Anda di halaman 1dari 252

BAB III

PERHITUNGAN GORDING



3.1 PERHITUNGAN ATAP
3.1.1 Goding

Direncanakan

Jarak Kuda-kuda




=



4



m

Panjang Batang Kuda-kuda = 7 m
Sudut = 30
Beban Pekerja
= 100 kg (PPPURG hal. 7)
Berat Penutup Atap Genteng = 50 kg/m
2
(PPPURG hal. 6)
Tekanan Tiup Angin = 25 kg/m
2
(PPPURG hal.18)
Berat Sendiri Gording = 11 kg/m
Mutu baja BJ. 37 Fu = 370 Mpa
Fy = 240 Mpa
Modulus Elastisitas E = 200000 M pa
Gording yang dipakai = C 150.75 .20.4,5
Bentang bawah = 1.75 m
Bentang atas

=
1.75
cos 30

=


2,0207 m
Jarak antar gording

= 1 m
























Gambar 3.1 Denah Rencana Atap






1 m

1 m

1 m

1 m






















Gambar 3.2 Rangka Atap

Pembebanan yang bekerja :

1. Berat Sendiri gording ( qu )

2. Berat sendiri Penutup Atap

3. Be ban Air Hujan (H)

4. Beban Angin ( W )

5. Beban Pekerja ( P )


Pembebanan Gording

Profil Kuda-kuda

Gording (C.150.75.20.4,5)
2 m qu




2 m




Mmax

Gambar 3.3 Pembebanan Gording

Dimensi Gording

Digunakan gording baja C 150.75.20.4,5

Didapat dari table profil konstruksi baja 1987 ( Ir. Rudy Gunawan)
Berat sendiri profil (q) = 11 kg/m



Luas profil ( A ) = 13,97 cm
2


Ix =

489 cm
4


= 4,89 x 10
-6
m
4

m
4
Iy = 99,2 cm
4
= 9,92 x 10
-7

h = 150 mm = 15 cm
b = 75 mm = 7,5 cm
tf = 20 mm = 2 cm
tw = 4,5 mm = 0.45 cm

Cek Kekompakkan Penampang

Pelat Sayap ( Menurut SNI 03-1792-2002 hal 29-31)
b
=
2tf
75
=
2 x20

= 1.825



< p Penampang
p = 170 / fy = 170 / 240 = 10.97 Kompak
< r
r = 370 / fy - fr = 370 / (240 - 115) = 33,09


Pelat Badan ( Menurut SNI 03-1792-2002 hal 29-31)

=
h 2tf

150 mm

=

- 2 . 4,5

= 31,33

tw 4,5 mm
< p
p =1680 / fy = 1680 / 240 = 108,44 Penampang Kompak
< r
r =
2550 /

fy
=
2550 / 240
= 164,60

Jadi, Penampang Kompak Momen nominal (M
n
) = Momen Plastis ( M
p
)


A = 150 . 4,5 + ( 66 . 4,5 ) .2 = 1449 mm
2
= 14,49 cm
2



A 1449

=
2
mm2
2

= 724,5 mm
2
= 7,245 cm
2


A

150 . 4,5 + ( X 4,5 ) . 4,5 . 2 =
2

675 + 9X 40,5 = 724,5 mm
2


9X = 90

X = 10























































Gambar 3.4 Dimensi Profil Gording


Zx = 2.((75.4,5).37,5+(66 . 4,5).72,75+(20.4,5).65)

= 80226 mm
3

= 80,226 cm
3





Zy = (150.4,5).7,75+(5,5 . 4,5).2,75.2 + (60,5 . 4,5).30,25.2+(20.4.5).62,75.2

= 21838,5 mm
3

= 21,8385 cm
3


Mnx = Zx .fy
=
=
=
80226 mm
3
x 240 N/mm
2

19254240 Nmm
19,25424 KNm

Mny = Zy. fy
= 21838,5 mm
3
x 240 N/mm
2

=
=
5241240 Nmm
5,24124 KNm

Analisis Pembebanan terhadap Gording
a. Beban Mati (qd)
= Berat sendiri gording + (Berat penutup atap x Jarak gording)

= 11 kg/m+(50 kg/m
2
x 1 m)

= 61 kg/m

= 0,61 KN/m

qx = qd x sin 30
o


= 0,61 KN/m x sin 30
o


= 0,305 KN/m

qy = qd x cos 30
o


= 0,61 KN/m x cos 30
o


= 0,5283 KN/m

Mx = 1/8 qy. L
2


= 1/8 x 0,5283 KN/m x (4m)
2


= 1,0566 KNm

My = 1/8 qx. L
2


= 1/8 x 0,305 KN/m x (4m)
2


= 0,61 KNm

y
qSin



x
q Cos



b. Beban Hidup (ql)

1. Beban Pekerja = 100 kg

Px = 100 kg x sin 30
o


= 50 kg

= 0,5 KN

Py = 100 kg x cos 30
o


= 86,60 kg

= 0,866 KN

Mx = Py . L

= 0,866 KN. 4m

= 0,866 KNm

My = Px . L

= 0,5 KN. 4m

= 0,5 KNm



2. Beban air hujan (qh)

= ( 40 - 0,8 ) kg/m
2
x jarak mendatar gording

= ( 40 - 0,8 ) kg/m
2
x 1 m x cos 30

= 13,86 kg/m

= 0,1386 KN/m

qx = 0,1386 KN/m x sin 30
o


= 0,0693 KN/m

qy = 0,1386 KN/m x cos 30
o


= 0,12 KN/m

Mx = 1/8 qy . L
2


= 1/8 0,1386 KN/m. (4m)
2


= 0,24 KNm

My = 1/8 qx . L
2


= 1/8 0,0693 KN/m.( 4m)
2


= 0,1386 KNm



c. Beban Angin (W)

Untuk menghitung beban gording akibat angin yaitu dengan
mengalikan tekanann tiup yang ditentukan dalam pasal 2.1.3.2 dengan
koefisien-koefisien angin yang ditentukan dalam pasal 2.1.3.3. ( PPURG
hal.18-20)
Angin tekan = (0,02 . 0,4) . Tekanan Tiup Angin . Jarak Gording

= (0,02 . 30 - 0,4) . 25 kg/m
2
. 1 m

= 5 kg/m

= 0,05 KN/m

Angin hisap = - 0,4 . Tekanan Tiup Angin . Jarak Gording

= - 0,4 . 25 kg/m
2
. 1 m

= - 10 kg/m

= - 0,1 KN/m

Karena beban angin hisap memberikan keuntungan pada
konstruksi yaitu dapat mengurangi beban mati, maka untuk perhitungan
selanjutnya beban angin hisap diabaikan.
Mx = 1/8 qx . L
2


= 1/8 0,05 KN/m. (4 m)
2


= 0,1 KNm

My = 0



d. Kombinasi Pembebanan

1. Beban Mati dan Beban Pekerja
Mux = 1,2Mdx + 1,6Mlx

= 1,2 x 1,0566 KNm + 1,6 x 0,8660 KNm

= 2,65352 KNm
Muy = 1,2Mdy + 1,6Mly

= 1,2 x 0,61 KNm + 1,6 x 0,5 KN

= 1,532 KNm
Kontrol kekuatan lentur :
cmx . Mux
Mnx
cmx = 1
cmy = 1
cmy . Muy
Mny

= 1

+ 1
= 0,9

1 1 . 2,65352
0,9 . 19,25424

0,48 < 1
1 .1,532
0,9 .5,24124
1
+ 1
Aman





Kontrol lendutan yang terjadi:
Lendutan Akibat Beban Mati
qdx = 0,305 KN/m

qdy = 0,5283 KN/m

5.qdy.L
4

ox = =


5x 0,5283 KN/m x (4m)
4



= 0,0018 m

384.E.Ix
384 x (2.10
8
KN/m
2
) x 4,89 .10
6
m
4


5.qdx.L
4

oy = =

5 x 0,305 KN/m x (4m)
4


= 0,0051 m

384.E.Iy
384 x (2.10
8
KN/m) x 9,92 .10
7
m
4


om =

om =

(ox
2
+ oy
2
)
(0,0018
2
+ 0,0051
2
)
m = 0,0054 m

m = 0,54 cm


Py

y

x



Ly = 4 m
P Cos
P Sin

Gambar 3.5 Lendutan Akibat Beban Pekerja



Px = 0,5 KN

Py = 0,866 KN

3
3
3
3



x =
1 Py. Lx

48 E . Ix
=
1 0,866 KN . (4m)

48 2x10
8
KN/m
2
. 4,89 . 10
-6
m
4

= 1
0,05667 m
48
= 0,00118 m

y =
1 Px. Ly

48 E . Iy
=
1 0,5 KN . (4m)

48 2x10
8
KN/m
2
. 9,92 . 10
-7
m
4

= 1
0,1613 m
48


om =

om =
= 0,00336 m
(ox
2
+ oy
2
)
(0,00118
2
+ 0,00336
2
)
m = 0,00356 m

m = 0, 356 m

m total = m beban mati + m beban pekerja

= (0,54 + 0,356) cm

= 0,896 cm

m

1
240

x 400 cm

0,896 cm 1,667 cm Aman



2. Beban Mati dan Beban Air Hujan

Beban yang ditinjau adalah beban mati (qd) dan beban air hujan(qh)
Mux = 1,2Mdx + 1,6Mhx

= 1,2 x 1,0566 KNm + 1,6 x 0,24 KNm

= 1,65192 KNm
Muy = 1,2Mdy + 1,6Mhy

= 1,2 x 0,61 KNm + 1,6 x 0,1386 KNm

= 0,95376 KNm
Kontrol kekuatan lentur :
cmx . Mux
Mnx
cmx = 1
cmy = 1
cmy . Muy
Mny

= 1
+ 1
= 0,9

1 1 . 1,65192
0,9 . 19,25424

0,297 < 1
1 .0,95376
0,9 .5,24124
1
+ 1
Aman





Kontrol lendutan yang terjadi:


qu Gording









L= 4 m



Gambar 3.6 Lendutan Akibat Beban Mati dan Beban Air Hujan



Kontrol lendutan yang terjadi:

qx = qdx + qhx

= 0,305 KN/m + 0,0693 KN/m

= 0,3743 KN/m

qy = qdy + qhy

= 0,5283 KN/m + 0,12 KN/m

= 0,6483 KN/m


ox =


5.qy.L
4

=


5x 0,6483 KN/m x (4m)
4



= 0,0022 m

384.E.Ix
384 x (2.10
8
KN/ m
2
x 4,89 .10
6
m
4
)


oy =

5.qx.L
4

=

5 x 0,3743 KN/m x (4m)
4


= 0,0063 m

384.E.Iy
384 x (2.10
8
KN/m
2
) x 9,92 .10
7
m
4






om =

om =
(ox
2
+ oy
2
)
(0,0022
2
+ 0,0063
2
)
m = 0,00667 m

m = 0,667 cm

m

1
240

x 400 cm

0,667 m 1,667 cm Aman



3. Beban Mati dan Beban Angin

Beban yang ditinjau adalah beban mati (qd) dan beban angin (qw)
Mux = 1,2Mdx + 1,3Mwx

= 1,2 x 1,0566 KNm + 1,3 x 0,1 KNm

= 1,39792 KNm
Muy = 1,2Mdy + 1,3Mwx

= 1,2 x 0,61 KNm + 0

= 0,732 KNm


Kontrol kekuatan lentur :

cmx . Mux cmy . Muy

Mnx
+
Mny
1


cmx = 1 = 1
cmy = 1 = 0,9
1 . 1,39792 1 1 .0,732 1

0,9 . 19,25424
+


0,23 < 1 Aman
0,9 .5,24124
1





Kontrol lendutan yang terjadi:

qu Gording









L= 4 m


Gambar 3.6 Lendutan Akibat Beban Mati dan Beban Angin



Kontrol lendutan yang terjadi:

qx = qdx + qlx

= 0,305 KN/m + 0

= 0,305 KN/m

qy = qdy + qly

= 0,5283 KN/m + 0,05 KN/m

= 0,5783 KN/m


ox =


5.qy.L
4

=


5x 0,5783 KN/m x (4m)
4



= 0,0020 m

384.E.Ix
384 x (2.10
8
KN/m
2
) x 4,89.10
6
m
4



oy =

5.qx.L
4

=

5 x 0,305 KN/m x (4m)
4


= 0,0051m

384.E.Iy
384 x (2.10
8
KN/m
2
) x 9,92.10
7
m
4


om =

om =

(ox
2
+ oy
2
)
(0,0020
2
+ 0,0051
2
)
m = 0,0055 m

m = 0,55 cm

m

1
240

x 400 cm

0,55 cm 1,667 cm Aman









Gording (C.150.75.20.4,5)










1,75 m 1,75 m 1,75 m 1,75 m

7 m

sGambar 3.7 Perletakkan Gording




3.1.2 Kuda-Kuda
















Pembebanan

Beban mati
Gambar 3.9 Kuda Kuda

a. Berat sendiri kuda-kuda

- Panjang batang

Batang atas =

1.75m
cos 30

= 2,021m

a
1
= a
2
= ... = a
4
= 2,021 m

Total panjang batang atas = 2,021 m x 4 = 8,084 m

Batang bawah

b
1
= b
2
=......=b
4
= 1,75 m

Total batang bawah = 1.75 x 4= 7 m

Batang vertikal

V
1
= V
3
= tg 30
0
x 1,75 m = 1,011 m x 2 = 2,022 m
V
2
= tg 30
0
x 4,8 m = 2,021 m x 1= 2,021 m
Total panjangbatang vertikal = 4,043 m
Batang diagonal

d
1
= d
6
=

1,75m
cos 30

= 2,021 m

Total batang diagonal = 2 x 2,021 m = 4,042

Total panjang batang = Ba+ Bb + Bv + Bd

= 8,084 +7 m +4,043 m + 4,042

= 23,169 m

2



- Berat Batang

- Direncanakan memakai profil baja siku ( ) 50.50.5

- Berdasarkan buku daftar profil untuk konstruksi baja,luas
penampang profil (F) = 2 x 4.80 cm
2
= 9,60 cm
2
=0,00096 m
2

- Berat jenis baja = 7.850 kg/m
3
(Bedasarkan tabel I SKBI -

1.3.53.1987)

- Maka berat batang kuda kuda adalah:

= panjang total batang kuda kuda x luas penampang x volume
baja
= 23,169 m x 0,00096 m
2
x 7.850 kg/m
3


= 174,6 kg

Berat sendiri kuda-kuda per m'

q =
174,6kg
= 24,94 kg/m

7m

P
1
= P
5
= x 24,94 kg/m x 1.75 m = 21,83 kg

P
2
= P
3
= P
4
= x 24,94 kg/m x ( 1,75 + 1,75 ) m = 43,65 kg
b. Berat penutup atap
- Penutup atap (genteng) = 50 kg/m
2


Jarak antar kuda-kuda = 4 m

q =
50kg / m

cos 30


x4m


= 230,94 kg/m

P
1
= P
5
= x 230,94 kg/m x 1.75 m = 202,07 kg

P
2
= P
3
= P
4
= x 230,94 kg/m x ( 1,75 + 1,75 ) m = 404,15 kg
c. Berat gording
q = n x
B.S.gording
| xLk

| |
\
L
.

keterangan :

n = jumlah gording

B = berat sendiri gording

Lk = jarak kuda kuda

L = panjang betang kuda kuda




= 8x

11kg / m
| x4m

| |
\ 7m .

= 50,29kg/m

Beban simpul pada atap akibat beban gording

P
1
= P
5
= x 50,29 kg/m x 1.75 m = 44 kg

P
2
= P
3
= P
4
= x 50,29 kg/m x ( 1,75 + 1,75 ) m = 88 kg
d. Berat plafon + penggantung
- Berat plafon = 11 kg/m2 (Tabel I SKBI 1.3.53.1987)

- Berat Penggantung= 7 kg/m
2
(Tabel I SKBI 1.3.53.1987)

- Berat total = 11 kg/m2 + 7 kg/m
2
= 18 kg/m
2


- q= 18 kg/m
2
x 4 m = 72 kg/m

P
1
= P
5
= x 72 kg/m x 1,75= 63 kg

P
2
= P
3
= P
4
= x 72 kg/m x ( 1,75+1,75) m = 126 kg
a) Beban mati
EP = berat sendiri kuda-kuda + berat penutup atap + berat gording+
(berat plafn+penggantung)
Kombinasi beban pada masing masing titik simpul

P
1
= P
5
= 21,83 kg+ 202,07 kg + 44 kg + 63 kg

= 331 kg

P
2
= P
3
= P
4
= 43,65 kg + 404,15kg + 88 kg + 126 kg

=662 kg

Jumlah bebab simpul = ( 2 x 331 kg ) + ( 3 x 662 kg )

= 2648 kg

Oleh karena bentuk kuda- kuda simetris maka reasi perletakannya

adalah : RA=RB =


b) Beban hidup

2648 kg
= 1324 kg

2

1. Beban air hujan = ( 40 ( 0,8 x o ))

= ( 40 ( 0,8 x 30
o
))

= 16 kg/m
2





q = 16 kg/m
2
x 4 m

= 64 kg/m

P
1
= P
5
= x 64 kg/m x 1,75= 56 kg

P
2
= P
3
= P
4
= x 64 kg/m x ( 1,75+1,75) m = 112 kg

Jumlah bebab simpul = ( 2 x 56 kg ) + (3 x 112 kg ) = 448 kg

Oleh karena bentuk kuda- kuda simetris maka reaksi perletakannya

adalah : RA=RB =

448
= 224 kg

2

2. Beban pekerja

P
1
= P
5
= 100 kg

P
2
= P
3
= P
4
= 100 kg

Jumlah bebab simpul = 6 x 100 kg = 600 kg

Oleh karena bentuk kuda- kuda simetris maka reaksi perletakannya

adalah : RA=RB =

600
= 300 kg

2

3. Beban angin

Pada PPIUG 83 dinyatakan bahwa tekanan minimum yang
diambil adalah e = 25 kg/m
2
, karena tekanan angin yang bertiup
adalah angin normal. Koefisien angin untuk atap segitiga dengan
sudut kemiringan < 65 .
Beban angin tekan = ((0,02 x o ) - 0,4 ) x e x Lk

= (( 0,02 x 30) 0,4 ) x 25 kg/m x 4 m

= 20 kg/m

Beban angin hisap = - (0,4 x Px b)

= - (0,4 x 25 kg/m x 4m)

= - 40 kg/m

Beban simpul

Beban merata dari angin berkerja tegak lurus terhadap bidang atap.oleh
karena itu penentuan beban simpul dihitung berdasarkan panjang
batang batang atas kuda-kuda:
Panjang batang a
1=
a
2=
a
3=
a
4
= 2,021 m




1. Beban simpul angin tekan :

W
1
= x 20 kg/m x 2,021= 20,21 kg

W
2
= W
3
= x 20 kg/m x ( 2,021 + 2,021) m = 40,42 kg

WV
1
= W
1
x cos o = 20,21 kg x cos 30 = 17,5kg WH
1
= W
1
x sin o = 20,21 kg x sin 30 = 10.11 kg WV
2
=
WV
3
= W
2
x cos o = 40,42 kg x cos 30 = 35 kg
WH
2
= WH
3
= W
2
x sin o = 40,42 kg x sin 30 = 20,21 kg



2. Beban simpul angin hisap :

W
6
= x 40 kg/m x 2,021= 80,84 kg

W
4
= W
5
= x 40 kg/m x ( 2,021 + 2,021) m = 161,68 kg

WV
6
= W
6
x cos o = 80,84 kg x cos 30 = 70 kg

WH
6
= W
6
x sin o = 80,84 kg x sin 30 = 40,42 kg

WV
2
= WV
3
= W
2
x cos o = 161,68 kg x cos 30 = 140 kg

WH
2
= WH
3
= W
2
x sin o = 161,68 kg x sin 30 = 80,84 kg



Menghitung Portal Dengan Menggunakan Program SAP 2000 V.14

Langkah-Langkah Perhitungannya :

1) Buat model struktur kuda - kuda

2) Input data perencanaan :

a. Input data material digunakan material baja ( steel )

- Mutu Beton (Fu) = 370 MPa

- Mutu Baja (Fy) = 240 MPa

b. Input data dimensi struktur batang

- Batang dobeel siku ( ) : 50.50.5

3) Input data akibat beban mati kuda - kuda( Dead Load )

4) Input data akibat beban hidup ( Live Load )

- akibat beban hujan

- Akibat beban pekerja

- Akibat beban angin







5) Input data akibat beban kombinasi

6) Analisis struktur

7) Run analisis



Dimensi batang kuda-kuda

Baja BJ. 37 fy = 240 Mpa
fu = 370 Mpa
E = 2.10
5
Mpa



Kontrol batang tekan

a) Batang atas (batang tekan)

Nu = 31,935 KN ( tekan maksimum )
Profil 50.50.5
Sendi-sendi Kc = 1

L = 2,021 m = 202,1 cm

Lk = L x Kc

= 202,1 x 1 = 202,1 cm

Tebal pelat penyambung (tp) direncanakan 6 mm

A
1
= 4,8 cm
2
( satu profil siku ) dari tabel

2.A
1
= 2. 4,8 cm
2
= 9,60 cm
2


e = 1,40 cm
Ix
1
= 11 cm
4
( satu profil siku)
Ix = 2.Ix
1
= 2.11 cm
4
= 22 cm
4



r
x
=
Ix
=

2.A
1

22
= 1,51 cm

9,6

Iy
1
= 11 cm
4
( satu profil siku)
Iy = 2.Iy
1
+ 2.A
1
( e + tp )
2

= ( 2 x 11 cm
4
) + 9,60 cm
2
x (1,4 cm + .0,6 cm )
2


= 49,74 cm
4



r
y
=
Iy
=

2.A
1

49,74
= 2,28 cm

9,6

c
2



cek kelangsingan :

=
Lk
=

r
x

202,1
= 133,84 < 200

1,51

Syarat < 200 ( memenuhi batang tekan )

=
1
x
Lk
x
fy

t r
x
Es


=
1
x(133,84) x

t
240
2x10
5


c = 1,48 > 1,2

c > 1,2

e = 1,25 x c
2


e = 1,25 x 1,48
2


e = 2,738


Nn =

A
g
. fy
=
9,6 cm

e

x 240 0 kg/cm
2

2,378


= 8414,90 kg


~ 84,14 KN

.C.Nn > Nu C = 0,9

0,9 x 84,14 KN > 31,935 KN

75,73 KN > 31,935 KN ok
b) Batang diagonal (batang tekan) d
Nu = 9,6413 Kn ( tekan maksimum )
Profil 50.50.5Sendi-sendi Kc = 1
L = 2,021 m = 202,1 cm

Lk = L x Kc

= 202,1 cm x 1 = 202,1 cm

A
1
= 4,8 cm
2
( satu profil siku )

2.A
1
= 2. 4,8 cm
2
= 9,60 cm
2


e = 1,40 cm

Ix
1
= 11 cm
4
( satu profil siku)
Ix = 2.Ix
1
= 2.11 cm
4
= 22 cm
4


c
2




r
x
=
Ix
=

2.A
1

22
= 1,51 cm

9,6

Iy
1
= 11 cm
4
( satu profil siku)
Iy = 2.Iy
1
+ 2.A
1
( e + tp )
2

= ( 2 x 11 cm
4
) + 9,60 cm
2
x (1,4 cm + .0,6 cm )
2


= 49,74 cm
4



r
y
=
Iy
=

2.A
1

49,74
= 2,28 cm

9,6

cek kelangsingan :

=
Lk
=

r
x

202,1
= 133,84 < 200

1,51

Syarat < 200 ( memenuhi batang tekan )

=
1
x
Lk
x
fy

t r
x
Es


=
1
x(133,84) x

t
240
2x10
5


c = 1,48 > 1,2

e = 1,25 x c
2


e = 1,25 x 1,48
2


e = 2,738


Nn =

A
g
. fy
=
9,6 cm

e

x 240 0 kg/cm
2

2,378


= 8414,90 kg ~ 84,14 KN

C.Nn > Nu C = 0,9

0,9 x 84,14 KN > 9,641 KN

75,73 KN > 9,641 KN ok

Kontrol batang tarik

a) Batang bawah (batang tarik) b

Nu = 28,137 KN ( tarik maksimum )
Profil 50.50.5
A
1
= 4,8 cm
2
( satu profil siku )




2.A
1
= 2. 4,8 cm
2
= 9,60 cm
2



=
Lk

i

Keterangan :

Lk = panjang tekuk

i = jari jari girasi



i = 0,98 ( dari tabel )


=
175

i

175


=
0,98
= 178,57 < 240
ok


C.Nn > Nu C = 0,9

0,9 x 9,6 cm
2
x 24 KN/cm
2
> Nu

207,36 KN > 28,137 KN





b) Batang vertikal (batang tarik) v

Nu = 9,876 KN ( tarik maksimum )
Profil 50.50.5
A
1
= 4,8 cm
2
( satu profil siku )

2.A
1
= 2. 4,8 cm
2
= 9,60 cm
2



=
Lk

i

Keterangan :

Lk = panjang tekuk

i = jari jari girasi

i = 0,98 ( dari tabel )


=
202,1

i

d2



202,1


=
0,98
= 206,22 < 240
ok


C.Nn > Nu C = 0,9

0,9 x 9,6 cm
2
x 24 KN/cm
2
> Nu

207,36 KN > 9,876 KN













Perhitungan Sambungan Las

Titik simpul rangka batang yang akan dilas

5



2
a1
1
b1
3

a2
a3


v2
v1
d1
4

b2 b3




v3
a4
b4


1,75 m 1,75 m 1,75 m 1,75 m


7 m

Gambar 3.10 Join Join Pada Kuda - Kuda

1. Untuk sambungan titik simpul 1

a. Pada batang a1

Ru = 27,271 KN

Tebal pelat direncanakan 8 mm
direncanakan (Profil 50.50.5 )
baja Bj 37 f
u
= 370 Mpa




f
y
= 240 Mpa
tw = 4 mm
t
e
( tebal rencana ) = tw .0,707

= 4 mm . 0,707

= 2,83 mm

Kuat rencana las sudut

.R
nw
= .t
e
.(0,60.f
uw
) las

= 0,75 x 2,83 mm x 0,6 x 240 N/mm
2


= 305,64 N/mm

.R
nw
= .t
e
.(0,60.f
u
) bahan dasar

= 0,75 x 2,83 mm x 0,6 x 370 N/mm
2


= 471,195 N/mm

Dari kedua perhitungan kuat rencana las sudut diatas diambil nilai yang
paling kecil,maka nilai yang diambil dari perhitungan tersebut adalah
305,64 N/mm

.R
nw
.Lw R
u

R

Lw =
u

| R
nw



Lw =

27,271.10
3


= 89,22 mm

305,64 N/mm






50 mm


14 mm

5 mm

14 mm

50 mm

Gambar 3 .11 Penampang Profil



36 mm

14 mm








Lw 1

Ru1


Ru2
Ru
50 mm


Lw 2

dobel siku ( 50.50.5 )

Gambar 3.11 Gaya Gaya Pada Penampang

R
u1
+ R
u2
= R
U


Ma =0

R
u1
x 50 ) ( R
U
x 14 ) = 0

( R
U
x 14 )

R
u1
=
50


R
u1
=
( 27,271 x 14 )
50

= 7,64 KN

R
u2
= 27,271 KN - 7,64 KN

R
u2
= 19,64 KN


Lw
1
=
7,64 .10
3
N
305,64 N/mm

= 24,99 mm


Lw
2
=
19,64 .10
3
N
305,64 N/mm

= 64,26 mm

Lw
total
= Lw
1
+ Lw
2
= 24,99 mm + 64,25 mm = 89,24 ( oke )
tf tp tf
Lw 1

las sudut


Ru

tf

Lw 2

dobel siku ( 50.50.5 )



Gambar 3.12 Penampang las




b. Pada batang b1

Ru = 23,579 KN

direncanakan (Profil 50.50.5 )
Tebal pelat direncanakan 8 mm
baja Bj 37 f
u
= 370 Mpa
fy = 240 Mpa

tw = 4 mm

t
e
( tebal rencana ) = tw .0,707

= 4 mm . 0,707

= 2,83 mm

Kuat rencana las sudut

.R
nw
= .t
e
.(0,60.f
uw
) las

= 0,75 x 2,83 mm x 0,6 x 240 N/mm
2


= 305,64 N/mm

.R
nw
= .t
e
.(0,60.f
u
) bahan dasar

= 0,75 x 2,83 mm x 0,6 x 370 N/mm
2


= 471,195 N/mm

Dari kedua perhitungan kuat rencana las sudut diatas diambil nilai
yang paling kecil,maka nilai yang diambil dari perhitungan
tersebut adalah 305,64 N/mm

.Rnw .Lw Ru

R

Lw =
u

| R
nw



Lw =

23,579 .10
3
N
= 77,15 mm

305,64 N/mm



36 mm

14 mm











50 mm


14 mm

5 mm

14 mm

50 mm


Gambar 3 .13 Penampang Profil




Lw 1

Ru1



Ru2
Ru
50 mm


Lw 2

dobel siku ( 50.50.5 )



Gambar 3.14 Gaya Gaya Pada Penampang

R
u1
+ R
u2
= R
U


Ma =0

R
u1
x 50 ) ( R
U
x 14 ) = 0

( R
U
x 14 )

R
u1
=
50


R
u1
=
( 23,579 x 14 )
50

= 6,60 KN

R
u2
= 23,579 KN - 6,60 KN

R
u2
= 16,98 KN


Lw
1
=
6,60 .10
3
N
305,64 N/mm

= 21,59 mm





Lw
2
=
16,98 .10
3
N
305,64 N/mm

= 55,56 mm

Lwtotal = Lw1 + Lw2 = 21,59 mm + 55,56 mm = 77,15 mm( oke )


Lw 1

tf tp tf


las sudut


Ru

tf

Lw 2

dobel siku ( 50.50.5 )

Gambar 3.15 Penampang las

2. Untuk sambungan titik simpul 2

Untuk perhitungan batang a2 disamakan dengan perhitungan pada a1 dan
pada batang v1 oleh karena Ru = 0,maka untuk sambungannya disamakan
dengan batang a2 dan a1,sedangkan untuk batang d1 dihitung berdasarkan
perhitungan dibawah ini :

a. Pada batang D1

Ru = 8,997 KN

direncanakan (Profil 50.50.5 )
Tebal pelat direncanakan 8 mm
baja Bj 37 f
u
= 370 Mpa
fy = 240 Mpa

tw = 4 mm

t
e
( tebal rencana ) = tw .0,707

= 4 mm . 0,707

= 2,83 mm

Kuat rencana las sudut

.R
nw
= .t
e
.(0,60.f
uw
) las

= 0,75 x 2,83 mm x 0,6 x 240 N/mm
2




36 mm

14 mm






= 305,64 N/mm

.R
nw
= .t
e
.(0,60.f
u
) bahan dasar

= 0,75 x 2,83 mm x 0,6 x 370 N/mm
2


= 471,195 N/mm

Dari kedua perhitungan kuat rencana las sudut diatas diambil nilai
yang paling kecil,maka nilai yang diambil dari perhitungan
tersebut adalah 305,64 N/mm

