Analisa Harga Satuan Pekerjaan Persiapan

No.
A-01

URAIAN

SATUAN

1 M' Pagar Sementara Dari Kayu Tinggi 2 m


Dolken Kayu 8-10 / 400 cm
Semen Portland
Pasir beton
Koral Beton 2/3
Kayu balok terentang
Paku Biasa 2" - 5"
Residu
Pekerja
Tukang Kayu

Btg
Kg
M3
M3
M3
Kg
Kg
Oh
Oh

1.25
2.5
0.005
0.009
0.072
0.06
0.4
0.4
0.2

Oh

0.02

Mandor
Oh
Jumlah
Dibulatkan
1 M' Pagar Sementara Seng Gelombang Tinggi 2 m
Dolken Kayu 8-10 / 400 cm
Btg
Semen Portland
Kg
Seng Gelombang BJLS-30
Lbr
Pasir beton
M3
Koral Beton 2/3
M3
Kayu balok terentang
M3
Paku Biasa 2" - 5"
Kg
Meni Besi
Kg
Pekerja
Oh
Tukang Kayu
Oh

0.02

Kepala Tukang

A-02

A-03

VOLUM
E

Kepala Tukang

Mandor
Jumlah
Dibulatkan
1 M' Pagar SementaraKawat Duri Tinggi 1,80
m
Dolken Kayu 8-10 / 400 cm
Semen Portland
Kawat Duri
Pasir beton
Koral Beton 2/3
Paku Biasa 2" - 5"

1.25
2.5
1.2
0.005
0.009
0.072
0.06
0.45
0.4
0.2

Oh

0.02

Oh

0.02

Btg
Kg
Kg
M3
M3
Kg

1
2
2.5
0.005
0.009
0.06

Pekerja
Tukang Kayu

Oh
Oh

0.3
0.2

Kepala Tukang

Oh

0.02

A-04

Mandor
Jumlah
Dibulatkan
1 M2 Pengukuran Dan Pasang Bouwplank
Kayu kaso 5/7
Paku Biasa 2" - 5"
Kayu papan albasia
Pekerja
Tukang Kayu

Oh

0.02

M3
Kg
M3
Oh
Oh

0.012
0.02
0.007
0.1
0.1

Oh

0.01

Kepala Tukang

A-05

Mandor
Jumlah
Dibulatkan
1 M2 Pembuatan Kantor Sementara dgn
Lantai Diplester
Dolken Kayu 8-10 / 400 cm
Kayu Balok terentang
Paku Biasa
Besi Strip
Semen Portland
Pasir Pasang
Pasir beton
Koral Beton2/3
Bata Merah
Seng Plat
Kawat harmonika
Kaca Polos 3mm
Kunci Tanam
Plywood 120 x 240 x 0,4 cm
Pekerja
Tukang Kayu
Tukang Batu

Oh

0.005

Btg
M3
Kg
Kg
Kg
M3
M3
M3
Bh
m'
M2
M2
Bh
Lbr
Oh
Oh
Oh

1.25
0.18
0.85
1.1
35
0.15
0.1
0.15
30
0.25
2
0.08
0.15
0.06
2
2
1

Oh

0.3

Oh

0.05

Btg
M3

1.7
0.21

A-06

Kepala Tukang

Mandor
Jumlah
Dibulatkan
1 M2 Pembuatan Gudang Semen dan Alatalat
Dolken Kayu 8-10 / 400 cm
Kayu balok terentang

Paku Biasa
Semen Portland
Pasir Beton
Koral Beton 2/3
Seng Gelombang BJLS 30
Pekerja
Tukang Kayu

Kg
Kg
M3
M3
Lbr
Oh
Oh

0.3
10.5
0.03
0.05
1.5
1
2

Kepala Tukang

Oh

0.2

A-07

Mandor
Jumlah
Dibulatkan
1 M2 Pembuatan Bedeng Buruh
Dolken Kayu 8-10 / 400 cm
Kayu balok terentang
Paku Biasa
Semen Portland
Pasir Beton
Koral Beton 2/3
Seng Gelombang BJLS 30
Pekerja
Tukang Kayu

