Anda di halaman 1dari 844

No.

URAIAN HARGA UPAH

HARGA

SATUAN

52,500.00
65,600.00
78,800.00
78,800.00
78,800.00
78,800.00
78,800.00
78,800.00
78,800.00
91,900.00
42,000.00
63,000.00
50,800.00
105,000.00

Org/Hari
OH
OH
OH
OH
OH
OH
OH
OH
OH
OM
OH
OH

1
2
3
4
5
6
7
8
9
10
11
12
13
14

Pekerja
Mandor
Tukang Batu
Tukang Kayu
Tukang besi
Tukang Keramik
Tukang Plafond
Tukang Pasang Pipa
Tukang Cat
Kepala Tukang
Jaga Malam
Masinis
Sewa Mesin Gilas
Pemeliharaan

No.

URAIAN HARGA BAHAN

HARGA

SATUAN

52,500.00
70,400.00
68,300.00
94,500.00
94,400.00
96,600.00
89,300.00

m
m
m
m
m
m
m

A.

TIMBUNAN / GALIAN

1
2
3
4
5
6
7

Tanah timbun /Merah


Pasir Timbun / Urug
Tanah Timbun
Pasir pasang
Pasir beton
Sirtu
Tanah Humus

B.

BAHAN PEREKAT

Portland Cement (PC)

1,400.00

Kg

2
3
4
5
6
7
8
9

Portland Cement (PC)


Cement putih
Cement putih
Lem kayu
Lem Vynil / karet
Perekat kaca
Waterfroof
Kapur

56,000.00
2,700.00
108,000.00
40,700.00
48,800.00
83,000.00
57,200.00
3,700.00

zak
Kg
zak
Kg
Kg
Kg
Kg
Kg

C.

BATU / BATU CETAKAN

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28

Batu kerikil/koral 3-5 cm


Batu kerikil/koral 5-7 cm
Batu kerikil/koral 7-10 cm
Batu kerikil (A)
Batu belah/kali 10-15 cm
Batu belah/kali 15-20 cm
Batu pecah 1-2 cm
Batu pecah 2-3 cm
Batu pecah 3-5 cm
Batu pecah 5-7 cm
Batu kacang/jagung 0,5 - 1 cm
Batu splyt
Batu bata biasa 5x10x20 cm
Batu bata mesin 5x10x20 cm
Batu bataco 6x12x24 cm
Batu krawang 10x10x20 cm
Batu krawang 10x15x15 cm
Batu krawang 10x20x20 cm
Concrete block (CB) 10
Concrete block (CB) 15
Concrete block (CB) 20
Bondbeam 40x20x20 cm
Con block warna type holland tb 6 cm
Con block warna type uni pave tb 6 cm
Con block warna type dosex six tb 6 cm
Con block warna type hexagon tb 6 cm
Con block K 125
Con block K 175

D.

KAYU / LANGIT -LANGIT

1
2
3
4
5
6
7
8
9
10
11
12
13

Balok Kayu Jati


Papan Kayu Jati
Balok Kayu Damar Laut
Papan Kayu Damar Laut
Balok Kayu Meranti Batu
Papan Kayu Meranti Batu
Balok Kayu Kapur
Papan Kayu Kapur
Papan Kayu Meranti kls I
Papan Kayu Meranti kls I
Kayu Sembarangan /Bokisting
Kayu Bakar
Papan Lambersering/Rider

215,300.00
199,500.00
181,700
199,500.00
165,900.00
136,500.00
341,300.00
283,500.00
258,300.00
219,500.00
414,800.00
404,300.00
650
750
4,600.00
3,300.00
3,800.00
4,100.00
800
1,800.00
3,400.00
33,600.00
1,900.00
1,800.00
2,000
1,900.00
1,900.00
2,900.00

m
m
m
m
m
m
m
m
m
m
m
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

26,000,500.00
26,195,500.00
10,161,100.00
10,487,100.00
9,862,300.00
10,188,300.00
7,053,000.00
7,379,000
5,678,300.00
5,950,000.00
4,462,500.00
203,200.00
244,500.00

M
M
M
M
M
M
M
M
M
M
M
M
M2

14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57

Kayu Lat Asbes 5x30x400 mm


Kayu Kaso 5 - 7 /400 cm
Kayu Dolken /Kayu Laut 7,5-10/400 cm
Bambu 6-8 /600 cm
Bilik Bambu
Kayu Profil 1"
Kayu Profil 2"
Kayu Profil 3"
Kayu Profil 4"
Profil Gypsum 2"
Profil Gypsum 3"
Profil Gypsum 4"
Profil Gypsum 6"
Plywood 120x240 tbl. 18 mm
Plywood 120x240 tbl. 12 mm
Plywood 120x240 tbl. 9 mm
Plywood 120x240 tbl. 6 mm
Plywood 120x240 tbl. 4 mm
Teakwood 120x240 tbl. 3 mm
Triplek jati 120x240 tbl. 3 mm
Triplek sungkai 120x240 tbl. 3mm
Formika 120x240
Soft Board 120x240 tbl. 4 mm
Soft Board 120x240 tbl. 6 mm
Soft Board 120x240 tbl. 9 mm
Soft Board 120x240 tbl. 12 mm
Gypsum 120x240 tbl. 6 mm
Gypsum 120x240 tbl. 9 mm
Gypsum 120x240 tbl. 12 mm
Asbes Lokal 100x100 cm
Asbes atrisco 100x100 cm t=4mm
Asbes atrisco 100x100 cm t=5 mm
Asbes atrisco 100x100 cm t=6mm
Akustik 30x30 cm
Akustik 30x60 cm
Akustik 60x120 cm
Rangka furing celling gypsum
Rangka furing dinding gypsum
Wall stud 64 mm
Wall track mead 64
Wall track bottom
Tepung dempul
Kain Kasa/Paper tape
Main runner white

8,100.00
95,400.00
20,900.00
15,000.00
17,800.00
6,800.00
13,700.00
20,500.00
27,300.00
5,000
5,900.00
7,200.00
8,600.00
253,900.00
169,300.00
127,000.00
84,700.00
56,400.00
59,200.00
86,400.00
92,900.00
80,700.00
60,800.00
91,500.00
137,200.00
182,900.00
65,300.00
77,900.00
101,600.00
10,200.00
12,600.00
15,700.00
18,800.00
9,300.00
18,600.00
74,200.00
56,800.00
69,500.00
7,900.00
8,100.00
7,900.00
11,400.00
62,800.00
10,000.00

Btg
Btg
Btg
Btg
M2
M'
M'
M'
M'
M'
M'
M'
M'
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
M2
M2
M'
M'
M'
Kg
Roll
M'

58
59
60
61
62
63
64
65
66
67
68

Cross tee white


Waal angel white
Top croos
Furing chanel
Waal angel (lokal)
Conector
Suspension rod 3 mm
Suspension spring clip 5 mm
Suspension rod 100 cm 5 mm
Besi angel bracket (to concrete)
Baut ramset

E.

BESI / ALUMINIUM

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31

Besi beton polos


Besi beton ulir
Besi profil WF/INP
Besi siku
Besi CNP
Besi plat strip
Besi plat polos
Kawat besi beton
Kawat licin / seng polos
Kawat duri
Kawat nyamuk
Kawat kasa
Kawat harmonia
Kawat burug
Pagar kawat BRC 120 polos
Pintu besi
Pintu gulung besi
Pintu lipat besi
Pintu rolling door
Jerajak besi bermotif
Jerajak besi strip
Rangka baja ringan
Rangka atap twin light
Kosen pintu aluminium (80x210 )coklat
Kosen pintu aluminium (80x210 )putih
Kosen jendela aluminium (120x60)coklat
Kosen jendela aluminium (120x60)putih
Pintu aluminium (80x210) coklat
Pintu aluminium (80x210) putih
Jendela aluminium + kaca 5mm (120x60)coklat
Jendela aluminium + kaca 5mm (120x60)putih

8,800.00
8,100.00
7,900.00
17,300.00
6,700.00
1,000.00
3,800.00
3,700.00
2,400.00
7,600.00
900,00

M'
M'
M'
M'
M'
Bh
M'
Bh
M'
Bh
Bh

15,700.00
15,900.00
17,400.00
14,800.00
18,200.00
14,800.00
14,900.00
18,300.00
24,500.00
4,700.00
13,100.00
15,200.00
25,700.00
14,200.00
256,200.00
887,300.00
899,900.00
909,300.00
506,100.00
377,000.00
339,200.00
193,200.00
309,800.00
440,000.00
403,200.00
311,900.00
268,800.00
772,800.00
662,600.00
330,800.00
283,500.00

Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
M'
M2
M2
M2
M2
Lbr
M2
M2
M2
M2
M2
M2
M2
M2
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50

Kosen pintu /jendela aluminium coklat


Kosen pintu /jendela aluminium putih
Daun jendela aluminium coklat
Daun jendela aluminium putih
Profil aluminium T
Ventions blinds
Verticals blinds
Bingkai naco nikl hitam
Bingkai naco nikl putih
Paku beton 0,5-2"
Paku beton 2"-5"
Paku biasa 0,5-2"
Paku biasa 2"-5"
Sekrup macam ukuran
Sekrup 0,5-2"
Sekrup fisher
Baut 5/8"-8"
Baut angker 3/4"-10"

F.

PENUTUP LANTAI DAN DINDING

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23

Ubin Granito 30x30 cm


Ubin Granito 40x40 cm
Ubin Granito 60x60 cm
Ubin Roman 20x20 cm
Ubin Roman 20x25 cm
Ubin Roman 25x25 cm
Ubin Roman 30x30 cm
Ubin Roman 40x40 cm
Ubin Roman 60x60 cm
Ubin Platinum 20x25 cm
Ubin Platinum 25x25 cm
Ubin Platinum 30x30 cm
Ubin Platinum 40x40 cm
Ubin Ikad 20x20 cm
Ubin Ikad 20x25 cm
Ubin Ikad 25x25 cm
Ubin Ikad 30x30 cm
Ubin Ikad 40x40 cm
Ubin Garuda 20x20 cm
Ubin Garuda 20x25 cm
Ubin Garuda 25x25 cm
Ubin Garuda 30x30 cm
Ubin Garuda 40x40 cm

Baut ramset /dina bolt

83,000.00
71,400.00
58,800.00
52,500.00
9,500.00
177,500.00
190,100.00
218,400.00
131,700.00
400
600
18,400.00
16,300.00
22,100.00
500
400
21,500.00
49,400.00
800

M2
M2
M2
M2
M'
M2
M2
M2
M2
Bh
Bh
Kg
Kg
Kg
Bh
Bh
Bh
Bh
Bh

24,500.00
43,500.00
130,400.00
3,800.00
4,900.00
6,100.00
9,500.00
16,900.00
75,800.00
4,100.00
5,100.00
7,300.00
11,700.00
2,400.00
3,200.00
3,200.00
4,600.00
10,000.00
2,100.00
2,800.00
3,500.00
4,300.00
8,900.00

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67

Ubin lcl 60x60 cm


Ubin Mosalk 30x30 cm
Ubin Marmer Ex.DN
Ubin Teralux Marmer 30x30 cm
Ubin Teralux Marmer 40x40 cm
Ubin Teralux Marmer 60x60 cm
Ubin Keramik 10x20 cm
Ubin Keramik 15x15 cm
Ubin Keramik 20x20 cm
Ubin Keramik 20x25 cm
Ubin Keramik 25x25 cm
Ubin Keramik 30x30 cm
Ubin Keramik 30x30 cm anti slip
Ubin Keramik 40x40 cm
Ubin Keramik 60x60 cm
Ubin Keramik artistik 5x20 cm
Ubin Keramik artistik 10x10 cm
Ubin Keramik artistik 10x20 cm
Ubin Keramik Essenza 30x30 cm
Ubin Keramik Essenza 40x40 cm
Ubin Keramik Essenza 60x60 cm
Porselin 11x11 cm, putih
Porselin 11x11 cm, warna
Porselin 15x15 cm, putih
Porselin 15x15 cm, warna
Plint Ubin teralux marmer 10x30 cm
Plint Ubin teralux marmer 10x40 cm
Plint Ubin teralux marmer 10x60 cm
Plint Ubin granito 10x30 cm
Plint Ubin granito 15x30 cm
Plint Ubin granito 10x40 cm
Plint Ubin granito 15x40 cm
Plint Ubin granito 10x60 cm
Plint Ubin granito 15x60 cm
Plint Ubin Essenza10x30 cm
Plint Ubin Essenza15x30 cm
Plint Ubin Essenza10x40 cm
Plint Ubin Essenza15x40 cm
Plint Ubin Essenza10x60 cm
Plint Ubin Essenza15x60 cm
Plint Ubin Roman 10x30 cm
Plint Ubin Roman 15x30 cm
Plint Ubin Roman 10x40 cm
Plint Ubin Roman 15x40 cm

53,800.00
15,200.00
284,600.00
31,500.00
68,300.00
141,800.00
1,400.00
1,500.00
2,700.00
3,500.00
4,300.00
6,100.00
6,900.00
11,800.00
28,900.00
1,000.00
1,000.00
1,900.00
26,500.00
47,000.00
137,800.00
1,400.00
1,600.00
2,500.00
2,800.00
15,800.00
34,100.00
70,900.00
10,600.00
14,700.00
15,800.00
26,300.00
34,800.00
45,700.00
10,600.00
16,000
16,500.00
28,200.00
36,800.00
48,200.00
4,100.00
5,700.00
5,900.00
10,100.00

