April 2016
Teknik Geologi, Universitas Trisakti
EKSPLORASI MINERAL (BATUBARA) : Upaya/ kegiatan untuk
menemukan deposit mineral dan endapan batubara, yang dapat
ditambang secara ekonomis
Eksplorasi menjadi kegiatan UNIK yang tidak semua orang bisa memahami.
EKSPLORASI !!!
GOLD (+COPPER) MINE – LAPSE TIMES
Contract
Mine Owner Status Signed Production Lapse
Lebong Tandai Billiton (CSR) Closed 1985 1986 1
Gosowong Newcrest Closed 1997 1999 2
Wetar Billiton Closed 1986 1991 5
Ertsberg Freeport Closed 1967 1973 6
Pongkor Antam Production 1988 1994 6
Kelian Riotinto Closed 1985 1992 7
Mt. Muro Aurora Closed 1985 1994 9
Kencana Newcrest Production 1997 2006 9
Mesel Newmont Closed 1986 1996 10
Rawas Laverton Closed 1986 1997 11
Cibaliung Austindo/ Antam Production 1998 2010 12
Batu Hijau Newmont Production 1986 1999 13
Mt. Muro West Straits Production 1985 2004 19
Grasberg Freeport Production 1967 1989 22
Average Lapse Time (Years) 9.5
ASPEK KUNCI UNTUK MENYUSUN STRATEGI EKSPLORASI
1. JENIS KOMODITI
Umum di Indonesia: Au, Cu, Ag, Pb, Zn, Ni, Cr, Co, bauksit, bijih besi, pasir besi,
batubara, mineral industri
Potensi target masa depan: REE, uranium, Ni sulfida
General Geology IUP Application Mapping (geology Drilling Geology Model Pre Feasibility Study
Forestry Statues IPPKH Expl and Geophysical) - Scout Drilling - Lithology / Seam - Metalurgycal Mapping
Landuse Socialization Trenching - Resource Drilling - Quality - Infrastructure Assesment
Coal /Mineral Potential Test Pitting - Reserve Drilling - Alteration - Enviromental Assesment
Soil Sampling Scooping Study - Density - Pre Design Criteria
Database Ore Definition - Geotechnical - Modifyng Factor Recognize
Scout Drilling Bulk Sampling Test - Pre design pit LOM
Metalurgical Test Resource Calculation
Geotechnical Test - Inferred Reserve Calculation
- Indicated - Proven
- Measure - Probable
General Detail
Exploration Exploration
$ 1-5 m $ 5-50 m
Geophysics – Aero mag and Aero radiometric Detail Geology Mapping
Geochemical – Stream Sediment Sampling (80#, 200#, BLEG) Detail Soil Sampling
Geophysical : Ground Magnetic and IP
Mapping Drilling :
- Mapping Geology - Scout Drilling
- Rock and Rock Genesis - Resource Drilling
- Mineralisasi / Coal - Reserve Drilling
- Alteration
- Stratigraphy Scooping Study
- Use Traverse line (GPS or Chain and Compass Specific Quality Test (Simple leach test; Bottle Role Test etc )
- Spur and Ridge Soil Mapping and Sampling (Auger, Leach Sampling) Bulk Sampling Test ( Metalurgical Test , Column Test, Bulk Production Test etc )
- Trenching, Test Pit Geotechnical Test ( Point Load, WI, Plasticity, etc )
Hydrology Test ( Rain Fall, Packer Test etc)
Database Collection
Scout Drilling
- Assure continuity of outcrop KEY OF SUCCESS
- To get fresher samples
1. Good Geologist ( Competent Geologist) that understand about MINING
2. Good and appropriate Drilling Equipment
KEY OF SUCCESS 3. Good Drilling Plan to get Inferred > Indicated > Measured Resource.