Oh

0.05

Btg
M3
Kg
Kg
M3
M3
Lbr
Oh
Oh

1.25
0.186
0.3
18
0.03
0.05
1.5
1
2

Oh

0.2

Oh

0.05

Oh
Oh

0.1
0.05

M3
M3
M3
Oh
Oh

0.15
0.09
0.01
1
0.05

Oh
Oh

6.667
0.333

A-08

A-09

A-10

Kepala Tukang

Mandor
Jumlah
Dibulatkan
1 M2 Membersihkan Lapangan dan Perataan
Pekerja
Mandor
Jumlah
Dibulatkan
1M2 Pembuatan Jalan Sementara
Batu Belah 15/20
Batu Pecah 5/7
Pasir Pasang
Pekerja
Mandor
Jumlah
Dibulatkan
1 M3 Bongkaran Beton Bertulang
Pekerja
Mandor
Jumlah

A-11

A-12

Dibulatk
an
1 M3 Bongkaran Dinding Tembok Bata Merah
Pekerja
Mandor
Jumlah
Dibulatkan
1 M Pagar beton Pracetak ( 5 x 50 x 213 ) cm
Panel Beton Pracetak
Kolom Beton Pracetak
Pasir Beton
Koral 2/3
Semen abu - abu
Pekerja
Tukang Batu

Oh
Oh

6.667
0.033

Lbr
Btg
M3
M3
Kg
Oh
Oh

0.986
0.525
0.074
0.146
45
0.375
0.125

Oh

0.012

Kepala Tukang

A-13

Mandor
Oh
Jumlah
Dibulatkan
1 M Pagar kawat ayam tiang besi L50.50.5, tinggi 1 m'
Kawat ram ayam
Lbr
Besi siku L 50.50.5
Kg
Besi pelat (1,2 x 3) mm
Kg
Baut
bh
Semen Portland
Kg
Pasir beton
M3
Koral Beton 2/3
M3
Pekerja
Oh
Tukang Batu
Oh
-

A-14

Kepala Tukang

Mandor
Jumlah
Dibulatkan
1 M2 Pagar BRC lengkap dengan tiang
BRC lengkap dengan tiang
Semen Portland
Kawat Duri
Pasir beton
Koral Beton 2/3
Pekerja
Tukang Batu

0.019

0.434
6.786
0.0424
4
2.5
0.005
0.009
0.375
0.125

Oh

0.012

Oh

0.019

Lbr
Kg
Kg
M3
M3
Oh
Oh

0.434
2
2.5
0.005
0.009
0.375
0.125

Kepala Tukang

A-15

0.012

Mandor
Jumlah
Dibulatkan
1 M2 Steiger Werk / perancah dari Bambu
Bambu 6 - 10 (600) cm
Tali ijuk
Pekerja
Tukang kayu

Oh

0.019

btng
kg
org
org

1
0.25
0.25
0.017

Kepala tukang

org

0.002

Mandor
Jumlah
Dibulatkan
1 M' Cerucuk Bambu
Bambu 7 -10 (400) cm
Pekerja
Mandor
Jumlah
Dibulatkan

org

0.013

btng
org
org

1.25
0.5
0.025

A-16

Oh

HARGA
SATUAN
(Rp)

HARGA
(Rp)

28,000.00
1,406.00
255,400.00
211,100.00
2,640,000.00
23,400.00
8,100.00
42,000.00
65,000.00

35,000.00
3,515.00
1,277.00
1,899.90
190,080.00
1,404.00
3,240.00
16,800.00
13,000.00

75,000.00

1,500.00

80,000.00

1,600.00
269,315.90
269,316.00

28,000.00
1,406.00
62,900.00
255,400.00
211,100.00
2,640,000.00
23,400.00
30,400.00
42,000.00
65,000.00

35,000.00
3,515.00
75,480.00
1,277.00
1,899.90
190,080.00
1,404.00
13,680.00
16,800.00
13,000.00