.R
nw
.Lw R
u

R

Lw =
u

| R
nw



Lw =

8,997 .10
3
N

= 29,44 mm

305,64 N/mm





50 mm


14 mm

5 mm

14 mm

50 mm

Gambar 3 .16 Penampang Profil

Lw 1

Ru1


Ru2
Ru
50 mm


Lw 2

dobel siku ( 50.50.5 )
Gambar 3.17 Gaya Gaya Pada Penampang

R
u1
+ R
u2
= R
U


Ma =0

R
u1
x 50 ) ( R
U
x 14 ) = 0





R
u1
=
( R
U
x 14 )
50


R
u1
=
( 8,997 x 14 )
50

= 2,52 KN

R
u2
= 8,997 KN 2,52 KN

Ru2 = 6,477 KN


Lw
1
=
2,52 .10
3
N
305,64 N/mm

= 8,24 mm


Lw
2
=
6,477 .10
3
N
305,64 N/mm

= 21,20 mm

Lwtotal = Lw1 + Lw2 = 8,24 mm + 21,20 mm = 29,44 mm( oke )




Lw 1
tf tp tf


las sudut


Ru

tf

Lw 2

dobel siku ( 50.50.5 )


Gambar 3.18 Penampang las




3. Untuk sambungan titik simpul 3

Untuk sambungan pada batang b2 perhitungannya sama dengan
perhitungan b1 dan untuk batang v1 oleh karena R
U
= 0,maka untuk tebal
dan panjang lasnya disamakan dengan batang b1 dan batang b2

4. Untuk sambungan titik simpul 4

Untuk sambungan pada batang b3,b4 perhitungannya sama dengan
perhitungan b1 dan untuk batang d2 disamkan dengan perhitungan batang
d1,sedangkan untuk batang v2 dihitung berdasarkan perhitungan dibawah
ini :




a. Pada batang v2

Ru = 9,876 KN

direncanakan (Profil 50.50.5 )
Tebal pelat direncanakan 8 mm
baja Bj 37 f
u
= 370 Mpa
fy = 240 Mpa

tw = 4 mm

t
e
( tebal rencana ) = tw .0,707

= 4 mm . 0,707

= 2,83 mm

Kuat rencana las sudut

.R
nw
= .t
e
.(0,60.f
uw
) las

= 0,75 x 2,83 mm x 0,6 x 240 N/mm
2


= 305,64 N/mm

.R
nw
= .t
e
.(0,60.f
u
) bahan dasar

= 0,75 x 2,83 mm x 0,6 x 370 N/mm
2


= 471,195 N/mm

Dari kedua perhitungan kuat rencana las sudut diatas diambil nilai
yang paling kecil,maka nilai yang diambil dari perhitungan
tersebut adalah 305,64 N/mm

.Rnw .Lw Ru

R

Lw =
u

| R
nw



Lw =

9,876 .10
3
N

= 32,31 mm

305,64 N/mm



36 mm

14 mm










50 mm


14 mm

5 mm

14 mm

50 mm



Gambar 3 .19 Penampang Profil



Lw 1

Ru1



Ru2
Ru
50 mm


Lw 2

dobel siku ( 50.50.5 )




Gambar 3.20 Gaya Gaya Pada Penampang




R
u1
+ R
u2
= R
U


Ma =0

R
u1
x 50 ) ( R
U
x 14 ) = 0

( R
U
x 14 )

R
u1
=
50


R
u1
=
( 9,876 x 14 )
50

= 2,77 KN

R
u2
= 9,876 KN 2,77 KN

Ru2 = 7,11 KN


Lw
1
=
2,77 .10
3
N
305,64 N/mm

= 9,06 mm





Lw
2
=
7,11.10
3
N
305,64 N/mm

= 23,25 mm

Lwtotal = Lw1 + Lw2 = 9,06 mm + 23,25 mm = 32,31 mm( oke )


Lw 1
tf tp tf


las sudut


Ru

tf

Lw 2

dobel siku ( 50.50.5 )


Gambar 3.21 Penampang las

5. Untuk sambungan pada titik simpul 5

Untuk sambungan pada batang a2 dan a3 perhitungannya sama dengan
perhitungan pada batang a1




3.3 Pelat Lantai

3.3.1 Perencanaan Penulangan Pelat Atap Dak

Pembebanan Pelat Lantai :

1. Beban mati (WD)

Berat pelat lantai

Berat plafond + Penggantung
= 0,09m x 24 KN/m
3


= (0,11+0,7) KN/m
2

= 2,16 KN/m
2


= 0,18 KN/m
2


= 2,34 KN/m
2

2. Beban hidup (WL)

Beban orang



= 1 KN/m
2

Beban hujan

= 0,4 KN/m
2


= 1,4 KN/m
2

3. Beban terfaktor (Wu) = 1,2 WD + 1,6 WL

= 1,2 . (2,34 KN/m
2
) + 1,6 . (1,4 KN/m
2
)

= 5,048 KN/m
2


Beban terfaktor untuk per meter, Wu = 4,648 KN/m
2
x 1m = 4,648 KN/m

Misal :

Diameter tulangan yang digunakan untuk arah x = 8, arah y = 8

Syarat pelat yang berhubungan langsung dengan cuaca, tebal selimut beton ( P )

minimum adalah 40 mm.

Jarak tulangan ( S
max
) = 3 x tebal pelat atau 450 mm

Tinggi efektif arah x
dx = h p
= 90 40 . 8

= 46 mm

Tinggi efektif arah y

dy = h p

= 90 40 8 . 8

= 38 mm

Tahapan-tahapan perhitungan penulangan untuk panel A :

- Menentukan koef ( x ) dari tabel momen per meter lebar dalam jalur
tengah pada pelat dua arah akibat beban terbagi rata. ( Kusuma G, grafik




dan Tabel Perhitungan Beton Bertulang, Penerbit Elangga )
Didapat dari tabel, Panel A merupakan gambar skema III
Interpolasi untuk mendapatkan nilai x


Tipe panel V A
Ly
=
4 m
= 1,54
Lx 2,6 m


Momen
Koefisien x
Ly

= 1,4
Lx
Ly

= 1,6
Lx
M
lx
= 0,001.q.l
x
2
. x
M
ly
= 0,001.q.l
x
2
. x
M
ty
= 0,001.q.l
x
2
. x
M
tix
= M
lx
M
tiy
= M
ly
58

34

108
71

30

111


x = 58 +
71 58
( 1,54 - 1,4 ) = 67,1

1
1,6 1,4
x = 108 +
111 108
( 1,54 - 1,4 ) = 110,1

3
1,6 1,4


x = 34
34 30
( 1,54 - 1,4 ) = 31,2

2
1,6 1,4


- Menghitung Momen Lapangan Arah x

Mlx = 0,001.Wu.Lx
2
.x
1

= 0,001. 5,048. (2,6)
2
.67,1

= 2,108 KNm

= 2,108 x 10
6
Nmm

k =
Mu
=


2,108 x10
6



= 0,605

|bdx
2
0,8x1000x(46)
2



Mu = |..b.dx
2
. fy (1
fy
)

2.0,85. fc'

Mu
|bdx
2


= . fy (1
fy
)

1,7. fc'
Mu
|bdx
2

240
1,7.25
= .240 (1 )

0,605 = 240 1129,412
2


1129,412
2
240 + 0,605 = 0

Rumus abc



1,2
=

b b
2
4ac
2.a



1,2
=

(240) (240
2
) 4(1129,412)(0,605)
2.(1129,412)

=
240 234,24

2258,824


1
= 0,21


2
= 0,00255 ( diambil yang terkecil )

As = . b. dx = 0,00255 . 1000 . 46 = 112,5 mm
2


As
min
= 0,002. b. h = 0,002 . 1000 . 90 = 180 mm
2

As < As
min,
jadi As
perlu
= 180 mm
2


S
max
= 3 x 90 mm = 270 mm S
max
= 270 mm

S
max
= 450 mm

S < S
max

Jadi digunakan
8 270
(As
terpasang
= 186,17 mm
2
)



- Menghitung Momen Lapangan Arah y

Mly = 0,001.Wu.Lx
2
.x
2

= 0,001. 4,648.(2,6)
2
.31,2

= 0,980 KNm

= 0,980 x 10
6
Nmm

k =
Mu
=


0,980 x10
6



= 0,364

|bdy
2
0,8x1000 x(58)
2


Mu
|bdy
2


= .240 (1
240
)

2.0,85.25




1129,412
2
240 + 0,364 = 0

Rumus abc

= 0,001153

As = . b. dy = 0,001153 . 1000 . 66 = 88,604 mm
2


As
min
= 0,002. b. h = 0,002 . 1000 . 90 = 180 mm
2

As < As
min
, jadi As
perlu
= 180 mm
2

Jadi digunakan
8 275
(As
terpasang
= 182,78 mm
2
)



- Menghitung Momen Tumpuan Arah y

Mty = - 0,001. Wu.Lx
2
.x
3

= - 0,001. 4,648.(2,6)
2
.110,1

= - 3,459 KNm

= - 3,459 x 10
6
Nmm

k =
Mu
=


3,459 x10
6



= 1,285

|bdy
2
0,8x1000 x(58)
2


Mu
|bdy
2


= .240 (1
240
)

2.0,85.25

1129,412
2
240 + 1,285 = 0

Rumus abc

= 0,0056

As = . b. dy = 0,0056 . 1000 . 58 = 324,8 mm
2


As
min
= 0,002. b. h = 0,002 . 1000 . 90 = 180 mm
2

As > As
min
, jadi As
perlu
= 319 mm
2

Jadi digunakan
8 150
(As
terpasang
= 335,1 mm
2
)



- Menghitung Mtix

Mtix = Mlx = 2,108 x 10
6
Nmm = 1,054 x 10
6
Nmm

k =
Mu
=


1,054 x10
6



= 0,302

|bdx
2
0,8x1000 x(66)
2

Mu
|bdx
2

240
2.0,85.25
= .240 (1 )

1129,412
2
240 + 0,302 = 0

Rumus abc

= 0,00127

As = . b. dx = 0,00127 . 1000 . 66 = 83,82 mm
2


As
min
= 0,002. b. h = 0,002 . 1000 . 90 = 180 mm
2

As < As
min
, jadi As
perlu
= 180 mm
2

Jadi digunakan
8 275
(As
terpasang
= 182,78 mm
2
)



- Menghitung Mtiy

Mtiy = Mly = 0,980 x 10
6
Nmm = 0,49 x 10
6
Nmm

k =
Mu
=


0,49 x10
6



= 0,182

|bdy
2
0,8x1000 x(58)
2


Mu
|bdx
2


= .240 (1
240
)

2.0,85.25

1129,412
2
240 + 0,141 = 0

Rumus abc

= 0,00076

As = . b. dx = 0,00076. 1000 . 58 = 44,08 mm
2


As
min
= 0,002. b. h = 0,002 . 1000 . 90 = 180 mm
2

As < As
min
, jadi As
perlu
= 180 mm
2

Jadi digunakan
8 275
(As
terpasang
= 182,78 mm
2
)



Perhitungan pelat lantai untuk panel lainnya dihitung dengan cara
yang sama seperti pada perhitungan pelat lantai untuk panel A dan hasil
perhitungan penulangannya dapat dilihat pada tabel 3.2.






Tabel 3.1
Tabel Penulangan Pelat Atap



No
Tipe Panel D x Momen Per Meter
( KNm)
Mu
(KNm)
k =
Mu

|.b.d
2

As=
.b.d
(mm
2
)
As
min

2

(mm )
Tulangan
Terpasang
As
Tulangan
Terpasang
(mm
2
)



1

66
58
58
66
58

67,1
31,2
110,1
-
-

Mlx= 0,001.Wu.lx
2
.x
Mly= 0,001.Wu.lx
2
.x
Mty= -0,001.Wu.lx
2
.x
Mtix = 1/2. Mlx
Mtiy = 1/2. Mly

2,108
0,98
3,459
1,054
0,49

0,605
0,364
1,285
0,302
0,182

0,00255
0,00115
0,0056
0,00127
0,00076

168,3
88,604
324,8
83,82
44,08

180
180
180
180
180

8-275
8-275
8-150
8-275
8-275

182,78
182,78
335,1
182,78
182,78





2

66
58
58
66

58,8
29,9
102,6
-

Mlx= 0,001.Wu.lx
2
.x
Mly= 0,001.Wu.lx
2
.x
2

Mty= -0,001.Wu.lx .x
Mtix=1/2.Mlx

1,847
0,939
3,224
0,924

0,53
0,349
1,198
0,265

0,00223
0,00146
0,00511
0,0011

147,3
84,93
296,66
73,26

180
180
180
180

8-275
8-275
8-165
8-275

182,78
182,78
304,64
182,78




3.3.2 Perencanaan Penulangan Pelat Lantai

Pembebanan Pelat Lantai :

2. Beban mati (WD)

Berat pelat lantai = 0,125 m x 24 KN/m
3
= 3 KN/m
2

Berat plafond + Penggantung = (0,11+0,7) KN/m
2
= 0,18 KN/m
2

Berat Adukan ( tebal 2cm ) = 0,21 KN/m
2
x 2 = 0,42 KN/m
2

Berat penutup Lantai ( tebal 1 cm ) = 0,24 KN/m
2
x 1 = 0,24 KN/m
2


= 3,84 KN/m
2

2. Beban hidup (WL)

Untuk lantai Sekolah, Ruang Kuliah, Kantor, Toko, Toserba, restoran, hotel,
asrama dan Rumah Sakit beban hidupnya adalah sebesar 2,5 KN/m
2
.
( SNI 03-1727-1989-F, Tata cara perencanaan pembebanan untuk rumah dan gedung )


3. Beban terfaktor (Wu) = 1,2 WD + 1,6 WL

= 1,2 . (3,84 KN/m
2
) + 1,6 . (2,5 KN/m
2
)

= 8,608 KN/m
2


Beban terfaktor untuk per meter, Wu = 8,608 KN/m
2
x 1m = 8,608 KN/m

Misal :

Diameter tulangan yang digunakan untuk arah x = 10, arah y = 10

Syarat pelat yang tidak berhubungan langsung dengan cuaca atau tanah, tebal
selimut beton ( P ) minimum adalah 20 mm.
Jarak tulangan ( S
max
) = 3 x tebal pelat atau 450 mm

Tinggi efektif arah x
dx = h p
= 125 20 . 10

= 100 mm
Tinggi efektif arah y
dy = h p
= 125 20 10 . 10

= 90 mm

Tahapan-tahapan perhitungan penulangan untuk panel A :




- Menentukan koef ( x ) dari tabel momen per meter lebar dalam jalur
tengah pada pelat dua arah akibat beban terbagi rata. ( Kusuma G, grafik
dan Tabel Perhitungan Beton Bertulang, Penerbit Elangga )
Didapat dari tabel, Panel A merupakan gambar skema III

Interpolasi untuk mendapatkan nilai x



Tipe panel III

Ly
=
7 m
= 1,75

Lx 4 m






Momen
Koefisien x
Ly

= 1,6
Lx
Ly

= 1,8
Lx
M
lx
= 0,001.q.l
x
2
. x
M
ly
= 0,001.q.l
x
2
. x
M
tx
= 0,001.q.l
x
2
. x
M
ty
= 0,001.q.l
x
2
. x
M
tix
= M
lx
M
tiy
= M
ly
61

22

106

77
67

20

113

77


x = 61 +
67 61
( 1,75 - 1,6 ) = 65,5

1
1,8 1,6


x = 22
22 20
( 1,75 - 1,6 ) = 20,5

2
1,8 1,6


x = 106 +
113 106
( 1,75 - 1,6 ) = 111,25

3
1,8 1,6


x
4
= 77
35








- Menghitung Momen Lapangan Arah x

Mlx = 0,001.Wu.Lx
2
.x
1

= 0,001. 8,608. (4)
2
.65,5

= 9,021 KNm

= 9,021 x 10
6
Nmm

k =
Mu
=


9,021x10
6



= 1,127

|bdx
2
0,8x1000 x(100)
2



Mu = |..b.dx
2
. fy (1
fy
)

2.0,85. fc'

Mu
|bdx
2


= . fy (1
fy
)

1,7. fc'

Mu
|bdx
2


= .240 (1
240
)

1,7.30

1,127 = 240 1129,412
2


1129,412
2
240 + 1,127 = 0

Rumus abc



1,2
=

b b
2
4ac
2.a



1,2
=

(240) (240
2
) 4(1129,412)(1,127)
2.(1129,412)

=
240 228,960

2258,824


1
= 0,2076


2
= 0,00488 ( diambil yang terkecil )

As = . b. dx = 0,00488 . 1000 . 100 = 488 mm
2


As
min
= 0,002. b. h = 0,002 . 1000 . 125 = 250 mm
2

As > As
min,
jadi As
perlu
= 488 mm
2


S
max
= 3 x 125 mm = 375 mm S
max
= 375 mm

S
max
= 450 mm
36






S < S
max

Jadi digunakan
10 160
(As
terpasang
= 490,87 mm
2
)



- Menghitung Momen Lapangan Arah y

Mly = 0,001.Wu.Lx
2
.x
2

= 0,001. 8,608.(4)
2
.20,5

= 2,87 KNm

= 2,87 x 10
6
Nmm

k =
Mu
=


2,87 x10
6



= 0,4429

|bdy
2
0,8x1000 x(90)
2


Mu
|bdy
2


= .240 (1
240
)

2.0,85.30

1129,412
2
240 + 0,4429 = 0

Rumus abc

= 0,00186

As = . b. dy = 0,00186 . 1000 . 90 = 167,4 mm
2


As
min
= 0,002. b. h = 0,002 . 1000 . 125 = 250 mm
2

As < As
min
, jadi As
perlu
= 250 mm
2

Jadi digunakan
10 310
(As
terpasang
= 253,4 mm
2
)



- Menghitung Momen Tumpuan Arah x

Mtx = - 0,001. Wu.Lx
2
.x
3

= - 0,001. 8,608.(4)
2
. 111,25

= -15,13 KNm

= -15,575 x 10
6
Nmm

k =
Mu
=


15,575x10
6



= 1,946

|bdx
2
0,8x1000 x(100)
2


Mu
|bdx
2


= .240 (1
240
)

2.0,85.30

1129,412
2
240 + 1,946 = 0
37






Rumus abc

= 0,00844

As = . b. dx = 0,00844 . 1000 . 100 = 844 mm
2


As
min
= 0,002. b. h = 0,002 . 1000 . 125 = 250 mm
2

As > As
min
, jadi As
perlu
= 844 mm
2

Jadi digunakan
10 90
(As
terpasang
= 872,66 mm
2
)





- Menghitung Momen Tumpuan Arah y

Mty = - 0,001. Wu.Lx
2
.x
4

= - 0,001. 8,608.(4)
2
.51

= - 10,78 KNm

= - 10,78 x 10
6
Nmm

k =
Mu
=


10,78x10
6



= 1,664

|bdy
2
0,8x1000 x(90)
2


Mu
|bdy
2


= .240 (1
240
)

2.0,85.30

1129,412
2
240 + 1,664 = 0

Rumus abc

= 0,0072

As = . b. dy = 0,0072 . 1000 . 90 = 648 mm
2


As
min
= 0,002. b. h = 0,002 . 1000 . 125 = 250 mm
2

As > As
min
, jadi As
perlu
= 648 mm
2

Jadi digunakan
10 120
(As
terpasang
= 654,45 mm
2
)



- Menghitung Mtix

Mtix = Mlx = 9,021 x 10
6
Nmm = 4,511 x 10
6
Nmm

k =
Mu
=


4,511x10
6



= 0,573

|bdx
2
0,8x1000 x(100)
2

38






Mu
|bdx
2


= .240 (1
240
)

2.0,85.30

1129,412
2
240 + 0,573 = 0

Rumus abc

= 0,0024

As = . b. dx = 0,0024 . 1000 . 100 = 241 mm
2


As
min
= 0,002. b. h = 0,002 . 1000 . 125 = 250 mm
2

As < As
min
, jadi As
perlu
= 250 mm
2

Jadi digunakan
10 310
(As
terpasang
= 253,4 mm
2
)

- Menghitung Mtiy

Mtiy = Mlx = 2,87 x 10
6
Nmm = 1,435 x 10
6
Nmm

k =
Mu
=


1,435x10
6



= 0,187

|bdy
2
0,8x1000 x(90)
2


Mu
|bdy
2


= .240 (1
240
)

2.0,85.30

1129,412
2
240 + 0,187 = 0

Rumus abc

= 0,0022

As = . b. dy = 0,0022 . 1000 . 90 = 82,8 mm
2


As
min
= 0,002. b. h = 0,002 . 1000 . 125 = 250 mm
2

As < As
min
, jadi As
perlu
= 250 mm
2

Jadi digunakan
10 310
(As
terpasang
= 253,4 mm
2
)



Perhitungan pelat lantai untuk panel lainnya dihitung dengan cara
yang sama seperti pada perhitungan pelat lantai untuk panel A dan hasil
perhitungan penulangannya dapat dilihat pada tabel 3.2.
35



Tabel 3.2

Tabel Penulangan Pelat Lantai




No Tipe Panel D x Momen Per Meter
( KNm)
Mu
(KNm)
k =
Mu

|.b.d
2

As=
.b.d
(mm
2
)
As
min
(mm
2
)
Tulangan
Terpasang
As
Tulangan
Terpasang
(mm
2
)



1





100
90
100
90
100
90

65,5
20,5
111,25
77



Mlx= 0,001.Wu.lx
2
.x
2

Mly= 0,001.Wu.lx .x
Mtx= 0,001.Wu.lx
2
.x
Mty= 0,001.Wu.lx
2
.x
Mtix = 1/2. Mlx
Mtiy = 1/2. Mly

9,021
2,87
15,575
10,78
4,585
1,435

1,127
0,443
1,947
1,664
0,573
0,221

0,00488
0,00186
0,00844
0,0072
0,0024
0,0009

488
167,4
844
648
241
82,8

250
250
250
250
250
250

10160
10310
1090
10120
10310
10310

490,87
253,4
872,66
654,45
253,4
253,4
2
100
90
100
90
90

53
17,25
81,5
53,25


Mlx= 0,001.Wu.lx
2
.x
Mly= 0,001.Wu.lx
2
.x
Mtx= 0,001.Wu.lx
2
.x
Mty= 0,001.Wu.lx
2
.x
Mtiy=1/2.Mlx

7,42
2,415
11,41
7,455
1,21

0,928
0,373
1,426
1,150
0,187

0,00394
0,00156
0,00612
0,00491
0,00078

393,74
140,81
611,91
441,63
70,28

250
250
250
250
250

10190
10310
10120
10160
10310

413,36
253,4
654,45
462,99
253,4




36







3

100
90
100
90
100
90

58,3
22,3
103,3
77



Mlx= 0,001.Wu.lx
2
.x
Mly= 0,001.Wu.lx
2
.x
Mtx= 0,001.Wu.lx
2
.x
Mty= 0,001.Wu.lx
2
.x
Mtix = 1/2. Mlx
Mtiy = 1/2. Mly

3,449
1,319
6,112
4,555
1,724
0,659

0,431
0,204
0,764
0,703
0,216
0,102

0,00181
0,0085
0,00323
0,00297
0,00091
0,00042

181,07
76,66
323,27
267,35
90,31
38.25

250
250
250
205
250
250

10310
10310
10240
10290
10310
10310

253,4
253,4
327,25
270,83
253,4
253,4
4
100
90
100
90
100

54
20,9
96,4
75,4


Mlx= 0,001.Wu.lx
2
.x
Mly= 0,001.Wu.lx
2
.x
Mtx= 0,001.Wu.lx
2
.x
Mty= 0,001.Wu.lx
2
.x
Mtix=1/2.Mlx

3,194
1,236
5,703
4,461
1,597

0,399
0,191
0,713
0,688
0,200

000168
0,0008
0,00301
0,00291
0,00083

167,7
71,8
301,31
261,73
83,49

250
250
250
250
250

10310
10310
10260
10290
10310

253,4
253,4
302,07
270,83
253,4
37








5

100
90
90
100

58,8
29,9
102,6


Mlx= 0,001.Wu.lx
2
.x
Mly= 0,001.Wu.lx
2
.x
Mty= 0,001.Wu.lx
2
.x
Mtix=1/2.Mlx

3,469
1,764
6,053
1,735

0,434
0,272
0,934
0,217

0,00182
0,00114
0,00397
0,00091

182,26
102,64
356,96
90,31

250
250
250
250

10310
10310
10220
10310

253,4
253,4
357
253,4
.
38






3.2.3 Menentukan Dimensi Balok


3.2.3.1 Balok Arah Melintang


Dimensi balok induk

h =
1
. 7000 mm = 466,67 mm ~ 500 mm

15

b =
1
.500 mm = 250 mm

2

Pada konstruksi balok struktur gedung ini tidak menggunakan balok anak,jadi
balok yang ditinjau untuk perhitungan dimensi balok hanya balok induk,ukuran
balok induk yang dipakai adalah ukuran 25/50

Menurunan Rumus


Beban segitiga




x =
1
.L

2



x
1
=
1
.(
1

3 2

.L ) =
1
.L

6



V
A
=
1
(
1

2 2

.LT) =
1
.LT

4
39









M
max
= V
A
.x
1
(
1

2 2
1

.LT) .x
1
=(.LT .
2
.L)-(T.
1

6

.L)


2 2

=
L .T

L .T

8 24


2 2 2

=
3L T - L T

24
=
L T

12

Momen maksimum akibat beban merata segi empat = M
maks
= (1/8 . H . L
2
)

L
2
T

Momen maksimum akibat beban segitiga = M
maks
= ( )
12

Agar beban ekivalen, maka ;

M
maks
segi empat = M
maks
segi tiga

HL
2

8
L
2
T

=
12

H =
8T
=
2
T

12 3




Beban Trapezium

















x =
1
.L

2
40
2
2 3 2 3 2 2 3
2 2 2 3 3 3







x
1
=
1
T +

3
( L - 2T )
2


x
2
=
1
.
( L - 2T )

2 2
( L - 2T )

=
4

1
T
2
+
|
( L - 2T )
.T
|
=

T
2
+ ( L - 2T )

V
A
=
|

2
\
2
.
2



M
max
=

T
2
+ ( L - 2T )
2

.x (
1

T
2
) .x
1

2
( L - 2T )
2

.T .X
2


=(
T

+ ( L - 2T )
.L) (

1
T
2
.(
1
T +
( L - 2T )
) )- (

( L - 2T ) ( L - 2T )

T. )

2 2 3 2 2 4

= (
T

2
L + ( TL
2

4
- 2T
2
L ) 1
3

) ( T +
6
T
2
L 2T
3

)
4

TL
2
2T
2
L 2T
2
L + 4T
3

( )
8

2
( TL
2
- 2T
2
L )

| T
3

T
2
L

2T
3
|

| TL
2

T
2
L

T
2
L

2T
3
|

=
T L
+

+

| + |

4 4
\
6 4

4
. \
8 4

4 4
.

T
2
L ( TL
2

= +

- 2T L )

T


T L
+
2T

TL
2


+
T L
+
T

L

2T

4 4 6 4 4 8 4 4 4

=
T L

T L

+
2T

L

T


2T

T

TL
2


T
2
L

+

( TL
2

+

- 2T
2
L )
4 4 8 6 4 2 8 4 4

2T
2
L - 2T
2
L + 2T
2
L

|
2T
3
+ 6T
3
6T
3
|

TL
2
T
2
L

( TL
2
- 2T
2
L )

=
8
\
12

| + +
.
8 4 4


2T
2
L

=
8
2T
3


12
TL
2


8
T
2
L

+
4
TL
2

+
4
2T
2
L


4

|
2T
2
L

T
2
L

2T
2
L
|

|
TL
2
2TL
2
|

2T
3
= +

| |

\
8 4

4
. \
8
.
12

41


.






TL
2

=
8
2T
3


12
3TL
3
4T
3

=
24

Momen maksimum akibat beban merata segi empat = M
maks
= (1/8 . H . L
2
)

3TL
3
4T
3

Momen maksimum akibat beban Trapezium = M
maks
= ( )
24

Agar beban ekivalen, maka ;



M
maks
segi empat = M
maks
Trapezium


HL
2

=
8
3TL
3
4T
3

24

24TL
2
32T
3

H =
24L2

| 4T
3
|

24L
2
T - |


H =



H = T -


\
24L
2


4T
3

3L
2

3L
2 |


1. Analisis Pembebanan






42






Gambar 3.27 Pembebanan Pelat Arah Melintang
Mengekivalenkan beban segitiga dan trapezium menjadi beban merata ;
Untuk beban segitiga :









Gambar 3.28 Beban Segitiga


L = 2,6 m

T = 1,3 m

Dari penurunan rumus beban segitiga maka didapat nilai H :

H =
2
T =
2
(1,3 m ) = 0,87 m

3 3

Untuk beban trapesium :














Gambar 3.29 Pembebanan Trapesium


L = 7 m


T = 2 m


Dari penurunan rumus beban trapesium maka didapat nilai H :
43







H = T -
4T
3

3L
2




H = (2 m) -
4(2 m)
3

3(7 m)
2



H = 1,67 m


2.

Pembebanan


1.

