NO URAIAN PEKERJAAN Satuan Volume Harga Satuan Jumlah Sub Total
(Rp) (Rp) (Rp)
A PEKERJAAN PONDASI 10,290,107
1 Galian tanah pondasi m3 21.84 25,400 554,736
2 Pasangan Pondasi Batu Kosong (aanstamping) tebal 20 cm m3 5.46 361,635 1,974,527
3 Pasangan Pondasi Batu adukan 1pc : 5 psr m3 12.29 627,675 7,710,987
4 Urugan tanah pondasi m3 4.10 12,175 49,857
B PEKERJAAN BETON (adukan 1pc:2psr:3krikil) 45,487,790
1 Sloof Beton Tulang 15/20 (180 kg besi + bekisting) 4dia. 12 ring 8-15 m3 2.17 4,308,980 9,359,105
2 Kolom, 15/20 (180 kg besi + bekisting) 4dia.12 , ring 8 -15 m3 2.15 4,975,850 10,700,068
3 Ring Balk, sofi-sofi (180 kg besi + bekisting) 4dia. 12mm, ring 8mm -15 m3 2.17 4,600,530 9,992,351
4 Tangga Beton (90 kg besi + bekisting), dia 10 & 8 mm m3 0.42 4,108,520 1,725,578
5 Plat Lantai 10 cm ( 90 Kg Besi + Bekisting ) dia 8mm, 2x 15x15 m3 3.09 4,437,116 13,710,688
C PEKERJAAN PASANGAN DINDING 56,572,916
1 Pasang bata merah adukan 1 pc : 5 psr m2 280.55 89,291 25,050,590
2 Plesteran tebal 2 cm 1 pc : 5 psr m2 420.83 45,848 19,293,985
3 Acian semen m2 420.83 21,888 9,211,018
4 Pasangan keramik roman dinding km. mandi 20 x 25 m2 7.50 105,871 794,033
5 Pasangan keramik roman dinding dapur 20 x 25 m2 21.00 105,871 2,223,291
D PEKERJAAN ATAP - 12,434,508
1 Rangka atap baja ringan m2 70.50 135,000 9,517,500
2 Tutup atap genting plentong m2 70.50 14,820 1,044,810
3 Genting bubung plentong m' 6.00 73,770 442,620
4 Listplang kayu kamper medan 2/20 m' 15.00 81,565 1,223,475
5 Talang sudut (seng) m' 3.00 68,701 206,103
E PEKERJAAN LANGIT-LANGIT 8,708,617
1 Langit-langit GRC 120 x 240 + rangka hollow m2 92.40 83,284 7,695,442
2 List gypsum m' 135.00 7,505 1,013,175
F PEKERJAAN LANTAI 15,329,884
1 Lantai keramik, luar & dalam, 40 x 40 cm m2 83.40 98,983 8,255,182
2 Lantai keramik, kamar mandi, 30 x 30 m2 9.00 88,983 800,847
3 Plint Keramik 10 x 40, dalam m' 135.00 46,473 6,273,855
G PEKERJAAN KAYU - 19,013,612
1 Kusen pintu dan jendela, kayu balok kamper samarinda m3 0.71 11,375,500 8,105,180
2 Daun pintu panel, kayu papan kamper samarinda m2 4.00 575,200 2,300,800
3 Daun pintu triplek, rangka kayu papan kamper samarinda m2 8.00 420,520 3,364,160
Rencana Anggaran Biaya (RAB)
4 Daun jendela ram kaca, kayu papan kamper samarinda m2 8.16 483,400 3,944,544
5 Daun pintu triplek lapis formika, rangka papan kamper samarinda m2 2.40 541,220 1,298,928
H PEKERJAAN KACA DAN KUNCI 3,017,480
1 Pasang kaca jendela 5 mm m2 4.48 128,093 573,857
2 Pasang kunci tanam bh 7.00 126,775 887,425
3 Pasang kunci kamar mandi bh 2.00 115,888 231,776
4 Pasang engsel pintu bh 18.00 32,593 586,674
5 Pasang engsel jendela bh 24.00 20,893 501,432
6 Pasang tulak angin bh 12.00 19,693 236,316
I PEKERJAAN SANITASI 11,658,829
1 Pasang closet jongkok bh 2.00 392,800 785,600
2 Pasang washtafel bh 1.00 645,200 645,200
3 Pasang bak mandi fibergalass bh 2.00 576,550 1,153,100
4 Pasang bak cuci piring stainless bh 1.00 275,178 275,178
5 Septictank uk 2 x 1.5 x 1.5 + rembesan unit 1.00 5,997,167 5,997,167
6 Keran air bh 4.00 38,850 155,400
7 Pipa pvc 1/2" instalasi air m' 30.00 22,313 669,390
8 Pipa pvc 4" AW saluran air hujan dan air limbah m' 14.00 141,271 1,977,794
J PEKERJAAN PENGECATAN 14,824,901
1 Pengecatan kusen, dengan cat kayu m2 32.17 39,613 1,274,334
2 Pengecatan pintu dan jendela, dengan cat kayu m2 14.08 39,613 557,751
3 Pengecatan Plapond 3x, dengan cat tembok Vinilex m2 92.40 46,075 4,257,330
4 Pengecatan tembok 3x dengan Cat Vinilex m2 420.83 20,758 8,735,485
TOTAL 197,338,644 197,338,644
DIBULATKAN 197,338,000