75,000.00

1,500.00

80,000.00

1,600.00
355,235.90
355,236.00

28,000.00
1,406.00
63,500.00
255,400.00
211,100.00
23,400.00

28,000.00
2,812.00
158,750.00
1,277.00
1,899.90
1,404.00

42,000.00
65,000.00

12,600.00
13,000.00

75,000.00

1,500.00

80,000.00

1,600.00
222,842.90
222,843.00

1,870,500.00
23,400.00
2,071,700.00
42,000.00
65,000.00

22,446.00
468
14,501.90
4,200.00
6,500.00

75,000.00

750

80,000.00

400
49,265.90
49,266.00

28,000.00
2,640,000.00
23,400.00
26,800.00
1,406.00
233,400.00
255,400.00
211,100.00
775
15,815.00
35,900.00
87,400.00
94,500.00
140,000.00
42,000.00
65,000.00
65,000.00

35,000.00
475,200.00
19,890.00
29,480.00
49,210.00
35,010.00
25,540.00
31,665.00
23,250.00
3,953.75
71,800.00
6,992.00
14,175.00
8,400.00
84,000.00
130,000.00
65,000.00

75,000.00

22,500.00

80,000.00

4,000.00
1,135,065.75
1,135,066.00

28,000.00
2,640,000.00

47,600.00
554,400.00

23,400.00
1,406.00
255,400.00
211,100.00
62,900.00
42,000.00
65,000.00

7,020.00
14,763.00
7,662.00
10,555.00
94,350.00
42,000.00
130,000.00

75,000.00

15,000.00

80,000.00

4,000.00
927,350.00
927,350.00

28,000.00
2,640,000.00
23,400.00
1,406.00
255,400.00
211,100.00
62,900.00
42,000.00
65,000.00

35,000.00
491,040.00
7,020.00
25,308.00
7,662.00
10,555.00
94,350.00
42,000.00
130,000.00

75,000.00

15,000.00

80,000.00

4,000.00
861,935.00
861,935.00

42,000.00
80,000.00

4,200.00
4,000.00
8,200.00
8,200.00

205,500.00
196,000.00
233,400.00
42,000.00
80,000.00

30,825.00
17,640.00
2,334.00
42,000.00
4,000.00
96,799.00
96,799.00

42,000.00
80,000.00

280,014.00
26,640.00
306,654.00

306,654.00
42,000.00
80,000.00

280,014.00
2,640.00
282,654.00
282,654.00

199,200.00
264,000.00
255,400.00
211,100.00
1,406.00
42,000.00
65,000.00

196,411.20
138,600.00
18,899.60
30,820.60
63,270.00
15,750.00
8,125.00

75,000.00

900

80,000.00

1,520.00
474,296.40
474,296.00

14,900.00
18,300.00
18,300.00
600
1,406.00
255,400.00
211,100.00
42,000.00
65,000.00

6,466.60
124,183.80
775.92
2,400.00
3,515.00
1,277.00
1,899.90
15,750.00
8,125.00

75,000.00

900

80,000.00

1,520.00
166,813.22
166,813.00

171,300.00
1,406.00
63,500.00
255,400.00
211,100.00
42,000.00
65,000.00

74,344.20
2,812.00
158,750.00
1,277.00
1,899.90
15,750.00
8,125.00

75,000.00

900

80,000.00

1,520.00
265,378.10
265,378.00

25,000.00
23,400.00
42,000.00
65,000.00

25,000.00
5,850.00
10,500.00
1,105.00

75,000.00

150

80,000.00

1,040.00
43,645.00
43,645.00

25,000.00
42,000.00
80,000.00

31,250.00
21,000.00
2,000.00
54,250.00
54,250.00

Analisa Harga Satuan Pekerjaan Tanah


B. ANALISA HARGA SATUAN PEKERJAAN TANAH

No.