Akibat Beban mati


Beban merata :

Pembebanan balok pada struktur gedung ini mempunyai satu type
pembebanan pelat yaitu segitiga pelat,dan untuk perhitungan digunakan
dengan program SAP 2000 V.14 pada perhitungan balok ini berat sendiri
balok tidak di perhitungkan karena berat sendiri balok sudah dihitung oleh
program SAP 2000 V.14

Untuk beban mati ( bentang 7 m )

- Berat pelat
= 0,125 m . 24 Kn/m
3
. 2 . 1,67 m = 10,02 KN/m

- Berat plafon + penggantung
= ( 0,11 + 0,07 ) KN/m
2
. 2 . 1,67 m = 0,601 KN/m

- Berat penutup lantai ( tebal 1 cm )
= 0,24 KN/m
2
. 2 . 1,67 m = 0,80 KN/m

- Berat spesi ( tebal 2 cm )
= 2cm . 0,21 KN/m
2
/cm . 2 . 1,67 m = 1,40 KN/m

- Berat dinding bata
= 4m . 2,5 KN/m
2
= 10 KN/m

- Berat plesteran dinding ( luar dan dalam @ 2 cm = 4 cm )
44






= 4 cm . 4m . 0,21 KN/m
2
/cm = 3,36 KN/m



Jumlah beban merata = ( 10,02+0,60+0,8+1,4+10+3,36 )KN/m

= 26,18 KN/m


Untuk beban mati ( bentang 2,6 m )


- Berat pelat
= 0,125 m . 24 Kn/m
3
. 2 . 0,87 m = 5,43 KN/m

- Berat plafon + penggantung
= ( 0,11 + 0,07 ) KN/m
2
. 2 . 0,87 m = 0,31 KN/m

- Berat penutup lantai ( tebal 1 cm )
= 0,24 KN/m
2
. 2 . 0,87 m = 0,42 KN/m

- Berat spesi ( tebal 2 cm )
= 2cm . 0,21 KN/m
2
/cm . 2 . 0,87 m = 0,73 KN/m

- Berat dinding bata
= 4m . 2,5 KN/m
2
= 10 KN/m

- Berat plesteran dinding ( luar dan dalam @ 2 cm = 4 cm )
= 4 cm . 4m . 0,21 KN/m
2
/cm = 3,36 KN/m

Jumlah beban merata = ( 5,43+0,31+0,42+0,73+10+3,36 )KN/m

= 20,25 KN/m


2. Beban Hidup
Untu beban bentang ( 7 m )
Beban merata :


- Beban hidup pada lantai gedung;
= 2,5 KN/m
2
. 2 . 0,87 m= 4,35 KN/m



Untu beban bentang ( 2,6 m )
45






Beban merata :


- Beban hidup pada lantai gedung;
= 2,5 KN/m
2
. 2 . 1,67 m= 8,35 KN/m

























Cek dimensi balok melintang 25/50
Direncanakan
fy = 400 Mpa
fc = 25 Mpa




min
=

fc
4 fy
=
25
= 0,003125

4.400


1,4

1,4


min
=

=
fy 400
= 0,0035


(
min

diambil yang terkecil )


sengkang = 10 mm
46








tulangan pokok = 19 mm


Selimut beton = 40 mm


d = h p sengkang -



1
tulangan pokok

2


= 500 40 10 -
1
.19

2

= 440,5 mm





Momen lapangan


Mu = 139,08 KNm


Mu
bd
2

= x 0,8 x fy x
|
1 - 0,5882 x x

\
fy |

|
fc
.


139,08.10
6
Nmm
250 x 440,5
2

= x 0,8 x 400 x
|
1 - 0,5882 x x

\
400 |

|
25
.

2,8670 = 320 - 3011,584
2



3011,584
2
- 320 +2,8670 = 0



Rumus ABC =

b b
2
4ac
2a




1
=
320 + 320
2
(4 x 3011,584 x 2,8670
2 x 3011,584

= 0,09637
47













2
=
320 320
2
(4 x 3011,584 x 2,8670
2 x 3011,584

= 0,00987 (diambil terkecil)


maks

= 0,75 b = 0,75
| 0,85 x | x fc
x

600 |

|

\
fy

600 + fy
.


= 0,75
| 0,85 x 0,85 x 25
x

600 |

|

\
400 600 + 400
.

= 0,0271

min

< <
maks



0,003125 < 0,009877 < 0,0271 ( OK )


Momen tumpuan


Mu = 163,52 KNm


Mu
bd
2

= x 0,8 x fy x
|
1 - 0,5882 x x

\
fy |

|
fc
.


163,52.10
6
Nmm
250 x 440,5
2

= x 0,8 x 400 x
|
1 - 0,5882 x x

\
400 |

|
25
.

3,3708 = 320 - 3011,584
2



3011,584
2
- 320 +3,3708 = 0



Rumus ABC =

b b
2
4ac
2a




1
=
320 + 320
2
(4 x 3011,584 x 3,3708
2 x 3011,584

= 0,0944
48











2
=
320 320
2
(4 x 3011,584 x 3,3708
2 x 3011,584

= 0,0119(diambil terkecil)


maks

= 0,75 b = 0,75
| 0,85 x | x fc
x

600 |

|

\
fy

600 + fy
.


= 0,75
| 0,85 x 0,85 x 25
x

600 |

|

\
400 600 + 400
.

= 0,0271

min

< <
maks



0,003125 < 0,0119 < 0,0271 ( OK )






















3.2.3.2 Balok Arah Memanjang

Dimensi balok induk

h =
1
. 7000 mm = 466,67 mm ~ 500 mm

15

b =
1
.500 mm = 250 mm

2
49








Pada konstruksi balok struktur gedung ini tidak menggunakan balok anak,jadi
balok yang ditinjau untuk perhitungan dimensi balok hanya balok induk,ukuran
balok induk yang dipakai adalah ukuran 25/50

Analisis Pembebanan





















Gambar 3.30 Pembebanan Pelat Arah Memanjang

Mengekivalenkan beban segitiga dan trapesium menjadi beban merata

; Untuk beban segitiga :










Gambar 3.31 Beban Segitiga;
L = 4 m
T = 2 m

Dari penurunan rumus beban segitiga maka didapat nilai H :
50






H =
2
T =
2
(2

m) = 1,333 m

3 3

Untuk Beban Trapesium :














Gambar 3.32 Pembebanan Trapesium


L = 4 m

T = 1,3 m

Dari penurunan rumus beban trapesium maka didapat nilai H :

4T
3
H = T -

3L
2



H = (1,3 m) -
4(1,3 m)
3

3(4 m)
2


H = 1,117 m

3.3.3 Pembebanan

3. Akibat Beban mati


Beban merata :


Pembebanan balok pada struktur gedung ini mempunyai satu type
pembebanan pelat yaitu segitiga trapezium,dan untuk perhitungan
digunakan dengan program SAP 2000 V.14 pada perhitungan balok ini
51






berat sendiri balok tidak di perhitungkan karena berat sendiri balok sudah
dihitung oleh program SAP 2000 V.14

Berat pelat

= ( 0,125 m . 24 KN/m
3
. 1,117 m ) + ( 0,125 m . 24 KN/m
3
.
1,333 m )

= 7,644 KN/m

Berat Penutup Lantai ( tebal 1 cm )

= ( 0,24 KN/m
2
. 1,117 m ) + ( 0,24 KN/m
2
. 1,333 m )

= 0,588 KN/m

Berat plafon + penggantung

= ( 0,11 + 0,07) KN/m
2
. 1,117 m ) + ( 0,11 + 0,07) KN/m
2
. 1,333
)

= 0,441 KN/m

Berat Spesi ( tebal 2 cm )

= ( 2 cm . 0,21 KN/m
2
/cm . 1,117 m ) + ( 2 cm . 0,21 KN/m
2
/cm .
1,117 m )

= 1,029 KN/m

Berat Dinding Bata

= 4 m . 2,5 KN/m
2


= 10 KN/m

Berat Plesteran Dinding (luar dan dalam@ 2 cm = 4 cm )

= 4 cm . 4 m . 0,21 KN/m
2
/cm

= 3,36 KN/m

Jumlah beban merata :

= ( 7,644 + 0,588 + 0,441 + 1,029 + 10 + 3,36 ) KN/m

= 23,062 KN/m
52






4. Beban Hidup

Beban merata :

Beban Hidup pada lantai gedung

= ( 2,5 KN/m
2
. 1,117 m ) + ( 2,5 KN/m
2
. 1,333 m ) = 6,125 KN/m

Cek dimensi balok memanjang 25/50
Direncanakan
fy = 400 Mpa
fc = 25 Mpa



min
=

fc
4 fy
=
25
= 0,003125

4.400

1,4

1,4


min
=

=
fy 400
= 0,0035

(
min

diambil yang terkecil )

sengkang = 10 mm

tulangan pokok = 19 mm

Selimut beton = 40 mm


d = h p sengkang -



1
tulangan pokok

2


= 500 40 10 -
1
.19

2

= 440,5 mm

Momen lapangan

Mu = 51,1917 KNm
53











Mu
bd
2

= x 0,8 x fy x
|
1 - 0,5882 x x

\
fy |

|
fc
.

51,1917.10
6
Nmm
250 x 440,5
2

= x 0,8 x 400 x
|
1 - 0,5882 x x

\
400 |

|
25
.

1,0553 = 320 - 3011,584
2


3011,584
2
- 320 +1,0553 = 0



Rumus ABC =

b b
2
4ac
2a



1
=
320 + 320
2
(4 x 3011,584 x 1,0553
2 x 3011,584

= 0,1028




2
=
320 320
2
(4 x 3011,584 x 1,0553
2 x 3011,584

= 0,003407 ( diambil yang
terkecil )

maks

= 0,75 b = 0,75
| 0,85 x | x fc
x

600 |

|

\
fy

600 + fy
.

= 0,75
| 0,85 x 0,85 x 25
x

600 |

|

\
400 600 + 400
.



min




< <
= 0,0271

maks


0,003125 < 0,003407 < 0,0271 ( OK )

Momen tumpuan

Mu = 68,8887 KNm

Mu
bd
2

= x 0,8 x fy x
|
1 - 0,5882 x x

\
fy |

|
fc
.
54









68,8887.10
6
Nmm
250 x 440,5
2

= x 0,8 x 400 x
|
1 - 0,5882 x x

\
400 |

|
25
.

1,4201 = 320 - 3011,584
2


3011,584
2
- 320 +1,4201 = 0



Rumus ABC =

b b
2
4ac
2a



1
=
320 + 320
2
(4 x 3011,584 x 1,4201
2 x 3011,584

= 0,1016




2
=
320 320
2
(4 x 3011,584 x 1,4201
2 x 3011,584

= 0,004640 ( diambil yang
terkecil )

maks

= 0,75 b = 0,75
| 0,85 x | x fc
x

600 |

|

\
fy

600 + fy
.

= 0,75
| 0,85 x 0,85 x 25
x

600 |

|

\
400 600 + 400
.



min




< <
= 0,0271

maks


0,003125 < 0,004640 < 0,0271 ( OK )
55





























3.2.4 Menentukan Dimensi Kolom
56
























Gambar 3.33 Denah Kolom

Data-data perhitungan :

Dimensi kolom = (30 x 30 ) cm
2


Fy = 400 Mpa
f'c = 25 Mpa
tulangan utama = 16 mm

Analisis Pembebanan ditinjau pada kolom K
B-2


a. Beban mati

Lantai 3

Reaksi kuda kuda

= 13,24 KN

Berat sendiri kolom

= 0,3m x 0,3m x 3,5 m x 24 KN/m
3
= 7,56 KN
Berat balok
= (4m x (0,20 x 0,21)m
2
+(1,3m x (0,20 x 0,21)m
2


+ 3,3 m x (0,25 x 0,5m
2
)) x 24 KN/m
3

57






= 8,67 KN
Berat dinding
= 3,5 m x ( 4,65 + 4 )m x 2,5 KN/m
2
= 75,69 KN

Berat pelat

= 0,09 m x ( 1,3 x 4 ) m
2
x 24 KN/m
3
= 11,232 KN
Berat plafon + penggantung
= ( 4,8 x 4 ) m
2
x 0,18 KN/m
2
= 3,456 KN

Q
3
= ( 13,24 + 7,56 + 8,67 + 75,69 + 11,232 + 3,456 ) KN = 119,85 KN
Lantai 2
Berat sendiri kolom

= 0,3m x 0,3m x 3,5 m x 24 KN/m
3
= 7,56 KN
Berat balok
= (4m x (0,25 x 0,375)m
2
+4,55m x (0,25 x 0,375 m
2
) x 24 KN/m
3
= 19,24 KN

Berat dinding

= 3,5 m x (4,65 + 4 )m x 2,5 KN/m
2
= 75,69 KN
Berat pelat
0,125 m x ( 4,8 x 4 ) m
2
x 24 KN/m
3
= 57,6 KN

Berat plafon + penggantung = ( 4,8 x 4 ) m
2
x 0,18 KN/m
2
= 3,456 KN

Q
2
= 7,56 KN + 19,24 KN + 75,69 KN + 57,6 KN + 3,456 KN = 163,546 KN




Lantai 1

Berat sendiri kolom

= 0,3 m x 0,3 m x 3,5 m x 24 KN/m
3
= 7,56 KN
58






Berat balok

= (4m x (0,25 x 0,375)m
2
+4,55m x (0,25 x 0,375 m
2
) x 24 KN/m
3
= 19,24 KN
Berat pelat
0,125 m x ( 4,8 x 4 ) m
2
x 24 KN/m
3
= 57,6 KN

Berat plafon + penggantung = ( 4,8 x 4 ) m
2
x 0,18 KN/m
2
= 3,456 KN
Q
1
= 7,56 + 19,24 KN + 57,6 KN + 3,456 KN = 87,856 KN





b. Beban hidup

QL
3
= 1 KN/m
2
x 1,3 m x 4 m + 2,5 KN = 7,7 KN
Q L
2
= 2,5 KN/m
2
x 4,8 m x 4 m = 48 KN
Q L
1
= 2,5 KN/m
2
x 4,8 m x 4 m = 48 KN

Merencanakan Dimensi Kolom Lantai 1

Total Beban Mati (W
D
) = Q
3
+ Q
2
+ Q
1


= 119,85 KN + 163,546 KN + 87,856 KN

= 388,155

Total Beban Hidup (W
L
) = QL
3
+ Q L
2
+ Q L
1


= 19,2 KN + 48 KN + 48 KN

= 103,7 KN

Reduksi beban hidup komulatif = 0,9 x 103,7 KN = 93,33 KN
Beban terfaktor
Pu = 1,2 x 388,155 KN + 1,6 x 93,33 KN = 615,114 KN
Dicoba ukuran kolom ( 30 x 30 ) cm
2

59






d = P + D

= 40 + 9,5 = 49,5 mm

d = 300 49,5 = 250,5 mm

Ditaksir jumlah penulangan 1 %


' = =
As

= 0,01
bd

As' = As = 0,01 x 300 x 250,5 = 751,5 mm
2


4D16 ( As = 850,586 mm
2
)

Pemeriksaan Pu terhadap beton dalam keadaan seimbang


c
b
=



c =

600
600 + fy

600

. d



. 250,5 = 150,3 mm

b
600 + 400

a
b
= 0,85 . c
b
= 0,85 . 150,3 = 127,755 mm


c
s
' =
c
b
d '
c
b


. 0,003 =
150,3 49,5
150,3

. 0,003 = 0,00202


c
y
=
fy
=

Es
400
= 0,002

200000

c
s
' > c
y


Fs = Es . c
s
' = 200000 Mpa . 0,00202 = 490 > fy = 400 Mpa
fs' = fy
Dipakai fy = 400 Mpa

Pnb = 0,85 fc' . b . a
b
= 0,85 . 30 . 300 . 127,755 = 977325,75 N = 977,325 KN

| Pnb = 0,65 . 1464,656 KN = 635,26 KN > 615,114 KN
60






Karena | Pnb>Pu, berarti kolom beton mengalami keruntuhan tarik
e = 15 + 0,03 . 300 = 24 mm
Periksa kekuatan penampang


h 2e

Pn = 0,85 fc'.b.d +
|
h 2e
|
+ 2m
|
1
d '
|
(


2d

|
\
2d
.
| (
\
d
.
(


| d ' | |

49,5 |

1

|
= 1

| = 0,802

\
d
. \
250,5
.

m =
fy
=

0,85. fc'
400
= 15,69

0,85.30

h 2e
=
300 2.24
= 0,503

2d

=
As
b.d
2.250,5


= 0,01

Pn = 2325280 N = 2325,8 KN

| Pn = 0,65 2325,8 KN = 1511,43 KN > Pu = 615,114 KN

Dengan demikian penampang memenuhi syarat, jadi penampang kolom
ukuran 30 cm x 30 cm dapat digunakan , ukuran kolom dapat dibuat sama pada setiap
lantai.

3.4 Perhitungan Tangga








1,5m

2 m




3m

2 m


61

2m 2m
3 m
1 5 m

62



















Gambar 3.34 Sket Tangga
a. Syarat syarat tangga :
Untuk umum ( perkantoran,sekolah,bioskop,pasar,dll)

1. Antrede = 25 cm (minimum)

2. Opret = 17 cm (minimum)
Lebar tangga untuk :
Tempat umum 120 cm

2 oprede + 1 antrede = 57 cm 65 cm

Direncanakan Tinggi optrede = 17 cm


h=200 cm



Jumlah optrede =
h
t.
opt



=
200cm
= 11,76 buah

17cm


Tinggi optrede sebenarnya =
h
jml.opt


=
200cm

11,76bh
63






= 17 cm/bh


2 optrede + 1 antrede = 57 65


2 (17 cm ) + 1(25 cm ) = 57 65


59 = 57 65


Jadi Lebar Antrede = 25 cm


Sudut tangga

Arc tan o =
optrede
antrede


Arc tan o =
17cm

25cm

o = 34,22 < 45 OK


b. Lebar tangga


Tangga untuk digunakan sebagai tempat umum yang difungsikan pada
banguna sekolah

Lebar tangga diambil = 200 cm 120 cm


c. Tebal pelat tangga dan pelat bordes


- Tebal pelat tangga = 12 cm
- Tebal pelat bordes = 12 cm
d. Rencana luasan bordes


|

y = lebar antride x

200cm |

|

\
tinggioptrede
.


| 200cm |

y = 25 cm x


\
17cm

| = 294,12 cm ~ 300 cm
.
64






x = 450 300

= 150 cm luasan bordes diambil ( 150 x 200 ) cm
2









2 m







2 m




y x



Gambar 3.35 Rencana Luasan Bordes











e. Pembebanan

1. Pembebanan Tangga
65












Gambar 3.36 Pelat Tangga






Tebal anak tangga ( t
2
) =
17. cos o
2

17. cos o

Tebal pelat + anak tangga ( t
1
) = 12 +
2
= 19,03 cm

Tebal pelat + anak tangga akibat beban =


t1
=
19,03
= 23,01 cm = 0,2301 m



Beban mati (W
D
)
coso cos 34
- Berat sendiri pelat = 0,2301 m x 24 KN/m
3
x 1 m = 5,52 KN/m


- Berat penutup lantai

Berat ubin = 0,24 KN/m
2
x 1 m = 0,24 KN/m

Berat adukan= 0,21 KN/m
2
x 1 m= 0,21 KN/m +

= 0,43 KN/m

- Berat sandaran= 0,20 KN/m
2
x 1m = 0,20 KN/m


Wd = 5,52 KN/m + 0,43 KN/m + 0,20 KN/m = 6,15 KN/m


Beban hidup (W
L
)

W
L
= 3 KN/m
2
x 1m = 3 KN/m
a. Beban terfaktor
W
u
= 1,2Wd + 1,6Wl
66






= 1,2 ( 6,58 KN/m ) + 1,6 ( 3 KN/m )

= 12,18 KN/m ~ 12 KN/m


2. Pembebanan bordes
a. Beban mati (W
D
)
- Berat sendiri plat = tebal. plat.bordesx24KN / m
3
x1m


= 0,12mx24KN / m
3
x1m


= 2,88 KN/m


- Berat penutup lantai

Berat ubin = 0,24 KN/m
2
x 1 m = 0,24 KN/m

Berat adukan = 0,21 KN/m
2
x 1 m = 0,21 KN/m +


= 0,43 KN/m

- Berat sandaran= 0,20 KN/m
2
x 1m = 0,20 KN/m




W
D
= 2,88 + 0,65
= 3,53 KN/m
b. Beban hidup (W
L
)
W
L
= 3 KN/m
2
x 1m = 3 KN/m
c. Beban terfaktor
Wu = 1,2Wd + 1,6Wl


= 1,2 (3,53 KN/m) + 1,6 (3 KN/m)


= 9,036 KN/m ~ 9 KN/m
67
AB






f. Analisa struktur




















Gambar 3.37 Pembebanan Pada Tangga


- Inersia

1

I
AB
= xbxh
12
Inersia plat tangga


=
1
x100 x12
3

12

= 14400 cm
4



I =
1
xbxh

12

Inersia plat bordes


=
1
x100 x12
3

12

= 14400 cm
4



- Kekakuan

K
AB
= K
BA
=



4(2EI )
=

L


4(EI )
3,6



= 1,11 EI
68
AB BA
BC CB







K
BC
= K
CB
=
4EI
L
=
4EI

1,5

= 2,67 EI


- Faktor distribusi

=
1,11

AB
1,11 + 2,67



= 0,29 ~ 0,3




BC
=
2,67
2,67 + 1,11

= 0,71~ 0,7


- Momen primer










2000



34


3000 1500




Gambar 3.38 Momen Primer






KNm
M = - M =
1
x 12 KN/m x ( 3,6 m )
2
. cos 34,22
o
= 10,72 KNm ~ 11

12


M = - M =
1
x

12

9 KN/m x ( 1,5 m )
2
= 1,69 KNm ~ 2 KNm


- Pemerataan momen
69



























Gambar 3.39 pemerataan momen





- Momen final





2000



34


3000 1500


Gambar 3.40 momen final





- Free body






70















Gambar 3.41 Free Body


Untuk batang BC






1,5 m 1,5 m
1,5 m










Gambar 3.42 Reaksi Perletakan


|
9 KN/m x 1,5 m
|

| 8,3 KNm + 1,15 KNm |

| + |

\
2
. \
1,5m
.


6,75 KN + 6,3 KN = 13,05 KN ( )
6,75 KN - 6,3 KN = 0,45 ( )
Untuk batang AB

V = 0

= V
AB
( 9,92 KN/m x 3,6 m) 13,05 KN
V
AB
= 48,76 KN


MB = 0
71






= (48,75 KN x 3 m) (H
AB
x 2 m) (12,35 KNm) (9,92 KN/m x
3,6 m x 1,5 m) + (8,3 KNm)


H
AB
=

88,63 KNm
2 m

H
AB
= 44,32 KN



- Gaya Gaya Dalam

Untuk batang AB

Untuk mengetahui gaya batang digunakan beban merata / 1 meter bidang
mirirng :

























Gambar 3.43 Batang AB
72






URAIAN GAYA














Gambar 3.44 Uraian Gaya


Selanjutnya,gaya- gaya batang diuraikan untuk menjadi gaya-gaya bantang
yang sejajar dan tegak lurus bidang miring

Beban merata tegak lurus bidang miring ;

= Wu x cos 34
o
= 9,92 KN/m x cos 34
o
= 8,224 KN/m

Beban merata sejajar bidang miring ;

= Wu x sin 34
o
= 9,92 KN/m x sin 34
o
= 5,547 KN/m















Gambar 3.45 Gaya Batang AB
Untuk batang BC






73











Gamabar 3.46 Gaya Gaya Batang BC
Bidang Gaya Gaya Dalam










Gambar 3.47 Bidang Gaya Normal






1,7
m 1,45
m
0,5
m




1,9
m




Gambar 3.48 Bidang Gaya Lintang
















1,9 m
74
















Gambar 3.49 bidang momen

Perhitungan jarak dan momen maksimum pada bidang momen diatas :

1. Perhtungan jarak momen maksimum

Perhitungan jarak momen ini di hitung dengan menggunakan metode
perbandingan segitiga.



13,98 KN



15,64 KN
X

29,62 KN


3,6 m





29,62 KN
=
15,64 KN

3,6 KN X


29,84 KN . X = 15,64 KN . 3,6 m


X =
56,30 KNm
= 1,90 m

29,62 KN







13,5 K N 13,05 K N




X
1,5 m
75









13,5 KN
=
13,05 KN

1,5 m X


13,5 KN . X = 13,05 KN . 1,5 m


X =
19,575 KNm

13,5 KN


X = 1,45 m


2. Perhitungan momen maksimum

Untuk perhitungan momen maksimum dihitung dengan menggunakan
metode luasan diagram lintang gaya dalam :

1. Untuk momen bidang miring


Luasan segitga gaya lintang = momen maksimum gaya dalam


(
1
. 15,64 KN . 1,9 m) (12,35 KNm ) = 2,51 KNm

2

2. Untuk momen pelat bordes


(
1
. 13,05 KN . 1,45 m) (8,3 KNm ) = 1,16 KNm

2





Penulangan Tangga

fy = 240 MPa
fc' = 30 Mpa
Tebal pelat tangga = 120 mm

Tebal pelat bordes = 120 mm
76






Tebal selimut beton (p) = 20 mm
d = h p D
= 120 20 .10

= 95 mm

1. Penulangan pelat tangga

- Momen Tumpuan

K =
Mu
=


12,35x10
6



= 1,71

|.b.d
2
0,8x1000 x95
2



Mu = |..b.dx
2
. fy (1
fy
)

2.0,85. fc'

Mu
|bdx
2


= . fy (1
fy
)

1,7. fc'

Mu
|bdx
2


= .240 (1
240
)

1,7.30

1,71 = 240 1129,412
2


1129,412
2
240 + 1,71 = 0

Rumus abc



1,2
=

b b
2
4ac
2.a



1,2
=

(240) (240
2
) 4(1129,412)(1,71)
2.(1129,412)

=
240 228,960

2258,824


1
= 0,2051


2
= 0,00737 ( diambil yang terkecil )

As = .b.d = 0,00737 x 1000 mm x 95 mm = 700,15 mm
2


As
min
= 0,002. b. h = 0,002 . 1000 . 120 = 240 mm
2

77
6






As > As
min
, jadi As
perlu
= 700,15 mm
2


Dipakai tulangan C10 110 mm (As
terpasang
= 714 mm
2
)



- Momen lapangan

K =
Mu


=
13,863x10



= 1,920

|.b.d
2
0,8x1000 x95
2


Mu
|bdy
2


= .240 (1
240
)

2.0,85.30

1129,412
2
240 + 0,312 = 0

Rumus abc

= 0,00131

As = .b.d

= 0,00131 x 1000 mm x 95 mm = 124,45 mm
2


As
min
= 0,002. b. h = 0,002 . 1000 . 120 = 240 mm
2

As < As
min,
jadi As
perlu
= 240 mm
2


Dipakai tulangan C10 325 mm (As
terpasang
= 241,66 mm
2
)



2. Penulangan Pelat Bordes

- Momen Tumpuan

K =
Mu
=


8,3x10
6



= 1,15

|.b.d
2
0,8x1000 x95
2


Mu
|bdy
2


= .240 (1
240
)

2.0,85.30

1129,412
2
240 + 1,15 = 0

Rumus abc

= 0,0049

As = .b.d = 0,0049 x 1000 mm x 95 mm = 465,5 mm
2


As
min
= 0,002. b. h = 0,002 . 1000 . 120 = 240 mm
2

78






As > As
min
, jadi As
perlu
= 465,5 mm
2


Dipakai tulangan C10 165 mm (As
terpasang
= 476 mm
2
)



- Momen lapangan

K =
Mu
=


1,16 x10
6



= 0,161

|.b.d
2
0,8x1000 x95
2


Mu
|bdy
2


= .240 (1
240
)

2.0,85.30

1129,412
2
240 + 0,161 = 0

Rumus abc

= 0,0007

As = .b.d

= 0,0007 x 1000 mm x 95 mm = 66,5 mm
2


As
min
= 0,002. b. h = 0,002 . 1000 . 120 = 240 mm
2

As < As
min,
jadi As
perlu
= 240 mm
2


Dipakai tulangan C10 325 mm (As
terpasang
= 241,66 mm
2
)



3. Penulangan Balok Bordes

fy = 240 MPa
fc' = 30 Mpa
Ukuran Balok 20 cm x 40cm

Tulangan C 16 mm

Selimut beton = 40 mm

d = h p C = 400 40 .16 = 352 mm



- Pembebanan Balok
Berat balok = 0,2 m x 0,4 m x 24 KN/m
3


= 1,92 KN/m

Beban dinding = (0,21 KN/m
2
x 2 + 2,5 KN/m
2
= 5,84 KN/m +

= 7,76 KN/m

79
6






Beban Pelat bordes = 0,45 KN/m



Wu = 1,2 x 7,76 + 0,45 = 9,762 KN/m
M
lap
= 1/8 x Wu x L
2
= 1/8 x 9,762 KN/m x (4m)
2
= 19,524 KN/m
M
tump
= 1/24 x Wu x L
2
= 1/24 x 9,762 KN/m x (4m)
2
= 6,508 KN/m



- Tulangan Tumpuan

K =
Mu
=


6,508x10
6



= 0,901

|.b.d
2
0,8x1000 x95
2


Mu
|bdy
2


= .240 (1
240
)

2.0,85.30

1129,412
2
240 + 0,901 = 0

Rumus abc

= 0,00382



min
=

fc'
4 fy
=
30

4.240

= 0,00571



min
=

1,4
=

fy
1,4
240

= 0,00583

Diambil
min
= 0,00571 ( diambil yang terkecil )


max
= 0,0484

Dipakai = 0,00571

As = .b.d

= 0,00571 x 1000 mm x 95 mm = 542,45 mm
2


Dipakai tulangan 3 C16 (As
terpasang
= 603,2 mm
2
)



- Tulangan Lapangan

K =
Mu


=
19,524 x10



= 2,704

|.b.d
2
0,8x1000 x95
2

80






Mu
|bdy
2


= .240 (1
240
)

2.0,85.30

1129,412
2
240 + 2,704 = 0

Rumus abc

= 0,0119


min
= 0,00571


max
= 0,0484


min
< <
max


As = .b.d

= 0,0119 x 1000 mm x 95 mm = 1130,5 mm
2


Dipakai tulangan 6 C16 (As
terpasang
= 1206,4 mm
2
)



4. Penulangan Geser Balok Bordes






x = . 4000-352-150

= 1498 mm

= 1,498 m



Vu =
9,762 x4
9,762 x1,498 = 4,9

2

Vc = 0,6
1

6

30 = 40,55


Vu =


4,9 x10
3



= 0,0532

200 x352

Vu < Vc, jadi tidak memerlukan tulangan geser

Digunakan sengkang praktis
81







S
maks
=

d
atau 600 mm

2

=
352
= 176

2

Dipakai sengkang C 6 150 mm



5. Penulangan Torsi Balok Bordes

beff

= bw + hw = 200 + 280 = 480

Diambil beff yang terkecil

beff = bw + 4.hf = 200 + 4.120 = 680 yaitu 48 mm

















x
2
y = 200
2
x 280 + 120
2
x 480 = 181,12 x 10
5
mm
3



Tc =
fc'
15

. Ex
2
y =
fc'
15

.181,12 .10
5


= 6613567,308 Nmm

| Tc = 0,6 x Tc = 0,6 x 6613467,308 Nmm = 3,968x10
6
Nmm

Tu = 1,16 KNm = 1,16 x 10
6
Nmm

Tu < | Tc, Tulangan Torsi tidak perlu digunakan
82
































3.5.1 Perhitungan Portal Arah Memanjang

Denah Pembebanan Pada Pelat pada portal




















Gambar 3.17 Pembebanan Pelat Arah Memanjang
83




























Gambar 3.18 Pembebanan Pelat Arah Melintang






Perhitungan portal memanjang B-B


























Gambar 3.19 Portal Pembebanan Arah Memanjang 2-2
84









Mengekivalenkan beban segitiga dan trapesium menjadi beban merata ;
Untuk beban segitiga :











