URAIAN PEKERJAAN
VOL. SAT.
Pekerjaan Persiapan
Galian tanah
1.00
Bobok Batukali
1.00
Ls
Strouss . 30 cm p.3m (5 D 13 )
4.00
Ttk
HARGA MATERIAL
HARGA MANDOR
JUMLAH
(Rp.)
(Rp.)
(Rp.)
Ls
100,000.00
100,000.00
500,000.00
500,000.00
167,965.53
671,862.13
SUBTOTAL
1,271,862.13
II
Pekerjaan Beton
6.00
bh
301,781.23
150,000.00
2,710,687.40
6.00
bh
755,345.19
150,000.00
5,432,071.15
SUBTOTAL
8,142,758.55