00 Desain Operasi Peledakan
00 Desain Operasi Peledakan
PELEDAKAN
UU YG
UU YG MENGATUR
MENGATUR TTG
TTG 3
BAHAN PELEDAK
BAHAN PELEDAK
LANDASAN HUKUM
BAHAN PELEDAK
BAHAN PELEDAK
a)
c)
b)
DETONATOR
STRENGTH DETONATOR
Stemming Stemming
Stemming
Primer
Charge
Primer ANFO
Spacer
ANFO
Stemming
Charge
ANFO
Spacer
Primer Bottom
Column Loading
Deck Loading Spacer Loading
BEFORE LOADING EXPLOSIVE
LOADING WEAK ZONE
LOADING
STEMMING
LOADING WET HOLE
Detonator
Connecting Wire
To Firin g Cable
Rangkaian Seri
To Firing Cable
Detonator
Connecting
Wire
Rangkaian Paralel
RANGKAIAN PELEDAKAN
To firing cable
Detonator
Rangkaian Seri-Paralel
5 set of
6 detonators
Rangkaian Paralel-Seri
BLAST TIMING
BLAST TIMING
BLAST TIMING
BLAST TIMING
“V” Pattern
BLAST TIMING
Row by Row
BLAST TIMING
Echelon Pattern
SAFETY COME FIRST !!!
THANK YOU
AN IMPORT INDONESIA
Tahun 2002 – 2010 (MT)
500675
500000
442107
400000
340608
300433
300000 277579
248000
200000
159106
144387
126487
100000
0
2002 2003 2004 2005 2006 2007 2008 2009 2010
250,000
195,000
200,000 175,000
170,000
160,000
150,000
50,000 54,1%
43,5% 43,6% 43,7%
0
2001 2002 2003 2004 2005 2006 2007
Kebutuhan Nasional Pangsa Pasar MNK
Penggunaan AN di Indonesia
Cements
3.7% Others
1.0%
Gold/Metal
26.0%
Coal
69.2%