Gambar 3.23 Beban Segitiga;
L = 4 m
T = 2 m

Dari penurunan rumus beban segitiga maka didapat nilai H :

H =
2
T =
2
(2 m ) = 1,33 m

3 3



Untuk beban trapesium :














Gambar 3.22 Pembebanan Trapesium


L = 4 m

T = 1,3 m

Dari penurunan rumus beban trapesium maka didapat nilai H :
85







H = T -
4T
3

3L
2



H = (1,3 m) -
4(1,3 m)
3

3(4 m)
2


H = 0,87 m

Pembebanan pada portal arah memanjang

5. Beban mati
Beban merata :
Tingkat I dan II
Berat sendiri pelat

= 0,125 m . 24 KN/m
3
.0,87 m + 0,125 m . 24 KN/m
3
. 1,333 m

= 6,609 KN/m

Berat Penutup Lantai ( tebal 1 cm )

= 0,24 KN/m
2
. 0,87 m + 0,24 KN/m
2
. 1,333 m

= 0,528 KN/m

Berat plafon + penggantung

= ( 0,11 + 0,07) KN/m
2
. 0,87 m + ( 0,11 + 0,07) KN/m
2
. 1,333

= 0,396 KN/m

Berat Spesi ( tebal 2 cm )

= 2 cm .0,21 KN/m
2
/cm .0,87 m + 2 cm . 0,21 KN/m
2
/cm . 1,333 m

= 0,924 KN/m

Berat Dinding Bata

= 4 m . 2,5 KN/m
2


= 10 KN/m

Berat Plesteran Dinding (luar dan dalam@ 2 cm = 4 cm )
86






= 4 cm . 4 m . 0,21 KN/m
2
/cm

= 3,36 KN/m

Jumlah beban merata :

= ( 6,609 + 0,528 + 0,396 + 0,924 + 10 + 3,36 ) KN/m

= 21,82 KN/m

Tingkat III ( atap )
Berat pelat atap
0,090 m . 24 KN/m
3
. 1,333 m ` = 2,88 KN/m

Berat sendiri plafon + penggantung

( 0,11 + 0,07) KN/m
2
. 1,333 = 0,23 KN/m

= 3,11 KN/m

6. Beban Hidup
Beban merata :
Tingkat I dan II
Beban Hidup pada lantai gedung

= 0,9 x ( 2,5 KN/m
2
. 0,87 m + 2,5 KN/m
2
. 1,333 m )

= 4,95 KN/m



Tingkat III ( atap )

Be ban hujan

= 0,9 x ( 0,87 m x 1 KN/m
2
) = 0,783 KN/m
87






















































Perhitungan portal memanjang A-A
88























Gambar 3.19 Portal Pembebanan Arah Memanjang 1-1

Untuk beban trapesium :











Gambar 3.22 Pembebanan Trapesium


L = 4 m

T = 1,3 m

Dari penurunan rumus beban trapesium maka didapat nilai H :

4T
3
H = T -

3L
2



H = (1,3 m) -
4(1,3 m)
3

3(4 m)
2


H = 0,87 m

Pembebanan pada portal arah memanjang

1. Beban mati

Beban merata :
89






Tingkat I dan II

Berat sendiri pelat

= 0,125 m . 24 KN/m
3
.0,87 m = 2,61 KN/m

Berat Penutup Lantai ( tebal 1 cm )

= 0,24 KN/m
2
. 0,87 m = 0,21 KN/m

Berat plafon + penggantung

= ( 0,11 + 0,07) KN/m
2
. 0,87 m = 0,16 KN/m

Berat Spesi ( tebal 2 cm )

= 2 cm .0,21 KN/m
2
/cm .0,87 m = 0,37 KN/m

Berat Dinding Bata

= 4 m . 2,5 KN/m
2


= 10 KN/m

Berat Plesteran Dinding (luar dan dalam@ 2 cm = 4 cm )

= 4 cm . 4 m . 0,21 KN/m
2
/cm

= 3,36 KN/m

Jumlah beban merata :

= ( 2,61 + 0,21 + 0,16 + 0,37 + 10 + 3,36 ) KN/m

= 16,71 KN/m

Tingkat III ( atap )
Berat pelat
(0,090 m . 24 KN/m
3
.0,87 m) = 1,88 KN/m

Berat sendiri plafon + penggantung = 0,16 KN/m

= 2,04 KN/m



2. Beban Hidup
90






Beban merata :
Tingkat I dan II
Beban Hidup pada lantai gedung

= 0,9 x ( 2,5 KN/m
2
. 0,87 m )

= 1,95 KN/m

Tingkat III ( atap )

Beban hujan

= 0,9 x ( 0,87 m x 1 KN/m
2
) = 0,783 KN/m
91









Perhitungan portal memanjang C-C
























Gambar 3.19 Portal Pembebanan Arah Memanjang 3-3



Mengekivalenkan beban segitiga dan trapesium menjadi beban merata ;
Untuk beban segitiga :











Gambar 3.23 Beban Segitiga;
L = 4 m
T = 2 m

Dari penurunan rumus beban segitiga maka didapat nilai H :
92






H =
2
T =
2
(2 m ) = 1,33 m

3 3




Pembebanan pada portal arah memanjang

1. Beban mati
Beban merata :
Tingkat I dan II
Berat sendiri pelat

= 0,125 m . 24 KN/m
3
. 1,333 m = 3,99 KN/m

Berat Penutup Lantai ( tebal 1 cm )

= 0,24 KN/m
2
. 1,333 m = 0,32 KN/m

Berat plafon + penggantung

= ( 0,11 + 0,07) KN/m
2
. 1,333 = 0,24 KN/m

Berat Spesi ( tebal 2 cm )

= 2 cm . 0,21 KN/m
2
/cm . 1,333 m= 0,56 KN/m

Berat Dinding Bata

= 4 m . 2,5 KN/m
2
= 10 KN/m

Berat Plesteran Dinding (luar dan dalam@ 2 cm = 4 cm )

= 4 cm . 4 m . 0,21 KN/m
2
/cm = 3,36 KN/m

Jumlah beban merata :

= ( 3,99 + 0,32 + 0,24 + 0,56 + 10 + 3,36 ) KN/m

= 18,47 KN/m

Tingkat III ( atap )

Berat sendiri plafon + penggantung
93






= ( 0,11 + 0,07) KN/m
2
. 1,333 = 0,24 KN/m

2. Beban Hidup
Beban merata :
Tingkat I dan II
Beban Hidup pada lantai gedung

= 0,9 x ( 2,5 KN/m
2
. 1,333 m ) = 2,99 KN/m

Tingkat III ( atap )

Beban hujan

= 0,9 x ( 1,33 m x 1 KN/m
2
) = 1,197 KN/m
94
























3.5.2 Perhitungan Portal Arah Melintang 2-2



































Gambar 3.21 Pembebanan Portal Arah Melintang Pot. 2-2
95






Mengekivalenkan beban segitiga dan trapezium menjadi beban merata ;
Untuk Beban Segitiga :
















Gambar 3.23 Beban Segitiga

L = 2,6 m

T = 1,3 m

Dari penurunan rumus beban segitiga maka didapat nilai H :

H =
2
T =
2
(1,3 m ) = 0,87 m

3 3

Untuk Beban trapezium :














Gambar 3.24 Beban Trapesium

L = 7 m

T = 2 m

Dari penurunan rumus beban trapesium maka didapat nilai H :
96







H = T -
4T
3

3L
2



H = (2 m) -
4(2 m)
3

3(7 m)
2


H = 1,67 m




Pembebanan portal melintang

1. Beban Mati

- Untuk beban pada bentang beban segitiga ( 2,6 m )
Tingkat I dan II

- Berat sendiri pelat
= 0,125 m . 24 Kn/m
3
. 2 . 0,87 m = 5,22 KN/m

- Berat plafon + penggantung
= ( 0,11 + 0,07 ) KN/m
2
. 2 . 0,87 m = 0,31 KN/m

- Berat penutup lantai ( tebal 1 cm )
= 0,24 KN/m
2
. 2 . 0,87 m = 0,42 KN/m

- Berat spesi ( tebal 2 cm )
= 2 cm . 0,21 KN/m
2
/cm . 2 . 0,87 m = 0,73 KN/m

- Berat dinding bata
= 4m . 2,5 KN/m
2
= 10 KN/m

- Berat plesteran dinding ( luar dan dalam @ 2 cm = 4 cm )
= 4 cm . 4m . 0,21 KN/m
2
/cm = 3,36 KN/m

Jumlah beban merata = ( 5,22+0,31+0,42+0,73+10+3,36 )KN/m

= 20,04 KN/m

Tingkat III

- Berat sendiri pelat
- 0,09 m . 24 Kn/m
3
.2. 0,87 m = 3,76 KN/m
97






- Berat plafon + penggantung
- ( 0,11 + 0,07 ) KN/m
2
.2. 0,87 m = 0,32 KN/m +

4,08 KN/m




- Untuk beban pada bentang trapezium ( 7 m ) :
Tingkat I dan II

- Berat sendiri pelat
= 0,125 m . 24 Kn/m
3
. 2 . 1,67 m = 10,02 KN/m

- Berat plafon + penggantung
= ( 0,11 + 0,07 ) KN/m
2
. 2 . 1,67 m = 0,60 KN/m

- Berat penutup lantai ( tebal 1 cm )
= 0,24 KN/m
2
. 2 . 1,67 m = 0,80 KN/m

- Berat spesi ( tebal 2 cm )
= 2cm . 0,21 KN/m
2
/cm . 2 . 1,67 m = 1,4 KN/m

- Berat dinding bata
= 4m . 2,5 KN/m
2
= 10 KN/m

- Berat plesteran dinding ( luar dan dalam @ 2 cm = 4 cm )
= 4 cm . 4m . 0,21 KN/m
2
/cm = 3,36 KN/m

Jumlah beban merata = ( 10,02+0,60+0,80+1,4+10+3,36 )KN/m

= 26,18 KN/m




2. Beban Hidup

- Untuk beban pada bentang beban segitiga ( 2,6 m ) :
Tingkat I dan II

- Beban hidup pada lantai gedung;
= 2,5 KN/m
2
. 2 . 0,87 m

= 4,35 KN/m
98






Tingkat III

- Beban hujan = 0,9 x ( 1 KN/m
2
x 2 . 0,87 m ) = 1,566 KN/m



- Untuk beban pada bentang trapezium ( 7 m ) :
Tingkat I dan II

- Beban hidup pada lantai gedung;
= 2,5 KN/m
2
. 2 . 1,67 m

= 8,35 KN/m




















3.5.3 Perhitungan Portal Arah Melintang 1-1
99

















Gambar 3.21 Pembebanan Portal Arah Melintang Pot. As I-I




Mengekivalenkan beban segitiga dan trapezium menjadi beban merata ;
Untuk Beban Segitiga :
















Gambar 3.23 Beban Segitiga






L = 2,6 m

T = 1,3 m

Dari penurunan rumus beban segitiga maka didapat nilai H :

H =
2
T =
2
(1,3 m ) = 0,87 m

3 3

Untuk Beban trapezium :
10
0



















Gambar 3.24 Beban Trapesium

L = 7 m

T = 2 m

Dari penurunan rumus beban trapesium maka didapat nilai H :

4T
3
H = T -

3L
2



H = (2 m) -
4(2 m)
3

3(7 m)
2


H = 1,67 m




Pembebanan portal melintang

1. Beban Mati

- Untuk beban pada bentang beban segitiga ( 2,6 m )
Tingkat I dan II

- Berat sendiri pelat
= 0,125 m . 24 Kn/m
3
. 0,87 m = 2,61 KN/m

- Berat plafon + penggantung
= ( 0,11 + 0,07 ) KN/m
2
. 0,87 m = 0,16 KN/m

- Berat penutup lantai ( tebal 1 cm )
= 0,24 KN/m
2
. 0,87 m = 0,21 KN/m
101






- Berat spesi ( tebal 2 cm )
= 2 cm . 0,21 KN/m
2
/cm . 0,87 m = 0,37 KN/m

- Berat dinding bata
= 4m . 2,5 KN/m
2
= 10 KN/m

- Berat plesteran dinding ( luar dan dalam @ 2 cm = 4 cm )
= 4 cm . 4m . 0,21 KN/m
2
/cm = 3,36 KN/m

Jumlah beban merata = ( 2,61+0,16+0,21+0,37+10+3,36 )KN/m

= 16,71 KN/m

Tingkat III

- Berat sendiri pelat
- 0,09 m . 24 Kn/m
3
. 0,87 m = 1,88 KN/m

- Berat plafon + penggantung
- ( 0,11 + 0,07 ) KN/m
2
.0,87 m = 0,16 KN/m +

2,04 KN/m




- Untuk beban pada bentang trapezium ( 7 m ) :
Tingkat I dan II

- Berat sendiri pelat
= 0,125 m . 24 Kn/m
3
. 1,67 m = 5,01 KN/m

- Berat plafon + penggantung
= ( 0,11 + 0,07 ) KN/m
2
. 1,67 m = 0,30 KN/m

- Berat penutup lantai ( tebal 1 cm )
= 0,24 KN/m
2
. 1,67 m = 0,40 KN/m

- Berat spesi ( tebal 2 cm )
= 2cm . 0,21 KN/m
2
/cm . 1,67 m = 0,7 KN/m

- Berat dinding bata
= 4m . 2,5 KN/m
2
= 10 KN/m
10
2






- Berat plesteran dinding ( luar dan dalam @ 2 cm = 4 cm )
= 4 cm . 4m . 0,21 KN/m
2
/cm = 3,36 KN/m

Jumlah beban merata = ( 5,01+0,30+0,40+0,7+10+3,36 )KN/m

= 19,77 KN/m




Tingkat III ( atap )

Berat sendiri plafon + penggantung = 0,72 KN/m



2. Beban Hidup

- Untuk beban pada bentang beban segitiga ( 2,6 m ) :
Tingkat I dan II

- Beban hidup pada lantai gedung;
= 2,5 KN/m
2
. 0,87 m

= 2,18 KN/m

Tingkat III

- Beban hujan = 0,9 x ( 1 KN/m
2
x 0,87 m ) = 0,78 KN/m



- Untuk beban pada bentang trapezium ( 7 m ) :
Tingkat I dan II

- Beban hidup pada lantai gedung;
= 2,5 KN/m
2
. 1,67 m

= 4,18 KN/m

Tingkat III

- Beban hujan = 0,9 x ( 1 KN/m
2
x 1,67 m ) = 1,50 KN/m
103






3.6 Perhitungan Balok


Untuk Perhitungan balok mengacu pada peraturan SNI dan dilengkapi dengan
literature buku Desain Struktur Rangka Beton Bertulang di Daerah Rawan Gempa
(Gideon Kusuma).

Perhitungan selengkapnya akan disajikan dalam bentuk contoh contoh perhitungan
dan tabel tabel

3. 6.1 Perencanaa Penulangan Balok Portal Memanjang As B B

Data data

Dimensi Balok Lantai 1 & 2 = 25/50 cm
Dimensi Ring Balok = 20/30 cm
fc' = 25 MPa
fy = 400 MPa



min
=

fc
4 fy
=
25
= 0,003125

4.400

1,4

1,4


min
=

=
fy 400
= 0,0035

(
min

diambil yang terkecil )


sengkang = 10 mm


tulangan utama = 19 mm


Selimut beton ( P ) = 40 mm



d = h p sengkang -
1
tulangan utama

2


= 500 40 10 -
1
.19

2
10
4






= 440,5 mm


d' = P +



= 40 +
1
tulangan utama + sengkang

2

1
19 + 10

2

= 59,5 mm

Untuk atap


d = h p sengkang -





1
tulangan utama

2


= 300 40 10 -


= 242 mm
1
.16

2


d' = P +



= 40 +
1
tulangan utama + sengkang

2

1
16 + 10

2

= 58 mm



a. Penulangan Tumpuan Memanjang As B B

1. Momen Tumpuan Rencana

Untuk perhitungan momen tumpuan rencana ada dua jenis tulangan tumpuan,
yaitu tulangan tumpuan negatif dan tulangan tumpuan positif. Penulangan tersebut
berdasarkan pada nilai momen positif dan terbesar tiap lantai dalam satu portal.

Adapun nilai momen maksimum positif dan negative diambil dari kombinasi :


- Momen kombinasi akibat beban mati dan beban hidup


M
k1
= 1,2 M
D
+1,6 M
L

105






- Momen kombinasi akibat beban mati dan beban hidup


M
k2
= 0,9 M
D
+ M
E



- Momen kombinasi akibat beban mati dan beban hidup


M
k2
= 1,05 ( M
D
+ 0,9 M
L
+ M
E
)


2. Penulangan Tumpuan


o Perhitungan Balok untuk lantai 1

M
-
tumpuan
= 82,018KNm

M
+
tumpuan
= 33,418 KNm

Tulangan tumpuan negatif


'/ =
33,418
= 0,41

82,018

'/ = 0,5 ( persyaratan gempa )



Rn =
Mu
=

b.d
2

82,018
= 1690,742 KN/m
2

0,25 m . (0,4405 m)
2



= 0,0044

As = . b . d = 0,0044 x 250 x 440,5 = 484,55 mm
2



As' = 0,5 As = 0,5 x 1288,46 mm
2
= 242,275 mm
2



Tulangan tumpuan positif


/' =
82,018
= 2,45

33,418

/' = 1 ( persyaratan gempa )
10
6







Rn =
Mu
=

b.d
2

33,418
= 688,89 KN/m
2

0,25 m . (0,4405 m)
2


Karena Rn = 688,89 KN/m
2
maka digunakan




min
=

fc
4 fy
=
25
= 0,003125

4.400

1,4

1,4


min
=

=
fy 400
= 0,0035

(
min

diambil yang terkecil )

= 0,003125

As = As' = . b . d = 0,003125 x 250 x 440,5 = 344,141 mm
2



Dalam hal ini tulangan terpasang diambil berdasarkan harga maksimum dari 2
jenis tulangan tumpuan

As
atas
= 484,55 mm
2


As
bawah
= 344,141 mm
2





o Perhitungan Balok untuk lantai 2

M
-
tumpuan
= 69,941KNm

M
+
tumpuan
= 18,032

Tulangan tumpuan negatif

'/ =
18,032
= 0,26

69,941

'/ = 0,5 ( persyaratan gempa )


Rn =
Mu
=

b.d
2

69,941
= 1441,78 KN/m
2

0,25 m . (0,4405 m)
2

107






= 0,0039

As = . b . d = 0,0039 x 250 x 440,5 = 429,49 mm
2



As' = 0,5 AS = 0,5 x 1244,41 mm
2
= 214,74 mm
2



Tulangan tumpuan positif


/' =
69,941
= 3,89

18,032

/' = 1 ( persyaratan gempa )



Rn =
Mu
=

b.d
2

18,302
= 369,69 KN/m
2

0,25 m . (0,4405 m)
2



Karena Rn = 369,69 KN/m
2
maka digunakan




min
=

fc
4 fy
=
25
= 0,003125

4.400

1,4

1,4


min
=

=
fy 400
= 0,0035

(
min

diambil yang terkecil )


= 0,003125

As = As' = . b . d = 0,003125 x 250 x 440,5 = 344,141 mm
2



Dalam hal ini tulangan terpasang diambil berdasarkan harga maksimum dari 2
jenis tulangan tumpuan

As
atas
= 429,49 mm
2


As
bawah
= 344,141 mm
2

10
8






oPerhitungan Balok untuk lantai 3

M
-
tumpuan
= 17,704 KNm

M
+
tumpuan
= 3,881 KNm

Tulangan tumpuan negatif


'/ =
3,881
17,704

= 0,22

'/ = 0,5 ( persyaratan gempa )



Rn =
Mu
=

b.d
2

17,704
= 364,96 KN/m
2

0,20 m . (0,242 m)
2



Karena Rn = 364,96 KN/m
2
maka digunakan




min
=

fc
4 fy
=
25
= 0,003125

4.400

1,4

1,4


min
=

=
fy 400
= 0,0035

(
min

diambil yang terkecil )


= 0,003125

As = As' = . b . d = 0,003125 x 200 x 242 = 151,25 mm
2



Tulangan tumpuan positif

/' =
17,704
= 4,56

3,881

/' = 1 ( persyaratan gempa )



Rn =
Mu
=

b.d
2

3,881
= 80 KN/m
2

0,25 m . (0,4405 m)
2

109






Karena Rn = 80 KN/m
2
maka digunakan




min
=

fc
4 fy
=
25
= 0,003125

4.400

1,4

1,4


min
=

=
fy 400
= 0,0035

(
min

diambil yang terkecil )


= 0,003125

As = As' = . b . d = 0,003125 x 200 x 242 = 151,25 mm
2



Dalam hal ini tulangan terpasang diambil berdasarkan harga maksimum dari 2
jenis tulangan tumpuan

As
atas
= 151,25 mm
2


As
bawah
= 151,25 mm
2





b. Penulangan Geser


1. Momen Nominal Aktual Balok


o Perhitungan balok lantai 1


Momen Nominal Aktual Positif

( asumsi balok persegi )

Tulangan atas = 2D 19 = 567 mm
2



Tulangan bawah = 2D 19 = 567 mm
2




/' =
567 mm
2

= 1
567 mm
2

11
0






=
567

250x440,5

= 0, 00515

Pada tabel tulangan lentur pada lampiran 3 ( Gideon Kusuma )
Didapat Rn = 2000
Mnak + = Mn = Rn.b.d
2
= 2000 x 0,25 x 0,4405
2
= 97,020 KNm


Momen Nominal Aktual Negatif


( asumsi balok T )



/' =
567
567 + (2 x
1
.t .10
2
.4)

4

= 0,474

567 + (2 x
1
.t .10
2
.4)

=
4

250 x440,5

=
567 + 628,32
= 0,011

250x440,5

Pada tabel tulangan lentur pada lampiran 3 ( Gideon Kusuma )
Didapat Rn = 3900
Mnak - = Mn = Rn.b.d
2
= 3900 x 0,25 x 0,4405
2
= 189,19 KNm




o Perhitungan balok lantai 2


Momen Nominal Aktual Positif


( asumsi balok persegi )

Tulangan atas = 2D 19 = 567 mm
2



Tulangan bawah = 2D 19 = 567 mm
2

111







/' =
567 mm
2

= 1
567 mm
2


=
567

250x440,5

= 0, 00515

Pada tabel tulangan lentur pada lampiran 3 ( Gideon Kusuma )
Didapat Rn = 2000
Mnak + = Mn = Rn.b.d
2
= 2000 x 0,25 x 0,4405
2
= 97,020 KNm


Momen Nominal Aktual Negatif


( asumsi balok T )



/' =
567
567 + (2 x
1
.t .10
2
.4)

4

= 0,474

567 + (2 x
1
.t .10
2
.4)

=
4

250 x440,5

=
567 + 628,32
= 0,011

250x440,5

Pada tabel tulangan lentur pada lampiran 3 ( Gideon Kusuma )
Didapat Rn = 3900
Mnak - = Mn = Rn.b.d
2
= 3900 x 0,25 x 0,4405
2
= 189,19 KNm




oPerhitungan balok lantai 3


Momen Nominal Aktual Positif


( asumsi balok persegi )

Tulangan atas = 2D 16 = 402,12 mm
2

11
2






Tulangan bawah = 2D 16 = 402,12 mm
2




/' =
402,12 mm
2

= 1
402,12 mm
2


=
402,12

200x242

= 0, 00831

Pada tabel tulangan lentur pada lampiran 3 ( Gideon Kusuma )
Didapat Rn = 2400
Mnak + = Mn = Rn.b.d
2
= 2400 x 0,20 x 0,242
2
= 28,111 KNm


Momen Nominal Aktual Negatif


( asumsi balok T )



/' =
402,12
402,12 + (2x
1
.t .10
2
.4)

4

= 0,390

402,12 + (2x
1
.t .10
2
.4)

=
4

200x242


=
402,12 + 628,32
= 0,021

200x242

Pada tabel tulangan lentur ( Gideon Kusuma )
Didapat Rn = 5400
Mnak - = Mn = Rn.b.d
2
= 5400 x 0,20 x 0,242
2
= 63,249 KNm


2. Gaya Geser Maksimum Balok ( Vub )
Lantai 1

Vub = 136,741 KN ( dapat dilihat dari tabel gaya geser rencana )
113






Lantai 2

Vub = 135,785 KN ( dapat dilihat dari tabel gaya geser rencana )


Lantai 3

Vub = 84,420 KN ( dapat dilihat dari tabel gaya geser rencana )


3. Gaya Geser Terpakai Maksimum Balok ( Vub
terpakai
)
Lantai 1

Vub
terpakai
= 120,625 KN ( dapat dilihat dari tabel gaya geser rencana )


Lantai 2

Vub
terpakai
= 119,668 KN ( dapat dilihat dari tabel gaya geser rencana )


Lantai 3

Vub
terpakai
= 68,303 KN ( dapat dilihat dari tabel gaya geser rencana )


4. Penulangan Geser


o Perhitungan untuk balok lantai 1


Skema gaya geser rencana :
11
4
|
|
6
|
6






Vujung = Vub
| Vub Vubterpakai

xLn
|

\
d
.


= 136,741KN
| 136,741KN 120,625KN

x3,75
|

\
0,4405
.


= 1,374 KN


Penulangan geser dalam daerah sendi plastis


Vub
terpakai

Vs =
|
=
120,625KN

0,75

= 160,83 KN = 160,83 x 10
3
N




s =
Av. fy.d

Vs
2.
1
.t .10
2
.400.440,5

=
4

160,83x10
3



= 172,09 mm >


d
= 110,125 mm

4


Jadi diambil jarak 110 mm


Dipakai sengkang 10 110 mm





Penulangan geser diluar sendi plastis


Vub' = Vujung +
ln+ 2h
(Vub





Vujung )

ln
maksimum



Vub' = 1,374KN +
3,75m 1m
(136,74KN 1,374KN )

3,75m


Vub' = 100,64 KN


|
fc'
|

|
25MPa
|

Vc =


|
.bw.d =


|
.250mm .440,5mm = 91770 N = 91,77 KN

|

\ .
\ .

115
|
|






Vs' =
Vub'
Vc =
100,64 KN
91,77 KN = 42,42 KN = 42,42 x 10
3
N

0,75 0,75




s =
Av. fy.d
=

Vs'
2.
1
.t .10
2
.400.440,5

4
42,42 x10
3



= 652,46 mm >


d
= 220, 25 mm

2


Dipakai sengkang 10 220 mm





o Perhitungan untuk balok lantai 2


Skema gaya geser rencana :























Vujung = Vub
| Vub Vubterpakai

xLn
|

\
d
.


= 135,785KN
| 135,785KN 119,668KN

x3,75
|

\
0,4405
.


= 0,41 KN
11
6
6
|
6






Penulangan geser dalam daerah sendi plastis


Vub
terpakai

Vs =
|
=
119,668KN

0,75

= 159,56KN = 159,56 x 10
3
N




s =
Av. fy.d

Vs
2.
1
.t .10
2
.400.440,5

=
4

159,56x10
3



= 173,46 mm >


d
= 110,125 mm

4


Jadi diambil jarak 110 mm


Dipakai sengkang 10 110 mm


Penulangan geser diluar sendi plastis


Vub' = Vujung +
ln+ 2h
(Vub





Vujung )

ln
maksimum



Vub' = 0,41KN +
3,75m 1m
(135,785KN 0,41KN )

3,75m


Vub' = 99,685 KN


|
fc'
|

|
25MPa
|

Vc =


|
.bw.d =


|
.250mm .440,5mm = 91770 N = 91,77 KN

|

\ . \ .

Vs' =
Vub'
Vc =

0,75
99,685 KN
91,77 KN = 41,143 KN = 41,143 x 10
3
N

0,75




s =
Av. fy.d
=

Vs'
2.
1
.t .10
2
.400.440,5

4
41,143x10
3



= 672,71 mm >


d
= 220, 25 mm

2


Dipakai sengkang 10 220 mm
117
|
|






o Perhitungan untuk balok lantai 3


Skema gaya geser rencana :























Vujung = Vub
| Vub Vubterpakai

xLn
|

\
d
.


= 38,34KN
| 38,34KN 37,67 KN

x3,8
|

\
0,242
.


= 10,52 KN


Penulangan geser dalam daerah sendi plastis


Vub
terpakai

Vs =
|
=
37,67KN
= 50,23KN = 50,23 x 10
3
N

0,75




s =
Av. fy.d
=

Vs
2.
1
.t .10
2
.200.242

4
50,23x10
3



= 151,4 mm >


d
= 60,5 mm

4


Jadi diambil jarak 60 mm
11
8
|
|
6
\
6
.






Dipakai sengkang 10 60 mm


Penulangan geser diluar sendi plastis


Vub' = Vujung +
ln 2h
(Vub

ln


maksimum
Vujung )


Vub' = 10,52KN +
3,8m 0.6m
(38,34KN 10,52KN )

3,8m


Vub' = 33,95 KN


|

Vc =


fc'
| |

|
.bw.d =


25MPa
|
.200mm .242mm = 30333 N = 30,33 KN

|

\ .

