Slof 15 x 20
= 34,56 m
Pembesian
Slof 20 x 15
Besi Begel
= 34,56 / 0,15
= 230
= 230 x 0,76
= 174,8 m
Besi tulang
= 34,56 x 4
= 138,24 m
Kolom 15 x 15
Besi begel
= 3 / 0,15
= 20
= 20 x 0,66
= 13,2 m
kolom 12 = 13,2 x 12
= 158,4 m
Besi Tulang
=3x4
= 12 m
12 Kolom
= 12 x 12
= 144 m
L = 27,648 m
P = 9,6 m
L = 2,88 m
Tulangan pembesian = 9,6 / 2,88
= 276,48 m
Tulangan pokok
= 2,88 / 0,1 = 28
= 28 x 9,6
= 268,8 m
Beton Tumbuk
= 96 x 2,88 x 0,125
= 3,456 m
Slof 15 x 20
= 28,8 m
V
Kolom 15 x 15
= 0,03375 m
9 kolom
= 0,0675 x 9
= 0,6075 m
Ring balk 15 x 20
Pembesian
Slof 15 x 20
Besi begel
= 28,8 / 0,15
= 192
= 192 x 0,76
= 145,92 m
Tulangan
= 28,8 x 4
= 115,2 m
Kolom 15 x 15
Besi begel
= 1,5 / 0,15
= 10
Panjang begel
= 0,66
Jumlah
= 10 x 0,66
= 6,6
9 kolom
= 6,6 x 9
= 59,4 m
Besi tulang
= 1,5 x 4
=6m
9 kolom
=6x9
= 54 m
= 7,68
= 2,88
= 0,125
= 7,68
=2,88
Tulangan pokok
= 28 / 0,1
= 28
Tullangan pembagi
= 7,68 / 0,1
= 77
tulangan pokok
= 28 x 7,68
= 215 m