Anda di halaman 1dari 139

HARGA

No. URAIAN SATUAN VOLUME


SATUAN

(Rp)
A-01 1 M' Pagar Sementara Dari Kayu Tinggi 2 m

- Dolken Kayu Ø 8-10 / 400 cm Btg 1.25 28,000.00

- Semen Portland Kg 2.5 1,406.00

- Pasir beton M3 0.005 255,400.00

- Koral Beton 2/3 M3 0.009 211,100.00

- Kayu balok terentang M3 0.072 2,640,000.00

- Paku Biasa 2" - 5" Kg 0.06 23,400.00

- Residu Kg 0.4 8,100.00


- Pekerja Oh 0.4 42,000.00
- Tukang Kayu Oh 0.2 65,000.00

- Kepala Tukang Oh 0.02 75,000.00


- Mandor Oh 0.02 80,000.00
Jumlah
Dibulatkan
A-02 1 M' Pagar Sementara Seng Gelombang Tinggi 2 m

- Dolken Kayu Ø 8-10 / 400 cm Btg 1.25 28,000.00

- Semen Portland Kg 2.5 1,406.00


- Seng Gelombang BJLS-30 Lbr 1.2 62,900.00

- Pasir beton M3 0.005 255,400.00

- Koral Beton 2/3 M3 0.009 211,100.00

- Kayu balok terentang M3 0.072 2,640,000.00

- Paku Biasa 2" - 5" Kg 0.06 23,400.00

- Meni Besi Kg 0.45 30,400.00


- Pekerja Oh 0.4 42,000.00
- Tukang Kayu Oh 0.2 65,000.00

- Kepala Tukang Oh 0.02 75,000.00


- Mandor Oh 0.02 80,000.00
Jumlah
Dibulatkan

1 M' Pagar SementaraKawat Duri


A-03
Tinggi 1,80 m

- Dolken Kayu Ø 8-10 / 400 cm Btg 1 28,000.00

- Semen Portland Kg 2 1,406.00

- Kawat Duri Kg 2.5 63,500.00

- Pasir beton M3 0.005 255,400.00

- Koral Beton 2/3 M3 0.009 211,100.00


- Paku Biasa 2" - 5" Kg 0.06 23,400.00

- Pekerja Oh 0.3 42,000.00


- Tukang Kayu Oh 0.2 65,000.00

- Kepala Tukang Oh 0.02 75,000.00


- Mandor Oh 0.02 80,000.00
Jumlah
Dibulatkan

1 M2 Pengukuran Dan Pasang


A-04
Bouwplank

- Kayu kaso 5/7 M3 0.012 1,870,500.00

- Paku Biasa 2" - 5" Kg 0.02 23,400.00

- Kayu papan albasia M3 0.007 2,071,700.00

- Pekerja Oh 0.1 42,000.00


- Tukang Kayu Oh 0.1 65,000.00

- Kepala Tukang Oh 0.01 75,000.00


- Mandor Oh 0.005 80,000.00
Jumlah
Dibulatkan

1 M2 Pembuatan Kantor
A-05
Sementara dgn Lantai Diplester

- Dolken Kayu Ø 8-10 / 400 cm Btg 1.25 28,000.00

- Kayu Balok terentang M3 0.18 2,640,000.00


- Paku Biasa Kg 0.85 23,400.00

- Besi Strip Kg 1.1 26,800.00

- Semen Portland Kg 35 1,406.00

- Pasir Pasang M3 0.15 233,400.00

- Pasir beton M3 0.1 255,400.00

- Koral Beton2/3 M3 0.15 211,100.00

- Bata Merah Bh 30 775

- Seng Plat m' 0.25 15,815.00

- Kawat harmonika M2 2 35,900.00

- Kaca Polos 3mm M2 0.08 87,400.00

- Kunci Tanam Bh 0.15 94,500.00

- Plywood 120 x 240 x 0,4 cm Lbr 0.06 140,000.00

- Pekerja Oh 2 42,000.00
- Tukang Kayu Oh 2 65,000.00

- Tukang Batu Oh 1 65,000.00

- Kepala Tukang Oh 0.3 75,000.00


- Mandor Oh 0.05 80,000.00
Jumlah
Dibulatkan
1 M2 Pembuatan Gudang Semen
A-06
dan Alat-alat
- Dolken Kayu Ø 8-10 / 400 cm Btg 1.7 28,000.00

- Kayu balok terentang M3 0.21 2,640,000.00

- Paku Biasa Kg 0.3 23,400.00

- Semen Portland Kg 10.5 1,406.00

- Pasir Beton M3 0.03 255,400.00

- Koral Beton 2/3 M3 0.05 211,100.00

- Seng Gelombang BJLS 30 Lbr 1.5 62,900.00

- Pekerja Oh 1 42,000.00
- Tukang Kayu Oh 2 65,000.00

- Kepala Tukang Oh 0.2 75,000.00


- Mandor Oh 0.05 80,000.00
Jumlah
Dibulatkan
A-07 1 M2 Pembuatan Bedeng Buruh

- Dolken Kayu Ø 8-10 / 400 cm Btg 1.25 28,000.00

- Kayu balok terentang M3 0.186 2,640,000.00

- Paku Biasa Kg 0.3 23,400.00


- Semen Portland Kg 18 1,406.00

- Pasir Beton M3 0.03 255,400.00

- Koral Beton 2/3 M3 0.05 211,100.00

- Seng Gelombang BJLS 30 Lbr 1.5 62,900.00

- Pekerja Oh 1 42,000.00
- Tukang Kayu Oh 2 65,000.00

- Kepala Tukang Oh 0.2 75,000.00


- Mandor Oh 0.05 80,000.00
Jumlah
Dibulatkan
A-08 1 M2 Membersihkan Lapangan dan Perataan
- Pekerja Oh 0.1 42,000.00
- Mandor Oh 0.05 80,000.00
Jumlah
Dibulatkan
1M2 Pembuatan Jalan
A-09
Sementara

- Batu Belah 15/20 M3 0.15 205,500.00

- Batu Pecah 5/7 M3 0.09 196,000.00

- Pasir Pasang M3 0.01 233,400.00


- Pekerja Oh 1 42,000.00
- Mandor Oh 0.05 80,000.00
Jumlah
Dibulatkan
A-10 1 M3 Bongkaran Beton Bertulang
- Pekerja Oh 6.667 42,000.00
- Mandor Oh 0.333 80,000.00
Dib Jumlah
ula
tka
n
A-11 1 M3 Bongkaran Dinding Tembok Bata Merah
- Pekerja Oh 6.667 42,000.00
- Mandor Oh 0.033 80,000.00
Jumlah
Dibulatkan

A-12 1 M¹ Pagar beton Pracetak ( 5 x 50 x 213 ) cm

- Panel Beton Pracetak Lbr 0.986 199,200.00

- Kolom Beton Pracetak Btg 0.525 264,000.00

- Pasir Beton M3 0.074 255,400.00

- Koral 2/3 M3 0.146 211,100.00

- Semen abu - abu Kg 45 1,406.00

- Pekerja Oh 0.375 42,000.00


- Tukang Batu Oh 0.125 65,000.00

- Kepala Tukang Oh 0.012 75,000.00


- Mandor Oh 0.019 80,000.00
Jumlah
Dibulatkan
A-13 1 M¹ Pagar kawat ayam tiang besi L50.50.5, tinggi 1 m'

- Kawat ram ayam Lbr 0.434 14,900.00

- Besi siku L 50.50.5 Kg 6.786 18,300.00


- Besi pelat (1,2 x 3) mm Kg 0.0424 18,300.00

- Baut bh 4 600

- Semen Portland Kg 2.5 1,406.00

- Pasir beton M3 0.005 255,400.00

- Koral Beton 2/3 M3 0.009 211,100.00

- Pekerja Oh 0.375 42,000.00


- Tukang Batu Oh 0.125 65,000.00

- Kepala Tukang Oh 0.012 75,000.00


- Mandor Oh 0.019 80,000.00
Jumlah
Dibulatkan
A-14 1 M2 Pagar BRC lengkap dengan tiang

- BRC lengkap dengan tiang Lbr 0.434 171,300.00

- Semen Portland Kg 2 1,406.00

- Kawat Duri Kg 2.5 63,500.00

- Pasir beton M3 0.005 255,400.00

- Koral Beton 2/3 M3 0.009 211,100.00

- Pekerja Oh 0.375 42,000.00


- Tukang Batu Oh 0.125 65,000.00

- Kepala Tukang Oh 0.012 75,000.00


- Mandor Oh 0.019 80,000.00
Jumlah
Dibulatkan
A-15 1 M2 Steiger Werk / perancah dari Bambu

- Bambu Ø 6 - 10 (600) cm btng 1 25,000.00

- Tali ijuk kg 0.25 23,400.00


- Pekerja org 0.25 42,000.00
- Tukang kayu org 0.017 65,000.00

- Kepala tukang org 0.002 75,000.00


- Mandor org 0.013 80,000.00
Jumlah
Dibulatkan
A-16 1 M' Cerucuk Bambu

- Bambu Ø 7 -10 (400) cm btng 1.25 25,000.00

- Pekerja org 0.5 42,000.00


- Mandor org 0.025 80,000.00
Jumlah
Dibulatkan
HARGA

(Rp)

35,000.00

3,515.00

1,277.00

1,899.90

190,080.00

1,404.00

3,240.00
16,800.00
13,000.00

1,500.00
1,600.00
269,315.90
269,316.00

35,000.00

3,515.00
75,480.00

1,277.00

1,899.90

190,080.00

1,404.00

13,680.00
16,800.00
13,000.00

1,500.00
1,600.00
355,235.90
355,236.00

28,000.00

2,812.00

158,750.00

1,277.00

1,899.90
1,404.00

12,600.00
13,000.00

1,500.00
1,600.00
222,842.90
222,843.00

22,446.00

468

14,501.90

4,200.00
6,500.00

750
400
49,265.90
49,266.00

35,000.00

475,200.00
19,890.00

29,480.00

49,210.00

35,010.00

25,540.00

31,665.00

23,250.00

3,953.75

71,800.00

6,992.00

14,175.00

8,400.00

84,000.00
130,000.00

65,000.00

22,500.00
4,000.00
1,135,065.75
1,135,066.00
47,600.00

554,400.00

7,020.00

14,763.00

7,662.00

10,555.00

94,350.00

42,000.00
130,000.00

15,000.00
4,000.00
927,350.00
927,350.00

35,000.00

491,040.00

7,020.00
25,308.00

7,662.00

10,555.00

94,350.00

42,000.00
130,000.00

15,000.00
4,000.00
861,935.00
861,935.00

4,200.00
4,000.00
8,200.00
8,200.00

30,825.00

17,640.00

2,334.00
42,000.00
4,000.00
96,799.00
96,799.00

280,014.00
26,640.00
306,654.00
306,654.00

280,014.00
2,640.00
282,654.00
282,654.00

196,411.20

138,600.00

18,899.60

30,820.60

63,270.00

15,750.00
8,125.00

900
1,520.00
474,296.40
474,296.00

6,466.60

124,183.80
775.92

2,400.00

3,515.00

1,277.00

1,899.90

15,750.00
8,125.00

900
1,520.00
166,813.22
166,813.00

74,344.20

2,812.00

158,750.00

1,277.00

1,899.90

15,750.00
8,125.00

900
1,520.00
265,378.10
265,378.00
25,000.00

5,850.00
10,500.00
1,105.00

150
1,040.00
43,645.00
43,645.00

31,250.00

21,000.00
2,000.00
54,250.00
54,250.00
HARGA
No. URAIAN SATUAN VOLUME
SATUAN
(Rp)
1 M3 Galian Tanah
B-01 Biasa sedalam 1
m
- Pekerja Oh 0.4 42,000.00
- Mandor Oh 0.04 80,000.00
Jumlah
Dibulatkan
1 M3 Galian Tanah
B-02 Biasa Sedalam 2
m
- Pekerja Oh 0.526 42,000.00
- Mandor Oh 0.052 80,000.00
Jumlah
Dibulatkan
1 M3 Galian Tanah
B-03 Biasa Sedalam 3
m
- Pekerja Oh 0.735 42,000.00
- Mandor Oh 0.073 80,000.00
Jumlah
Dibulatkan
1 M3 Galian Tanah
B-04 Keras Sedalam 1
m
- Pekerja Oh 0.625 42,000.00
- Mandor Oh 0.062 80,000.00
Jumlah
Dibulatkan
1 M3 Galian Tanah
B-05 Lumpur Sedalam
1m
- Pekerja Oh 0.823 42,000.00
- Mandor Oh 0.083 80,000.00
Jumlah
Dibulatkan
HARGA
(Rp)

16,800.00
3,200.00
20,000.00
20,000.00

22,092.00
4,160.00
26,252.00
26,252.00

30,870.00
5,840.00
36,710.00
36,710.00

26,250.00
4,960.00
31,210.00
31,210.00

34,566.00
6,640.00
41,206.00
41,206.00
HARGA
No. URAIAN SATUAN VOLUME
SATUAN
(Rp)

1 M3 Pasanag Pondasi
C-01
batu Kali adk 1pc : 3 ps

- Batu Belah M3 1.1 205,500.00


- Semen Portland Kg 202 1,406.00
- Pasir Pasang M3 0.485 233,400.00
- Pekerja Oh 1.5 42,000.00
- Tukang Batu Oh 0.6 65,000.00
- Kepala Tukang Oh 0.06 75,000.00
- Mandor Oh 0.075 80,000.00
Jumlah
Dibulatkan

1 M3 Pasang Pondasi
C-02
Batu kali adk 1pc : 4ps

- Batu Belah M3 1.1 205,500.00


- Semen Portland Kg 163 1,406.00
- Pasir Pasang M3 0.52 233,400.00
- Pekerja Oh 1.5 42,000.00
- Tukang Batu Oh 0.6 65,000.00
- Kepala Tukang Oh 0.06 75,000.00
- Mandor Oh 0.075 80,000.00
Jumlah
Dibulatkan