Vs' =
Vub'
Vc =

0,75
33,95 KN
30,333 KN = 14,93 KN = 14,93 x 10
3
N

0,75




s =
Av. fy.d
=

Vs'
2.
1
.t .10
2
.200.242

4
14,93x10
3



= 509,22 mm >


d
= 121 mm

2


Dipakai sengkang 10 120 mm




c. Penulangan Lapangan


1. Momen Lapangan Rencana


Nilai nilai dari momen lapangan rencana dapat dilihat dari tabel


2. Penulangan Lapangan


Data data perhitungan :
119









L = 4000 mm ( nilai ini diambil karena momen lapangan maks terdapat pada
bentang dengan L = 4 m )

Ln = 4800 mm





4,8 m
2,6 m 7 m



Lebar efektif



1
b
eff


4
L =
1

4

4000 = 1000 mm


b
eff
16 hf + bw = 16 x 125 + 250 = 2250 mm
b
eff
bw + Ln = 250 + 4800 = 5050 mm
Diambil b
eff
terkecil = 1000 mm

beff = 1000


hf = 125

hw = 375


bw = 250


o Perhitungan penulangan balok lantai 1


Mu = 35,526 KNm


Asumsi letak garis netral di dalam sayap
a hf dan c < hf
12
0






Batasan tulangan

As
min
=
min
x bw x d = 0,003125 x 250 x 440,5 = 344,141 mm
2


(0.85.| . f ' c)

As
maks
= 0,75 x

x

600 (

(
x bw x d


fy

600 + fy



As
maks
= 0,75 x

(0.85.0.85. f ' c)


400
x
600 (

600 + 400
(


x 250 x 440,5

= 2237,774 mm
2



Mu
= 0,85 x f'c x a x b

|

d
a (

2
(



35,526 x10
6

0,8

= 0,85 x 25 x a x 1000

440,5

a (
2
(




44,41 x 10
6
= 21250a x

440,5

a (
2
(


44,41 x 10
6
= 9360625a 10625a
2



4179,76 = 881a a
2



a
2
881a + 4179,76 = 0



a
12
=
881 881
2
4.1.(4179,76)
2.1


=
881 871,46

2


a
1
=
881 + 871,46
2

= 876,23 mm
121







a
2
=
881 871,46
2

= 4,77 mm


Ambil a yang terkecil a = 4,77 mm


c =
a
=

|
1
4,77
= 5,61 < hf = 125 mm.anggapan benar

0,85


Cc = Ts



As =

0,85.fc'.c.b
=
0,85.25.5,61.1000
= 298,03 mm
2

fy 400

Dipakai 2 D19 ( As = 567 mm
2
)





o Perhitungan penulangan balok lantai 2


Mu = 35,499 KNm


Asumsi letak garis netral di dalam sayap
a hf dan c < hf
Batasan tulangan

As
min
=
min
x bw x d = 0,003125 x 250 x 440,5 = 344,141 mm
2


(0.85.| . f ' c)

As
maks
= 0,75 x

x

600 (

(
x bw x d


fy

600 + fy



As
maks
= 0,75 x

(0.85.0.85. f ' c)


400
x
600 (

600 + 400
(


x 250 x 440,5

= 2237,774 mm
2

12
2






Mu
= 0,85 x fc' x a x b

|

d
a (

2
(



35,499 x10
6

0,8

= 0,85 x 25 x a x 1000

440,5

a (
2
(




44,37 x 10
6
= 21250a x

440,5

a (
2
(


44,37 x 10
6
= 9360625a 10625a
2



4176 = 881a a
2



a
2
881a + 4176 = 0



a
12
=
881 881
2
4.1.(4176)
2.1


=
881 871,47

2


a
1
=
881 + 871,47
2

= 876,24 mm



a
2
=
881 871,47
2

= 4,77 mm


Ambil a yang terkecil a = 4,77 mm


c =
a
=

|
1
4,77
= 5,61 < hf = 125 mm.anggapan benar

0,85


Cc = Ts



As =

0,85.fc'.c.b
=
0,85.25.5,61.1000
= 298,03 mm
2

fy 400
123






Dipakai 2 D19 ( As = 567 mm
2
)





o Perhitungan penulangan balok lantai 3


Mu = 10,035 KNm


Lebar efektif



1
b
eff


4
L =
1

4

4000 = 1000 mm


b
eff
16 hf + bw = 16 x 90 + 200 = 1640 mm
b
eff
bw + Ln = 200 + 4000 = 4200 mm
Diambil b
eff
terkecil = 1000 mm


beff = 1000


hf = 90

hw = 210


bw = 200





Asumsi letak garis netral di dalam sayap
a hf dan c < hf
Batasan tulangan

As
min
=
min
x bw x d = 0,003125 x 200 x 242 = 151,25mm
2

12
4






(0.85.| . f ' c)

As
maks
= 0,75 x

x

600 (

(
x bw x d


fy

600 + fy



As
maks
= 0,75 x

(0.85.0.85. f ' c)


400
x
600 (

600 + 400
(


x 200 x 242

= 983,503 mm
2



Mu
= 0,85 x f'c x a x b

|

d
a (

2
(



10,04 x10
6

0,8

= 0,85 x 25 x a x 1000

242

a (
2
(




12,564 x 10
6
= 34850a x

242

a (
2
(


12,564 x 10
6
= 8433700a 17425a
2



721,03 = 484a a
2



a
2
484a + 721,03 = 0



a
12
=
484 484
2
4.1.(721,03)
2.1


=
484 481,01

2


a
1
=
484 + 481,01
2

= 482,51 mm



a
2
=
484 481,01
2

= 1,495 mm
125






Ambil a yang terkecil a = 1,495 mm


c =
a
=
1,495
= 1,76 < hf = 125 mm.anggapan benar

|
1
0,85



Cc = Ts



As =

0,85.fc'.c.b
=
0,85.25.1,76.1640
= 153,34 mm
2

fy 400


Dipakai 2 D16 ( As = 402,2 mm
2
)
35



Tabel Momen Rencana Balok -Balok Portal Memanjang As B-B ( Tumpuan )


Lantai

Balok

M
D


M
L


M
E kiri

M
E kanan

1.2 M
D
+ 1.6 M
L

0.9 MD ME 1.05 ( M
D
+ 0.9 M
L
M
E
)

E
kiri


E
kanan


E
kiri


E
kanan





1
2--6 -15.885 -3.147 47.714 -47.714 -24.098 33.418 -62.011 30.447 -69.754
6--2 -36.609 -7.334 -34.904 38.904 -55.664 -67.852 5.956 -82.018 -4.520
6--10 -35.034 -7.003 27.309 -27.309 -53.245 -4.222 -58.840 -14.729 -72.078
34-38 -33.095 -6.601 28.372 -28.372 -50.275 -1.414 -58.157 -11.197 -70.778
38-34 -33.090 -6.599 -28.319 28.319 -50.267 -58.100 -1.463 -70.716 -11.247
38-42 -33.097 -6.601 28.225 -28.225 -50.278 -1.562 -58.012 -11.353 -70.626




2
3--7 -17.500 -3.382 33.782 -33.782 -26.412 18.032 -49.533 13.900 -57.043
7--3 -35.080 -7.070 -25.168 25.168 -53.407 -56.740 -6.404 -69.941 -17.088
7--11 -33.909 -6.823 21.542 -21.542 -51.608 -8.976 -52.061 -19.433 -64.672
15-19 -33.051 -6.596 21.679 -21.679 -50.214 -8.067 -51.424 -18.173 -63.698
19-15 -33.147 -6.609 -21.537 21.537 -50.350 -51.369 -8.295 -63.663 -18.435
19-23 -33.032 -6.588 21.296 -21.296 -50.179 -8.433 -51.025 -18.548 -63.270




3
4--8 -6.184 -1.013 9.447 -9.447 -9.041 3.881 -15.012 2.469 -17.369
8--4 -7.501 -0.546 -7.965 7.965 -9.875 -14.716 1.214 -16.755 -0.029
8--12 -7.600 -0.594 7.231 -7.231 -10.071 0.390 -14.071 -0.950 -16.134
24-28 -9.419 -1.041 6.505 -6.505 -12.968 -1.972 -14.982 -4.043 -17.704
28-24 -9.4558 -1.0464 -6.4546 6.4546 -13.021 -14.965 -2.056 -17.695 -4.140
28-32 -9.4309 -1.0427 6.3116 -6.3616 -12.985 -2.176 -14.849 -4.261 -17.567
36









Tabel Momen Rencana Balok Balok Portal Memanjang As BB ( Lapangan )


Lantai

Balok

M
D


M
L


M
E kiri

M
E kanan

1.2 M
D
+ 1.6 M
L

0.9 MD ME 1.05 ( M
D
+ 0.9 M
L
M
E
)
E
kiri
E
kanan
E
kiri
E
kanan


1
26 23.392 4.660 0 0 35.526 21.053 21.053 28.965 28.965
610 15.807 3.148 0 0 24.004 14.226 14.226 19.572 19.572
3438 61.547 3.300 0 0 79.137 55.392 55.392 67.743 67.743
3842 16.546 3.300 0 0 25.136 14.892 14.892 20.492 20.492


2
37 23.350 4.674 0 0 35.499 21.015 21.015 28.935 28.935
711 16.132 3.199 0 0 24.475 14.518 14.518 19.961 19.961
1519 16.542 3.298 0 0 25.126 14.887 14.887 20.485 20.485
1923 16.552 3.302 0 0 25.146 14.897 14.897 20.500 20.500


3
48 7.314 0.787 0 0 10.035 6.582 6.582 8.423 8.423
812 5.284 0.669 0 0 7.410 4.756 4.756 6.180 6.180
2428 4.723 0.523 0 0 6.503 4.250 4.250 5.452 5.452
2832 4.721 0.522 0 0 6.501 4.249 4.249 5.451 5.451
37


Lantai

M -
(KNm)
As Tulangan Atas

M +
(KNm)
As Tulangan Bawah


As (mm
2
)
Mnak (KNm)

As (mm
2
)

As (mm
2
)

As (mm
2
)

Positif

Negatif
1 82.018 484.55 2D - 19 = 567 33.418 344.141 2D - 19 = 567 97.02 189.19
2 69.941 429.49 2D - 19 = 567 18.032 344.141 2D - 19 = 567 97.02 189.19
3 17.704 151.25 2D - 16 = 402.2 3.881 151.25 2D - 16 = 402.2 28,111 63,249





Tabel Tulangan Dan Momen Nominal Aktual Balok Portal Memanjang As B -B





Perlu

Terpasang

Perlu
Terpasang
38



Gaya Geser Rencana Balok Portal As B B



Lantai

Balok
Mnak+
(KNm)
Mnak-
(KNm)

1.25 x 0.7 ((Mnak+) + (Mnak-)/ln)

VD

VL

1,05 Vg

Vub
(ln-
d)/ln

Vub terpakai




1
2--6 97.020 189.190 67.685 -44.459 -8.853 -55.978 11.707 0.881 -4.409
6--2 189.190 97.020 67.685 54.821 10.947 69.056 136.741 0.881 120.625
6--10 97.020 189.190 67.685 -50.240 -10.025 -63.278 4.407 0.881 -11.710
34-38 97.020 189.190 67.685 -49.641 -9.900 -62.518 5.167 0.881 -10.950
38-34 189.190 97.020 67.685 49.639 9.900 62.516 130.201 0.881 114.084
38-42 97.020 189.190 67.685 -49.620 -9.901 -62.497 5.188 0.881 -10.929




2
3--7 97.020 189.190 67.685 -45.245 -8.978 -56.934 10.751 0.881 -5.366
7--3 189.190 97.020 67.685 54.035 10.822 68.100 135.785 0.881 119.668
7--11 97.020 189.190 67.685 -49.840 -9.961 -62.791 4.894 0.881 -11.223
15-19 97.020 189.190 67.685 -49.616 -9.897 -62.489 5.196 0.881 -10.920
19-15 189.190 97.020 67.685 49.664 9.903 62.545 130.230 0.881 114.114
19-23 97.020 189.190 67.685 -49.612 -9.895 -62.482 5.202 0.881 -10.914




3
4--8 28.111 63.249 21.605 -13.831 -1.683 -16.290 5.316 0.881 0.171
8--4 63.249 28.111 21.605 14.489 1.449 16.735 38.340 0.881 37.696
8--12 28.111 63.249 21.605 -13.522 -1.414 -15.683 5.923 0.881 0.778
24-28 28.111 63.249 21.605 -14.151 -1.565 -16.502 5.104 0.881 -0.041
28-24 63.249 28.111 21.605 14.169 1.567 16.523 38.128 0.881 32.984
28-32 28.111 63.249 21.605 -14.156 -1.565 -16.507 5.098 0.881 -0.046
M
+
+ M
-
(

Keterangan: (1)V
g
= V
D
+ V
L
(2) V
Ub
= 0,7|



ln

(
+ 1,05 Vg

39
6



| M
+
+ M
-
|(

ln - d


| M
+
M
-
|((

(3) Vub
terpakai
=

1.05Vg - 0,7|

|
(
+

Vub -

1,05Vg - 0,7|

|
((

\
ln
.
ln
\
ln
.


Penulangan Geser Balok Portal Memanjang As B B



Lantai

Vub
maks

Vub terpakai
Maks

Ln
(m)


d (m)

2h
(m)
Dalam sendi plastis Diluar sendi plastis


V ujung
Vs

s (mm)

Tul G
terpasang

Vub'

Vc

Vs'

s (mm)

Tul G
terpasang
1 136.741 120.625 3.75 0.4405 1 160.83 172.09 10 110 100.640 91.77 42,420 652,46 10 220 1.374
2 135.785 119.668 3.75 0.4405 1 159.56 173.46 10 110 99.685 91.77 41,143 672,71 10 220 0.41
3 38.34 37.67 3.75 0.242 0.6 50.23 151.4 10 60 33.95 30.33 14.93 509.22 10 120 10,52
Vub
terpakai

Keterangan: Vs =
|

= 0,75

|

Vc =


fc'
|

|
.bw.d

|

\ .

Vs' =
Vub'
Vc

|

= 0,75

s =
Av. fy.d

Vs'
40



Vub' = Vujung +
ln+ 2h
(Vub

Vujung )

ln
maksimum


| Vub Vubterpakai |

Vujung = Vub

\
d

xLn |
.

Tabel Penulangan Lapangan As B-B



Lantai

Mu (N/mm)

As
min

(mm
2
)

As
maks

(mm
2
)

a
(mm)

c
(mm)

As
perlu

(mm
2
)

As
terpasang

(mm
2
)
(1) (2) (3) (4) (5) (6) (7) (8)
1 35.526 x 10
6
344.141 2237.774 4.77 5.61 298.03 2D - 19 = 567
2 35.499 x 10
6
344.141 2237.774 4.77 5.61 298.03 2D - 19 = 567
3 10.035 x 10
6
151,25 983.503 1.34 1.58 83.94 2D - 16 = 402.2
Ket :
(2) Dari tabel momen rencana balok Lapangan ( hasil analisa struktur )
(3) As
min
=
min
x bw x d

(0.85.| . f ' c)

(4) As
maks
= 0,75 x

x


600 (

(
x bw x d


fy

600 + fy

41
1 2




(5)

Mu
= 0,85 x fc' x a x b

d
a (

didapat a


dan a


diambil a yang terkecil

| 2


(6) c =
a

|
1



(7) As =
0,85.fc'.c.b
fy


Tabel Momen Rencana Balok Balok Portal Memanjang CC ( Tumpuan )


Lantai

Balok

M
D


M
L


M
E kiri

M
E kanan
1.2 M
D
+ 1.6
M
L
0.9 MD ME 1.05 ( MD + 0.9 ML ME )
E
kiri E
kanan E
kiri E
kanan




1
26 13.713 1.918 47.714 47.714 19.525 35.372 60.056 33.889 66.312
62 31.672 4.392 34.904 38.904 45.032 63.408 10.399 74.054 3.444
610 30.307 4.217 27.309 27.309 43.115 0.033 54.585 7.133 64.482
3438 28.628 3.987 28.372 28.372 40.732 2.606 54.137 4.037 63.617
3834 28.625 3.987 28.319 28.319 40.728 54.081 2.556 63.558 4.089
3842 28.629 3.986 28.225 28.225 40.733 2.459 53.991 4.191 63.464



2
37 15.314 2.265 33.782 33.782 22.002 20.000 47.565 17.251 53.692
73 30.376 4.175 25.168 25.168 43.130 52.506 2.170 62.266 9.413
711 29.166 4.006 21.542 21.542 41.410 4.707 47.792 11.791 57.030
1519 28.522 3.968 21.679 21.679 40.575 3.991 47.349 10.935 56.460
1915 28.717 4.002 21.537 21.537 40.864 47.383 4.308 56.549 11.321
42



1923 28.557 3.976 21.296 21.296 40.629 4.405 46.997 11.381 56.103




3
48 6.183 1.213 9.447 9.447 9.360 3.882 15.011 2.281 17.557
84 7.344 1.670 7.965 7.965 11.484 14.574 1.355 17.652 0.926
812 7.113 1.586 7.231 7.231 11.074 0.829 13.632 1.376 16.560
2428 7.331 1.590 6.505 6.505 11.342 0.093 13.103 2.370 16.031
2824 7.3845 1.6007 6.4546 6.4546 11.423 13.101 0.191 16.044 2.489
2832 7.3445 1.593 6.3116 6.3616 11.362 0.298 12.972 2.590 15.897









Tabel Momen Rencana Balok Balok Portal Memanjang CC ( Lapangan )


Lantai

Balok

M
D


M
L


M
E kiri

M
E kanan
1.2 M
D
+ 1.6
M
L
0.9 MD ME 1.05 ( M
D
+ 0.9 M
L
M
E
)
E
kiri E
kanan E
kiri E
kanan


1
26 20.248 2.825 0 0 28.818 18.223 18.223 23.930 23.930
610 13.663 1.905 0 0 19.443 12.297 12.297 16.146 16.146
3438 14.314 1.993 0 0 20.366 12.882 12.882 16.913 16.913
3842 14.313 1.993 0 0 20.365 12.882 12.882 16.912 16.912


2
37 20.099 2.760 0 0 28.535 18.089 18.089 23.713 23.713
711 13.983 1.966 0 0 19.926 12.585 12.585 16.541 16.541
1519 14.320 1.995 0 0 20.377 12.888 12.888 16.922 16.922
43


Lantai

M -
(KNm)
As Tulangan Atas

M +
(KNm)
As Tulangan Bawah


As (mm
2
)
Mnak (KNm)

As (mm
2
)

As (mm
2
)

As (mm
2
)

Positif

Negatif
1 74.054 484.55 2D - 19 = 567 35.374 344.141 2D - 19 = 567 97.02 189.19
2 69.941 429.49 2D - 19 = 567 18.032 344.141 2D - 19 = 567 97.02 189.19
3 17.704 151.25 2D - 16 = 402.2 3.881 151.25 2D - 16 = 402.2 28,111 63,249




1923 14.317 1.994 0 0 20.370 12.885 12.885 16.916 16.916


3
48 4.277 0.953 0 0 6.657 3.849 3.849 5.391 5.391
812 3.713 0.793 0 0 5.724 3.341 3.341 4.648 4.648
2428 3.682 0.798 0 0 5.696 3.314 3.314 4.621 4.621
2832 3.682 0.798 0 0 5.696 3.314 3.314 4.621 4.621



Tabel Tulangan Dan Momen Nominal Aktual Balok Portal Memanjang As C -C





Perlu

Terpasang

Perlu
Terpasang
44



Gaya Geser Rencana Balok Portal As C C



Lantai

Balok
Mnak+
(KNm)
Mnak-
(KNm)

1.25 x 0.7 ((Mnak+) + (Mnak-)/ln)

VD

VL

1,05 Vg

Vub
(ln-
d)/ln

Vub terpakai




1
2--6 97.020 189.190 67.685 -44.459 -8.853 -55.978 11.707 0.881 -4.409
6--2 189.190 97.020 67.685 54.821 10.947 69.056 136.741 0.881 120.625
6--10 97.020 189.190 67.685 -50.240 -10.025 -63.278 4.407 0.881 -11.710
34-38 97.020 189.190 67.685 -49.641 -9.900 -62.518 5.167 0.881 -10.950
38-34 189.190 97.020 67.685 49.639 9.900 62.516 130.201 0.881 114.084
38-42 97.020 189.190 67.685 -49.620 -9.901 -62.497 5.188 0.881 -10.929




2
3--7 97.020 189.190 67.685 -45.245 -8.978 -56.934 10.751 0.881 -5.366
7--3 189.190 97.020 67.685 54.035 10.822 68.100 135.785 0.881 119.668
7--11 97.020 189.190 67.685 -49.840 -9.961 -62.791 4.894 0.881 -11.223
15-19 97.020 189.190 67.685 -49.616 -9.897 -62.489 5.196 0.881 -10.920
19-15 189.190 97.020 67.685 49.664 9.903 62.545 130.230 0.881 114.114
19-23 97.020 189.190 67.685 -49.612 -9.895 -62.482 5.202 0.881 -10.914




3
4--8 28.111 63.249 21.605 -13.831 -1.683 -16.290 5.316 0.881 0.171
8--4 63.249 28.111 21.605 14.489 1.449 16.735 38.340 0.881 37.696
8--12 28.111 63.249 21.605 -13.522 -1.414 -15.683 5.923 0.881 0.778
24-28 28.111 63.249 21.605 -14.151 -1.565 -16.502 5.104 0.881 -0.041
28-24 63.249 28.111 21.605 14.169 1.567 16.523 38.128 0.881 32.984
28-32 28.111 63.249 21.605 -14.156 -1.565 -16.507 5.098 0.881 -0.046
M
+
+ M
-
(

Keterangan: (1)V
g
= V
D
+ V
L
(2) V
Ub
= 0,7|



ln

(
+ 1,05 Vg

45
6



| M
+
+ M
-
|(

ln - d


| M
+
M
-
|((

(3) Vub
terpakai
=

1.05Vg - 0,7|

|
(
+

Vub -

1,05Vg - 0,7|

|
((

\
ln
.
ln
\
ln
.


Penulangan Geser Balok Portal Memanjang As C -C




Lantai

Vub
maks

Vub terpakai
Maks

Ln
(m)


d (m)

2h
(m)
Dalam sendi plastis Diluar sendi plastis


V ujung
Vs

s (mm)

Tul G
terpasang

Vub'

Vc

Vs'

s (mm)

Tul G
terpasang
1 136.741 120.625 3.75 0.4405 1 160.83 172.09 10 - 110 100.640 91.77 42,420 652,46 10 - 220 1.374
2 135.785 119.668 3.75 0.4405 1 159.56 173.46 10 - 110 99.685 91.77 41,143 672,71 10 - 220 0.41
3 38.34 37.67 3.75 0.242 0.6 50.23 151.4 10 - 60 33.95 30.33 14.93 509.22 10 - 120 10,52


Vub
terpakai

Keterangan: Vs =
|

= 0,75

|

Vc =


fc'
|

|
.bw.d

|

\ .

Vs' =
Vub'
Vc

|

= 0,75

s =
Av. fy.d

Vs'
46



Vub' = Vujung +
ln+ 2h
(Vub

Vujung )

ln
maksimum


| Vub Vubterpakai |

Vujung = Vub

\
d

xLn |
.




Tabel Penulangan Lapangan As C C



Lantai

Mu (N/mm)

As
min

(mm
2
)

As
maks

(mm
2
)

a
(mm)

c
(mm)

As
perlu

(mm
2
)

As
terpasang

(mm
2
)
(1) (2) (3) (4) (5) (6) (7) (8)
1 28.818 x 10
6
344.141 2237.774 4.77 5.61 298.03 2D - 19 = 567
2 28.535 x 10
6
344.141 2237.774 4.77 5.61 298.03 2D - 19 = 567
3 6.657 x 10
6
151,25 983.503 1.34 1.58 83.94 2D - 16 = 402.2
Ket :
(2) Dari tabel momen rencana balok Lapangan ( hasil analisa struktur )
(3) As
min
=
min
x bw x d

(0.85.| . f ' c)

(4) As
maks
= 0,75 x

x


600 (

(
x bw x d


fy

600 + fy

47
1 2




(5)

Mu
= 0,85 x f'c x a x b

d
a (

didapat a


dan a


diambil a yang terkecil

| 2


(6) c =
a

|
1



(7) As =
0,85.fc'.c.b
fy
48






3.6.2 Perencanaan Penulangan Balok Portal Melintang As 1 1

Data data

Dimensi Balok Lantai 1 & 2 = 25/50 cm
Dimensi Ring Balok = 20/30 cm
fc' = 25 MPa
fy = 400 MPa



min
=

fc
4 fy
=
25
= 0,003125

4.400

1,4

1,4


min
=

=
fy 400
= 0,0035

(
min

diambil yang terkecil )


sengkang = 10 mm


tulangan utama = 19 mm


Selimut beton ( P ) = 40 mm


Untuk Lantai 1 & 2


d = h p sengkang -



1
tulangan utama

2


= 500 40 10 -


= 440,5 mm
1
.19

2


d' = P +



= 40 +
1
tulangan utama + sengkang

2

1
19 + 10

2

= 59,5 mm
49






Untuk atap


d = h p sengkang -



1
tulangan utama

2


= 300 40 10 -


= 242 mm
1
.16

2


d' = P +



= 40 +
1
tulangan utama + sengkang

2

1
16 + 10

2

= 58 mm



d. Penulangan Tumpuan Melintang As 1 1

3. Momen Tumpuan Rencana

Untuk perhitungan momen tumpuan rencana ada dua jenis tulangan tumpuan,
yaitu tulangan tumpuan negatif dan tulangan tumpuan positif. Penulangan tersebut
berdasarkan pada nilai momen positif dan terbesar tiap lantai dalam satu portal.

Adapun nilai momen maksimum positif dan negative diambil dari kombinasi :


- Momen kombinasi akibat beban mati dan beban hidup


M
k1
= 1,2 M
D
+1,6 M
L



- Momen kombinasi akibat beban mati dan beban hidup


M
k2
= 0,9 M
D
+ M
E



- Momen kombinasi akibat beban mati dan beban hidup


M
k2
= 1,05 ( M
D
+ 0,9 M
L
+ M
E
)
50






4. Penulangan Tumpuan


o Perhitungan Balok untuk lantai 1

M
-
tumpuan
= 137.965 KNm

M
+
tumpuan
= 0


Tulangan tumpuan negatif


'/ =
0
= 0

137,965

'/ = 0,5 ( persyaratan gempa )



Rn =
Mu
=

b.d
2

137,965
= 3555,06 KN/m
2

0,8.0,25 m . (0,4405 m)
2



= 0,0128

As = . b . d = 0,0128 x 250 x 440,5 = 1409,6 mm
2



As' = 0,5 AS = 0,5 x 1244,413 mm
2
= 704,8 mm
2



Tulangan tumpuan positif

/' =
137,965
= ~

0

/' = 1 ( persyaratan gempa )



Rn =
Mu
=

b.d
2

0
= 0

0.8.0,25 m . (0,4405 m)
2



Karena Rn = 0 maka digunakan




min
=

fc
4 fy
=
25
= 0,003125

4.400
51






1,4

1,4


min
=

=
fy 400
= 0,0035

(
min

diambil yang terkecil )


= 0,003125

As = As' = . b . d = 0,003125 x 250 x 440,5 = 344,141 mm
2



Dalam hal ini tulangan terpasang diambil berdasarkan harga maksimum dari 2
jenis tulangan tumpuan

As
atas
= 1409,6 mm
2


As
bawah
= 704,8 mm
2





oPerhitungan Balok untuk lantai 2

M
-
tumpuan
= 133.853 KNm

M
+
tumpuan
= 0


Tulangan tumpuan negatif


'/ =
0
= 0

133.853

'/ = 0,5 ( persyaratan gempa )



Rn =
Mu
=

b.d
2

133.853
= 3449,104 KN/m
2

0.8.0,25 m . (0,4405 m)
2


= 0,0122

As = . b . d = 0,0122 x 250 x 440,5 = 1343,525 mm
2



As' = 0,5 AS = 0,5 x 1244,41 mm
2
= 671,763 mm
2

52






Tulangan tumpuan positif

/' =
133,853
= ~

0

/' = 1 ( persyaratan gempa )



Rn =
Mu
=

b.d
2

0
= 0

0,8.0,25 m . (0,4405 m)
2



Karena Rn = 0 maka digunakan




min
=

fc
4 fy
=
25
= 0,003125

4.400

1,4

1,4


min
=

=
fy 400
= 0,0035

(
min

diambil yang terkecil )


= 0,003125

As = As' = . b . d = 0,003125 x 250 x 440,5 = 344,141 mm
2



Dalam hal ini tulangan terpasang diambil berdasarkan harga maksimum dari 2
jenis tulangan tumpuan

As
atas
= 1343,525 mm
2


As
bawah
= 671,763 mm
2


oPerhitungan Balok untuk atap

M
-
tumpuan
= 18,789 KNm

M
+
tumpuan
= 0


Tulangan tumpuan negatif
53







'/ =
0
= 0

18,789

'/ = 0,5 ( persyaratan gempa )



Rn =
Mu
=

b.d
2

18,789
= 484,152 KN/m
2

0,8.0,25 m . (0,4405 m)
2



Karena Rn = 484,152 KN/m
2
maka digunakan




min
=

fc
4 fy
=
25
= 0,003125

4.400

1,4

1,4


min
=

=
fy 400
= 0,0035

(
min

diambil yang terkecil )


= 0,003125

As = As' = . b . d = 0,003125 x 200 x 242 = 151,25 mm
2



Tulangan tumpuan positif

/' =
18,789
= ~

0

/' = 1 ( persyaratan gempa )



Rn =
Mu
=

b.d
2

0
= 0

0,8 .0,25 m . (0,4405 m)
2



Karena Rn = 0 maka digunakan




min
=

fc
4 fy
=
25
= 0,003125

4.400
54






1,4

1,4


min
=

=
fy 400
= 0,0035

(
min

diambil yang terkecil )


= 0,003125

As = As' = . b . d = 0,003125 x 200 x 242 = 151,25 mm
2



Dalam hal ini tulangan terpasang diambil berdasarkan harga maksimum dari 2
jenis tulangan tumpuan

As
atas
= 151,25 mm
2


As
bawah
= 151,25 mm
2





e. Penulangan Geser


5. Momen Nominal Aktual Balok


o Perhitungan balok lantai 1


Momen Nominal Aktual Positif


( asumsi balok persegi )

Tulangan atas = 5D 19 = 1417,64 mm
2



Tulangan bawah = 3D 19 = 850,59 mm
2




'/ =
1417,64 mm
2

= 1
850,59 mm
2


=
850,59

250x440,5

= 0, 00772
55






Pada tabel tulangan lentur pada lampiran 3 ( Gideon Kusuma )
Didapat Rn = 2300
Mnak + = Mn = Rn.b.d
2
= 2300 x 0,25 x 0,4405
2
= 111,573 KNm


Momen Nominal Aktual Negatif


( asumsi balok T )



/' =
850,59
1417,64 + (2x
1
.t .10
2
.4)

4

= 0,416

1417,64 + (2x
1
.t .10
2
.4)

=
4

250x440,5


=
1417,64 + 628,32
= 0,0186

250 x440,5

Pada tabel tulangan lentur pada lampiran 3 ( Gideon Kusuma )
Didapat Rn = 4900
Mnak - = Mn = Rn.b.d
2
= 4900 x 0,25 x 0,4405
2
= 237,699 KNm




o Perhitungan balok lantai 2


Momen Nominal Aktual Positif


( asumsi balok persegi )

Tulangan atas = 5D 19 = 1417,64 mm
2



Tulangan bawah = 3D 19 = 850,59 mm
2




'/ =
1417,64 mm
2

= 1
850,59 mm
2

56






=
850,59

250x440,5

= 0, 00772

Pada tabel tulangan lentur pada lampiran 3 ( Gideon Kusuma )
Didapat Rn = 2300
Mnak + = Mn = Rn.b.d
2
= 2300 x 0,25 x 0,4405
2
= 111,573 KNm


Momen Nominal Aktual Negatif


( asumsi balok T )



/' =
850,59
1417,64 + (2x
1
.t .10
2
.4)

4

= 0,416

1417,64 + (2x
1
.t .10
2
.4)

=
4

250x440,5

=
1417,64 + 628,32
= 0,0186

250 x440,5

Pada tabel tulangan lentur pada lampiran 3 ( Gideon Kusuma )
Didapat Rn = 4900
Mnak - = Mn = Rn.b.d
2
= 4900 x 0,25 x 0,4405
2
= 237,699 KNm




o Perhitungan balok lantai 3


Momen Nominal Aktual Positif


( asumsi balok persegi )

Tulangan atas = 2D 16 = 402,12 mm
2



Tulangan bawah = 2D 16 = 402,12 mm
2

57







/' =
402,12 mm
2

= 1
402,12 mm
2


=
402,12

200x242

= 0, 00831

Pada tabel tulangan lentur pada lampiran 3 ( Gideon Kusuma )
Didapat Rn = 2400
Mnak + = Mn = Rn.b.d
2
= 2400 x 0,20 x 0,242
2
= 28,111 KNm


Momen Nominal Aktual Negatif


( asumsi balok T )



/' =
402,12
402,12 + (2x
1
.t .10
2
.4)

4

= 0,390

402,12 + (2x
1
.t .10
2
.4)

=
4

200 x242


=
402,12 + 628,32
= 0,021

200 x242

Pada tabel tulangan lentur ( Gideon Kusuma )
Didapat Rn = 5400
Mnak - = Mn = Rn.b.d
2
= 5400 x 0,20 x 0,242
2
= 63,249 KNm


6. Gaya Geser Maksimum Balok ( Vub )
Lantai 1
Vub = 151,447 KN ( dapat dilihat dari tabel gaya geser rencana )


Lantai 2

Vub = 150,589 KN ( dapat dilihat dari tabel gaya geser rencana )
58
|
|






Lantai 3

Vub = 23,483 KN ( dapat dilihat dari tabel gaya geser rencana )


7. Gaya Geser Terpakai Maksimum Balok ( Vub
terpakai
)
Lantai 1
Vub
terpakai
= 145,537 KN ( dapat dilihat dari tabel gaya geser rencana )

Lantai 2

Vub
terpakai
= 144,68KN ( dapat dilihat dari tabel gaya geser rencana )
Lantai 3
Vub
terpakai
= 22,45 KN ( dapat dilihat dari tabel gaya geser rencana )


8. Penulangan Geser


o Perhitungan untuk balok lantai 1


Skema gaya geser rencana :

















Vujung = Vub
| Vub Vubterpakai

xLn
|

\
d
.

