Anda di halaman 1dari 1

LUAS LAHAN (100%) 39718 m2

LUAS TERBANGUN (60 %) 23830,8 m2


U
UNIT KAVLING TYPE:27/72 = 67 UNIT (12,16%) 4828 m2 PEMERINTAH KABUPATEN MAROS
DINAS PEKERJAAN UMUM,TATA RUANG,
UNIT KAVLING TYPE:30/72 = 243 UNIT (44,05%) 17496 m2
PERHUBUNGAN DAN PERTANAHAN
KELEBIHAN TANAH (3,71 %) 1472,8 m2 Jl.asoka No. 6 Maros 90511,Tlpn./fax (0411) 372 132

POS JAGA (0,08 %) 34 m2 PROYEK


LUAS FASUM/FASOS (40%) 15887,2 m2

JALAN DAN DRAINASE 11295,05 m2


PERUMAHAN "BUKIT ASERA"
i3
RTH 3177,44 m2 i4
i5
MASJID 576 m2 i6
i7
KETERANGAN LOKASI
203 m2 i8
TK/PAUD i9 27
i2 i10 RENCANA :TYPE 72 & 30
72
SALURAN/DRAINASE BESAR 635,71 m2 i11
i12 KONSTRUKSI :PERMANEN BIASA
H1 i13
(KAVLING STANDAR: 6X12 M) AA.6 i1 H2 RTH JUMLAH LANTAI :1 LANTAI
AA.5 H3
AA.4 H4 RTH DESA/KELURAHAN :BONTO BUNGA
AA.3 H5
AA.2 G1 H6 RTH RTH RTH KECAMATAN :MONCONGLOE
AA.1 H7 i14 i22
G2
G3 H8 i15
RTH
KABBUPATEN :MAROS
G4 H9 i16 i26
i21
G5 i17 RTH
G6 H10 i18 i25
G7 H11
H12
i19 i20 PERUSAHAAN PEMOHON
G8
g

G9 H13 i24
n

F1 i19
nga

F2 H14 PT.ROYAL PERSADA PROPERTI


F3 G10 H15 MASJID
i23 Alamat:
nto

F4 G11 H16
F5 G12 H17 Jalan Mon.Emmy Saelan 3 No.70 Makassar
atta

RTH F6 G13 H18 Sulawesi Selatan


E1
F7 G14
g-P

E2 H19
E3 F8 G15
F9 G16 H20
kan

E4
E5 G17 H21
H22 RTH
PEMOHON
G18
nai

E6 F10
D1 E7 F11 H23
Pa

E8 F12 G19 H24


E9 F13 G20 H25
ros

D3 G21 H26
D4 F14
G22 H27
.Po

D5 E10 F15
RTH
D6 E11 F16 G23
Jln

E12 F17 G24


D2 D9
E13 F18 G25 TK/PAUD
D13 E14 G26
RTH D7 D10 E15 F19 G27
RTH
RTH
E16 F20
D8 D14 D17 E17 F21
D11 F22
C1 E18
F23
SAIFUL ISLAM H
C2 D15 D21
D12 D18 E19 F24 DIREKTUR
C3 E20 F25
C4 D16 D22 D25 E21 F26
C5 D19 E22 F27 DIPERIKSA
C6 D23 D29 E23
C7 D20 D26 E24
A1 C8 E25 Jabfung. Penata Ruang Ahli Muda
C9 D24 D30 D33 E26
B1 C10 D27 E27
A2
C11 D37
RTH D31 D34
B2 AB.1 D28 E28
A3 C12 E29
C13 D32 D38 D41 E30
B3 AC.1 C14 D35
A4 AB.2
C15 D45
C16 D39 D42
B4 AC.2 AD.1 D36 NURANNAH, ST
A5 AB.3 C17
C18 D40 D46 D49
B5 AC.3 C19 D43 NIP. 19740707 200502 2 006
A6 AB.4 AD.2 AE.1 C20 D53
NAMA BLOK JUMLAH UNIT D47 D50
D44
BLOK A 7 UNIT A7
B6 AB.5
AC.4 AD.3 AE.2
AF.1 C21
C22 D54
DITELITI DAN DISETUJUI
D48 D51
B7 AC.5 AD.4 AF.2 C23
BLOK B 7 UNIT AB.6 AE.3 AG.1 C24 Kabid. Penataan Ruang & Pertanahan
C25 D55
AH.1 D52
BLOK C 34 UNIT AF.3 AG.2 C26
AE.4 C27 D56
BLOK D 56 UNIT AH.2 C28
AF.4 AG.3 Ai.1 C29
BLOK E 30 UNIT AH.3 AJ.1 C30
AG.4 Ai.2
C31
BLOK F 27 UNIT AJ.2 C32
AH.4 Ai.3 AK.1 C33
BLOK G 27 UNIT C34
AJ.3 AL.1
RTH Ai.4 AK.2 RTH KURNIATI AS,ST,MSP
BLOK H 27 UNIT
AJ.4 AK.3
AL.2 AM.1 NIP. 19731215 200502 2 002
BLOK I Ai.5
26 UNIT
AL.3 AN.1
BLOK AA 6 UNIT
RTH AK.4 AM.2 DISAHKAN
RTH
AL.4 AN.2
BLOK AB 6 UNIT AM.3
Kepala Dinas
RTH AN.3
BLOK AC 5 UNIT AM.4
RTH

BLOK AD 4 UNIT AN.4


AM.5
BLOK AE 4 UNIT RTH AN.5
BLOK AF 4 UNIT AN.6 AO.1 MUETAZIM MANSYUR,ST
BLOK AG 4 UNIT
RTH
AO.2 NIP. 19751120 200112 1 006
BLOK AH 4 UNIT
BLOK Ai 5 UNIT
AO.3 GAMBAR SKALA
AO.4
BLOK AJ 4 UNIT
SITE PLAN PERUBAHAN 1:1200
BLOK AK 4 UNIT
BLOK AL 4 UNIT
No. Lbr Jml. Lbr KODE
BLOK AM 5 UNIT
BLOK AN 6 UNIT SITE PLAN PERUBAHAN TAHAP PERTAMA 04 13
BLOK AO 4 UNIT SKALA 1:1200 PENGESAHAN
TOTAL 310 UNIT
NOMOR :
TANGGAL :

Anda mungkin juga menyukai