NO.
JENIS ALAT
SATUAN
HARGA SATUAN
(Rp.)
jam
100,000.00
jam
35,000.00
bh/ hari
150,000.00
unit/ hari
95,000.00
unit/ jam
30,000.00
Sepeda motor
unit/ hari
90,000.00
Truk / Pick Up
unit/ hari
125,000.00
bh
55,000.00
Gergaji Listrik
bh
35,000.00
10
bh
45,000.00
NO.
HARGA
(Rp.)
SATUAN WAKTU
Pekerja
35,000.00
30,000.00
Pekerja Terampil
50,000.00
Tukang Gali
40,000.00
35,000.00
45,000.00
35,500.00
40,000.00
35,000.00
40,000.00
35,000.00
40,000.00
35,000.00
40,000.00
Mandor
60,000.00
35,000.00
40,000.00
45,000.00
35,000.00
40,000.00
45,000.00
No
JENIS BAHAN
SATUAN
HARGA
(Rp.)
1
2
3
4
1
2
3
4
5
6
7
1
2
3
1
1
2
3
1
1
1
2
1
1
2
1
2
3
4
5
6
m3
m3
m3
m3
m3
m3
m3
m3
m3
bh
Zak
m3
m3
bh
kg
95,000
105,000
65,000
125,000
120,000
153,000
142,000
131,000
92,000
500
55,000
695,000
695,000
3,500
15,500
Kg
Kg
Kg
Kg
Kg
m2
sheet
m'
Lbr
Lbr
Psng
Bh
M'
M2
btg
btg
10,000
11,000
20,000
15,000
27,000
484,000
730,000
45,000
45,700
100,100
12,500
20,000
194,000
13,000
75,000
55,000
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
1
2
3
4
5
6
7
C. BAHAN PERPIPAAN
Pipa Galvanis 1/2"
Pipa Galvanis 1"
Pipa Galvanis 1 1/4"
Pipa Galvanis 2 1/4"
Pipa Galvanis 2 1/2"
Pipa Besi 1 1/4"
Pipa PVC 1/2" ( setara Maspion )
Pipa PVC 3/4" ( setara Maspion )
Pipa PVC 1" ( Setara Maspion )
Pipa PVC 1" 1/4 ( Setara Maspion )
Pipa PVC 1 1/2" ( Setara Maspion )
Pipa PVC 2" ( Setara Maspion )
Pipa PVC 2 1/2" ( Setara Maspion )
Pipa PVC 3 " ( Setara Maspion )
Pipa PVC 4" ( Setara Maspion )
Gravel 1/2 Dia 20 cm
Gravel 1/2 Dia 30 cm
Buis beton dia 20 cm
Buis beton dia 30 cm
Bio tank
Ground Tank Full shet
Tutup Plat bordes + Engsel
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
m'
m'
bh
bh
bh
bh
bh
55,000
85,000
160,000
250,000
275,000
24,000
5,000
11,000
14,000
18,000
21,000
27,000
30,000
56,000
84,000
19,000
23,000
34,000
41,000
1,200,000
1,950,000
235,000
1
2
3
4
5
6
7
8
9
10
11
12
13
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
btg
btg
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
bh
bh
bh
bh
Zak
Zak
m3
m3
m3
m3
m3
m'
m'
m'
lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
6,000
9,000
21,000
27,000
81,000
4,600,000
4,600,000
8,800,000
6,300,000
8,800,000
9,200,000
10,100,000
4,000,000
8,100,000
16,000,000
16,000,000
9,200,000
4,000,000
6,300,000
8,100,000
2,400,000
2,400,000
1,400,000
1,400,000
2,400,000
7,000
43,000
70,000
72,000
86,000
82,000
79,000
93,000
139,000
173,000
226,000
58,000
127,000
1
26
27
28
29
30
31
32
33
2
Plywood 18 mm 120 x 240
Teakwood 3 mm 120 x 240
Teakwood 3 mm Uk/ Pintu
Teakwood 4 mm 120 x 240
Teakwood 4 mm Uk/ Pintu
Triplek 3 mm
Ijuk
Plastik Cor
3
Lbr
Lbr
Lbr
Lbr
Lbr
lbr
kg
m2
4
192,000
93,000
161,000
135,000
111,000
50,000
8,000
15,500
1
1
2
3
4
5
6
7
2
E. BAHAN PENUTUP RANGKA PLAFOND
Eternit 1x1 M2
Eternit 1x1 M2
Asbes semen 1x1 M2
Plat Kalsiboard (1.2x2.4)m tebal 4 mm
Cornis
Kumpon
Plester @ roll 20 m
bh
peti
bh
lbr
Zak
Kg
Rol
5,700
57,000
26,000
45,000
85,000
4,200
75,000
1
1
2
3
4
5
6
7
1
2
1
2
3
4
1
2
1
2
3
Lbr
Gall
Kg
Kg
Kg
Kg
Kg
Kg
bh
bh
Kg
Kg
Bh
Ltr
Ltr
Ltr
0
Kg
ls
1,700
78,000
15,000
14,400
115,000
90,000
15,000
27,500
9,000
12,100
14,000
24,000
12,000
14,000
8,400
19,300
12,600
66,000
15,000
1
2
3
4
5
6
G. BAHAN KACA
Kaca Polos 2 mm
Kaca Polos 3 mm
Kaca Polos 5 mm
Kaca Rayban 5 mm
Kaca cermin 5 mm
Karet Kaca
m2
m2
m2
m2
bh
m1
30,000
48,000
58,000
70,000
55,000
65,000
1
2
3
4
5
6
Kg
Kg
Kg
Kg
bh
m2
14,500
30,200
5,700
16,000
500
160,000
1
2
3
4
5
6
7
I. BAHAN SANITER
Bak fibreglass
Closet Jongkok Porselin Putih ( standar )
Closet Jongkok Porselin Warna
TOTO CW 420J/SW 420JP 2 tanki Warna Putih (full shet)
CLOSET JONGKOK set CE7
Kran Tembok 3/4 "
Kran Leher angsa 1/2 " TOTO
Bh
bh
bh
bh
bh
bh
bh
220,000
157,000
175,000
850,000
199,300
18,000
85,000
2
Stop Kran Tembok 1/2 " setara TOTO
Stop Kran Tembok 3/4 " setara TOTO
Kitchen Zink Stailess Non Standar franke ( 1 Lobang )
Kitchen Zink Stailess Non Standar franke ( 2 Lobang )
Wastafel setara merk INA ( lengkap )
