Anda di halaman 1dari 13

H

A
S
A
R
D
A 1
N
MN I
H 2
SE K
AR I 1
LT L 2 0
EN O0 2
KA H2
GS S
NE SN N
AP U
UK TU U
Kegiatan :

RO OH
ND LA H
AN DT A
NO U
UP O T
G R

GAMBAR RENCANA
N
A
B
M
E

PONDOK PESANTREN ROUDLOTUS SHOLIKHIN


P
A

PONDOK PESANTREN
ROUDLOTUS SHOLIKHIN
18.00
NAMA KEGIATAN :
3.00 12.00 3.00
3.00 3.00 3.00 3.00 PEMBANGUNAN RUANG KELAS MADRASAH
PONDOK PESANTREN
1.50 ROUDLOTUS SHOLIKHIN
TAHUN 2021
MENGETAHUI

PERPUSTAKAAN
2.00

KEPALA DESA KALI JARAN


WC/KM
-0.05

±0.00
4.00

4.00
B

B
H. SUPRIYANTO
RUANG
GURU AULA ±0.00 MENYETUJUI
±0.00 KETUA YAYASAN PONDOK PESANTREN

KOPERASI ±0.00
10.00

10.00
4.00

4.00
H. SAEFURRACHMAN
MENYETUJUI
PENGASUH PONDOK PESANTREN
SELASAR
2.00

2.00
-0.05 K.H. ACHMAD MUSTA'IND BILLAH
DI BUAT OLEH
KETUA UMUM PANITIA
3.00 3.00 3.00 3.00
3.00 12.00 3.00 KHAERUL ANWAR, S.Pd
ARSITEK : ZAINI MAKARIM SUPRIYATNO, ST
18.00 TEKNIK SIPIL : SIGIT HARYONO, ST
TAHUN 2021
GAMBAR
LANTAI 1
DENAH

A
SKALA
SKALA 1 : 100
LOKASI
DESA KALIJARAN
D EN A H KECAMATAN KARANGANYAR
KABUPATEN PURBALINGGA
SK A L A 1 : 100
A

PONDOK PESANTREN
ROUDLOTUS SHOLIKHIN
18.00
NAMA KEGIATAN :
3.00 3.00 3.00 3.00 3.00 3.00 PEMBANGUNAN RUANG KELAS MADRASAH
PONDOK PESANTREN
ROUDLOTUS SHOLIKHIN
TAHUN 2021
MENGETAHUI
KEPALA DESA KALI JARAN
4.00

4.00
B

B
H. SUPRIYANTO
MENYETUJUI
KETUA YAYASAN PONDOK PESANTREN
10.00

10.00
AULA +4.00
4.00

4.00
H. SAEFURRACHMAN
MENYETUJUI
PENGASUH PONDOK PESANTREN
TERAS
2.00

2.00
+3.95 K.H. ACHMAD MUSTA'IND BILLAH
DI BUAT OLEH
KETUA UMUM PANITIA
3.00 3.00 3.00 3.00 3.00 3.00
KHAERUL ANWAR, S.Pd
18.00 ARSITEK : ZAINI MAKARIM SUPRIYATNO, ST
TEKNIK SIPIL : SIGIT HARYONO, ST
TAHUN 2021
GAMBAR
LANTAI 2
DENAH

