Anda di halaman 1dari 1

CATATAN

Pasi. Bata 1:4


Keramik Uk.30x30 cm T= 2 cm
Rabat Beton T= 5 cm
Pasir Urug Kolom Teras 15/15
Keramik Uk.50x50 cm
Tanah Timbun
T= 2 cm
±0.00
25 -0.05

28
sloof 15/20

MT -0.40

600 50
300 300
Pas. Pond. Batu Kali

UNIVERSITAS TEUKU UMAR


5 Pasir Alas T= 5 cm FAKULTAS TEKNIK
20 20 JURUSAN TEKNIK SIPIL
40 40 2022
100

B B 300 POTONGAN A-A MATA KULIAH


Skala 1:20

300

GAMBAR STRUKTUR BANGUNAN


PV1

150 750 Pasi. Bata 1:4


800 Rabat Beton T= 5 cm
Pasir Urug
Tanah Timbun
Keramik Uk.50x50 cm Keramik Uk.50x50 cm
T= 2 cm T= 2 cm
±0.00 ±0.00 DOSEN PEMBIMBING
2
250 5
5

A
300
Kolom Praktis
28
FADLI IDRIS, S.T.,MT
Sloof 15x20
150
sloof 15/20
50

Pas. Pond. Batu Kali


A MAHASISWA / NIM
5
180 Pasir Alas T= 5 cm

20
300 300 40

SUSAN MARGARET MAIMA


2205903020109
RENC. PONDASI, SLOOF & KOLOM POTONGAN B-B
Skala 1:100 Skala 1:20

JUDUL GAMBAR SKALA

- RENC. PONDASI, SLOOF


Tulangan Pokok 4Ø8 1:100
& KOLOM
Sengkang Ø8- 150
Tulangan Pokok 4Ø8
Beton K250
- POTONGAN A-A 1:20
Sengkang Ø8- 150 20 - POTONGAN B-B 1:20
15 Beton K250 - DETAIL KOLOM
1:10
PRAKTIS
- DETAIL SLOOF 1:10
15 15
DETAIL KOLOM PRAKTIS DETAIL SLOOF JENIS GAMBAR NO. LEMBAR JUMLAH LEMBAR
Skala 1:10 Skala 1:10

3 7

Anda mungkin juga menyukai