Wastafel setara merk TOTO
Seal tape
Pompa air 125 watt
Pompa air 250 watt otomatic
Pintu Fiber KM/WC
Water Drain + Assessoris
Sumur Gali
Instalasi Pompa + Stop kontak
Foot Valve Dia 1"
Water Level Kontrol
Water level kontrol NYM 2 X 2.5 MM2
Fitting accessories
Shower (tanpa tiang)
Shower Tube
Jetwasher
Waterheater 250 watt
Kompor gas (MODENA Freestanding Cooker Type FC 7300)
Penghisap asap (MODENA slim ExsausetHoodType SX 9002)
Instalasi AS+Stop Kontak AC+AC LG 0,5 PK+ saluran pembuang air
3
bh
bh
Set
Set
Set
Set
Set
Unit
Unit
Set
set
Ls
Ls
bh
Unit
ttk
ls
bh
bh
bh
Unit
Unit
Unit
set
1
2
3
4
5
1
2
3
4
5
6
m2
bh
m2
Lbr
bh
bh
bh
bh
bh
m2
bh
91,000
6,276
37,500
19,000
24,900
2,500
26,000
1,850
1,300
1,500
1,200
1
2
3
4
1
2
1
2
3
4
5
K. BAHAN ELEKTRIKAL
Lampu Pijar 25 Watt
Lampu Pijar 40 Watt
Lampu PLC 18 watt
Lampu TKO 2x18 watt
Saklar Ganda Broco
Saklar tunggal Broco
Stop kontak Broco
Plafond fitting Broco
Instalasi titik stop kontak Broco kabel (3x2.5mm2) skw Prima
Instalasi Titik Cahaya/penerangan dgn kabel Prima (2x2.5mm2)
Box panel Lengkap
bh
bh
bh
set
bh
bh
bh
bh
Ttk
Ttk
bh
4,800
8,400
32,600
65,200
15,700
11,400
12,100
13,000
95,000
110,000
300,000
8
9
1
2
3
4
5
6
7
8
1
2
3
4
5
6
7
8
9
10
11
12
13
14
4
30,000
60,000
225,000
350,000
351,000
465,000
2,000
453,000
1,262,000
285,000
115,000
1,500,000
150,000
25,000
135,000
125,000
98,000
85,000
120,000
150,000
2,000,000
2,950,000
1,850,000
3,000,000
1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
2
Box Presto 8 group
MCB induk 10 A
MCB induk 6 A
Otomatis Radar pompair + Pelampung
Soket Antena
Soket Telepon
BP Telepon 1 Line
BP Listrik 3600 VA
UJL Listrik 3600 VA
Kabel NYY 2x2,5mm
Kabel NYY 3x2,5mm
Kabel NYY 3x6,5mm
Kabel NYY 3x10mm
Solatif kabel
T - Dus
Inbow - dus
Kabel telephone
Kabel TV
Kabel Tuvur 3x6 m
Kabel Tuvur 3x2,5 m
Kabel tembaga bc 5
Fiting lampu Down Ligt exs Artolite RD 150
Fiting Lampu Bundar exs Artolite B 79923
Fitting Lampu gantung exs artolite HLG CF BG C3
Fitting Lampu exs Artolite RD 3HALOGEN REFF
Fiting Lampu Taman exs Artolite GL PILAR DAIKO KOTAK
Fiting Lampu Tempel Kolom exs Artolite WL DAICO
Fiting Lampu exs Artolite RD 21- 1 HALLOGEN
Lampu Down Ligt exs Philips cool dayligt 20 W TORNADO
Lampu Bundar exs Philips cool daylight CIRCLEuntuk dalam ruangan
Lampu gantung exs philips Incandescent E 27 25 W
Lampu exs QR-CBC51 GU 5.3 20 W
Lampu Taman exs philips Essential E 27 - 18 W
Lampu Tempel Kolom exs philips Essential E 27 8 W
Lampu exs QR-CBC 51 GU 5.3 20 W
3
Unit
bh
bh
0
bh
bh
Ls
Ls
Ls
m
m
m
m
roll
bh
bh
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
bh
bh
bh
bh
Bh
Bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
Set
bh
bh
bh
bh
bh
bh
4
75,000
55,000
45,000
57,500
18,000
17,000
1,000,000
3,500,000
2,000,000
10,000
11,500
30,000
45,000
5,500
5,500
7,500
7,000
6,500
11,000
9,000
4,500
20,000
21,500
22,000
25,000
30,000
32,000
35,000
45,000
34,000
40,000
42,000
30,000
28,000
35,000
9,600
13,500
9,600
13,500
12,000
9,600
20,700
4,000
9,000
12,500
78,600
139,100
165,000
150,000
75,000
4,800
66,000
33,300
4,800
3,000
17,000
21,000
22,600
18,700
6,000
13,500
1
27
28
29
30
31
32
33
2
Handle Alumunium
kait Angin alumunium
Ripet
Kunci Silinder Kaca
Springknip (stainless steel)
Rel, engsel, handle, kunci pintu sliding (lengkap)
Alumunium Foil
3
Psng
Psng
Psng
bh
bh
set
m2
4
50,000
41,600
7,500
33,300
21,000
1,500,000
20,000
1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
1
2
1
2
3
2
M. BAHAN LANTAI DAN PELAPIS DINDING
Keramik 40 x 40 ROMAN ( polos )
Keramik 40 x 40 ROMAN Warna
Keramik 30 x 30 KW I DN Putih ( polos ) KW 1
Keramik 30 x 30 KW I DN Warna KW 1
Keramik 30 x 30 KW I DN POLOS KW II
Keramik 30 x 30 ROMAN Vivaldi Garnet
Keramik 30 x 30 ROMAN Strata Black
Keramik 30 x 30 ROMAN Colonial Sabia
Keramik 33 x 33 ROMAN Columbus Beige
Keramik 25 x 33 ROMAN Aquila Crema
Keramik 25 x 33 ROMAN Aquila Bruno
Keramik 20 x 20 KW I DN Putih ( polos )
Keramik 20 x 20 KW I DN Warna
