Anda di halaman 1dari 20

LAPORAN DRAFT

PENYEMPURNAAN IPLT
CIBINONG
SKEMA SYSTEM
• Kapasitas : 50 m3/hari (Tahap awal dr 100 m3/hari)
• Lokasi : Cibinong,Kab. Bogor, Jawa Barat
• TA : 2016

SUPERNATAN
Pengendap Aerobik Anaerobik
Penerima Badan Air
1 Fixed Bed Biofilter

LUMPUR
LUMPUR
SUPERNATAN


SDB

Pre-
treatment Treatment
DIAGRAM PROSES

ALIRAN
SUPERNATAN

ALIRAN LUMPUR
50M3/Hari
U

TATA LETAK IPLT CIBINONG KAP B

T
S
U

61
°
B C
A 141.0 D

1.7 18.7 4.0 4.0 15.3 7.0 1.6 4.0 15.9 4.0 1.5 26.0 2.51.5 6.0 16.1 10.1
1.1
26.7 24.0
62.5 9.3 6.8 4.5 5.6

PIPA AIR BERSIH Ø 3/4"


L=58 METER

PAGAR PANEL BETON


PIPA AIR BERSIH Ø 1"
L=96 METER
L=53 METER

16.6
3.5 3.5
5.5

7
8
MH1 PIPA PVCØ150 -23M
MH2
+115,00

2.0
MH5

PIPA PVCØ150 -10M


MH4
8.6

2 2 2
+114,50
3 +112,50

8.0
PARKIR MOTOR

8.1
MH6

5.4 0.7
4
13

UNTUK TRUK
AREA MANUVER
6.7

+114,00 MH3
1

9.5
PANEL

4.2
7.0
+117,00
+116,50
+117,50
+116,00 +115,00 +114,00

7.4
5.0
PAGAR PANEL BETON

120,0

129,4
70,0
71,4
60,0
47,4

110,0
50,0

100,0
80,0

90,0
L=58 METER
40,0

1.6

2.8
AREA PARKIR /
BERHENTI SEMENTARA
MOBIL / TRUK
30

11
,0

SALURAN JALAN
GRASS BLOCK
20
,0 1 BAK PENERIMA

2 BAK PENGENDAP
10,0
3 SLUDGE DRYING BED

4 BAK PEMBAGI

5 IPAL (ANAEROB AEROB BIOFIL)

6 RUMAH JAGA

9
7 SUMUR BOR

PAGAR BRC 6 8 MENARA AIR


L=61 METER

9 SEPTICKTANK
10
10 GERBANG PINTU MASUK

11 JALAN AKSES
PELAKSANAAN PEMBANGUNAN
KONDISI SAAT INI
BAR SCREEN BAK PENERIMA PIPA INLET BAK PENGENDAP RABIC PRO (TANKI REKATOR)

EFLUENT

SAMPAH YANG
LOLOS KE TANKI
BAK SDB REAKTOR
MASS BALANCE

Kesetimbangan Karakteristik Kimiawi Supernatan


HASIL UJI EFLUEN DENGAN SISTEM
SEJENIS IPLT KOMPAK BANDUNG
No Parameter Inlet Outlet Baku Mutu
1 pH 7,19 7,19 6,0 – 9,0
2 BOD 250,89 4,58 30
3 COD 681,77 14,59 100
4 TSS 412,00 11,00 30
5 Minyak & Lemak 26,00 < 0,94 5
6 Amonia (NH3) 3,52 0,80 10
7 Total Coliform 8400 94 3000
(dok. inlet - outlet)
Pemeriksaan konsultan Evaluasi: 25&28 Agustus 2017

Berdasarkan kualitas effluent yang didapatkan, telah memenuhi baku mutu untuk semua
parameter.
Efisiensi removal:
a. BOD = 98,2% d. Amonia = 77,3 %
b. COD = 97,8% e. Total Coliform = 98,9%
c. TSS = 97,3%
Sampling Outlet
PERMASALAHAN PENGOPERASIAN

FOOT SCREEN
PIPE

Truk tinja tidak dilengkapi Pasir dan tanah langsung SDB, tidak berfungsi
penyaring pipa, sehingga, masuk ke tangki sebagai pengering lumpur
sampah, tanah lempung pengendap sehingga halus, oleh karena
dan pasir terbawa dengan tangki pengendap mampat tersumbat tanah dan hal
lumpur tinja,diperkirakan karena pasir dan lumpur ini menyebabkan pipa-
mencapai 20%-30% tidak tertahan di bak pipa di SDB menjadi
volume tangki penerima mampat
Rencana Penyempurnaan IPLT
Bak Penerima Eksisting
1. Penambahan barscreen dengan kerapatan 2 cm dengan lebar 3 m.
2. Penambahan kisi-kisi barscreen eksisting dari kerapatan 4cm menjadi 2
cm.
3. Penambahan fine screen (dot screen) 0,3 m x 3 m dengan lubang
berdiameter 0,5 cm
4. Perubahan pipa penguras lumpur dari Pipa baja menjadi saluran terbuka.