B-01

URAIAN

SATUAN

VOLUME

HARGA
SATUAN
(Rp)

1 M3 Galian Tanah Biasa sedalam


1m
Pekerja

Oh

0.4

###

Oh

0.04

###

Dibulatkan
1 M3 Galian Tanah Biasa Sedalam
2m
Pekerja

Oh

0.526

###

Oh

0.052

###

Dibulatkan
1 M3 Galian Tanah Biasa Sedalam
3m
Pekerja

Oh

0.735

###

Oh

0.073

###

Dibulatkan
1 M3 Galian Tanah Keras Sedalam
1m
Pekerja

Oh

0.625

###

Oh

0.062

###

Mandor
Jumlah

B-02

Mandor
Jumlah

B-03

Mandor
Jumlah

B-04

Mandor
Jumlah

Dibulatkan
B-05

1 M3 Galian Tanah Lumpur


Sedalam 1 m
-

Pekerja

Oh

0.823

###

Mandor

Oh

0.083

###

Jumlah
Dibulatkan

HARGA
(Rp)
###
3,200.00
###
###
###
4,160.00
###
###
###
5,840.00
###
###
###
4,960.00
###
###

###
6,640.00
###
###

Analisa Harga Satuan Pekerjaan Pondasi


C. ANALISA HARGA SATUAN PEKERJAAN PONDASI

No.

C-01

URAIAN

SATUAN

VOLUME

1 M3 Pasanag Pondasi batu Kali adk 1pc :


3 ps
Batu Belah

M3

1.1

Semen Portland

Kg

202

Pasir Pasang

M3

0.485

Pekerja

Oh

1.5

Tukang Batu

Oh

0.6

Kepala Tukang

Oh

0.06

Mandor

Oh

0.075

Jumlah
C-02

Dibulatkan
1 M3 Pasang Pondasi Batu kali adk 1pc :
4ps
-

Batu Belah

M3

1.1

Semen Portland

Kg

163

Pasir Pasang

M3

0.52

Pekerja

Oh

1.5

Tukang Batu

Oh

0.6

Kepala Tukang

Oh

0.06

Mandor

Oh

0.075

Jumlah
C-03

Dibulatkan
1 M3 Pasang Pondasi Batu kali adk 1pc :
5ps
-

Batu Belah

M3

1.1

Semen Portland

Kg

136

Pasir Pasang

M3

0.544

Pekerja

Oh

1.5

Tukang Batu

Oh

0.6

Kepala Tukang

Oh

0.06

Mandor

Oh

0.075

Jumlah
Dibulatkan

C-04

1 M3 Pasang Pondasi Batu Kosong


(aanstamping)
-

Batu Belah

M3

1.2

Pasir Urug

M3

0.3

Pekerja

Oh

0.78

Tukang Batu

Oh

0.39

Kepala Tukang

Oh

0.039

Mandor

Oh

0.039

Jumlah
Dibulatkan

HARGA
SATUAN

HARGA

(Rp)

(Rp)

###

###

1,406.00

###

###

###

42,000.00 63,000.00
65,000.00 39,000.00
75,000.00

4,500.00

80,000.00

6,000.00
###
###

###

###

1,406.00

###

###

###

42,000.00 63,000.00
65,000.00 39,000.00
75,000.00

4,500.00

80,000.00

6,000.00
###
###

###

###

1,406.00

###

###

###

42,000.00 63,000.00
65,000.00 39,000.00
75,000.00

4,500.00

80,000.00

6,000.00
###
###

###

###

### 52,590.00
42,000.00 32,760.00
65,000.00 25,350.00
75,000.00

2,925.00

80,000.00

3,120.00
###
###

Analisa Harga Satuan Pekerjaan Beton


NO
D-17r2

URAIAN
1 M3 Sloof Beton Tulang 15/20 (180 kg besi + bekisting) 4dia. 12
ring 8-15
Kayu papan terentang

SAT
M3

Paku Biasa 2" - 5"

Kg

Besi Beton

Kg

Kawat Beton

Kg

Semen Portland

Kg

Pasir Beton

M3

Koral Beton 2/3

M3

Pekerja

Oh

Tukang Batu

Oh

Tukang Kayu

Oh

Tukang Besi

Oh

Kepala Tukang

Oh

Mandor

Oh

Jumlah
Dibulatkan

1 M3 Kolom Beton Tulang 15/20 (180 kg besi + bekisting) 4dia.12


8-15
Kayu papan terentang

M3

Paku Biasa 2" - 5"