Keramik 20 x 20 KW I DN Warna anti slip
Keramik 20 x 20 ROMAN Troy Bruno
Keramik 20 x 20 ROMAN Giada Beige
Keramik 20 x 20 ROMAN Venere Crme
Keramik 20 x 25 KW I DN ( Polos )
Keramik 20 x 25 KW I DN Warna
Keramik 20 x 25 ROMAN Canossa Dark
Keramik 20 x 25 ROMAN Canossa Beige
Keramik 10 x 40 ROMAN
Keramik 10 x 30 ROMAN Vivaldi Garnet
Keramik 10 x 30 ROMAN Strata Black
Keramik 10 x 30 ROMAN colonial sabia
Keramik 7 x 25 ROMAN Tulip Aquila Crema Listello
Keramik 7 x 25 ROMAN Tulip Aquila Crema Listello
Keramik 6 x 20 ROMAN Marigold Marmara Beige
Keramik 6 x 20 ROMAN Marigold Marmara Beige
Keramik 6 x 20 Light new zhutilani beige mulia
Step nosing 30 cm
Border Keramik 20 cm
N. HARGA BBM
Premium
Minyak Solar
Minyak Bakar
Pelumas Bekisting
Olie SAE (Mesran, Pertamina)
m2 /Dus
m2 /Dus
bh
bh
bh
m2 /Dus
m2 /Dus
m2 /Dus
m2 /Dus
m2 /Dus
m2 /Dus
bh
bh
bh
m2 /Dus
m2 /Dus
m2 /Dus
bh
bh
m2 /Dus
m2 /Dus
m1 /Dus
m1 /Dus
m1 /Dus
m1 /Dus
m1 /Dus
bh
m1 /Dus
bh
bh
Bh
Bh
52,500
54,000
38,000
42,000
50,000
48,900
50,000
45,000
46,000
45,000
42,000
39,000
44,000
47,000
52,000
51,500
50,000
41,000
47,000
48,000
48,000
24,000
24,000
24,000
23,500
30,000
7,500
22,500
4,500
9,600
3,750
2,500
Ltr
Ltr
Ltr
Ltr
Ltr
4,500
4,300
7,500
12,600
19,000
Riezqi Badruzaman
Teguh Firmansyah
NO.
URAIAN
2
1
A1 1 M2 PEK. PEMBERSIHAN LOKASI
Pekerja
Mandor
Alat Bantu
Jumlah
Keuntungan Maksimal 10%
Jumlah Total
Dibulatkan
KOEF.
SAT.
4
0.01
0.00
0.10
org
org
lot
HARGA SATUAN
Rp.
5
35,000
60,000
47,500
JUMLAH HARGA
Rp.
6 = (3 x 5)
350
60
4,750
5,160
516
5,676
5,650
2
1
A2 1 M1 PEK. PASANGAN BOUWPLANK
Kayu Terentang
Paku 5-7
Ongkos Pasang
Jumlah
Keuntungan Maksimal 10%
Jumlah Total
Dibulatkan
A3 1 M3 PEK. GALIAN TANAH PONDASI MAX KEDALAMAN 1 M
Tukang Gali
Mandor
Alat Bantu
Jumlah
Keuntungan Maksimal 10%
Jumlah Total
Dibulatkan
A4 1 M3 URUGAN PASIR URUG
Pasir urug
Pekerja
Mandor
Jumlah
Keuntungan Maksimal 10%
Jumlah Total
Dibulatkan
A5 1 M3 URUGAN TANAH KEMBALI DIPADATKAN
Tukang Gali
Mandor
Alat Bantu
Jumlah
Keuntungan Maksimal 10%
Jumlah Total
Dibulatkan
A6 1 M3 PASANGAN AANSTAMPING BATU BELAH
Batu Belah
Pasir Pasang
Pekerja
Tk. Batu setengah terampil
Mandor
Jumlah
Keuntungan Maksimal 10%
Jumlah Total
Dibulatkan
A7 1 M3 PASANGAN BATU BELAH 1 : 5
Batu Belah
Semen PC (50 kg)
Pasir Pasang
Pekerja
Tk. Batu setengah terampil
Mandor
Jumlah
Keuntungan Maksimal 10%
Jumlah Total
Dibulatkan
6 = (3 x 5)
0.01
0.04
0.20
m3
kg
lot
1,400,000
16,000
14,160
14,000
640
2,832
17,472
1,747
19,219
19,200
0.40
0.04
0.10
org
org
lot
40,000
60,000
10,000
16,000
2,400
1,000
19,400
1,940
21,340
21,300
1.20
0.15
0.01
m3
org
org
95,000
35,000
60,000
114,000
5,250
600
119,850
11,985
131,835
131,800
0.19
0.02
0.10
org
org
lot
40,000
60,000
10,000
7,600
1,200
1,000
9,800
980
10,780
10,750
1.20
0.10
0.50
0.56
0.06
m3
m3
org
org
org
120,000
65,000
35,000
35,000
60,000
144,000
6,500
17,500
19,600
3,600
191,200
19,120
210,320
210,300
1.20
1.08
0.44
1.25
0.50
0.02
m3
zak
m3
org
org
org
120,000
55,000
65,000
35,000
35,000
60,000
144,000
59,400
28,600
43,750
17,500
1,200
294,450
29,445
323,895
323,850
2
1
A8 1 M3 LANTAI KERJA 1 PC : 3 PS : 5 KRL/ RABAT BETON
Semen PC (50 kg)
Pasir beton
Split Pecah mesin 1/2
Pekerja
Tk. Batu setengah terampil
Mandor
Alat Bantu
Jumlah
Keuntungan Maksimal 10%
Jumlah Total
Dibulatkan
A9 1 M3 COR BETON SITE MIX K.175
Semen PC (50 kg)
Pasir beton
Split Pecah mesin 1/2
Pekerja
Tk. Batu setengah terampil
Mandor
Peralatan
Jumlah
Keuntungan Maksimal 10%
Jumlah Total
Dibulatkan
A10 1 KG BESI BETON TERPASANG U - 24
Besi beton rata-rata
Kawat beton
Tk. Besi setengah terampil
Tk. Besi beton terampil
Mandor
Peralatan
Jumlah
Keuntungan Maksimal 10%
Jumlah Total
Dibulatkan
6 = (3 x 5)
3.96
0.55
0.93
2.00
0.50
0.01
0.10
zak
m3
m3
org
org
org
lot
55,000
125,000
153,000
35,000
35,000
60,000
33,300
217,800
68,750
142,290
70,000
17,500
600
3,330
520,270
52,027
572,297
572,250
6.80
0.54
0.83
1.50
0.50
0.01
0.10
zak
m3
m3
org
org
org
lot
55,000
125,000
153,000
35,000
