BATUBARA

DISAJIKAN OLEH: DR. CHAIRUL NAS


PADA WORKSHOP PERTAMBANGAN BATUBARA
BIDS CONSULTING BANK MANDIRI
JAKARTA - 13 MEI 2013
COAL
A readily combustible rock containing
more than 50 percent by weight and
more than 70 percent by volume of
carbonaceous material, including
inherent moisture. It is formed from
plant remains that have been
compacted, indurated, chemically
altered, and metamorphosed by heat
and pressure during geologic time.
TAHAP TAMBANG BATUBARA
1. EKSPLORASI FS
- RISET REKON PEMETAAN GEOLOGI
- EKSPLORASI RINCI STUDI KELAYAKAN
2. PERENCANAAN TAMBANG
- RANCANGAN TAMBANG PERALATAN TAMBANG
- SKEDUL TAMBANG BIAYA TAMBANG DLL
3. KONSTRUKSI/PENGEMBANGAN TAMBANG
- INFRASTRUKTUR, KANTOR, BENGKEL, PLANTS, PRASARANA
LINGKUNGAN
- PERUMAHAN, GUDANG, DLL
4. OPERASI PRODUKSI
- PEMBERSIHAN, PENGUPASAN PENGAMBILAN
- PENUMPUKAN, PENGANGKUTAN PENGOLAHAN
- PEMANTAUAN DAN PENGELOLAAN LINGKUNGAN
5. PENUTUPAN TAMBANG
- REKLAMASI PENATAAN LINGKUNGAN
KEGIATAN UTAMA
PERTAMBANGAN BATUBARA
1. EKSPLORASI BATUBARA (1-2-3-4)
2. PERENCANAAN TAMBANG BATUBARA (5)
3. PEMBERSIHAN LAHAN TAMBANG
4. PEMB. INFRASTRUKTUR TAMBANG (KONSTRUKSI)
5. PENGUPASAN TANAH PUCUK (6)
6. PEMINDAHAN TANAH PENUTUP (7)
7. PENGAMBILAN BATUBARA (8-9)
8. PENIRISAN TAMBANG
9. PENGUKURAN TAMBANG (MINE SURVEY)
10. PENGANGKUTAN BATUBARA (10)
11. PREPARASI & PENANGANAN BATUBARA (11-12)
12. PENUMPUKAN BATUBARA (13-14)
13. PEMUATAN BATUBARA (15)
14. PENJUALAN BATUBARA
KEGIATAN PENUNJANG
PENGUJIAN KUALITAS BATUBARA (17-18)
PEMELIHARAAN (PERALATAN, JALAN, GEDUNG, KANTOR)
REKLAMASI DAN PENGHIJAUAN (19-20-21)
PENGEMBANGAN MASYARAKAT SEKITAR (25-26-27)
ACCOUNTING
INFORMATION TECHNOLOGY (IT)
TRANSPORTASI (22)
KESEHATAN (23)
PERUMAHAN (24)
CATERING
KEAMANAN (SECURITY)
SISTEM KOMUNIKASI
DIKLAT
REKRUITMEN
PENELITIAN
KEGIATAN PELENGKAP

PENYEDIAAN TEMPAT REKREASI


SARANA OLAH RAGA
PEMBANGUNAN TAMAN-TAMAN
PENYEDIAAN SARANA PERTOKOAN