= 151,447KN
| 151,447 KN 145,537 KN

x6,75
|

\
0,4405
.

= 60,89 KN
59
6
|
6






Penulangan geser dalam daerah sendi plastis


Vub
terpakai

Vs =
|
=
151,447 KN

0,75

= 194,05 KN = 194,05 x 10
3
N




s =
Av. fy.d

Vs
2.
1
.t .10
2
.400.440,5

=
4

194,05x10
3



= 142,63 mm >


d
= 110,125 mm

4


Jadi diambil jarak 110 mm


Dipakai sengkang 10 110 mm





Penulangan geser diluar sendi plastis


Vub' = Vujung +
ln+ 2h
(Vub





Vujung )

ln
maksimum



Vub' = 60,89KN +
6,75m 1m
(151,447KN 60,89KN )

6,75m


Vub' = 138,03KN


|
fc'
|

|
25MPa
|

Vc =


|
.bw.d =


|
.250mm .440,5mm = 91770 N = 91,77 KN

|

\ . \ .

Vs' =
Vub'
Vc =
138,03 KN
91,77 KN = 92,27 KN = 92,27 x 10
3
N

0,75 0,75




s =
Av. fy.d

Vs'
2.
1
.t .10
2
.400.440,5

=
4

92,27 x10
3



= 299,95 mm >


d
= 220, 25 mm

2


Dipakai sengkang 10 220 mm
60
|
|






o Perhitungan untuk balok lantai 2


Skema gaya geser rencana :

















Vujung = Vub
| Vub Vubterpakai

xLn
|

\
d
.


= 150,589KN
| 150,589KN 144,68KN

x6,75
|

\
0,4405
.


= 60,04 KN


Penulangan geser dalam daerah sendi plastis


Vub
terpakai

Vs =
|
=
144,68KN

0,75

= 192,91KN = 192,91 x 10
3
N




s =
Av. fy.d

Vs
2.
1
.t .10
2
.400.440,5

=
4

192,91x10
3



= 143,5 mm >


d
= 110,125 mm

4


Jadi diambil jarak 110 mm


Dipakai sengkang 10 110 mm
61
6
|
6






Penulangan geser diluar sendi plastis


Vub' = Vujung +
ln+ 2h
(Vub





Vujung )

ln
maksimum



Vub' = 60,04KN +
6,75m 1m
(150,589KN 60,04KN )

6,75m


Vub' = 137,17 KN


|
fc'
|

|
25MPa
|

Vc =


|
.bw.d =


|
.250mm .440,5mm = 91770 N = 91,77 KN

|

\ . \ .

Vs' =
Vub'
Vc =
137,17 KN
91,77 KN = 91,13 KN = 91,13 x 10
3
N

0,75 0,75




s =
Av. fy.d

Vs'
2.
1
.t .10
2
.400.440,5

=
4

91,13x10
3



= 303,72 mm >


d
= 220, 25 mm

2


Dipakai sengkang 10 220 mm


o Perhitungan untuk balok lantai 3


Skema gaya geser rencana :















62
|
|
6
|
6






Vujung = Vub
| Vub Vubterpakai

xLn
|

\
d
.


= 23,483KN
| 23,483KN 22,87 KN

x6,8
|

\
0,242
.


= 6,3 KN


Penulangan geser dalam daerah sendi plastis


Vub
terpakai

Vs =
|
=
22,87 KN

0,75

= 30,5KN = 30,5 x 10
3
N




s =
Av. fy.d

Vs
2.
1
.t .10
2
.200.242

=
4

30,5x10
3



= 249,32 mm >


d
= 60,5 mm

4


Jadi diambil jarak 60 mm


Dipakai sengkang 10 60 mm


Penulangan geser diluar sendi plastis


Vub' = Vujung +
ln 2h
(Vub

ln


maksimum
Vujung )


Vub' = 6,3KN +
3,8m 0,6m
(23,483KN 6,3KN )

3,8m


Vub' = 21,96 KN


|
fc'
|

|
25MPa
|

Vc =


|
.bw.d =


|
.200mm .242mm = 30333,33 N = 30,333 KN

|

\ . \ .

Vs' =
Vub'
Vc =

0,75
21,96 KN
30,333 KN = 11,05 KN = 11,05 x 10
3
N

0,75
63










s =
Av. fy.d

Vs'
2.
1
.t .10
2
.200.242

=
4

11,05x10
3



= 250,5 mm >


d
= 121 mm

2

Dipakai sengkang 10 120 mm





f. Penulangan Lapangan


3. Momen Lapangan Rencana


Nilai nilai dari momen lapangan rencana dapat dilihat dari tabel


4. Penulangan Lapangan


Data data perhitungan :


L = 7000 mm ( nilai ini diambil karena momen lapangan maks terdapat pada
bentang dengan L = 7 m )

Ln = 4000 mm





4 m
4 m 4 m



Lebar efektif



1
b
eff


4
L =
1

4

7000 = 1750 mm


b
eff
16 hf + bw = 16 x 125 + 250 = 2250 mm
b
eff
bw + Ln = 250 + 4000 = 4250 mm
64






Diambil b
eff
terkecil = 1750 mm

beff = 1750


hf = 125

hw = 375

bw = 250



o Perhitungan penulangan balok lantai 1


Mu = 100,323 KNm


Asumsi letak garis netral di dalam sayap
a hf dan c < hf
Batasan tulangan

As
min
=
min
x bw x d = 0,003125 x 250 x 440,5 = 344,141 mm
2


(0.85.| . f ' c)

As
maks
= 0,75 x

x

600 (

(
x bw x d


fy

600 + fy



As
maks
= 0,75 x

(0.85.0.85. f ' c)


400
x
600 (

600 + 400
(


x 250 x 440,5

= 2237,774 mm
2



Mu
= 0,85 x fc' x a x b

|

d
a (

2
(



100,323x10
6

0,8

= 0,85 x 25 x a x 1750

440,5

a (
2
(

65






125,404 x 10
6
= 37187,5a x

440,5

a (
2
(


125,404 x 10
6
= 16381093,75a 18593,75a
2


6744,417 = 881a a
2


a
2
881a + 6744,417 = 0


a
12
=

881 881
2
4.1.(6744,417)
2.1


=
881 865,554

2


a
1
=
881 + 865,554
2

= 873,277 mm



a
2
=
881 865,554
2

= 7,723 mm


Ambil a yang terkecil a = 7,723 mm


c =
a
=

|
1
7,723
= 9,086 < hf = 125 mm.anggapan benar

0,85


Cc = Ts



As =

0,85.fc'.c.b
=
0,85.25. 9,086.1750
= 844,714 mm
2

fy 400


Dipakai 3 D19 ( As = 850,586 mm
2
)





oPerhitungan penulangan balok lantai 2


Mu = 100,656 KNm
66






Asumsi letak garis netral di dalam sayap
a hf dan c < hf
Batasan tulangan

As
min
=
min
x bw x d = 0,003125 x 250 x 440,5 = 344,141 mm
2


(0.85.| . f ' c)

As
maks
= 0,75 x

x

600 (

(
x bw x d


fy

600 + fy



As
maks
= 0,75 x

(0.85.0.85. f ' c)


400
x
600 (

600 + 400
(


x 250 x 440,5

= 2237,774 mm
2



Mu
= 0,85 x fc' x a x b

|

d
a (

2
(



100,656 x10
6

0,8

= 0,85 x 25 x a x 1750

440,5

a (
2
(



125,82 x 10
6
= 37187,5a x

440,5

a (
2
(


125,82 x 10
6
= 16381093,75a 18593,75a
2



6766,8 = 881a a
2



a
2
881a + 6766,8 = 0



a
12
=

881 881
2
4.1.(6766,8)
2.1


=
881 865,551

2
67







a
1
=
881 + 865,551
2

= 873,277 mm



a
2
=
881 865,551
2

= 7,723 mm


Ambil a yang terkecil a = 7,723 mm


c =
a
=

|
1
7,723
= 9,086 < hf = 125 mm.anggapan benar

0,85


Cc = Ts



As =

0,85.fc'.c.b
=
0,85.25. 9,086.1750
= 844,714 mm
2

fy 400


Dipakai 3 D19 ( As = 850,586 mm
2
)





oPerhitungan penulangan balok lantai 3


Mu = 10,051 KNm


Lebar efektif



1
b
eff


4
L =
1

4

7000 = 1750 mm


b
eff
16 hf + bw = 16 x 90 + 200 = 1640 mm
b
eff
bw + Ln = 200 + 4800 = 5000 mm
Diambil b
eff
terkecil = 1640 mm
68







beff = 1640


hf = 90

hw = 210


bw = 200

Asumsi letak garis netral di dalam sayap
a hf dan c < hf
Batasan tulangan

As
min
=
min
x bw x d = 0,003125 x 200 x 242 = 151,25mm
2


(0.85.| . f ' c)

As
maks
= 0,75 x

x

600 (

(
x bw x d


fy

600 + fy



As
maks
= 0,75 x

(0.85.0.85. f ' c)


400
x
600 (

600 + 400
(


x 200 x 242

= 983,503 mm
2



Mu
= 0,85 x fc' x a x b

|

d
a (

2
(



10,051x10
6

0,8

= 0,85 x 25 x a x 1640

242

a (
2
(




12,564 x 10
6
= 34850a x

242

a (
2
(


12,564 x 10
6
= 8433700a 17425a
2



721,03 = 484a a
2

69






a
2
484a + 721,03 = 0



a
12
=

484 484
2
4.1.(721,03)
2.1


=
484 481,01

2


a
1
=
484 + 481,01
2

= 482,51 mm



a
2
=
484 481,01
2

= 1,495 mm


Ambil a yang terkecil a = 1,495 mm


c =
a
=
1,495
= 1,76 < hf = 125 mm.anggapan benar

|
1
0,85



Cc = Ts



As =

0,85.fc'.c.b
=
0,85.25.1,76.1640
= 153,34 mm
2

fy 400

Dipakai 2 D16 ( As = 402,2 mm
2
)
70







Tabel Momen Rencana Balok Balok Portal Melintang 11 ( Tumpuan )



Lantai


Balok


M
D



M
L



M
E kiri


M
E kanan

1.2 M
D
+
1.6 M
L

0.9 MD ME
1.05 ( M
D
+ 0.9 M
L

M
E
)
E
kiri E
kanan E
kiri E
kanan


1
26 52.240 9.617 16.751 16.751 78.075 30.265 63.767 46.351 81.529
62 92.633 16.753 11.485 11.485 137.965 94.855 71.885 125.156 101.038
610 52.654 9.130 15.812 15.812 77.793 31.576 63.201 47.312 80.518


2
37 53.781 10.592 11.571 11.571 81.484 36.831 59.974 54.329 78.629
73 89.995 16.162 8.907 8.907 133.853 89.902 72.089 119.120 100.415
711 50.343 7.500 11.446 11.446 72.413 33.863 56.755 47.930 71.967


3
48 9.009 4.987 2.407 2.407 18.789 5.701 10.516 11.644 16.700
84 5.213 6.224 1.691 1.691 16.214 6.383 3.001 13.131 9.580
812 4.260 2.620 5.449 5.449 9.304 1.616 9.283 1.227 12.670
71

Lantai

Balok

M
D


M
L


M
E kiri
M
E

kanan
1.2 M
D
+
1.6 M
L
0.9 MD ME 1.05 ( M
D
+ 0.9 M
L
M
E
)
E
kiri E
kanan E
kiri E
kanan

1
26 67.029 12.430 0 0 100.323 60.326 60.326 82.127 82.127
610 13.741 3.320 0 0 21.801 12.367 12.367 17.565 17.565

2
37 67.579 12.226 0 0 100.656 60.821 60.821 82.511 82.511
711 13.130 2.956 0 0 20.485 11.817 11.817 16.579 16.579

3
48 3.600 3.582 0 0 10.051 3.240 3.240 7.165 7.165
812 3.900 1.343 0 0 2.531 3.510 3.510 2.826 2.826







Tabel Momen Rencana Balok Balok Portal Melintang 11 ( Lapangan )

















Tulangan Dan Momen Nominal aktual Balok Portal Melintang As 1 - 1



Lantai
M -
(KNm)
As Tulangan Atas M +
(KNm)
As Tulangan Bawah Mnak (KNm)
As
Perlu

(mm
2
)
2

As
Terpasang
(mm )
2

As
Perlu
(mm )
2

As
Terpasang
(mm )

Positif

Negatif
1 137.965 1409.600 5D - 19 = 1417,64 0 704.800 3D - 19 = 567 111.573 237.699
2 133.853 1343.525 5D - 19 = 1417,64 0 671.763 3D - 19 = 567 111.573 237.699
3 18.789 151.25 2D - 16 = 402.12 0 151.25 2D - 16 = 402.12 28.111 63.249
72
| |






Gaya Geser Rencana Balok Portal As 1 1



Lantai

Balok
Mnak+
(KNm)
Mnak-
(KNm)
1.25 x 0.7 ((Mnak+) +
(Mnak-)/ln)

VD

VL

1,05 Vg

Vub

(ln-d)/ln
Vub
terpakai


1
2--6 111.573 237.699 45.276 -73.925 -13.610 -91.912 -46.636 0.935 -52.545
6--2 237.699 111.573 45.276 85.465 15.650 106.171 151.447 0.935 145.537
6--10 111.573 237.699 130.048 -42.744 -5.890 -51.066 78.982 2.685 517.217


2
3--7 111.573 237.699 45.276 -74.522 -13.830 -92.770 -47.494 0.935 -53.403
7--3 237.699 111.573 45.276 84.868 15.430 105.313 150.589 0.935 144.680
7--11 111.573 237.699 130.048 -41.437 -4.910 -48.664 81.384 2.685 519.618


3
4--8 28.111 63.249 11.756 -6.632 -5.070 -12.287 -0.531 0.964 -1.368
8--4 63.249 28.111 11.756 5.548 5.430 11.527 23.283 0.964 22.446
8--12 28.111 63.249 33.308 -3.000 -1.490 -4.715 28.594 0.899 21.877



M
+
+ M
-
(

Keterangan: (1)V
g
= V
D
+ V
L
(2) V
Ub
= 0,7|



ln

(
+ 1,05 Vg



|
M
+
+ M
-
|(

ln - d


|
M
+
+ M
-
|((

(3) Vub
terpakai
=

1.05Vg - 0,7|
|
(
+

Vub -

1,05Vg - 0,7|
|
((

\
ln
.
ln
\
ln
.
73
|
6






Penulangan Geser Balok Portal Melintang As 1 1




Lantai

Vub
maks

Vub terpakai
Maks

Ln
(m)


d (m)

2h
(m)
Dalam sendi plastis Diluar sendi plastis


V ujung
Vs

s (mm)

Tul G
terpasang

Vub'

Vc

Vs'

s (mm)

Tul G
terpasang
1 151.447 145.537 6.75 0.4405 1 194.05 142.63 10 110 138.03 91.77 92.27 299.95 10 220 60.89
2 150.589 144.68 6.75 0.4405 1 192.91 143.48 10 110 137.17 91.77 91.13 303.72 10 220 60.04
3 23.483 22.87 6.8 0.242 0.6 30.5 249.32 10 60 21.96 30.333 11.05 250,5 10 120 6.3
Vub
terpakai

Keterangan: Vs =
|

= 0,75

|

Vc =


fc'
|

|
.bw.d

|

\ .

Vs' =
Vub'
Vc

|

= 0,75

s =
Av. fy.d

Vs'

Vub' = Vujung +
ln+ 2h
(Vub

Vujung )

ln
maksimum


Vujung = Vub
| Vub Vubterpakai

xLn
|

\
d
.
74






Tabel Penulangan Lapangan Melintang 1-1



Lantai

Mu (N/mm)

As
min

(mm
2
)

As
maks

(mm
2
)

a
(mm)

c
(mm)

As
perlu

(mm
2
)

As
terpasang
(mm
2
)

(1) (2) (3) (4) (5) (6) (7) (8)
1 100,323 x 10
6
344.141 2237.774 7.723 9.086 844,714 3D - 19 = 850.586
2 100.656 x 10
6
344.141 2237.774 7.723 9.086 844,714 3D - 19 = 850.586
3 10.051 x 10
6
151.25 983.503 1.495 1.76 153.34 2D - 16 = 402.2
Ket :
(2) Dari tabel momen rencana balok Lapangan ( hasil analisa struktur )
(3) As
min
=
min
x bw x d

(0.85.| . f ' c)

(4) As
maks
= 0,75 x

x

600 (

(
x bw x d


fy

600 + fy




(5)
Mu
= 0,85 x fc' x a x b

|

d
a (

2
(


didapat a
1


dan a
2


diambil a yang terkecil


(6) c =
a

|
1



(7) As =
0,85.fc'.c.b
fy
75






Tabel Momen Rencana Balok -Balok Portal Melintang 2-2 ( Tumpuan )


Lantai

Balok

M
D


M
L


M
E kiri

M
E kanan

1.2 M
D
+ 1.6 M
L

0.9 MD ME 1.05 ( M
D
+ 0.9 M
L
M
E
)
E
kiri
E
kanan
E
kiri
E
kanan



1
2--6 -66.994 -19.210 16.751 -16.751 -111.130 -43.543 -77.046 -70.909 -106.086
6--2 -118.369 -33.492 -11.485 11.485 -195.630 -118.017 -95.047 -167.996 -143.878
6--10 -66.650 -18.237 15.812 -15.812 -109.159 -44.173 -75.797 -70.614 -103.819


2
3--7 -69.374 -21.164 11.571 -11.571 -117.111 -50.865 -74.008 -80.693 -104.993
7--3 -114.885 -32.283 -8.907 8.907 -189.514 -112.303 -94.490 -160.489 -141.784
7--11 -63.065 -14.971 11.446 -11.446 -99.632 -45.312 -68.205 -68.347 -92.384


3
4--8 -13.432 -9.988 2.407 -2.407 -32.099 -9.681 -14.496 -21.014 -26.070
8--4 -9.817 -12.473 -1.691 1.691 -31.737 -10.526 -7.144 -23.871 -20.319
8--12 -6.882 -5.263 5.449 -5.449 -16.680 -0.745 -11.644 -6.478 -17.922
76






Tabel Momen Rencana Balok -Balok Portal Melintang 2-2 ( Lapangan )


Lantai

Balok

M
D


M
L


M
E kiri

M
E kanan

1.2 M
D
+ 1.6 M
L

0.9 MD ME 1.05 ( M
D
+ 0.9 M
L
M
E
)

E
kiri


E
kanan


E
kiri


E
kanan


1
2--6 86.046 24.824
0 0
142.974 77.441 77.441 113.807 113.807
6--10 -18.829 -6.634
0 0
-33.210 -16.946 -16.946 -26.040 -26.040

2
3--7 86.598 24.420
0 0
142.990 77.938 77.938 114.005 114.005
7--11 -17.985 -5.905
0 0
-31.031 -16.187 -16.187 -24.465 -24.465

3
4--8 6.199 7.180
0 0
18.927 5.579 5.579 13.294 13.294
8--12 5.348 -2.694
0 0
2.108 4.813 4.813 3.070 3.070



Tulangan Dan Momen Nominal Aktual Balok Portal Melintang As 2 - 2


As Tulangan Atas
As Tulangan Bawah
Mnak (KNm)

Lantai
M -
(KNm)

As
Perlu
(mm
2
)

As
Terpasang
(mm
2
)
M +
(KNm)

As
Perlu
(mm
2
)

As
Terpasang
(mm
2
)

Positif

Negatif
1 195.63 1244,4 5D - 19 = 1417,64 0 704.800 3D - 19 = 567 111.573 237.699
2 189.514 1222.388 5D - 19 = 1417,64 0 671.763 3D - 19 = 567 111.573 237.699
3 32.099 151.25 2D - 16 = 402.12 0 151.25 2D - 16 = 402.12 28.111 63.249
77
| |






Tabel Geser Rencana Balok Melintang As 2 2




Lantai


Balok

Mnak+
(KNm)

Mnak-
(KNm)

1.25 x 0.7 ((Mnak+) +
(Mnak-)/ln)


VD


VL


1,05 Vg


Vub


(ln-d)/ln

Vub
terpakai



1
2--6 111.573 237.699 92.923 -95.162 -27.273 -128.084 -35.162 0.935 -47.290
6--2 237.699 111.573 92.923 109.098 31.177 147.761 240.684 0.935 228.556
6--10 111.573 237.699 92.923 -51.761 -11.753 -66.69 26.233 2.685 339.364



2
3--7 111.573 237.699 45.888 -95.628 -27.637 -129.428 -83.54 0.935 -89.529
7--3 237.699 111.573 139.957 108.632 30.813 146.417 286.375 0.935 268.108
7--11 111.573 237.699 45.888 -49.653 -9.801 -62.427 -16.539 2.685 138.094



3
4--8 28.111 63.249 67.685 -10.701 -10.116 -21.858 45.827 0.964 41.009
8--4 63.249 28.111 67.685 9.669 10.876 21.572 89.257 0.964 84.439
8--12 28.111 63.249 67.685 -7.225 -2.994 -10.73 56.955 0.899 43.305



M
+
+ M
-
(

Keterangan: (1)V
g
= V
D
+ V
L
(2) V
Ub
= 0,7|



ln

(
+ 1,05 Vg



|
M
+
+ M
-
|(

ln - d


|
M
+
+ M
-
|((

(3) Vub
terpakai
=

1.05Vg - 0,7|
|
(
+

Vub -

1,05Vg - 0,7|
|
((

\
ln
.
ln
\
ln
.
78
|
6






Penulangan Geser Balok Portal Melintang As 2 2




Lantai

Vub
maks

Vub terpakai
Maks

Ln
(m)


d (m)

2h
(m)
Dalam sendi plastis Diluar sendi plastis


V ujung
Vs

s (mm)

Tul G
terpasang

Vub'

Vc

Vs'

s (mm)

Tul G
terpasang
1 240.684 228.556 3.75 0.4405 1 304.74 908.22 10 110 213.151 91.77 192.43 143.83 10 220 54.84
2 286.375 268.108 3.75 0.4405 1 357.47 774.24 10 110 244.91 91.77 234.77 117.89 10 220 6.46
3 89.257 84.439 3.8 0.242 0.6 112.59 675.27 10 60 82.74 30.333 69.99 395.44 10 120 15.43
Vub
terpakai

Keterangan: Vs =
|

= 0,75

|

Vc =


fc'
|

|
.bw.d

|

\ .

Vs' =
Vub'
Vc

|

= 0,75

s =
Av. fy.d

Vs'

Vub' = Vujung +
ln+ 2h
(Vub

Vujung )

ln
maksimum


Vujung = Vub
| Vub Vubterpakai

xLn
|

\
d
.
79






Tabel Penulangan Lapangan Melintang 2-2



Lantai

Mu (N/mm)

As
min

(mm
2
)

As
maks

(mm
2
)

a
(mm)

c
(mm)

As
perlu

(mm
2
)

As
terpasang
(mm
2
)

(1) (2) (3) (4) (5) (6) (7) (8)
1 142.974 x 10
6
344.141 2237.774 7.723 9.086 844,714 3D - 19 = 850.586
2 142.99 x 10
6
344.141 2237.774 7.723 9.086 844,714 3D - 19 = 850.586
3 18.9 x 10
6
151,25 983.503 1.495 1,76 153,34 2D - 16 = 402.2
Ket :
(2) Dari tabel momen rencana balok Lapangan ( hasil analisa struktur )
(3) As
min
=
min
x bw x d

(0.85.| . f ' c)

(4) As
maks
= 0,75 x

x

600 (

(
x bw x d


fy

600 + fy




(5)
Mu
= 0,85 x fc' x a x b

|

d
a (

2
(


didapat a
1


dan a
2


diambil a yang terkecil


(6) c =
a

|
1



(7) As =
0,85.fc'.c.b
fy
80






3.7 Perhitungan Penulangan Kolom


Untuk perhitungan kolom mengacu pada peraturan SNI-03-2847-2002,
tentang Tata Cara Perhitungan Struktur Beton Untuk Bangunan Gedung dan
dilengkapi dengan literatur buku Desain Struktur Rangka Beton Bertulang di Daerah
Rawan Gempa ( Gideon B. Kusuma ).

Perhitungan selengkapnya akan disajikan dalam bentuk contoh contoh dan
tabel tabel.



Perhitungan Kolom As C-2


o Momen momen yang bekerja pada kolom C-2 lantai 1


Momen akibat beban mati portal As C C Arah Memanjang


M
D
= 0,51 KNm
M
L
= 0,07 KNm
M
E
= 35,18 KNm
Momen akibat beban mati portal As 2 2 Arah Melintang


M
D
= 27,65 KNm
M
L
= 8,01 KNm
M
E
= 12,68 KNm
Mencari nilai momen maksimum kolom



4
(

Mu atas arah memanjang = 1,05

M
D
+ M
L
+
K
(M
E
+ 0,3 . M
E
)
(


81







4
(

= 1,05

0,51 + 0,07 +
1
(35,18 + 0,3 . 12,68)
(



= 164,342 KNm



4
(

Mu bawah arah memanjang = 1,05

M
D
+ M
L
- +
K
(M
E
+ 0,3 . M
E
)
(





4
(

= 1,05

0,51 + 0,07
1
(35,18 + 0,3 . 12,68)
(



= -163,124 KNm



4
(

Mu atas arah melintang = 1,05

M
D
+ M
L
+
K
(0,3 . M
E
+ M
E
)
(





4
(

= 1,05

27,65 + 8,01 +
1
(0,3 . 35,18 + 12,68)
(



= 135,026 KNm



4
(

Mu bawah arah melintang = 1,05

M
D
+ M
L

K
(0,3 . M
E
+ M
E
)
(





4
(

= 1,05

27,65 + 8,01
1
(0,3 . 35,18 + 12,68)
(



= -60,14 KNm





Mencari nilai gaya aksial rencana kolom ( lihat ditabel )
Gaya aksial yang bekerja pada kolom C-2 lantai 1
Gaya aksial akibat beban mati arah melintang = 227,04 KN
82






Gaya aksial akibat beban mati arah memanjang = 228,82 KN
Total gaya aksial akibat beban mati ( N
D
) = 455,86 KN



Gaya aksial akibat beban hidup arah melintang = 65 KN
Gaya aksial akibat beban hidup arah memanjang = 29,98 KN
Total gaya aksial akibat beban hidup ( N
L
) = 94,98 KN



Gaya aksial akibat beban gempa arah melintang (N
E
, k-x) = 7,54 KN
Gaya aksial akibat beban gempa arah memanjang (N
E
, k-y) = 11,05 KN
Berat sendiri kolom lantai 1 = 3 x (4 x 0,3 x 0,3 x 4 x 24) = 25,92 KN
Untuk perhitungan, gaya tekan dianggap bernilai positif
Ng,k = N
D
+ N
L
+ Berat sendiri kolom lantai 1


= 455,86 KN + 94,98 KN + 25,92 = 576,76 KN
Mencari gaya aksial rencana
Nu = 1,05 . Ng = 1,05 . 576,76 KN = 605,598 KN





Mencari gaya aksial maksimum



4
(

Nu, kx atas = 1,05

Ng, k +
K
(N
E
, kx + 0,3 . N
E
, ky)
(


83







4
(

= 1,05

576,76 +
1
(7,54 + 0,3 .11,05)
(



= 651,189 KN



4
(

Nu, kx bawah = 1,05

Ng, k
K
(N
E
, kx + 0,3 . N
E
, ky)
(





4
(

= 1,05

576,76
1
(7,54 + 0,3 .11,05)
(



= 560,007 KN



4
(

Nu, kx atas = 1,05

Ng, k +
K
(0,3 . N
E
, kx + N
E
, ky)
(





4
(

= 1,05

576,76 +
1
(0,3 . 7,54 + 11,05)
(



= 661,508 KN



4
(

Nu, kx bawah = 1,05

Ng, k
K
(0,3 . N
E
, kx + N
E
, ky)
(





4
(

= 1,05

576,76
1
(0,3 . 7,54 + 11,05)
(



= 549,688 KN


Penulangan kolom arah melintang ( arah y )


Mu, ky
=

164,342 x 10
6


= 0,441

|.Ag.0,85.fc'.h 0,65.300
2
.0,85.25.300
84
3






Nu, ky
=
605,598 x 10


= 0,487

|.Ag.0,85.fc' 0,65.300
2
.0,85.25


d'
=

h
66
= 0,20

300


Maka gunakan tabel Gideon untuk fy = 400, fc = 25 dan
koordinat ( 0,441 ; 0,487 )
Dari titik koordinat pada grafik didapat r = 0,053
d'
=0,20 untuk titik

h


= r . = 0.053 . 1 = 0,053 dimana untuk fc' 25 MPa adalah 1

As
total
= x Ag = 0,053 x 300 x 300 = 4770 mm
2


Dipakai tulangan 6 32 ( 4825,5 mm
2
)





Mencari nilai gaya geser rencana kolom ( lihat ditabel )
Gaya lintang yang bekerja pada kolom C-2 lantai 1
Gaya lintang akibat beban mati arah melintang = 9,76 KN
Gaya lintang akibat beban mati arah memanjang = 0,18 KN
Total gaya lintang akibat beban mati ( V
D
) = 9,94 KN
Gaya lintang akibat beban hidup arah melintang = 2,83 KN
Gaya lintang akibat beban hidup arah memanjang = 0,02 KN
Total gaya lintang akibat beban hidup ( V
L
) = 2,85 KN
Gaya lintang akibat beban gempa arah melintang (V
E
, k-x) = 5,51 KN
85
(







Gaya lintang akibat beban gempa arah memanjang (V
E
, k-y) = 17,03 KN
Berat sendiri kolom lantai 1 = 3 x (4 x 0,3 x 0,3 x 4 x 24) = 25,92 KN
Gaya Geser Rencana Kolom



4
(

Vu,kx = 1,05

V
D
, k + V
L
, k +
K
(V
E
, kx + 0,3 . V
E
, ky)
(




4
(

= 1,05

9,94 + 2,85 +

(5,51 + 0,3 .17,03)

1


= 58,03 KN


4
(

Vu, ky = 1,05

V
D
, k + V
L
, k +
K
(0,3 . V
E
, kx + V
E
, ky)
(




4
(

= 1,05

9,94 + 2,85 +
1
( 0,3 . 5,51 + 17,03)
(



= 91,898 KN

Diambil Vu,k terkecil = 58,03 KN


Vc =

1 +

Nu, k (

1
(

fc'
(
x bw x d


14 . Ag

6



549,688 x 10

=

1 +

3
(

1
(

25
(
x 300 x 234


14 . 300 . 300



6
(



= 84,021 N



Vs =
Vu, k
Vc =

|
58,03 x 10
3

0,75

84,021= 77288,376 N = 772,884 KN



Av = 2 .
1
. . d
2
= 2 .