35,000
60,000
33,300
374,000
67,500
126,990
52,500
17,500
600
3,330
642,420
64,242
706,662
706,650
1.05
0.01
0.03
0.02
0.01
0.10
kg
kg
org
org
org
lot
10,000
15,000
35,000
40,000
60,000
2,500
10,500
150
1,050
800
600
250
13,350
1,335
14,685
14,650
2
1
A11 1 M2 BEKISTING MULTIPLEK 9 MM
Kaso 5/7 Borneo Super (2x pakai) 50%
Multiplek 9 mm (2x pakai) 75%
Paku
Pekerja
Tk. Kayu terampil
Mandor
Tk. Kayu 1/2 terampil (bongkar cetakan)
Jumlah
Keuntungan Maksimal 10%
Jumlah Total
Dibulatkan
A12 1 M2 BEKISTING DENGAN PAPAN
Kaso 5/7 Borneo Super (2x pakai) 50%
Papan terentang (2x pakai) 75%
Paku
Pekerja
Tk. Kayu terampil
Mandor
Tk. Kayu 1/2 terampil (bongkar cetakan)
Jumlah
Keuntungan Maksimal 10%
Jumlah Total
Dibulatkan
6 = (3 x 5)
0.02
0.35
0.40
0.12
0.15
0.05
0.12
m3
lbr
kg
org
org
org
org
2,000,000
104,250
16,000
35,000
40,000
60,000
35,500
40,000
36,488
6,400
4,200
6,000
3,000
4,260
100,348
10,035
110,382
110,350
0.02
0.02
0.40
0.12
0.15
0.05
0.12
m3
m3
kg
org
org
org
org
2,000,000
1,050,000
16,000
35,000
40,000
60,000
35,500
40,000
21,000
6,400
4,200
6,000
3,000
4,260
84,860
8,486
93,346
93,300
2
1
A13 1 M2 PASANGAN 1/2 BATA MERAH 1 : 5
Bata Merah
Semen PC (50 kg)
Pasir Pasang
Pekerja setengah terampil
Tk. Batu terampil
Mandor
Jumlah
Keuntungan Maksimal 10%
Jumlah Total
Dibulatkan
A14 1 M2 PAS. PLESTERAN DINDING 1 : 5 + ACIAN
Semen PC (50 kg)
Pasir Pasang
Pekerja setengah terampil
Tk. Batu setengah terampil
Mandor
Jumlah
Keuntungan Maksimal 10%
Jumlah Total
Dibulatkan
6 = (3 x 5)
70.00
0.20
0.06
0.32
0.18
0.01
bh
zak
m3
org
org
org
500
55,000
65,000
30,000
45,000
60,000
35,000
11,000
3,900
9,600
8,100
600
68,200
6,820
75,020
81,840
0.10
0.02
0.29
0.21
0.02
zak
m3
org
org
org
55,000
65,000
30,000
45,000
60,000
5,500
1,300
8,700
9,450
1,200
26,150
2,615
28,765
28,750
2
1
A15 1 M2 ATAP BAJA RINGAN
Rangka Atap Baja Ringan
Alat Bantu
Jumlah
Keuntungan Maksimal 10%
Jumlah Total
Dibulatkan
A16 1 M1 PASANGAN PLASTIK BUBUNGAN
Plastik Cor
Alat
Upah Pasang
Jumlah
Keuntungan Maksimal 10%
Jumlah Total
Dibulatkan
A17 1 M2 PASANGAN ATAP GENTENG ALUMUNIUM TEBAL 0.55
Genting alumunium tebal 0.55
Pekerja setengah terampil
Tukang kayu setengah terampil
Mandor
Jumlah
Keuntungan Maksimal 10%
Jumlah Total
Dibulatkan
6 = (3 x 5)
1.00
0.10
m2
ls
160,000
16,000
160,000
1,600
161,600
16,160
177,760
177,750
0.25
1.00
1.00
m2
ls
ls
15,500
1,550
3,100
3,875
1,550
3,100
8,525
853
9,378
9,350
18.00
0.12
0.06
0.01
bh
org
org
org
1,500
30,000
35,500
60,000
27,000
3,600
2,130
600
33,330
3,333
36,663
36,650
6 = (3 x 5)
2
1
3
A18 1 M2 PAS. PLAFOND GRC 4 MM + BESI HOLO 4x4
Rangka hollow 40x40 @ 4m
0.50
Rangka hollow 20x40 @ 4m
0.67
Paku
0.22
Pekerja setengah terampil
0.28
Tukang kayu terampil
0.40
Mandor
0.01
Jumlah
Keuntungan Maksimal 10%
Jumlah Total
Dibulatkan
A19 1 M2 PAS. PLAFOND GYPSUM 9 MM BERIKUT RANGKA BESI HOLO 4x4
Gypsum 9 mm
0.35
Rangka hollow 40x40 @ 4m
0.50
Rangka hollow 20x40 @ 4m
0.67
Paku
0.22
Pekerja setengah terampil
0.28
Tukang kayu terampil
0.40
Mandor
0.01
Jumlah
Keuntungan Maksimal 10%
Jumlah Total
Dibulatkan
A20 1 M1 PEKERJAAN LIST PLAFOND GYPSUM 5 cm
List Gypsum 5 cm
1.00
Paku
0.01
Pekerja terampil
0.07
Tukang kayu setengah terampil
0.02
Mandor
0.00
Jumlah
Keuntungan Maksimal 10%
Jumlah Total
Dibulatkan
6 = (3 x 5)
btg
btg
kg
org
org
org
75,000
55,000
16,000
30,000
40,000
60,000
37,500
36,850
3,520
8,400
16,000
600
102,870
10,287
113,157
113,150
lbr
btg
btg
kg
org
org
org
72,000
75,000
55,000
16,000
30,000
40,000
60,000
25,200
37,500
36,850
3,520
8,400
16,000
600
128,070
12,807
140,877
140,850
m1
kg
org
org
org
70,000
16,000
30,000
35,500
60,000
70,000
160
2,100
710
60
73,030
7,303
80,333
80,300
6 = (3 x 5)
2
1
3
A21 1 BH PASANG KUNCI 2 HINGES UNTUK DAUN SATU DAUN PINTU
Kunci tanam 2 slagg HINGES
1.00
Tukang kayu terampil
0.35
Jumlah
Keuntungan Maksimal 10%
Jumlah Total
Dibulatkan
A22 1 BH PASANG KUNCI KM/ WC
Lockset KC-BL-DKS-8587-BK-SS
1.00
Tukang kayu terampil
0.35
Jumlah
Keuntungan Maksimal 10%