Bak Prasedimentasi
Merubah letak Pipa Inletl dari bawah Tanki ke atas bagian Tanki.

Penyempurnaan Unit IPLT

1. Bak Penerima lengkap dengan Screen Padatan


2. Bak Settling Thickener
3. Sludge Drying Bed
Lay out Penyempurnaan IPLT
1. Bangunan Bak Penerima Eksisting
2. Pra Sedimentasi
3. Bak Penerima (rencana)
B
C 141.0 D

8.7 4. 4.0Settling15.3Thickener
4.0 7.0 (rencana)
1.6 4.0 15.9 4.0 1.5 26.0 2.51.5 6.0 16.1
1.1
26.7
5. SDB (rencana) 24.0
62.5 9.3 6.8

28.8
7
8


 









 
  

 


SETTLING
00 MH2
MH1 PENERIMA
2

 
  

 


11.0
+114,50


SDB

 
 






5 4 2%

3
SDB 
 

 



 



 

 



 

3
4

1 1
TANKI5 AAFB
PAN EL

+117,00
+117,50
+116,00 +115,00 +114,00
5.0

120,0

129,4
60,0

70,0
71,4
47,4

110,0
50,0

100,0
80,0

90,0
40,0

1.6

2.8
30
,0

SALURAN JALAN
Profil Hidrolis Penyempurnaan
Atap +118.40
Lantai +117.25
Top Pipa Drain +117.05
Top Pipa Drain +116.25
TOP Bak +117.35
Jalan +117.00 Muka Air +116.35
Top Pipa Inlet +114.48
Top Pipa Drain +114.50 Dasar Pipa Inlet +114.38
Dasar Pipa Drain +114.40 MA +114.62

  Bordes Bak +114.78
Sirtu Dipadatkan




Lantai+116.25 +114.55 MT +114.33


1% 1% 
 


Lantai Bak +114.35


Lantai SDB +113.32 Lantai SDB +113.20 Lantai Bak +112.63
BAK PENERIMA BAK PENGENDAP SLUDGE DRYING BED SUMPIT PEMBAGI BAK REAKTOR







 
SKALA 1 : 250

Atap +118.40
Lantai +117.25
Top Pipa Drain +117.05
Top Pipa Drain +116.25

Jalan +117.00 +116.875 +116.27

+116.19
+115.01
Sirtu Dipadatkan +114.26 +114.06



Lantai+116.25 +114.56

BAK PENGENDAP 
 
 
 
 
 
 
 
 
 
 


+114.27
+112.41
PRASED BAK PEMBAGI IPAL (ANAEROB AEROB BIOFIL)







 
SKALA 1 : 250






MA. +114.62 Atap Beton Bak +114.78




 Top Pipa Inlet +114.48 Top Bak +114.63 Top Pipa Outlet +112.43
M A.M AKS

PIPA Ø 200 mm
+115.53 Dasar Pipa Inlet +114.38 Dasar Pipa Outlet +112.33
MT +114.33 MT +114.33

 
 
 
 
 
 
 
 
 
 


KE BAK PEMBAGI 


 

 

Lantai Bak +112.63


SDB BAK PENGENDAP BAK PEMBAGI TANKI AFBR
SLUDGE CAIRAN






Kesetimbangan Karakteristik Kimiawi Supernatan
(Penyempurnaa)
Optimalisasi Bak Penerima Dan Bak Pra
Sedimentasi Eksisting
Bar Screen Eksisting
Bar Screen #2cm

200

Bak Pra Sedimentasi


0
270
Fine Screen (Dot Screen)
10 12 12 10
64 98 64

Sirtu

1000

50
BIOGAS
+ 116.83 PIPA BYPASS
INLET ND.150 mm
Pas.1/2 Bt.merah

300 150 350

50
Sirtu Dipadatkan GATTER

50

20
11
150150 1900 1900 150 800 150150

80
BIOBALL
4750 DINDING COR BETON
5050 PELINDUNG TANGKI

Bak Penerima + 114.87 LUBANG Ø 1,5"


PIPA Ø 25 MM PIPA OUTLET
Ø 150 mm PVC

240
10

50
10 10
+ 114.87

DOP Ø 150 mm
LUBANG Ø 1.5"
10

50

50
PIPA OUTLET
10 10 Ø 100 mm PVC

+ 114.22

5
PASIR URUG
DIPADATKAN

25
10
LANTAI KERJA

20 20 250 20 20

POTONGAN A - A
SEKALA : 1 : 20
Settling Thickener
BAR SCREEN #2CM

BAR SCREEN #2CM

160
FINE SCREEM (DOT SCREEN)

160
30
MUKA JALAN RENC
(UNLOADING)

20

50
MUKA JALAN
2%

20 25
50

5
20
MUKA JALAN EKS. MUKA JALAN EKS.

