PROYEK:

380 380 PEMBANGUNAN 6 (ENAM) RUAS JALAN TOL DALAM KOTA JAKARTA
TAHAP 1 RUAS SEMANAN-SUNTER DAN SUNTER PULO GEBANG
SEKSI A KELAPA GADING-PULO GEBANG
(STA. 21+881 - STA. 31+168)

GAMBAR TERLAKSANA
(AS BUILT DRAWING)

A A DETAIL
DECK DRAIN & HANGER

250

250
360

360
TYPE D3

PENGGUNA JASA

VIEW TOP DECK DRAIN JAYA PRATAMA


PT JTD JAYA PRATAMA

SECTION C - C ADJUSTER PLAT STRIP


DIKETAHUI OLEH

15 DYNABOLT M.16X60 mm T=6mm L=80mm


230

15
B
4 POTONGAN 3
SKALA 1 : 10
6 INDRIYONO
OWNER'S REPRESENTATIVE
-
24

TANGGAL

TEE HANGER KONSULTAN


DYNABOLT M.16X60 mm DYNABOLT M.16X60 mm
C 304 C
3
200 -
ADJUSTER PLAT STRIP PT. CIPTA STRADA
ENGINEERING CONSULTANS

T=6mm L=80mm KSO JAYA CM - VIRAMA KARYA - CIPTA STRADA

ADJUSTER PLAT STRIP


T=6mm L=80mm
DIPERIKSA/DISETUJUI OLEH
MUR BAUT M 16X30 mm
384

384

360

MUR BAUT M 16X30 mm

BARNARD SAHAT HUTAPEA


TEAM LEADER

290
TANGGAL

KONTRAKTOR
BREKET HANGER PIPA 10" T=6mm L 80mm
PIPA 10'' JAYA
KONSTRUKSI
144 144
BREKET HANGER PIPA 10" T=6mm L 80mm
KSO JAYA KONSTRUKSI - ADHI
152 152
DETAIL HANGER GERAK GALVANIS 5 POTONGAN 4
SKALA 1 : 10
7 DIAJUKAN OLEH

SKALA 1 : 10
B SECTION B - B
- -

SECTION A - A

R. ARY ARDAKA
GENERAL SUPERINTENDENT

TANGGAL

CATATAN
SUMMARY OF QUANTITY

SKALA : 1 : 100

NOMOR GAMBAR : HALAMAN :


N1-19-004 4 of 4