Jumlah Total
Dibulatkan
A23 1 BH PASANG ENGSEL PINTU
Hinges ES-IR-DKS-4"x3"x3mm-4BB-SN, engsel daun pintu
1.00
Tukang kayu terampil
0.08
Jumlah
Keuntungan Maksimal 10%
Jumlah Total
Dibulatkan
A24 1 BH PASANG ENGSEL JENDELA
Hinges ES-IR-DKS-4"x3"x3mm-4BB-SN, engsel daun jendela
1.00
Tukang kayu terampil
0.08
Jumlah
Keuntungan Maksimal 10%
Jumlah Total
Dibulatkan
A25 1 BH PASANG SLOT JENDELA
Slot jendela spring knief
1.00
Tukang kayu terampil
0.08
Jumlah
Keuntungan Maksimal 10%
Jumlah Total
Dibulatkan
6 = (3 x 5)
sheet
org
150,000
50,000
150,000
17,500
167,500
16,750
184,250
184,250
bh
org
75,000
50,000
75,000
17,500
92,500
9,250
101,750
101,750
bh
org
13,500
50,000
13,500
4,000
17,500
1,750
19,250
19,250
bh
org
13,500
50,000
13,500
4,000
17,500
1,750
19,250
19,250
bh
org
4,800
50,000
4,800
4,000
8,800
880
9,680
9,650
2
1
3
A26 1 M2 PASANG KACA POLOS TEBAL 5 mm, BEPEL 1 MUKA L 2 cm
Kaca polos tebal 5 mm
1.10
Pekerja
0.15
Tukang kayu terampil
0.15
Jumlah
Keuntungan Maksimal 10%
Jumlah Total
Dibulatkan
A27 1 M2 PASANG KACA ES TEBAL 5 mm,
Kaca polos tebal 5 mm
1.10
Pekerja
0.15
Tukang kayu terampil
0.15
Jumlah
Keuntungan Maksimal 10%
Jumlah Total
Dibulatkan
A28 1 M2 ROMAN 20x20 TROY BRUNO
Roman 20x20 troy bruno
1.01
Semen PC (50 kg)
0.16
Pasir pasang
0.03
Pekerja terampil
0.19
Tukang batu terampil
0.38
Mandor
0.02
Jumlah
Keuntungan Maksimal 10%
Jumlah Total
Dibulatkan
6 = (3 x 5)
m2
org
org
70,000
35,000
40,000
77,000
5,250
6,000
88,250
8,825
97,075
97,050
m2
org
org
58,000
35,000
40,000
63,800
5,250
6,000
75,050
7,505
82,555
82,550
m2
zak
m3
org
org
org
52,000
55,000
55,000
50,000
45,000
60,000
52,520
8,800
1,650
9,500
17,100
1,200
90,770
9,077
99,847
99,800
2
1
A29 1 M2 ROMAN 20x20 GIADA BEIGE
Roman 20x20 giada beige
Semen PC (50 kg)
Pasir pasang
Pekerja terampil
Tukang batu terampil
Mandor
Jumlah
Keuntungan Maksimal 10%
Jumlah Total
Dibulatkan
A30 1 M2 PAS. LANTAI KERAMIK 30/30 ROMAN VIVALDI GARNET
Roman 30x30 vivaldi garnet
Semen PC (50 kg)
Pasir pasang
Pekerja terampil
Tukang batu terampil
Mandor
Jumlah
Keuntungan Maksimal 10%
Jumlah Total
Dibulatkan
6 = (3 x 5)
1.01
0.16
0.03
0.19
0.38
0.02
m2
zak
m3
org
org
org
51,500
55,000
55,000
50,000
45,000
60,000
52,015
8,800
1,650
9,500
17,100
1,200
90,265
9,027
99,292
99,250
1.01
0.16
0.03
0.19
0.38
0.02
m2
zak
m3
org
org
org
48,900
55,000
65,000
50,000
45,000
60,000
49,389
8,800
1,950
9,500
17,100
1,200
87,939
8,794
96,733
96,700
6 = (3 x 5)
6 = (3 x 5)
6 = (3 x 5)
2
1
A31 1 M2 PENGECATAN DINDING VINILEX (3X)
Cat tembok Vinilex
Plamur tembok
Roll cat
Ampelas
Pekerja
Tukang cat setengah terampil
Mandor
Jumlah
Keuntungan Maksimal 10%
Jumlah Total
Dibulatkan
A32 1 M2 PENGECATAN PLAFOND DULUX ICI (3X)
Cat tembok dulux ICI
Plamur tembok
Roll cat
Ampelas
Pekerja
Tukang cat setengah terampil
Mandor
Jumlah
Keuntungan Maksimal 10%
Jumlah Total
Dibulatkan
6 = (3 x 5)
0.18
0.16
0.01
0.50
0.10
0.18
0.01
kg
kg
bh
lbr
org
org
org
90,000
24,000
12,000
1,700
35,000
35,000
60,000
16,200
3,840
120
850
3,500
6,300
600
31,410
3,141
34,551
34,550
0.20
0.16
0.01
0.50
0.10
0.18
0.01
kg
kg
bh
lbr
org
org
org
115,000
24,000
12,000
1,700
35,000
35,000
60,000
23,000
3,840
120
850
3,500
6,300
600
38,210
3,821
42,031
42,000
2
1
A33 1 M2 MELAMIK DAUN JENDELA
Ampelas
Thiner
Finishing melamic dop/ gloss
Alat
Pekerja setengah terampil
Tukang cat terampil
Mandor
Jumlah
Keuntungan Maksimal 10%
Jumlah Total
Dibulatkan
A34 1 M2 MELAMIK DAUN PINTU
Ampelas
Thiner
Finishing melamic dop/ gloss
Alat
Pekerja setengah terampil
Tukang cat terampil
Mandor
Jumlah
Keuntungan Maksimal 10%
Jumlah Total
Dibulatkan
6 = (3 x 5)
1.00
0.20
0.10
1.00
0.26
0.14
0.02
lbr
ltr
kgr
ls
org
org
org
1,700
8,400
15,000
2,510
30,000
40,000
60,000
1,700
1,680
1,500
2,510
7,800
5,600
1,200
21,990
2,199
24,189
24,150
1.50
0.25
0.12
1.00
0.26
0.14
0.02
lbr
ltr
kgr
ls
org
org
org
1,700
8,400
15,000
2,510
30,000
40,000
60,000
2,550
2,100
1,800
2,510
7,800
5,600
1,200
23,560
2,356
25,916
25,900
NO.