A
SKALA
SKALA 1 : 100
LOKASI
DESA KALIJARAN
D EN A H KECAMATAN KARANGANYAR
KABUPATEN PURBALINGGA
SK A L A 1 : 100
PONDOK PESANTREN
ROUDLOTUS SHOLIKHIN
NAMA KEGIATAN :
PEMBANGUNAN RUANG KELAS MADRASAH
PONDOK PESANTREN
ROUDLOTUS SHOLIKHIN
TAHUN 2021
MENGETAHUI
KEPALA DESA KALI JARAN
H. SUPRIYANTO
MENYETUJUI
KETUA YAYASAN PONDOK PESANTREN
H. SAEFURRACHMAN
MENYETUJUI
PENGASUH PONDOK PESANTREN
K.H. ACHMAD MUSTA'IND BILLAH
DI BUAT OLEH
KETUA UMUM PANITIA
KHAERUL ANWAR, S.Pd
ARSITEK : ZAINI MAKARIM SUPRIYATNO, ST
TEKNIK SIPIL : SIGIT HARYONO, ST
TAHUN 2021
GAMBAR
DENAH ATAP
SKALA
SKALA 1 : 100
LOKASI
DESA KALIJARAN
DENAH ATAP KECAMATAN KARANGANYAR
KABUPATEN PURBALINGGA
SKALA 1 : 100
PONDOK PESANTREN
ROUDLOTUS SHOLIKHIN
NAMA KEGIATAN :
PEMBANGUNAN RUANG KELAS MADRASAH
PONDOK PESANTREN
ROUDLOTUS SHOLIKHIN
Atap Genteng Multyroof TAHUN 2021
+10.14 Atas Kuda-Kuda / Nok
MENGETAHUI
Kuda - kuda Baja Ringan KEPALA DESA KALI JARAN
+7.70 Ring Balk Dudukan Kuda-Kuda
+7.30 Plafon H. SUPRIYANTO
Balok (B3) 15x20
MENYETUJUI
KETUA YAYASAN PONDOK PESANTREN
Tembok Pembatas +5.15
Balok (B1) 25x60
Balok Lantai 2 +3.95 +3.97 +4.00 +3.95 Balok Lantai 2 H. SAEFURRACHMAN
Balok (B2) 20x30 +3.30 Plafon
MENYETUJUI
Balok Konsol +2.64 PENGASUH PONDOK PESANTREN
Pondasi Batu kali
K.H. ACHMAD MUSTA'IND BILLAH
Timbunan
±0.00 -0.03 ±0.00 Footplat ±0.00 Muka Lantai dasar DI BUAT OLEH
KETUA UMUM PANITIA

40
-0.40 -0.40 Tanah dasar

3
4

1
2.00 8.00 KHAERUL ANWAR, S.Pd
ARSITEK : ZAINI MAKARIM SUPRIYATNO, ST
TEKNIK SIPIL : SIGIT HARYONO, ST
Potongan A - A TAHUN 2021
GAMBAR
POTONGAN
SKALA
SKALA 1 : 100
LOKASI
DESA KALIJARAN
PO T O N G A N KECAMATAN KARANGANYAR
KABUPATEN PURBALINGGA
SK A L A 1 : 100
PONDOK PESANTREN
ROUDLOTUS SHOLIKHIN
NAMA KEGIATAN :
PEMBANGUNAN RUANG KELAS MADRASAH
Atap Genteng Multyroof PONDOK PESANTREN
ROUDLOTUS SHOLIKHIN
Rangka atap Baja Ringan Profil Z TAHUN 2021
Atas Kuda-Kuda / Nok +10.14
MENGETAHUI
KEPALA DESA KALI JARAN
239

Ring Balk +7.70


Plafon +7.20
H. SUPRIYANTO
MENYETUJUI
KETUA YAYASAN PONDOK PESANTREN
335

Lantai Granitile
Balok Lantai 2 +3.95 +4.00
Plafon +3.30 H. SAEFURRACHMAN
Balok (B1) 25x60
MENYETUJUI
Kolom (K1) 30x30
PENGASUH PONDOK PESANTREN
395

