Luas
Diameter
Penampan
(mm)
g (cm)
Berat
(kg/m)
Luas
Diameter
Penampan
(mm)
g (cm)
Berat
(kg/m)
4.5
5
5.5
6
6.5
0.16
0.2
0.24
0.28
0.33
0.125
0.153
0.188
0.22
0.259
25
26
28
30
32
4.91
5.31
6.16
7.07
8.04
3.85
4.136
4.83
5.51
6.31
6.8
7
8
8.5
9
0.36
0.38
0.5
0.56
0.63
0.282
0.3
0.393
0.439
0.499
34
35
36
38
40
9.08
9.62
10.18
8.9
9.87
7.13
7.6
7.99
8.9
9.87
10
12
13
14
15
0.79
1.13
1.33
1.54
1.77
0.62
0.887
1.04
1.209
1.377
42
44
46
48
48.5
10.9
11.9
13
14.2
14.5
10.9
11.9
13
14.2
14.5
16
18
19
20
22
2.01
2.54
2.83
3.14
3.8
1.58
1.994
2.23
2.465
2.98
50
55
15.4
18.7
15.4
18.7
Upah/Hari (Rp)
60,000.00
85,000.00
80,000.00
80,000.00
80,000.00
75,000.00
85,000.00
85,000.00
85,000.00
85,000.00
Macam Bahan
Pasir Pasang
Semen Pc @50 kg
Semen putih @40 kg
split
Besi Beton Polos U 24
Besi Beton Ulir u 40
Bendrad kawat Ikat
Paku
Kayu Meranti
multipleks 6 mm
multipleks 9 mm
beton ready mix fc 25 mpa
Scafolding
beton ready mix fc 25 mpa
Sat
m3
zak
kg
m3
kg
kg
kg
kg
m3
lbr
lbr
m3
m2
m3
Harga (Rp)
85,000.00
62,000.00
250,000.00
350,000.00
9,000.00
9,000.00
15,000.00
15,000.00
1,750,000.00
75,000.00
90,000.00
650,000.00
50,000.00
1,250,000.00
No
URAIAN
1 1 m3 beton ready mix fc = 25 mpa
Bahan
Upah
2 100 kg Pembesian
Bahan
1.000
1.000
0.100
6.000
0.300
m3
org
org
org
org
ready mix
Tk Batu
Kep. Tk batu
Pekerja
Mandor
@
@
@
@
@
Rp
Rp
Rp
Rp
Rp
110.000
1.000
3.000
1.500
3.000
kg
kg
org
org
org
@
@
@
@
@
Rp
Rp
Rp
Rp
Rp
Multipleks
ky. Meranti
paku
@
@
@
Rp
Rp
Rp
tk. Kayu
Kep. Tk Kayu
Pekerja
Mandor
Pekerja, Siram
@
@
@
@
@
Rp
Rp
Rp
Rp
Rp
Scalfolding
Rp
Upah
0.35 lbr
0.21 m3
0.25 kg
0.36
0.36
0.54
0.027
0.18
org
org
org
org
org
5.475 m2
4
0.4
2
0.15
org
org
org
org
Tk. Kayu
Kep. Tk Kayu
Pkerja
Mandor
@
@
@
@
Rp
Rp
Rp
Rp
1
93.23373
1
1
m3
kg
m2
m3
Ready mix
Pembesian
Bekisting
Scafolding
@
@
@
@
Rp
Rp
Rp
Rp
650,000.00
80,000.00
80,000.00
60,000.00
85,000.00
Jumlah
Rp
Rp
Rp
Rp
Rp
Rp
650,000.00
80,000.00
8,000.00
360,000.00
25,500.00
1,123,500.00
9,000.00
15,000.00
80,000.00
85,000.00
60,000.00
Jumlah
Rp
Rp
Rp
Rp
Rp
Rp
990,000.000
15,000.000
240,000.000
127,500.000
180,000.000
1,552,500.000
75,000.00
1,750,000.00
15,000.00
Jumlah
85,000.00
85,000.00
60,000.00
85,000.00
60,000.00
Jumlah
Rp
Rp
Rp
26,250.00
367,500.00
3,750.00
397,500.00
30,600.00
30,600.00
32,400.00
2,295.00
10,800.00
106,695.00
504,195.00
273,750.00
80,000.00
85,000.00
60,000.00
85,000.00
Rp
Rp
Rp
Rp
Rp
320,000.00
34,000.00
120,000.00
12,750.00
760,500.00
1,250,000.00
1,552,500.00
504,195.00
760,500.00
Jumlah
Rp
Rp
Rp
Rp
1,250,000.00
144,745,366.07
504,195.00
760,500.00
147,260,061.07
Rp
Rp
Rp
Rp
Rp
Rp
Rp
50,000.00 Rp
Jumlah
Uraian Pekerjaan
Pekerjaan Beton
1.1 Pekerjan cor lantai
Volume
Diketahui
P=
L=
tebal =
Volume
7
28
0.12
23.52 m3
Diketahui
Panjang
28.0
lebar
Jarak Spasi
7.00
Tulangan
0.12
Perhitungan
Arah Memanjang, panjang = 28 m1
Tulangan 10
Jml Tulangan
=
=
28 m1/0,12 m1 + 1
234.3333333
P. Tulangan
(7 m x 234 bh)
1640.333333
Perhitungan
Arah Melintang, panjang = 7m1
Tulangan 10
Jml Tulangan
=
=
7 m /0,12 m + 1
59.33333333
P. Tulangan
28 m1 x 59.333 bh
1661.333333
(1640.333 m + 1661.333 m )
3301.666667
Berat 10
0.62
Berat Total
=
=
Total Panjang
Tulangan
Tulangan Sengkang 8
Berat 10
0.62
P.Sengkang "S"
0.6
28 m1 x 7 m1
196
Jml Sengkang S
=
=
196 x 2
392
P. Sengkang
392 bh x 0,60 m
235.2
Berat Tulangan
=
=
Total Berat
=
=
2047.033 kg +145.824 kg
2192.857333
28 m1
7 m1
0.12 m1
keliling
=
=
=
2*(l+t)
14.24
398.72
23.52 m3
m1
m1
m1
m1/0,12 m1 + 1
bh
1
m x 234 bh)
/0,12 m + 1
bh
m1 x 59.333 bh
m1
40.333 m + 1661.333 m )
m1
kg/m1
1
2 kg/m x 3301.667 m
kg
23.52
kg/m1
m1
m2
bh
1
bh x 0,60 m
m1
2 kg/m1 x 235.2 m1
kg
7.033 kg +145.824 kg
kg
x 28 m
m2
2192.857
398.72 m2
kg
2193
398.72
m3
kg
3480.952
93.23373
m2
5.499743
No
Uraian Pekerjaan
1 Pekerjaan Beton
1.1 Pekerjan cor Plat lantai
Sat
m3
2 Pekerjaan Pembesian
kg
3 Pekerjaan Bekisting
3.1 Scafolding
m2
m2
Volume
23.52
1,260,000.00
29,635,200.00
2,192.86
1,580,000.00
3,464,714,586.67
398.72
196.00
504,195.00
760,500.00
201,032,630.40
149,058,000.00
Total
3,844,440,417.07
Keterangan