1 M3 Pasang Pondasi
C-03
Batu kali adk 1pc : 5ps

- Batu Belah M3 1.1 205,500.00


- Semen Portland Kg 136 1,406.00
- Pasir Pasang M3 0.544 233,400.00
- Pekerja Oh 1.5 42,000.00
- Tukang Batu Oh 0.6 65,000.00
- Kepala Tukang Oh 0.06 75,000.00
- Mandor Oh 0.075 80,000.00
Jumlah
Dibulatkan
1 M3 Pasang Pondasi
C-04 Batu Kosong
(aanstamping)
- Batu Belah M3 1.2 205,500.00
- Pasir Urug M3 0.3 175,300.00
- Pekerja Oh 0.78 42,000.00
- Tukang Batu Oh 0.39 65,000.00
- Kepala Tukang Oh 0.039 75,000.00
- Mandor Oh 0.039 80,000.00
Jumlah
Dibulatkan
HARGA
(Rp)

226,050.00
284,012.00
113,199.00
63,000.00
39,000.00
4,500.00
6,000.00
735,761.00
735,761.00

226,050.00
229,178.00
121,368.00
63,000.00
39,000.00
4,500.00
6,000.00
689,096.00
689,096.00

226,050.00
191,216.00
126,969.60
63,000.00
39,000.00
4,500.00
6,000.00
656,735.60
656,736.00

246,600.00
52,590.00
32,760.00
25,350.00
2,925.00
3,120.00
363,345.00
363,345.00
NO URAIAN SAT VOLUME HRG.SAT
1 M3 Sloof Beton Tulang
15/20 (180 kg besi +
D-17r2
bekisting) 4dia. 12 ring 8-
15
Kayu papan terentang M3 0.27 2,850,000
Paku Biasa 2" - 5" Kg 2 23,400
Besi Beton Kg 180 16,500
Kawat Beton Kg 3 27,700
Semen Portland Kg 323 1,200
Pasir Beton M3 0.52 225,000
Koral Beton 2/3 M3 0.78 200,000
Pekerja Oh 4.85 55,000
Tukang Batu Oh 0.35 70,000
Tukang Kayu Oh 1.56 70,000
Tukang Besi Oh 1.4 70,000
Kepala Tukang Oh 0.331 80,000
Mandor Oh 0.17 85,000
Jumlah
Dibulatkan

1 M3 Kolom Beton Tulang


15/20 (180 kg besi +
bekisting) 4dia.12 8-15

Kayu papan terentang M3 0.4 2,850,000


Paku Biasa 2" - 5" Kg 4 23,400
Minyak Bekisting Ltr 40,500
Besi Beton Kg 180 16,500
Kawat Beton Kg 1.8 27,700
Semen Portland Kg 323 1,200
Pasir Beton M3 0.52 225,000
Koral Beton 2/3 M3 0.78 200,000
Kayu Balok Terentang M3 0.15 2,640,000
Dolken Ø-8-10/4m Btg 20 15,000
Pekerja Oh 7.3 55,000
Tukang Batu Oh 0.35 70,000
Tukang Kayu Oh 3.3 70,000
Tukang Besi Oh 2.1 70,000
Kepala Tukang Oh 0.57 80,000
Mandor Oh 0.25 85,000
Jumlah
Dibulatkan
1 M3 Balok Beton Tulang
15/20 sofi-sofi, ring balk +
balok poratl (180 kg besi +
bekisting) 4dia. 12, 8-15

Kayu papan terentang M3 0.32 2,850,000


Paku Biasa 2" - 5" Kg 3.2 23,400
Besi Beton Kg 180 16,500
Kawat Beton Kg 2.25 27,700
Semen Portland Kg 323 1,200
Pasir Beton M3 0.52 225,000
Koral Beton 2/3 M3 0.78 200,000
Kayu Balok Terentang M3 0.14 2,640,000
Dolken Ø-8-10/4m Btg 16 15,000
Pekerja Oh 5.96 55,000
Tukang Batu Oh 0.35 70,000
Tukang Kayu Oh 2.8 70,000
Tukang Besi Oh 1.4 70,000
Kepala Tukang Oh 0.455 80,000
Mandor Oh 0.208 85,000
Jumlah
Dibulatkan

1 M3 Tangga Beton Tulang


D-29
(90 kg besi + bekisting)

Kayu papan terentang M3 0.25 2,850,000


Paku Biasa 2" - 5" Kg 3 23,400
Minyak Bekisting Ltr 1.2 40,500
Besi Beton Kg 90 16,500
Kawat Beton Kg 3 27,700
Semen Portland Kg 323 1,200
Pasir Beton M3 0.52 225,000
Koral Beton 2/3 M3 0.78 200,000
Kayu Balok Terentang M3 0.105 2,640,000
Dolken Ø-8-10/4m Btg 14 15,000
Pekerja Oh 5.6 55,000
Tukang Batu Oh 0.35 70,000
Tukang Kayu Oh 2.3 70,000
Tukang Besi Oh 1.4 70,000
Kepala Tukang Oh 0.405 80,000
Mandor Oh 0.202 85,000
Jumlah
Dibulatkan
1 M3 Membuat Plat Lantai
3 Tb. 10 Cm Beton Bertulang
( 90 Kg Besi + Bekisting )

Kayu Terentang M3 0.4 2,850,000


Paku Biasa 2" - 5" Kg 4 23,400
Minyak Bekisting Ltr 2 40,500
Besi Beton Polos Kg 90 16,500
Kawat Beton Kg 3 27,700
Kayu Balok Terentang M3 0.105 151,100
Plywood Tebal 9 mm Lbr 3.5 151,100
Dolken kayu Galam o - 8-
Btg 60 15,000
10/4 m
Semen Portland Kg 323 1,200
Pasir Beton M3 0.52 225,000
Koral Beton 2/3 M3 0.78 200,000
Pekerja Oh 5.2 55,000
Tukang Batu Oh 0.35 70,000
Tukang Kayu Oh 3.3 70,000
Kepala Tukang Oh 0.365 80,000
Mandor Oh 1.06 85,000
Jumlah
Dibulatkan
JUMLAH

769,500
46,800
2,970,000
83,100
387,600
117,000
156,000
266,750
24,500
109,200
98,000
26,480
14,450
5,069,380
5,069,380

1,140,000
93,600
-
2,970,000
49,860
387,600
117,000
156,000
396,000
300,000
401,500
24,500
231,000
147,000
45,600
21,250
6.480.910
6.481.000
912,000
74,880
2,970,000
62,325
387,600
117,000
156,000
369,600
240,000
327,800
24,500
196,000
98,000
36,400
17,680
6.412.865
6,413,000

712,500
70,200
48,600
1,485,000
83,100
387,600
117,000
156,000
277,200
210,000
308,000
24,500
161,000
98,000
32,400
17,170
4,188,720
4,189,000
1,140,000
93,600
81,000
1,485,000
83,100
15,866
528,850
900,000
387,600
117,000
156,000
286,000
24,500
231,000
29,200
90,100
5,648,816
5,649,000
HARGA
No. URAIAN SATUAN VOLUME
SATUAN
(Rp)
E-01 1 M2 Pasang Bata Merah Tebal 1 Bata, 1pc : 3ps
- Bata Merah Bh 140 775
- Semen Portland Kg 32.95 1,406.00
- Pasir Pasang M3 0.091 233,400.00
- Pekerja Oh 0.65 42,000.00
- Tukang Batu Oh 0.2 65,000.00
- Kepala Tukang Oh 0.02 75,000.00
- Mandor Oh 0.03 80,000.00
Jumlah
Dibulatkan
M2 Pasang Bata
E-02 1 Merah Tebal 1 Bata,
1pc : 4ps
- Bata Merah Bh 140 775
- Semen Portland Kg 26.55 1,406.00
- Pasir Pasang M3 0.093 233,400.00
- Pekerja Oh 0.65 42,000.00
- Tukang Batu Oh 0.2 65,000.00
- Kepala Tukang Oh 0.02 75,000.00
- Mandor Oh 0.03 80,000.00
Jumlah
Dibulatkan
M2 Pasang Bata
E-03 1 Merah Tebal 1 Bata,
1pc : 5ps
- Bata Merah Bh 140 775
- Semen Portland Kg 22.2 1,406.00
- Pasir Pasang M3 0.102 233,400.00
- Pekerja Oh 0.65 42,000.00
- Tukang Batu Oh 0.2 65,000.00
- Kepala Tukang Oh 0.02 75,000.00
- Mandor Oh 0.03 80,000.00
Jumlah
Dibulatkan
E-04 1 M2 Pasang Bata Merah Tebal 1/2 Bata, 1pc : 3ps
- Bata Merah Bh 70 775
- Semen Portland Kg 14.37 1,406.00
- Pasir Pasang M3 0.04 233,400.00
- Pekerja Oh 0.32 42,000.00
- Tukang Batu Oh 0.1 65,000.00
- Kepala Tukang Oh 0.01 75,000.00
- Mandor Oh 0.015 80,000.00
Jumlah
Dibulatkan
E-05 1 M2 Pasang Bata Merah Tebal 1/2 Bata, 1pc : 4ps
- Bata Merah Bh 70 775
- Semen Portland Kg 11.5 1,406.00
- Pasir Pasang M3 0.043 233,400.00
- Pekerja Oh 0.32 42,000.00
- Tukang Batu Oh 0.1 65,000.00
- Kepala Tukang Oh 0.01 75,000.00
- Mandor Oh 0.015 80,000.00
Jumlah
Dibulatkan
E-06 1 M2 Pasang Bata Merah Tebal 1/2 Bata, 1pc : 5ps
- Bata Merah Bh 70 775
- Semen Portland Kg 9.68 1,406.00
- Pasir Pasang M3 0.045 233,400.00
- Pekerja Oh 0.32 42,000.00
- Tukang Batu Oh 0.1 65,000.00
- Kepala Tukang Oh 0.01 75,000.00
- Mandor Oh 0.015 80,000.00
Jumlah
Dibulatkan
HARGA
(Rp)

108,500.00
46,327.70
21,239.40
27,300.00
13,000.00
1,500.00
2,400.00
220,267.10
220,267.00

108,500.00
37,329.30
21,706.20
27,300.00
13,000.00
1,500.00
2,400.00
211,735.50
211,736.00

108,500.00
31,213.20
23,806.80
27,300.00
13,000.00
1,500.00
2,400.00
207,720.00
207,720.00

54,250.00
20,204.22
9,336.00
13,440.00
6,500.00
750
1,200.00
105,680.22
105,680.00

54,250.00
16,169.00
10,036.20
13,440.00
6,500.00
750
1,200.00
102,345.20
102,345.00

54,250.00
13,610.08
10,503.00
13,440.00
6,500.00
750
1,200.00
100,253.08
100,253.00
No. URAIAN SATUAN VOLUME HARGA SATUAN
(Rp)
1 M2 Plesteran
F-01 adk. 1pc : 2ps
Tebal 15 mm
- Semen Portland Kg 8.52 1,406.00
- Pasir Pasang M3 0.017 233,400.00
- Pekerja Oh 0.2 42,000.00
- Tukang Batu Oh 0.15 65,000.00
- Kepala Tukang Oh 0.015 75,000.00
- Mandor Oh 0.01 80,000.00
Jumlah
Dibulatkan
1 M2 Plesteran
F-02 adk. 1pc : 3ps
Tebal 15 mm
- Semen Portland Kg 6.48 1,406.00
- Pasir Pasang M3 0.019 233,400.00
- Pekerja Oh 0.2 42,000.00
- Tukang Batu Oh 0.15 65,000.00
- Kepala Tukang Oh 0.015 75,000.00
- Mandor Oh 0.01 80,000.00
Jumlah
Dibulatkan
1 M2 Plesteran
F-03 adk. 1pc : 4ps
Tebal 15 mm
- Semen Portland Kg 5.2 1,406.00
- Pasir Pasang M3 0.02 233,400.00
- Pekerja Oh 0.2 42,000.00
- Tukang Batu Oh 0.15 65,000.00
- Kepala Tukang Oh 0.015 75,000.00
- Mandor Oh 0.01 80,000.00
Jumlah
Dibulatkan
1 M2 Plesteran
F-04 adk. 1pc : 3ps
Tebal 20 mm
- Semen Portland Kg 10.8 1,406.00
- Pasir Pasang M3 0.026 233,400.00
- Pekerja Oh 0.25 42,000.00
- Tukang Batu Oh 0.2 65,000.00
- Kepala Tukang Oh 0.02 75,000.00
- Mandor Oh 0.0125 80,000.00
Jumlah
Dibulatkan
1 M2 Plesteran
F-05 adk. 1pc : 4ps
Tebal 20 mm
- Semen Portland Kg 8.68 1,406.00
- Pasir Pasang M3 0.028 233,400.00
- Pekerja Oh 0.25 42,000.00
- Tukang Batu Oh 0.2 65,000.00
- Kepala Tukang Oh 0.02 75,000.00
- Mandor Oh 0.0125 80,000.00
Jumlah
Dibulatkan
1 M2 Plesteran
F-06 adk. 1pc:5ps tebal
20 mm
- Semen Portland Kg 7.29 1,406.00
- Pasir Pasang M3 0.026 233,400.00
- Pekerja Oh 0.25 42,000.00
- Tukang Batu Oh 0.2 65,000.00
- Kepala Tukang Oh 0.02 75,000.00
- Mandor Oh 0.0125 80,000.00
Jumlah
Dibulatkan
1 M2 Acian
F-11
Plesteran
- Semen Portland Kg 4 1,406.00
- Pekerja Oh 0.143 42,000.00
- Tukang batu Oh 0.107 65,000.00
- Kepala Tukang Oh 0.0105 75,000.00
- Mandor Oh 0.0105 80,000.00
Jumlah
Dibulatkan
HARGA
(Rp)