Lantai Granitile K.H. ACHMAD MUSTA'IND BILLAH


Muka Lantai dasar ±0.00 ±0.00
40

Tanah dasar -0.40 DI BUAT OLEH


KETUA UMUM PANITIA
Pintu Kayu (P1)
150

1.50 1.50 1.50 1.50 1.50 1.50 1.50

G
KHAERUL ANWAR, S.Pd
ARSITEK : ZAINI MAKARIM SUPRIYATNO, ST
TEKNIK SIPIL : SIGIT HARYONO, ST
18.00 TAHUN 2021
GAMBAR
POTONGAN
SKALA
SKALA 1 : 100
LOKASI
DESA KALIJARAN
PO T O N G A N KECAMATAN KARANGANYAR
KABUPATEN PURBALINGGA
SK A L A 1 : 100
PONDOK PESANTREN
ROUDLOTUS SHOLIKHIN
NAMA KEGIATAN :
PEMBANGUNAN RUANG KELAS MADRASAH
PONDOK PESANTREN
ROUDLOTUS SHOLIKHIN
TAHUN 2021
MENGETAHUI
KEPALA DESA KALI JARAN
H. SUPRIYANTO
MENYETUJUI
KETUA YAYASAN PONDOK PESANTREN
H. SAEFURRACHMAN
MENYETUJUI
PENGASUH PONDOK PESANTREN
K.H. ACHMAD MUSTA'IND BILLAH
DI BUAT OLEH
KETUA UMUM PANITIA
KHAERUL ANWAR, S.Pd
ARSITEK : ZAINI MAKARIM SUPRIYATNO, ST
TEKNIK SIPIL : SIGIT HARYONO, ST
TAHUN 2021
GAMBAR
TAMPAK
SKALA
SKALA 1 : 100
LOKASI
DESA KALIJARAN
T A M PA K D E PA N KECAMATAN KARANGANYAR
KABUPATEN PURBALINGGA
SK A L A 1 : 100
PONDOK PESANTREN
ROUDLOTUS SHOLIKHIN
NAMA KEGIATAN :
PEMBANGUNAN RUANG KELAS MADRASAH
PONDOK PESANTREN
ROUDLOTUS SHOLIKHIN
TAHUN 2021
MENGETAHUI
KEPALA DESA KALI JARAN
H. SUPRIYANTO
MENYETUJUI
KETUA YAYASAN PONDOK PESANTREN
H. SAEFURRACHMAN
MENYETUJUI
PENGASUH PONDOK PESANTREN
K.H. ACHMAD MUSTA'IND BILLAH
DI BUAT OLEH
KETUA UMUM PANITIA
KHAERUL ANWAR, S.Pd
ARSITEK : ZAINI MAKARIM SUPRIYATNO, ST
TEKNIK SIPIL : SIGIT HARYONO, ST
TAHUN 2021
GAMBAR
TAMPAK
SKALA
SKALA 1 : 100
LOKASI
DESA KALIJARAN
T A M PA K SA M PIN G KECAMATAN KARANGANYAR
KABUPATEN PURBALINGGA
SK A L A 1 : 100
RENCANA ANGGARAN
BIAYA (RAB)

TAHUN 2021
REKAPITULASI
PROPINSI : JAWA TENGAH
KABUPATEN : PURBALINGGA
NAMA KEGIATAN : PEMBANGUNAN RUANG KELAS MADRASAH PONDOK PESANTREN ROUDLOTUS SOLIKHIN
TAHUN : 2021

NO URAIAN PEKERJAAN JUMLAH HARGA

I PEKERJAAN PENDAHULUAN 9.655.820,00

II PEKERJAAN TANAH DAN STRUKTUR BAWAH 252.936.045,19

III PEKERJAAN STRUKTUR TENGAH 349.346.978,54

IV PEKERJAAN ATAP, TALANG DAN LISTPLANK 60.698.000,00

V PEKERJAAN DINDING 43.860.146,01

VI PEKERJAAN PELAPIS DINDING 31.052.642,76

VII PEKERJAAN PELAPIS LANTAI 117.021.141,20

VIII PEKERJAAN PENGECATAN 13.594.156,00

IX PEKERJAAN KUSEN 60.146.868,41

X PEKERJAAN KUNCI, ENGSEL DAN ASESORIS KUSEN 4.438.155,00

XI PEKERJAAN PLAFOND DAN LANGT-LANGIT 60.975.980,00

XIII PEKERJAAN MEKANIKAL ELEKTRIKAL 14.855.000,00

XIV PEKERJAAN PLUMBING 5.943.170,33

(A) Jumlah Haga Pekerjaan ( termasuk Biaya Umum dan Keuntungan ) 1.024.524.103,45

(B) PEMBULATAN 1.024.524.000,00

Terbilang :
SATU MILYAR DUA PULUH EMPAT JUTA LIMA RATUS DUA PULUH EMPAT RIBU RUPIAH

Purbalingga, 17 JULI 2021

Menyetujui, Dibuat Oleh,


Ketua Yayasan Ketua Panitia
PONDOK PESANTREN PEMBANGUNAN RUANG KELAS BARU

H. SAEFURRACHMAN KHAERUL ANWAR, S. Pd

Mengetahui, Menyetujui,
Kepala Desa Pengasuh
Desa Kalijaran PONDOK PESANTREN

H. SUPRIYANTO KH. ACHMAD MUSTA'IND BILLAH


DAFTAR KUANTITAS DAN HARGA

PROPINSI : JAWA TENGAH


KABUPATEN : PURBALINGGA
NAMA KEGIATAN : PEMBANGUNAN RUANG KELAS MADRASAH PONDOK PESANTREN ROUDLOTUS SOLIKHIN
TAHUN : 2021

