4380
Gerbang Masuk
Toilet Kantor
Gudang Bank Sampah
Area Pos Umum TPST
Dumping Sementara Satpam 15m² 48m²
9m² 24m² PROGRAM STUDI SARJANA
60m² 6m² TEKNIK LINGKUNGAN
FAKULTAS TEKNIK
UNIVERSITAS RIAU
Gerbang Keluar
39.4813
TUGAS SANITASI BERBASIS
Pool Becak
Motor Pos MASYARAKAT
Parkir Satpam
Tempat 8m²
Sorting Komposting Kendaraan 6m²
95m² 100m² Pool Dump Truck DESIGN TPST
48m²
DOSEN PENGAMPU
IPAL
24m² ARYO SASMITA, S.T., M.T
NIP. 19860612 201212 1 003
Tempat Sorting
(Pemilahan)
60m²
MAHASISWA
DIKA JUNANDA
NIM. 2107124948
SATUAN GAMBAR
METER
1200 m² 75.0000
1:500
138m²
SUMBER
133.0438