Anda di halaman 1dari 1

I

J
F
E

K
A

D
B

H
G

1
1

1 2 3 4 5 6
1475

450 250 225 200 350

2
2

180
VOID

3
3

PIPA VERTICAL 3/4"


545

DARI ROOF TANK

225
TURUN KE KM. MANDI PIPA VERTICAL 1"
DARI SUMBER AIR
ELBOW AW 3/4"
KE ROOF TANK

VLOKSHOCK AW1/2"

4
4

PIPA PVC AW 1/2" B

340
200

5
5

ELBOW AW 3/4"
C
VOID

350
350

6
6

100

D
150
150

7
7

400
150

2640
VLOKSHOCK AW1/2" ELBOW AW 3/4"
PIPA VETICAL 3/4" F
2800

DARI ROOF TANK

650
KE KM.MANDI

8
8

PIPA PVC AW 1/2"


250

250
G
100

9
9

GSB
350

10
10

SYMBOL KETERANGAN
600
600

SUMBER AIR SUMUR

POMPA SUMBERSIBLE + RUANG POMPA

POMPA BOSTER
PB
150

Elbow AW 90°

11
11

Elbow AW 45°
100

Sambungan T AW

Sambungan AW Y 45° I
700

Pipa PVC AW 3/4" flokshock 1/2"

Pipa PVC AW 3"


12
12

295

Pipa PVC AW 4"


455

13
13

250 150 225 350


J
200 100 200
SAL. AIR BERSIH LT.2 1475
SKALA 1:100
14
14

DATE
SKALA
NILAI

15
15

1:50 1:20

STR.54

LO
1-12-2023
DRAWING NO.

KA
SI
KEYPLAN

CATATAN

XII DPIB 1
DIGAMBAR

DISETUJUI
DIKETAHUI
DIKETAHUI

SHEET NO.
ORANG TUA :
GEDUNG

ADE SUMARNI
MUHAMAD RIZKI
JUDUL GAMBAR

N
JALA
MATA PELAJARAN

JA
LA
N
TEGUH KARYA S.Pd,Gr
TEGUH KARYA S.Pd,Gr
DETAIL TANGGA

GURU MATA PELAJARAN :

NIP19870307 202221 1006


NIP19870307 202221 1006
GURU MATA PELAJARAN :
KONTRUKSI UTILITAS
16

TANGGAL

13-11-2023

56
A3
DWG SIZE
I

J
E

K
A

D
B

H
G

Anda mungkin juga menyukai