SPESIFIKASI TEKNIS

PEKERJAAN :
1. PENGUKURAN AWAL / UITZET a. Pengukuran harus dilaksanakan oleh tenaga pengukur yang terampil dan menggunakan alat ukur Theodolith atau sejenisnya. b. Hasil pengukuran dilapangan harus dinyatakan dengan tandatanda berupa cat warna merah dan patokpatok.

d. Hasil akhir pengurugan dan pemadatan harus diukur dengan alat ukur waterpass yang disaksikan oleh Direksi Lapangan dengan dibuat berita acara pengukuran lapangan.

TECHNICAL SPECIFICATION
CONSTRUCTION WORK
1. INITIAL MEASURING / UITZET

a. The measuring must be carried out by skilful technician and using Theodolith measuring instrument or of the same type. b. The result of the field measuring must be stated in red paint and pegs. c. The initial measure / uitzet is drafted in Report of Initial Measurement, signed by all parties involved, and used to do the next measurings. 2. GROUND HARDENING

c. Pengukuran awal / uitzet ini akan dituangkan dalam Berita Acara pengukuran awal (uitzet) yang ditandatangani semua pihak yang terlibat, untuk dipakai sebagai pedoman bagi pengukuran selanjutnya. 2. PEKERJAAN LAHAN PEMATANGAN

a. Stripping Pemborong harus menyediakan alatalat berat untuk melaksanakan pembersihan lahan dari segala kotoran seperti tanaman, pohon, rumput alangalang dll. Semua jenis kotoran tersebut dibuang ke luar lokasi. b. Untuk mencapai elevasi yang diinginkan, kontraktor harus mengadakan pengurugan dengan sirtu dengan padat dozer dan walles/road roller atau vibro sehingga dicapai CBR minimal 80%. c. Pemadatan dilaksanakan dengan per lapis, setiap lapis setebal 40 cm disiram dengan air hingga kenyang agar didapatkan hasil yang optimal.

a. Stripping Contractor must set the heavy equipments ready to do the ground cleaning from any plants, trees, grass, and bush. All of these waste must cleared and sent out of the location. b. To obtain the intended elevation, the contractor must do the ground hardening using sandy soil, solidified with buldozer, stamper, or vibrator in order to obtain the minimum of CBR 80%. c. The hardeing must be done layer by layer, one layer is about 40cm, sprayed with sufficient water to obtain maximum hardening.

d. The final result of the filling and hardening must be measured using waterpass, witnessed by the field of Board Director, stated in a report of filed measureing.

3. PEKERJAAN GALIAN a. Setelah pekerjaan pematangan lahan dinyatakan selesai dengan level yang telah ditentukan dan CBR yang telah memenuhi syarat maka dilakukan uitzet lagi untuk menentukan titiktitik kolom/pondasi. b. Pada titik kolom ditandai untuk dilakukan galian pondasi. c. Kedalaman galian sesuai gambar selanjutnya dipadatkan kembali. 4. CETAKAN DAN LANTAI KERJA a. Cetakan yang dimaksud adalah untuk membuat begesting dari papan 3/30 pada pekerjaan poer. Jika di lapangan mengalami kesulitan akibat sirtu yang mudah longsor. b. Lantai kerja yang dimaksud adalah bahan dari plastik tebal yang dihampar di seluruh permukaan yang telah dipadatkan dengan dibantu pakai paku agar plastik tidak bergelombang. c. Setelah pekerjaan diatas selesai maka dilakukan pembesian yang diteruskan pengecoran. d. Pekerjaan lantai kerja dengan plastik tidak boleh bocor oleh air semen.

3. THE DIGGING a. After the field ground structure is stated also have been done with the level and CBR set up in qualified standard, uitzet shall be made again in order to locate the points for foundation. b. In the points located, the ground is dug for foundation. c. The depth of the dug is in accordance to the drawing and shall be hardened.