Kg

Minyak Bekisting

Ltr

Besi Beton

Kg

Kawat Beton

Kg

Semen Portland

Kg

Pasir Beton

M3

Koral Beton 2/3

M3

Kayu Balok Terentang

M3

Dolken -8-10/4m

Btg

Pekerja

Oh

Tukang Batu

Oh

Tukang Kayu

Oh

Tukang Besi

Oh

Kepala Tukang

Oh

Mandor

Oh

Jumlah

Dibulatkan
1 M3 Balok Beton Tulang 15/20 sofi-sofi, ring balk + balok poratl
(180 kg besi + bekisting) 4dia. 12, 8-15
Kayu papan terentang

M3

Paku Biasa 2" - 5"

Kg

Besi Beton

Kg

Kawat Beton

Kg

Semen Portland

Kg

Pasir Beton

M3

Koral Beton 2/3

M3

Kayu Balok Terentang

M3

Dolken -8-10/4m

Btg

Pekerja

Oh

Tukang Batu

Oh

Tukang Kayu

Oh

Tukang Besi

Oh

Kepala Tukang

Oh

Mandor

Oh

Jumlah
Dibulatkan
D-29

1 M3 Tangga Beton Tulang (90 kg besi + bekisting)


Kayu papan terentang

M3

Paku Biasa 2" - 5"

Kg

Minyak Bekisting

Ltr

Besi Beton

Kg

Kawat Beton

Kg

Semen Portland

Kg

Pasir Beton

M3

Koral Beton 2/3

M3

Kayu Balok Terentang

M3

Dolken -8-10/4m

Btg

Pekerja

Oh

Tukang Batu

Oh

Tukang Kayu

Oh

Tukang Besi

Oh

Kepala Tukang

Oh

Mandor

Oh

Jumlah
Dibulatkan

1 M3 Membuat Plat Lantai Tb. 10 Cm Beton Bertulang ( 90 Kg


Besi + Bekisting )
Kayu Terentang

M3

Paku Biasa 2" - 5"