HARGA
No REKAPITULASI AKHIR SAT. VOLUME KODE ANALIS JUMLAH HARGA
SATUAN
I PEKERJAAN PENDAHULUAN
1 Pengukuran dan pemasangan bowplank m' 56,000 A.2.2.1.4 65.282,50 3.655.820,00
2 Sewa direksi keet / kantor sementara & gudang alat dan bahan Unit 1,000 Taksir 6.000.000,00 6.000.000,00
Ke Penjumlahan Rp. 9.655.820,00
TOTAL I Rp 9.655.820,00
II PEKERJAAN TANAH DAN STRUKTUR BAWAH
A. Pekerjaan galian tanah manual
1 Foot Plat Kondisi tanah dengan kekerasan standart m3 20,608 A.2.3.1.3 87.907,50 1.811.597,76
2 Pondasi Batu Kali Kondisi tanah dengan kekerasan standart m3 42,992 A.2.3.1.1 60.562,50 2.603.703,00
Ke Penjumlahan Rp. 4.415.300,76
B. Urugan pasir
1 Foot Plat Pasir Urug dipadatkan m3 0,074 A.2.3.1.14m 213.812,50 15.736,60
2 Pasir urug bawah Lantai Pasir Urug dipadatkan m3 9,000 A.2.3.1.14m 213.812,50 1.924.312,50
3 Pondasi Batu Kali Pasir Urug dipadatkan m3 3,975 A.2.3.1.14m 213.812,50 849.904,69
Ke Penjumlahan Rp. 2.789.953,79
C. Lantai kerja (beton B-0)
1 Foot Plat Site mix, tebal 5cm m3 0,074 A.4.1.1.4 724.245,00 53.304,43
Ke Penjumlahan Rp. 53.304,43
D. Beton K-300 :
1 Foot Plat Beton K-300, (1200 X 1200 X 200) m3 2,944 A.4.1.1.10 970.657,50 2.857.615,68
2 Sloof type 1 Beton K-300, (150 X 200) m3 4,770 A.4.1.1.10 970.657,50 4.630.036,28
3 Sloof type 2 Beton K-300, (150 X 250) m3 0,105 A.4.1.1.10 970.657,50 101.919,04
Ke Penjumlahan Rp. 7.589.570,99
F. Pembesian
1 Foot Plat Tulangan Tapak Ø12-150, kolom 4Ø12, sengkang Ø12-150 10 kg 517,408 A.4.1.1.17 157.897,50 81.697.429,68
2 Sloof type 1 Tulangan 4Ø12 + sengkang Ø10-150 10 kg 789,618 A.4.1.1.17 157.897,50 124.678.708,16
3 Sloof type 2 Tulangan 6Ø10 + sengkang Ø6-150 10 kg 15,366 A.4.1.1.17 157.897,50 2.426.279,30
Ke Penjumlahan Rp. 208.802.417,14
G. Bekesting halus :
1 Foot Plat Multiplek 9mm rangka kaso (2x pakai) m2 7,360 A.4.1.1.20 165.870,00 1.220.803,20
2 Sloof type 1 Multiplek 9mm rangka kaso (2x pakai) m2 15,900 A.4.1.1.21 177.120,00 2.816.208,00
3 Sloof type 2 Multiplek 9mm rangka kaso m2 0,525 A.4.1.1.21 177.120,00 92.988,00
Ke Penjumlahan Rp. 4.129.999,20
H. Tanah Urug
1 Foot Plat Menggunakan tanah bekas galian m3 1,693 A.2.3.1.9 14.541,67 24.616,13
2 Pondasi Batu Kali menggunakan tanah bekas galian m3 22,260 A.2.3.1.9 14.541,67 323.697,50
I. Pasangan Batu Kosong / Aanstampeng m3 9,960 A.3.2.1.9 414.225,00 4.125.681,00
