AC AC PA AC AC PA AC AC AC PA AC
N N N
Ma Ma
T M M M M2* T* M M
C C 1 2 1 1 C2 C
SIV, LB,MRe,MCTR BAT, MG, LB,MRe,MCTR BAT, MG, SIV, MaC LB,MRe,MCTR BAT, MG,
FUSE SIV ,DS,EXS CM ,DS,EXS CM, MaC ,DS,EXS CM,
300A, TM TM TM TM TM TM
KONTAKT TM
TM TM TM TM TM
OR SIV FUNGSI SIV SEBAGAI CATU DAYA UNTUK :
(OUTPUT TEGANGAN 440 VAC)
1. AIR CONDITIONONG (AC),
2. UNIT KOMUTASI TM.
FUNGSI CM SEBAGAI CATU UDARA TEKAN UNTUK : FUNGSI MG SEBAGAI CATU DAYA UNTUK :
1.SISTEM PNEUMATIK PENGEREMAN, (OUTPUT TEGANGAN 200 VAC)
2.PNEUMATIK BUKA TUTUP PINTU, 1.SISTEM KONTROL (100 VAC),
3.OPERASI WIPER, 2.PENGISIAN BATEREI,
4.SISTEM SULING, 3.SISTEM PENERANGAN RUANGAN,
5.SUSPENSI, 4.SISTEM FAN RUANGAN PENUMPANG,
6.LINE BREAKER. 5.SISTEM KONTROL TENAGA.
STATIC INVERTER
PANTOGRAPH
STATIC INVERTER
M2 M2 MC2
5. PASTIKAN SAKELAR SIV DI T DAN TC PADA POSISI ON,
TC T
6. PASTIKAN SAKELAR AC, LAMPU, FAN DAN BEBAN LAIN TIAP KERETA
PADA POSISI ON,
Rabu 7 April 2021 KRL TYPE SERI 1000 / 5000 9
7. NFB BAT ON, DAN YAKINKAN PADA VOLTMETER BATEREI
MENUNJUK TEGANGAN ± 90V (SALAH SATU KABIN)
8. TEKAN TOMBOL PANTO UP (± 5 DETIK), DAN YAKINKAN PADA
VOLTMETER TT MENUNJUK ± 1500V (SALAH SATU KABIN)
9. NFB MG ON, DAN YAKINKAN PADA VOLTMETER BATEREI
TEGANGAN MENCAPAI ± 100V (SALAH SATU KABIN)
10. NFB CM ON, YAKINKAN TEKANAN ANGIN PADA MANOMETER
NORMAL (SALAH SATU KABIN)
11. SW. LAMPU DAN BEBAN LAINNYA BILA DIPERLUKAN ON
(SALAH SATU KABIN)
12. TEKAN TOMBOL AC ON PADA BOX KONTROL AC DI KABIN
13. LAKUKAN TES FUNGSI OPERASI (LAMPU BESAR, PINTU, SULING,
WIFER, INTERCOM, DLL)
14. COS UNTUK KABIN KERJA PADA POSISI F, BLK POSISI R
15. LAKUKAN TES FUNGSI PENGEREMAN SEBELUM KRL DIJALANKAN.