URAIAN
KOEF.
SAT.
HARGA SATUAN
Rp.
5
ANALISA ELEKTRIKAL
A1
A2
A3
A4
A5
7.8000
0.3330
2.0000
1.0000
1.0000
1.0000
m1
roll
btg
bh
bh
ls
10,000
5,500
5,000
5,500
7,500
6,700
9.0000
0.3330
2.0000
1.0000
1.0000
1.0000
m1
roll
btg
bh
bh
ls
11,500
5,500
5,000
5,500
7,500
7,000
1.0000
1.0000
1.0000
bh
ls
ls
12,100
1,210
2,420
1.0000
1.0000
1.0000
bh
ls
ls
11,400
1,140
2,280
1.0000
1.0000
1.0000
bh
ls
ls
15,700
1,570
3,140
1
A6
2
BOX x PRESTO + 8 grup MCB ex MERLIN GERYN
Box Presto 8 Grop
mcb Induk 10 A exs Nerlin gerin
mcb Induk 6 A exs Nerlin gerin
Alat Bantu
Upah Kerja Pasang
Jumlah
Keuntungan Maksimal 10%
Jumlah Total
Dibulatkan
1.0000
1.0000
7.0000
1.0000
1.0000
bh
bh
bh
ls
ls
5
75,000
55,000
45,000
17,500
35,000
1
A7
A8
A9
2
3
Lampu Down Ligt exs Philips cool dayligt 20 W TORNADO
Lampu Down Ligt exs Philips cool dayligt 20 W TORNADO
1.0000
Alat Bantu
1.0000
Upah Kerja
1.0000
Jumlah
Keuntungan Maksimal 10%
Jumlah Total
Dibulatkan
Fiting Lampu Bundar exs Artolite B 79923
Fiting Lampu Bundar exs Artolite B 79923
1.0000
Alat Bantu
1.0000
Upah Kerja
1.0000
Jumlah
Keuntungan Maksimal 10%
Jumlah Total
Dibulatkan
Lampu Bundar exs Philips cool daylight CIRCLEuntuk dalam ruangan
Lampu Bundar exs Philips cool daylight CIRCLEuntuk dalam ruangan
1.0000
Alat Bantu
1.0000
Upah Kerja
1.0000
Jumlah
Keuntungan Maksimal 10%
Jumlah Total
Dibulatkan
m1
ls
ls
45,000
4,500
9,000
m1
ls
ls
21,500
2,150
4,300
m1
ls
ls
34,000
3,400
6,800
ANALISA MEKANIKAL/PLUMBING
A10 1 M 1 PAS.PIPA PVC dia.3 "
Pipa PVC dia. 3 "
Fiting & Assesories
Alat Bantu
Upah Kerja
Jumlah
Keuntungan Maksimal 10%
Jumlah Total
Dibulatkan
0.2500
0.1000
0.1000
0.2000
btg
lot
lot
lot
56,000
98,000
15,400
30,800
2
1
A11 1 M 1 PAS.PIPA PVC dia. 3/4"
Pipa PVC dia. 3/4 "
Fiting & Assesories
Alat Bantu
Upah Kerja
Jumlah
Keuntungan Maksimal 10%
Jumlah Total
Dibulatkan
A12 1 M 1 PAS.PIPA PVC dia. 1/2"
Pipa PVC dia. 1/2 "
Fiting & Assesories
Alat Bantu
Upah Kerja
Jumlah
Keuntungan Maksimal 10%
Jumlah Total
Dibulatkan
0.2500
0.1000
0.1000
0.2000
btg
lot
lot
lot
11,000
98,000
10,900
21,800
0.2500
0.1000
0.1000
0.2000
btg
lot
lot
lot
5,000
98,000
10,300
20,600
2
1
A13 1 UNIT GALIAN SEPTICTANK + SEPTICTANK,exs Bio Tank
Galian
Septictank Bio Tank
Alat
Upah Pasang
Jumlah
Keuntungan Maksimal 10%
Jumlah Total
Dibulatkan
4.5000
1.0000
1.0000
1.0000
m3
bh
ls
ls
21,300
1,200,000
122,130
244,260
1.0000
1.0000
1.5000
0.0500
bh
org
org
org
199,300
50,000
45,000
60,000
ANALISA SANITARY
A14 1 UNIT PAS.CLOSET JONGKOK TOTO CE7+PAS.BATA
1 PAS.CLOSET JONGKOK set CE7
Pekerja Trampil
TK Batu Terampil
Mandor
Jumlah
Keuntungan Maksimal 10%
Jumlah Total
Dibulatkan
2
1
A15 1 UNIT CERMIN 5 mm = 100 cm x75 cm
Cermin 5 mm 100 x 75cm
Upah Kerja
Alat Bantu
Jumlah
Keuntungan Maksimal 10%
Jumlah Total
Dibulatkan
A16 1 BH PAS.KRAN AIR TOTO 1/2"
Kran Air
Alat Bantu (10%bahan)
Upah Kerja Pasang (20 % bahan)
Jumlah
Keuntungan Maksimal 10%
Jumlah Total
Dibulatkan
1.0000
0.0500
0.0250
bh
lot
lot
55,000
11,000
5,500
1.0000
0.1000
0.2000
bh
lot
lot
30,000
3,000
6,000
78,000
1,832
10,000
5,500
7,500
6,700
109,532
10,953
120,485
120,450
103,500
1,832
10,000
5,500
7,500
7,000
135,332
13,533
148,865
148,850
12,100
1,210
2,420
15,730
1,573
17,303
17,300
11,400
1,140
2,280
14,820
1,482
16,302
16,300
15,700
1,570
3,140
20,410
2,041
22,451
22,450
6 = (3 x 5)
75,000
55,000
315,000
17,500
35,000
497,500
49,750
547,250
547,250
6 = (3 x 5)
45,000
4,500
9,000
58,500
5,850
64,350
64,350
21,500
2,150
4,300
27,950
2,795
30,745
30,700
34,000
3,400
6,800
44,200
4,420
48,620
48,600
6 = (3 x 5)
14,000
9,800
1,540
6,160
31,500
3,150
34,650
34,650
6 = (3 x 5)
2,750
9,800
1,090
4,360
18,000
1,800
19,800
19,800
1,250
9,800
1,030
4,120
16,200
1,620
17,820
17,800
6 = (3 x 5)
95,850
1,200,000
122,130
244,260
1,662,240
166,224
1,828,464
1,828,450
199,300
50,000
67,500
3,000
319,800
31,980
351,780
351,750
6 = (3 x 5)
55,000
550
138
55,688
5,569
61,256
61,250
30,000
300
1,200
31,500
3,150
34,650
34,650
6 = (3 x 5)
NO.