Bh
Bh
M2
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90

Plint Ubin Roman 10x60 cm


Plint Ubin Roman 15x60 cm
Plint Ubin Platinum 10x30 cm
Plint Ubin Platinum 15x30 cm
Plint Ubin Platinum 10x40 cm
Plint Ubin Platinum 15x40 cm
Plint Ubin Ikad 10x30 cm
Plint Ubin Ikad 15x30 cm
Plint Ubin Ikad 10x40 cm
Plint Ubin Ikad 15x40 cm
Plint Ubin Garuda 10x30 cm
Plint Ubin Garuda 15x30 cm
Plint Ubin Garuda 10x40 cm
Plint Ubin Garuda 15x40 cm
Plint Ubin lcl10x60 cm
Plint Ubin lcl15x60 cm
Plint Ubin Keramik 10x30 cm
Plint Ubin Keramik 10x40 cm
Plint Ubin Keramik 10x60 cm
Plint Ubin Keramik 15x30 cm
Plint Ubin Keramik 15x40 cm
Plint Ubin Keramik 15x60 cm
Batu Lapis Dinding 7x3x24

20,500.00
26,500.00
3,200.00
4,400.00
4,100.00
6,900.00
2,000.00
2,800.00
3,500.00
6,000.00
1,800.00
2,600.00
3,200.00
5,400.00
9,500.00
14,000.00
3,200.00
5,900.00
14,400.00
4,700.00
8,900.00
21,700.00
2,300.00

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

91

Batu Tempel Hitam

113,600.00

m2

92

Batu Poros

124,600.00

m2

93

Carpet

98,700.00

m2

94
95

carpet 80% wool, 20% nylon


Feltex carpet 100% wool-T-21

95,000.00
92,700.00

m2

96
97
98
99
100
101
102
103
104
105
106
107
108
109

Underlyer tbl.6mm / rubber corrugated


Vynil asbes 30x30 cm
Vynil karet 30x30 cm KL I
Vynil karet 30x30 cm KL II
Vynil motif kembang ex DN 30x30 cm
Vynil wall covering lebar 50 cm
Perquet jati
Gymfloor
Paku pancing 60-230
Sekrup 3,5"
Sekrup 3,5"
Aspal AC 60/70
Tempat memasak aspal
Alat-alat mengaspal

113,600.00
9,000.00
10,700.00
9,900.00
10,300.00
68,800.00
400,500.00
86,700.00
800.00
500.00
22,200.00
4,600.00
20,100.00
63,700.00

m2
m2
Bh
Bh
Bh
Bh
M2
M2
M2
Bh
Bh
Kg
Kg

G.

PENUTUP ATAP

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43

Atap Genteng Palentong


Atap Genteng Palentong super
Atap Genteng Kodok
Atap Genteng Beton
Atap Genteng Keramik
Atap Genteng Aspal
Atap Genteng Metal/Multi roof 35
Atap Genteng Asbes cement
Atap Genteng Sirap
Atap Aluminium gelombang tebal 0,55
Atap seng Alumi Zinc warna 0,35
Atap Genteng Twin Light
Atap Seng Gelombang 3'x6' bjls 35
Atap Seng Super Deck3'x6' bjls 0,30
Rooflight fibreglass gelombang
Atap Asbes gelombang 1,8x1,05 tbl. 4mm
Atap Asbes gelombang 2,1x1,05 tbl. 4mm
Atap Asbes gelombang 2,4x1,05 tbl. 4mm
Atap Asbes gelombang 2,7x1,05 tbl. 4mm
Atap Asbes gelombang 1,8x0,92 tbl. 5mm
Atap Asbes gelombang 2,1x0,92 tbl. 5mm
Atap Asbes gelombang 2,4x0,92 tbl. 5mm
Atap Asbes gelombang 2,7x0,92 tbl. 5mm
Atap Asbes gelombang 1,8x1,08 tbl. 6mm
Atap Asbes gelombang 2,1x1,08 tbl. 6mm
Atap Asbes gelombang 2,4x1,08 tbl. 6mm
Atap Asbes gelombang 2,7x1,08 tbl. 6mm
Atap asbes motif genteng
Genteng Bubung palentong
Genteng Bubung palentong super
Genteng Bubung kodok
Rabung seng BJLS 35 K
Nok Genteng beton
Nok Genteng keramik
Nok Genteng aspal
Nok Genteng Metal/Multiroof (decra bond)
Nok Genteng Asbes cement 0,35
Nok Aluminium standard 40cm 18 swg22
Bubung/Nok stel Gelombang 0,92 m' tbl.5 mm
Bubung/Nok stel Gelombang 1,05 m' tbl.4 mm
Bubung/Nok stel Gelombang 1,08 m' tbl.6 mm
Bubung/Nok Paten 0,92 m' tbl.5 mm
Bubung/Nok Paten 1,05 m' tbl.4 mm

1,800.00
4,400.00
2,400.00
6,500.00
12,400.00
12,300.00
131,600.00
62,100.00
1,300.00
106,700.00
67,700.00
65,100.00
64,800.00
80,000.00
55,100.00
64,600.00
101,300.00
117,500.00
123,200.00
77,100.00
96,500.00
105,500.00
116,100.00
112,600.00
130,900.00
139,500.00
168,900.00
36,800.00
10,200.00
13,900.00
10,400.00
39,400.00
14,600.00
16,400.00
31,900.00
58,800.00
36,800.00
52,100.00
21,300.00
28,200.00
31,000.00
40,000.00
33,600.00

Bh
Bh
Bh
Bh
Bh
Lbr
M2
M2
Bh
M2
M2
M2
M2
M2
M2
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Bh
Bh
Bh
M'
Bh
Bh
Bh
Bh
Lbr
M2
Lbr
Lbr
Lbr
Lbr
Lbr

44
45
46
47
48
49
50
51
52
53
54

Bubung/Nok Paten 1,08 m' tbl.6 mm


Bubung/Nok Stel Rata 0,92 m' tbl.5 mm
Bubung/Nok Stel Rata 1,05 m' tbl.4 mm
Bubung/Nok Stel Rata 1,08 m' tbl.6 mm
Seng Plat 3" x 6" bjls 35
Seng Plat 3" x 6" bjls 30
Plastic aerator
Sisalation / aluminium foil
Paku seng +Ring karet
Paku seng +Ring karet
Paku hak panjang 15 cm

55

Lat Asbes

H.

KUNCI DAN KACA

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30

Kunci tanam antik


Kunci tanam biasa
Kunci tanam kamar mandi
Kunci silinder
Kunci solot
Kunci lemari
Engsel pintu 4"
Engsel pintu jendela 3"
Engsel angin
Kait angin
Rel pintu dorong
Sealeant
spring knip
Door Closer
Door Handle
Door Stoop
Espanyolet
Kaca Block 20x20 cm
Kaca Polos tbl. 3mm
Kaca Polos tbl. 5mm
Kaca Polos tbl. 8mm
Kaca Reyben tbl. 5mm
Kaca Reyben tbl. 8mm
Kaca Buram tbl. 3 mm
Kaca Buram tbl. 5 mm
Kaca Buram tbl. 8 mm
Kaca Cermin tbl. 5 mm
Kaca Cermin tbl. 6 mm
Kaca Cermin tbl. 8 mm
Kaca Patri

46,700.00
39,200.00
32,900.00
44,100.00
125,500.00
113,000.00
29,900.00
83,900.00
22,200.00
500
33,200.00

Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Bh
M2
Kg
Bh
Kg

8,100.00

Bh

233,100.00
97,900.00
59,500.00
37,500.00
29,600.00
13,400.00
16,500.00
12,200.00
27,200.00
20,800.00
174,200.00
42,800.00
9,900.00
119,300.00
122,900.00
41,500.00
96,100.00
28,300.00
94,700.00
157,800.00
252,500.00
209,900.00
335,800.00
79,000.00
121,300.00
210,500.00
175,900.00
210,800.00
281,200.00
184,300.00

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Kg
Bh
Bh
Bh
Bh
Bh
Bh
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2

31
32
33
I

Kaca Wireglass
Kaca Reyben Naco 30x60 cm tbl. 5mm
Kaca Bening Naco 30x60 cm tbl. 5mm

164,300.00
14,800.00
11,700.00

M2
Lbr
Lbr

CAT / MINYAK

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

Cat dasar
Cat Tembok setara Vinilex (putih)
Cat Tembok setara Vinilex (warna)
Cat Minyak untuk kayu
Cat Minyak untuk besi
Cat Menie kayu
Cat Menie besi
Cat sending
Cat Melamix
Cat Vernis jadi
Plamir
Dempul Gypsum
Dempul Cat
Tinner
Minyak belkisting
Minyak Solar
Minyak Silinder
Minyak Gerdang
Minyak gemuk
Residu/kolter
Soda Api
Sabun
Kuas
Ampelas / kertas pasir

17,100.00
20,500.00
41,500.00
38,800.00
42,800.00
27,800
28,900.00
59,200.00
64,500.00
52,500.00
17,100.00
11,300.00
12,900.00
12,000.00
6,900.00
5,700.00
34,100.00
29,400.00
34,700.00
7,100.00
13,200.00
11,200.00
8,600.00
2,000.00

25

Wall paper

33,300.00

Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
Kg
Bh
Lbr
m2

J.

SANITASI / PIPA

1
2
3
4
5
6
7
8
9
10
11
12

Kloset duduk /menoblok lengkap tangki


Kloset duduk /menoblok tanpa tangki
Kloset jongkok porselin
Bakkif Porselin
Wastafel
Urinoir
Kran air 1/2" - 3/4"

2,099,200.00
1,512,300.00
244,900.00
3,287,400.00
572,000.00
605,900.00
29,800.00
83,900.00
131,300.00
78,500.00
288,800.00
577,500.00

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

Kran air leher angsa 1/2"


Kran shower
Kran cebok
Bak fibreglass 0,3 M3
Bak fibreglass 1 M3

13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54

Bak cuci piring stainless 2 lobang


Bak cuci piring teraso 2 lobang
Tempat sabun keramik
Floor drain 4" stainless
Stop Kran 3/4"
Tutup bak air 1" kuningan
Instalasi air bersih
Instalasi air kotor/limbah
Buls Beton 1/2 15 cm
Buls Beton 1/2 20 cm
Buls Beton 1/2 30 cm
Buls Beton 15 cm
Buls Beton 20 cm
Buls Beton 30 cm
Buls Beton 40 cm
Buls Beton 50 cm
Buls Beton 60 cm
Buls Beton 80 cm
Buls Beton 100 cm
Bodeam 30x60 cm
Pipa PVC Tipe AW 1/2"
Pipa
Pipa
Pipa
Pipa

PVC
PVC
PVC
PVC

Tipe AW
Tipe AW
Tipe AW
Tipe AW

Pipa
Pipa
Pipa
Pipa

PVC Tipe AW 2 1/2"


PVC Tipe AW 3"
PVC Tipe AW 4"
Besi Hitam 1/2"

Pipa
Pipa
Pipa
Pipa

Besi
Besi
Besi
Besi

Hitam
Hitam
Hitam
Hitam

3/4"
1"
1 1/2"
2"

3/4"
1"
1 1/2"
2"

Pipa Besi Hitam 2 1/2"


Pipa Galvanis 1/2"
Pipa Galvanis 3/4"
Pipa Galvanis 1"
Pipa Galvanis 1 1/4"
Pipa Galvanis 1 1/2"
Pipa Galvanis 2"
Pipa Galvanis 2 1/2"
Fitting Pipa AW 1" yg terdiri dari :
Knee AW 1"
Tee AW 1"

507,200.00
295,900.00
61,200.00
16,300.00
29,900.00
13,600.00
109,000.00
135,900.00
12,200.00
19,400.00
21,800.00
20,900.00
29,800.00
61,200.00
68,900.00
104,300.00
147,800.00
218,600.00
375,800.00
27,500.00
6,000.00
8,100.00
14,800.00
21,400.00
25,200.00
29,000.00
32,400.00
54,300.00
16,100.00
21,900.00
32,100.00
40,800.00
51,800.00
54,600.00
16,100.00
21,900.00
32,100.00
36,500.00
40,800.00
51,800.00
57,000.00

Bh
Bh
Bh
Bh
Bh
Bh
Ttk
Ttk
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
Bh
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'

5,700.00
7,800.00

Bh
Bh

Souch AW 1"
Boucht LL-D 1"
Union Socht 1"
D-Nipple 1"
K.

