PENYEMPURNAAN IPLT
CIBINONG
SKEMA SYSTEM
• Kapasitas : 50 m3/hari (Tahap awal dr 100 m3/hari)
• Lokasi : Cibinong,Kab. Bogor, Jawa Barat
• TA : 2016
SUPERNATAN
Pengendap Aerobik Anaerobik
Penerima Badan Air
1 Fixed Bed Biofilter
LUMPUR
LUMPUR
SUPERNATAN
✓
SDB
Pre-
treatment Treatment
DIAGRAM PROSES
ALIRAN
SUPERNATAN
ALIRAN LUMPUR
50M3/Hari
U
T
S
U
61
°
B C
A 141.0 D
1.7 18.7 4.0 4.0 15.3 7.0 1.6 4.0 15.9 4.0 1.5 26.0 2.51.5 6.0 16.1 10.1
1.1
26.7 24.0
62.5 9.3 6.8 4.5 5.6
16.6
3.5 3.5
5.5
7
8
MH1 PIPA PVCØ150 -23M
MH2
+115,00
2.0
MH5
2 2 2
+114,50
3 +112,50
8.0
PARKIR MOTOR
8.1
MH6
5.4 0.7
4
13
UNTUK TRUK
AREA MANUVER
6.7
+114,00 MH3
1
9.5
PANEL
4.2
7.0
+117,00
+116,50
+117,50
+116,00 +115,00 +114,00
7.4
5.0
PAGAR PANEL BETON
120,0
129,4
70,0
71,4
60,0
47,4
110,0
50,0
100,0
80,0
90,0
L=58 METER
40,0
1.6
2.8
AREA PARKIR /
BERHENTI SEMENTARA
MOBIL / TRUK
30
11
,0
SALURAN JALAN
GRASS BLOCK
20
,0 1 BAK PENERIMA
2 BAK PENGENDAP
10,0
3 SLUDGE DRYING BED
4 BAK PEMBAGI
6 RUMAH JAGA
9
7 SUMUR BOR
9 SEPTICKTANK
10
10 GERBANG PINTU MASUK
11 JALAN AKSES
PELAKSANAAN PEMBANGUNAN
KONDISI SAAT INI
BAR SCREEN BAK PENERIMA PIPA INLET BAK PENGENDAP RABIC PRO (TANKI REKATOR)
EFLUENT
SAMPAH YANG
LOLOS KE TANKI
BAK SDB REAKTOR
MASS BALANCE
Berdasarkan kualitas effluent yang didapatkan, telah memenuhi baku mutu untuk semua
parameter.
Efisiensi removal:
a. BOD = 98,2% d. Amonia = 77,3 %
b. COD = 97,8% e. Total Coliform = 98,9%
c. TSS = 97,3%
Sampling Outlet
PERMASALAHAN PENGOPERASIAN
FOOT SCREEN
PIPE
Truk tinja tidak dilengkapi Pasir dan tanah langsung SDB, tidak berfungsi
penyaring pipa, sehingga, masuk ke tangki sebagai pengering lumpur
sampah, tanah lempung pengendap sehingga halus, oleh karena
dan pasir terbawa dengan tangki pengendap mampat tersumbat tanah dan hal
lumpur tinja,diperkirakan karena pasir dan lumpur ini menyebabkan pipa-
mencapai 20%-30% tidak tertahan di bak pipa di SDB menjadi
volume tangki penerima mampat
Rencana Penyempurnaan IPLT
Bak Penerima Eksisting
1. Penambahan barscreen dengan kerapatan 2 cm dengan lebar 3 m.
2. Penambahan kisi-kisi barscreen eksisting dari kerapatan 4cm menjadi 2
cm.
3. Penambahan fine screen (dot screen) 0,3 m x 3 m dengan lubang
berdiameter 0,5 cm
4. Perubahan pipa penguras lumpur dari Pipa baja menjadi saluran terbuka.
Bak Prasedimentasi
Merubah letak Pipa Inletl dari bawah Tanki ke atas bagian Tanki.