J. Pemasangan Pondasi Batu Belah 1SP : 4 PP m3 27,390 A.3.2.1.2 755.075,00 20.681.504,25
Ke Penjumlahan Rp. 25.155.498,88
TOTAL II Rp 252.936.045,19
III PEKERJAAN STRUKTUR TENGAH
III.1 PEKERJAAN STRUKTUR BETON
A PEKERJAAN BETON
a. kolom
1 Tipe kolom (K1) Readymix K-300 300x300 m3 17,802 A.4.1.1.10 970.657,50 17.279.644,82
2 Tipe kolom (KP) Beton sitemix K-175 m3 0,176 A.4.1.1.5 875.197,50 153.597,16
Ke Penjumlahan Rp. 17.433.241,98
b. Ring balok
1 Ring balok type 1 Beton readymix K-250 m3 17,790 A.4.1.1.5 875.197,50 15.569.763,53
2 Ring balok type 2 Beton readymix K-250 m3 7,920 A.4.1.1.6 903.707,50 7.157.363,40
3 Ring balok type 3 Beton sitemix K-175 m3 4,483 A.4.1.1.5 875.197,50 3.923.685,43
Ke Penjumlahan Rp. 26.650.812,36
c. Plat beton
1 Plat beton lantai 2 Beton readymix K-300 tebal 120mm m3 20,390 A.4.1.1.10 970.657,50 19.791.318,16
2 Tangga Plat beton readymix K-200 m3 16,243 A.4.1.1.6 939.297,50 15.257.197,15
Ke Penjumlahan Rp. 35.048.515,31
B PEKERJAAN PEMBESIAN
a. Kolom Struktur
1 Tipe kolom (K1) Besi beton 8Ø12, sengkang Ø10-150 10 kg 359,955 A.4.1.1.17 157.897,50 56.835.994,61
2 Tipe kolom (KP) Lihat Detail Gambar 10 kg 0,893 A.4.1.1.17 157.897,50 141.005,63
Ke Penjumlahan Rp. 56.977.000,24
b. Ring balok
1 Ring balok type 1 Lihat Detail Gambar 10 kg 308,459 A.4.1.1.17 157.897,50 48.704.869,69
2 Ring balok type 2 Lihat Detail Gambar 10 kg 131,159 A.4.1.1.17 157.897,50 20.709.725,57
3 Ring balok type 3 Lihat Detail Gambar 10 kg 64,512 A.4.1.1.17 157.897,50 10.186.206,99
Ke Penjumlahan Rp. 79.600.802,25
c. Plat beton
1 Plat beton lantai 2 Lihat Detail Gambar 10 kg 228,200 A.4.1.1.17 157.897,50 36.032.240,65
2 Tangga Ø10-150 10 kg 46,506 A.4.1.1.17 157.897,50 7.343.181,14
Ke Penjumlahan Rp. 43.375.421,79
C PEKERJAAN BEKISTING
a. Kolom Struktur
1 Tipe kolom (K1) Multiplek 9mm rangka kaso (2x pakai) m2 118,680 A.4.1.1.22 304.585,00 36.148.147,80
2 Tipe kolom (Kp) Multiplek 9mm rangka kaso (2x pakai) m2 2,028 A.4.1.1.28 304.585,00 617.698,38
Ke Penjumlahan Rp. 36.765.846,18
b. Ring balok
1 Ring balok type 1 Multiplek 9mm rangka kaso (2x pakai) m2 44,475 A.4.1.1.23 311.335,00 13.846.624,13
2 Ring balok type 2 Multiplek 9mm rangka kaso (2x pakai) m2 39,200 A.4.1.1.23 311.335,00 12.204.332,00
3 Ring balok type 3 Multiplek 9mm rangka kaso m2 33,624 A.4.1.1.23 311.335,00 10.468.328,04