LISTRIK / ACSESORIES

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38

Lampu TL 1x20 W Lengkap Kotak


Lampu TL 1x40 W Lengkap Kotak
Lampu TL 2x20 W Lengkap Kotak
Lampu TL 2x40 W Lengkap Kotak
Lampu TL Bambu 1x20 W Lengkap
Lampu TL Bambu 1x40 W Lengkap
Lampu XL 5 W+Fitting
Lampu XL 8 W+Fitting
Lampu XL 10 W+Fitting
Lampu XL 14 W+Fitting
Lampu XL 18 W+Fitting
Lampu XL 24 W+Fitting
Lampu Downlight 5 W Lengkap
Lampu Pijar 5w + Fitting
Lampu Pijar 10w + Fitting
Lampu Pijar 15w + Fitting
Lampu Pijar 20w + Fitting
Lampu Pijar 25w + Fitting
Lampu Pijar 40w + Fitting
Stop kontak tanam
Saklar tunggal
Saklar ganda
Saklar Triple
Zekring box 1 grup
Zekring box 2 grup
Zekring box 3 grup
Zekring box 4 grup
MCB 2 Ampere
MCB 4 Ampere
MCB 6 Ampere
MCB 8 Ampere
Kabel listrik NYA 1,5 mm
Kabel listrik NYA 2,5 mm
Kabel listrik NYA 4 mm
Kabel listrik NYM 2 1,5 mm
Kabel listrik NYM 2 2,5 mm
Kabel listrik NYM 2 4 mm
Instalasi Listrik titik api / lampu nyala

5,100.00
26,900.00
8,100.00
19,700.00

Bh
Bh
Bh
Bh

59,300.00
65,900.00
178,000.00
200,000.00
118,400.00
134,200.00
27,800.00
29,900.00
31,500.00
36,200.00
36,800.00
42,000.00
59,300.00
9,200.00
9,500.00
10,200.00
11,000.00
11,600.00
12,600.00
11,200.00
15,800.00
17,100.00
19,700.00
29,000.00
34,000
41,800.00
50,400.00
38,300.00
46,700.00
73,800.00
107,800.00
1,300.00
2,100.00
9,000.00
4,400.00
10,900.00
17,400.00
110,300.00

Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Bh
Bh
Bh
Bh
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
M'
M'
M'
M'
M'
M'
Ttk

1 Anl. A.1

1 m Galian Tanah Keras :


0.7500
Pekerja
0.0250
Mandor

52,500.00
65,600.00
Jumlah
di bulatkan

2 Anl.1/4. A.1

1 m Urugan Kembali Tanah Galian :


0.2500
Upah Kerja (A.1)

41,015.00
Jumlah
di bulatkan

3 Anl. A.2

1 m Galian Tanah Keras :


1.0000
Pekerja
0.0330
Mandor

52,500.00
65,600.00
Jumlah
di bulatkan

4 Anl.A.6

1 M3 Angkut tanah Max. 30 M' :


0.3300
Pekerja
0.0100
Mandor

52,500.00
65,600.00
Jumlah
di bulatkan

5 Anl. A.18

1 M3 Urugan Pasir di Bawah Lantai


0.3000
Pekerja
0.0100
Mandor
1.2000
m3 Pasir urug

52,500.00
65,600.00
70,400.00
Jumlah
di bulatkan

6 Anl.A.18.a

1 M3 Urugan Tanah
0.3000
0.0100
1.2000
M3

Pekerja
Mandor
Tanah Timbun

52,500.00
65,600.00
68,300.00
Jumlah
di bulatkan

7 Anl.A.18.b

1M3 Urugan Sirtu


0.3000
0.0100
1.5000

Pekerja
Mandor
m3 Sirtu

52,500.00
65,600.00
96,600.00

Jumlah
di bulatkan

8 Anl.F.1.

1 M3 Gantungan/Rangka Plafond
Upah :
5.0000
Pekerja
0.2500
Mandor
15.0000
Tukang
1.5000
Kepala Tukang
0.5000
Bahan :
1.1000
0.2000

M3
Kg

52,500.00
65,600.00
78,800.00
91,900.00

Upah Kerja

1,598,750.00

Broti Kayu Meranti


Paku biasa 2"-5"

5,678,300.00
16,300.00
Jumlah
di bulatkan

9 Anl. F.1.a

1 M2 Piyan Papan Rider (STRIP)


Upah :
0.2800
Pekerja
0.0140
Mandor
0.8000
Tukang
0.0800
Kepala Tukang
1.2000
Bahan :
0.0200
0.2000

Upah Kerja
M3
Kg

Kayu Meranti Batu


Paku biasa 2"-5"

52,500.00
65,600.00
78,800.00
91,900.00
86,010.40
$ 10,188,300.00
16,300.00
Jumlah
di bulatkan

10 Anl. F.16

1 M2 Rangka atap (pasang usuk dan reng untuk atap genteng dan sirap)
0.1000
Pekerja
52,500.00
0.0050
Mandor
65,600.00
0.1000
Tukang
78,800.00
0.0100
Kepala Tukang
91,900.00
0.0147
M3
Kayu Meranti
5,678,300.00
0.2500
Kg
Paku biasa 2"-5"
16,300.00
Jumlah
di bulatkan

11 Anl.F.16.a

1 M2 Rangka atap genteng biasa/genteng semen (pasang usuk, reng dan gording)

0.1500
0.0075
0.1000
0.0100
0.0250
0.1000

12 Anl.F.19

M3
Kg

Pekerja
Mandor
Tukang
Kepala Tukang
Kayu Meranti
Paku biasa 2"-5"

1 M2 Rangka atap seng dan Asbes Gelombang Kayu


0.0150
Pekerja
0.0075
Mandor
0.1000
Tukang
0.0100
Kepala Tukang
0.0110
M3
Kayu Meranti
0.1000
Kg
Paku biasa 2"-5"

52,500.00
65,600.00
78,800.00
91,900.00
5,678,300.00
16,300.00
Jumlah
di bulatkan

52,500.00
65,600.00
78,800.00
91,900.00
5,678,300.00
16,300.00
Jumlah
di bulatkan

13 Anl.F.19.a

1 M2 Rangka atap Genteng Metal dan Genteng Asbes Kayu


0.0150
Pekerja
52,500.00
0.0075
Mandor
65,600.00
0.1000
Tukang
78,800.00
0.0100
Kepala Tukang
91,900.00
0.0125
M3
Kayu Meranti
5,678,300.00
0.1200
Kg
Paku biasa 2"-5"
16,300.00
Jumlah
di bulatkan

14 Anl.F.21

1 M2 Lystplank
0.2800
0.0140
0.8000
0.0800
0.0240
M3
0.1000
Kg

15 Anl.F.22

Pekerja
Mandor
Tukang
Kepala Tukang
Papan Kayu Damar Laut
Paku biasa 0,5"-2"

1 M3 Konstruksi Kayu Kuda-Kuda


Upah :
8.0000
Pekerja
0.4000
Mandor
24.0000
Tukang

52,500.00
65,600.00
78,800.00
91,900.00
10,487,100.00
18,400.00
Jumlah
di bulatkan

52,500.00
65,600.00
78,800.00

16 Anl.F.27

2.4000

Kepala Tukang

0.5000
Bahan :
1.1000

Upah kerja
Kayu damar laut

1 M3 Kozen pintu/jendela tanpa jalusi


Upah :
12.0000
Pekerja
0.6000
Mandor
36.0000
Tukang
3.6000
Kepala Tukang
0.5000
Bahan :
1.1000

17 Anl.F.27.a

M3

Upah kerja
M3

Kayu damar laut

1 M3 Kozen pintu/jendela dengan jalusi


Upah :
12.0000
Pekerja
0.6000
Mandor
36.0000
Tukang
3.6000
Kepala Tukang
0.5000
Bahan :
1.1000
0.0240
1.0000

Upah kerja

M3
M3
Kg

Kayu damar laut


Papan Kayu meranti batu
Paku biasa 2"-5"

91,900.00
2,558,000.00
10,161,100.00
Jumlah
di bulatkan

52,500.00
65,600.00
78,800.00
91,900.00
3,837,000.00
10,161,100.00
Jumlah
di bulatkan

52,500.00
65,600.00
78,800.00
91,900.00
3,837,000.00

10,161,100.00
10,188,300.00
16,300.00
Jumlah
di bulatkan

18 Anl.F.28

1 M3 Kozen yang berlobang cahaya berbentuk busur


Upah :
14.0000
Pekerja
0.7000
Mandor
42.0000
Tukang
4.2000
Kepala Tukang

52,500.00
65,600.00
78,800.00
91,900.00

0.5000
Bahan :
1.1000

19 Anl.F.33

Upah kerja

M3

10,161,100.00
Jumlah
di bulatkan

1 M2 Pintu/jendela panel :
Upah :
2.5000
Pekerja
0.1250
Mandor
7.5000
Tukang
0.7500
Kepala Tukang
0.5000
Bahan :
0.0440

20 Anl. F.30

Kayu damar laut

4,476,500.00

52,500.00
65,600.00
78,800.00
91,900.00

Upah Kerja

M3

Kayu meranti batu

799,375.00

10,188,300.00
Jumlah
di bulatkan

1 M2 Daun Pintu triplek 4mm double rangka kayu meranti


Upah :
1.3000
Pekerja
0.0650
Mandor
4.0000
Tukang
0.4000
Kepala Tukang
0.5000
Bahan :
0.0250
1.0000
0.2000

Upah Kerja

M3
Lbr
Kg

Kayu meranti
Triplek 4mm
Paku biasa 0,5"-2"

52,500.00
65,600.00
78,800.00
91,900.00
424,474.00

5,678,300.00
56,400.00
18,400.00
Jumlah
di bulatkan

21 Anl.F.30a

1 M2 Daun Pintu Triplek Sungkai Double Rangka Kayu Meranti :


Upah :
1.3000
Pekerja
52,500.00
0.0650
Mandor
65,600.00
4.0000
Tukang
78,800.00

0.4000

Kepala Tukang

0.5500

Upah kerja

Bahan :
0.0250
1.0000
0.2500

M3
Lbr
Kg

Kayu meranti
Triplek sungkai
Paku biasa 0.5"-2"

91,900.00
424,474.00

5,678,300.00
92,900.00
18,400.00
Jumlah
di bulatkan

22 Anl. F.34

1 M2 Pintu/Jendela Jalusi :
3.0000
Pekerja
0.1500
Mandor
9.0000
Tukang
0.9000
Kepala Tukang
0.5000
0.3187
0.0640

Upah Kerja
Kg
M3

Paku biasa 2"-5"


Kayu meranti batu

52,500.00
65,600.00
78,800.00
91,900.00
959,250.00
16,300.00
9,862,300.00
Jumlah
di bulatkan

23 Anl.F.36

1 M2 Pintu/Jendela Kaca bingkai Kayu meranti batu :


2.0000
Pekerja
0.1000
Mandor
6.0000
Tukang
0.6000
Kepala Tukang
0.5000
1.0000
0.0350

Upah Kerja
M2
M3

Kaca Polos 5mm


Kayu meranti batu

52,500.00
65,600.00
78,800.00
91,900.00
639,500.00
157,800.00
9,862,300.00
Jumlah
di bulatkan

24 Anl.F.37

1 M2 Dinding Papan Dilidah


Upah :
0.2800
Pekerja
0.0140
Mandor

52,500.00
65,600.00

0.8000
0.0800

Tukang
Kepala Tukang

78,800.00
91,900.00

0.7500

Upah kerja

86,010.40

Bahan :
0.0198
0.2000

M3
Kg

Papan Kayu Meranti


Paku biasa 2"-5"

5,950,000.00
16,300.00
Jumlah
di bulatkan

25 Anl.F.37a

1 M2 Dinding Papan Susun Sirih :


Upah :
0.2800
Pekerja
0.0140
Mandor
0.8000
Tukang
0.0800
Kepala Tukang
0.5000
Bahan :
0.0187
0.2000

Upah kerja
M3
Kg

Papan Kayu Meranti


Paku biasa 2"-5"

52,500.00
65,600.00
78,800.00
91,900.00
86,010.40
5,950,000.00
16,300.00
Jumlah
di bulatkan

26 Anl.F.37b

1 M2 Dinding triplek 4mm rangka kayu meranti


Upah :
0.2800
Pekerja
0.0140
Mandor
0.8000
Tukang
0.0800
Kepala Tukang
0.3000
Bahan :
0.0138
0.3500
0.1500

Upah kerja
M3
Lbr
Kg

Broti Kayu meranti


Triplek 4mm
Paku biasa 0,5"-2"

52,500.00
65,600.00
78,800.00
91,900.00
86,010.40
5,678,300.00
56,400.00
18,400.00
Jumlah
di bulatkan

27 Anl.F.37c

1M2 Dinding double triplek 4mm rangka kayu meranti


Upah :
0.2800
Pekerja
0.0140
Mandor
0.8000
Tukang
0.0800
Kepala Tukang
0.4000
Bahan :
0.0138
0.7000
0.2500

Upah kerja
M3
Lbr
Kg

Broti Kayu Meranti


Triplek 4mm
Paku biasa 0,5"-2"

52,500.00
65,600.00
78,800.00
91,900.00
86,010.40
5,678,300.00
56,400.00
18,400.00
Jumlah
di bulatkan

28 Anl.F.37d.

1M2 Dinding double triplek sungkai rangka kayu meranti


0.1400
Pekerja
52,500.00
0.0700
Mandor
65,600.00
0.4000
Tukang
78,800.00
0.0400
Kepala Tukang
91,900.00
0.0150
M3
Broti Kayu Meranti
5,678,300.00
0.8000
Lbr
Triplek sungkai
92,900.00
0.2500
Lbr
Paku biasa 0,5"-2"
18,400.00
Jumlah
di bulatkan

29 Anl.F.37e.

1M2 Dinding single triplek sungkai rangka kayu meranti


Upah :
0.1400
Pekerja
52,500.00
0.0700
Mandor
65,600.00
0.4000
Tukang
78,800.00
0.0400
Kepala Tukang
91,900.00
0.0125
M3
Broti Kayu Meranti
5,678,300.00
0.4000
Lbr
Triplek sungkai
92,900.00
0.2500
Kg
Paku biasa 0,5"-2"
18,400.00
Jumlah
di bulatkan

30 Anl.F.60

1 M' Memasang cerocok kayu laut 1 btg panjang 2,5 M


Masuk kedalam tanah 1,5
tanah
-2 1,5 - 2 3"-4"
1.0000
Pekerja
0.0500
Mandor
3.0000
Tukang