Kg

Minyak Bekisting

Ltr

Besi Beton Polos

Kg

Kawat Beton

Kg

Kayu Balok Terentang

M3

Plywood Tebal 9 mm

Lbr

Dolken kayu Galam o - 8-10/4 m

Btg

Semen Portland

Kg

Pasir Beton

M3

Koral Beton 2/3

M3

Pekerja

Oh

Tukang Batu

Oh

Tukang Kayu

Oh

Kepala Tukang

Oh

Mandor

Oh

Jumlah
Dibulatkan

VOLUME HRG.SAT JUMLAH


0.27

###

769,500

23,400

46,800

180

16,500

###

27,700

83,100

323

1,200

387,600

0.52

225,000

117,000

0.78

200,000

156,000

4.85

55,000

266,750

0.35

70,000

24,500

1.56

70,000

109,200

1.4

70,000

98,000

0.331

80,000

26,480

0.17

85,000

14,450
###
###

0.4

###

###

23,400

93,600

40,500

180

16,500

###

1.8

27,700

49,860

323

1,200

387,600

0.52

225,000

117,000

0.78

200,000

156,000

0.15

###

396,000

20

15,000

300,000

7.3

55,000

401,500

0.35

70,000

24,500

3.3

70,000

231,000

2.1

70,000

147,000

0.57

80,000

45,600

0.25

85,000

21,250
6.480.91
0

6.481.00
0

0.32

###

912,000

3.2

23,400

74,880

180

16,500

###

2.25

27,700

62,325

323

1,200

387,600

0.52

225,000

117,000

0.78

200,000

156,000

0.14

###

369,600

16

15,000

240,000

5.96

55,000

327,800

0.35

70,000

24,500

2.8

70,000

196,000

1.4

70,000

98,000

0.455

80,000

36,400

0.208

85,000

17,680
6.412.86
5
###

0.25

###

712,500

23,400

70,200

1.2

40,500

48,600

90

16,500

###

27,700

83,100

323

1,200

387,600

0.52

225,000

117,000

0.78

200,000

156,000

0.105

###

277,200

14

15,000

210,000

5.6

55,000

308,000

0.35

70,000

24,500

2.3

70,000

161,000

1.4

70,000

98,000

0.405

80,000

32,400

0.202

85,000

17,170
###
###

0.4

###

###

23,400

93,600

40,500

81,000

90

16,500

###

27,700

83,100

0.105

151,100

15,866

3.5

151,100

528,850

60

15,000

900,000

323

1,200

387,600

0.52

225,000

117,000

0.78

200,000

156,000

5.2

55,000

286,000

0.35

70,000

24,500

3.3

70,000

231,000

0.365

80,000

29,200

1.06

85,000

90,100
###
###

Analisa Harga Satuan Pekerjaan Dinding


E. ANALISA HARGA SATUAN PEKERJAAN DINDING
No.

E-01

URAIAN

SATUAN

VOLUME

M2 Pasang Bata Merah Tebal 1 Bata, 1pc : 3ps

Bata Merah

Bh

140

Semen Portland

Kg

32.95

Pasir Pasang

M3

0.091

Pekerja

Oh

0.65

Tukang Batu

Oh

0.2

Kepala Tukang

Oh

0.02

Mandor

Oh

0.03

Jumlah
Dibulatkan

E-02

M2 Pasang Bata Merah Tebal 1 Bata,


1pc : 4ps

Bata Merah

Bh

140

Semen Portland

Kg

26.55

Pasir Pasang

M3

0.093

Pekerja

Oh

0.65

Tukang Batu

Oh

0.2

Kepala Tukang

Oh

0.02

Mandor

Oh

0.03

Jumlah
Dibulatkan

E-03

M2 Pasang Bata Merah Tebal 1 Bata,


1pc : 5ps

Bata Merah

Bh

140

Semen Portland

Kg

22.2

Pasir Pasang

M3

0.102

Pekerja

Oh

0.65

Tukang Batu

Oh

0.2

Kepala Tukang

Oh

0.02

Mandor

Oh

0.03

Jumlah
Dibulatkan
E-04

M2 Pasang Bata Merah Tebal 1/2 Bata, 1pc : 3ps

Bata Merah

Bh

70

Semen Portland

Kg

14.37

Pasir Pasang

M3

0.04

Pekerja

Oh

0.32

Tukang Batu

Oh

0.1

Kepala Tukang

Oh

0.01

Mandor

Oh

0.015

Jumlah
Dibulatkan
E-05

M2 Pasang Bata Merah Tebal 1/2 Bata, 1pc : 4ps

Bata Merah

Bh

70

Semen Portland

Kg

11.5

Pasir Pasang

M3

0.043

Pekerja

Oh

0.32

Tukang Batu

Oh

0.1

Kepala Tukang

Oh

0.01

Mandor

Oh

0.015

Jumlah
Dibulatkan
E-06

M2 Pasang Bata Merah Tebal 1/2 Bata, 1pc : 5ps

Bata Merah

Bh

70

Semen Portland

Kg

9.68

Pasir Pasang

M3

0.045

Pekerja

Oh

0.32

Tukang Batu

Oh

0.1

Kepala Tukang

Oh

0.01

Mandor

Oh

0.015

Jumlah
Dibulatkan

HARGA
SATUAN

HARGA

(Rp)

(Rp)

775 108,500.00
1,406.00

46,327.70

###

21,239.40

42,000.00

27,300.00

65,000.00

13,000.00

75,000.00

1,500.00

80,000.00

2,400.00
220,267.10
220,267.00

775 108,500.00
1,406.00

37,329.30

###

21,706.20

42,000.00

27,300.00

65,000.00

13,000.00

75,000.00

1,500.00

80,000.00

2,400.00
211,735.50
211,736.00

775 108,500.00
1,406.00

31,213.20

###

23,806.80

42,000.00

27,300.00

65,000.00

13,000.00

75,000.00

1,500.00

80,000.00

2,400.00
###
###

775

54,250.00

1,406.00

20,204.22

###

9,336.00

42,000.00

13,440.00

65,000.00

6,500.00

75,000.00

750

80,000.00

1,200.00
###
###

775

54,250.00

1,406.00

16,169.00

###

10,036.20

42,000.00

13,440.00

65,000.00

6,500.00

75,000.00

750

80,000.00

1,200.00
###
###

775

54,250.00

1,406.00

13,610.08

###

10,503.00

42,000.00

13,440.00

65,000.00

6,500.00

75,000.00

750

80,000.00

1,200.00
###
###

Analisa Harga Satuan Pekerjaan Plesteran


F. ANALISA HARGA SATUAN PEKERJAAN PLESTERAN
No.

URAIAN

SATUAN

VOLUME

HARGA
SATUAN
(Rp)

