DETAIL STANDARD UNTUK PEKERJAAN STRUKTUR

UNTUK TIE BEAM (SLOOF) & PELAT LT. DASAR

mutu beton pelat lantai dasar mutu beton pelat lantai dasar
bw+8hf bw+8hf bw+6hf bw+6hf

hf

hf
mutu beton K-250 0.125 nS 0.125 S n mutu beton K-250 mutu beton K-250 0.125 nS 0.125 S n mutu beton K-250
0.25 S n ldh ldh 0.25 S n 0.25 S n ldh ldh 0.25 S n

BF > 0.3 S n > 0.3 S n bw BF > 0.3 S n > 0.3 S n bw


In In
(DIMENSI TERPANJANG DARI PELAT) (DIMENSI TERPANJANG DARI PELAT)

mutu beton pelat lantai dasar mutu beton pelat lantai dasar
bw+8hf bw+8hf bw+6hf bw+6hf

hf

hf
mutu beton K-250 0.125 nS 0.125 S n mutu beton K-250 mutu beton K-250 0.125 nS 0.125 Sn mutu beton K-250
0.25 S n ldh ldh 0.25 S n 0.25 S n ldh ldh 0.25 S n

BF > 0.3 S n > 0.3 S n bw BF > 0.3 S n > 0.3 S n bw


Sn Sn
(DIMENSI TERPENDEK DARI PELAT) (DIMENSI TERPENDEK DARI PELAT)

AREA PELAT INTERIOR AREA PELAT EXTERIOR

TGL. REVISI TTD. KODE GAMBAR NOMOR LEMBAR TOTAL LEMBAR


PROJECT : HOTEL MICRO PENANGGUNG JAWAB PARAF

STRUCTURE DRAWING OWNER : - STRUKTUR : I WAYAN WETU SAPUTRA NEGARA, S.TR.,SPL - - -

HOTEL MICRO PERERENAN DRAFTER : I WAYAN WARTA YASA


JALAN JANTUK ANGSA, PERERENAN KEC.MENGWI KAB.BADUNG-BALI
NAMA GAMBAR : SKALA : PRINT DATE : CATATAN :