52,500.00
65,600.00
78,800.00

0.3
7.5000
0.5000

Btg
Kg

Kepala Tukang
Kayu Laut 3" - 4"
Kawat licin

91,900.00
20,900.00
24,500.00
Jumlah
di bulatkan

31 Anl.G.2

32 Anl.G.14

1M3 Lantai kerja batu kosong


1.5000
Pekerja
0.0750
Mandor
1.1000
M3
Batu koral 3-5 cm

1M3 Perekat 1:2


14.6880
zak
0.9500
M3

Semen PC
Pasir Pasang

52,500.00
65,600.00
215,300.00
Jumlah
di bulatkan

56,000.00
94,500.00
Jumlah
di bulatkan

33 Anl.G.16

1M3 Perekat 1:3


11.2490
Zak
1.0800
zak

Semen PC
Pasir Pasang

56,000.00
94,500.00
Jumlah
di bulatkan

34 Anl.G31.h

35 Anl.G31.m

1M3 Pasangan batu belah atau batu kali 1:4


3.6000
Pekerja
0.1800
Mandor
1.2000
Tukang
0.1200
Kepala Tukang
1.2000
M3
Batu belah/batu kali 10-15cm
3.8675
Zak
Semen PC
0.4860
M3
Pasir pasang

1 M3 Pasangan batu belah atau batu kali 1 : 3


3.6000
Pekerja
0.1800
Mandor
1.2000
Tukang
0.1200
Kepala Tukang
1.2000
M3
Batu belah/batu kali 10-15cm
4.0715
Zak
Semen PC
0.5220
M3
Pasir pasang

52,500.00
65,600.00
78,800.00
91,900.00
165,900.00
56,000.00
94,500.00
Jumlah
di bulatkan

52,500.00
65,600.00
78,800.00
91,900.00
165,900.00
56,000.00
94,500.00

Jumlah
di bulatkan
36 Anl.G32.h

1M3 Pasangan batu bata 1 : 4


4.5000
Pekerja
0.2250
Mandor
1.5000
Tukang
0.1500
Kepala Tukang
720.0000
Bh
Batu bata
3.1663
Zak
Semen PC
0.4060
M3
Pasir pasang

52,500.00
65,600.00
78,800.00
91,900.00
650
56,000.00
94,500.00
Jumlah
di bulatkan

37 Anl.G32.m

1M3 Pasangan batu bata 1 : 2 (Trasraam)


4.5000
Pekerja
0.2250
Mandor
1.5000
Tukang
0.1500
Kepala Tukang
720.0000
Bh
Batu bata
5.1467
Zak
Semen PC
0.3330
M3
Pasir pasang

52,500.00
65,600.00
78,800.00
91,900.00
650
56,000.00
94,500.00
Jumlah
di bulatkan

38 Anl.G.41

39 Anl.G.41a

1M3Beton cor 1:2:3


6.0000
0.3000
1.0000
0.1000
0.8300
M3
0.5400
M3
8.5000
Zak

Pekerja
Mandor
Tukang
Kepala Tukang
Batu kerikil (A)
Pasir pasang
Semen PC

1M3 Beton cor 1: 1,5 :2,5


6.0000
Pekerja
0.3000
Mandor
1.0000
Tukang
0.1000
Kepala Tukang
0.7800
M3
Batu kerikil (A)
0.4650
M3
Pasir pasang
9.6857
Zak
Semen PC

52,500.00
65,600.00
78,800.00
91,900.00
199,500.00
94,500.00
56,000.00
Jumlah
di bulatkan

52,500.00
65,600.00
78,800.00
91,900.00
199,500.00
94,500.00
56,000.00

Jumlah
di bulatkan
40 Anl G. 42

1M3 Beton cor 1:2:4 dipakai untuk lantai ubin,beton yang dicor dibawah air'
lapisan turap diatas pasangan-pasangan yang dimiringkan tebal 6 cm
6.0000
Pekerja
52,500.00
0.3000
Mandor
65,600.00
0.5000
Tukang
78,800.00
0.0500
Kepala Tukang
91,900.00
0.9600
M3
Batu kerikil (A)
199,500.00
0.4800
M3
Pasir pasang
94,500.00
7.4630
Zak
Semen PC
56,000.00
Jumlah
di bulatkan

41 Anl.G.43

1M3 Beton Cor 1 :2,5


6.0000
0.3000
0.5000
0.0500
1.0000
M3
0.5000
M3
6.2517
Zak

:5
Pekerja
Mandor
Tukang
Kepala Tukang
Batu kerikil (A)
Pasir pasang
Semen PC

1M3 Beton Cor 1:3:5


6.0000
0.3000
0.5000
0.0500
1.0000
M3
5.2955
Zak
0.5000
M3

Pekerja
Mandor
Tukang
Kepala Tukang
Batu kerikil (A)
Semen PC
Pasir pasang

42 Anl.G.44

43 Anl.G50.h

1M2 Plesteran 1 : 2 Tebal 10mm (Trasraam)


0.4000
Pekerja
0.0200
Mandor
0.1500
Tukang
0.0150
Kepala Tukang
0.1785
zak
Semen PC
0.0114
M3
Pasir pasang

52,500.00
65,600.00
78,800.00
91,900.00
199,500.00
94,500.00
56,000.00
Jumlah
di bulatkan

52,500.00
65,600.00
78,800.00
91,900.00
199,500.00
56,000.00
94,500.00
Jumlah
di bulatkan

52,500.00
65,600.00
78,800.00
91,900.00
56,000.00
94,500.00

Jumlah
di bulatkan
44 Anl.G50.h1

1M2 Plesteran 1 : 2 Tebal 15mm (Trasraam)


0.4000
Pekerja
0.0200
Mandor
0.2000
Tukang
0.0200
Kepala Tukang
0.2678
Zak
Semen PC
0.0171
M3
Pasir pasang

52,500.00
65,600.00
78,800.00
91,900.00
56,000.00
94,500.00
Jumlah
di bulatkan

45 Anl.G50.i

1M2 Plesteran 1 : 3 Tebal 15mm


0.4000
Pekerja
0.0200
Mandor
0.2000
Tukang
0.0200
Kepala Tukang
0.2040
Zak
Semen PC
0.0194
M3
Pasir pasang

52,500.00
65,600.00
78,800.00
91,900.00
56,000.00
94,500.00
Jumlah
di bulatkan

46 Anl.G50.k

1M2 Plesteran 1 : 3 Tabal 10mm


0.4000
Pekerja
0.0200
Mandor
0.1500
Tukang
0.0150
Kepala Tukang
0.1347
Zak
Semen PC
0.0130
M3
Pasir pasang

52,500.00
65,600.00
78,800.00
91,900.00
56,000.00
94,500.00
Jumlah
di bulatkan

47 Anl.G50.q

1M2 Plesteran 1 : 4 Tebal 10mm


0.4000
Pekerja
0.0200
Mandor
0.1500
Tukang
0.0150
Kepala Tukang
0.1084
Zak
Semen PC
0.0139
M3
Pasir pasang

52,500.00
65,600.00
78,800.00
91,900.00
56,000.00
94,500.00
Jumlah
di bulatkan

48 Anl.G50.q1

1M2 Plesteran 1 : 4 Tebal 15mm

0.4000
0.0200
0.2000
0.0200
0.1628
0.0209

Zak
M3

Pekerja
Mandor
Tukang
Kepala Tukang
Semen PC
Pasir pasang

52,500.00
65,600.00
78,800.00
91,900.00
56,000.00
94,500.00
Jumlah
di bulatkan

49 Anl.G.6O

1M2 Memasang Conblock


0.4000
Pekerja
0.1000
Tukang
46.0000
Bh
Conblock
0.1200
M3
Pasir pasang

52,500.00
78,800.00
1,900.00
94,500.00
Jumlah
di bulatkan

50 Anl.G.67

1M2 Lantai beton tebal 7 cm camp,1:3:6 diplester tebal 6mm


0.7200
Pekerja
52,500.00
0.0360
Mandor
65,600.00
0.1350
Tukang
78,800.00
0.0135
Kepala Tukang
91,900.00
0.0700
M3
Batu kerikil (A)
199,500.00
0.0440
M3
Pasir pasang
94,500.00
0.4547
Zak
Semen PC
56,000.00
Jumlah
di bulatkan

51 Anl.G.68

1M' Pasang Plint tegel PC. 10x30 cm


Upah :
0.3000
Pekerja
0.0150
Mandor
0.1000
Tukang
0.0100
Kepala Tukang

52,500.00
65,600.00
78,800.00
91,900.00
Jumlah

Bahan :
3.3330
0.0765
0.0070

Bh
Zak
M3

Plint tegel 10x30 cm


Semen PC
Pasir pasang

3,200.00
56,000.00
94,500.00
Jumlah
Jumlah U + B
di bulatkan

52 Anl.G.68a

1M' Pasang Plint Keramik 15x30 cm


3.3330
Bh
Plint Keramik 15x30 cm
0.0765
Zak
Semen PC
0.0070
M3
Pasir pasang
1.1000
Upah Kerja

4,700.00
56,000.00
94,500.00
25,533.00
Jumlah
di bulatkan

53 Anl.G.68b

1M' Pasang Plint Keramik 15x40 cm


2.5500
Bh
Plint Keramik 15x40cm
0.0765
Zak
Semen PC
0.0070
M3
Pasir pasang
1.1000
Upah Kerja

8,900.00
56,000.00
94,500.00
25,533.00
Jumlah
di bulatkan

54 Anl.G.68c

1M' Pasang Plint Granito 15x40 cm


2.5500
Bh
Plint Granito 15x40 cm
0.0765
Zak
Semen PC
0.0070
M3
Pasir pasang
1.2500
Upah Kerja

26,300.00
56,000.00
94,500.00
25,533.00
Jumlah
di bulatkan

55 Anl.G.68d

1M' Pasang Plint Keramik Essenza 15x40 cm


2.5500
Bh
Plint Essenza 15x40 cm
0.0765
Zak
Semen PC
0.0070
M3
Pasir pasang
1.2500
Upah Kerja

28,200.00
56,000.00
94,500.00
25,533.00
Jumlah
di bulatkan

56 Anl.G.72

1 M2 Lantai Keramik Uk.10x20 cm


0.5000
Pekerja
0.0250
Mandor
0.2500
Tukang
0.0250
Kepala Tukang
50.0000
Bh
Keramik 10x20 cm
0.1419
Zak
Semen PC
0.0020
Zak
Semen Putih
2.4000
Kg
Kapur
0.0230
M3
Pasir Pasang

52,500.00
65,600.00
78,800.00
91,900.00
1,400.00
56,000.00
108,000.00
3,700.00
94,500.00
Jumlah
di bulatkan

57 Anl.G.72a

58 Anl.G.72b

59 Anl.G.72c

60 Anl.G.72d

1M2 Lantai Keramik Uk.20x20 cm


0.5000
Pekerja
0.0250
Mandor
0.2500
Tukang
0.0250
Kepala Tukang
25.0000
Bh
Keramik 20x20 cm
0.1419
Zak
Semen PC
0.0020
Zak
Semen Putih
2.4000
Kg
Kapur
0.0230
M3
Pasir Pasang

1M2 Lantai Keramik Uk. 30x30 cm


0.5000
Pekerja
0.0250
Mandor
0.2500
Tukang
0.0250
Kepala Tukang
11.1100
Bh
Keramik 30x30 cm
0.1419
Zak
Semen PC
0.0020
Zak
Semen Putih
2.4000
Kg
Kapur
0.0230
M3
Pasir Pasang

1M2 Pasang Lantai Keramik 40x40 cm


0.5000
Pekerja
0.0250
Mandor
0.2500
Tukang
0.0250
Kepala Tukang
6.2500
Bh
Keramik 40x40 cm
0.1419
Zak
Semen PC
0.0020
Zak
Semen Putih
2.4000
Kg
Kapur
0.0230
M3
Pasir Pasang

1M2 Pasang Lantai Keramik Essenza 40x40 cm


Upah :
0.5000
Pekerja
0.0250
Mandor

52,500.00
65,600.00
78,800.00
91,900.00
2,700.00
56,000.00
108,000.00
3,700.00
94,500.00
Jumlah
di bulatkan

52,500.00
65,600.00
78,800.00
91,900.00
6,100.00
56,000.00
108,000.00
3,700.00
94,500.00
Jumlah
di bulatkan

52,500.00
65,600.00
78,800.00
91,900.00
11,800.00
56,000.00
108,000.00
3,700.00
94,500.00
Jumlah
di bulatkan

52,500.00
65,600.00

0.2500
0.0250

Tukang
Kepala Tukang

78,800.00
91,900.00

1.1250
Bahan :
6.2500
0.1419
0.0020
2.4000
0.0230

Upah

49,887.50

Bh
Zak
Zak
Kg
M3

Keramik Essenza 40x40 cm


Semen PC
Semen Putih
Kapur
Pasir Pasang

47,000.00
56,000.00
108,000.00
3,700.00
94,500.00
Jumlah
di bulatkan

61 Anl.G.72e

1M2 Pasang Lantai Keramik Essenza 60x60 cm


Upah :
0.5000
Pekerja
0.0250
Mandor
0.2500
Tukang
0.0250
Kepala Tukang
1.2500
Bahan :
2.7800
0.1419
0.0020
2.4000
0.0230

Upah
Bh
Zak
Zak
Kg
M3

Keramik Essenza 60x60 cm


Semen PC
Semen Putih
Kapur
Pasir Pasang

52,500.00
65,600.00
78,800.00
91,900.00
49,887.50
137,800.00
56,000.00
108,000.00
3,700.00
94,500.00
Jumlah
di bulatkan