4. THE BLOCK AND THE WORKING FLOOR a. The block is meant to make stands from board of 3/30 for poer work,in case there is difficulty due to the sandy soil that easily slide. b. The working floor is meant to be from thick plastic spread all over the surface that has been previously hardened, supported with nails so that thepalstic does not wave. c. After the above works are done, the steeling is done and continued with concreting. 2

d. The platic working floor must not leak when poured with wet cement.

susah didapatkan, dipakai split.

maka

dapat

d. S e m e n. Semen yang digunakan harus terdiri dari satu jenis merk dari mutu yang baik dan atas persetujuan Direksi. e. Besi Beton a. Baja tulangan secara umum adalah baja tulangan polos dengan mutu baja U24 yakni bagian tulangan yang didalam gambar perencanaan ditandai dengan huruf f untuk diameter pengenalnya. Semua f tulangan yang ada mempunyai toleransi + 0.5 mm. b. Baja tulangan yang akan digunakan dalam pelaksanaan hendaknya harus dilakukan pengujian laboratorium lebih dahulu atau bersertifikat dari pabrik yang membuat dengan mutu kekuatan tarik minimal au = 2080 kg/cm2. 5. PEKERJAAN BETON a. A i r. Air yang digunakan harus air tawar yang bersih dan tidak mengandung minyak, asam, garam, alkalis dan bahan-bahan organis/bahan lain yang dapat merusak beton. b. Pasir dan koral. Pasir beton harus terdiri dari pasir dengan butir-butir yang bersih dan bebas dari bahan-bahan organis, lumpur dan sebagainya dan memenuhi komposisi butir serta kekerasan yang tercantum dalam PBI 1971 dan PB 89. c. Koral / kerikil Koral yang digunakan harus bersih, bermutu baik dan mempunyai gradasi serta kekerasan sesuai dengan syaratsyarat yang dicantumkan dalam PBI 1971dan PB 89. Apabila koral yang memenuhi persyaratan tersebut diatas

5. CONCRETE WORK a. Water The water used must be fresh water and does not contain any oil, acid, salt, alcelic, and other organic which are capable of damaging the concrete. b. Sand and coral The sand and coral used must consist of crystal sand and clear from any organic materials, mud, and others and meets the composition and the level of hardness as stipulated in PBI 1971 and PB 89. c. The Coral / rock The coral used must be clean, in good quality, having grade and hardness as per stipulated in PBI 1971 and PB 89. When such coral is difficult to obtain 3

with the above requirements difficult to obtain, split is acceptable.

is

d. Cement The cement used must consist of one mark of cement from qualified grade and approved by the board of directors. e. Steel wire rod mesh a. The steel wire mesh used in general is made of ordinary steel wire with the quality of U24. That is the framing as in the draft figure marked with f for diameter marking. All framing marked with f carries + 0.5 mm as the toleration. b. Steel wire mesh to be used in this work shall have a prior laboratory test or certified from the manufacturing factory with the standard draging quality of minimum au = 2080 kg/cm2.

pemasangan tulangan lewatan dan lain-lain) harus memenuhi PBI 1971 dan PB 89. f. Sebelum pengecoran rangkaian tulangan harus sudah dilengkapi dengan beton decking yang jumlah, penempatan dan mutunya harus disetujui Direksi. Demikian pula seluruh bagian yang akan terisi beton harus dibersihkan dari segala macam kotoran. g. Baja-baja tulangan yang akan dipakai sampai saat akan dilakukan pengecoran beton harus bebas dari kotoran, lemak atau karat serta kotoran-kotoran lain yang dapat mengurangi daya rekat antara campuran agregat beton dengan tulangan itu sendiri. h. Untuk kotoran berupa karat dapat dipergunakan bahan kimia penghilang karat (Rust Remover) yang tidak mengurangi diameter dan kekuatan baja tulangan. Untuk penggunaan bahan kima tersebut kontraktor harus memperoleh petunjuk yang jelas dari produsen dan persetujuan dari pengawas.

