TINJA
OLEH :
KEMENTERIAN KESEHATAN RI
POLITEKNIK KESEHATAN SEMARANG
JURUSAN KESEHATAN LINGKUNGAN
PURWOKERTO, 2014
1
DAFTAR ISI
LATAR BELAKANG
PERENCANAAN SARANA PEMBUANGAN
TINJA TIPE JAMBAN
PERENCANAAN SARANA PEMBUANGAN
TINJA TIPE ALIRAN AIR
2
LATAR BELAKANG
3
PERENCANAAN SARANA
PEMBUANGAN TINJA TIPE JAMBAN
CONTOH SOAL 1 :
JAWABAN:
4
KEDALAMAN
TOTAL
KEDALAMAN
EFEKTIF
JAWABAN:
6
PERENCANAAN SARANA PEMBUANGAN
TINJA SISTEM ALIRAN AIR
PERENCANAAN SEPTIC TANK
CONTOH SOAL 1 :
(UNTUK SEPTIK TANK + SUMUR PERESAPAN)
BUATLAH RENCANA SEPTIK TANK & SISTEM PERESAPANNYA APABILA
DIKETAHUI DATA-DATA SBB :
• JUMLAH PEMAKAI = 9 ORANG
• VOLUME ALIRAN LIMBAH CAIR = 200 L/ORANG/HARI
• ANGKA PERESAPAN TANAH = 5 MENIT/INCH
• PERIODE PENGURASAN SEPTIK TANK = 4 TAHUN SEKALI
• WAKTU PENAHANAN CAIRAN DLM TANGKI = 24 JAM
• LEBAR SEPTIK TANK = 1,2 M
• RATIO PANJANG : LEBAR SEPTIK TANK = 2 : 1
• DIAMETER SUMUR PERESAPAN = 0,8 M
• KEDALAMAN MUKA AIR TANAH = 5 M
• JARAK DASAR INLET SUMUR PERESAPAN KE MUKA TANAH = 0,4 M
• PERSYARATAN JARAK MUKA AIR TANAH KE DASAR SUMUR
PERESAPAN = 3 M
CATATAN : GUNAKAN TABEL-TABEL YG DIPERLUKAN UNTUK DESAIN
SEPTIK TANK
7
PIPA VENTILASI
PASANGAN
BAFEL/PENAHAN RUANG UDARA KEDAP AIR
ALIRAN
TUTUP RUANG
PENGENDAPAN TUTUP
INLET TUTUP
DARI WC B
A
OUTLET C
PASANGAN
KEDAP AIR RUANG LUMPUR
KETERANGAN :
A = TANGKI PEMBUSUKAN (SEPTIC TANK))
B = BAK PEMBAGI (DISTRIBUTION BOX) PASANGAN MINIMUM 3 M
C = SUMUR PERESAPAN (SEAPAGE PIT) REMBES AIR
a) RUANG UDARA :
TENTUKAN KETINGGIAN ZONA UDARA SESUAI STANDAR (T1) = 0,3 M
b) RUANG PENGENDAPAN :
VOL LIMBAH CAIR 1 HARI = 9 ORANG X 200 L = 1.800 L = 1,8 M3
LUAS PENAMPANG SEPTIK TANK = (2 X 1,2 M) X 1,2 M = 2,88 M2
JADI TINGGI RUANG PENGENDAPAN (T2) = 1,8 M3 / 2,88 M2 = 0,625 M
c) RUANG LUMPUR :
VOL LUMPUR 4 TH, 9 ORANG, 30 L/OR/TH = 4 X 9 X 0,03 M3 = 1,080 M3
LUAS PENAMPANG R. LUMPUR = LUAS PENAMPANG R.
PENGENDAPAN = 2,88 M2
JADI TINGGI RUANG LUMPUR (T3) = 1,080 M3 / 2,88 M2 = 0,375 M
9
B. PERENCANAAN SUMUR PERESAPAN
10
DENGAN DEMIKIAN SPESIFIKASI SUMUR PERESAPAN YANG HARUS DIBUAT
ADALAH SBB :
11
GAMBAR LAY OUT
SISTEM SEPTIK TANK
YANG AKAN DIBANGUN
C3
C2 C4
C1
C5
D A B
C6
C9
KETERANGAN : C8 C7
A = SEPTIK TANK
B = BAK PEMBAGI
C = SUMUR PERESAPAN
D = WC
12
CONTOH SOAL 2 :
(UNTUK SEPTIK TANK + SALURAN PERESAPAN)
13
PIPA VENTILASI
DARI WC B
A
OUTLET C
PASIR KERIKIL
PASANGAN PIPA DGN
KEDAP AIR RUANG LUMPUR BAGIAN BAWAH
BERLUBANG-
LUBANG
KETERANGAN :
A = TANGKI PEMBUSUKAN (SEPTIC TANK))
B = BAK PEMBAGI (DISTRIBUTION BOX)
C = SALURAN PERESAPAN
14
JAWABAN :
a) RUANG UDARA :
TENTUKAN KETINGGIAN ZONA UDARA SESUAI STANDAR (T1) = 0,3 M
b) RUANG PENGENDAPAN :
VOL LIMBAH CAIR 1 HARI = 9 ORANG X 125 L = 1.125 L = 1,125 M3
LUAS PENAMPANG SEPTIK TANK = (2 X 1 M) X 1 M = 2 M2
JADI TINGGI RUANG PENGENDAPAN (T2) = 1,125 M3 / 2 M2 = 0,5625 M
c) RUANG LUMPUR :
VOL LUMPUR 4 TH, 9 ORANG, 30 L/OR/TH = 4 X 9 X 0,03 M3 = 1,080 M3
LUAS PENAMPANG R. LUMPUR = LUAS PENAMPANG R.
PENGENDAPAN = 2 M2
JADI TINGGI RUANG LUMPUR (T3) = 1,080 M3 / 2 M2 = 0,54 M
15
PERENCANAAN SALURAN PERESAPAN
17
GAMBAR LAY OUT
SISTEM SEPTIK TANK
YANG AKAN DIBANGUN
D A B C
KETERANGAN :
A = SEPTIK TANK
B = BAK PEMBAGI
C = SALURAN PERESAPAN
D = WC
18
PENGOLAHAN LUMPUR TINJA
CONTOH SOAL :
DIKETAHUI :
VOLUME LUMPUR TINJA YG HARUS DIOLAH OLEH IPLT 224 M3/HARI DGN
KANDUNGAN LUMPUR KERING 150 MG/L, BOD5 1400 MG/L , KADAR AIR 45% &
BERAT JENIS 1,56
DITANYAKAN :
BERAPA UKURAN TANGKI DIGESTER ANAEROBIK YG DIBUTUHKAN ?
JAWABAN :
A. VOLUME LUMPUR & BEBAN BOD5 :
150 MG/L X 224 M3/HARI
VOLUME LUMPUR & AIR = = 430 M3/HARI
1,56 X (“YIELD COEFFICIENT” = 0,05)
BEBAN BOD5 = 1400 MG/L X 224 M3/HARI = 314 KG/HARI
A LUMPUR DIPROSES
LUMPUR
STABIL DI A = DIGESTER ANAEROBIK
ALIRKAN KE
SLUDGE B = SLUDGE DRYING BED
DRYING BED
LUMPUR STABIL
20
SEKIAN
WASALLAMU’ALAIKUM WR WB
21