62 Anl.G.72f

1M2 Lantai Granito Uk.30x30 cm


Upah :
0.5000
Pekerja
0.0250
Mandor
0.2500
Tukang
0.0250
Kepala Tukang
1.0000
Bahan :
11.1100
0.1419
0.0020

Upah
Bh
Zak
Zak

Granito 30x30 cm
Semen PC
Semen Putih

52,500.00
65,600.00
78,800.00
91,900.00
49,887.50
24,500.00
56,000.00
108,000.00

2.4000
0.0230

Kg
M3

Kapur
Pasir Pasang

3,700.00
94,500.00
Jumlah
di bulatkan

63 Anl.G.72g

1M2 Pasang Lantai Granito 40x40 cm


Upah :
0.5000
Pekerja
0.0250
Mandor
0.2500
Tukang
0.0250
Kepala Tukang
1.1250
Bahan :
6.2500
0.1419
0.0020
2.4000
0.0230

Upah
Bh
Zak
Zak
Kg
M3

Granito 40x40 cm
Semen PC
Semen Putih
Kapur
Pasir Pasang

52,500.00
65,600.00
78,800.00
91,900.00
49,887.50
43,500.00
56,000.00
108,000.00
3,700.00
94,500.00
Jumlah
di bulatkan

64 Anl.G.72h

1M2 Pasang Lantai Granito 60x60 cm


Upah :
0.5000
Pekerja
0.0250
Mandor
0.2500
Tukang
0.0250
Kepala Tukang
1.2500
Bahan :
2.7800
0.1419
0.0020
2.4000
0.0230

Upah
Bh
Zak
Zak
Kg
M3

Keramik Essenza 60x60 cm


Semen PC
Semen Putih
Kapur
Pasir Pasang

52,500.00
65,600.00
78,800.00
91,900.00
49,887.50
130,400.00
56,000.00
108,000.00
3,700.00
94,500.00
Jumlah
di bulatkan

65 Anl.Supl.IV

1M2 Pas,Keramik dinding Uk. 10x20 cm


Upah :
1.0000
Pekerja
0.0500
Mandor

52,500.00
65,600.00

0.5000
0.0500
Bahan :
50.0000
0.0150

Tukang
Kepala Tukang

Bh

Keramik 10x20 cm
Perekat (G.14)

78,800.00
91,900.00

1,400.00
912,303.00
Jumlah
di bulatkan

66 Anl.Supl.Iva

67 Anl.Supl.Ivb

68 Anl.Supl.Ivc

69 Anl.Supl.Ivd

1M2 Pas,Keramik dinding Uk. 20x20 cm


1.0000
Pekerja
0.0500
Mandor
0.5000
Tukang
0.0500
Kepala Tukang
25.0000
Bh
Keramik 20x20 cm
0.0150
Perekat (G.14)

1M2 Pas,Keramik dinding Uk. 20x25 cm


1.0000
Pekerja
0.0500
Mandor
0.5000
Tukang
0.0500
Kepala Tukang
20.0000
Bh
Keramik 20x25 cm
0.0150
Perekat (G.14)

1M2 Pas,Keramik dinding Uk. 30x30 cm


1.0000
Pekerja
0.0500
Mandor
0.5000
Tukang
0.0500
Kepala Tukang
11.1100
Bh
Keramik 30x30 cm
0.0150
Perekat (G.14)

1M2 Pas,Keramik dinding Uk. 40x40 cm


1.0000
Pekerja
0.0500
Mandor
0.5000
Tukang

52,500.00
65,600.00
78,800.00
91,900.00
2,700.00
912,303.00
Jumlah
di bulatkan

52,500.00
65,600.00
78,800.00
91,900.00
3,500.00
912,303.00
Jumlah
di bulatkan

52,500.00
65,600.00
78,800.00
91,900.00
6,100.00
912,303.00
Jumlah
di bulatkan

52,500.00
65,600.00
78,800.00

0.0500
6.2500
0.0150

70 Anl.Supl.Ive

71 Anl.Supl.Ivf

72 Anl.Supl.Ivg

73 Anl.Supl.Ivh

Bh

Kepala Tukang
Keramik 40x40 cm
Perekat (G.14)

1M2 Pas,Keramik dinding Essenza Uk.40x40 cm


6.2500
Bh
Essenza 40x40 cm
0.0150
Perekat (G.14)
1.2500
Upah Kerja (Supl.IV)

1M2 Pas,Keramik dinding Essenza Uk.60x60 cm


2.7800
Bh
Essenza 60x60 cm
0.0150
Perekat (G.14)
1.5000
Upah Kerja (Supl.IV)

1M2 Pas,Keramik dinding Granito Uk.40x40 cm


6.2500
Bh
Granito 40x40 cm
0.0150
Perekat (G.14)
1.2500
Upah Kerja (Supl.IV)

1M2 Pas,Keramik dinding Granito Uk.60x60 cm


2.7800
Bh
Granito 60x60 cm
0.0150
Perekat (G.14)
1.5000
Upah Kerja (Supl.IV)

74 Anl.Supl.V :

Untuk Beton Bertulang

75 Anl.G.41

1M3 Beton Cor 1:2:3


6.0000
0.3000
1.0000
0.1000
0.8300
M3
0.5400
M3
8.5000
Zak

Pekerja
Mandor
Tukang
Kepala Tukang
Batu Kerikil
Pasir Pasang
Semen PC

91,900.00
11,800.00
912,303.00
Jumlah
di bulatkan

47,000.00
912,303.00
99,775.00
Jumlah
di bulatkan

137,800.00
912,303.00
99,775.00
Jumlah
di bulatkan

43,500.00
912,303.00
99,775.00
Jumlah
di bulatkan

130,400.00
912,303.00
99,775.00
Jumlah
di bulatkan

52,500.00
65,600.00
78,800.00
91,900.00
199,500.00
94,500.00
56,000.00

Jumlah
di bulatkan
76 Anl.I.2

Mengerjakan (memotong/memasang)110 Kg besi utk beton bertulang


Upah :
9.0000
Pekerja
52,500.00
9.0000
Tukang
78,800.00
3.0000
Kepala Tukang
91,900.00
Upah =

0.50 x

1,457,400.00

Bahan-bahan yang diperlukan :


110.0000
Kg
Besi beton
2.0000
Kg
Kawat Beton

15,700.00
18,300.00
Jumlah

Untuk 1 M3

77 Anl.F.8

Tiap-tiap 1M3 Besi bertulang diperlukan 125 Kg besi yaitu :


1.2500 x
2,492,300.00
di bulatkan

1 M3 beton bertulang diperlukan 10 M2 papan belkisting


1 M2 upah cetakan beton
0.2000
Pekerja
0.0100
Mandor
0.5000
Tukang
0.0500
Kepala Tukang

52,500.00
65,600.00
78,800.00
91,900.00

utk 10 M2 =

55,151.00

10 x

Bahan-bahan yang diperlukan :


4.0000
Kg
Paku biasa
0.4000
M3
kayu sembarangan

18,400.00
4,462,500.00
Jumlah
di bulatkan

Himpunan Supl.V
1.Anl.G.41
.

2.Anl.I.2

3.Anl.F.8

Jumlah
78 Anl. Supl.VIII

1 M2 Plafond Asbes 1x1 m

0.5000
0.0250
1.0000
0.0200
1.0000

Lbr
Kg
Bh

Pekerja
Mandor
Asbes 1x1 m atrisco
Paku biasa
Lat Asbes

52,500.00
65,600.00
12,600.00
18,400.00
8,100.00
Jumlah
di bulatkan

79 Anl. Supl.VIIIa

1M2 Plafond triplek 4 mm


0.5000
Pekerja
0.0250
Mandor
1.0500
M2
Triplek 4mm
0.0200
Kg
Paku biasa

52,500.00
65,600.00
56,400.00
18,400.00
Jumlah
di bulatkan

80 Anl.Taksir (a)

1M2 Gypsum rangka partisi metal sistem


0.0350
Tukang
0.3500
Kepala Tukang
1.9000
M'
Wall stud 64 mm
0.4200
M'
Wall track mead 64
0.4200
M'
Wall track bottom
12.0000
Bh
Sekrup fisher

78,800.00
91,900.00
7,900.00
8,100.00
7,900.00
400
Jumlah
di bulatkan

81 Anl.Taksir (b)

1M2 Gypsum board 6 mm (partisi)


0.0500
Pekerja
0.1500
Tukang
0.0250
Kepala Tukang
0.0600
Lbr
Kertas pasir
0.2200
Kg
Dempul Gypsum
12.0000
Bh
Screw
0.3500
Lbr
Gypsum board 6mm

52,500.00
78,800.00
91,900.00
2,000.00
11,300.00
500
65,300.00
Jumlah
di bulatkan

82 Anl.Taksir (c)

1M2 Gypsum board 9 mm (partisi)


0.0500
Pekerja
0.1500
Tukang
0.0250
Kepala Tukang
0.0600
Lbr
Kertas pasir
0.2200
Kg
Dempul Gypsum
12.1000
Bh
Screw

52,500.00
78,800.00
91,900.00
2,000.00
11,300.00
500

0.3500

Lbr

Gypsum board 9mm

77,900.00
Jumlah
di bulatkan

83 Anl.Taksir (d)

84 Anl.H.8

1M2 Gypsum board 12 mm (partisi)


0.0500
Pekerja
0.1500
Tukang
0.0250
Kepala Tukang
0.0140
Rol
Paper tape
0.0600
Lbr
Kertas pasir
0.2200
Kg
Dempul Gypsum
12.1000
Bh
Screw
1.0000
Lbr
Gypsum board 12 mm

52,500.00
78,800.00
91,900.00
62,800.00
2,000.00
11,300.00
500.00
101,600.00
Jumlah
di bulatkan

1M2 Pasangan atap asbes gelombang


0.1000
Pekerja
0.0050
Mandor
0.2000
Tukang
0.0200
Kepala Tukang
0.8700
Lbr
Atap asbes gelombang
6.0000
Bh
Paku atap

52,500.00
65,600.00
78,800.00
91,900.00
64,600.00
500.00
Jumlah
di bulatkan

85 Anl.H.5a

1M2 Pasangan atap seng BJLS 35 K


0.1000
Pekerja
0.0050
Mandor
0.2000
Tukang
0.0200
Kepala Tukang
0.8700
Lbr
Seng BJLS 35 K
6.0000
Bh
Paku seng

52,500.00
65,600.00
78,800.00
91,900.00
64,800.00
500.00
Jumlah
di bulatkan

86 Anl.H.8b

1M2 Pasangan atap asbes motif genteng


0.1000
Pekerja
0.0050
Mandor
0.2000
Tukang
0.0200
Kepala Tukang
1.1000
Lbr
Atap asbes motif genteng
4.0000
Bh
paku seng

52,500.00
65,600.00
78,800.00
91,900.00
36,800.00
500.00
Jumlah

di bulatkan
87 Anl.H.8c

88 Anl.H.10

1M2 Pasangan atap asbes genteng Metal Roof


0.1000
Pekerja
0.0050
Mandor
0.2000
Tukang
0.0200
Kepala Tukang
1.1000
Lbr
Atap Metal motif genteng
4.0000
Bh
paku seng

1M' Rabung Seng BJLS


0.0250
0.0750
0.0075
1.1000
M'
4.0000
Bh

52,500.00
65,600.00
78,800.00
91,900.00
131,600.00
500.00
Jumlah
di bulatkan

35 K
Pekerja
Tukang
Kepala Tukang
Rabung Seng BJLS 35 K
paku seng

52,500.00
78,800.00
91,900.00
39,400.00
500.00
Jumlah
di bulatkan

89 Anl.H.10a

90 Anl.H.15

91 Anl.H.17

1M' Rabung Genteng


0.0400
0.0020
0.0200
0.0020
3.5000
Bh
0.0030

Pekerja
Mandor
Tukang
Kepala Tukang
Rabung Genteng
Perekat G.16

1M' Talang Patahan Seng 35 K


0.2500
Pekerja
0.0150
Mandor
0.4000
Tukang
0.0400
Kepala Tukang
0.2500
Lbr
Seng Plat 35 K
Ongkos Patri

52,500.00
65,600.00
78,800.00
91,900.00
14,600.00
732,004.00
Jumlah
di bulatkan

52,500.00
65,600.00
78,800.00
91,900.00
125,500.00
7,900.00
Jumlah
di bulatkan

1M' Talang Datar Seng 35 K bentuk U atau 1/2 lingkaran


0.3000
Pekerja
0.0150
Mandor

52,500.00
65,600.00

0.5000
0.0500
0.3000

92 Anl.H.18

78,800.00
91,900.00
125,500.00
7,900.00
Jumlah
di bulatkan

1M' Pipa Talang Seng 35 K 10 cm


0.0250
0.0110
0.3750
0.0375
0.2080

93 Anl.K.23

Lbr

Tukang
Kepala Tukang
Seng Plat 35 K
Ongkos Patri

Lbr

Pekerja
Mandor
Tukang
Kepala Tukang
Seng Plat 35 K
Ongkos Patri

52,500.00
65,600.00
78,800.00
91,900.00
125,500.00
7,900.00
Jumlah
di bulatkan

100 M2 Upah Mengecat


5.0000
Pekerja
0.2500
Mandor
7.5000
Tukang
0.7500
Kepala Tukang

52,500.00
65,600.00
78,800.00
91,900.00
Jumlah

Upah utk 1M2 0.0100

94 Anl.K.23a

1M2 Cat Tembok (3xcat)