8.7 4. 4.0Settling15.3Thickener
4.0 7.0 (rencana)
1.6 4.0 15.9 4.0 1.5 26.0 2.51.5 6.0 16.1
1.1
26.7
5. SDB (rencana) 24.0
62.5 9.3 6.8
28.8
7
8
SETTLING
00 MH2
MH1 PENERIMA
2
11.0
+114,50
SDB
5 4 2%
3
SDB
3
4
1 1
TANKI5 AAFB
PAN EL
+117,00
+117,50
+116,00 +115,00 +114,00
5.0
120,0
129,4
60,0
70,0
71,4
47,4
110,0
50,0
100,0
80,0
90,0
40,0
1.6
2.8
30
,0
SALURAN JALAN
Profil Hidrolis Penyempurnaan
Atap +118.40
Lantai +117.25
Top Pipa Drain +117.05
Top Pipa Drain +116.25
TOP Bak +117.35
Jalan +117.00 Muka Air +116.35
Top Pipa Inlet +114.48
Top Pipa Drain +114.50 Dasar Pipa Inlet +114.38
Dasar Pipa Drain +114.40 MA +114.62
Bordes Bak +114.78
Sirtu Dipadatkan
SKALA 1 : 250
Atap +118.40
Lantai +117.25
Top Pipa Drain +117.05
Top Pipa Drain +116.25
+116.19
+115.01
Sirtu Dipadatkan +114.26 +114.06
Lantai+116.25 +114.56
BAK PENGENDAP
+114.27
+112.41
PRASED BAK PEMBAGI IPAL (ANAEROB AEROB BIOFIL)
SKALA 1 : 250
MA. +114.62 Atap Beton Bak +114.78
Top Pipa Inlet +114.48 Top Bak +114.63 Top Pipa Outlet +112.43
M A.M AKS
PIPA Ø 200 mm
+115.53 Dasar Pipa Inlet +114.38 Dasar Pipa Outlet +112.33
MT +114.33 MT +114.33
Kesetimbangan Karakteristik Kimiawi Supernatan
(Penyempurnaa)
Optimalisasi Bak Penerima Dan Bak Pra
Sedimentasi Eksisting
Bar Screen Eksisting
Bar Screen #2cm
200
Sirtu
1000
50
BIOGAS
+ 116.83 PIPA BYPASS
INLET ND.150 mm
Pas.1/2 Bt.merah
50
Sirtu Dipadatkan GATTER
50
20
11
150150 1900 1900 150 800 150150
80
BIOBALL
4750 DINDING COR BETON
5050 PELINDUNG TANGKI
240
10
50
10 10
+ 114.87
DOP Ø 150 mm
LUBANG Ø 1.5"
10
50
50
PIPA OUTLET
10 10 Ø 100 mm PVC
+ 114.22
5
PASIR URUG
DIPADATKAN
25
10
LANTAI KERJA
20 20 250 20 20
POTONGAN A - A
SEKALA : 1 : 20
Settling Thickener
BAR SCREEN #2CM
160
FINE SCREEM (DOT SCREEN)
160
30
MUKA JALAN RENC
(UNLOADING)
20
50
MUKA JALAN
2%
20 25
50
5
20
MUKA JALAN EKS. MUKA JALAN EKS.
20 25
5
LANTAI KERJA T-5CM
LANTAI KERJA T=5CM
PASIR URUG 20 CM
PASIR URUG T=20 CM
PINTU AIR
50
50
MA.MAKS
MA.Maks.
50
PIPA Ø 200 mm
50
MUKA JALAN MUKA JALAN
220
120
120
BAK PENGENDAP
TANGGA DINDING Ø19 PIPA Ø 200 mm
232
12
20 25
20 25
5
5
VALVE ND.200
100
50
PASIR URUG T=20 CM
20 5 25
30 20 100 20 30
80
930
930
1030
140
50
20 100 20
100 PIPA DINIDNG GI.ND.200 MA.Maks. MA.Maks.
100
50
PERFORATED WALL
20
100
230
120
20
220
20
FINE SCREEN
(DOT SCREEN)
100
20
BAR SCREEN
560
250
50
60
17
PINTU AIR 2%
20 25
5
20
560
230
100
T.200x200 660
BAK PENGENDAP
200 20
100
Sludge Draying Bed (SDB)
30
80
170
270
25
25 20 980 20 25
25
POTONGAN A-A
50
20 980 20
40 40 40 40 40
C
90 90 90 90 90
25 20 180 20 180 20 180 20 180 20 180 20 25
20
1020
60
POTONGAN B-B
20
670
500
B B
170
320
80
80
80
80
80
25
A A
20
80 80 80 80 80
50
20
50
C
20 180 20 180 20 180 20 180 20 180 20 25
25 20 60 20 500 20 25 25 20 25
1020
POTONGAN C-C
DENAH
Rekapitulasi Rencana Anggaran Biaya
Penyempurnaan IPLT CIBINONG
NO U R A I AN JUMLAH HARGA
JUMLAH 1,023,775,656.14
PPN (10 %) 102,377,565.61
TOTAL 1,126,153,221.75
DIBULATKAN 1,126,153,000.00
BIAYA OM : 9.000.000.
Operator (2 org) : Rp.5.000.000/Bln
Pembersihan lumpur SDB: Rp.2.000.000/Bln
Listrik : Rp.1.920.000/Bln
TERIMA KASIH
ALTERNATIF PENYEMPURNAAN(2)
Initial Cost :
1. Bak Penerima & Bak
Pengendap :
Rp.275.000.000
2. SDB : Rp.400.000.000
3. Perbaikan Bak Penerima
eksisting+Penggantian
Peralatan lainnya Manual
Bar screen
Rp.100.000.000
4. Total = Rp. 775.000.000
Biaya OM : Rp.9000.000
• Operator (2 org) :
Rp.5.000.000/Bln
• Pembersihan lumpur SDB:
Rp.2.000.000/Bln
• Listrik : Rp.1.920.000/Bln
ALTERNATIF PERBAIKAN (3)
LESS ENERGY
Kelebihan :
• Kebutuhan listrik kecil
• Lingkungan kotor dan timbul bau
• Biaya investasi & operasi sedang
• Dibutuhkan tenaga kasar & rajin
Kekurangan :
• Setiap saat membersihkan
sampah yg tersangkut di screen
secara manual
• Setiap hari pada akhir operasi,
wajib mengosongkan padatan
dari bak pengendap ke SDB
secrara manual
• Rutin melakukan
pembersihan/pencucian pasir
SDB setiap minggu