Anda di halaman 1dari 1

C

A
7 8 10 12 14 15 16

7 6 5 4 3 2 1

REFER TO RA N E2 A

TOP PARAPET
+93.575 T.o.S.
C E T FAC ET 05 1 2 3 4 4 55 6 9 11 13 15 16

ON AR O L

ROOF FL. 3 ( RF3 ) ho o


+88.125
WALL LAMP
10 20
od d
E PLAN
WL1-D03 -R1F/T1 ROOF FL. 2 ( RF2 )
+84.525
WALL LAMP LE1-X x 3 NOS LE1-X x 3 NOS LE1-X x 3 NOS OLE OLE OLE
UP1 X 4 NOS UP1 X 4 NOS UP1 X 4 NOS
WL1-D01 -R1F/T2 (@908mm) (@908mm) (@908mm)
180DEG UPLIGHT
ROOF FL. 1 ( RF1 ) WL1 WL1 WL1 WL1 LIGHTING FIXTURE
UP1-D08-R1F/T3
+78.575
LINEAR GRAZER ACP 2 ACP 2 ACP 2 ACP 2 LE1 LINEAR GRAZER
180DEG UPLIGHT

ACP 3

ACP 3

ACP 3
LE1-X-D02 -R1F/T3 ACP 1 ACP 1 ACP 1
ACP 5 ACP 5 ACP 5 ACP 5 UP1-D07 -R1F/T2
UP1 UPLIGHT 180 DEG

10 Th FLOOR UP2 UPLIGHT


+70.700 F.F.L.
REFER TO RA N WL1 WALL FLOODLIGHT
C E T FAC ET 04 REFER TO RA N
C E T FAC ET 03
9 Th FLOOR
+63.000 F.F.L.

WALL LAMP
WL1-D01 -8F/T2
WL1 WL1
8 Th FLOOR
+55.300 F.F.L. WL1 WL1
WALL LAMP
WL1-D01 -7F/T2

7 Th FLOOR
+47.600 F.F.L.

ACP 3

ACP 3

ACP 3
ACP 2 ACP 2 ACP 2
ACP 1 ACP 1 ACP 1

ACP 5 ACP 5 ACP 5 ACP 5

6 Th FLOOR
+39.900 F.F.L.

5 Th FLOOR
+32.200 F.F.L.
ACP 5

180DEG UPLIGHT
4 Th FLOOR UP1-D05 -4F/T1
180DEG UPLIGHT +23.625 F.F.L. UP1 X 2 NOS UP1 X 2 NOS UP1 X 2 NOS UP1 X 2 NOS
UP1-D03 -D4F/T1

3 Rd FLOOR
+16.100 F.F.L. UP1 X 2 NOS ACP 5 UP1 X 2 NOS UP1 X 2 NOS UP1 X 2 NOS 180DEG UPLIGHT
180DEG UPLIGHT
UP1-D03 -3F/T1 UP1-D05 -3F/T1 - POWER CABLE : NYM 3 X 2.5mm
- DRIVER TO FIXTURE CABLE :

ACP 3

ACP 3

ACP 3
ACP 2 ACP 1 ACP 1 ACP 1
REFER TO RA N 2 Nd FLOOR NYYHY 2 X 1.5mm
C E T FAC ET 01 +8.050 F.F.L. ACP 5 ACP 5 ACP 5 ACP 5
OR EQUIVALENT
ACP 2 ACP 2

180DEG UPLIGHT
UP1-D03-1F/T1
1 St FLOOR
±0.000 F.F.L.
UP1 X 2 NOS UP1 X 2 NOS TIMER SWITCH
ELEVATION
FACADE ELEVATION 2 T1: 18.00-21.00
SCALE 1 : 500
T2: 18.00-00.00
T3: 18.00-06.00

GAMBAR INI MERUPAKAN PROPERTI DARI PT. ESTETIKA JIKA ADA KETIDAKCOCOKAN DALAM GAMBAR MOHON PT. ESTETIKA CAHAYA INTERNASIONAL
CAHAYA INTERNASIONAL. TIDAK ADA BAGIAN DARI GAMBAR DIKLARIFIKASIKAN KEPADA DESAINER SEBELUM EKSEKUSI DI REVISI DAN TANGGAL: NAMA PROYEK: SKALA: TANGGAL: STAGE:
INI UNTUK DIPRODUKSI ULANG DENGAN CARA APAPUN LAPANGAN. 00 11 ESE ER 2023 1:500 11 JANUARI 2024 TENDER DRAWING JL. KEMANG RAYA NO. 3,
TANPA SEIZIN PIHAK PT. ESTETIKA CAHAYA INTERNASIONAL.

SEMUA GAMBAR DESAIN DAN CONTOH MERUPAKAN PROPERTI


TIDAK ADA PERUBAHAN STRUKTUR YANG DAPAT DILAKUKAN
DI LAPANGAN TANPA PERSETUJUAN DARI KONSULTAN
01 11 AN AR 2024 DCI E1 ARIOBIMO KEMANG POINT #03-06
JAKARTA SELATAN 12730
DARI PT, ESTETIKA CAHAYA INTERNASIONAL. TIDAK UNTUK STRUKTUR DAN PIHAK LAIN YANG BERSANGKUTAN.
DIGAMBAR OLEH: RR DESIGN PRICIPAL: AS
KONSTRUKSI. SEMUA INFORMASI YANG TERDAPAT DI SET www.lightboxlighting.com
GAMBAR INI MERUPAKAN BAGIAN DARI TAHAP DESAIN. SIRKUIT LAMPU YANG TERTERA DI DALAM GAMBAR
MERUPAKAN TUJUAN DESAIN SEBAGAI SKEMA PENGATURAN LOKASI:
SEMUA LOKASI TITIK LAMPU DAN POSISI PEMASANGAN YANG LAMPU. HAL TERSEBUT DIDESAIN SEHUBUNGAN DENGAN JUDUL GAMBAR: REV: NOMOR GAMBAR:
TERTERA DALAM GAMBAR INI BERGANTUNG PADA LIGHTING CONTROL SYSTEM BILA TERSEDIA.
KETERBATASAN DI LAPANGAN DAN AKAN KEMBALI
DIKONFIRMASI OLEH LIGHTING CONSULTANT SEBELUM SIRKUIT LAMPU YANG DIBERIKAN BUKAN MERUPAKAN
JAKARTA, INDONESIA DCI E1 ARIOBIMO
FACADE 01 DCI/EXT/FAC/EL-2
PEMASANGAN DALAM BENTUK GAMBAR KERJA (SHOP SIRKUIT LISTRIK YANG FINAL/SEBENARNYA. SIRKUIT LAMPU
DRAWING) DARI KONTRAKTOR YANG FINAL MOHON MENGACU KEPADA GAMBAR KERJA
ELEVATION 2
KONSULTAN MEP ATAU GAMBAR KERJA KONTRATOR MEP.

Anda mungkin juga menyukai