4
1
. . 10
2
= 157,08 mm
2

4
86






s =
Av . fy . d
=
157,08 . 400 . 234
= 190,231

Vs 77288,376


d

d
maks
= =
2
234
2

= 117 mm


Vu,k < Vs jadi dipakai sengkang praktis 10 100
87

LANTAI

ME( atas )

ME ( bawah )


LANTAI

ME ( atas )

ME ( bawah )


LANTAI
ME ( atas ME ( ba
) )
1 9.35 12.68
1 32.92 35.18
1 42.27 47.86
2 8.6 7.4 2 29.73 29.29 2 38.33 36.69
3 2.41 2.97 3 15.2 16.98 3 17.61 19.95











PORTAL 2-2 ARAH MELINTANG (KOLOM C) PORTAL C-C ARAH MEMANJANG (KOLOM 2)


Beban Mati Beban Mati
LANTAI M
D
( atas ) M
D
( bawah )

LANTAI M
D
( atas ) M
D
( bawah )
1 27,65 11,41 1 0,51 0,21
2 39,29 39,35 2 0,72 0,86
3 13,43 30,08 3 0,23 0,49



Beban Hidup

Beban Hidup

LANTAI ML( atas ) ML ( bawah ) LANTAI ML( atas ) ML ( bawah )
1 8.01 3,32 1 0,07 0,03
2 10,82 11,20 2 0,08 0,11
3 9,99 10,35 3 0,08 0,09



Beban Gempa Beban Gempa Total Beban Gempa
wah
88

LANTAI

GAYA AKSIAL
1 227.04
2 123.61
3 19.34


LANTAI

GAYA AKSIAL
1 228.82
2 29.29
3 30.9


LANTAI
GAYA
AKSIAL
1 455.86
2 152.9
3 50.24


LANTAI

GAYA AKSIAL
1 29.98
2 17.33
3 4.39


LANTAI
GAYA
AKSIAL
1 94.98
2 55.13
3 14.56


LANTAI

GAYA AKSIAL
1 7.54
2 3.51
3 0.69


LANTAI

GAYA AKSIAL
1 11.05
2 4.53
3 0.74


LANTAI
GAYA
AKSIAL
1 18.59
2 8.04
3 1.43










PORTAL 2-2 ARAH MELINTANG ( KOLOM C ) PORTAL C-C ARAH MEMANJANG ( KOLOM 2 )


Beban Mati

Beban Mati

Total Beban Mati










Beban Hidup Beban Hidup Total Beban Hidup

LANTAI

GAYA AKSIAL
1 65
2 37.8
3 10.17



Beban Gempa Beban Gempa Total Beban Gempa
89
LANTAI GAYA LINTANG
1 9.76
2 19.66
3 10.88

LANTAI GAYA LINTANG
1 0.18
2 0.39
3 0.18

LANTAI GAYA LINTANG
1 9.94
2 20.05
3 11.06

LANTAI GAYA LINTANG
1 0.02
2 0.05
3 0.04

LANTAI GAYA LINTANG
1 2.85
2 5.55
3 5.12

LANTAI GAYA LINTANG
1 17.03
2 14.76
3 8.04

LANTAI GAYA LINTANG
1 22.54
2 18.76
3 9.38







PORTAL 22 ARAH MELINTANG ( KOLOM C ) PORTAL CC ARAH MEMANJANG ( KOLOM 2 )


Beban Mati

Beban Mati

TOTAL Beban MATI









Beban Hidup Beban Hidup TOTAL Beban Hidup
LANTAI GAYA LINTANG
1 2.83
2 5.5
3 5.08



Beban Gempa Beban Gempa TOTAL Beban Gempa
LANTAI GAYA LINTANG
1 5.51
2 4
3 1.34
90






Tabel Momen Rencana Kolom



Kolom

Lantai
M
E
,k

, ka

, kb
Mnak, b-x Mnak, b-y Mu,k-x Mu,k-y
atas bawah kiri kanan kiri kanan atas bawah atas bawah
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14)
C - 2 1 42,270 47,860 0,535 97,020 189,190 97,020 295,910 72,021 296,494 72,021 376,178
2 38,330 36,690 0,658 0,465 97,020 189,190 97,020 295,910 115,026 385,442 115,026 489,032
3 17,610 19,950 1,000 0,342 97,020 189,190 97,020 189,190 134,534 262,343 134,534 262,343
Ket :


(5) , ka =

M
E
, k atas

lt.i
M
E
, k atad
lt.i

+ M
E
, k bawah
lt.i +1


(6) , kb = 1- , ka
lt.i+1

(7), (8) Lihat tabel momen aktual balok As C-C
(9), (10) Lihat tabel momen aktual balok As 2-2

h l

( h 4 l 4

(11) Mu, k
lt.i
=
hn
. 0,7 .
d
.| .o ka

ln
(Mnak, bx + 0,3 . EMnak, by)
lt.i
(

= ;

hn 3,5
=

ln 3,75



h l (

(12) Mu, k
lt.i
=
hn
. 0,7 .
d
. | . o kb

ln
(Mnak, bx + 0,3 . EMnak, by)
lt.i
(



h l

d
lantai 1 dan 3 = 1


(

(13) Mu, k
lt.i
=
hn
. 0,7 .
d
. | .o ka

ln
(Mnak, bx + 0,3 . EMnak, by)
lt.i
(



h l

d
lantai 2 = 1,3


(

(14) Mu, k
lt.i
=
hn
. 0,7 .
d
. | . o kb

ln
(Mnak, bx + 0,3 . EMnak, by)
lt.i
(

| = 1,25



91






Tabel Momen Maksimum Kolom


Kolom

Lantai

M
D
,k-x

M
D
,k-y

M
L
,k-x

M
L
,k-y

M
E
,k-x

M
E
,k-y
Mu,k-x Mu,k-y
atas bawah atas bawah
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12)
c - 2 1 0,51 27,65 0,07 8,01 35,18 12,68 164,3418 -163,124 135,0258 -60,1398
2 0,86 39,35 0,11 11,2 29,73 8,6 136,7205 -134,684 126,6573 -20,5023
3 0,49 30,08 0,09 10,35 16,98 2,97 75,6672 -74,4492 76,3203 8,5827
Ket :

(3), (4), (5)(6), (7), (8) dari hasil analisa struktur

4 (

(9)

1,05

M
D
, k + M
L
, k +
K
(M
E
, kx + 0,3 . M
E
, ky)
(



4 (

(10)

1,05

M
D
, k + M
L
, k
K
(M
E
, kx + 0,3 . M
E
, ky)
(



4 (

(11)

1,05

M
D
, k + M
L
, k +
K
(0,3 . M
E
, kx + M
E
, ky)
(



4 (

(12)

1,05

M
D
, k + M
L
, k
K
(0,3 . M
E
, kx + M
E
, ky)
(


92






Tabel Gaya Aksial Rencana Kolom


Kolom

Lantai
Berat
sendiri
kolom

N
D
,k
(KN)

N
L
,k
(KN)

N
g
,k
(KN)
Mnak, b-x Mnak, b-y Nu,k-x (KN) Nu,k-y (KN)
kiri kanan kiri kanan maks min maks min
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14)
C - 2 1 25,92 455.860 94.980 576.760 97,020 189,190 97,020 295,910 -5,99834 60,43034 -22,3398 76,77184
2 17,28 152.900 55.130 225.310 97,020 189,190 97,020 295,910 -15,0703 51,35834 -31,4118 67,69984
3 8,64 50.240 14.560 73.440 97,020 189,190 97,020 189,190 -17,1388 35,28284 -17,1388 35,28284
Ket :

(6) Ng, k = N
D
,k + N
L
,k + bs kolom


(7), (8) Lihat tabel momen aktual balok As C-C
(9), (10) Lihat tabel momen aktual balok As 2-2
(11) = 1,05 . Ng,k + (0,7 . /l (( Mnak,bx ki Mnak, bx ka ) + ( 0,3 ( Mnak by ki Mnak, by ka ))) /l = 1,25/4
(12) = 1,05 . Ng,k - (0,7 . /l (( Mnak,bx ki Mnak, bx ka ) + ( 0,3 ( Mnak by ki Mnak, by ka )))
(13) = 1,05 . Ng,k + (0,7 . /l (( 0,3 Mnak,bx ki Mnak, bx ka ) + ( ( Mnak by ki Mnak, by ka )))
(14) = 1,05 . Ng,k - (0,7 . /l (( 0,3 Mnak,bx ki Mnak, bx ka ) + (( Mnak by ki Mnak, by ka )))
93






Tabel Gaya Aksial Maksimum Kolom


Kolom

Lantai

Berat sendiri
kolom

N
D
,k
(KN)

N
L
,k
(KN)

N
g
,k
(KN)

N
E
,k-x
(KN)

N
E
,k-y
(KN)
Nu,k-x (KN) Nu,k-y (KN)

atas

bawah

atas

bawah
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12)
c - 2 1 25.920 455.860 94.980 576.760 7.540 11.050 651.189 560.007 661.508 549.688

2 17.280 152.900 55.130 225.310 3.510 4.530 257.025 216.126 260.024 213.127

3 8.640 50.240 14.560 73.440 0.690 0.740 80.942 73.282 81.089 73.135



Ket :


(4), dan (5) dari hasil analisa struktur


Untuk perhitungan , gaya aksial tekan dianggap bernilai positif


(6) N
g
,k = berat sendiri kolom + N
D
,k + N
L
,k

4 (

(9)

1,05

Ng, k +
K
(N
E
, kx + 0,3 . M
E
, ky)
(



4 (

(10)

1,05

Ng, k
K
(N
E
, kx + 0,3 . M
E
, ky)
(



4 (

(11)

1,05

Ng, k +
K
(0,3 N
E
, kx + M
E
, ky)
(



4 (

(12)

1,05

Ng, k
K
(0,3 N
E
, kx + M
E
, ky)
(


94






Tabel Penulangan Kolom Arah y




Kolom


Lantai

Nu,ky (KN)


Mu,ky
Nuk y
| .Ag.0,85.f ' c

Muky
|.Ag.0,85.f ' c

r pada grafik

= r .


As
total
(mm
2
)

Tulangan
terpasang


As
aktual
maks min maks min maks min
C 2 1 29.3433 83.77534 135.0258 0.024 0.067 0.362 0.050 0.048 0.050 4500.000 632 4825.500
2 38.4153 74.70334 126.6573 0.031 0.060 0.340 0.046 0.042 0.046 4140.000 632 4825.500
3 17.1388 35.28284 76.3203 0.014 0.028 0.205 0.056 0.056 0.056 5040.000 732 5629.800



Ket :


Untuk Mu diambil nilai yang terkecil antara Mu rencana dan Mu Maksimum
Untuk Nu diambil nilai yang terkecil antara Nu rencana dan Nu Maksimum
= 0,65 ; untuk titik perpotongan dibawah 0, untuk Nu = 0,8
Ag = 300 mm x 300 mm = 90000 mm
2



Untuk fc' = 25 ; = 1 ; r diambil yang terbesar
d' = 40 + 10 + (32/2) = 66 ; h = 300 mm
d'/h = 0,20
95






Tabel Gaya Geser Rencana Kolom



Lantai

hn (m)
Mu,k (KN)

V
D
,k (KN)

V
L
,k (KN)
V
E
,k (KN)

Vu,k (KN)
Vu,k maks
atas bawah V
E
,kx V
E
,ky Vu,kx Vu,ky
1 3.5 72.021 376.178 9.94 2.85 17.03 5.51 128.0569 91.8981 58.0293
2 3.5 115.026 489.032 20.05 5.55 14.76 4 172.588 93.912 62.2776
3 3.5 134.534 262.343 11.06 5.12 8.04 1.34 113.3934 52.4454 32.7474



Ket :


Mu,k diambil nilai yang terkecil


Vu,k = (Mu,k atas + Mu,k bawah )/hn


Vu,kx = 1,05 ( VD,k + VL,k + 4/K ( VE,k-x + 0,3 . VE,k-y ))
Vu,kx = 1,05 ( VD,k + VL,k + 4/K ( 0,3 . VE,k-x +VE,k-y ))
96






Tabel Penulangan Geser Kolom


Kolom Lantai Vu, k (N) Nu, k (N) Vc (N) Vs (N) Av S (mm) Tulangan Geser
C 2 1 58029.300 549687.600 84.021 77288.379 157.080 190.231 Vu,k < Vs dipakai sengkang praktis 10100
2 62277.600 213126.900 68.395 82968.405 157.080 177.208 Vu,k < Vs dipakai sengkang praktis 10100
3 32747.400 73134.600 61.896 43601.304 157.080 337.207 Vu,k < Vs dipakai sengkang praktis 10100



Ket :


Vu,k diambil dari Vu,k-x dan Vu,k-y yang terkecil
Nu,k diambil dari Nu,k-x dan Nu,k-y yang terkecil
d = 300 40 (32/2) 10 = 234


Vc =

1 +

Nu, k (
1
(
fc'
(
x bw x d


14 . Ag

6




Vs =
Vu, k
Vc

|



Av = 2 .
1
. . d
2

4

s =
Av . fy . d

Vs
97

LANTAI

ME( atas )

ME ( bawah )


LANTAI

ME ( atas )

ME ( bawah )


LANTAI

ME ( atas )
ME
( bawah
1 9.35 12.68
1 32.92 35.18
1 42.27 47.86
2 8.6 7.4 2 29.73 29.29 2 38.33 36.69
3 2.41 2.97
3 15.2 16.98
3 17.61 19.95











PORTAL 2-2 ARAH MELINTANG (KOLOM B) PORTAL B-B ARAH MEMANJANG (KOLOM 2)


Beban Mati Beban Mati
LANTAI M
D
( atas ) M
D
( bawah )

LANTAI M
D
( atas ) M
D
( bawah )
1 27,65 11,41 1 0,57 0,23
2 39,29 39,35
2 0,86 1,002
3 13,43 30,08
3 0,09 0,31



Beban Hidup

Beban Hidup

LANTAI ML( atas ) ML ( bawah ) LANTAI ML( atas ) ML ( bawah )
1 8.01 3,32 1 0,12 0,05
2 10,82 11,20
2 1,19 2,21
3 9,99 10,35
3 2,05 2,06



Beban Gempa Beban Gempa Total Beban Gempa

)
98
LANTAI GAYA AKSIAL
1 227.04
2 123.61
3 19.34

LANTAI GAYA AKSIAL
1 262.87
2 149.167
3 36.65

LANTAI GAYA AKSIAL
1 489.91
2 272.777
3 55.99

LANTAI GAYA AKSIAL
1 65
2 37.8
3 10.17

LANTAI GAYA AKSIAL
1 44.618
2 23.647
3 2.864

LANTAI GAYA AKSIAL
1 109.618
2 61.447
3 13.034

LANTAI GAYA AKSIAL
1 7.54
2 3.51
3 0.69

LANTAI GAYA AKSIAL
1 11.05
2 4.53
3 0.74

LANTAI GAYA AKSIAL
1 18.59
2 8.04
3 1.43







PORTAL 22 ARAH MELINTANG ( KOLOM B ) PORTAL BB ARAH MEMANJANG ( KOLOM 2 )


Beban Mati

Beban Mati

Total Beban Mati









Beban Hidup Beban Hidup Total Beban Hidup









Beban Gempa Beban Gempa Total Beban Gempa
99
LANTAI GAYA LINTANG
1 9.76
2 19.66
3 10.88

LANTAI GAYA LINTANG
1 0.2
2 0.47
3 0.053

LANTAI GAYA LINTANG
1 9.96
2 20.13
3 10.933

LANTAI GAYA LINTANG
1 2.83
2 5.5
3 5.08

LANTAI GAYA LINTANG
1 0.042
2 0.101
3 0.002

LANTAI GAYA LINTANG
1 2.872
2 5.601
3 5.082

LANTAI GAYA LINTANG
1 5.51
2 4
3 1.34

LANTAI GAYA LINTANG
1 17.03
2 14.76
3 8.04

LANTAI GAYA LINTANG
1 22.54
2 18.76
3 9.38







PORTAL 22 ARAH MELINTANG ( KOLOM B ) PORTALBB ARAH MEMANJANG ( KOLOM 2 )


Beban Mati

Beban Mati

TOTAL Beban MATI









Beban Hidup Beban Hidup TOTAL Beban Hidup









Beban Gempa Beban Gempa TOTAL Beban Gempa
100






Tabel Momen Rencana Kolom



M
E
,k

Mnak, bx Mnak, by Mu,kx Mu,ky
Kolom Lantai atas bawah , ka , kb kiri kanan kiri kanan atas bawah atas bawah
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14)
B 2 1 42.270 47.860 0.535
97,020 189,190 97.020 295.910 72.021 410.329 72.021 410.329
2 38.330 36.690 0.658 0.465 97,020 189,190 97.020 295.910 115.026 533.427 115.026 533.427
3 17.610 19.950 1.000 0.342 97,020 189,190 97.020 189.190 134.534 262.343 134.534 262.343
Ket :


(5) , ka =

M
E
, k atas

lt.i
M
E
, k atad
lt.i

+ M
E
, k bawah
lt.i +1


(6) , kb = 1- , ka
lt.i+1

(7), (8) Lihat tabel momen aktual balok As B-B
(9), (10) Lihat tabel momen aktual balok As 2-2

h l

( h 4 l 4

(11) Mu, k
lt.i
=
hn
. 0,7 .
d
.| .o ka

ln
(Mnak, bx + 0,3 . EMnak, by)
lt.i
(

= ;

hn 3,5
=

ln 3,75



h l (

(12) Mu, k
lt.i
=
hn
. 0,7 .
d
. | . o kb

ln
(Mnak, bx + 0,3 . EMnak, by)
lt.i
(



h l

d
lantai 1 dan 3 = 1


(

(13) Mu, k
lt.i
=
hn
. 0,7 .
d
. | .o ka

ln
(Mnak, bx + 0,3 . EMnak, by)
lt.i
(



h l

d
lantai 2 = 1,3


(

(14) Mu, k
lt.i
=
hn
. 0,7 .
d
. | . o kb

ln
(Mnak, bx + 0,3 . EMnak, by)
lt.i
(

| = 1,25



101






Tabel Momen Maksimum Kolom


Kolom

Lantai

M
D
,kx

M
D
,ky

M
L
,kx

M
L
,ky

M
E
,kx

M
E
,ky
Mu,kx Mu,ky
atas bawah atas bawah
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12)
B 2 1 0.57 27.65 0.12 8.01 35.18 12.68 164.4573 163.008 135.0258 60.1398

2 1.002 39.35 2.21 11.2 29.73 8.6 139.0746 132.329 126.6573 20.5023
3 0.31 30.08 2.06 10.35 16.98 2.97 77.5467 72.5697 76.3203 8.5827
Ket :

(3), (4), (5)(6), (7), (8) dari hasil analisa struktur

4 (

(9)

1,05

M
D
, k + M
L
, k +
K
(M
E
, kx + 0,3 . M
E
, ky)
(



4 (

(10)

1,05

M
D
, k + M
L
, k
K
(M
E
, kx + 0,3 . M
E
, ky)
(



4 (

(11)

1,05

M
D
, k + M
L
, k +
K
(0,3 . M
E
, kx + M
E
, ky)
(



4 (

(12)

1,05

M
D
, k + M
L
, k
K
(0,3 . M
E
, kx + M
E
, ky)
(


102

Kolom

Lantai
Berat
sendiri
kolom

N ,k
(KN)

N ,k
(KN)

N ,k
(KN)
Mnak, bx Mnak, by Nu,kx (KN) Nu,ky (KN)
kiri kanan kiri kanan maks min maks min
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14)
B 2 1 25.92 0 0 25.92 97,020 189,190 97.020 295.910 29.3433 83.77534 29.3433 83.77534

2 17.28 0 0 17.28 97,020 189,190 97.020 295.910 38.4153 74.70334 38.4153 74.70334
3 8.64 0 0 8.64 97,020 189,190 97.020 189.190 17.1388 35.28284 17.1388 35.28284







Tabel Gaya Aksial Rencana Kolom


D L g








Ket :

(6) Ng, k = N
D
,k + N
L
,k + bs kolom


Karena kolom terletak ditengah tengah bangunan serta bentang balok kiri dan kanan sama panjang maka hanya ada normal akibat
gravitasi, NU = 1,05 . Ng

(7), (8) Lihat tabel momen aktual balok As B-B
(9), (10) Lihat tabel momen aktual balok As 2-2
(11) = 1,05 . Ng,k + (0,7 . /l (( Mnak,bx ki Mnak, bx ka ) + ( 0,3 ( Mnak by ki Mnak, by ka ))) /l = 1,25/4
(12) = 1,05 . Ng,k - (0,7 . /l (( Mnak,bx ki Mnak, bx ka ) + ( 0,3 ( Mnak by ki Mnak, by ka )))
(13) = 1,05 . Ng,k + (0,7 . /l (( 0,3 Mnak,bx ki Mnak, bx ka ) + ( ( Mnak by ki Mnak, by ka )))
(14) = 1,05 . Ng,k - (0,7 . /l (( 0,3 Mnak,bx ki Mnak, bx ka ) + (( Mnak by ki Mnak, by ka )))
103






Tabel Gaya Aksial Maksimum Kolom


Kolom

Lantai
Berat sendiri
kolom

N
D
,k
(KN)

N
L
,k
(KN)

N
g
,k
(KN)

N
E
,kx
(KN)

N
E
,ky
(KN)
Nu,kx (KN) Nu,ky (KN)

atas

bawah

atas

bawah
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12)
B 2 1 25.92 489.91 109.618 625.448 11.05 11.05 717.0534 596.3874 717.0534 596.3874
2 17.28 272.777 61.447 351.504 4.53 4.53 393.813 344.3454 393.813 344.3454
3 8.64 55.99 13.034 77.664 0.74 0.74 85.5876 77.5068 85.5876 77.5068



Ket :


(4), dan (5) dari hasil analisa struktur


Untuk perhitungan , gaya aksial tekan dianggap bernilai positif


(6) N
g
,k = berat sendiri kolom + N
D
,k + N
L
,k

4 (

(9)

1,05

Ng, k +
K
(N
E
, kx + 0,3 . M
E
, ky)
(



4 (

(10)

1,05

Ng, k
K
(N
E
, kx + 0,3 . M
E
, ky)
(



4 (

(11)

1,05

Ng, k +
K
(0,3 N
E
, kx + M
E
, ky)
(



4 (

(12)

1,05

Ng, k
K
(0,3 N
E
, kx + M
E
, ky)
(


104






Tabel Penulangan Kolom Arah y




Kolom


Lantai

Nu,ky (KN)


Mu,ky
Nuk y
| .Ag.0,85.f ' c

Muky
|.Ag.0,85.f ' c

r pada grafik

= r .


As
total
(mm
2
)

Tulangan
terpasang


As
aktual
maks min maks min maks min
B 2 1 29.3433 83.77534 135.0258 0.024 0.067 0.362 0.050 0.048 0.050 4500.000 632 4825.500
2 38.4153 74.70334 126.6573 0.031 0.060 0.340 0.046 0.042 0.046 4140.000 632 4825.500
3 17.1388 35.28284 76.3203 0.014 0.028 0.205 0.056 0.056 0.056 5040.000 732 5629.800



Ket :


Untuk Mu diambil nilai yang terkecil antara Mu rencana dan Mu Maksimum
Untuk Nu diambil nilai yang terkecil antara Nu rencana dan Nu Maksimum
= 0,65 ; untuk titik perpotongan dibawah 0, untuk Nu = 0,8
Ag = 300 mm x 300 mm = 90000 mm
2



Untuk fc' = 25 ; = 1 ; r diambil yang terbesar
d' = 40 + 10 + (32/2) = 66 ; h = 300 mm
d'/h = 0,20
105






Tabel Gaya Geser Rencana Kolom



Lantai

hn (m)
Mu,k (KN)

V
D
,k (KN)

V
L
,k (KN)
V
E
,k (KN)

Vu,k (KN)
Vu,k maks
atas bawah V
E
,kx V
E
,ky Vu,kx Vu,ky
1 3.5 72.021 376.178 9.94 2.85 17.03 5.51 128.0569 91.8981 58.0293
2 3.5 115.026 489.032 20.05 5.55 14.76 4 172.588 93.912 62.2776
3 3.5 134.534 262.343 11.06 5.12 8.04 1.34 113.3934 52.4454 32.7474



Ket :


Mu,k diambil nilai yang terkecil


Vu,k = (Mu,k atas + Mu,k bawah )/hn


Vu,kx = 1,05 ( VD,k + VL,k + 4/K ( VE,k-x + 0,3 . VE,k-y ))
Vu,kx = 1,05 ( VD,k + VL,k + 4/K ( 0,3 . VE,k-x +VE,k-y ))
106






Tabel Penulangan Geser Kolom


Kolom Lantai Vu, k (N) Nu, k (N) Vc (N) Vs (N) Av S (mm) Tulangan Geser
B 2 1 58029.300 549687.600 84.021 77288.379 157.080 190.231 Vu,k < Vs dipakai sengkang praktis 10100
2 62277.600 213126.900 68.395 82968.405 157.080 177.208 Vu,k < Vs dipakai sengkang praktis 10100
3 32747.400 73134.600 61.896 43601.304 157.080 337.207 Vu,k < Vs dipakai sengkang praktis 10100



Ket :


Vu,k diambil dari Vu,k-x dan Vu,k-y yang terkecil
Nu,k diambil dari Nu,k-x dan Nu,k-y yang terkecil
d = 300 40 (32/2) 10 = 234


Vc =

1 +

Nu, k (
1
(

fc'
(
x bw x d


14 . Ag

6




Vs =
Vu, k
Vc

|



Av = 2 .
1
. . d
2

4

s =
Av . fy . d

Vs
107






Pertemuan Balok Kolom


o Pertemuan Balok Kolom Luar


1. Perhitungan gaya-gaya dalam ( kolom C2, lantai 1)





0,7 Mkap, b bj




Gambar 3.29 Join Balok Kolom Luar


Mnak, b = 237,699 KNm


Mkap, b = . Mnak, b = 1,25 . 237,699 KNm = 297,124 KNm



V
kol
=

0,7.(l
ki
/ l
ki '
.Mkap, ki + l
ka
/ l
ka '
.Mkap, ka)
1

2
.(h
k ,a
+ h
k ,b
)



Karena pertemuan dengan kolom luar, maka Mkap, ki = 0



V
kol
=

0,7.((7 / 6,7).297,124)
1
.(4 + 4)


= 54,325 KN
2

T = 0.7 . Mkap, ka / Z
ka



Z = jarak dari titik berat tulangan ke resultan bagian tekan beton ( diambil 40
cm )

T = (0.7 . 297,124) / 0,40 = 519,97 KN


V
j,h
= T V
kol
= 519,97 KN 54,325 KN = 465,645 KN
V
j,v
= (d/ hc). V
j,h
= ( 0,5/0,3) . 465,645 KN = 776,075 KN
108






2. Kontrol tegangan geser horizontal minimal

V
j ,h

V
j,h
=

bj.hc
< 1,5. fc'

Dengan lebar efektif pertemuan (bj) diambil sebagai berikut :

a. Bila bc > bb, maka diambil nilai terkecil antara
bj = bc atau bj = bb + 0,5 . hc
b. Bila bc < bb, maka diambil nilai terkecil antara
bj = bb atau bj = bc + 0,5 . hc
dengan bc = 30 dan bb = 25 cm, berarti bc > bb, maka :


bj = bc = 30 cm
bj = 25 + 0,5 . 30 = 40 cm
dipakai bj = 30 cm


V
j,h
=

V
j ,h
bj.hc

< 1,5.

