Main topic:
TAHAPAN SDLC
STUDI KELAYAKAN
KONVERSI
Dilakukan karena
Kebutuhan bisnis
Perkembangan teknologi
Perkembangan bisnis proses
Efisiensi Biaya
Peningkatan produktivitas
SDLC
DeLegasi pengambilan keputusan
Integrasi sistem
Sistem Lama yang tidak stabiL
70 66
54
30
PiC Pengembangan Sistem
LATE
CANCELED
UNSUCCESSFUL
OVER BUDGET
Manajemen
Akuntan
standish group
Analis Sistem
American Management Systems Programmer
found that:
Project Development Team
75% of proyek pengembangan
sistem tidak digunakan IS Steering Committee
Generate meaningless reports or Pihak EksternaL
inaccurate data
>> System Development Life CycLe (SDLC) / System Life CycLe (SLC)
Implementation
Physical Design
& Conversion
AnaLisis Sistem
Cutting Edge
TechnoLogy Penggunaan Teknologi Terbaru
Investigasi AwaL
Mengapa sistem dikembangkan, masalah sistem sekarang,
cost and benefit new system, harapan dan tujuan
Survey sistem
Identifikasi kelebihan dan kekurangan sistem
Dilakukan Oleh:
Manajemen, Akuntan, auditor internal, pengelola sistem,
user
Meliputi
Technical Feasibility
Operational Feasibility
Legal Feasibility
Scheduling Feasibility
Economic Feasibility
ECONOMIC FEASIBILITY
Cost vs Benefit
Menggunakan metode NPV, Payback Period, IRR
Types of Resistance
Aggression - active
Projection - neutraL
Avoidance - passive
GANTT Chart
Complete
Testing
In Development
Milestone
ConceptuaL Design
Output
Prepare Data storage
Design
Input
Specifications
Processing procedures and operations
Prepare
Conceptual
Systems
Design Report
outsourcing
In House DeveLopment
Shelf (OTS) men- user eskternal
Canned develop
sendiri
Turnkey
System
ASP
PhysicaL Design
FiLe and
Database
Memperhatikan:
Design Storage medium, Processing mode, Maintenance, Size, Activity level
Input Memperhatikan:
Design Input medium, Input source, Input format, Input type, Volume,
Personnel, Frequency, Cost, Error detection and correction
System manuals
Procedures User instruction classes
Design Training materials
Online help screens
MeLiputi:
ControL Validity, Authorization,
Design Accuracy, Security, Numerical
control, Availability, Integrity
Maintainability, Audit trail
#3: Accounting Information System S D L C 1577.ws
16
Sub topic:
ImpLementasi Sistem
& Konversi
Conceptual
Systems
System Design
Implementation
and Physical
Conversion Systems
Design
Prepare Site;
Complete
Install and Test
Documentation
Hardware
Implementation Conversion
Planning
Select and Train Test
Personnel System
Operation
and
Maintenance
1577.ws
l Pengujian Sistem
Acceptance test
Tipe-tipe cutover:
Percontohan (pilot)
Sistem diujicoba pada satu subset keseluruhan operasi
Serentak (direct/immediate)
Sistem lama langsung diganti sistem baru
Paralel
Sistem baru dan sistem lama dijalankan bersamaan
Operation &
Maintenance
Yang Direview:
Goals and Objectives
Satisfaction
Cost and Benefit
Reliability
Acccuracy Compatibility
Timeliness Controls and security
Errors
Training
Communications
Organization changes
Documentation
ardhiana.ws@gmail.com
|
#3: Accounting Information System S D L C 24