URAIAN
2
1
A 1 1 M3 ANALISA BETON PONDASI (K-175)
Beton Site Mix K-175
Besi Beton 6 10 mm(Memanjang)
Besi Beton 6 10 mm(Melintang)
Bekisting Papan
Jumlah
Dibulatkan
A 2 1 M3 ANALISA BETON SLOOF S1 15/20 (K-175)
Beton Site Mix K-175
Besi Beton 4 12 mm
Besi Beton Cincin 8mm-150 mm
Bekisting Papan
Jumlah
Dibulatkan
A3 1 M3 ANALISA BETON KOLOM PRAKTIS (KP) 15/15
Beton Site Mix K-175
Besi Beton 4 12 mm
Besi Beton Cincin 8mm-(150s/d200)mm
Bekisting Multipleks 9mm
Jumlah
Dibulatkan
A4 1 M3 ANALISA BETON BP/RING BALOK 15/20 (K-175)
Beton Site Mix K-175
Besi Beton 4 12 mm
Besi Beton Cincin 8mm-(150s/d200)mm
Bekisting Multipleks 9mm
Jumlah
Dibulatkan
KOEF.
SAT.
HARGA SATUAN
Rp.
5
JUMLAH HARGA
Rp.
6 = (3 x 5)
1.05
42.78
42.78
2.50
m3
KG
KG
M2
706,650
14,650
14,650
93,300
741,983
626,727
626,727
233,250
2,228,687
2,228,650
1.05
118.89
48.28
20.00
m3
KG
KG
M2
706,650
14,650
14,650
93,300
741,983
1,741,739
707,302
1,866,000
5,057,023
5,057,000
1.05
109.63
50.16
26.67
M3
KG
KG
M2
706,650
14,650
14,650
110,350
741,983
1,606,080
734,844
2,943,035
6,025,941
6,025,900
1.05
82.22
27.65
5.50
M3
KG
KG
M2
706,650
14,650
14,650
110,350
741,983
1,204,523
405,073
606,925
2,958,503
2,958,500
6 = (3 x 5)
NO.
KODE
1
URAIAN PEKERJAAN
A1
A2
A3
A4
A5
A6
A7
2
PEKERJAAN PERSIAPAN
1 M2 PEK. PEMBERSIHAN LOKASI
1 M1 PEK. PASANGAN BOUWPLANK
1 M3 PEK. GALIAN TANAH PONDASI MAX KEDALAMAN 1 M
1 M3 URUGAN PASIR URUG
1 M3 URUGAN TANAH KEMBALI DIPADATKAN
1 M3 PASANGAN AANSTAMPING BATU BELAH
1 M3 PASANGAN BATU BELAH 1 : 5
A1
A2
PEKERJAAN BEKISTING
1 M2 BEKISTING MULTIPLEK 9 MM
1 M2 BEKISTING DENGAN PAPAN
A1
A2
A1
A2
A3
PEKERJAAN ATAP
1 M2 ATAP BAJA RINGAN
1M2 PASANGAN ATAP GENTENG ALUMUNIUM TEBAL 0.55
1 M1 PASANGAN PLASTIK BUBUNGAN
JUMLAH HARGA
(Rp.)
3
5,650.00
19,200.00
21,300.00
131,800.00
10,750.00
210,300.00
323,850.00
110,350.00
93,300.00
81,840.00
28,750.00
177,750.00
36,650.00
9,350.00
1
A4
A1
A2
PEKERJAAN PLAFOND
1 M2 PAS. PLAFOND GYPSUM 9 MM BERIKUT RANGKA BESI HOLO 4x4
1 M1 PEKERJAAN LIST PLAFOND GYPSUM 5 cm
140,850.00
80,300.00
A1
A2
A3
A4
A5
A6
A7
PEKERJAAN KUSEN
1 BH PASANG KUNCI 2 HINGES UNTUK DAUN SATU DAUN PINTU
1 BH PASANG KUNCI KM/ WC
1 BH PASANG ENGSEL PINTU
1 BH PASANG ENGSEL JENDELA
1 BH PASANG SLOT JENDELA
1 M2 PASANG KACA POLOS TEBAL 5 mm, BEPEL 1 MUKA L 2 cm
1 M2 PASANG KACA ES TEBAL 5 mm,
184,250.00
101,750.00
19,250.00
19,250.00
9,650.00
97,050.00
82,550.00
A1
A2
A3
PEKERJAAN LANTAI
1 M2 ROMAN 20x20 TROY BRUNO
1 M2 ROMAN 20x20 GIADA BEIGE
1 M2 PAS. LANTAI KERAMIK 30/30 ROMAN VIVALDI GARNET
99,800.00
99,250.00
96,700.00
A1
A2
A3
A4
A1
A2
A3
A4
A5
A6
A7
A8
A9
PEKERJAAN ELEKTRIKAL
1 TTK PAS. TITIK LAMPU/CAHAYA
1 TTK PAS.TITIK DAYA/STOP KONTAK
1 BH PAS. ARMATUR STOP KONTAK
1 BH PAS.ARMATUR SAKLAR ENGSEL
1 BH PAS. ARMATUR SAKLAR SERI (Ganda )
BOX x PRESTO + 8 grup MCB ex MERLIN GERYN
Lampu Down Ligt exs Philips cool dayligt 20 W TORNADO
Fiting Lampu Bundar exs Artolite B 79923
Lampu Bundar exs Philips cool daylight CIRCLEuntuk dalam ruangan
A1
A2
A3
A4
A1
PEKERJAAN SANITARY
1 UNIT PAS.CLOSET JONGKOK TOTO CE7+PAS.BATA
34,550.00
42,000.00
24,150.00
25,900.00
120,450.00
148,850.00
17,300.00
16,300.00
22,450.00
547,250.00
64,350.00
30,700.00
48,600.00
34,650.00
19,800.00
17,800.00
1,828,450.00
351,750.00
1
A2
A3
A1
A2
A3
A4
3
61,250.00
34,650.00
2,228,650.00
5,057,000.00
6,025,900.00
2,958,500.00
LOKASI
JENIS PEKERJAAN
NO.