11,979.12
3,967.80
8,400.00
9,750.00
1,125.00
800
36,021.92
36,022.00

9,110.88
4,434.60
8,400.00
9,750.00
1,125.00
800
33,620.48
33,620.00

7,311.20
4,668.00
8,400.00
9,750.00
1,125.00
800
32,054.20
32,054.00

15,184.80
6,068.40
10,500.00
13,000.00
1,500.00
1,000.00
47,253.20
47,253.00

12,204.08
6,535.20
10,500.00
13,000.00
1,500.00
1,000.00
44,739.28
44,739.00

10,249.74
6,068.40
10,500.00
13,000.00
1,500.00
1,000.00
42,318.14
42,318.00

5,624.00
6,006.00
6,955.00
787.5
840
20,212.50
20,213.00
HARGA
No. URAIAN SATUAN VOLUME
SATUAN
(Rp)
M2 Pasang Atap
G-01 1
Genteng Palentong
- Genteng palentong Bh 25 1,900.00
- Pekerja Oh 0.15 42,000.00
- Tukang kayu Oh 0.075 65,000.00
- Kepala tukang Oh 0.008 75,000.00
- Mandor Oh 0.008 80,000.00
Jumlah
Dibulatkan

1 M2 Pasang Genteng Bubung


G-02
Palentong

Genteng bubung
- Bh 5 6,000.00
palentong
- Semen Portland Kg 8 1,406.00
- Pasir pasang M3 0.032 233,400.00
- Pekerja Oh 0.4 42,000.00
- Tukang kayu Oh 0.2 65,000.00
- Kepala tukang Oh 0.02 75,000.00
- Mandor Oh 0.002 80,000.00
Jumlah
Dibulatkan
1 M2 Pasang Roof Light Fibreglass ( 180 x
G-03
90 ) cm
- Roof light fibreglass Lbr 0.6 100,000.00
- Paku biasa ½" - 1" Kg 0.05 23,800.00
- Pekerja Oh 0.14 42,000.00
- Tukang kayu Oh 0.067 65,000.00
- Kepala tukang Oh 0.007 75,000.00
- Mandor Oh 0.007 80,000.00
Jumlah
Dibulatkan

1 M2 Pasang Atap Asbes


G-04 Gelombang ( 3,00 x 1,05 m )
x 4 mm

- Asbes gelombang Lbr 0.35 80,000.00


- Paku seng Kg 0.12 23,800.00
- Pekerja Oh 0.14 42,000.00
- Tukang kayu Oh 0.07 65,000.00
- Kepala tukang Oh 0.007 75,000.00
- Mandor Oh 0.007 80,000.00
Jumlah
Dibulatkan
G-05 1 M2 Pasang Atap Asbes Gelombang ( 2,70 x 1,05 m ) x 4 mm
- Asbes gelombang Lbr 0.42 73,300.00
- Paku seng Kg 0.12 23,800.00
- Pekerja Oh 0.14 42,000.00
- Tukang kayu Oh 0.07 65,000.00
- Kepala tukang Oh 0.007 75,000.00
- Mandor Oh 0.007 80,000.00
Jumlah
Dibulatkan

1 M2 Pasang Atap Asbes


G-06 Gelombang ( 2,40 x 1,05 m )
x 4 mm

- Asbes gelombang Lbr 0.44 65,900.00


- Paku seng Kg 0.12 23,800.00
- Pekerja Oh 0.14 42,000.00
- Tukang kayu Oh 0.067 65,000.00
- Kepala tukang Oh 0.007 75,000.00
- Mandor Oh 0.007 80,000.00
Jumlah
Dibulatkan
M2 Pasang Atap
Asbes Gelombang
G-07 1
( 2,10 x 1,05 m ) x 4
mm
- Asbes gelombang Lbr 0.51 58,500.00
- Paku seng Kg 0.12 23,800.00
- Pekerja Oh 0.14 42,000.00
- Tukang kayu Oh 0.067 65,000.00
- Kepala tukang Oh 0.007 75,000.00
- Mandor Oh 0.007 80,000.00
Jumlah
Dibulatkan

1 M2 Pasang Atap Asbes


G-08 Gelombang ( 1,50 x 1,05 m )
x 4 mm

- Asbes gelombang Lbr 0.8 42,300.00


- Paku seng Kg 0.12 23,800.00
- Pekerja Oh 0.14 42,000.00
- Tukang kayu Oh 0.067 65,000.00
- Kepala tukang Oh 0.007 75,000.00
- Mandor Oh 0.007 80,000.00
Jumlah
Dibulatkan

1 M¹ Pasang Nok Stel


G-09
Gelombang 1,05 m

- Nok stel gelombang Lbr 2.1 38,100.00


- Paku sekrup 3,5" Bh 6 800
- Pekerja Oh 0.084 42,000.00
- Tukang kayu Oh 0.125 65,000.00
- Kepala tukang Oh 0.013 75,000.00
- Mandor Oh 0.004 80,000.00
Jumlah
Dibulatkan
1 M2 Pasang Atap Genteng
G-10
Beton
- Genteng beton bh 11 8,500.00
- Paku biasa 2" - 5" Kg 0.03 23,400.00
- Pekerja Oh 0.2 42,000.00
- Tukang kayu Oh 0.1 65,000.00
- Kepala tukang Oh 0.01 75,000.00
- Mandor Oh 0.01 80,000.00
Jumlah
Dibulatkan

1 M2 Pasang Atap Genteng


G-11
Murando Natural

Genteng murando
- bh 18 2,700.00
natural
- Pekerja Oh 0.15 42,000.00
- Tukang kayu Oh 0.075 65,000.00
- Kepala tukang Oh 0.008 75,000.00
- Mandor Oh 0.008 80,000.00
Jumlah
Dibulatkan

1 M2 Pasang Atap Genteng


G-12
Murando Glazur

Genteng murando
- bh 18 4,000.00
glazur
- Pekerja Oh 0.15 42,000.00
- Tukang kayu Oh 0.075 65,000.00
- Kepala tukang Oh 0.008 75,000.00
- Mandor Oh 0.008 80,000.00
Jumlah
Dibulatkan
HARGA
(Rp)

47,500.00
6,300.00
4,875.00
600
640
59,915.00
59,915.00

30,000.00
11,248.00
7,468.80
16,800.00
13,000.00
1,500.00
160
80,176.80
80,177.00

60,000.00
1,190.00
5,880.00
4,355.00
525
560
72,510.00
72,510.00

28,000.00
2,856.00
5,880.00
4,550.00
525
560
42,371.00
42,371.00

30,786.00
2,856.00
5,880.00
4,550.00
525
560
45,157.00
45,157.00

28,996.00
2,856.00
5,880.00
4,355.00
525
560
43,172.00
43,172.00

29,835.00
2,856.00
5,880.00
4,355.00
525
560
44,011.00
44,011.00

33,840.00
2,856.00
5,880.00
4,355.00
525
560
48,016.00
48,016.00

80,010.00
4,800.00
3,528.00
8,125.00
975
320
97,758.00
97,758.00

93,500.00
702
8,400.00
6,500.00
750
800
110,652.00
110,652.00

48,600.00
6,300.00
4,875.00
600
640
61,015.00
61,015.00

72,000.00
6,300.00
4,875.00
600
640
84,415.00
84,415.00
No. URAIAN SATUAN VOLUME HARGA SATUAN HARGA
(Rp) (Rp)
(Rp) (Rp)

1 M2 Langit-langit Asbes (
H-01 1,00 x 1,00 ) m, tebal 5
mm

Pelat asbes tebal


- m2 1.1 22,500.00 24,750.00
4 mm
- Paku seng Kg 0.01 23,800.00 238
- Pekerja Oh 0.03 42,000.00 1,260.00
- Tukang kayu Oh 0.07 65,000.00 4,550.00
- Kepala tukang Oh 0.007 75,000.00 525
- Mandor Oh 0.0015 80,000.00 120
Jumlah 31,443.00
Dibulatkan 31,443.00

1 M2 Langit-langit Asbes (
H-02 1,00 x 1,00 ) m, tebal 3,5
mm

Pelat asbes tebal


- Lbr 1.1 19,500.00 21,450.00
3,5 mm
- Paku seng Kg 0.01 23,800.00 238
- Pekerja Oh 0.03 42,000.00 1,260.00
- Tukang kayu Oh 0.07 65,000.00 4,550.00
- Kepala tukang Oh 0.007 75,000.00 525
- Mandor Oh 0.0015 80,000.00 120
Jumlah 28,143.00
Dibulatkan 28,143.00
1 M2 Langit-langit Akustik ( 60 x 120
H-03
) cm
Akustik 600 x
- Lbr 1.5 132,800.00 199,200.00
1200
- Paku Kg 0.05 23,800.00 1,190.00
- Pekerja Oh 0.06 42,000.00 2,520.00
- Tukang kayu Oh 0.1 65,000.00 6,500.00
- Kepala tukang Oh 0.01 75,000.00 750
- Mandor Oh 0.003 80,000.00 240
Jumlah 210,400.00
Dibulatkan 210,400.00
H-04 1 M2 Langit-langit Akustik ( 60 x 120 ) cm + Rangka Alluminium
Profil Alluminium
- M¹ 3.6 12,200.00 43,920.00
"T"
- Kawat f 4 mm Kg 0.15 28,200.00 4,230.00
Ramset / dina
- Bh 1.05 7,200.00 7,560.00
bolt
Akustik 600 x
- Lbr 1.5 132,800.00 199,200.00
1200
- Pekerja Oh 0.15 42,000.00 6,300.00
- Tukang kayu Oh 0.5 65,000.00 32,500.00
- Kepala tukang Oh 0.05 75,000.00 3,750.00
- Mandor Oh 0.0075 80,000.00 600
Jumlah 298,060.00
Dibulatkan 298,060.00
H-05 1 M2 Langit-langit teakwood (60 x 120) cm, t = 4 mm + rangka kayu borneo super
Kayu Balok
- M3 0.023 2,640,000.00 60,720.00
Borneo Super
- Paku biasa 2" - 5" Kg 0.06 23,400.00 1,404.00

Teakwood 120
- cm x 240 cm x Lbr 0.39 131,700.00 51,363.00
0,4 cm
- Pekerja Oh 0.27 42,000.00 11,340.00
- Tukang kayu Oh 0.4 65,000.00 26,000.00
- Kepala tukang Oh 0.04 75,000.00 3,000.00
- Mandor Oh 0.0135 80,000.00 1,080.00
Jumlah 154,907.00
Dibulatkan 154,907.00
1 M2 Langit-langit Teakwood 3 mm + Rangka Kayu Borneo
H-06
Super
Kayu Balok
- M3 0.023 2,640,000.00 60,720.00
Borneo Super
- Paku biasa 2" - 5" Kg 0.06 23,400.00 1,404.00
Teakwood (120 x
- Lbr 0.39 129,100.00 50,349.00
240x 0,3) cm
- Pekerja Oh 0.27 42,000.00 11,340.00
- Tukang kayu Oh 0.4 65,000.00 26,000.00
- Kepala tukang Oh 0.04 75,000.00 3,000.00
- Mandor Oh 0.0135 80,000.00 1,080.00
Jumlah 153,893.00
Dibulatkan 153,893.00
H-07 1 M2 Langit-langit Triplek 4 mm + Rangka Kayu Borneo Super
Kayu Balok
- M3 0.023 2,640,000.00 60,720.00
Borneo Super
- Paku biasa 2" - 5" Kg 0.06 23,800.00 1,428.00
Triplek 120 cm x
- Lbr 0.39 64,400.00 25,116.00
240 cm x 0,4 cm

- Pekerja Oh 0.27 42,000.00 11,340.00


- Tukang kayu Oh 0.4 65,000.00 26,000.00
- Kepala tukang Oh 0.04 75,000.00 3,000.00
- Mandor Oh 0.0135 80,000.00 1,080.00
Jumlah 128,684.00
Dibulatkan 128,684.00
1 M2 Langit-langit Gypsum Board, tebal 9 mm + rangka besi
H-08
hollow
Hollow 4/4
- Btg 0.415 29,200.00 12,118.00
Zincromate
Hollow 2/4
- Btg 0.15 22,600.00 3,390.00
Zincromate
Gypsum board
- ( 120 x 240 x 9 ) Lbr 0.364 79,800.00 29,047.20
mm
- Paku gypsum kg 0.11 17,500.00 1,925.00
Ramset / dina
- Bh 4 7,200.00 28,800.00
bolt
- Cotton plaster Bh 0.072 15,000.00 1,080.00
- Compoun Zak 0.125 75,000.00 9,375.00
- Pekerja Oh 0.1 42,000.00 4,200.00
- Tukang kayu Oh 0.05 65,000.00 3,250.00
- Kepala tukang Oh 0.005 75,000.00 375
- Mandor Oh 0.005 80,000.00 400
Jumlah 93,960.20
Dibulatkan 93,960.00
1 M2 Langit-langit GRC t = 4 mm + rangka besi
H-09
hollow
Hollow 4/4
- Btg 0.415 29,200.00 12,118.00
Zincromate
Hollow 2/4
- Btg 0.15 22,600.00 3,390.00
Zincromate
GRC ( 120 x 240
- Lbr 0.364 67,500.00 24,570.00
x 4 ) mm
- Paku GRC kg 0.11 35,000.00 3,850.00
Ramset / dina
- Bh 4 7,200.00 28,800.00
bolt
- Cotton plaster Bh 0.072 15,000.00 1,080.00
- Compoun Zak 0.125 75,000.00 9,375.00
- Pekerja Oh 0.1 42,000.00 4,200.00
- Tukang kayu Oh 0.05 65,000.00 3,250.00
- Kepala tukang Oh 0.005 75,000.00 375
- Mandor Oh 0.005 80,000.00 400
Jumlah 91,408.00
Dibulatkan 91,408.00
1 M2 Langit-langit gypsum t = 9 mm + Rangka Kayu Borneo
H-10
Super
Kayu Balok
- M3 0.023 2,640,000.00 60,720.00
Borneo Super
- Paku biasa 2" - 5" Kg 0.06 23,800.00 1,428.00