3.0000
Upah cat 3 lapis
0.4250
Kg
Cat tembok

938,825.00
di bulatkan

9,388.00
20,500.00
Jumlah
di bulatkan

95 Anl.K.23a1

1M2 Cat Tembok (2xcat)


2.0000
Upah cat 2 lapis
0.2830
Kg
Cat tembok

9,388.00
20,500.00
Jumlah
di bulatkan

96 Anl.K.23b

1M2 Cat Kilat /Cat Minyak (3xcat)


3.0000
Upah cat 3 lapis
0.4250
Kg
Cat Kilat
0.1000
Ltr
Tinner

9,388.00
38,800.00
12,000.00

Jumlah
di bulatkan
97 Anl.K.23b1

1M2 Cat Kilat /Cat Minyak (2xcat)


2.0000
Upah cat 2 lapis
0.2830
Kg
Cat Kilat
0.1000
Ltr
Tinner

9,388.00
38,800.00
12,000.00
Jumlah
di bulatkan

98 Anl.K.23c

1M2 Cat Menie (1xcat)


1.0000
Upah Mengecat
0.1416
Kg
Cat Menie

9,388.00
27,800.00
Jumlah
di bulatkan

99 Anl.K.23d

1M2 Cat Vernis (3xcat)


3.0000
Upah Cat 3 Lapis
0.4250
Kg
Cat Vernis

9,388.00
52,500.00
Jumlah
di bulatkan

100 Anl.K.23d1

1M2 Cat Vernis (2xcat)


2.0000
Upah Cat 2 Lapis
0.2830
Kg
Cat Vernis

9,388.00
52,500.00
Jumlah
di bulatkan

101 Anl.K.23e

1M2 Cat Sending (3xcat)


3.0000
Upah Cat 3 Lapis
0.4250
Kg
Cat Sending
0.1000
Ltr
Tinner

9,388.00
59,200.00
12,000.00
Jumlah
di bulatkan

102 Anl.K.23f

1M2 Cat Melamix (3xcat)


3.0000
Upah Cat 3 Lapis
0.4250
Kg
Cat Melamix
0.1000
Ltr
Tinner

9,388.00
64,500.00
12,000.00
Jumlah
di bulatkan

103 Anl.L.4

Membongkar 1 M3 dinding tembok yang tipis berikut membersihkan batas-batasnya

2.0000
0.1000

Pekerja
Mandor

52,500.00
65,600.00
Jumlah
di bulatkan

104 Anl.L.5

Membongkar 1 M2 Lantai lama berikut membersihkannya


0.1000
Pekerja
52,500.00
0.0100
Mandor
65,600.00
Jumlah
di bulatkan

105 Anl.L.6

Mengupas plesteran tiap 1 M2


0.2000
Pekerja
0.0025
Mandor

52,500.00
65,600.00
Jumlah
di bulatkan

107 Anl.L.7

Menurunkan 1M2 atap genteng/sirap (jika dipakai kembali)


0.2000
Pekerja
52,500.00
0.0100
Mandor
65,600.00
Jumlah
di bulatkan

Jika bongkaran tidak dipakai lagi dihitung 1/2dari analisa L.7


108 Anl.L.8

Menurunkan 1M2 Atap Seng


0.0500
Pekerja
0.0100
Mandor

52,500.00
65,600.00
Jumlah
di bulatkan

109 Anl.L.9

Menurunkan 1M2 Rangka atap dari kayu


0.2000
Pekerja
0.0050
Mandor
0.0250
Tukang
0.0025
Kepala Tukang

52,500.00
65,600.00
78,800.00
91,900.00
Jumlah
di bulatkan

Jika bongkaran tidak dipakai lagi tukang dan kepala tukang dapat diabaikan
110 Anl.L.11

Membongkar 1 M2 loteng,dinding luar,lantai jembatan(dari kayu)


bagian atas,bawah dihitung terpisah

0.2000
0.0100
0.0600
0.0060

Pekerja
Mandor
Tukang
Kepala Tukang

52,500.00
65,600.00
78,800.00
91,900.00
Jumlah
di bulatkan

111 Anl.L.12

Membongkar 1 M3 Kuda-kuda,balok loteng,selasar jembatan,dsb


(kayu bongkaran dipakai lagi)
4.0000
Pekerja
52,500.00
0.2000
Mandor
65,600.00
6.0000
Tukang
78,800.00
0.6000
Kepala Tukang
91,900.00
Jumlah
di bulatkan

112 Anl.W.1

1 M3 Timbunan pasir timbun untuk dasar badan jalan dan digilas padat
0.3750
Pekerja
52,500.00
0.0190
Mandor
65,600.00
1.2000
M3
Pasir Urug
70,400.00
0.0005
0.0001 Biaya gilas
7,862,600.00
Jumlah
di bulatkan

113 Anl.W.1a

1M3 Timbunan Sirtu/kerikil kotor dipadatkan dengan mesin gilas


0.3750
Pekerja
52,500.00
0.0190
Mandor
65,600.00
1.1000
M3
Pasir Urug
70,400.00
0.0005
0.0001 Biaya gilas
7,862,600.00
Jumlah
di bulatkan

114 Anl.W.2

1M2 Memasang sub base/onderlaag batu kali tebal 15-20 cm padat


0.3750
Pekerja
52,500.00
0.0190
Mandor
65,600.00
0.2000
M3
Batu kali 15-20 cm
136,500.00
0.0500
M3
Pasir Urug
70,400.00
0.0001 Biaya gilas
7,862,600.00
Jumlah
utk tbl.5 cm

0.6667

52,802.25
di bulatkan

115 Anl.W.3

100 M2 Lapisan Base course/slytlaag batu guli 6 cm dipadatkan


7.5000
Pekerja
52,500.00
0.3750
Mandor
65,600.00
8.0000
M3
Batu Kerikil (A)
199,500.00
2.0000
M3
Pasir Urug
70,400.00
0.0267
Biaya gilas
7,862,600.00
Jumlah
untuk 1 M2
utk tbl 5 cm

116 Anl.W.3a

118 Anl.W.5

2,364,819.33
23,648.19
di bulatkan

100 M2 Lapisan Base course/slytlaag batu pecah tebal 6 cm dipadatkan


7.5000
Pekerja
52,500.00
0.3750
Mandor
65,600.00
8.0000
M3
Batu pecah 2-3 cm
283,500.00
2.0000
M3
Pasir Urug
70,400.00
0.0267
Biaya gilas
7,862,600.00

untuk 1 M2
utk tbl 5 cm

117 Anl.W.4

0.01
0.8333

0.0100
0.8333

Biaya Menggilas 1 bulan (25)hari


25.0000
Hr
Sewa mesin gilas
25.0000
Hr
Masinis
30.0000
Hr
Jaga Malam
500.0000
Ltr
Minyak Solar
15.0000
Ltr
Minyak silinder
4.0000
Ltr
Minyak Gerdang
5.0000
Kg
Minyak Gemuk
Pemeliharaan

3,036,819.33
30,368.19
di bulatkan

50,800.00
63,000.00
42,000.00
5,700.00
34,100.00
29,400.00
34,700.00
105,000.00
Jumlah
di bulatkan

100 M2 Mengaspal I jalan dengan aspal 2,5Kg/M2 dan digilas padat


10.0000
Pekerja
52,500.00
0.5000
Mandor
65,600.00
250.0000
Kg
Aspal AC 60/70
4,600.00
4.0000
M3
Batu pecah 3-5
258,300.00
2.2200
M3
Batu pecah 2-3
283,500.00
1.1100
M3
Batu pecah 1-2
341,300.00

119 Anl.W.7

0.7500
0.5000
0.0013

M3

untuk 1M2

0.0100 x

203,200.00
20,100.00
7,862,600.00
63,700.00
Jumlah
3,985,846.47
di bulatkan

100 M2 Mengaspal II jalan dengan aspal 1,5Kg/M2 dan digilas padat


8.0000
Pekerja
52,500.00
0.4000
Mandor
65,600.00
150.0000
Kg
Aspal AC 60/70
4,600.00
1.2000
M3
Splyt/kepala pasir
404,300.00
0.5000
M3
Kayu Api
203,200.00
0.3000
Tempat memasak aspal
20,100.00
0.0013
Biaya gilas
7,862,600.00
alat-alat mengaspal
63,700.00
Jumlah
untuk 1 M2

120 Anl.W5+W.7

Kayu Api
Tempat memasak aspal
Biaya gilas
alat-alat mengaspal

0.0100 x

1,803,213.47
di bulatkan

1 M2 Mengaspal Idan II permukaan badan jalan dengan aspal 4 Kg/ M2


(2,5 Kg/M2+1,5Kg/M2)2 kali siram
W.5
Mengaspal I
W.7
Mengaspal II
Jumlah
di bulatkan

Memperbaharui lapisan aspal lama/overpainting

121 Anl.W.5a

100 M2 Mengaspal Ijalan dengan aspal 2 KG/M2 dan digilas padat


10.0000
Pekerja
52,500.00
0.5000
Mandor
65,600.00
200.0000
Kg
Aspal AC 60/70
4,600.00
1.2000
M3
Batu kacang
414,800.00
0.6000
M3
Kayu api
203,200.00
0.5000
Tempat memasak aspal
20,100.00
0.0013
Biaya gilas
7,862,600.00
alat-alat mengaspal
63,700.00
Jumlah

untuk 1 M2

122 Anl.W.7a

0.0100 x

2,181,713.47
di bulatkan

100 M2 Mengaspal Iijalan dengan aspal 1 Kg/M2 dan digilas padat


8.0000
Pekerja
52,500.00
0.4000
Mandor
65,600.00
100.0000
Kg
Aspal AC 60/70
4,600.00
1.2000
M3
Splyt/kepala pasir
404,300.00
0.4000
M3
Kayu api
203,200.00
0.3000
Tempat memasak aspal
20,100.00
0.0013
Biaya gilas
7,862,600.00
alat-alat mengaspal
63,700.00
Jumlah
untuk 1 M2

0.0100 x

1,552,893.47
di bulatkan

123 Anl.W5a+W.7a Untuk mengaspal Idan II jalan dengan aspal 3 Kg/M2


2x siram (memperbaharui lapisan aspal lama/overpainting)
W.5a
Mengaspal I
W.7a
Mengaspal II
Jumlah
Memperbaharui lapisan aspal lama/overpainting
di bulatkan

39,375.00
1,640.00
41,015.00
41,015.00

10,253.75
10,253.75
10,254.00

52,500.00
2,164.80
54,664.80
54,665.00

17,325.00
656.00
17,981.00
17,981.00

15,750.00
656.00
84,480.00
100,886.00
100,886.00

15,750.00
656.00
81,960.00
98,366.00
98,366.00

15,750.00
656.00
144,900.00

161,306.00
161,306.00

262,500.00
16,400.00
1,182,000.00
137,850.00
1,598,750.00
799,375.00
6,246,130.00
3,260.00
6,249,390.00
7,048,765.00
7,048,765.00

14,700.00
918.40
63,040.00
7,352.00
86,010.40
103,212.48
203,766.00
3,260.00
310,238.48
310,238.00

5,250.00
328.00
7,880.00
919.00
83,471.01
4,075.00
101,923.01
101,923.00

k, reng dan gording)

7,875.00
492.00
7,880.00
919.00
141,957.50
1,630.00
160,753.50
160,754.00

787.50
492.00
7,880.00
919.00
62,461.30
1,630.00
74,169.80
74,170.00

787.50
492.00
7,880.00
919.00
70,978.75
1,956.00
83,013.25
83,013.00

14,700.00
918.40
63,040.00
7,352.00
251,690.40
1,840.00
339,540.80
339,541.00

420,000.00
26,240.00
1,891,200.00

220,560.00
2,558,000.00
1,279,000.00
11,177,210.00
12,456,210.00
12,456,210.00

630,000.00
39,360.00
2,836,800.00
330,840.00
3,837,000.00
1,918,500.00
11,177,210.00
13,095,710.00
13,095,710.00

630,000.00
39,360.00
2,836,800.00
330,840.00
3,837,000.00
1,918,500.00

11,177,210.00
244,519.20
16,300.00
11,438,029.20
13,356,529.20
13,356,529.00

735,000.00
45,920.00
3,309,600.00
385,980.00

4,476,500.00
2,238,250.00

11,177,210.00
13,415,460.00
13,415,460.00

131,250.00
8,200.00
591,000.00
68,925.00
799,375.00
399,687.50

448,285.20
847,972.70
847,973.00

68,250.00
4,264.00
315,200.00
36,760.00
424,474.00
212,237.00

141,957.50
56,400.00
3,680.00
202,037.50
414,274.50
414,275.00

68,250.00
4,264.00
315,200.00

36,760.00
424,474.00
233,460.70

141,957.50
92,900.00
4,600.00
239,457.50
472,918.20
472,918.00

157,500.00
9,840.00
709,200.00
82,710.00
959,250.00
479,625.00
5,194.81
631,187.20
636,382.01
1,116,007.01
1,116,007.00

105,000.00
6,560.00
472,800.00
55,140.00
639,500.00
319,750.00
157,800.00
345,180.50
502,980.50
822,730.50
822,731.00

14,700.00
918.40

63,040.00
7,352.00
86,010.40
64,507.80

117,810.00
3,260.00
121,070.00
185,577.80
185,578.00

14,700.00
918.40
63,040.00
7,352.00
86,010.40
43,005.20
111,265.00
3,260.00
114,525.00
157,530.20
157,530.00