1 M2 Plesteran adk. 1pc : 2ps


Tebal 15 mm

F-01

Semen Portland

Kg

8.52

1,406.00

Pasir Pasang

M3

0.017

###

Pekerja

Oh

0.2 42,000.00

Tukang Batu

Oh

0.15 65,000.00

Kepala Tukang

Oh

0.015 75,000.00

Mandor

Oh

0.01 80,000.00

Jumlah
Dibulatkan
1 M2 Plesteran adk. 1pc : 3ps
Tebal 15 mm

F-02

Semen Portland

Kg

6.48

1,406.00

Pasir Pasang

M3

0.019

###

Pekerja

Oh

0.2 42,000.00

Tukang Batu

Oh

0.15 65,000.00

Kepala Tukang

Oh

0.015 75,000.00

Mandor

Oh

0.01 80,000.00

Jumlah
Dibulatkan
1 M2 Plesteran adk. 1pc : 4ps
Tebal 15 mm

F-03

Semen Portland

Kg

5.2

1,406.00

Pasir Pasang

M3

0.02

###

Pekerja

Oh

0.2 42,000.00

Tukang Batu

Oh

0.15 65,000.00

Kepala Tukang

Oh

0.015 75,000.00

Mandor

Oh

0.01 80,000.00

Jumlah
Dibulatkan
1 M2 Plesteran adk. 1pc : 3ps
Tebal 20 mm

F-04

Semen Portland

Kg

10.8

1,406.00

Pasir Pasang

M3

0.026

###

Pekerja

Oh

0.25 42,000.00

Tukang Batu

Oh

0.2 65,000.00

Kepala Tukang

Oh

0.02 75,000.00

Mandor

Oh

0.0125 80,000.00

Jumlah
Dibulatkan
1 M2 Plesteran adk. 1pc : 4ps
Tebal 20 mm

F-05

Semen Portland

Kg

8.68

1,406.00

Pasir Pasang

M3

0.028

###

Pekerja

Oh

0.25 42,000.00

Tukang Batu

Oh

0.2 65,000.00

Kepala Tukang

Oh

0.02 75,000.00

Mandor

Oh

0.0125 80,000.00

Jumlah
Dibulatkan

1 M2 Plesteran adk. 1pc:5ps tebal


20 mm

F-06

Semen Portland

Kg

7.29

1,406.00

Pasir Pasang

M3

0.026

###

Pekerja

Oh

0.25 42,000.00

Tukang Batu

Oh

0.2 65,000.00

Kepala Tukang

Oh

0.02 75,000.00

Mandor

Oh

0.0125 80,000.00

Jumlah
Dibulatkan
F-11

1 M2 Acian Plesteran
-

Semen Portland

Kg

Pekerja

Oh

0.143 42,000.00

Tukang batu

Oh

0.107 65,000.00

Kepala Tukang

Oh

0.0105 75,000.00

Mandor

Oh

0.0105 80,000.00

Jumlah
Dibulatkan

1,406.00

HARGA
(Rp)

11,979.12
3,967.80
8,400.00
9,750.00
1,125.00
800
###
###

9,110.88
4,434.60
8,400.00
9,750.00
1,125.00
800
###
###

7,311.20

4,668.00
8,400.00
9,750.00
1,125.00
800
###
###

15,184.80
6,068.40
10,500.00
13,000.00
1,500.00
1,000.00
###
###

12,204.08
6,535.20
10,500.00
13,000.00
1,500.00
1,000.00
###
###

10,249.74
6,068.40
10,500.00
13,000.00
1,500.00
1,000.00
###
###

5,624.00
6,006.00
6,955.00
787.5
840
###
###

Penggalan Analisa Harga Satuan Penutup Atap