c. Plat beton
1 Plat beton lantai 2 Multiplek 9mm rangka kaso (2x pakai) m2 105,905 A.4.1.1.24 394.585,00 41.788.524,43
2 Tangga Multiplek 9mm rangka kaso (2x pakai) m2 19,315 A.4.1.1.24 394.585,00 7.621.409,28
Ke Penjumlahan Rp. 49.409.933,70
III.3 PEKERJAAN STRUKTUR BAJA RINGAN
1 Rangka Atap Baja Ringan m2 367,500 LS 200.000,00 73.500.000,00
2 Reng + kaso Baja ringan profil C 75mm termasuk assesoris mur dan m2 - LS 132.000,00 -
Ke Penjumlahan Rp. 73.500.000,00
TOTAL III Rp 349.346.978,54

Page 1 of 3
HARGA
No REKAPITULASI AKHIR SAT. VOLUME KODE ANALIS JUMLAH HARGA
SATUAN
IV PEKERJAAN ATAP, TALANG DAN LISTPLANK
a. Penutup atap
1 Atap utama Genteng metal pasir m2 367,500 Taksir 140.000,00 51.450.000,00
b. bubungan
1 Nok atap utama Nok genteng metal m' 36,400 Taksir 80.000,00 2.912.000,00
c. Listplank
1 Listplank atap teritisan GRC lebar 20cm Panel GRC 9mm termasuk asesoris mur dan pemasangan m' 128,000 Taksir 49.500,00 6.336.000,00
Ke Penjumlahan Rp. 60.698.000,00
TOTAL IV Rp 60.698.000,00

V PEKERJAAN DINDING
a. Pekerjaan dinding bata
1 Dinding bata bangunan utama Adukan 1 PC : 4 PS, Bata merah m2 285,892 A.4.4.1.9 109.342,50 31.260.146,01
2 Partisi Dinding Calsiboard Rangka Hollow m2 70,000 Taksir 180.000,00 12.600.000,00
Ke Penjumlahan Rp. 43.860.146,01
TOTAL V Rp 43.860.146,01
VI PEKERJAAN PELAPIS DINDING
a. Plester aci
1 Dinding bata bangunan utama Adukan 1 pc : 4 ps m2 582,984 A,4,4,2.4 53.265,00 31.052.642,76
Ke Penjumlahan Rp. 31.052.642,76
TOTAL VI Rp 31.052.642,76

VII PEKERJAAN PELAPIS LANTAI


a. Keramik
1 Lantai Granite Granit tile 60 x 60 warna latte polished merk aurora atau setara m2 343,286 Taksir 322.000,00 110.538.092,00
3 Keramik tangga Keramik 20x20 warna putih gloss merk asia tile atau setara m2 20,440 A.4.4.3.36 187.155,00 3.825.448,20
4 Keramik dinding toilet Keramik 20x20 warna putih gloss merk asia tile atau setara m2 11,200 A.4.4.3.36 187.155,00 2.096.136,00
5 Keramik toilet Keramik 20x20 warna abu-abu type rock tile(kasar) merk asia tile m7 3,000 A.4.4.3.36 187.155,00 561.465,00
Ke Penjumlahan Rp. 117.021.141,20
TOTAL VII Rp 117.021.141,20

VIII PEKERJAAN PENGECATAN


a. Pengecatan area luar
1 Pengecatan dinding bangunan utama Cat tembok warna cream weathershield merk vinilex atau setara m2 582,984 A.4.7.1.10 17.001,75 9.911.748,22
2 Pengecatan kolom Cat tembok warna abu-abu weathershield merk vinilex atau m2 149,040 A.4.7.1.10 17.001,75 2.533.940,82
3 Pengecatan listplank atap teritisan GRC lebar 20cm Cat tembok warna putih weathershield merk vinilex atau setara m2 32,966 A.4.7.1.4 34.837,50 1.148.466,96
Ke Penjumlahan Rp. 13.594.156,00
TOTAL VIII Rp 13.594.156,00