14,700.00
918.40
63,040.00
7,352.00
86,010.40
25,803.12
78,360.54
19,740.00
2,760.00
100,860.54
126,663.66
126,664.00

14,700.00
918.40
63,040.00
7,352.00
86,010.40
34,404.16
78,360.54
39,480.00
4,600.00
122,440.54
156,844.70
156,845.00

7,350.00
4,592.00
31,520.00
3,676.00
85,174.50
74,320.00
4,600.00
211,232.50
211,233.00

7,350.00
4,592.00
31,520.00
3,676.00
70,978.75
37,160.00
4,600.00
159,876.75
159,877.00

52,500.00
3,280.00
236400

Pekerja

Pekerja

Pekerja

Pekerja

27570
156750
12250
488,750.00
488,750.00

78,750.00
4,920.00
236,830.00
320,500.00
320,500.00

822,528.00
89,775.00
912,303.00
912,303.00

629,944.00
102,060.00
732,004.00
732,004.00

189,000.00
11,808.00
94,560.00
11,028.00
199,080.00
216,580.00
45,927.00
767,983.00
767,983.00

189,000.00
11,808.00
94,560.00
11,028.00
199,080.00
228,004.00
49,329.00

Mandor
Mandor
Mandor
Mandor
Tukang
Tukang
Tukang
Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang

782,809.00
782,809.00

236,250.00
14,760.00
118,200.00
13,785.00
468,000.00
177,312.80
38,367.00
1,066,674.80
1,066,675.00

236,250.00
14,760.00
118,200.00
13,785.00
468,000.00
288,215.20
31,468.50
1,170,678.70
1,170,679.00

315,000.00
19,680.00
78,800.00
9,190.00
165,585.00
51,030.00
476,000.00
1,115,285.00
1,115,285.00

315,000.00
19,680.00
78,800.00
9,190.00
155,610.00
43,942.50
542,399.20

1,164,621.70
1,164,622.00

cor dibawah air'


315,000.00
19,680.00
39,400.00
4,595.00
191,520.00
45,360.00
417,928.00
1,033,483.00
1,033,483.00

315,000.00
19,680.00
39,400.00
4,595.00
199,500.00
47,250.00
350,095.20
975,520.20
975,520.00

315,000.00
19,680.00
39,400.00
4,595.00
199,500.00
296,548.00
47,250.00
921,973.00
921,973.00

21,000.00
1,312.00
11,820.00
1,378.50
9,996.00
1,077.30

46,583.80
46,584.00

21,000.00
1,312.00
15,760.00
1,838.00
14,996.80
1,615.95
56,522.75
56,523.00

21,000.00
1,312.00
15,760.00
1,838.00
11,424.00
1,833.30
53,167.30
53,167.00

21,000.00
1,312.00
11,820.00
1,378.50
7,543.20
1,228.50
44,282.20
44,282.00

21,000.00
1,312.00
11,820.00
1,378.50
6,070.40
1,313.55
42,894.45
42,894.00

21,000.00
1,312.00
15,760.00
1,838.00
9,116.80
1,975.05
51,001.85
51,002.00

21,000.00
7,880.00
87,400.00
11,340.00
127,620.00
127,620.00

37,800.00
2,361.60
10,638.00
1,240.65
13,965.00
4,158.00
25,463.20
95,626.45
95,626.00

15,750.00
984.00
7,880.00
919.00
25,533.00

10,665.60
4,284.00
661.50
15,611.10
41,144.10
41,144.00

15,665.10
4,284.00
661.50
28,086.30
48,696.90
48,697.00

22,695.00
4,284.00
661.50
28,086.30
55,726.80
55,727.00

67,065.00
4,284.00
661.50
31,916.25
103,926.75
103,927.00

71,910.00
4,284.00
661.50
31,916.25
108,771.75
108,772.00

26,250.00
1,640.00
19,700.00
2,297.50
70,000.00
7,946.40
216.00
8,880.00
2,173.50
139,103.40
139,103.00

26,250.00
1,640.00
19,700.00
2,297.50
67,500.00
7,946.40
216.00
8,880.00
2,173.50
136,603.40
136,603.00

26,250.00
1,640.00
19,700.00
2,297.50
67,771.00
7,946.40
216.00
8,880.00
2,173.50
136,874.40
136,874.00

26,250.00
1,640.00
19,700.00
2,297.50
73,750.00
7,946.40
216.00
8,880.00
2,173.50
142,853.40
142,854.00

26,250.00
1,640.00

19,700.00
2,297.50
49,887.50
56,123.44
293,750.00
7,946.40
216.00
8,880.00
2,173.50
312,965.90
369,089.34
369,090.00

26,250.00
1,640.00
19,700.00
2,297.50
49,887.50
62,359.38
383,084.00
7,946.40
216.00
8,880.00
2,173.50
402,299.90
464,659.28
464,660.00

26,250.00
1,640.00
19,700.00
2,297.50
49,887.50
49,887.50
272,195.00
7,946.40
216.00

8,880.00
2,173.50
291,410.90
341,298.40
341,300.00

26,250.00
1,640.00
19,700.00
2,297.50
49,887.50
56,123.44
271,875.00
7,946.40
216.00
8,880.00
2,173.50
291,090.90
347,214.34
347,210.00

26,250.00
1,640.00
19,700.00
2,297.50
49,887.50
62,359.38
362,512.00
7,946.40
216.00
8,880.00
2,173.50
381,727.90
444,087.28
444,090.00

52,500.00
3,280.00

39,400.00
4,595.00
99,775.00
70,000.00
13,684.55
83,684.55
183,459.55
183,460.00

52,500.00
3,280.00
39,400.00
4,595.00
67,500.00
13,684.55
180,959.55
180,960.00

52,500.00
3,280.00
39,400.00
4,595.00
70,000.00
13,684.55
183,459.55
183,460.00

52,500.00
3,280.00
39,400.00
4,595.00
67,771.00
13,684.55
181,230.55
181,231.00

52,500.00
3,280.00
39,400.00

4,595.00
73,750.00
13,684.55
187,209.55
187,210.00

293,750.00
13,684.55
124,718.75
432,153.30
432,153.00

383,084.00
13,684.55
149,662.50
546,431.05
546,431.00

271,875.00
13,684.55
124,718.75
410,278.30
410,278.00

362,512.00
13,684.55
149,662.50
525,859.05
525,859.00

315,000.00
19,680.00
78,800.00
9,190.00
165,585.00
51,030.00
476,000.00

1,115,285.00
1,115,285.00

472,500.00
709,200.00
275,700.00
1,457,400.00
728,700.00

1,727,000.00
36,600.00
1,763,600.00
2,492,300.00

an 125 Kg besi yaitu :


3,115,375.00
3,115,375.00

10,500.00
656.00
39,400.00
4,595.00
55,151.00
551,510.00

73,600.00
1,785,000.00
1,858,600.00
2,410,110.00
2,410,110.00

1,115,285.00
3,115,375.00
2,410,110.00
6,640,770.00

26,250.00
1,640.00
12,600.00
368.00
8,100.00
48,958.00
48,958.00

26,250.00
1,640.00
59,220.00
368.00
87,478.00
87,478.00

2,758.00
32,165.00
15,010.00
3,402.00
3,318.00
4,800.00
61,453.00
61,453.00

2,625.00
11,820.00
2,297.50
120.00
2,486.00
6,000.00
22,855.00
48,203.50
48,204.00

2,625.00
11,820.00
2,297.50
120.00
2,486.00
6,050.00

27,265.00
52,663.50
52,664.00

2,625.00
11,820.00
2,297.50
879.20
120.00
2,486.00
6,050.00
101,600.00
127,877.70
127,878.00

5,250.00
328.00
15,760.00
1,838.00
56,202.00
3,000.00
82,378.00
82,378.00

5,250.00
328.00
15,760.00
1,838.00
56,376.00
3,000.00
82,552.00
82,552.00

5,250.00
328.00
15,760.00
1,838.00
40,480.00
2,000.00
65,656.00

65,656.00

5,250.00
328.00
15,760.00
1,838.00
144,760.00
2,000.00
169,936.00
169,936.00

1,312.50
5,910.00
689.25
43,340.00
2,000.00
53,251.75
53,252.00

2,100.00
131.20
1,576.00
183.80
51,100.00
2,196.01
57,287.01
57,287.00

13,125.00
984.00
31,520.00
3,676.00
31,375.00
7,900.00
88,580.00
88,580.00

15,750.00
984.00

39,400.00
4,595.00
37,650.00
7,900.00
106,279.00
106,279.00

1,312.50
721.60
29,550.00
3,446.25
26,104.00
7,900.00
69,034.35
69,034.00

262,500.00
16,400.00
591,000.00
68,925.00
938,825.00
9,388.25
9,388.00

28,164.00
8,712.50
36,876.50
36,877.00

18,776.00
5,801.50
24,577.50
24,578.00

28,164.00
16,490.00
1,200.00

45,854.00
45,854.00

18,776.00
10,980.40
1,200.00
30,956.40
30,956.00

9,388.00
3,936.48
13,324.48
13,324.00

28,164.00
22,312.50
50,476.50
50,477.00

18,776.00
14,857.50
33,633.50
33,634.00

28,164.00
25,160.00
1,200.00
54,524.00
54,524.00

28,164.00
27,412.50
1,200.00
56,776.50
56,777.00

rsihkan batas-batasnya

105000
6,560.00
111,560.00
111,560.00

5250
656.00
5,906.00
5,906.00

10500
164.00
10,664.00
10,664.00

10500
656.00
11,156.00
11,156.00

2625
656.00
3,281.00
3,281.00

10,500.00
328.00
1,970.00
229.75
13,027.75
13,028.00

10,500.00
656.00
4,728.00
551.40
16,435.40
16,435.00

210,000.00
13,120.00
472,800.00
55,140.00
751,060.00
751,060.00

19,687.50
1,246.40
84,480.00
3,931.30
109,345.20
109,345.00

19,687.50
1,246.40
77,440.00
3,931.30
102,305.20
102,305.00

19,687.50
1,246.40
27,300.00
3,520.00
1,048.35
52,802.25
35,201.50
35,201.00

393,750.00
24,600.00
1,596,000.00
140,800.00
209,669.33
2,364,819.33
23,648.19
19,706.83
19,707.00

393,750.00
24,600.00
2,268,000.00
140,800.00
209,669.33
3,036,819.33
30,368.19
25,306.83
25,307.00

1,270,000.00
1,575,000.00
1,260,000.00
2,850,000.00
511,500.00
117,600.00
173,500.00
105,000.00
7,862,600.00
7,862,600.00

525,000.00
32,800.00
1,150,000.00
1,033,200.00
629,370.00
378,843.00

152,400.00
10,050.00
10,483.47
63,700.00
3,985,846.47
39,858.46
39,858.00

420,000.00
26,240.00
690,000.00
485,160.00
101,600.00
6,030.00
10,483.47
63,700.00
1,803,213.47
18,032.13
18,032.00

39,858.00
18,032.00
57,890.00
57,890.00

525,000.00
32,800.00
920,000.00
497,760.00
121,920.00
10,050.00
10,483.47
63,700.00
2,181,713.47

21,817.13
21,817.00

420,000.00
26,240.00
460,000.00
485,160.00
81,280.00
6,030.00
10,483.47
63,700.00
1,552,893.47
15,528.93
15,529.00

21,817.00
15,529.00
37,346.00
37,346.00

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Tukang
Tukang
Tukang
Tukang
Tukang
Tukang
Tukang
Tukang
Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Tukang
Tukang
Tukang
Tukang
Tukang
Tukang
Tukang
Tukang
Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Tukang
Tukang
Tukang
Tukang
Tukang
Tukang
Tukang
Tukang
Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Tukang
Tukang
Tukang
Tukang
Tukang
Tukang
Tukang
Tukang
Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Tukang
Tukang
Tukang
Tukang
Tukang
Tukang
Tukang
Tukang
Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Tukang
Tukang
Tukang
Tukang
Tukang
Tukang
Tukang
Tukang
Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Tukang
Tukang
Tukang
Tukang
Tukang
Tukang
Tukang
Tukang
Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Tukang
Tukang
Tukang
Tukang
Tukang
Tukang
Tukang
Tukang
Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Tukang
Tukang
Tukang
Tukang
Tukang
Tukang
Tukang
Tukang
Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Tukang
Tukang
Tukang
Tukang
Tukang
Tukang
Tukang
Tukang
Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Tukang
Tukang
Tukang
Tukang
Tukang
Tukang
Tukang
Tukang
Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Tukang
Tukang
Tukang
Tukang
Tukang
Tukang
Tukang
Tukang
Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Tukang
Tukang
Tukang
Tukang
Tukang
Tukang
Tukang
Tukang
Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Tukang
Tukang
Tukang
Tukang
Tukang
Tukang
Tukang
Tukang
Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Tukang
Tukang
Tukang
Tukang
Tukang
Tukang
Tukang
Tukang
Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Tukang
Tukang
Tukang
Tukang
Tukang
Tukang
Tukang
Tukang
Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Tukang
Tukang
Tukang
Tukang
Tukang
Tukang
Tukang
Tukang
Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Tukang
Tukang
Tukang
Tukang
Tukang
Tukang
Tukang
Tukang
Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Tukang
Tukang
Tukang
Tukang
Tukang
Tukang
Tukang
Tukang
Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Tukang
Tukang
Tukang
Tukang
Tukang
Tukang
Tukang
Tukang
Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Tukang
Tukang
Tukang
Tukang
Tukang
Tukang
Tukang
Tukang
Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Tukang
Tukang
Tukang
Tukang
Tukang
Tukang
Tukang
Tukang
Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Tukang
Tukang
Tukang
Tukang
Tukang
Tukang
Tukang
Tukang
Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Tukang
Tukang
Tukang
Tukang
Tukang
Tukang
Tukang
Tukang
Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Pekerja

Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Tukang
Tukang
Tukang
Tukang
Tukang
Tukang
Tukang
Tukang
Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang

Pekerja

Pekerja

Pekerja

Mandor
Mandor
Mandor
Tukang
Tukang
Tukang
Kepala Tukang
Kepala Tukang
Kepala Tukang

No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30

Analisa
Anl.A.1
Anl.1/4.A.1
Anl.A.2
Anl.A.6
Anl.A.13
Anl.A.18.a
Anl.A.18.b
Anl.F.1
Anl.F.1.a
Anl.F.16
Anl.F.16.a
Anl.F.19
Anl.F.19.a
Anl.F.21
Anl.F.22
Anl.F.27
Anl.F.27a
Anl.F.28
Anl.F.33
Anl.F.30
Anl.F.30a
Anl.F.34
Anl.F.36
Anl.F.37
Anl.F.37a
Anl.F.37b
Anl.F.37c
Anl.F.37d
Anl.F.37e
Anl.F.60

31
32
33
34
35
36
37
38
39
40

Anl.G.2
Anl.G.14
Anl.G.16
Anl.G31.h
Anl.G31.m
Anl.G32.h
Anl.G32.m
Anl.G.41
Anl.G.41a
Anl.G.42

41
42
43
44
45
46
47

Anl.G.43
Anl.G.44
Anl.G.50.h
Anl.G.50.h1
Anl.G50.i
Anl.G50.k
Anl.G50.q

48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99

Anl.G50.q1
Anl.G.60
Anl.G.67
Anl.G.68
Anl.G.68a
Anl.G.68b
Anl.G.68c
Anl.G.68d
Anl.G.72
Anl.G.72a
Anl.G.72b
Anl.G.72c
Anl.G.72d
Anl.G.72e
Anl.G.72f
Anl.G.72g
Anl.G.72h
Anl.Supl.IV
Anl.Supl.Iva
Anl.Supl.Ivb
Anl.Supl.Ivc
Anl.Supl.Ivd
Anl.Supl.Ive
Anl.Supl.Ivf
Anl.Supl.Ivg
Anl.Supl.Ivh
Supl.V
Anl.G.41
Anl.I.2
Anl.F.8
Anl.Supl.VIII
Anl.Supl.VIIIa
Anl.Taksir (a)
Anl.Taksir (b)
Anl.Taksir (c)
Anl.Taksir (d)
Anl.Taksir (e)
Anl.Taksir (f)
Anl.Taksir (g)
Anl.Taksir (h)
Anl.H.2
Anl.H.2a
Anl.H.8
Anl.H.8a
Anl.H.8b
Anl.H.8c
Anl.H.10
Anl.H.10a
Anl.H.15
Anl.H.17
Anl.H.18
Anl.K.23

100
101
102
103
104
105
106
107
108
109

Anl.K.23a
Anl.K.23a1
Anl.K.23b
Anl.K.23b1
Anl.K.23c
Anl.K.23d
Anl.K.23d1
Anl.K.23e
Anl.K.23f
Anl.L.4

110
111
112
113
114
115

Anl.L.5
Anl.L.6
Anl.L.7
Anl.L.8
Anl.L.9
Anl.L.11

116 Anl.L.12
117
118
119
120
121
122
123
124
125
126
127
128

Anl.W.1
Anl.W.1a
Anl.W.2
Anl.W.3
Anl.W.3a
Anl.W.4
Anl.W.5
Anl.W.7
Anl.W5+W.7
Anl.W.5a
Anl.W.7a
Anl.W5a+W.7a

Pekerjaan
1 M3 Galian tanah
1 M3 Urugan kembali galian tanah
1 M3 Galian tanah keras
1 M3 Angkut tanah Max.30 M'
1 M3 Pasir urug
1 M3 Urugan tanah
1 M3 Urugan sirtu
1 M3 Gantungan / Rangka Plafond
1 M2 Piyan Papan Rider (STRIP)
1 M2 Rangka atap (pasang usuk dan reng utk atap genteng dan sirap
1 M2 Rangka atap genteng biasa /genteng semen (pasang usuk,reng dan gording)
1 M2 Rangka atap seng dan Asbes Gelombang Kayu
1 M2 Rngja atap genteng metal dan Genteng asbes kayu
1 M2 Lypstplank
1 M3 Konstruksi kayu kuda - kuda
1 M3 Kozen pintu / jendela tanpa jalusi
1 M3 Kozen pintu / jendela dengan jalusi
1 M3 Kozen yang berlobang cahaya berbentuk busur
1 M2 Pintu / jendela panel
1 M2 Daun pintu triplek 4 mm double
1 M2 Daun pintu triplek sungkai double rangka kayu meranti :
1 M2 Pintu / jendela jalusi
1 M2 Pintu / jendela kaca
1 M2 Dinding papan dilidah / alur
1 M2 Dinding papan susun sirih
1 M2 Dinding triplek 4 mm rangka kayu meranti
1 M2 Dinding double triplek 4 mm rangka kayu meranti
1 M2 Dinding double triplek sungkai rangka kayu meranti
1 M2 Dinding single triplek sungkai rangka kayu meranti
1 M' Memasang cerocok kayu laut 1 btg panjang 2,5 M
Masuk ke dalam tanah 1,5 - 2 3"-4"
1 M3 Lantai kerja batu kosong
1 M3 Perekat 1:2
1 M3 Perekat 1:3
1 M3 Pasangan batu belah atau batu kali 1:4
1 M3 Pasangan batu belah atau batu kali 1:3
1 M3 Pasangan batu bata 1:4
1 M3 Pasangan batu bata 1:2 (Trasraam)
1 M3 Beton cor 1:2:3
1 M3 Beton cor 1 : 1,5 : 2,5
1 M3 Beton cor 1:2:4 dipakai utk lantai ubin,beton yg dicor
dibawah air,lapisan turap
1 M3 Beton cor 1:2,5:5
1 M3 Beton cor 1:3:5
1 M2 Plesteran 1:2 tebal 10 mm (Trasraam)
1 M2 Plesteran 1:2 tebal 15 mm (Trasraam)
1 M2 Plesteran 1:3 tebal 15 mm
1 M2 Plesteran 1:3 tebal 10mm
1 M2 Plesteran 1:4 tebal 10mm

Harga
41,015.00
10,254.00
54,665.00
17,981.00
100,886.00
98,366.00
161,306.00
7,048,765.00
310,238.00
101,923.00
160,754.00
74,170.00
83,013.00
339,541.00
12,456,210.00
13,095,710.00
13,356,529.00
13,415,460.00
847,973.00
414,275.00
472,918.00
1,116,007.00
822,731.00
185,578.00
157,530.00
126,664.00
156,845.00
211,233.00
159,877.00
488,750.00
320,500.00
912,303.00
732,004.00
767,983.00
782,809.00
1,066,675.00
1,170,679.00
1,115,285.00
1,164,622.00
1,033,483.00
975,520.00
921,973.00
46,584.00
56,523.00
53,167.00
44,282.00
42,894.00

1 M2 Plesteran 1:4 tebal 15mm


1 M2 Memasang Coneblock
1 M2 Lantai beton tebal 7 cm.1:3:6 diplester tebal 6 mm
1 M' Pasang Plint Tegel PC.10x30 cm
1 M' Pasang Plint Keramik 15x30 cm
1 M' Pasang Plint Keramik 15x40 cm
1 M' Pasang Plint Granito 15x40 cm
1 M' Pasang Plint Keramik Essenza 15x40 cm
1 M2 Lantai Keramik Uk.10x20 cm
1 M2 Lantai Keramik Uk.20x20 cm
1 M2 Lantai Keramik Uk.30x30 cm
1 M2 Pasang Lantai Keramik 40x40 cm
1 M2 Pasang Lantai Keramik Essenza 40x40 cm
1 M2 Pasang Lantai Keramik Essenza 60x60 cm
1 M2 Lantai Granito Uk. 30x30 cm
1 M2 Pasang Lantai Granito 40x40 cm
1 M2 Pasang Lantai Granito 60x60 cm
1 M2 Pas.Keramik dinding Uk.10x20 cm
1 M2 Pas.Keramik dinding Uk.20x20 cm
1 M2 Pas.Keramik dinding Uk.20x25 cm
1 M2 Pas.Keramik dinding Uk.30x30 cm
1 M2 Pas.Keramik dinding Uk.40x40 cm
1 M2 Pas.Keramik dinding Essenza Uk.40x40 cm
1 M2 Pas.Keramik dinding Essenza Uk.60x60 cm
1 M2 Pas.Keramik dinding Granito Uk.40x40 cm
1 M2 Pas.Keramik dinding Granito Uk.60x60 cm
Untuk beton bertulang
1 M3 Beton cor 1:2:3
Mengerjakan (memotong/memasang)110 kg besi untuk beton bertulang
1 M3 beton bertulang diperlukan 10 M2 papan bekisting
1 M2 Plafond Asbes 1x1 m
1 M2 Plafond triplek 4 mm
1 M2 Gypsum Rangka Partisi Metal Sistem
1 M2 Gypsum board 6 mm (partisi)
1 M2 Gypsum board 9 mm (partisi)
1 M2 Gypsum board 12 mm (partisi)
1 M2 Frame Celling Concealed
1 M2 Frame Celling Exposed
1 M2 Celling Gypsum Board 6 mm (standard)
1 M2 Celling Gypsum Board 9 mm (standard)
1 M2 Pasangan Atap Genteng beton warna
1 M2 Pasangan Atap Genteng Keramik
1 M2 Pasangan Atap Asbes Gelombang
1 M2 Pasangan Atap Seng BJLS 35 K
1 M2 Pasangan Atap Asbes Motif Genteng
1 M2 Pasangan Atap Genteng Metal Roof
1 M' Rabung seng BJLS 35 K
1 M' Rabung Genteng
1 M' Talang Patahan Seng 35 K
1 M' Talang Datar seng 35 K bentuk1/2 lingkaran
1 M' Pipa Talang Seng 35 K 10 cm
100 M2 Upah Mengecat

51,002.00
127,620.00
95,626.00
41,144.00
48,697.00
55,727.00
103,927.00
108,772.00
139,103.00
136,603.00
136,874.00
142,854.00
369,090.00
464,660.00
341,300.00
347,210.00
444,090.00
183,460.00
180,960.00
183,460.00
181,231.00
187,210.00
432,153.00
546,431.00
410,278.00
525,859.00
6,640,770.00
1,115,285.00
3,115,375.00
2,410,110.00
48,958.00
87,478.00
61,453.00
48,204.00
52,664.00
127,878.00
74,603.00
61,304.00
55,528.00
59,938.00
91,455.00
199,755.00
82,378.00
82,552.00
65,656.00
169,936.00
53,252.00
57,287.00
88,580.00
106,279.00
69,034.00
9,388.00

1 M2 Cat Tembok (3 x cat)


1 M2 Cat Tembok (2 x cat)
1 M2 Cat Kilat (3 x cat)
1 M2 Cat Kilat (2 x cat)
1 M2 Cat Menie (1 x cat)
1 M2 Cat Vernis (3 x cat)
1 M2 Cat Vernis (2 x cat)
1 M2 Cat Sending (3 x cat)
1 M2 Cat Melamix (3 x cat)
Membongkar 1 M3 Lantai Lama berikut membersihkan
batas - batasnya
Membongkar 1 M2Lantai Lama berikut membersihkannya
Mengupas plesteran tiap 1 M2
Menurunkan 1 M2 atap genteng / sirap (jika dipakai kembali)
Menurunkan 1 M2 atap seng
Menurunkan Rangka Atap dari kayu
Membongkar 1M2 loteng,dinding luar,lantai jembatan (dari kayu)bagian
atas dihitung terpisah
Maembongkar 1 M3 Kuda - kuda,balok loteng,selasar jembatan dsb(kayu
bongkaran dipakai lagi)
1 M3 Timbunan pasir timbun untuk dasar badan jalan dan digilas padat
1 M3 Timbunan sirtu / kerikilkotor dipadatkan dengan mesin gilas
1 M2 Memasang sub base / onderlaag batu kali tebal 15-20 cm padat
100 M2 Lapisan Base Course / stylaag batu guli 6 cm dipadatkan
100 M2 Lapisan Base Course / stylaag batu pecah 6 cm dipadatkan
Biaya menggilas 1 bulan (25 hari)
100 M2 Mengaspal I jalan dengan aspal 2,5 kg / M2 dan digilas padat
100 M2 Mengaspal II jalan dengan aspal 1,5 kg / M2 dan digilas padat
1 M2 Mengaspal I dan II permukaan badan jalan dengan aspal 4 kg / M2
100 M2 Mengaspal I jalan dengan aspal 2 kg / M2 dan digilas padat
100 M2 Mengaspal II jalan dengan aspal 1 kg / M2 dan digilas padat
Untuk 1 M2 mengaspal I dan II jaln dengan aspal 3 kg / M2

36,877.00
24,578.00
45,854.00
30,956.00
13,324.00
50,477.00
33,634.00
54,524.00
56,777.00
111,560.00
5,906.00
10,664.00
11,156.00
3,281.00
13,028.00
16,435.00
751,060.00
109,345.00
102,305.00
35,201.00
19,707.00
25,307.00
7,862,600.00
39,858.00
18,032.00
57,890.00
21,817.00
15,529.00
37,346.00

Anda mungkin juga menyukai