35 50 35 35 50 35 35 50 35

Kegiatan:
B

B
35 35 35
A A A
50 120 50 120 50 120 AS BUILD DRAWING
Keterangan:
35 35 35
50 50 50
60 60 60 60 60 60
120 120 120
DENAH PILE CAP PRECAST P3 DENAH PENULANGAN PILE CAP PRECAST P3 DENAH PENULANGAN PILE CAP INSITU P3
35 50 35 35 50 35 35 50 35
HANDLING LOOP HANDLING LOOP
15 15 PC.STRAND 12.7mm
15 15 PC.STRAND 12.7mm
15 15
70 70 70
45 45 45
145 145 145
Ø12-100
DIBUAT : PT. WAHYU AGUNG
KONTRAKTOR PELAKSANA
75 75 75
20 20 20
24.6 70.9 24.6 24.6 70.9 24.6 24.6 70.9 24.6 AHMAD SUTISNA,ST.,
Project Manager
DIPERIKSA : PT. WAKU
KONSULTAN PENGAWAS
60 60 60 60 60 60
120 120 120
ARIE KADARIL M, S.T.,
PC1 : POTONGAN A-A PC1 : POTONGAN A-A PC1 : POTONGAN A-A TEAM LEADER
DIPERIKSA : DIFASLANAL MABESAL
TIM DIREKSI
35 50 35 35 50 35 35 50 35
HANDLING LOOP HANDLING LOOP
15 15 15 15 15 15
PC.STRAND 12.7mm PC.STRAND 12.7mm TTD
MUHAMMAD ISA,S.T.,
70 70 70 Mayor Laut (KH) NRP 18895/P
45 45 45
DIPERIKSA : KASUBDIS FASDUKMAT
145 145 145
Ø12-100
TTD
75 75 75
HENDI KITRIS MERISA, S.T.,
20 20 20 Kolonel Laut (T) NRP 13323/P
24.6 70.9 24.6 24.6 70.9 24.6 24.6 70.9 24.6
Disetujui oleh
Kepala Disfaslanal
Selaku PPK
60 60 60 60 60 60
120 120 120 TTD
PC1 : POTONGAN B-B PC1 : POTONGAN B-B PC1 : POTONGAN B-B