Anda di halaman 1dari 16

KEMENTRIAN

KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :

PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH

PEKERJAAN :

PEMBANGUNAN WORKSHOP MANUFAKTUR,


REFRIGASI, DAN KANTOR TAHAP II

TAHUN ANGGARAN :

VOID 2023
T LOKASI :

JL. KELINCI, TALISE,


KECAMATAN PALU TIM., KOTA PALU,
SULAWESI TENGAH - 94118

MENGETAHUI OLEH :

DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI


VOID

AGUNG NUR ROHMAD, ST.,MM.


NIP. 19760725B200501 1 001
DISETUJUI OLEH :

PEJABAT PEMBUAT KOMITMEN (PPK)


PEJABAT PEMBUAT KOMITMEN

Aditya Wibawa
AKHIRUDIN, S.P, ST
S.T.,M.Ec.Dev
NIP.19860707 201503
NIP. 19851004200912 1 0011 003

DI BUAT OLEH :

KONSULTAN PERENCANA

BAMBANG RIYANTO
TEAM LEADER

Digambar -

Diperiksa -

Disetujui -
Nama Gambar Skala

INSTALASI APAR
1:200
LANTAI 2
INSTALASI APAR LANTAI 2 Kode Gmbr. No. Lembar Jml. Lembar
Skala 1 : 200
MEP 37 109
KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :

PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH

PEKERJAAN :

PEMBANGUNAN WORKSHOP MANUFAKTUR,


REFRIGASI, DAN KANTOR TAHAP II

TAHUN ANGGARAN :

2023
LOKASI :

JL. KELINCI, TALISE,


KECAMATAN PALU TIM., KOTA PALU,
SULAWESI TENGAH - 94118

MENGETAHUI OLEH :

DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI

AGUNG NUR ROHMAD, ST.,MM.


NIP. 19760725B200501 1 001
DISETUJUI OLEH :

PEJABAT PEMBUAT
PEJABAT KOMITMEN
PEMBUAT (PPK)
KOMITMEN

Aditya Wibawa
AKHIRUDIN, S.P, ST
S.T.,M.Ec.Dev
NIP.19860707 201503
NIP. 19851004200912 1 0011 003

DI BUAT OLEH :

KONSULTAN PERENCANA

BAMBANG RIYANTO
TEAM LEADER

Digambar -

Diperiksa -

Disetujui -
Nama Gambar Skala

SINGLE LINE DIAGRAM


NTS
PD.AC-BU.2
SINGLE LINE DIAGRAM PD.AC-BU.2 Kode Gmbr. No. Lembar Jml. Lembar
Skala NTS
MEP 38 109
KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :

PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH

Pipa Drain - ∅ 3/4"


PEKERJAAN :

PEMBANGUNAN WORKSHOP MANUFAKTUR,


REFRIGASI, DAN KANTOR TAHAP II

Pipa Drain - ∅ 3/4"


Pipa Drain - ∅ 1"

Pipa Drain - ∅ 1"


Pipa Drain - ∅ 1"

TAHUN ANGGARAN :
Pipa Drain - ∅ 3/4"

VOID
2023
T

Pipa Drain - ∅ 1"


LOKASI :

JL. KELINCI, TALISE,


Pipa Drain - ∅ 1" KECAMATAN PALU TIM., KOTA PALU,
SULAWESI TENGAH - 94118

MENGETAHUI OLEH :

DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI


VOID
Pipa Drain - ∅ 1" Pipa Drain - ∅ 1"

Pipa Drain - ∅ 1"

Pipa Drain - ∅ 1"


Pipa Drain - ∅ 1"

Pipa Drain - ∅ 3/4"

AGUNG NUR ROHMAD, ST.,MM.


NIP. 19760725B200501 1 001
DISETUJUI OLEH :

PEJABAT PEMBUAT
PEJABAT KOMITMEN
PEMBUAT (PPK)
KOMITMEN

Aditya Wibawa
AKHIRUDIN, S.P, ST
S.T.,M.Ec.Dev
NIP.19860707 201503 1 003
NIP. 19851004200912 1 001

DI BUAT OLEH :

KONSULTAN PERENCANA

BAMBANG RIYANTO
TEAM LEADER

Digambar -

Diperiksa -

Disetujui -
Nama Gambar Skala

INSTALASI TATA UDARA


1:200
LANTAI 2
INSTALASI TATA UDARA LANTAI 2 Kode Gmbr. No. Lembar Jml. Lembar
Skala 1 : 200
MEP 39 109
KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :

PERENCANAAN PEMBANGUNAN
OOD SCRE BLK PALU
SULAWESI TENGAH

PEKERJAAN :

PEMBANGUNAN WORKSHOP MANUFAKTUR,


REFRIGASI, DAN KANTOR TAHAP II
INDOOR UNIT AC IU

TAHUN ANGGARAN :
PIPA DRAIN AC

PIPA AC ISOLASI
2023
DIDING PIPA SPARING
P C CLASS D LOKASI :

JL. KELINCI, TALISE,


KECAMATAN PALU TIM., KOTA PALU,
SULAWESI TENGAH - 94118

MENGETAHUI OLEH :

DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI

AGUNG NUR ROHMAD, ST.,MM.