Gypsum board
- ( 120 x 240 x 9 ) Lbr 0.39 79,800.00 31,122.00
mm
- Paku sekrup kg 0.11 17,500.00 1,925.00
- Pekerja Oh 0.27 42,000.00 11,340.00
- Tukang kayu Oh 0.4 65,000.00 26,000.00
- Kepala tukang Oh 0.04 75,000.00 3,000.00
- Mandor Oh 0.0135 80,000.00 1,080.00
Jumlah 136,615.00
Dibulatkan 136,615.00
H-11 1 M2 Langit-langit GRC t = 4 mm + Rangka Kayu Borneo Super
Kayu Balok
- M3 0.023 2,640,000.00 60,720.00
Borneo Super
- Paku biasa 2" - 5" Kg 0.06 23,800.00 1,428.00
GRC ( 120 x 240
- Lbr 0.39 67,500.00 26,325.00
x 4 ) mm
- Paku GRC kg 0.11 35,000.00 3,850.00
- Pekerja Oh 0.27 42,000.00 11,340.00
- Tukang kayu Oh 0.4 65,000.00 26,000.00
- Kepala tukang Oh 0.04 75,000.00 3,000.00
- Mandor Oh 0.0135 80,000.00 1,080.00
Jumlah 133,743.00
Dibulatkan 133,743.00

1 M¹ List Langit-langit
H-12
Kayu Profil 10 cm

- List Kayu profil M¹ 1.05 29,400.00 30,870.00


- Paku Kg 0.01 23,800.00 238
- Pekerja Oh 0.05 42,000.00 2,100.00
- Tukang kayu Oh 0.05 65,000.00 3,250.00
- Kepala tukang Oh 0.005 75,000.00 375
- Mandor Oh 0.003 80,000.00 240
Jumlah 37,073.00
Dibulatkan 37,073.00
1 M¹ List Langit-langit
H-13
Gypsum 10 cm

- List gypsum M¹ 1.05 8,500.00 8,925.00


- Tepung gypsum Kg 0.15 12,500.00 1,875.00
- Pekerja Oh 0.05 42,000.00 2,100.00
- Tukang kayu Oh 0.05 65,000.00 3,250.00
- Kepala tukang Oh 0.005 75,000.00 375
- Mandor Oh 0.003 80,000.00 240
Jumlah 16,765.00
Dibulatkan 16,765.00
No. URAIAN SATUAN VOLUME HARGA SATUAN
(Rp)

1 M2 Lantai Ubin Granito


I-01 ukuran 40 x 40 cm Setara
Essenza

- Granito 40 x 40 cm m2 1.05 345,000.00


- Semen portland Kg 9.8 1,406.00
- Pasir pasang M3 0.0215 233,400.00
- Semen warna Kg 1.3 15,700.00
- Pekerja Oh 0.25 42,000.00
- Tukang batu Oh 0.12 65,000.00
- Kepala tukang Oh 0.012 75,000.00
- Mandor Oh 0.0125 80,000.00
Jumlah
Dibulatkan

1 M2 Lantai Ubin Granito


I-02 ukuran 30 x 30 cm Setara
Essenza

- Granito 30 x 30 cm m2 1.05 322,800.00


- Semen portland Kg 10 1,406.00
- Pasir pasang M3 0.0215 233,400.00
- Semen warna Kg 1.5 15,700.00
- Pekerja Oh 0.26 42,000.00
- Tukang batu Oh 0.125 65,000.00
- Kepala tukang Oh 0.0125 75,000.00
- Mandor Oh 0.013 80,000.00
Jumlah
Dibulatkan

1 M¹ Plint Ubin Granito ukuran


I-03
10 x 40 cm Setara Essenza

- Plint granito 10 x 40 cm Bh 2.65 27,600.00


- Semen portland Kg 1.2 1,406.00
- Pasir pasang M3 0.003 233,400.00
- Semen warna Kg 0.1 15,700.00
- Pekerja Oh 0.06 42,000.00
- Tukang batu Oh 0.03 65,000.00
- Kepala tukang Oh 0.003 75,000.00
- Mandor Oh 0.003 80,000.00
Jumlah
Dibulatkan

1 M¹ Plint Ubin Granito ukuran


I-04
10 x 30 cm Setara Essenza

- Plint granito 10 x 30 cm Bh 3.33 25,900.00


- Semen portland Kg 1.65 1,406.00
- Pasir pasang M3 0.0032 233,400.00
- Semen warna Kg 0.1 15,700.00
- Pekerja Oh 0.09 42,000.00
- Tukang batu Oh 0.09 65,000.00
- Kepala tukang Oh 0.009 75,000.00
- Mandor Oh 0.0045 80,000.00
Jumlah
Dibulatkan
I-05 1 M2 Lantai Keramik Corak 10 x 20 cm setara Mulia
Keramik corak 10 x 20
- m2 1 56,000.00
cm
- Semen portland Kg 8 1,406.00
- Pasir pasang M3 0.0215 233,400.00
- Semen warna Kg 0.013 15,700.00
- Pekerja Oh 0.25 42,000.00
- Tukang batu Oh 0.12 65,000.00
- Kepala tukang Oh 0.012 75,000.00
- Mandor Oh 0.0125 80,000.00
Jumlah
Dibulatkan

1 M2 Lantai Keramik corak 20


I-06
x 20 cm setara Mulia

Keramik corak 20 x 20
- m2 1 62,500.00
cm
- Semen portland Kg 8 1,406.00
- Pasir pasang M3 0.0215 233,400.00
- Semen warna Kg 0.013 15,700.00
- Pekerja Oh 0.25 42,000.00
- Tukang batu Oh 0.12 65,000.00
- Kepala tukang Oh 0.012 75,000.00
- Mandor Oh 0.0125 80,000.00
Jumlah
Dibulatkan
1 M2 Lantai Keramik polos 30
I-07
x 30 cm setara Mulia

Keramik polos 30 x 30
- m2 1 53,000.00
cm
- Semen portland Kg 8 1,406.00
- Pasir pasang M3 0.0215 233,400.00
- Semen warna Kg 0.013 15,700.00
- Pekerja Oh 0.25 42,000.00
- Tukang batu Oh 0.12 65,000.00
- Kepala tukang Oh 0.012 75,000.00
- Mandor Oh 0.0125 80,000.00
Jumlah
Dibulatkan

1 M2 Lantai Keramik corak 30


I-08
x 30 cm Setara Mulia

Keramik corak 30 x 30
- m2 1 58,000.00
cm
- Semen portland Kg 8 1,406.00
- Pasir pasang M3 0.0215 233,400.00
- Semen warna Kg 0.013 15,700.00
- Pekerja Oh 0.25 42,000.00
- Tukang batu Oh 0.12 65,000.00
- Kepala tukang Oh 0.012 75,000.00
- Mandor Oh 0.0125 80,000.00
Jumlah
Dibulatkan

1 M2 Lantai Keramik polos 40


I-09
x 40 cm Setara Mulia

Keramik polos 40 x 40
- m2 1 56,800.00
cm
- Semen portland Kg 8 1,406.00
- Pasir pasang M3 0.0215 233,400.00
- Semen warna Kg 0.013 15,700.00
- Pekerja Oh 0.25 42,000.00
- Tukang batu Oh 0.12 65,000.00
- Kepala tukang Oh 0.012 75,000.00
- Mandor Oh 0.0125 80,000.00
Jumlah
Dibulatkan
1 M2 Lantai Keramik corak 40
I-10
x 40 cm Setara Mulia

Keramik corak 40 x 40
- m2 1 65,500.00
cm
- Semen portland Kg 8 1,406.00
- Pasir pasang M3 0.0215 233,400.00
- Semen warna Kg 0.013 15,700.00
- Pekerja Oh 0.25 42,000.00
- Tukang batu Oh 0.12 65,000.00
- Kepala tukang Oh 0.012 75,000.00
- Mandor Oh 0.0125 80,000.00
Jumlah
Dibulatkan
I-11 1 M2 Lantai Keramik Corak 10 x 20 cm setara Roman
Keramik corak 10 x 20
- m2 1 72,200.00
cm
- Semen portland Kg 8 1,406.00
- Pasir pasang M3 0.0215 233,400.00
- Semen warna Kg 0.013 15,700.00
- Pekerja Oh 0.25 42,000.00
- Tukang batu Oh 0.12 65,000.00
- Kepala tukang Oh 0.012 75,000.00
- Mandor Oh 0.0125 80,000.00
Jumlah
Dibulatkan

1 M2 Lantai Keramik corak 20


I-12
x 20 cm setara Roman

Keramik corak 20 x 20
- m2 1 75,200.00
cm
- Semen portland Kg 8 1,406.00
- Pasir pasang M3 0.0215 233,400.00
- Semen warna Kg 0.013 15,700.00
- Pekerja Oh 0.25 42,000.00
- Tukang batu Oh 0.12 65,000.00
- Kepala tukang Oh 0.012 75,000.00
- Mandor Oh 0.0125 80,000.00
Jumlah
Dibulatkan
1 M2 Lantai Keramik polos 30
I-13
x 30 cm setara Roman

Keramik polos 30 x 30
- m2 1 68,900.00
cm
- Semen portland Kg 8 1,406.00
- Pasir pasang M3 0.0215 233,400.00
- Semen warna Kg 0.013 15,700.00
- Pekerja Oh 0.25 42,000.00
- Tukang batu Oh 0.12 65,000.00
- Kepala tukang Oh 0.012 75,000.00
- Mandor Oh 0.0125 80,000.00
Jumlah
Dibulatkan

1 M2 Lantai Keramik corak 30


I-14
x 30 cm Setara Roman

Keramik corak 30 x 30
- M2 1 76,600.00
cm
- Semen portland Kg 8 1,406.00
- Pasir pasang M3 0.0215 233,400.00
- Semen warna Kg 0.013 15,700.00
- Pekerja Oh 0.25 42,000.00
- Tukang batu Oh 0.12 65,000.00
- Kepala tukang Oh 0.012 75,000.00
- Mandor Oh 0.0125 80,000.00
Jumlah
Dibulatkan

1 M2 Lantai Keramik polos 40


I-15
x 40 cm setara Roman

Keramik polos 40 x 40
- m2 1 72,500.00
cm
- Semen portland Kg 8 1,406.00
- Pasir pasang M3 0.0215 233,400.00
- Semen warna Kg 0.013 15,700.00
- Pekerja Oh 0.25 42,000.00
- Tukang batu Oh 0.12 65,000.00
- Kepala tukang Oh 0.012 75,000.00
- Mandor Oh 0.0125 80,000.00
Jumlah
Dibulatkan
1 M2 Lantai Keramik corak 40
I-16
x 40 cm Setara Roman

Keramik corak 40 x 40
- m2 1 77,000.00
cm
- Semen portland Kg 8 1,406.00
- Pasir pasang M3 0.0215 233,400.00
- Semen warna Kg 0.013 15,700.00
- Pekerja Oh 0.25 42,000.00
- Tukang batu Oh 0.12 65,000.00
- Kepala tukang Oh 0.012 75,000.00
- Mandor Oh 0.0125 80,000.00
Jumlah
Dibulatkan
I-17 1 M2 Lantai Marmer
- Marmer m2 1.06 550,000.00
- Semen portland Kg 8.19 1,406.00
- Pasir pasang M3 0.045 233,400.00
- Semen warna Kg 0.65 15,700.00
- Pekerja Oh 0.7 42,000.00
- Tukang batu Oh 0.35 65,000.00
- Kepala tukang Oh 0.035 75,000.00
- Mandor Oh 0.035 80,000.00
Jumlah
Dibulatkan
I-18 1 M2 Lantai Parquet Jati
- Parquet jati M2 1.05 375,400.00
- Lem vinyl Kg 0.6 44,000.00
- Pekerja Oh 0.65 42,000.00
- Tukang Oh 0.35 65,000.00
- Kepala tukang Oh 0.035 75,000.00
- Mandor Oh 0.0325 80,000.00
Jumlah
Dibulatkan
HARGA
(Rp)

362,250.00
13,778.80
5,018.10
20,410.00
10,500.00
7,800.00
900
1,000.00
421,656.90
421,657.00

338,940.00
14,060.00
5,018.10
23,550.00
10,920.00
8,125.00
937.5
1,040.00
402,590.60
402,591.00

73,140.00
1,687.20
700.2
1,570.00
2,520.00
1,950.00
225
240
82,032.40
82,032.00

86,247.00
2,319.90
746.88
1,570.00
3,780.00
5,850.00
675
360
101,548.78
101,549.00

56,000.00
11,248.00
5,018.10
204.1
10,500.00
7,800.00
900
1,000.00
92,670.20
92,670.00

62,500.00
11,248.00
5,018.10
204.1
10,500.00
7,800.00
900
1,000.00
99,170.20
99,170.00
53,000.00
11,248.00
5,018.10
204.1
10,500.00
7,800.00
900
1,000.00
89,670.20
89,670.00

58,000.00
11,248.00
5,018.10
204.1
10,500.00
7,800.00
900
1,000.00
94,670.20
94,670.00

56,800.00
11,248.00
5,018.10
204.1
10,500.00
7,800.00
900
1,000.00
93,470.20
93,470.00
65,500.00
11,248.00
5,018.10
204.1
10,500.00
7,800.00
900
1,000.00
102,170.20
102,170.00

72,200.00
11,248.00
5,018.10
204.1
10,500.00
7,800.00
900
1,000.00
108,870.20
108,870.00

