Anda di halaman 1dari 2

PRICE LIST KAVLING MENAGGIO SUPER PI AS OF NOV, 9TH 2016

(TAHAP 2)
Dalam Ribuan Rupiah (,000)
NO UK KAV LUAS TUNAI
No. JALAN TIPE
UNIT (M2) TNH KERAS

1 MENAGGIO BARAT 3 5B STD 8 X 17 136 1,768,600

2 MENAGGIO BARAT 3 7A STD 8 X 17 136 1,786,400

3 MENAGGIO BARAT 3 7B STD 8 X 17 136 1,786,406

4 MENAGGIO BARAT 3 9 STD 8 X 17 136 1,786,412

5 MENAGGIO BARAT 3 11 STD 8 X 17 136 1,742,800

6 MENAGGIO BARAT 3 15A STD 8 X 17 136 1,742,802

7 MENAGGIO BARAT 5 6B STD 8 X 17 136 1,649,300

8 MENAGGIO BARAT 5 8A STD 8 X 17 136 1,708,200

9 MENAGGIO BARAT 5 8B STD 8 X 17 136 1,708,202

10 MENAGGIO BARAT 5 10 STD 8 X 17 136 1,683,000

11 MENAGGIO BARAT 5 12 STD 8 X 17 136 1,683,009

12 MENAGGIO BARAT 5 16 STD 8 X 17 136 1,683,017

CARA PEMBAYARAN:
TUNAI KERAS
- Uang Tanda Jadi (UTJ) : Rp. 50.000.000,- (pada saat transaksi)
- Pembayaran DP (30% - UTJ) : Hari ke 15 setelah UTJ
- Pelunasan (70%) : Hari ke 30 setelah UTJ

HARGA SUDAH TERMASUK: HARGA BELUM TERMASUK:


1. PPN Tanah 1. BPHTB (Biaya Perolehan Hak Atas Tanah & Bangunan)
2. Biaya AJB (Akta Jual Beli) & Balik Nama Sertifikat HGB
3. IMB (Izin Mendirikan Bangunan)
4. Biaya Penyambungan Daya Listrik
5. Biaya Penyambungan Air Bersih
6. Biaya Penyambungan Telepon

KETERANGAN:
- Unit yang sudah dibeli tidak dapat ditukar dengan unit lainnya
- Uang Tanda Jadi harus disetor ke Kasir Developer (tidak menerima reserve & titipan booking )
- Uang Tanda Jadi tidak dikembalikan jika terjadi pembatalan pembelian
- Untuk mengetahui stok unit yang masih tersedia silakan menghubungi Kantor Pemasaran
- Harga dan ketentuan dapat berubah sewaktu-waktu tanpa pemberitahuan terlebih dahulu
- Proses penandatanganan PPJB dilakukan setelah pembayaran lunas
- Serah terima bulan ke 12 atau bulan ke 24 setelah penandatangan PPJB
- Jaminan kenaikan harga dihitung 12 bulan atau 24 bulan sejak penandatangan PPJB

Anda mungkin juga menyukai