NIP. 19760725B200501 1 001
DISETUJUI OLEH :

INSULATING FINISHING TAPE PEJABAT PEMBUAT


PEJABAT PEMBUAT KOMITMEN
KOMITMEN (PPK)
INSULATING MATERIAL

CEILING
REFRIGERANT LI UID PIPE

ELECTRIC IRE PO ER CONTROL


MOUNTING
REFRIGERANT GAS PIPE
EXHAUST FAN
P C OPPOSED LADE DAMPER
CATATAN
ISOLASI PIPA REFRIGERAN TIDA OLEH DI ELAH SAAT PEMASANGAN ITH FIXING DE ICE Aditya Wibawa S.P, ST
AKHIRUDIN, S.T.,M.Ec.Dev
TIAP SAM UNGAN ANTARA ISOLASI PIPA REFRIGERAN HARUS DILEM DENGAN
LEM UNTU AHAN PERE AT YANG DIRE OMENDASI AN DARI PA RI ISOLASI PIPA REFF
ALL NIP.19860707 201503 1 003
NIP. 19851004200912 1 001

DI BUAT OLEH :

IRE
INSULATION SCREEN
REFRIGERANT PIPE KONSULTAN PERENCANA

RU ER CLOSE CELL INSULATION

RU ER CLOSE CELL INSULATION


GA METAL CLANDDING
FOR PORTION EXPOSED TO EATHER

EXHAUST GRILLE OOD FRAME

ALL BAMBANG RIYANTO


REFRIGANT LI UID PIPE
TEAM LEADER
REFRIGANT SUCTION PIPE

Digambar -
REFRIGERANT PIPING INSULATION DETAIL
DETAIL EXHAUST FAN CEILING MOUNTED TYPE
Diperiksa -

Disetujui -
Nama Gambar Skala

DETAIL ARMATUR TATA


NTS
UDARA
DETAIL ARMATUR TATA UDARA Kode Gmbr. No. Lembar Jml. Lembar
Skala NTS
MEP 40 109
KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :

PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH

PEKERJAAN :

PEMBANGUNAN WORKSHOP MANUFAKTUR,


REFRIGASI, DAN KANTOR TAHAP II

EXIT
TAHUN ANGGARAN :

2023
LOKASI :

JL. KELINCI, TALISE,


KECAMATAN PALU TIM., KOTA PALU,
SULAWESI TENGAH - 94118

MENGETAHUI OLEH :

DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI

AGUNG NUR ROHMAD, ST.,MM.


NIP. 19760725B200501 1 001
DISETUJUI OLEH :

PEJABAT PEMBUAT
PEJABAT KOMITMEN
PEMBUAT (PPK)
KOMITMEN

Aditya Wibawa
AKHIRUDIN, S.P, ST
S.T.,M.Ec.Dev
NIP.19860707 201503
NIP. 19851004200912 1 0011 003

DI BUAT OLEH :

KONSULTAN PERENCANA

BAMBANG RIYANTO
TEAM LEADER

Digambar -

Diperiksa -

Disetujui -
Nama Gambar Skala

SINGLE LINE DIAGRAM


NTS
PL-BU.2
SINGLE LINE DIAGRAM PL-BU.2 Kode Gmbr. No. Lembar Jml. Lembar
Skala NTS
MEP 41 109
KETERANGAN KETERANGAN

EXIT

KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :

PERENCANAAN PEMBANGUNAN
PL-2 BLK PALU
SULAWESI TENGAH
PD.AC-2

PEKERJAAN :

PEMBANGUNAN WORKSHOP MANUFAKTUR,


REFRIGASI, DAN KANTOR TAHAP II

TAHUN ANGGARAN :

2023
LOKASI :

JL. KELINCI, TALISE,


VOID
KECAMATAN PALU TIM., KOTA PALU,
T SULAWESI TENGAH - 94118

MENGETAHUI OLEH :

EXIT
DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI

VOID AGUNG NUR ROHMAD, ST.,MM.


