Rencana Instalasi Air Kotor Lt.1 Rencana Instalasi Air Kotor Lt.2
Rencana Instalasi Air Kotor Lt.1 Rencana Instalasi Air Kotor Lt.2
27 1 271
264 264
368
325
198
PRODI TEKNIK SIPIL
318
FAKULTAS TEKNIK
Floordrain
DAN ILMU KOMPUTER
Kloset duduk UNIVERSITAS PNCASAKTI
120
TEGAL
320
320
Pipa PVC 3"
(Dari Klosed Mengalir Ke Pipa Lt.1) MATA KULIAH
200
200
Pipa PVC 3"
(Dari Floordrain Mengalir Ke Pipa Lt.1)
1245
PERENCANAAN DAN
PENGENDALIAN PROYEK
1118
(RAB)
1540
150
Floordrain
Klosed Duduk
Shaft Air Kotor
300
300
300
DIGAMBAR
150
1520
Pipa PVC 3" Air Kotor Padat
(dari Klosed Mengalir ke Septitank)
NAMA : LAKSANA PUTRA R
NPM : 6521600006
150
150
300
300
NAMA GAMBAR
Pipa PVC 3" Air Kotor Cair
150
(dari Floordrain Mengalir ke Saluran Depan)
552
Septictank
Sumur Peresapan
260 260 NO GAMBAR JML GAMBAR
520
270
Sumur Resapan
265
800 17 -
265
RENCANA INSTALASI AIR KOTOR LT.1 RENCANA INSTALASI AIR KOTOR LT.2
Skala 1 : 100 Skala 1 : 100