75,200.00
11,248.00
5,018.10
204.1
10,500.00
7,800.00
900
1,000.00
111,870.20
111,870.00
68,900.00
11,248.00
5,018.10
204.1
10,500.00
7,800.00
900
1,000.00
105,570.20
105,570.00

76,600.00
11,248.00
5,018.10
204.1
10,500.00
7,800.00
900
1,000.00
113,270.20
113,270.00

72,500.00
11,248.00
5,018.10
204.1
10,500.00
7,800.00
900
1,000.00
109,170.20
109,170.00
77,000.00
11,248.00
5,018.10
204.1
10,500.00
7,800.00
900
1,000.00
113,670.20
113,670.00

583,000.00
11,515.14
10,503.00
10,205.00
29,400.00
22,750.00
2,625.00
2,800.00
672,798.14
672,798.00

394,170.00
26,400.00
27,300.00
22,750.00
2,625.00
2,600.00
475,845.00
475,845.00
No. URAIAN SATUAN VOLUME HARGA SATUAN

1 M3 Kusen Pintu & jendela kayu


J-01
Kamper Samarinda

Kayu Balok Kamper


- m3 1.2 8,633,700.00
Samarinda
- Pekerja Oh 6 42,000.00
- Tukang Kayu Oh 18 65,000.00
- Kepala Tukang Oh 2 75,000.00
- Mandor Oh 0.3 80,000.00
Jumlah
Dibulatkan
M3 Kusen Pintu & jendela
J-02 1 kayu Kamper
Medan/Kruing

- Kayu Balok Kamper Medan M3 1.2 5,692,600.00


- Pekerja Oh 6 42,000.00
- Tukang Kayu Oh 18 65,000.00
- Kepala Tukang Oh 2 75,000.00
- Mandor Oh 0.3 80,000.00
Jumlah
Dibulatkan

M3 Kusen Pintu & jendela


J-03 1
kayu Borneo Super

- Kayu Borneo Balok Super M3 1.2 5,280,000.00


- Pekerja Oh 6 42,000.00
- Tukang Kayu Oh 18 65,000.00
- Kepala Tukang Oh 2 75,000.00
- Mandor Oh 0.3 80,000.00
Jumlah
Dibulatkan
J-04 1 M2 Pintu Panel Kayu Kamper Samarinda
Kayu Papan Kamper
- M3 0.04 8,633,700.00
Samarinda
- Paku Biasa 2" - 5" Kg 0.05 23,400.00
- Pekerja Oh 1 42,000.00
- Tukang Kayu Oh 2.5 65,000.00
- Kepala Tukang Oh 0.25 75,000.00
- Mandor Oh 0.05 80,000.00
Jumlah
Dibulatkan
J-05 1 M2 Pintu Panel Kayu Kamper Medan/Kruing
Kayu Papan Kamper
- M3 0.04 5,692,600.00
Medan
- Paku Biasa 2" - 5" Kg 0.05 23,400.00
- Pekerja Oh 1 42,000.00
- Tukang Kayu Oh 2.5 65,000.00
- Kepala Tukang Oh 0.25 75,000.00
- Mandor Oh 0.05 80,000.00
Jumlah
Dibulatkan
J-06 1 M2 Pintu & Jendela Kaca Kayu Kamper Medan
Kayu Papan Kamper
- M3 0.035 5,692,600.00
Medan
- Pekerja Oh 0.8 42,000.00
- Tukang Kayu Oh 2 65,000.00
- Kepala Tukang Oh 0.2 75,000.00
- Mandor Oh 0.04 80,000.00
Jumlah
Dibulatkan
M2 Pintu & Jendela Kaca
J-07 1
Kayu Borneo
- Kayu Papan Borneo Super M3 0.035 5,595,800.00
- Pekerja Oh 0.8 42,000.00
- Tukang Kayu Oh 2 65,000.00
- Kepala Tukang Oh 0.2 75,000.00
- Mandor Oh 0.04 80,000.00
Jumlah
Dibulatkan

M2 Pintu & Jendela Jalusi


J-08 1
Kayu Kamper Medan

Kayu Papan Kamper


- M3 0.064 5,692,600.00
Medan
- Pekerja Oh 1 42,000.00
- Tukang Kayu Oh 3 65,000.00
- Kepala Tukang Oh 0.3 75,000.00
- Mandor Oh 0.5 80,000.00
Jumlah
Dibulatkan
M2 Pintu Triplek Rangkap,
J-09 1 Rangka Tertutup Kayu
Kamper Medan

Kayu Papan Kamper


- M3 0.0196 5,692,600.00
Medan
- Paku Biasa ½" - 1" Kg 0.03 23,800.00
- Lem Kayu Ltr 0.3 23,900.00
- Triplek 120 x 240 x 0,4 cm Lbr 1 64,400.00
- Pekerja Oh 0.6 42,000.00
- Tukang Kayu Oh 2 65,000.00
- Kepala Tukang Oh 0.2 75,000.00
- Mandor Oh 0.03 80,000.00
Jumlah
Dibulatkan
J-10 1 M2 Jalusi Mati Kusen Kayu kamper Medan
Kayu Papan Kamper
- M3 0.06 5,692,600.00
Medan
- Paku Biasa ½" - 1" Kg 0.15 23,800.00
- Pekerja Oh 0.5 42,000.00
- Tukang Kayu Oh 2 65,000.00
- Kepala Tukang Oh 0.2 75,000.00
- Mandor Oh 0.025 80,000.00
Jumlah
Dibulatkan
J-11 1 M2 Pintu Triplek Rangkap, Rangka Kayu Borneo Super

- Kayu Papan Borneo Super M3 0.0196 5,595,800.00


- Paku Biasa ½" - 1" Kg 0.03 23,800.00
- Lem Kayu Ltr 0.3 23,900.00
- Triplek 120 x 240 x 0,4 cm Lbr 1 64,400.00
- Pekerja Oh 0.6 42,000.00
- Tukang Kayu Oh 2 65,000.00
- Kepala Tukang Oh 0.2 75,000.00
- Mandor Oh 0.03 80,000.00
Jumlah
Dibulatkan
M2 Pintu Teakwood
J-12 1 Rangkap, rangka Kayu
Kamper Medan
Kayu Papan Kamper
- M3 0.0196 5,692,600.00
Medan
- Paku Biasa ½" - 1" Kg 0.3 23,800.00
- Lem Kayu Ltr 0.3 23,900.00
- Teakwood 4 mm Lbr 1 131,700.00
- Pekerja Oh 0.6 42,000.00
- Tukang Kayu Oh 2 65,000.00
- Kepala Tukang Oh 0.2 75,000.00
- Mandor Oh 0.03 80,000.00
Jumlah
Dibulatkan
M2 Pintu Triplek &
J-13 1 Formika, Rangka Kayu
Kamper Medan
Kayu Papan Kamper
- M3 0.0196 5,692,600.00
Medan
- Paku Biasa ½" - 1" Kg 0.3 23,800.00
- Lem Kayu Ltr 0.8 23,900.00
- Triplek 120 x 240 x 0,4 cm Lbr 1 64,400.00
- Formica 3" x 6" Lbr 0.5 132,900.00
- Pekerja Oh 0.8 42,000.00
- Tukang Kayu Oh 2.5 65,000.00
- Kepala Tukang Oh 0.25 75,000.00
- Mandor Oh 0.04 80,000.00
Jumlah
Dibulatkan

M2 Pintu Teakwood &


J-14 1 Formika, Rangka Kayu
Kamper Medan (dipolitur)

Kayu Papan Kamper


- M3 0.0196 5,692,600.00
Medan
- Paku Biasa ½" - 1" Kg 0.3 23,800.00
- Lem Kayu Ltr 0.8 23,900.00
Teakwood 120 x 240 x 0,4
- Lbr 1 131,700.00
cm
- Formica 4" x 8" Lbr 0.5 238,100.00
- Pekerja Oh 0.8 42,000.00
- Tukang Kayu Oh 2.5 65,000.00
- Kepala Tukang Oh 0.25 75,000.00
- Mandor Oh 0.04 80,000.00
Jumlah
Dibulatkan
J-15 1 M3 Kuda-kuda Kayu Kamper Medan

- Kayu Balok Kamper Medan M3 1.1 5,692,600.00


- Besi Strip Kg 15 26,800.00
- Paku Biasa 2" - 5" Kg 0.8 23,800.00
- Pekerja Oh 4 42,000.00
- Tukang Kayu Oh 12 65,000.00
- Kepala Tukang Oh 1.2 75,000.00
- Mandor Oh 0.2 80,000.00
Jumlah
Dibulatkan
M3 Kuda-kuda Kayu
J-16 1
Borneo Super
- Kayu balok Borneo super M3 1.1 5,280,000.00
- Besi Strip Kg 15 26,800.00
- Paku Biasa 2" - 5" Kg 0.8 23,800.00
- Pekerja Oh 4 42,000.00
- Tukang Kayu Oh 12 65,000.00
- Kepala Tukang Oh 1.2 75,000.00
- Mandor Oh 0.2 80,000.00
Jumlah
Dibulatkan
M2 Kaso + Reng Genteng
J-17 1 Plentong Kayu Borneo
Super

- Kayu balok Borneo super m3 0.012 5,280,000.00


- Paku Biasa 2" - 5" Kg 0.15 23,800.00
- Pekerja Oh 0.1 42,000.00
- Tukang Kayu Oh 0.1 65,000.00
- Kepala Tukang Oh 0.01 75,000.00
- Mandor Oh 0.005 80,000.00
Jumlah
Dibulatkan

M2 Kaso + Reng Genteng


J-18 1
Beton Kayu Borneo Super

- Kayu balok Borneo super M3 0.014 5,280,000.00


- Paku Biasa 2" - 5" Kg 0.15 23,800.00
- Pekerja Oh 0.1 42,000.00
- Tukang Kayu Oh 0.1 65,000.00
- Kepala Tukang Oh 0.01 75,000.00
- Mandor Oh 0.005 80,000.00
Jumlah
Dibulatkan
M' Lisplang uk (3x20)cm,
J-19 1
Kayu Kamper Medan

Kayu Papan Kamper


- M3 0.0072 5,823,400.00
Medan
- Paku Biasa 2" - 5" Kg 0.05 23,800.00
- Pekerja Oh 0.1 42,000.00
- Tukang Kayu Oh 0.2 65,000.00
- Kepala Tukang Oh 0.02 75,000.00
- Mandor Oh 0.005 80,000.00
Jumlah
Dibulatkan
J-20 1 M' Lisplang uk (3x30)cm, Kayu Kamper Medan
Kayu Papan Kamper
- M3 0.011 5,692,600.00
Medan
- Paku Biasa 2" - 5" Kg 0.05 23,800.00
- Pekerja Oh 0.11 42,000.00
- Tukang Kayu Oh 0.22 65,000.00
- Kepala Tukang Oh 0.022 75,000.00
- Mandor Oh 0.005 80,000.00
Jumlah
Dibulatkan
J-21 1 M¹ List Plafond + kayu Profil 10 cm
- Kayu Profil 10 cm M' 1.05 29,400.00
- Pekerja Oh 0.021 42,000.00
- Tukang Kayu Oh 0.021 65,000.00
- Kepala Tukang Oh 0.002 75,000.00
- Mandor Oh 0.001 80,000.00
Jumlah
Dibulatkan
HARGA

10,360,440.00
252,000.00
1,170,000.00
150,000.00
24,000.00
11,956,440.00
11,956,440.00

6,831,120.00
252,000.00
1,170,000.00
150,000.00
24,000.00
8,427,120.00
8,427,120.00

6,336,000.00
252,000.00
1,170,000.00
150,000.00
24,000.00
7,932,000.00
7,932,000.00

345,348.00
1,170.00
42,000.00
162,500.00
18,750.00
4,000.00
573,768.00
573,768.00

227,704.00
1,170.00
42,000.00
162,500.00
18,750.00
4,000.00
456,124.00
456,124.00

199,241.00
33,600.00
130,000.00
15,000.00
3,200.00
381,041.00
381,041.00

195,853.00
33,600.00
130,000.00
15,000.00
3,200.00
377,653.00
377,653.00

364,326.40
42,000.00
195,000.00
22,500.00
40,000.00
663,826.40
663,826.00
111,574.96
714
7,170.00
64,400.00
25,200.00
130,000.00
15,000.00
2,400.00
356,458.96
356,459.00

341,556.00
3,570.00
21,000.00
130,000.00
15,000.00
2,000.00
513,126.00
513,126.00

109,677.68
714
7,170.00
64,400.00
25,200.00
130,000.00
15,000.00
2,400.00
354,561.68
354,562.00

111,574.96
7,140.00
7,170.00
131,700.00
25,200.00
130,000.00
15,000.00
2,400.00
430,184.96
430,185.00

111,574.96
7,140.00
19,120.00
64,400.00
66,450.00
33,600.00
162,500.00
18,750.00
3,200.00
486,734.96
486,735.00

111,574.96
7,140.00
19,120.00
131,700.00
119,050.00
33,600.00
162,500.00
18,750.00
3,200.00
606,634.96
606,635.00

6,261,860.00
402,000.00
19,040.00
168,000.00
780,000.00
90,000.00
16,000.00
7,736,900.00
7,736,900.00

5,808,000.00
402,000.00
19,040.00
168,000.00
780,000.00
90,000.00
16,000.00
7,283,040.00
7,283,040.00

63,360.00
3,570.00
4,200.00
6,500.00
750
400
78,780.00
78,780.00

73,920.00
3,570.00
4,200.00
6,500.00
750
400
89,340.00
89,340.00
41,928.48
1,190.00
4,200.00
13,000.00
1,500.00
400
62,218.48
62,218.00

