KEGIATAN
PEKERJAAN
VOLUME
LOKASI
:
:
NO.
I.
II.
URAIAN PEKERJAAN
PEKERJAAN PERSIAPAN
1 Pengukuran/Pemasangan Profil
2 Mobilisasi
3 Administrasi Proyek
PEKERJAAN JALAN
1 Pengupasan/Pembersihan Damija
2 LPA Klas A
3 Lapisan Penetrasi Macadam (Lapen)
III.
1
2
3
4
5
ANALISA
Ls
Ls
Ls
K. 210
K. 520
K. 618
IV.
PEKERJAAN PERBAIKAN SALURAN ( P = 50 M' )
1 Pasangan Batu Gunung/Kali
K. 810
2 Plasteran 1: 4 tebal 10 mm
G. 50o
Terbilang
VOLUME
1.00 Pkt
1.00 Pkt
1.00 Pkt
407.00 M2
79.00 M3
1,750.00 M2
3.50
2.88
7.50
2.40
0.96
M3
M3
M2
M2
M3
HARGA
SATUAN
(Rp.)
1,100,000.00
1,650,000.00
1,100,000.00
SUB TOTAL
JUMLAH
HARGA
(Rp.)
1,100,000.00
1,650,000.00
1,100,000.00
3,850,000.00
1,609.06
654,887.42
145,568.50
11,499,911.50
66,007.93
115,513,877.50
SUB TOTAL 127,668,676.42
22,693.00
488,774.00
34,663.20
74,822.00
3,040,436.05
SUB TOTAL
79,425.50
1,407,669.12
259,974.00
179,572.80
2,918,818.61
4,845,460.03
4.50 M3
40.00 M2
488,774.00
2,199,483.00
34,663.20
1,386,528.00
SUB TOTAL
3,586,011.00
TOTAL
139,950,147.45
DIBULATKAN
139,950,000.00
: Seratus Tiga Puluh Sembilan Juta Sembilan Ratus Lima Puluh ribu rupiah,-
ABD. MUTHALIB. AR
Direktur
SYAHRIAL. A, ST
Nip. 390 013 973
PEKERJAAN
VOLUME
604.00 M'
LOKASI
NO.
I.
II.
URAIAN PEKERJAAN
ANALISA
HARGA
SATUAN
(Rp.)
VOLUME
JUMLAH
HARGA
(Rp.)
PEKERJAAN PERSIAPAN
1 Pengukuran/Pemasangan Profil
Ls
1.00 Pkt
1,100,000.00
1,100,000.00
2 Mobilisasi
Ls
1.00 Pkt
1,650,000.00
1,650,000.00
3 Administrasi Proyek
Ls
1.00 Pkt
1,100,000.00
1,100,000.00
SUB TOTAL
3,850,000.00
PEKERJAAN JALAN
1 Pengupasan/Pembersihan Damija
K. 210
461.00
2 LPA Klas A
K. 520
93.70
K. 618
1,844.00
Terbilang
M2
1,609.06
741,776.66
145,568.50
13,639,768.45
66,007.93
121,718,622.92
SUB TOTAL
136,100,168.03
TOTAL
139,950,168.03
DIBULATKAN
139,950,000.00
: Seratus Tiga Puluh Sembilan Juta Sembilan Ratus Lima Puluh Ribu Rupiah,-
ABD. MUTHALIB. AR
Direktur
SYAHRIAL. A, ST
Nip. 390 013 973
:
:
:
:
NO.
URAIAN PEKERJAAN
I.
1
2
3
PEKERJAAN PERSIAPAN
Pengukuran/Pemasangan Profil
Mobilisasi
Administrasi Proyek
II.
1
2
3
PEKERJAAN JALAN
Pengupasan/Pembersihan Damija
LPA Klas A
Lapisan Penetrasi Macadam (Lapen)
III.
1
2
3
4
5
IV.
1
2
ANALISA
3
SELISIH
VOLUME
4
HARGA
JUMLAH
SATUAN
HARGA
(Rp.)
(Rp.)
PEKERJAAN TAMBAH
JUMLAH
VOLUME
JUMLAH
JUMLAH
VOLUME
HARGA
R EALI SAS I
PEKERJAAN KURANG
VOLUME
HARGA
(Rp.)
HARGA
10
11
13
1.00 Pkt
1.00 Pkt
1.00 Pkt
1,100,000.00
1,650,000.00
1,100,000.00
SUB TOTAL
1,100,000.00
1,650,000.00
1,100,000.00
3,850,000.00
1.00
1.00
1.00
1,100,000.00
1,650,000.00
1,100,000.00
3,850,013.00
K. 210
K. 520
K. 618
407.00 M2
79.00 M3
1,750.00 M2
1,609.06
145,568.50
66,007.93
SUB TOTAL
654,887.42
11,499,911.50
115,513,877.50
127,668,676.42
54.00
14.70
94.00
86,889.24
2,139,856.95
6,204,745.42
8,431,499.61
461.00
93.70
1,844.00
741,776.66
13,639,768.45
121,718,622.92
136,100,168.03
K. 224
K. 810
G. 50o
G. 67
Supl. Vb
3.50
2.88
7.50
2.40
0.96
22,693.00
488,774.00
34,663.20
74,822.00
3,040,436.05
SUB TOTAL
79,425.50
1,407,669.12
259,974.00
179,572.80
2,918,818.61
4,845,460.03
3.50
2.88
7.50
2.40
0.96
79,425.50
1,407,669.12
259,974.00
179,572.80
2,918,818.61
4,845,460.03
488,774.00
34,663.20
SUB TOTAL
2,199,483.00
1,386,528.00
3,586,011.00
139,950,147.45
139,950,000.00
2,199,483.00
1,386,528.00
3,586,011.00
8,431,471.03
8,431,000.00
139,950,181.03
139,950,000.00
Ls
Ls
Ls
K. 810
G. 50o
M3
M3
M2
M2
M3
4.50 M3
40.00 M2
4.50
40.00
8,431,499.61
8,431,000.00
Disetujui Oleh :
Pengelola Teknis Kegiatan
Dinas Kimpraswil Kab. Aceh Besar,
Diperiksa Oleh:
Konsultan Supervisi
CV. RISCA ENGGINEERING CONSULTANT
Dihitung Oleh:
Kontraktor Pelaksana
CV. BEUNA MEUFAKAT
S YA F E I
ABD. MUTHALIB. AR
Direktris
Direktur