NIP. 19760725B200501 1 001
DISETUJUI OLEH :

PEJABAT PEMBUAT
PEJABAT KOMITMEN
PEMBUAT (PPK)
KOMITMEN

Aditya Wibawa
AKHIRUDIN, S.P, ST
S.T.,M.Ec.Dev
NIP.19860707 201503 1 003
NIP. 19851004200912 1 001

DI BUAT OLEH :

KONSULTAN PERENCANA

BAMBANG RIYANTO
TEAM LEADER

Digambar -

Diperiksa -

Disetujui -
Nama Gambar Skala

INSTALASI PENERANGAN
1:200
LANTAI 2
INSTALASI PENERANGAN LANTAI 2 Kode Gmbr. No. Lembar Jml. Lembar
Skala 1 : 200
MEP 42 109
KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :

PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH

PEKERJAAN :

PEMBANGUNAN WORKSHOP MANUFAKTUR,


REFRIGASI, DAN KANTOR TAHAP II

TAHUN ANGGARAN :

2023
LOKASI :

JL. KELINCI, TALISE,


KECAMATAN PALU TIM., KOTA PALU,
SULAWESI TENGAH - 94118

MENGETAHUI OLEH :

DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI

AGUNG NUR ROHMAD, ST.,MM.


NIP. 19760725B200501 1 001
FLOOR DISETUJUI OLEH :

PEJABAT PEMBUAT
PEJABAT PEMBUATKOMITMEN (PPK)
KOMITMEN

800 mm Aditya Wibawa S.P, ST


T. DOOS PVC CONDUIT Ø 3/4" AKHIRUDIN, S.T.,M.Ec.Dev
NIP.19860707 201503
NIP. 19851004200912 1 003
1 001
FLEXIBLE CONDUIT
DI BUAT OLEH :

CLAMP KONSULTAN PERENCANA

CEILING downlight

DETAIL INSTALASI DOWNLIGHT DI PLAFON


BAMBANG RIYANTO
TEAM LEADER

Digambar -

Diperiksa -

Disetujui -
Nama Gambar Skala

INSTALASI PENERANGAN
NTS
LANTAI 2
DETAIL ARMATUR PENERANGAN Kode Gmbr. No. Lembar Jml. Lembar
Skala NTS
MEP 43 109
KETERANGAN

KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :

PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH

PEKERJAAN :

PEMBANGUNAN WORKSHOP MANUFAKTUR,


REFRIGASI, DAN KANTOR TAHAP II

TAHUN ANGGARAN :
VOID

T 2023
LOKASI :

JL. KELINCI, TALISE,


KECAMATAN PALU TIM., KOTA PALU,
SULAWESI TENGAH - 94118

MENGETAHUI OLEH :
VOID DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI

AGUNG NUR ROHMAD, ST.,MM.


NIP. 19760725B200501 1 001
DISETUJUI OLEH :

PEJABAT PEMBUAT
PEJABAT KOMITMEN
PEMBUAT (PPK)
KOMITMEN

Aditya Wibawa
AKHIRUDIN, S.P, ST
S.T.,M.Ec.Dev
NIP.19860707 201503 1 003
NIP. 19851004200912 1 001

DI BUAT OLEH :

KONSULTAN PERENCANA

BAMBANG RIYANTO
TEAM LEADER

Digambar -

Diperiksa -

Disetujui -
Nama Gambar Skala

INSTALASI KOTAK KONTAK


1:200
LANTAI 2
INSTALASI KOTAK KONTAK LANTAI 2 Kode Gmbr. No. Lembar Jml. Lembar
Skala 1 : 200
MEP 44 109
KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :

PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH

PEKERJAAN :

PEMBANGUNAN WORKSHOP MANUFAKTUR,


REFRIGASI, DAN KANTOR TAHAP II

TAHUN ANGGARAN :

2023
LOKASI :

JL. KELINCI, TALISE,


KECAMATAN PALU TIM., KOTA PALU,
SULAWESI TENGAH - 94118

MENGETAHUI OLEH :

DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI

AGUNG NUR ROHMAD, ST.,MM.