62,618.60
1,190.00
4,620.00
14,300.00
1,650.00
400
84,778.60
84,779.00

30,870.00
882
1,365.00
150
80
33,347.00
33,347.00
VOLUM
No. URAIAN SAT HARGA SAT
E
(Rp)
K-01 1 Kg Besi profil
- Besi profil WF Kg 1.1 24,000.00
- Meni besi Kg 0.08 30,400.00
- Pekerja Oh 0.06 42,000.00
- Tukang besi Oh 0.006 65,000.00
- Kepala tukang Oh 0.006 75,000.00
- Mandor Oh 0.0003 80,000.00
Jumlah
Dibulatkan
K-02 1 Kg Perakitan baja
- Solar m' 0.01 7,150.00
- Minyak pelumas m' 0.001 55,000.00
- Sewa alat jam 0.008 100,000.00
- Pekerja Oh 0.001 42,000.00
- Tukang besi Oh 0.00001 65,000.00
- Kepala tukang Oh 0.00001 75,000.00
- Mandor Oh 0.00005 80,000.00
Jumlah
Dibulatkan
1 Cm Pengelasan dengan
K-03
las listrik
- kawat las kg 0.04 23,600.00
- Solar ltr 0.03 7,150.00
- Minyak pelumas ltr 0.004 55,000.00
- Sewa alat jam 0.017 100,000.00
- Pekerja org 0.004 42,000.00
- Tukang org 0.002 65,000.00
- Kepala Tukang org 0.0002 75,000.00
- Mandor org 0.0002 80,000.00
Jumlah
Dibulatkan
K-04 1 m2 Pintu Rolling Door
- Rolling door M2 1 306,600.00
- Pekerja Oh 1.05 42,000.00
- Tukang besi Oh 1.5 65,000.00
- Kepala tukang Oh 0.105 75,000.00
- Mandor Oh 0.0052 80,000.00
Jumlah
Dibulatkan
1 m2 Pintu Alluminium
K-05
Natural

Pintu alluminium
- m2 1 211,800.00
natural
- Pekerja Oh 1.05 42,000.00
- Tukang besi Oh 1.05 65,000.00
- Kepala tukang Oh 0.105 75,000.00
- Mandor Oh 0.0052 80,000.00
Jumlah
Dibulatkan
K-06 1 m2 Terali Besi
- Besi strip 2 x 3 m' 11.5 5,500.00
- Pekerja Oh 1.2 42,000.00
- Tukang las Oh 1.2 65,000.00
- Kepala tukang Oh 0.012 75,000.00
- Mandor Oh 0.0006 80,000.00
Jumlah
Dibulatkan
1 m2 Kawat Harmonika 4
K-07
cm
- Kawat harmonika M2 1.1 35,900.00
- Paku biasa ½" - 1" kg 0.02 23,800.00
- Papan kayu kamper M2 0.0018 5,692,600.00
- Pekerja Oh 0.1 42,000.00
- Tukang kayu Oh 0.1 65,000.00
- Kepala tukang Oh 0.01 75,000.00
- Mandor Oh 0.005 80,000.00
Jumlah
Dibulatkan

1 m' Talang Datar, Seng


K-08
BJLS 28 lebar 90 cm

Seng plat 3' x 6'


- m' 1.05 20,801.00
BJLS 30
- Paku biasa ½" - 1" Kg 0.015 23,800.00
Kayu papan borneo
- M3 0.0096 5,595,800.00
super
- Flincote / meni besi Kg 0.25 30,400.00
- Pekerja Oh 0.15 42,000.00
- Tukang kayu Oh 0.4 65,000.00
- Kepala tukang Oh 0.025 75,000.00
- Mandor Oh 0.0013 80,000.00
Jumlah
Dibulatkan

1 m' Talang Miring, Seng


K-09
BJLS 28 lebar 90 cm

Seng plat 3' x 6'


- m' 1.05 20,801.00
BJLS 30
- Paku biasa ½" - 1" Kg 0.015 23,800.00
Kayu papan borneo
- M3 0.019 5,595,800.00
super
- Flincote / meni besi Kg 0.3 30,400.00
- Pekerja Oh 0.2 42,000.00
- Tukang kayu Oh 0.4 65,000.00
- Kepala tukang Oh 0.025 75,000.00
- Mandor Oh 0.0013 80,000.00
Jumlah
Dibulatkan

1 m' Talang 1/2 lingkaran D-


K-10 15 cm, seng pelat BJLS 28
lebar 90 cm

Seng plat 3' x 6'


- m' 1.05 20,801.00
BJLS 30
- Paku biasa ½" - 1" Kg 0.1 23,800.00
Kayu papan borneo
- kg 0.019 5,595,800.00
super
- Besi strip Kg 0.5 26,800.00
- Pekerja Oh 0.15 42,000.00
- Tukang kayu Oh 0.3 65,000.00
- Kepala tukang Oh 0.03 75,000.00
- Mandor Oh 0.008 80,000.00
Jumlah
Dibulatkan

1 m' Pasang kusen


K-11 pintu/jendela alluminium
natural 4"

Alumunium profil
- m' 1.1 151,100.00
natural 4"
- Skrup fixer bh 2 250
- Sealant m' 1 7,500.00
- Pekerja Oh 0.043 42,000.00
- Tukang kayu Oh 0.043 65,000.00
- Kepala tukang Oh 0.0043 75,000.00
- Mandor Oh 0.0021 80,000.00
Jumlah
Dibulatkan

1 m' Pasang kusen


K-12 pintu/jendela alluminium
warna 4"

Alumunium profil
- m' 1.1 163,000.00
warna 4"
- Skrup fixer bh 2 250
- Sealant m' 1 7,500.00
- Pekerja Oh 0.043 42,000.00
- Tukang kayu Oh 0.043 65,000.00
- Kepala tukang Oh 0.0043 75,000.00
- Mandor Oh 0.0021 80,000.00
Jumlah
Dibulatkan

1 m' Pasang kusen


K-13 pintu/jendela alluminium
natural 3"

Alumunium profil
- m' 1.1 81,000.00
natural 3"
- Skrup fixer bh 2 250
- Sealant m' 1 7,500.00
- Pekerja Oh 0.043 42,000.00
- Tukang kayu Oh 0.043 65,000.00
- Kepala tukang Oh 0.0043 75,000.00
- Mandor Oh 0.0021 80,000.00
Jumlah
Dibulatkan

1 m' Pasang kusen


K-14 pintu/jendela alluminium
warna 3"

Alumunium profil
- m' 1.1 102,000.00
warna 3"
- Skrup fixer bh 2 250
- Sealant m' 1 7,500.00
- Pekerja Oh 0.043 42,000.00
- Tukang kayu Oh 0.043 65,000.00
- Kepala tukang Oh 0.0043 75,000.00
- Mandor Oh 0.0021 80,000.00
Jumlah
Dibulatkan
1 m2 Pintu alluminium strip
K-15
lebar 8 cm

Alumunium profil 4"


- m' 4.4 151,100.00
natural
Alumunium strip
- m2 1.05 171,800.00
6mm
- Pekerja Oh 0.085 42,000.00
- Tukang kayu Oh 0.085 65,000.00
- Kepala tukang Oh 0.0085 75,000.00
- Mandor Oh 0.0042 80,000.00
Jumlah
Dibulatkan

1 m2 Pintu/jendela kaca
K-16 rangka alluminium natural
4"

Alumunium profil
- m' 4.4 151,100.00
natural 4"
- Profil alluminium T m' 4.5 12,200.00
- Sealant tube 0.27 7,500.00
- Pekerja Oh 0.085 42,000.00
- Tukang kayu Oh 0.085 65,000.00
- Kepala tukang Oh 0.0085 75,000.00
- Mandor Oh 0.005 80,000.00
Jumlah
Dibulatkan

1 m2 Pintu/jendela kaca
K-17
rangka alluminium warna 4"

Alumunium profil
- m' 4.4 163,000.00
warna 4"
- Profil alluminium T m' 4.5 12,200.00
- Sealant tube 0.27 7,500.00
- Pekerja Oh 0.085 42,000.00
- Tukang kayu Oh 0.085 65,000.00
- Kepala tukang Oh 0.0085 75,000.00
- Mandor Oh 0.005 80,000.00
Jumlah
Dibulatkan
1 m2 Jendela nako & teralis
K-18
(10 klips)

Jendela nako
- (rangka + kaca 5 m2 1.1 300,000.00
mm)
Paku skrup 1cm -
- bh 10 250
2,5cm
- Besi strip m' 7 5,500.00
- Pekerja Oh 0.2 42,000.00
- Tukang kayu Oh 0.2 65,000.00
- Kepala tukang Oh 0.02 75,000.00
- Mandor Oh 0.001 80,000.00
Jumlah
Dibulatkan
1 m2 Pintu pelat baja tebal 2mm rangkap,
K-19
rangka baja siku
- Besi siku L 30.30.3 Kg 15 24,000.00
- Baja pelat Kg 32.8 24,000.00
- kawat las Kg 0.05 23,600.00
- Pekerja Oh 0.2 42,000.00
- Tukang kayu Oh 0.2 65,000.00
- Kepala tukang Oh 0.02 75,000.00
- Mandor Oh 0.001 80,000.00
Jumlah
Dibulatkan

1 m2 Rangka jendela besi


K-20
square tube (5 x 5) cm

- Besi square tube M 4.76 7,300.00


Besi lis kaca (1 x 1)
- Kg 4.522 24,000.00
cm
- Pengelasan Cm 20 2,464.00
- Pekerja Oh 0.65 42,000.00
- Tukang kayu Oh 0.65 65,000.00
- Kepala tukang Oh 0.065 75,000.00
- Mandor Oh 0.032 80,000.00
Jumlah
Dibulatkan
1 m2 Pintu lipat (folding
K-21
door) bahan besi
- Pintu lipat M2 1 501,700.00
- Pekerja Oh 1.05 42,000.00
- Tukang kayu Oh 1.05 65,000.00
- Kepala tukang Oh 0.105 75,000.00
- Mandor Oh 0.0052 80,000.00
Jumlah
Dibulatkan

1 m2 Tirai (venetions blinds


K-22
and vertical blinds)

- Tirai M2 1 537,300.00
- Pekerja Oh 0.35 42,000.00
- Tukang kayu Oh 0.35 65,000.00
- Kepala tukang Oh 0.035 75,000.00
- Mandor Oh 0.0018 80,000.00
Jumlah
Dibulatkan
HARGA
(Rp)

26,400.00
2,432.00
2,520.00
390
450
24
32,216.00
32,216.00

71.5
55
800
42
0.65
0.75
4
973.9
974

944
214.5
220
1,700.00
168
130
15
16
2,463.50
2,464.00

306,600.00
44,100.00
97,500.00
7,875.00
416
456,491.00
456,491.00
211,800.00
44,100.00
68,250.00
7,875.00
416
332,441.00
332,441.00

63,250.00
50,400.00
78,000.00
900
48
192,598.00
192,598.00

39,490.00
476
10,246.68
4,200.00
6,500.00
750
400
62,062.68
62,063.00

21,841.05
357
53,719.68

7,600.00
6,300.00
26,000.00
1,875.00
104
117,796.73
117,797.00

21,841.05
357
106,320.20

9,120.00
8,400.00
26,000.00
1,875.00
100
174,013.25
174,013.00

21,841.05
2,380.00
106,320.20
13,400.00
6,300.00
19,500.00
2,250.00
640
172,631.25
172,631.00

166,210.00
500
7,500.00
1,806.00
2,795.00
322.5
168
179,301.50
179,302.00

179,300.00
500
7,500.00
1,806.00
2,795.00
322.5
168
192,391.50
192,392.00

89,100.00
500
7,500.00
1,806.00
2,795.00
322.5
168
102,191.50
102,192.00

112,200.00
500
7,500.00
1,806.00
2,795.00
322.5
168
125,291.50
125,292.00

664,840.00

180,390.00
3,570.00
5,525.00
637.5
336
855,298.50
855,299.00

664,840.00
54,900.00
2,025.00
3,570.00
5,525.00
637.5
400
731,897.50
731,898.00

717,200.00
54,900.00
2,025.00
3,570.00
5,525.00
637.5
400
784,257.50
784,258.00

330,000.00

2,500.00
38,500.00
8,400.00
13,000.00
1,500.00
80
393,980.00
393,980.00

360,000.00
787,200.00
1,180.00
8,400.00
13,000.00
1,500.00
80
1,171,360.00
1,171,360.00

34,748.00
108,528.00
49,280.00
27,300.00
42,250.00
4,875.00
2,560.00
269,541.00
269,541.00

501,700.00
44,100.00
68,250.00
7,875.00
416
622,341.00
622,341.00

537,300.00
14,700.00
22,750.00
2,625.00
144
577,519.00
577,519.00
No. URAIAN SAT VOLUME HARGA SAT
(Rp)
M-01 1 Buah Closet jongkok Porselen Standar
Closet jongkok bh 1 188,200.00
P.C (50 gk) Kg 6 1,406.00
Pasir pasang m3 0.01 233,400.00
Pekerja org 1 42,000.00
Tukang batu org 1.5 65,000.00
Kepala Tukang org 1.5 75,000.00
Mandor org 0.16 80,000.00
Jumlah
Dibulatkan
M-02 1 Buah Urinoir
Urinoir bh 1 1,773,400.00
P.C (50 gk) Kg 6 1,406.00
Pasir pasang m3 0.01 233,400.00
Pekerja org 1 42,000.00
Tukang batu org 1 65,000.00
Kepala Tukang org 0.1 75,000.00
Mandor org 0.001 80,000.00
Perlengkapan 30 %
lot 0.3 1,773,400.00
harga urinoir
Jumlah
Dibulatkan
M-03 1 Buah Wastafel
wastafel standar unit 1 1,012,700.00
P.C (50 gk) Kg 6 1,406.00
Pasir pasang m3 0.01 233,400.00
Pekerja org 1.2 42,000.00
Tukang batu org 1.45 65,000.00
Kepala Tukang org 0.15 75,000.00
Mandor org 0.1 80,000.00
Perlengkapan 12 %
lot 0.12 1,773,400.00
harga wastafel
Jumlah
Dibulatkan
M-04 1 Buah bak Mandi Fibreglass Volume 0,30 m3
Bak fibreglass
bh 1 255,300.00
0.60m x 0.60m
Pekerja org 1.8 42,000.00
Tukang batu org 2.7 65,000.00
Kepala Tukang org 0.54 75,000.00
Mandor org 0.11 80,000.00
Perlengkapan 18 %
lot 0.18 255,300.00
harga bak
Jumlah
Dibulatkan
M-05 1 M' Saluran Air Limbah Buis beton d = 30 cm - 60 cm