20 25
5
LANTAI KERJA T-5CM
LANTAI KERJA T=5CM
PASIR URUG 20 CM
PASIR URUG T=20 CM

299 20 160 20 22 410 20 200 20


 






 






PINTU AIR

PIPA OUTLET ND.200


PERFORATED WALL

PIPA OUTLET SCUM


PIPA GI.ND.200

50

50
MA.MAKS
MA.Maks.

50
PIPA Ø 200 mm

50
MUKA JALAN MUKA JALAN
220

120

120
BAK PENGENDAP
TANGGA DINDING Ø19 PIPA Ø 200 mm
232

12

20 25

20 25
5

5
VALVE ND.200
100

LANTAI KERJA T=5CM

50
PASIR URUG T=20 CM
20 5 25

LANTAI KERJA T= 5CM


30 20 230 20 60 20 230 20 30
PASIR URUG T=20CM
560
LANTAI KERJA T=5CM PAS.1/2 BT.MERAH 660
PASIR URUG T=20 CM

30 20 100 20 30
80  






30 20 100 100 150 580 20 30


KE SDB

930
930
1030

20 95 20 235  


 580 20
BLIND FLANGE ND.200




PIPA OUTLET SCUM PIPA GI.ND.200
PIPA GI.ND.200
PIPA LUMPUR
KE TANKI PENGENDAP
GI.ND.200
VALVE ND.200 VALVE.ND.200
PIPA OUTLET GI.ND.200
20 30

140

50
20 100 20
100 PIPA DINIDNG GI.ND.200 MA.Maks. MA.Maks.

100
50
PERFORATED WALL
20

PIPA OUTLET GI.ND200


140
100

100
230

120
20

220
20

FINE SCREEN
(DOT SCREEN)

100
20

BAR SCREEN

560

250
50
60

17

PINTU AIR 2%

20 25
5
20

299 20 160 20 22 410 65 100 65 65 100 65


 30 20 230 20 60 20 230 20 30
20

560
230

100

T.200x200 660
BAK PENGENDAP
200 20  





100

BLIND FLANENGE ND.200


VALVE ND.200 VALVE ND.200

  PIPA OUTLET SCUM  


PIPA GI.ND.200

20 100 100 150 580 20

 

 

 

 





Sludge Draying Bed (SDB)



 


30



 



80
170

270
25



 

 
 
 


25 20 980 20 25

25
POTONGAN A-A





50
20 980 20

 40 40 40 40 40
C 
 

90 90 90 90 90
25 20 180 20 180 20 180 20 180 20 180 20 25
20

1020
60




POTONGAN B-B




20


























































670

500











B B




















 












170



 

320
80

80

80

80

80

25

A A
20


80 80 80 80 80 
 
 

50


 
 

20

50



 
C
20 180 20 180 20 180 20 180 20 180 20 25
25 20 60 20 500 20 25 25 20 25
1020
POTONGAN C-C
DENAH 







Rekapitulasi Rencana Anggaran Biaya
Penyempurnaan IPLT CIBINONG
NO U R A I AN JUMLAH HARGA

1 PEKERJAAN PERSIAPAN 17,099,305.57

2 PEKERJAAN TANAH 73,205,550.00

3 OPTIMALISASI BAK PENERIMA EKSISITING 52,261,959.48

4 OPTIMALISASI BAK PRASED EKSISTING 80,765,713.84

5 REGENERASI MEDIA SDB EKSISTING 36,472,585.50

6 BAK SETTLING THICKENER 211,456,343.66

7 SLUDGE DRYING BED 508,747,095.49

8 JALAN UNLOADING TANKI 43,767,102.60

JUMLAH 1,023,775,656.14
PPN (10 %) 102,377,565.61
TOTAL 1,126,153,221.75
DIBULATKAN 1,126,153,000.00

BIAYA OM : 9.000.000.
Operator (2 org) : Rp.5.000.000/Bln
Pembersihan lumpur SDB: Rp.2.000.000/Bln
Listrik : Rp.1.920.000/Bln
TERIMA KASIH
ALTERNATIF PENYEMPURNAAN(2)

Initial Cost :
1. Bak Penerima & Bak
Pengendap :
Rp.275.000.000
2. SDB : Rp.400.000.000
3. Perbaikan Bak Penerima
eksisting+Penggantian
Peralatan lainnya Manual
Bar screen
Rp.100.000.000
4. Total = Rp. 775.000.000
Biaya OM : Rp.9000.000
• Operator (2 org) :
Rp.5.000.000/Bln
• Pembersihan lumpur SDB:
Rp.2.000.000/Bln
• Listrik : Rp.1.920.000/Bln
ALTERNATIF PERBAIKAN (3)
LESS ENERGY
Kelebihan :
• Kebutuhan listrik kecil
• Lingkungan kotor dan timbul bau
• Biaya investasi & operasi sedang
• Dibutuhkan tenaga kasar & rajin

Kekurangan :
• Setiap saat membersihkan
sampah yg tersangkut di screen
secara manual
• Setiap hari pada akhir operasi,
wajib mengosongkan padatan
dari bak pengendap ke SDB
secrara manual
• Rutin melakukan
pembersihan/pencucian pasir
SDB setiap minggu

Anda mungkin juga menyukai