NIP. 19760725B200501 1 001
DISETUJUI OLEH :

PEJABAT PEMBUAT
PEJABAT PEMBUAT KOMITMEN
KOMITMEN (PPK)

Aditya Wibawa S.P, ST


AKHIRUDIN, S.T.,M.Ec.Dev
NIP.19860707 201503 1 003
NIP. 19851004200912 1 001

DI BUAT OLEH :

KONSULTAN PERENCANA

BAMBANG RIYANTO
TEAM LEADER

Digambar -

Diperiksa -

Disetujui -
Nama Gambar Skala

INSTALASI PENERANGAN
1:200
LANTAI 2
INSTALASI PENERANGAN LANTAI 2 Kode Gmbr. No. Lembar Jml. Lembar
Skala 1 : 200
MEP 45 109
KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :
TB.FA-2
TB.TS-2
S
PERENCANAAN PEMBANGUNAN
BLK PALU
S

H
SULAWESI TENGAH

PEKERJAAN :

PEMBANGUNAN WORKSHOP MANUFAKTUR,


S

REFRIGASI, DAN KANTOR TAHAP II

TAHUN ANGGARAN :

S S S
2023
VOID

T LOKASI :

JL. KELINCI, TALISE,


KECAMATAN PALU TIM., KOTA PALU,
SULAWESI TENGAH - 94118

S
MENGETAHUI OLEH :

DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI

VOID

AGUNG NUR ROHMAD, ST.,MM.


NIP. 19760725B200501 1 001
DISETUJUI OLEH :

PEJABAT PEMBUAT
PEJABAT KOMITMEN
PEMBUAT (PPK)
KOMITMEN

Aditya Wibawa
AKHIRUDIN, S.P, ST
S.T.,M.Ec.Dev
NIP.19860707 201503
NIP. 19851004200912 1 0011 003

DI BUAT OLEH :

KONSULTAN PERENCANA

BAMBANG RIYANTO
TEAM LEADER

Digambar -

Diperiksa -

Disetujui -
Nama Gambar Skala

INSTALASI FIRE ALARM


1:200
LANTAI 2
INSTALASI FIRE ALARM LANTAI 2 Kode Gmbr. No. Lembar Jml. Lembar
Skala 1 : 200
MEP 46 109
KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :

PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH

PEKERJAAN :

PEMBANGUNAN WORKSHOP MANUFAKTUR,


REFRIGASI, DAN KANTOR TAHAP II

LOKASI :

JL. KELINCI, TALISE,


KECAMATAN PALU TIM., KOTA PALU,
SULAWESI TENGAH - 94118
VOID
MENGETAHUI OLEH :
T
DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI

AGUNG NUR ROHMAD, ST.,MM.


VOID
NIP. 19760725B200501 1 001
DISETUJUI OLEH :

PEJABAT PEMBUAT
PEJABAT KOMITMEN
PEMBUAT (PPK)
KOMITMEN

Aditya Wibawa S.P, ST


NIP.19860707 201503 1 003
AKHIRUDIN, S.T.,M.Ec.Dev
NIP. 19851004200912 1 001

DI BUAT OLEH :

KONSULTAN PERENCANA

BAMBANG RIYANTO
TEAM LEADER

Digambar -

Diperiksa -

Disetujui -
Nama Gambar Skala

INSTALASI AIR BERSIH


1:200
LANTAI 2
INSTALASI AIR BERSIH LANTAI 2 Kode Gmbr. No. Lembar Jml. Lembar
Skala 1 : 200
MEP 47 109
KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :

PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH

PEKERJAAN :

PEMBANGUNAN WORKSHOP MANUFAKTUR,


REFRIGASI, DAN KANTOR TAHAP II

LOKASI :

JL. KELINCI, TALISE,


KECAMATAN PALU TIM., KOTA PALU,
SULAWESI TENGAH - 94118

MENGETAHUI OLEH :

DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI

AGUNG NUR ROHMAD, ST.,MM.


NIP. 19760725B200501 1 001
DISETUJUI OLEH :

PEJABAT PEMBUAT
PEJABAT PEMBUAT KOMITMEN
KOMITMEN (PPK)

Aditya Wibawa S.P, ST


NIP.19860707 201503 1 003
AKHIRUDIN, S.T.,M.Ec.Dev
NIP. 19851004200912 1 001

DI BUAT OLEH :

KONSULTAN PERENCANA

BAMBANG RIYANTO
TEAM LEADER

Digambar -

Diperiksa -

Disetujui -
Nama Gambar Skala

INSTALASI AIR BERSIH


1:40
LANTAI 2
INSTALASI AIR BERSIH LANTAI 2 Kode Gmbr. No. Lembar Jml. Lembar
Skala 1 : 40
MEP 48 109
KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :

PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH

PEKERJAAN :

PEMBANGUNAN WORKSHOP MANUFAKTUR,


REFRIGASI, DAN KANTOR TAHAP II

LOKASI :

JL. KELINCI, TALISE,


KECAMATAN PALU TIM., KOTA PALU,
SULAWESI TENGAH - 94118

MENGETAHUI OLEH :

DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI

AGUNG NUR ROHMAD, ST.,MM.