IX PEKERJAAN KUSEN
1 Pintu 1 (P1) Kusen aluminium natural 3" bh 36,400 A.4.2.1.11 128.741,50 4.686.190,60
Kaca bening 5mm m2 1,685 A.4.6.2.17 107.148,13 180.523,16
Daun Pintu Double Alumunium bh 4,000 Taksir 2.500.000,00 10.000.000,00
2 Pintu 2 (P2) Kusen aluminium natural 3" bh 43,480 A.4.2.1.11 128.741,50 5.597.680,42
Kaca bening 5mm m2 7,794 A.4.6.2.17 107.148,13 835.112,49
Daun Pintu Single Alumunium bh 4,000 Taksir 1.300.000,00 5.200.000,00
Daun Jendela aluminium kaca aluminium m2 0,778 A.4.2.1.12 550.900,75 428.863,01
3 Pintu Toilet (PT) Kusen aluminium natural 3" m2 5,100 A.4.2.1.11 128.741,50 656.581,65
Pintu Toilet bh 1,000 Taksir 1.300.000,00 1.300.000,00
4 Jendela 1 (J1) Kusen aluminium natural 3" m' 27,200 A.4.2.1.11 128.741,50 3.501.768,80
Kaca bening 5mm m2 5,150 A.4.6.2.17 107.148,13 551.791,41
Daun Jendela aluminium kaca aluminium m2 1,420 A.4.2.1.12 550.900,75 782.389,25
5 Jendela 2 (J2) Kusen aluminium natural 3" m' 120,000 A.4.2.1.11 128.741,50 15.448.980,00
Kaca bening 5mm m2 25,419 A.4.6.2.17 107.148,13 2.723.598,19
Daun Jendela aluminium kaca aluminium m2 5,856 A.4.2.1.12 550.900,75 3.226.074,79
6 Boven 3 (BV1) Kusen aluminium natural 3" m2 34,800 A.4.2.1.11 128.741,50 4.480.204,20
Kaca bening 5mm m2 5,175 A.4.6.2.17 107.148,13
7 Boven 2 (BV2) Kusen aluminium natural 3" m2 4,000 A.4.2.1.11 128.741,50 514.966,00
Kaca bening 5mm m2 0,300 A.4.6.2.17 107.148,13 32.144,44
Ke Penjumlahan Rp. 60.146.868,41
TOTAL IX Rp 60.146.868,41

X PEKERJAAN KUNCI, ENGSEL DAN ASESORIS KUSEN


1 Pintu 2 (P1) Kunci slot tanam merk solid atau setara unit 4,000 A.4.6.2.11 32.597,50 130.390,00
Engsel kupu unit 12,000 A.4.6.2.5 26.606,25 319.275,00
2 Pintu 1 (P2) Kunci slot tanam merk solid atau setara unit 4,000 A.4.6.2.11 32.597,50 130.390,00
Engsel kupu unit 12,000 A.4.6.2.5 26.606,25 319.275,00
3 Jendela 1 (J1) Kunci slot tanam merk solid atau setara unit 6,000 A.4.6.2.11 32.597,50 195.585,00
Engsel kupu unit 12,000 A.4.6.2.5 26.606,25 319.275,00
4 Jendela 2 (J2) Kunci slot tanam merk solid atau setara unit 30,000 A.4.6.2.11 32.597,50 977.925,00
Engsel kupu unit 60,000 A.4.6.2.5 26.606,25 1.596.375,00
Ke Penjumlahan Rp. 4.438.155,00
TOTAL X Rp 4.438.155,00

Page 2 of 3
HARGA
No REKAPITULASI AKHIR SAT. VOLUME KODE ANALIS JUMLAH HARGA
SATUAN
XI PEKERJAAN PLAFOND DAN LANGT-LANGIT
a. plafond gypsum
1 Plafon Atap Utama Plafond gypsum 9mm rangka hollow m2 469,046 Taksir 130.000,00 60.975.980,00
Ke Penjumlahan Rp. 60.975.980,00
TOTAL XII Rp 60.975.980,00