fc'


V
j,h
=

465,645
0,3.0,3

= 5173,83 KN/m
2
= 5,17 N/mm
2


1,5. fc' = 1,5. 25 = 7,5 N/mm
2
> V
j,h
= 5,17 N/mm
2



3. Penulangan Geser horizontal


Nu = 560,007 KN


Nu
=
560,007KN
= 6222,3 KN/m
2
= 6,22 N/mm
2
> 0,1 . fc' = 2,5 MPa

Ag 0,3.0,3


V
c,h
= 2/3 . {(Nu, k / Ag ) 0,1 f ' c} . 30 . 30
109







= 2/3 . {(560,007.10
3
N /(300.300)) 0,1.25}. 300 . 300


= 115759 N


= 115,759 KN
V
s, h
+ V
c, h
= V
j, h
V
s, h
= 465,645 KN - 115,759 KN = 349,886 KN


A
j, h
= V
s, h
/ fy


= 349,886 . 10
3
N / 400 MPa

= 874,715 mm
2



Digunakan sengkang rangkap 10 mm

Luas yang tersedia = 314 mm
2



Jumlah lapis sengkang = 874,715 mm
2
/ 314 mm
2
= 2,8 = 3 lapis





4. Penulangan geser vertikal


V
c,v
= As' . Vj,h / As . ( 0,6 + Nu,k / Ag . f'c )

V
c,v
= 465,645 . 10
3
( 0,6 + 560,007 . 10
3
/ (300 .300 .25)


= 424256 N


= 424,256 KN
V
s,v
= V
j,v
- V
c,v
= 776,075 KN - 424,256 KN = 351,819 KN
110
V
u
v







A
j,v
= V
s,v
/ fy = 351,819 . 10
3
/ 400 = 879,55 mm
2



Tulangan kolom terpasang = 2D-25 > A
j,v



5. Kontrol jarak tulangan vertikal


2.s = 300 2 ( 40 + 10 + . 32 ) = 168 mm
jadi jarak tulangan = 84 mm < 200 mm
terdapat satu tulangan kolom antara pada tiap sisi kolom.





o Pertemuan Balok Kolom Dalam


1. Perhitungan gaya-gaya dalam ( kolom B2, lantai 1)






bj 0,7 Mkap, ki



Cki
Zki
Tki



vjh
vjh
vdv


Tka
Zka
0,7 Mkap, ka bj
Cka


hc


Gambar 3.29 Join Balok Kolom Dalam


Mnak, b kiri = 237,699 KNm
Mnak, b kanan = 111,573 KNm
Mkap, b = . Mnak, b
Mkap, b kiri = 1,25 . 237,699 KNm = 297,124 KNm


Mkap, b kanan = 1,25 . 111,573 KNm = 139,466 KNm
111







V
kol
=

0,7.(l
ki
/ l
ki '
.Mkap, ki + l
ka
/ l
ka '
.Mkap, ka)
1

2
.(h
k ,a
+ h
k ,b
)



V
kol
=

0,7.|((7 / 6,7).297,124) + ((2,6 / 2,3).139,466)|
1
.(4 + 4)


= 81,915 KN
2

C
ki
= ( 0,7 . Mkap, b ki ) / Z
ki
= ( 0,7 . 297,124 ) / 0,40 = 519,97 KN
T = 0.7 . Mkap, ka / Z
ka

T = ( 0.7 . 139,466 ) / 0,40 = 244,06 KN


V
j,h
= C
ki
+ T V
kol
= 519,97 KN + 244,06 KN 81,915 KN = 682,121 KN
V
j,v
= (d/ hc). V
j,h
= ( 0,5/0,3) . 682,121 KN = 1136,87 KN
2. Kontrol tegangan geser horizontal minimal

V
j ,h

V
j,h
=

bj.hc
< 1,5. fc'


V
j,h
=

682,121
0,3.0,3

= 7431 KN/m
2
= 7,43 N/mm
2


1,5. fc' = 1,5. 25 = 7,5 N/mm
2
> V
j,h
= 7,43 N/mm
2



3. Penulangan Geser horizontal


Nu = 596,387 KN


Nu
=
596,387KN
= 6626,52 KN/m
2
= 6,63 N/mm
2
> 0,1 . fc' = 2,5 MPa

Ag 0,3.0,3


V
c,h
= 2/3 . {(Nu, k / Ag ) 0,1 f ' c} . 30 . 30
112







= 2/3 . {(596,387.10
3
N /(300.300)) 0,1.25}. 300 . 300


= 121934 N


= 121,934 KN
V
s, h
+ V
c, h
= V
j, h
V
s, h
= 682,121 KN - 121,934 KN = 560,187 KN


A
j, h
= V
s, h
/ fy


= 560,187. 10
3
N / 400 MPa

= 1400,47 mm
2



Digunakan sengkang rangkap 10 mm

Luas yang tersedia = 314 mm
2



Jumlah lapis sengkang = 1400,47 mm
2
/ 314 mm
2
= 4,5 = 5 lapis





4. Penulangan geser vertikal


V
c,v
= As' . Vj,h / As . ( 0,6 + Nu,k / Ag . f'c )

V
c,v
= 682,121. 10
3
( 0,6 + 596,387 . 10
3
/ (300 .300 .25)


= 590076 N


= 590,076 KN
V
s,v
= V
j,v
- V
c,v
= 1136,87 KN - 590,076 KN = 546,794 KN
113






A
j,v
= V
s,v
/ fy = 546,794. 10
3
/ 400 = 1366,985 mm
2



Tulangan kolom terpasang = 3D-25 > A
j,v



5. Kontrol jarak tulangan vertikal


2.s = 300 2 ( 40 + 10 + . 32 ) = 168 mm
jadi jarak tulangan = 84 mm < 200 mm
terdapat satu tulangan kolom antara pada tiap sisi kolom.
114






3.8 Perhitungan Sloof

3.8.1 Sloof Arah Melintang

Data-data perhitungan :

- Ukuran balok sloof = 30 cm 40 cm

- fc' = 25 mpa

- fy = 400 mpa

- | tulangan utama = 16 mm

- | tulangan sengkang = 8 mm

- (p) selimut beton = 40 mm (tidak berhubungan dengan cuaca)

- Tinggi efektif (d) = h p | sengkang
1
.| tulangan utama

2

= 400 40 8 -


= 344 mm

1
. 16

2

Pembebanan sloof arah melintang

a. Beban mati (W
D
)

- Berat dinding = 4 m . 2,5
KN
m
2


KN






= 10
m

- Berat plesteran = 4m.1,5 m. 2 . 0,21
KN
m
2


KN



= 1,26
m

=10,26

KN
m

b. Beban hidup (W
L
) = 0

Oleh karena beban hidup pada sloof tidak ada maka nilai kombinasinya =

1,4W
D

115
















Gambar 3.23 Sloof Melintang



Perhitungan momen dan gaya lintang menggunakan program SAP

2000.V14



Penulangan Tumpuan Maksimum

fy = 400 MPa
fc = 25 Mpa
sengkang = 10 mm

tulangan pokok = 19 mm

Selimut beton = 40 mm

d = h p s d

= 400 40 10 (19)

= 340,5 mm



min
=

fc
4 fy
=
25
= 0,003125

4.400

1,4

1,4


min
=

=
fy 400
= 0,0035

(
min

diambil yang terkecil )



Momen tumpuan maksimum ( M
U
= 92,36 KNm )

Mu
bd
2


= x 0,8 x fy x
|
1 - 0,5882 x x

\

fy |

|
fc
.
116









92,36.10
6
Nmm
300 x 340,5
2

= x 0,8 x 400 x
|
1 - 0,5882 x x

\
400 |

|
25
.

2,6554 = 320 - 3011,584
2


3011,584
2
- 320 +2,6554 = 0



Rumus ABC =

b b
2
4ac
2a



1
=
320 + 320
2
(4 x 3011,584 x 2,6554
2 x 3011,584

= 0,09718




2
=
320 320
2
(4 x 3011,584 x 2,8670
2 x 3011,584

= 0,00907 (diambil yang
terkecil)

maks

= 0,75 b = 0,75
| 0,85 x | x fc
x

600 |

|

\
fy

600 + fy
.

= 0,75
| 0,85 x 0,85 x 25
x

600 |

|

\
400 600 + 400
.





min




< <
= 0,0271

maks


0,003125 < 0,00907 < 0,0271 ( OK )

As = .b.d

= 0,00907.300.340,5

= 926,5005 mm
2


Dipakai tulangan 4D19 (1134 mm
2
)
117

























Gambar 3.36 Penampang Penulangan Tumpuan Sloof



Penulangan Lapangan Maksimum

Momen lapangan maksimum ( M
U
= 79,19 KNm )
Mu
bd
2


= x 0,8 x fy x
|
1 - 0,5882 x x

\

fy |

|
fc
.

79,19.10
6
Nmm
300 x 340,5
2

= x 0,8 x 400 x
|
1 - 0,5882 x x

\
400 |

|
25
.

2,2767 = 320 - 3011,584
2


3011,584
2
- 320 +2,2767 = 0



Rumus ABC =

b b
2
4ac
2a



1
=
320 + 320
2
(4 x 3011,584 x 2,2767)
2 x 3011,584

= 0,09859




2
=
320 320
2
(4 x 3011,584 x 2,8670
2 x 3011,584

= 0,00767 (diambil yang
terkecil)
118











maks

= 0,75 b = 0,75
| 0,85 x | x fc
x

600 |

|

\
fy

600 + fy
.

= 0,75
| 0,85 x 0,85 x 25
x

600 |

|

\
400 600 + 400
.





min




< <
= 0,0271

maks


0,003125 < 0,00767 < 0,0271 ( OK )

As = .b.d

= 0,00767.300.340,5

= 783,49 mm
2


Dipakai tulangan 4D19 (1134 mm
2
)









Gambar 3.37 Penampang Penulangan Lapangan Sloof

















Penulangan Geser Sloof
119
3
























Vu = 82,48 KN

Vu = 56,09 KN

1

P = bw + d
efektif

2

1

= .300 + 340,5 = 490,5 mm = 0,4905 m
2

X =
Vu

Vu + Vu'

xL =

82,48
82,48 + 56,09

x7 = 4,17 m


Vu
renc
=

Vu.( X p)
X
=
82,48(4,17 0,4905)

4,17

= 72,78 KN

Vu =
72,78 x 10


= 0,71 MPa

ren
300 x 340,5

|vc = |
1

6
fc'.b.d = 0,75
1

6

25 = 0,625MPa

Vu
ren
> |Vc , sehingga diperlukan tulangan geser


X
1
=
(Vu
renc
|Vc).( X p)
Vu
renc

=
(0,71 0,625).(4,17 0,4905)

0,71

= 0,44 m

|Vs
perlu
= Vu
renc
|Vc = 0,71 0,625 = 0,085 MPa
120







|Vs

max
= 0,75
2

3
fc' = 0,75
2

3

25 = 2,5MPa




Cek nilai Vs :

|Vs = 0,75
1

3



fc' = 0,75
1

3



25 = 1,25MPa


|Vs
perlu
< |Vs , maka S =


S =
340,5
= 170,25mm

2
d
atau 600 mm

2

Untuk jarak tulangan per meter


Av
min
=
b.s

3. fy
=
300.1000

3.400

= 250 mm
2



Av
1
= 2.
1
.t .D
2

4

= 2.
1
.t .(10
2

4

) = 157,08mm
2


S =
Av
1
x1000 =
157,08
x1000 = 628,32 mm

Av / meter 250


S
max
=
340,5
= 170,25mm

2

Jadi tulangan geser minimum dipasang D 10 170
121






1
|Vc =
1
.0,75.
1

fc' =
1
.0,75.
1


25 = 0,3125MPa

2 2 6 2 6



X
2
=
1
|Vc.( X ( p + X ))

2
1

|Vc

=
0,3125.(4,17 (0,4905 + 0,44))

0,625


= 1,62 m


Av
min
=
b.s

3. fy
=
300.1000

3.400

= 250 mm
2





Sepanjang, d = 0,3405

Av =
|Vs.b.340,5
=
0,085MPa.300mm.340,5
= 28,94mm
2
|. fy 0,75.400MPa


Av =
28,94
0,3405

= 85 mm
2
per meter < Av
min


= 250 mm
2


Maka di pakai Av
min
= 250 mm
2


Sepanjang, X
1
= 0,44 m



Av =
1
|Vs.b.440

2
=

|. fy
1
0,085MPa.300mm.440

2
0,75.400MPa


= 18,7 mm
2


Av =
18,7
= 0,043 mm
2

440

per meter < Av
min


= 250 mm
2


Maka di pakai Av
min
= 250 mm
2


Sepanjang X
2
= 1,62 mb < Av
min
= 250 mm
2

122










3.8.2 Sloof Arah Memanjang

Data-data perhitungan :

- Ukuran balok sloof = 30 cm 40 cm

- fc' = 25 mpa

- fy = 400 mpa

- | tulangan utama = 12 mm

- | tulangan sengkang = 8 mm

- (p) selimut beton = 40 mm (tidak berhubungan dengan cuaca)

- Tinggi efektif (d) = h p | sengkang
1
.| tulangan utama

2

= 400 40 8 -


= 346 mm

1
. 12

2

Pembebanan sloof arah memanjang

c. Beban mati (W
D
)

- Berat dinding = 4 m . 2,5
KN
m
2


= 10
KN
m

- Berat plesteran = 4.1,5 m . 2 . 0,21
KN
m
2





d. Beban hidup (W
L
) = 0

= 1,26
KN
m

11,26
KN
m

Oleh karena beban hidup pada sloof tidak ada maka nilai kombinasinya =

1,4W
D






Gambar 3.24 Sloof Memanjang



Perhitungan momen dan gaya lintang menggunakan program SAP 2000.V14
123








Penulangan Tumpuan Maksimum

fy = 400 MPa
fc = 25 Mpa
sengkang = 10 mm

tulangan pokok = 19 mm

Selimut beton = 40 mm

d = h p s d

= 400 40 10 (19)

= 340,5 mm



min
=

fc
4 fy
=
25
= 0,003125

4.400

1,4

1,4


min
=

=
fy 400
= 0,0035

(
min

diambil yang terkecil )



Momen tumpuan maksimum ( M
U
= 31,809 KNm )
Mu
bd
2


= x 0,8 x fy x
|
1 - 0,5882 x x

\

fy |

|
fc
.

31,809.10
6
Nmm
300 x 340,5
2

= x 0,8 x 400 x
|
1 - 0,5882 x x

\
400 |

|
25
.

0,9145 = 320 - 3011,584
2


3011,584
2
- 320 +0,9145 = 0



Rumus ABC =

b b
2
4ac
2a
124













1
=
320 + 320
2
(4 x 3011,584 x 0,9145
2 x 3011,584

= 0,01033




2
=
320 320
2
(4 x 3011,584 x 2,8670
2 x 3011,584

= 0,00294 (diambil yang
terkecil)

maks

= 0,75 b = 0,75
| 0,85 x | x fc
x

600 |

|

\
fy

600 + fy
.

= 0,75
| 0,85 x 0,85 x 25
x

600 |

|

\
400 600 + 400
.





min




< <
= 0,0271

maks


0,003125 < 0,00294 < 0,0271

Dipakai
min


As = .b.d = 0,003125.300.340,5

= 319,21 mm
2


Dipakai tulangan 2D19 ( 567,057mm
2
)













Gambar 3.36 Penampang Penulangan Tumpuan Sloof

Penulangan Lapangan Maksimum

Momen lapangan maksimum ( M
U
= 21,9232 KNm)
125










Mu
bd
2

= x 0,8 x fy x
|
1 - 0,5882 x x

\
fy |

|
fc
.

21,9232.10
6
Nmm
300 x 340,5
2

= x 0,8 x 400 x
|
1 - 0,5882 x x

\
400 |

|
25
.

0,6303 = 320 - 3011,584
2


3011,584
2
- 320 +0,6303 = 0



Rumus ABC =

b b
2
4ac
2a



1
=
320 + 320
2
(4 x 3011,584 x 0,6303)
2 x 3011,584

= 0,1042




2
=
320 320
2
(4 x 3011,584 x 2,8670
2 x 3011,584

= 0,00276 (diambil yang
terkecil)

maks

= 0,75 b = 0,75
| 0,85 x | x fc
x

600 |

|

\
fy

600 + fy
.

= 0,75
| 0,85 x 0,85 x 25
x

600 |

|

\
400 600 + 400
.





min




< <
= 0,0271

maks


Dipakai
min


0,003125 < 0,00276< 0,0271 ( OK )

As = .b.d = 0,003125.300.340,5

= 319,21 mm
2


Dipakai tulangan 2D19 (567,057 mm
2
)
126

























Gambar 3.37 Penampang Penulangan Lapangan Sloof

Penulangan Geser Sloof




















Vu = 45,57 KN
Vu = 39,83 KN

1

P = bw + d
efektif

2

1

= .300 + 340,5 = 490,5 mm = 0,4905 m
2

X =
Vu

Vu + Vu'

xL =

45,57
45,57 + 39,83

x4 = 2,13 m
127
3







Vu
renc
=

Vu.( X p)
X
=
45,57(2,13 0,4905)

2,13

= 35,21 KN

Vu =
35,21x 10


= 0,34 MPa

ren
300 x 340,5

|Vc = |
1

6
fc'.b.d = 0,75
1

6

25 = 0,625MPa

Vu
ren
< |Vc , sehingga tidak diperlukan tulangan geser


Vu
ren
>
1
|Vc ,sehingga diperlukan tulangan geser minimum

2

Untuk jarak tulangan per meter


Av
min
=
b.s

3. fy
=
300.1000

3.400

= 250 mm
2


per meter


Av
1
= 2.
1
.t .D
2

4

= 2.
1
.t .(10
2

4

) = 157,08mm
2


S =
Av
1
x1000 =
157,08
x1000 = 628,32 mm

Av / meter 250


S
max
=
340,5
= 170,25mm

2

S =
d

max



S
max
2

=
340,5
= 170,25mm

2

Jadi tulangan geser dipasang tulangan D 10 170
128






3.9 . Perencanaan Pondasi

Diketahui datadata perencanaan :


1 Beban Vertikal


Beban mati :


1. N
D
pada portal Melintang = 227,04 KN

2. N
D
pada portal Memanjang = 262,87 KN

3. Beban Mati Atap = 13,24 KN

4. Berat sendiri kolom (0,3m x 0,3m x 4m x 24 KN/m
3
= 25,92 KN

4. Berat sloof melintang ( 0,3 m x 0,4 m x 4,8m) 24 KN/m
3
= 13,824 KN

5. Berat sloof memanjang ( 0,3 m x 0,4 m x 4m ) 24 KN/m
3
= 11,52 KN

= 576,41 KN
Beban Hidup :
1. N
L
pada portal Melintang = 65 KN


2. NL pada portal Memanjang = 44,62 KN


3. Beban Hidup Atap = 2,5 KN


= 112,12 KN


2. Momen


Beban mati :


1. Momen Melintang = 27,65 KNm

2. Momen Memanjang = 0,23 KNm

= 27,88 KNm


Beban hidup :


1. Momen Melintang = 8,01 KNm
129






2. Momen Memanjang = 0,95 KNm

= 8,96 KNm


P
total
= 576,41 KN + 112,12 KN = 688,53 KN


Muy ( Melintang ) = 1,2(27,65 )+1,6( 8,01) = 45,99 KNm


Mux (Memanjang) = 1,2(0,23) +1,6 (0,95) = 1,79 KNm


Pondasi yang dirancang adalah pondasi tiang pancang. Analisa perhitungan tiang pancang
mengggunakan data sondir (Terlampir). Dari data sondir diketahui bahwa nilai konus (NK
atau P) dan jumlah hambatan pelekat (JHP atau f) sudah tercapai dasar yang sesuai pada
kedalaman 14,8 m.

Datadata pondasi :

1. Kedalaman pondasi = 14,8 m
2. Ukuran pondasi 3 = 30cm x 30cm
3. Mutu baja (fy) = 400 MPa
4. Mutu beton (fc) = 25 Mpa
5. NK = 246,1 Kg/cm
2

6. JHP = 3860,505 Kg/cm
2




Daya dukung ijin berdasarkan :
Kekuatan Bahan Tiang Pancang
Qtiang = 0,3 x fc x Atiang


= 0,3 x 25 x 90000


= 675000 N = 675 KN
130






Kekuatan tanah


NK . Ab
Qijin =
JPH . O
+
Fb Fs




Dimana : NK = nilai konus


JHP = Jumlah hambatan pelekat


Ab = luas penampang, (m
2
)


Fb = faktor keamanan, diambil 3


Fs = faktor keamanan, diambil 5





A = Luas tiang


O = Keliling tiang


NK . Ab
Qijin =
JHP . O
+
Fb Fs

246,1 Kg/cm
2
.(30x30)


3860,505 Kg/cm .(4.30)
= +
3 5

= 166482,12 Kg = 1664,82 KN

Menentukan jumlah tiang pancang


P
total
n =
Q

= 688,53 KN
131






675 KN

= 1,12 ~ 2 buah




Jarak antar tiang S 2,5D atau S 3D
S
max
= 2,00 m
S
min
= 0,60 m


Dipakai : S 3D


S = 3. (0,3cm)


= 0,9 cm S
min
< S < S
mak
Oke













Kelompok tiang pancang Efesiensi kelompok tiang pancang


Eq = 1 - ( (n-1).m + (m-1).n )
132






90 m.n





Keterangan :


m = Jumlah baris = 1


n = Jumlah tiang dalam satu baris = 2


d
= Arc tan
s

s = jarak antar tiang = 0,9 m


d = dimensi tiang = 0,3 m


d
= Arc tan
s

30
= Arc tan
90

= 18,435





Eq = 1 -
(n-1).m + (m-1).n
( )
90 m.n

18,435
= 1 -
(2-1).1 + (1-1).2
( )
90 1.2

= 1 - 0,10

= 0,9

Daya dukung tiang :


Q
ult
group = 0,9 x 675 KN x 2
133






= 1215 KN > 675 KN ( Oke )





Perhitungan Tulangan Pedestal


Penulanga Pasak


Kuat Tekan Rencana Kolom :
Pn = . 0,85 .fc . b
= 0,65 . 0,85 . 30 . (300 x 300)


= 1491750 N


= 1491,750 KN > P = 824,796 KN ( Oke )


Jadi beban kolom dapat di pindahkan dengan dukungan saja tetapi digunakan tulangan
pasak minimum

As
minimum
= 0,005 x Ag


= 0,005 x ( 300 x 300 ) mm
2



= 450 mm
2



( Dipakai tulangan pasak 219 ( As = 567 mm
2
)
134














Perhitungan Poer











Kolom pedestal

My = 45,99 KNm
135
1 2












P = 1,2 (576,41 + (1,0 .1,9 . 0,4 .24) ) + 1,6 (112,12 )


= 892,97 KN


x
2
= X
1
2
+ X
2
2



= (0,45
2
) + (0,45
2
)


= 0,405 m
2


y
2
= Y
2
+ Y
2


= (0
2
) + (0
2
)


= 0 m
2












Q
Pmax
1
=
My.Xi

Mx.Yi

n x
2
y
2


892,97
=
45,99 . 0,45
+
0.0
+
2 0,405 0

= 497,585 KN




Pmax
2
= Q My.Xi Mx.Yi
136






n x
2
y
2


892,97
=
45,99 . 0,45

0.0
+
2 0,405 0

= 395,385 KN

P = 892,97 KN
Mx = (Pmax
1
+ Pmax
2
) x 0,3 m
= (892,97) x 0, 3 m


= 267,89 KNm





Perhitungan Poer :


fc = 25 MPa
fy = 400 MPa
tulangan utama = D
19

Tulangan sengkang = 10


Selimut beton (P) = 40 mm


Tinggi effektif (d) = h p s D


= 400 mm 40 mm 10 mm (1/2.19) mm


= 341,5 mm
137
























Aksi satu arah





























Aksi dua arah


Menentukan Tebal Poer


Tebal tapak diambil 0,4 m
138






Untuk aksi dua arah :
Gaya geser berfaktor
Tiang yang berada diluar daerah kritis ( sejauh d/2 dari kolom ) adalah 2 buah, maka gaya
geser pada penampang kritis adalah :

Vu = 2 Pu = 2 x 892,97 KN = 1785,94 KN


Gaya Geser Nominal



Vc = (1 +
2 2

) bo d
| |

fc' , | = L/B = 1,9/1 = 1,9



= 0,6 x (1 +
2
1,9

) x 4 (300+341,5) x 341,5 x 25


=5396095,421N


=5396,095 KN


5396,095 KN > 1785,94 KN ( tebal pelat mencukupi untuk memikul gaya geser tanpa
memerlukan tulangan geser.




Untuk aksi satu arah :
Gaya geser berfaktor
Vu = 1Pu = 892,97 KN
Gaya Geser Nominal


Vc = 1/6 bw d fc' ; bw = B


= 0,6 x 1/6 x 1000 x 341,5 x 25
139






= 1707500 N


= 1707,5 KN


1707,5 KN > 892,97 KN ( tebal pelat mencukupi untuk memikul gaya geser tanpa
memerlukan tulangan geser




Kontrol kekuatan geser secara individual.


Dengan jarak antar tiang 0,9 m, keliling kritis tidak overlap


Keliling :


bo = 4 x 300 mm = 1200 mm


Gaya geser berfaktor
Vu = 1Pu = 892,97 KN
Gaya Geser Nominal

Vc = 1/3 bo d fc' = 0,6 x 1/3 x 1200 mm x 25 = 1200 KN


1200 KN > 892,97 KN ( tebal pelat mencukupi untuk memikul gaya geser tanpa memerlukan
tulangan geser )




Penulangan Poer




min
=

fc
4 fy
=
25
= 0,003125

4.400



min
=
1,4
=

fy
1,4
400

= 0,0035
140








Didapat min = 0,003125


Mu
bd
2

= x 0,8 x fy x
|
1 - 0,5882 x x

\
fy |

|
fc
.

267,89,01.10
6
Nmm
1000 x 341,5
2

= x 0,8 x 400 x
|
1 - 0,5882 x x

\
400 |

|
25
.

1,8179 = 320 3011,584
2


3011,584
2
320 +1,8179 = 0



Rumus ABC =
b b
2
4ac
2a



1
=
320 + 320
2
(4 x 3011,584 x 1,8179)
2 x 3011,584

= 0,1002




2
=
320 320
2
(4 x 3011,584 x 1,8179)
2 x 3011,584

= 0,00602 ( diambil yang terkecil )




As = x b x d


= 0,00602 x 1900 x 341,5


= 3906,08 mm
2



Jadi digunakan 8 D 25 ( As = 3926,99 mm
2
)






Pengangkatan Tiang Pancang


Pengangkatan Pola 1
141






Perhitungan tiang pancang berdasarkan kebutuhan waktu pengangkatan.
















M1 M1




M2












M1 = .q . a
2



M1 = M2


1/2 .q . a
2
= 1/8 . q . (L2a)
2
. q .a
2



4a
2
+ (4 .a. L) L
2
= 0


4a
2
+ (4.a.5) 5
2
= 0


4a
2
+ 20 a 25 = 0
a
2
+ 5a 6,25 = 0
Didapat a = 1,035 m
142






Berat sendiri tiang pancang = 0.3 m x 0,3 m x 2400 Kg/m
3



= 216 Kg/m


M1 = M2


= .q . a
2



= .(216Kg/m). (1,035m)
2



= 115,69 Kgm


= 1,1569 KNm








Pengangkatan Pola 2









R2






R1
143












M1 = .q . a
2


1/2.q.a
2

R1 = q (L-a) -
L-a

q (L-a)





q.a
2

= -
2 2(L-a)

qL
2
- 2aqL
=
2.(L-a)

Mx = R1.x .q.x
2






Syarat extrim :





dMx
= 0
dx

R1 - qx = 0

R1
x =


L
2
-2aL
=
Q 2.(L-a)

L
2
-(2.a.L)
Mmax = M2 = R1 x -


1 L
2
-(2.a.L)
x q x ( )
2

2.(L-a) 2 2.(L-a)

L
2
-(2.a.L)
= q x
2.(L-a)
144







M1 = M2


1 1 L-(2.a.L)
q a
2
= q ( )
2 2 2.(L-a)

L-(2.a.L)
a
2
= ( )
2.(L-a)

2a
2
- 4. a. L + L
2
= 0

2a
2
- 4. a. 5+ 5
2
= 0

2a
2
-20a + 25 = 0

a = 1,46 m
M1 = M2

= .q . a
2



= .(216Kg/m). (1,46m)
2



= 230,21 Kgm


= 2,3021 KNm





Penulangan Tiang Pancang


Maka yang paling menentukan adalah M1=M2 = 1,2 (2,3021)


= 2,76 KNm


Diketahui :


Mmax = 2,76 KNm
fc = 25 MPa
fy = 240 Mpa
145








Tulangan utama = D
12



Tulangan sengkang = 8


Selimut beton (P) = 40 mm (Tidak berhubungan dengan cuaca)
Tinggi effektif (d) = h p s D
= 300 mm 40 mm 8 mm (1/2.12) mm


= 246 mm


Mu
bd
2

= x 0,8 x fy x
|
1 - 0,5882 x x

\
fy |

|
fc
.

2,76.10
6
Nmm
300 x 246
2

= x 0,8 x 400 x
|
1 - 0,5882 x x

\
400 |

|
25
.

0,152 = 320 3011,584
2


3011,584
2
320 +2,1686 = 0



Rumus ABC =
b b
2
4ac
2a



1
=
320 + 320
2
(4 x 3011,584 x 0,152)
2 x 3011,584

= 0,106




2
=
320 320
2
(4 x 3011,584 x 2,1686)
2 x 3011,584

= 0,00048 ( diambil yang terkecil )

min
= 0,003125 > = 0,00048


Jadi dipakai
min



As =
min
x b x d


= 0,003125 x 300 x 246
146






= 230,625 mm
2



Jadi digunakan 4 D 12 dengan As = 452,4 mm
2


Dipasang Tulangan sengkang :
Av = 2 . ..d
2



= 2. (8mm)
2



= 100,53 mm
2





1
Av =
bw . S
+
3 Fy

3.Av.Fy
S =
300

3.100,53 . 400
=
300

= 402,12 mm




Syarat S
max
= .d atau 600 mm


S
max
= . 242,5 mm


= 121,25 mm


Maka digunakan sengkang 8100 mm
147
















Gambar Pondasi Tiang Pancang



148

Anda mungkin juga menyukai