c. Baja tulangan yang didatangkan di lapangan pekerjaan tidak diperkenankan langsung dikerjakan sebelum mendapatkan pembenaran / persetujuan dari direksi. d. Bila baja tulangan yang tercantum di dalam gambar ternyata tidak ada atau sulit ditemukan di pasaran, kontraktor pelaksana harus segera mengajukan permintaan ijin secara tertulis yang dilampiri dengan rencana perubahan beserta perhitungan teknisnya. e. Perlakuan pelaksanaan tulangan (penyambungan - pembengkokan,

c. Steel wire for meshing sent inot the field is not allowed to be done directly without correction and approval from the board of directors. d. When the steel wire stipulated in the draft picture cannot be obtained or difficult to obtain in the market, the contractor must soon propose to obtain the written permission attached with technical calculation. e. The treatment of the meshing (connecting, bending, and wiring, etc.) must meet the standard as stipulated in PBI 1971 or PB 89. f. Prior to the cementing, the mesh 4

must be completely supported with the cement-decking with the amount, placement, and the quality must be approved by the board of directors. This is also applied to all parts of the cementing, and they must be cleared from any waste. g. The steel mesh to be used, upon the cementing, must be cleare from any waste, oil, fat, or stain and any other waste so that the tightness and the aggregate between the steel and the mix is not reduced. h. The waste in the form of stain can be removed using stain buster (rust remover) which does not reduced the diameter and the strength of the steel wire mesh. For the use of such chemical furmula, the contractor must obtain prior approval from the producer and approval from the supervisor.

sebelumnya, dan selanjutnya akan dilakukan joint inspection. b. Pengecoran hanya boleh dilaksanakan bila : - Kontraktor telah menyelesaikan pekerjaan penulangan dan bekisting serta pemasangan beton decking secara sempurna dan bersih serta telah mendapatkan persetujuan sesuai hasil joint inspection. - Kontraktor telah menyediakan bahan, peralatan dan persiapan tenaga serta dinyatakan dalam daftar bahan alat dan tenaga kerja. - Kontraktor telah membuat schedulle rencana pengecoranan dan metode teknik pengecoran berupa gambar tata letak bahan serta arah pengecoran. c. Selama pekerjaan pengecoran Kontraktor harus melaksanakan halhal sebagai berikut : - Pengujian slump test dan test kubus beton yang diperoleh harus sesuai dengan yang disyaratkan PBI 1971 dan PB 89.

f. Adukan Beton a. Adukan beton struktur harus memenuhi mutu karakteristik beton K225 sesuai dengan rekomendasi dalam PBI 1971 dan PB 89 atau dengan pendekatan campuran 1Pc : 1,5Ps : 2,5 Kr. g. Pengecoran Beton a. Apabila Kontraktor Pelaksana hendak memulai pekerjaan pengecoran beton, maka Kontraktor harus memberitahukan secara tertulis kepada Direksi kapan pengecoran dilaksanakan. Paling lambat 1 x 24 jam

f. Cement Mix a. The structure of the cement mix must meet the characterized quality of cement mix K225 as per recommended in the PBI 1971 and PB 89 or with the approach of the mix of 1Pc : 1,5Ps : 2,5 Kr. g. The Concreting (cement blocking) a. When the contractor is initiating the job of concreting (cement blocking), the contractor must notify the board of directors in written about the time and the date of the concreting, at 5

least within 1 x 24 hours in advance, and the joint-inspection is carried thereafter. b. The concreting can be done only if: - The contractor has finished the meshing and the framing and cement decking perfectly and clearly, and has obtained approval as per joint-inspection. - The contractor has prepared the materials, equipment, and the rediness of the labor and these are stipulated in the listing of materials, equipment, and labor. - The contractor has prepared the schedule of cementing and the technique of cementing in the form of draft showing the location of the marerials and the direction of the cementing. c. During the cementing, the contractor must do the following works: - The slump-testing of the cement square tubes and must be obtained in accordance with the standard as stipulated in PBI 1971 and PB 89.

