Presentasi PHO T3P2
Presentasi PHO T3P2
3. Penataan Kawasan
d. Tangga 1 buah
5. Saluran Drainase
STA 3+100 s.d Ujung
a. U-ditch 100x100 209 m
KSOP
b. U-ditch 40x40 125 m Sta 3+100 s.d 3+225
PARAPET
TANGGA
STA 3+225
JALAN MASUK
RCP Ø 50 cm
PARAPET
STA 3+175
SALURAN U-DITCH 40
PAVING BLOCK
JALAN MASUK
SALURAN CROSSING
CAPPING BEAM
RCP Ø 50 cm
RUMPUT
Lampu
PARAPET
Capping Beam
STA 3+125
Beton K-225, semen tipe 5
Tanah Merah Timbunan Sirtu Elv. +4.80
U-ditch 100cmx100cm
Dolken Ø10cm 3.00 3.00
Galian Timbun lagi
L=400cm tiap 1m 1:
± 1 meter Geotextile Non Woven 2
Sesek Bambu
Rakit Bambu 3 lapis ر80mm.
SALURAN WARGA
Geotextile Non Woven STA 3+100
Sesek Bambu
Rakit Bambu 3 lapis ر80mm.
KONDISI 0%
KONDISI 100%
DOKUMENTASI LOKASI KALIBARU BARAT RW 09
KONDISI 0%
KONDISI 100%
DOKUMENTASI LOKASI KALIBARU BARAT RW 09
1. Penataan Kawasan
d. Tangga 1 buah
2. Saluran Drainase
LAYOUT
POT. MELINTANG
LOKASI KALIBARU TIMUR
KONDISI 0%
KONDISI 100%
LOKASI KALIBARU TIMUR
KONDISI 0%
KONDISI 100%
LOKASI KALIBARU TIMUR
PENATAAN KAWASAN
SALURAN DRAINASE
PENINGKATAN STRUKTUR PENGAMAN PANTAI
SISI TIMUR PPS NIZAM ZACHMAN (MUARA BARU)
PEKERJAAN LOKASI MUARA BARU
300 A
STA 0+
+1.60
275 A
STA 0+
250 A
STA 0+
225 A
STA 0+
200 A
STA 0+
175 A
STA 0+
150 A
STA 0+
125 A
ST A 0+
100 A
STA 0+
075 A
STA 0+
+1.60
050 A
STA 0+
000 A
STA 0+
10.00
Geotextile Non Woven
Sesek Bambu
Rakit Bambu 3 lapis ر80mm.
KONDISI 100%
LOKASI MUARA BARU (PENINGKATAN STRUKTUR)
KONDISI 0%
KONDISI 100%
TERIMAKA