERBANGGI BESAR - GUNUNG SUGIH
DIGAMBAR DIRENCANA DIPERIKSA
CROSS JALAN SKALA 1 : 100
BALAI BESAR PELAKSANAAN JALAN NASIONAL V JEMBATAN DI PROVINSI LAMPUNG
JEMBATAN WAY PENGUBUAN KRISMAN ARIS MUNANDAR DAMIRI, S.T. Ir. NAPOLI SITUMORANG
S A T U A N K ER J A P ER EN CA N A A N & P EN G A W A S A N J A L A N N A S I ON A L P RO V I N S I L A M P U N G
PROV./KAB./KODYA LAMPUNG / LAMPUNG TENGAH TAHUN 2018
Ja lan Wo lt er M on go n si di No . 22 0 Te lu k Be tu n g B an da r L am pu n g Tel ep on / Fax . 07 21 -4 7 25 91
DRAFTMAN BRIDGE ENGINEER TEAM LEADER
180 700 160

BAHU EKSISTING JALAN EKSISTING BAHU EKSISTING


90.000 P.15

89.000

88.000

87.000

86.000
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
85.000

89.600

89.685

89.680
85.900

89.620

86.460
89.570

87.400
86.100
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL

JARAK (M)
5.00 4.00 1.10 1.80 7.00 1.60 3.50 5.00
DISTANCE (M)

160 640 220

90.000 BAHU EKSISTING JALAN EKSISTING BAHU EKSISTING


P.16

89.000

88.000

87.000
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
86.000
86.320

89.550
89.540
86.202

89.525

86.750
87.220
89.515
89.415
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL

JARAK (M)
5.00 4.00 1.00 1.60 6.40 2.20 4.00 5.00
DISTANCE (M)

100 700 170

90.000 BAHU EKSISTING JALAN EKSISTING BAHU EKSISTING


P.17

89.000

88.000

87.000
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
86.000

89.480
86.302

86.945
86.486

89.502
89.045

86.725
89.510

89.515
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL

JARAK (M)
5.00 3.00 2.00 1.00 7.00 1.70 4.00 5.00
DISTANCE (M)
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT NOMOR RUAS 004 KONSULTAN JUDUL : NO. LEMBAR C - 01
(PR-02)
D I R EK T O R A T J E N DE R A L B I N A M A R GA PERENCANAAN TEKNIK (DED)
NAMA RUAS TERBANGGI BESAR - GUNUNG SUGIH
DIGAMBAR DIRENCANA DIPERIKSA
DENAH DAN TAMPAK MEMANJANG SKALA 1 : 500
RENCANA ABUTMENT DAN PIER JEMBATAN
BALAI BESAR PELAKSANAAN JALAN NASIONAL V JEMBATAN DI PROVINSI LAMPUNG
JEMBATAN WAY PENGUBUAN KRISMAN ARIS MUNANDAR DAMIRI, S.T. Ir. NAPOLI SITUMORANG
S A T U A N K ER J A P ER EN CA N A A N & P EN G A W A S A N J A L A N N A S I ON A L P RO V I N S I L A M P U N G
PROV./KAB./KODYA LAMPUNG / LAMPUNG TENGAH TAHUN 2018
Ja lan Wo lt er M on go n si di No . 22 0 Te lu k Be tu n g B an da r L am pu n g Tel ep on / Fax . 07 21 -4 7 25 91
DRAFTMAN BRIDGE ENGINEER TEAM LEADER
X = 9892.4 X = 9975.7 85.875
BM.0 Y = 10061.9

86.896

80.236

81.836
80.281

84.301

84.136
87.841

81.821
BM.1 Y = 10042.4

P.26
Z = + 88.061 Z = + 85.245
87.654

+87.000

+84.000
86.456 +88.00 87.325 85.280

+82.000
0

+82.000
+84
.00 .0 00 87.564
00 0 .00
0 +87
+87.0 +85 85.540

+86.000
88.165 88.105 88.205 +83 0 0
.000 +86.0

+83.0
87.750

+81.000
+81.000
00
5060 5060 +88.000
91.455 91.615 91.950 92.020

+85.000
88.565
88.835
+89.00
0
+90.000
91.475 91.822 91.644 91.944 91.980 91.810
TERBANGGI BESAR

GUNUNG SUGI
91.485 91.835 91.650 91.950 91.958 91.767 H
+89.000 91.440
+88.000
91.625 86.764 +87.000
85.985

+81.0
+82.000
+86.000

00
88.895 +84.000
84.235 84.435 00 85.436
88.875 +83.0 .000

+82.000
+85.000 +84

+88.00
85.436

+83.000
88.755 85.240 85.635

0
X = 10000
00

+81.000
88.535 86.545
7.0 BM.3 Y = 10000

+86.000
X = 9887.5 +8 +85.00
0 Z = + 86.630
P.6 P.7 BM.2 Y = 10016 P.7A P.8 P.9 P.10 P.11
Z = + 88.507

TERBANGGI BESAR 10120 GUNUNG SUGIH


5060 5060

GUARDRAIL TANGGA INSPEKSI TANGGA INSPEKSI GUARDRAIL


95.000 +93.430 +93.430
+91.030 +91.030 +91.030 +91.030
90.000
+87.280 +87.280
MAB. +86.761
85.000 RETAINING WALL PIER RENCANA RETAINING WALL
PASANGAN BATU BELAH MAN. +83.000 PASANGAN BATU BELAH
PONDASI BORE PILE Ø80 +80.730
PONDASI BORE PILE Ø80
80.000 + CASING PIPA BAJA T. 6 MM PERMANEN + CASING PIPA BAJA T. 6 MM PERMANEN

PONDASI BORE PILE Ø100


75.000 +74.280 + CASING PIPA BAJA T. 6 MM PERMANEN +74.280

70.000 +68.730

65.000
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
61.000

NOMOR PROFIL
PROFILE NUMBER P.7 P.8 P.9 P.10 P.11
200.00

280.40

330.40
305.40
175.00

JARAK PROFIL
10.775 25.00 80.40 25.00 25.00
ACCUMULATED DISTANCE
91.950

91.958
91.835
91.684

91.440
91.767
TINGGI PERMUKAAN JALAN (EKSISTING)
80.360
82.960

82.360
84.360

80.160

82.910

83.710
82.710

TINGGI DASAR SUNGAI


BED LEVEL IN CENTER LINE
93.389

93.048
93.430

93.430

93.430
93.136

TINGGI PERMUKAAN JALAN (RENCANA)