4. Good SOP
1. Good Geologist 5. Good QAQC
2. Good Standart Operation (SOP) 6. Good Sampling Methods
3. Good Equipment 7. Expert Involvement
4. Expert Involvement
TAHAPAN EKSPLORASI MINERAL
Area of Interest Odds of finding
economic deposit
Time Cost/Km2 Typical Stage Method
<1:100,000 •
Area Selection •
In-house expertize
Published data review
1-6 100-10,000Km 2
To select, regions with favourable mineral potential and
$2-5 • Mineral deposit models
months >1:5,000 secure exploration/ mining contract/ licenses • literature studies
• Geology
Reconnaissance • Geochemistry
3-12 100-1,000Km 2
$100- To indetify mineralized areas and screen-out those not worth • Image interpretation
months 500 >1:1,000 further exploration • Geophysics
• Geology
$500,000- Exploration • Drilling
1-2 2-5Km2 1 million To preliminarily define deposits in 3D, estimate indicated • Geochemistry
years resources and screen-out worth further investigation • Geophysics
>1:10
• Geology
1-3Km2
Detailed Exploration • Drilling
To delineate ore bodies in detail, estimate measured resources, provide • Resource estimation
$3-1 million sufficient data to allow reserves to be estimated and allow a decission • Metallurgy
2-3
to be made whether to proceed to a feasibility study • Geotechnical
years • Mine design
• Environmental
>1:2 • Financial
Toka Tindung
Lanut Gosowong
Buduk Mt. Muro
Kelian Kencana
Mesel
Rawas
Mt. Muro West
Lb Tandai
Pongkor Grasberg
Way Linggo
Cibaliung
Wetar
Cikidang
Batu Hijau
PRIMARY GOLD + COPPER DEPOSITS/ OCCURENCES
Motomboto
Mirah
Paboya
Ojolali
Wabu
Awak Mas
Elang
Tujuh Bukit
Pangulir
SIMPLIFIED MAGMATIC ARC AXES
MAGMATIC ARCS vs GOLD ENDOWMENT
Non Magmatic Arc
Total Au: 237 Moz 0.76 Moz
INDONESIA GOLD ENDOWMENT
Au (Moz) (status by Dec 2014)
Au (Moz)
140.00&
120.00& 113.52&
Magmatic Arc
100.00&
80.00&
68.69&
60.00&
20.00& 14.88&12.44&
10.94&
5.12& 4.09& 3.83& 1.53&
0.76& 0.51& 0.46& 0.38&
0.00&
&
&
Eastern&
Sulawesi&
Western&
Kalimantan&
&
Sulawesi&
Halmahera&
Banda&
MoonJUtawaJObi&
MeratusJSumatera&
Papua&
Arc&
Schwanner&
Aceh&
Sunda&
&
Sunda&
&
North&
&
West&
Central&
MagmaI c&
Non& &
MAGMATIC ARC vs Endowment Cu,Au,Ag
(MGEI-IAGI, 2015)
ENDOWMENT (SUMBERDAYA) Au, Ag, Cu di INDONESIA
(MGEI – IAGI, 2015)
EXPLORATION WORKS
1. Preliminary survey (“grass root exploration”) – area
selection, reconnaissance, prospecting, general survey:
• Stream sediment prospecting
• Airborne geophysic surveys
• Interpretation (structures) from satellite imageries
• Regional geological mapping including rock sampling
4. Feasibility Study
• Grid pattern drilling for resource definition, metalurgical tests, etc
• Sampling for resource definition, met tests, geotechnic tests
• Geological modelling (domain concept, etc)
• Resource + reserve estimation
Obyek utama dalam pekerjaan eksplorasi DATA
DEFINISI
• Sampel (conto) adalah bagian terbatas dari populasi statistik yang dipelajari
untuk mendapatkan informasi dari keseluruhan populasi (Webster, 1985)
• Sampling (pengambilan conto) adalah tindakan, proses, atau teknik memilih
sampel yang sesuai atau yang mewakili populasi untuk tujuan menentukan
parameter atau karakteristik dari seluruh populasi
SAMPLING
• Metode sampling bervariasi, mulai dari sampel yang diambil dengan
sederhana pada singkapan batuan hingga dengan pemboran
• Mineralisasi di level permukaan sering kali kabur/tidak jelas karena
tertutup overburden, atau lapuk atau “leaching” di kedalaman
tertentu, sehingga mengaburkan sifat mineralisasinya.
DATA ----- sampling (cont.)
PENANGANAN SAMPEL
• Nomor sampel yang unik
• Tanggal pengambilan sampel
• Dokumentasi menyeluruh atas pengambilan sampel di lapangan
• Sampel harus dijaga agar tidak ada perubahan kimia atau
terkontaminasi dari saat pengumpulan dengan waktu analisis
• Sisipkan sampel standard, blank dan duplikat di interval tertentu
QA/ QC
• Semua orang yang terlibat dalam pengambilan data (sampel) harus
memiliki pengalaman dan keahlian yang diperlukan.
• Tanggung jawab untuk menjaga konsistensi dan memastikan
pengambilan data yang dapat diterima dan diverifikasi kualitasnya
melalui penerapan program QA / QC.
DATA ----- sampling (cont.)
RESO
URCE
+
RESE
RVE
MOD
EL
&
PROD
GEOCHEMICAL
UCTI
ANALYSIS
ON
&
GEOLOGICAL
INTERPRETATION
SAMPLING
&
GEOLOGICAL CLASSIFICATION
SAMPLING
&
GEOLOGICAL OBSERVATION
Technical Data RESOURCE + RESERVE ESTIMATION PROCESSES
• Jadi apun kemajuannya, Geologist haurs tetap bersiap diri dengan paham dan
menguasai konsep2 dasar geologi dan pergi ke lapangan. The man behind the
gun
Terima kasih
zardidahlius@yahoo.com