yang telah ditentukan. d. Pemeliharaan Beton a. Kontraktor pelaksana diwajibkan melindungi beton yang baru dicor terhadap sinar matahari langsung, angin dan hujan sampai beton mengeras secara wajar. b. Kontraktor Pelaksana diwajibkan menghindarkan pengeringan yang terlalu cepat dengan caracara seperti semua permukaan beton yang tidak terlindung harus ditutup dengan karung goni basah selama perkiraan pengikatan awal berlangsung dan selanjutnya digenangi dengan air selama 14 hari sejak saat pengecoran, kecuali ditentukan lain oleh Direksi. 6. PEKERJAAN ANKER Semua anker kolom dan partisi dilakukan oleh pihak Blue Scope dengan sistim cor Dinabolt Injection sehingga pengecoran pada poer permukaannya rata sama dengan plat. 7. PEKERJAAN DILATASI a. Jalur dilatasi sesuai gambar. b. Lebar dilatasi 15 mm, pada bagian bawah terisi stereo foam pada bagian atas setebal 20 mm diisi aspal sheet atau shealent delation.

- Pemadatan beton dengan menggunakan vibrator. Pelaksanaannya harus dilakukan secara semestinya yakni pencelupan vibrator harus diusahakan tegak lurus secara perlahan-lahan demikian juga penarikan vibrator. Selama pengecoran, vibrator tidak boleh disentuhkan tulangan dan bekisting. - Memenuhi syarat Setting Time

- The hardening of the cement mix using the vibrator. The hardening must be done as standardized; the vibrator immersion and the pulling back must be done vertically upright slowly. During the cementing, the vibratoer is not allowed to touch the mesh and the framing. - Meeting the reqiurements of 6

Setting Time set up in advance. d. Cement Mix Maintenance a. The contractor is required to protect the newly cemented concrete from the direct sunshine, wind, and rain until the concrete hardens naturally. b. The contractor is is required to avoid the rush drying by way of covering the surfaces of the concrete which are unprotected using wet gunny bags as long as the first tightening going and flooding the with water for 14 days since the day of the cementing, unless otherwise decided by the board of directors. 6. ACHORING JOB All of the anchors and partition are done by the Blue Scope by applying Dinabolt Injection system of cementing so that the cementing on the poer surface is equally balanced with the plate. 7. DILATATION JOB a. The track of dilatation shall be in aacordance with the draft. b. The width of the dilatation is 15 mm, and in the lower part is filled with stereo foam, and in the upper part (20 cm) is filled with the asphalt sheet or shealent delation.

8. PEKERJAAN RETTAINING WALL a. Jalur Rettaining Wall sesuai gambar yaitu seluruh bagian tepi keliling bangunan. b. Ukuran dan dimensi sesuai gambar. c. Pelaksanaan pekerjaan bersamaan dengan pekerjaan drainase. d. Pada Retaining wall yang dilakukan dengan perkuatan konstruksi harus dilaksanakan dengan hati-hati, terutama pada tahap penggalian tanah untuk pondasi. e. Penambahan Pondasi untuk perkuatan konstruksi menggunakan Pondasi Caisson, kedalaman pondasi harus mencapai minimal 1 m dibawah tanah asli atau sesuai gambar. f. Pasangan batu untuk retaining wall menggunakan campuran 1pc : 4ps. g. Disarankan untuk pekerjaan penggalian pondasi dilakukan dengan cara manual, pemakaian alat berat pada pekerjaan ini tidak direkomendasikan.

c. Anker dilatasi dipasang f16 300 dengan jarak 1,00 m, satu sisi mati / permanen sisi lain hidup / bergerak dengan cara diselongsong pipa PVC f1.

c. The anchor of dilatation is positioned f16 300 with the distance of 1,00 m, 7

one side death / permanent the other side alive / movebale by way of piping using PVC of f1. 8. RETAINING WALL JOB a. The track of Rettaining Wall shall be as drafted and all parts of the circle of the building. b. The measurement and the dimension shall be as drawing. c. The job is done together with drainage system implementing. d. Retaining wall construction must be set up carefully, especially due to the soil digging for the foundation. e. Additional Foundation as a construction reinforcement applied Caisson Foundation. f. Stone masonry for Retaining wall applied cement mortar with mixture 1pc : 4s. g. Soil excavation for Foundation should be manually, applying heavy duty equipment are not suggested.