NIP. 19760725B200501 1 001
DISETUJUI OLEH :

PEJABAT PEMBUAT
PEJABAT PEMBUATKOMITMEN (PPK)
KOMITMEN

Aditya Wibawa S.P, ST


NIP.19860707 201503 1 003
AKHIRUDIN, S.T.,M.Ec.Dev
NIP. 19851004200912 1 001

DI BUAT OLEH :

KONSULTAN PERENCANA

BAMBANG RIYANTO
TEAM LEADER

Digambar -

Diperiksa -

Disetujui -
Nama Gambar Skala

INSTALASI AIR BERSIH


1:25
LANTAI 2
INSTALASI AIR BERSIH LANTAI 2 Kode Gmbr. No. Lembar Jml. Lembar
Skala 1 : 25
MEP 49 109
KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :

PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH

PEKERJAAN :

PEMBANGUNAN WORKSHOP MANUFAKTUR,


REFRIGASI, DAN KANTOR TAHAP II

VOID LOKASI :

T JL. KELINCI, TALISE,


KECAMATAN PALU TIM., KOTA PALU,
SULAWESI TENGAH - 94118

MENGETAHUI OLEH :

DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI

VOID

AGUNG NUR ROHMAD, ST.,MM.


NIP. 19760725B200501 1 001
DISETUJUI OLEH :

PEJABAT PEMBUAT
PEJABAT KOMITMEN
PEMBUAT (PPK)
KOMITMEN

Aditya Wibawa S.P, ST


NIP.19860707 201503 1 003
AKHIRUDIN, S.T.,M.Ec.Dev
NIP. 19851004200912 1 001

DI BUAT OLEH :

KONSULTAN PERENCANA

BAMBANG RIYANTO
TEAM LEADER

Digambar -

Diperiksa -

Disetujui -
Nama Gambar Skala

INSTALASI AIR BEKAS


& 1:200

INSTALASI AIR BEKAS & AIR KOTOR LANTAI 2 AIR KOTOR LANTAI 2
Kode Gmbr. No. Lembar Jml. Lembar
Skala 1 : 200
MEP 50 109
KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :

PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH

PEKERJAAN :

PEMBANGUNAN WORKSHOP MANUFAKTUR,


REFRIGASI, DAN KANTOR TAHAP II

LOKASI :

JL. KELINCI, TALISE,


KECAMATAN PALU TIM., KOTA PALU,
SULAWESI TENGAH - 94118

MENGETAHUI OLEH :

DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI

AGUNG NUR ROHMAD, ST.,MM.


NIP. 19760725B200501 1 001
DISETUJUI OLEH :

PEJABAT PEMBUAT
PEJABAT PEMBUAT KOMITMEN
KOMITMEN (PPK)

Aditya Wibawa S.P, ST


NIP.19860707 201503 1 003
AKHIRUDIN, S.T.,M.Ec.Dev
NIP. 19851004200912 1 001

DI BUAT OLEH :

KONSULTAN PERENCANA

BAMBANG RIYANTO
TEAM LEADER

Digambar -

Diperiksa -

Disetujui -
Nama Gambar Skala

INSTALASI AIR BEKAS


& 1:40

INSTALASI AIR BEKAS & AIR KOTOR LANTAI 2 AIR KOTOR LANTAI 2
Kode Gmbr. No. Lembar Jml. Lembar
Skala 1 : 40
MEP 51 109
KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :

PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH

PEKERJAAN :

PEMBANGUNAN WORKSHOP MANUFAKTUR,


REFRIGASI, DAN KANTOR TAHAP II

LOKASI :

JL. KELINCI, TALISE,


KECAMATAN PALU TIM., KOTA PALU,
SULAWESI TENGAH - 94118

MENGETAHUI OLEH :

DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI

AGUNG NUR ROHMAD, ST.,MM.


NIP. 19760725B200501 1 001
DISETUJUI OLEH :

PEJABAT PEMBUAT
PEJABAT PEMBUAT KOMITMEN
KOMITMEN (PPK)

Aditya Wibawa S.P, ST


NIP.19860707 201503 1 003
AKHIRUDIN, S.T.,M.Ec.Dev
NIP. 19851004200912 1 001

DI BUAT OLEH :

KONSULTAN PERENCANA

BAMBANG RIYANTO
TEAM LEADER

Digambar -

Diperiksa -

Disetujui -
Nama Gambar Skala

INSTALASI AIR BEKAS


& 1:25

INSTALASI AIR BEKAS & AIR KOTOR LANTAI 2 AIR KOTOR LANTAI 2
Kode Gmbr. No. Lembar Jml. Lembar
Skala 1 : 25
MEP 52 109

Anda mungkin juga menyukai