XIII PEKERJAAN MEKANIKAL ELEKTRIKAL


XIII.1 PEKERJAAN PANEL DISTRIBUSI
A PEKERJAAN PANEL
a. Pekerjaan Main Panel Distribusi (MDP)
1 Box Panel plat 1,5mm fin. Cat warna abu-abu kulit jeruk (uk. 60x80 cm) Lengkap dengan Bus-Bar, Ampere/Volt/Frekwensi meter, pilot set 1,000 Taksir 2.500.000,00 2.500.000,00
XIII.2 PEKERJAAN INSTALASI
a. Instalasi dan Pemasangan
1 Pengadaan instalasi penerangan + Lampu 45 Watt Dengan kabel NYM 3x2,5 sqmm titik 32,000 Taksir 300.000,00 9.600.000,00
2 Pengadaan + penarikan instalasi stop kontak normal Broco Kabel NYM 3x2,5 (Supreme/Kabelindo/Tranka/Kabelmetal/s titik 10,000 Taksir 163.000,00 1.630.000,00
3 Pengadaan + penarikan instalasi saklar tunggal Kabel NYM 3x2,5 (Supreme/Kabelindo/Tranka/Kabelmetal/s titik 2,000 Taksir 162.500,00 325.000,00
4 Pengadaan + penarikan instalasi saklar ganda Kabel NYM 3x2,5 (Supreme/Kabelindo/Tranka/Kabelmetal/s titik 5,000 Taksir 160.000,00 800.000,00
Ke Penjumlahan Rp. 14.855.000,00
TOTAL XIII Rp 14.855.000,00

XIV PEKERJAAN PLUMBING


a. Pekerjaan plumbing air bersih
1 Pengadaan + pemasangan pipa air bersih supplay kran ke penampungan Pipa PVC dia. 1/2" ex.Wavin/Rucika/Vinilon/Paralon AW/setara m' 31,150 A.5.1.1.25 17.795,00 554.314,25
2 Pengadaan + pemasangan pipa air bersih supplay dari pompa ke pipa Pipa galvanis dia 1" lengkap dengan asesoris Lbow dan knie m' 11,000 A.5.1.1.21 57.578,33 633.361,67
3 Pengadaan + pemasangan pipa air bersih supplay dari pipa 1" horisontal ke Pipa galvanis dia 1/2" lengkap dengan asesoris Lbow dan knie m' 20,150 A.5.1.1.18 41.045,00 827.056,75
4 Pengadaan + pemasangan kran dinding 1/2" Merk onda/setara lengkap dengan selotip unit 4,000 Taksir 45.000,00 180.000,00
5 Pengadaan + pemasangan stop kran galvanis 1" pada pipa turun menuju Lengkap dengan knie drat dan selotip set 1,000 Taksir 254.000,00 254.000,00
6 Pengadaan + pemasangan stop kran PVC 1" posisi pada pompa in dan out Lengkap dengan knie drat dan selotip set 2,000 Taksir 75.000,00 150.000,00
7 Pengadaan + pemasangan stop kran PVC 1" posisi pada pipa suplay Lengkap dengan knie drat dan selotip set 1,000 Taksir 75.000,00 75.000,00
b. Pekerjaan plumbing air kotoran
1 Pengadaan + pemasangan pipa air kotoran dari closet ke septictank Pipa PVC dia. 4" ex.Wavin/Rucika/Vinilon/Paralon AW/setara m' 12,800 A.5.1.1.32 58.353,33 746.922,67
2 Pengadaan + pemasangan pipa air kotor toilet ke septictank Pipa PVC dia. 2" ex.Wavin/Rucika/Vinilon/Paralon AW/setara m' 7,200 A.5.1.1.29 34.571,67 248.916,00
3 Pengadaan + pemasangan pipa peresapan pada septictank Pipa PVC dia. 3" ex.Wavin/Rucika/Vinilon/Paralon AW/setara m' 1,600 A.5.1.1.31 58.267,08 93.227,33
4 Pengadaan + pemasangan pipa udara pada septictank Pipa PVC dia. 2" ex.Wavin/Rucika/Vinilon/Paralon AW/setara m' 1,000 A.5.1.1.29 34.571,67 34.571,67
5 Pengadaan + pemasangan closet jongkok Merk ina/setara unit 4,000 A.5.1.1.2 536.450,00 2.145.800,00
Ke Penjumlahan Rp. 5.943.170,33
TOTAL XIV Rp 5.943.170,33

Purbalingga, 17 JULI 2021


Menyetujui, Dibuat Oleh,
Ketua Yayasan Ketua Panitia
PONDOK PESANTREN PEMBANGUNAN RUANG KELAS BARU

H. SAEFURRACHMAN KHAERUL ANWAR, S. Pd

-
Kepala Desa Pengasuh
Desa Kalijaran PONDOK PESANTREN

H. SUPRIYANTO KH. ACHMAD MUSTA'IND BILLAH

Page 3 of 3