2
1
I PEKERJAAN PERSIAPAN
1 Pembersihan Lapangan+Pembersihan Akhir
2 Listrik & Air Kerja
II
1
2
3
4
III
1
2
3
4
PEKERJAAN PASANGAN
Pasangan aanstamping
Pasangan pondasi batu belah batu 1 PC : 5Psr
Pasangan bata merah pres adukan 1:5
Pasangan dinding plesteran+acian
IV
1
2
3
PEKERJAAN BETON
Kolom praktis 15x15 cm
Ring Balk beton 15x20 cm
Sloof beton 15x20 cm
V
1
2
3
VI
1
2
3
4
5
VII
1
2
3
4
5
6
VOLUME
SAT.
HARGA
(Rp)
5
84.00
1.00
m2
ls
5,650.00
1,865,000.00
37.00
73.80
1.98
46.99
m1
m3
m3
m3
19,200.00
21,300.00
131,800.00
10,750.00
11.71
21.45
162.24
328.48
m3
m3
m2
m2
210,300.00
323,850.00
81,840.00
28,750.00
1.22
0.96
1.78
m3
m3
m3
6,025,900.00
2,958,500.00
5,057,000.00
30.10
60.20
39.50
m2
m2
m2
177,750.00
36,650.00
140,850.00
2.00
2.00
1.00
2.00
2.00
unit
unit
unit
unit
unit
625,000.00
484,000.00
316,000.00
570,000.00
82,500.00
37.10
2.40
7.68
1.00
1.00
1.00
m2
m2
m2
bh
bh
bh
96,700.00
99,800.00
99,250.00
351,750.00
61,250.00
34,650.00
121.80
39.50
m2
m2
34,550.00
42,000.00
IX
1
2
3
4
PEKERJAAN SANITASI
Saluran Air Bersih Pipa PVC1/2 inch Rucika AW Warna Abu
Saluran Air Bersih Pipa PVC3/4 inch Rucika AW Warna Abu
Saluran Air Kotor Pipa PVC 3 Inch Maspion D Warna Abu
Septictank Bio Tank
13.40
2.000
10.40
1.00
m1
m1
m1
unit
17,800.00
19,800.00
34,650.00
1,828,450.00
X
1
2
3
4
5
6
PEKERJAAN LISTRIK
Instalasi Titik Lampu (kabel2x1,5)NYM ETERNA SNI
Instalasi Titik Stop Kontak (kabel 3x1,5)NYM ETERNA SNI
Saklar tunggal
Saklar ganda
Stop kontak Pengaman -Broco seri gracio-4154-55(white)
Box sekering ex presto+8 grup MCB ex multi merlyn Geerin
7.00
6.00
2.00
3.00
1.00
1.00
bh
bh
bh
bh
bh
bh
120,450.00
148,850.00
16,300.00
22,450.00
17,300.00
547,250.00
JUMLAH
(Rp)
6 = (3 x 5)
474,600.00
1,865,000.00
2,500.00
2,339,600.00
710,400.00
1,571,940.00
260,964.00
505,142.50
3,048,446.50
2,462,613.00
6,946,582.50
13,277,721.60
9,443,800.00
32,130,717.10
7,351,598.00
2,840,160.00
9,001,460.00
19,193,218.00
5,350,275.00
2,206,330.00
5,563,575.00
13,120,180.00
1,250,000.00
968,000.00
316,000.00
1,140,000.00
165,000.00
3,839,000.00
3,587,570.00
239,520.00
762,240.00
351,750.00
61,250.00
34,650.00
5,036,980.0000
4,208,190.00
1,659,000.00
5,867,190.0000
238,520.00
39,600.00
360,360.00
1,828,450.00
2,466,930.0000
843,150.00
893,100.00
32,600.00
67,350.00
17,300.00
547,250.00
2,400,750.0000
312500
242000
158000
285000
3E+06
41,250.00
312500
NO.
URAIAN PEKERJAAN
JUMLAH HARGA
(Rp.)
PEKERJAAN PERSIAPAN
Rp
2,339,600.00
II
Rp
3,048,446.50
III
PEKERJAAN PASANGAN
Rp
32,130,717.10
IV
PEKERJAAN BETON
Rp
19,193,218.00
Rp
13,120,180.00
VI
Rp
3,839,000.00
VII
Rp
5,036,980.00
Rp
5,867,190.00
IX
PEKERJAAN SANITASI
Rp
2,466,930.00
PEKERJAAN LISTRIK
Rp
2,400,750.00
JUMLAH
Rp
89,443,011.60
PEMBULATAN
Rp
89,443,000.00
PERMETER
Rp
2,353,763.16
TERBILANG : "Delapan Puluh Sembilan Juta Empat Ratus Empat Puluh Tiga Ribu Rupiah"
NO
URAIAN PEKERJAAN
BOBOT
(%)
MINGGU KEI
0.22
II
III
IV
VI
VII
VIII
XI
XII
XIII
0.22
0.22
0.22
0.22
0.22
0.22
0.22
0.22
0.22
0.22
0.22
7.18
7.18
7.33
7.33
PEKERJAAN PERSIAPAN
2.62
II
3.41
III
PEKERJAAN PASANGAN
35.92
7.18
7.18
7.18
IV
PEKERJAAN BETON
21.46
5.36
5.36
5.36
14.67
VI
5.63
VIII
6.56
IX
PEKERJAAN SANITASI
2.76
PEKERJAAN LISTRIK
2.68
100.00
5.36
7.33
1.43
4.29
VII
3.41
1.43
1.43
2.82
2.82
3.28
1.38
3.28
1.38
1.34
1.34
0.22
3.63
12.77
14.15
14.20
10.18
20.10
7.55
3.03
4.93
5.75
3.50
0.22
3.84
16.61
30.76
44.96
55.13
75.23
82.79
85.82
90.75
96.50
100.0