Buis beton Ø 30 cm bh 1.1 61,700.00


Bata merah bh 25 775
P.C (50 gk) Kg 10.3 1,406.00
Pasir pasang m3 0.061 233,400.00
Pasir urug m3 0.069 175,300.00
Pekerja org 0.38 42,000.00
Tukang batu org 0.19 65,000.00
Kepala Tukang org 0.019 75,000.00
Mandor org 0.019 80,000.00
Jumlah
Dibulatkan
M-06 1 Buah Bak Kontrol Pas Bata Merah Uk (60 x 60) cm
Bata merah bh 186 775
P.C (50 gk) Kg 114 1,406.00
Pasir pasang m3 0.184 233,400.00
Batu pecah 2/3 m3 0.033 211,100.00
Besi beton m3 4.85 16,500.00
Pasir beton m3 0.12 255,400.00
Pekerja org 2.16 42,000.00
Tukang batu org 0.72 65,000.00
Kepala Tukang org 0.072 75,000.00
Mandor org 0.108 80,000.00
Tukang gali org 0.1 42,000.00
Jumlah
Dibulatkan
M-07 1 Buah Bak Kontrol Pas Bata Merah Uk (30 x 30) cm
Bata merah bh 53 775
P.C (50 gk) Kg 44 1,406.00
Pasir pasang m3 0.07 233,400.00
Batu pecah 2/3 m3 0.07 211,100.00
Besi beton m3 1.6 16,500.00
Pasir beton m3 0.06 255,400.00
Pekerja org 3.2 42,000.00
Tukang batu org 1.015 65,000.00
Kepala Tukang org 0.0015 75,000.00
Mandor org 0.016 80,000.00
Jumlah
Dibulatkan
1 M' Pipa PVC Ø
M-08
1/2" (AW)
Pipa pvc Ø 1/2" m' 1.2 10,025.00
Pekerja org 0.036 42,000.00
Tukang batu org 0.06 65,000.00
Kepala Tukang org 0.006 75,000.00
Mandor org 0.0018 80,000.00
Perlengkapan 35 %
lot 0.35 12,030.00
harga pipa
Jumlah
Dibulatkan
1 M' Pipa PVC Ø 1"
M-09
(AW)
Pipa pvc Ø 1" m' 1.2 15,800.00
Pekerja org 0.036 42,000.00
Tukang batu org 0.06 65,000.00
Kepala Tukang org 0.006 75,000.00
Mandor org 0.0018 80,000.00
Perlengkapan 35 %
lot 0.35 18,960.00
harga pipa
Jumlah
Dibulatkan
1 M' Pipa PVC Ø
M-10
11/2" (AW)
Pipa pvc Ø 11/2" m' 1.2 26,475.00
Pekerja org 0.036 42,000.00
Tukang batu org 0.06 65,000.00
Kepala Tukang org 0.006 75,000.00
Mandor org 0.0018 80,000.00
Perlengkapan 35 %
lot 0.35 31,770.00
harga pipa
Jumlah
Dibulatkan
1 M' Pipa PVC Ø 2"
M-11
(AW)
Pipa pvc Ø 2" m' 1.2 27,675.00
Pekerja org 0.036 42,000.00
Tukang batu org 0.06 65,000.00
Kepala Tukang org 0.006 75,000.00
Mandor org 0.0018 80,000.00
Perlengkapan 35 %
lot 0.35 31,770.00
harga pipa
Jumlah
Dibulatkan
1 M' Pipa PVC Ø 4"
M-12
(AW)
Pipa pvc Ø 4" m' 1.2 86,975.00
Pekerja org 0.081 42,000.00
Tukang batu org 0.135 65,000.00
Kepala Tukang org 0.0135 75,000.00
Mandor org 0.0041 80,000.00
Perlengkapan 35 %
lot 0.35 104,370.00
harga pipa
Jumlah
Dibulatkan
1 M' Pipa PVC Ø
M-13
3/4" (AW)
Pipa pvc Ø 3/4" m' 1.2 13,050.00
Pekerja org 0.081 42,000.00
Tukang batu org 0.135 65,000.00
Kepala Tukang org 0.0135 75,000.00
Mandor org 0.0041 80,000.00
Perlengkapan 35 %
lot 0.35 15,660.00
harga pipa
Jumlah
Dibulatkan
M-14 1 Buah Bak Cuci piring Stainless steel
Bak cuci stainless
steel + asesoris bh 1 397,800.00
lengkap
Pekerja org 0.03 42,000.00
Tukang batu org 0.3 65,000.00
Kepala Tukang org 0.03 75,000.00
Mandor org 0.0015 80,000.00
Jumlah
Dibulatkan
1 Buah Kran Ø 1/2"
M-15
- 3/4"
Kran air bh 1 40,900.00
Seal tape bh 0.025 4,200.00
Pekerja org 0.01 42,000.00
Tukang batu org 0.1 65,000.00
Kepala Tukang org 0.01 75,000.00
Mandor org 0.005 80,000.00
Jumlah
Dibulatkan
M-16 1 Buah Floor Drain
Floor drain bh 1 66,600.00
Pekerja org 0.01 42,000.00
Tukang batu org 0.1 65,000.00
Kepala Tukang org 0.01 75,000.00
Mandor org 0.005 80,000.00
Jumlah
Dibulatkan
M-17 1 M' Grafel beton U 20 cm -60 cm
Pipa beton U bh 1.1 44,300.00
Bata merah bh 12 775
P.C (50 gk) zak 0.103 1,406.00
Pasir pasang m3 0.0305 233,400.00
Pasir urug m3 0.0345 175,300.00
Pekerja org 0.01 42,000.00
Tukang batu org 0.1 65,000.00
Kepala Tukang org 0.01 75,000.00
Mandor org 0.005 80,000.00
Jumlah
Dibulatkan
M-18 1 M' Pasang Talang Plastik PVC U 15 cm (AW)

Talang plastik PVC m' 1.05 60,000.00


Perlengkapan 35 %
lot 0.35 63,000.00
harga talang
Pekerja org 0.15 42,000.00
Tukang batu org 0.4 65,000.00
Kepala Tukang org 0.025 75,000.00
Mandor org 0.0013 80,000.00
Jumlah
Dibulatkan
M-19 1 M' Saluran Air Limbah Buis Beton Ø 60 cm

Buis beton Ø 60 cm bh 1.1 130,900.00


Bata merah bh 25 775
P.C (50 gk) zak 0.206 1,406.00
Pasir pasang m3 0.061 233,400.00
Pasir urug m3 0.069 175,300.00
Pekerja org 0.38 42,000.00
Tukang batu org 0.19 65,000.00
Kepala Tukang org 0.019 75,000.00
Mandor org 0.019 80,000.00
Jumlah
Dibulatkan
1 M' Pasang Talang
M-20
Seng Datar
Seng pelat 3" x 6" lbr 0.5 20,801.00
Paku kg 0.015 23,400.00
Kayu kelas II m3 0.0096 2,850,000.00
Meni besi kg 0.25 30,400.00
Pekerja org 0.15 42,000.00
Tukang batu org 0.4 65,000.00
Kepala Tukang org 0.025 75,000.00
Mandor org 0.0013 80,000.00
Jumlah
Dibulatkan
1 Buah Closet
M-21
Duduk
Closet duduk bh 1 1,724,700.00
Pekerja org 3.3 42,000.00
Tukang batu org 1.1 65,000.00
Kepala Tukang org 0.001 75,000.00
Mandor org 0.16 80,000.00
Perlengkapan 6 %
lot 0.06 1,724,700.00
harga closet
Jumlah
Dibulatkan
M-22 1 Buah Tangki Air fibreglass Volume 1 m3
Bak fibreglass
bh 1 1,316,400.00
kapasitas 1 m3
Pekerja org 3.3 42,000.00
Tukang batu org 1.1 65,000.00
Kepala Tukang org 0.001 75,000.00
Mandor org 0.16 80,000.00
Perlengkapan 6 %
lot 0.06 1,316,400.00
harga bak
Jumlah
Dibulatkan
M-23 1 Unit Septictank 2x1,50x1,50 m + Rembesan
Galian tanah m3 4.5 26,252.00
Pasir urug m3 0.214 175,300.00
lantai kerja m3 2.25 716,798.00
Pas bata adk 1pc :
m2 15 220,267.10
3ps
Pelat beton K-225 m3 0.3 6,438,864.00
Plesteran adk 1pc :
m2 15 41,301.82
3ps
Pipa PVC 4" jenis
m' 5.4 256,800.00
AW
Pipa GIP 1 1/2" m' 5 46,750.00
Galian tanah untuk
m3 3.375 20,000.00
rembesan
Pas ijuk kg 5.4 23,400.00
Urugan kerikil 3/5 m3 1.05 205,000.00
Pipa PVC 4"
m' 9 36,700.00
berlubang jenis AW

Urugan dan
m3 1.125 34,584.00
perataan tanah
Jumlah
Dibulatkan
M-24 1 Unit Septictank 1x1,50x1,50 m + Rembesan
Galian tanah m3 2.25 20,000.00
Pasir urug m3 0.107 175,300.00
lantai kerja m3 1.125 716,798.00
Pas bata adk 1pc :
m2 7.5 220,267.10
3ps
Pelat beton K-225 m3 0.15 6,438,864.00
Plesteran adk 1pc :
m2 7.5 41,301.82
3ps
Pipa PVC 4" jenis
m' 9 256,800.00
AW
Pipa GIP 1 1/2" m' 2.5 46,750.00
Galian tanah untuk
m3 1.688 20,000.00
rembesan
Pas ijuk kg 2.7 23,400.00
Urugan kerikil 3/5 m3 0.525 205,000.00
Pipa PVC 4"
m' 9 36,700.00
berlubang jenis AW

Urugan dan
m3 0.563 34,584.00
perataan tanah
Jumlah
Dibulatkan
HARGA
(Rp)
andar
188,200.00
8,436.00
2,334.00
42,000.00
97,500.00
112,500.00
12,800.00
463,770.00
463,770.00

1,773,400.00
8,436.00
2,334.00
42,000.00
65,000.00
7,500.00
80
532,020.00
2,430,770.00
2,430,770.00

1,012,700.00
8,436.00
2,334.00
50,400.00
94,250.00
11,250.00
8,000.00
212,808.00
1,400,178.00
1,400,178.00
0,30 m3

255,300.00
75,600.00
175,500.00
40,500.00
8,800.00
45,954.00
601,654.00
601,654.00
0 cm - 60 cm

67,870.00
19,375.00
14,481.80
14,237.40
12,095.70
15,960.00
12,350.00
1,425.00
1,520.00
159,314.90
159,315.00
60 x 60) cm
144,150.00
160,284.00
42,945.60
6,966.30
80,025.00
30,648.00
90,720.00
46,800.00
5,400.00
8,640.00
4,200.00
620,778.90
620,779.00
30 x 30) cm
41,075.00
61,864.00
16,338.00
14,777.00
26,400.00
15,324.00
134,400.00
65,975.00
112.5
1,280.00
377,545.50
377,546.00

12,030.00
1,512.00
3,900.00
450
144
4,210.50
22,246.50
22,247.00

18,960.00
1,512.00
3,900.00
450
144
6,636.00
31,602.00
31,602.00

31,770.00
1,512.00
3,900.00
450
144
11,119.50
48,895.50
48,896.00

33,210.00
1,512.00
3,900.00
450
144
11,119.50
50,335.50
50,336.00

104,370.00
3,402.00
8,775.00
1,012.50
328
36,529.50
154,417.00
154,417.00

15,660.00
3,402.00
8,775.00
1,012.50
328
5,481.00
34,658.50
34,659.00
steel

397,800.00

1,260.00
19,500.00
2,250.00
120
420,930.00
420,930.00

40,900.00
105
420
6,500.00
750
400
49,075.00
49,075.00

66,600.00
420
6,500.00
750
400
74,670.00
74,670.00

48,730.00
9,300.00
144.82
7,118.70
6,047.85
420
6,500.00
750
400
79,411.37
79,411.00
cm (AW)

63,000.00

22,050.00
6,300.00
26,000.00
1,875.00
100
119,325.00
119,325.00

143,990.00
19,375.00
289.64
14,237.40
12,095.70
15,960.00
12,350.00
1,425.00
1,520.00
221,242.74
221,243.00
10,400.50
351
27,360.00
7,600.00
6,300.00
26,000.00
1,875.00
100
79,986.50
79,987.00

1,724,700.00
138,600.00
71,500.00
75
12,800.00
103,482.00
2,051,157.00
2,051,157.00
e 1 m3
1,316,400.00
138,600.00
71,500.00
75
12,800.00
78,984.00
1,618,359.00
1,618,359.00
embesan
118,134.00
37,514.20
1,612,795.50
3,304,006.50
1,931,659.20
619,527.30
1,386,720.00
233,750.00
67,500.00
126,360.00
215,250.00

330,300.00

38,907.00
10,022,423.70
10,022,424.00
embesan
45,000.00
18,757.10
806,397.75
1,652,003.25
965,829.60
309,763.65

2,311,200.00
116,875.00
33,760.00
63,180.00
107,625.00

330,300.00

19,470.79
6,780,162.14
6,780,162.00
No. URAIAN SAT VOLUME HARGA SAT

N-01 1 M2 Mengikis / Mengerok Permukaan Cat Tembok Lama


- Soda api Kg 0.05 35,600.00
- Pekerja Oh 0.15 42,000.00
- Mandor Oh 0.0025 80,000.00
Jumlah
Dibulatkan
N-02 1 M2 Mendempul Dan Menggosok Kayu
- Dempul Kg 0.08 35,800.00
- Minyak cat Kg 0.02 38,400.00
- Batu apung Kg 0.01 29,600.00
- Pekerja Oh 0.04 42,000.00
- Tukang cat Oh 0.04 65,000.00
- Kepala tukang Oh 0.004 75,000.00
- Mandor Oh 0.0025 80,000.00
Jumlah
Dibulatkan
N-03 1 M2 Pengecatan Bidang Kayu Lama Setara Sieve
- Plamir Kg 0.15 25,000.00
- Cat dasar Kg 0.17 30,000.00
Cat penutup setara
- Kg 0.17 41,700.00
sieve 2x
- Pekerja Oh 0.07 42,000.00
- Tukang cat Oh 0.075 65,000.00
- Kepala tukang Oh 0.0075 75,000.00
- Mandor Oh 0.0025 80,000.00
Jumlah
Dibulatkan
N-04 1 M2 Pengecatan Bidang Kayu Baru Setara Sieve
- Cat meni Kg 0.2 30,400.00
- Plamir Kg 0.15 25,000.00
- Cat dasar Kg 0.17 30,000.00
Cat penutup 3x
- Kg 0.35 41,700.00
setara sieve
- Pekerja Oh 0.07 42,000.00
- Tukang cat Oh 0.105 65,000.00
- Kepala tukang Oh 0.004 75,000.00
- Mandor Oh 0.0025 80,000.00
Jumlah
Dibulatkan
N-05 1 M2 Pelaburan Bidang Kayu dengan Politur
- Politur Ltr 0.15 48,000.00
- Politur jadi Ltr 0.372 112,700.00
- Ampelas Lbr 2 5,000.00
- Tukang cat Oh 0.06 65,000.00
- Kepala tukang Oh 0.016 75,000.00
- Mandor Oh 0.0025 80,000.00
Jumlah
Dibulatkan
N-06 1 M2 Pelaburan Bidang Kayu dengan Cat Residu dan Ter
- Residu atau ter Ltr 0.35 8,100.00
- Pekerja Oh 0.1 42,000.00
- Mandor Oh 0.006 80,000.00
Jumlah
Dibulatkan
1 M2 Pengecatan Tembok Baru
N-07
Setara ICI
- Plamir tembok Kg 0.1 25,000.00
- Cat dasar Kg 0.1 30,000.00
Cat penutup 2x
- Kg 0.26 75,000.00
setara ICI
- Pekerja Oh 0.02 42,000.00
- Tukang cat Oh 0.063 65,000.00
- Kepala tukang Oh 0.0063 75,000.00
- Mandor Oh 0.0025 80,000.00
Jumlah
Dibulatkan
N-08 1 M2 Pengecatan Tembok Lama Setara ICI
- Cat dasar Kg 0.12 30,000.00
- Cat penutup 2 x Kg 0.18 75,000.00
- Pekerja Oh 0.028 42,000.00
- Tukang cat Oh 0.042 65,000.00
- Kepala tukang Oh 0.0042 75,000.00
- Mandor Oh 0.0025 80,000.00
Jumlah
Dibulatkan
N-09 1 M2 Pengecatan Plafond ( 3x ) Setara ICI
Cat tembok setara
- Kg 0.2 75,000.00
ICI
- Plamir tembok Kg 0.16 25,000.00
- Rol cat Bh 0.01 32,500.00
- Steger werk Ls 1 1,000.00
- Ampelas Lbr 0.5 5,000.00
- Pekerja Oh 0.2 42,000.00
- Tukang cat Oh 0.3 65,000.00
- Kepala tukang Oh 0.03 75,000.00
- Mandor Oh 0.01 80,000.00
Jumlah
Dibulatkan
N-10 1 M2 Pengecatan Plafond ( 3x ) Setara Vinilex
Cat tembok setara
- Kg 0.2 25,000.00
Vinilex
- Plamir tembok Kg 0.16 25,000.00
- Rol cat Bh 0.01 32,500.00
- Steger werk Ls 1 1,000.00
- Ampelas Lbr 0.5 5,000.00
- Pekerja Oh 0.2 42,000.00
- Tukang cat Oh 0.3 65,000.00
- Kepala tukang Oh 0.03 75,000.00
- Mandor Oh 0.01 80,000.00
Jumlah
Dibulatkan
N-10-r' 1 M2 Pengecatan Plafond ( 2x ) Setara Vinilex
Cat tembok setara
- Kg 0.13 25,000.00
Vinilex
- Plamir tembok Kg 0.11 25,000.00
- Rol cat Bh 0.1 32,500.00
- Steger werk Ls 0.67 1,000.00
- Ampelas Lbr 0.33 5,000.00
- Pekerja Oh 0.13 42,000.00
- Tukang cat Oh 0.2 65,000.00
- Kepala tukang Oh 0.02 75,000.00
- Mandor Oh 0.01 80,000.00
Jumlah
Dibulatkan
N-11 1 M2 Memasang Wallpaper
- Wallpaper m2 1.2 55,700.00
- Lem Perekat Kg 0.25 35,700.00
- Pekerja Oh 0.35 42,000.00
- Tukang cat Oh 0.175 65,000.00
- Kepala tukang Oh 0.017 75,000.00
- Mandor Oh 0.0017 80,000.00
Jumlah
Dibulatkan
N-12 1 M2 Pengecatan Permukaan Baja dengan Meni Besi
- Meni besi Kg 0.1 30,400.00
- Kuas 3" Bh 0.01 16,000.00
- Pekerja Oh 0.02 42,000.00
- Tukang cat Oh 0.2 65,000.00
- Kepala tukang Oh 0.02 75,000.00
- Mandor Oh 0.01 80,000.00
Jumlah
Dibulatkan
N-13 1 M2 Pengecatan Permukaan Baja dengan Meni Besi dan Perancah
- Meni besi Kg 0.1 30,400.00
- Kuas 3" Bh 0.01 16,000.00
- Kayu perancah m3 0.002 2,069,800.00
- Pekerja Oh 0.25 42,000.00
- Tukang cat Oh 0.225 65,000.00
- Kepala tukang Oh 0.0225 75,000.00
- Mandor Oh 0.0075 80,000.00
Jumlah
Dibulatkan
N-14 1 M2 Pengecatan Permukaan Baja Lapis seng (galbani) secara manual 1 lps cat 2

- Cat besi setara ICI Kg 0.3 67,700.00


- Pekerja Oh 0.006 42,000.00
- Tukang cat Oh 0.06 65,000.00
- Kepala tukang Oh 0.012 75,000.00
- Mandor Oh 0.006 80,000.00
Jumlah
Dibulatkan
N-15 1 M2 Pengecatan Tembok Baru Setara Vinilex (2 x laburan)
- Plamir tembok Kg 0.1 25,000.00
- Cat dasar Kg 0.1 30,000.00
Cat penutup 2x
- Kg 0.26 25,000.00
setara vinilex
- Pekerja Oh 0.02 42,000.00
- Tukang cat Oh 0.063 65,000.00
- Kepala tukang Oh 0.0063 75,000.00
- Mandor Oh 0.0025 80,000.00
Jumlah
Dibulatkan
N-15r' 1 M2 Pengecatan Tembok Baru Setara Vinilex (3 x laburan)
- Plamir tembok Kg 0.1 25,000.00
- Cat dasar Kg 0.1 30,000.00
Cat penutup 3x
- Kg 0.39 25,000.00
setara vinilex
- Pekerja Oh 0.03 42,000.00
- Tukang cat Oh 0.0945 65,000.00
- Kepala tukang Oh 0.0095 75,000.00
- Mandor Oh 0.0038 80,000.00
Jumlah
Dibulatkan
N-16 1 M2 Pengecatan Tembok Lama Setara Vinilex
- Cat dasar Kg 0.12 30,000.00
- Cat penutup 2 x Kg 0.18 25,000.00
- Pekerja Oh 0.028 42,000.00
- Tukang cat Oh 0.042 65,000.00
- Kepala tukang Oh 0.0042 75,000.00
- Mandor Oh 0.0025 80,000.00
Jumlah
Dibulatkan
HARGA

bok Lama
1,780.00
6,300.00
200
8,280.00
8,280.00
u
2,864.00
768
296
1,680.00
2,600.00
300
200
8,708.00
8,708.00

3,750.00
5,100.00
7,089.00
2,940.00
4,875.00
562.5
200
24,516.50
24,517.00

6,080.00
3,750.00
5,100.00
14,595.00
2,940.00
6,825.00
300
200
39,790.00
39,790.00
7,200.00
41,924.40
10,000.00
3,900.00
1,200.00
200
64,424.40
64,424.00
du dan Ter
2,835.00
4,200.00
480
7,515.00
7,515.00

2,500.00
3,000.00
19,500.00
840
4,095.00
472.5
200
30,607.50
30,608.00

3,600.00
13,500.00
1,176.00
2,730.00
315
200
21,521.00
21,521.00
CI
15,000.00
4,000.00
325
1,000.00
2,500.00
8,400.00
19,500.00
2,250.00
800
53,775.00
53,775.00

5,000.00
4,000.00
325
1,000.00
2,500.00
8,400.00
19,500.00
2,250.00
800
43,775.00
43,775.00
nilex
3,250.00
2,750.00
3,250.00
670
1,650.00
5,460.00
13,000.00
1,500.00
800
32,330.00
32,330.00

66,840.00
8,925.00
14,700.00
11,375.00
1,275.00
136
103,251.00
103,251.00
eni Besi
3,040.00
160
840
13,000.00
1,500.00
800
19,340.00
19,340.00
i dan Perancah
3,040.00
160
4,139.60
10,500.00
14,625.00
1,687.50
600
34,752.10
34,752.00
ra manual 1 lps cat 2 um

20,310.00
252
3,900.00
900
480
25,842.00
25,842.00
x laburan)
2,500.00
3,000.00
6,500.00
840
4,095.00
472.5
200
17,607.50
17,608.00
x laburan)
2,500.00
3,000.00
9,750.00
1,260.00
6,142.50
712.5
304
23,669.00
23,669.00
nilex
3,600.00
4,500.00
1,176.00
2,730.00
315
200
12,521.00
12,521.00
VOLUME HARGA
No. URAIAN SATUAN
(Rp) SATUAN (Rp)

1 m2 Pek. Pasangan
Baja Ringan
(Bersertifikat dan
bergaransi 10 tahun)
Mobilisasi Ls 1 9,000.00
Main truss C-75-75 m' 2.8 14,870.00
Roof Bottom/Reng R 33-
m' 5.1 8,500.00
0.45

Self drilling screw dia 6 x


bh 25 375
20 mm (truss Screw)

Self drilling screw dia 4 x


16 mm (Roof Bottom bh 35 350
Screw)
Dynabol dia 12 x 120
bh 1 1,500.00
mm
Tukang oh 0.247 45,000.00
Tukang Besi Profil Oh 0.176 50,000.00
Kepala Tukang Besi
Oh 0.117 52,500.00
Profil
Alat Bantu (Mesin Bor
Ls 1 4,500.00
Listrik)/Genset
Gambar Desain m2 1 2,340.00
Total

Keuntungan Max 10%

Total Harga
Dibulatkan
HARGA

9,000.00
41,636.00
43,350.00

9,375.00

12,250.00

1,500.00
11,115.00
8,800.00
6,142.50

4,500.00
2,340.00
150,008.50

15,000.85

165,009.35
165,000.00
NO URAIAN SATUAN UPAH (Rp.)

1 Mandor Org/hr Rp 80,000.00


2 Kepala Tukang Batu Org/hr Rp 75,000.00

3 Kepala Tukang Kayu Org/hr Rp 75,000.00

4 Kepala Tukang Besi Org/hr Rp 75,000.00

5 Kepala Tukang Cat Org/hr Rp 75,000.00


Kepala Tukang
6 Org/hr Rp 75,000.00
Listrik
7 Kepala Tukang Org/hr Rp 75,000.00
8 Tukang Batu Org/hr Rp 65,000.00
9 Tukang Kayu Org/hr Rp 65,000.00
10 Tukang Besi/Baja Org/hr Rp 65,000.00
11 Tukang Cat Org/hr Rp 65,000.00
12 Tukang Listrik Org/hr Rp 65,000.00
13 Tukang Pipa Org/hr Rp 65,000.00
14 Tukang Plitur Org/hr Rp 65,000.00
15 Tukang Taman Org/hr Rp 65,000.00
16 Tukang Org/hr Rp 65,000.00
17 Pembantu Tukang Org/hr Rp 42,000.00
18 Pekerja Biasa Org/hr Rp 42,000.00
19 Penjaga Malam Org/hr Rp 42,000.00
20 Sopir Org/hr Rp 65,000.00
21 Operator Org/hr Rp 75,000.00
22 Mekanik Org/hr Rp 65,000.00
23 Pembantu Sopir Org/hr Rp 42,000.00
24 Pembantu Operator Org/hr Rp 50,000.00

25 Pembantu Mekanik Org/hr Rp 42,000.00


NO MATERIAL SAT HARGA (Rp)

AGREGAT KASAR,BAHAN
A. PEREKAT & BAHAN
JADINYA

1 Pasir Urug m3 175,300.00


2 Tanah Urug Pilihan m3 89,200.00
3 Sirtu m3 203,500.00
4 Pasir Teras m3 174,200.00
5 Pasir Pasang Kali m3 233,400.00
6 Pasir Beton m3 255,400.00
7 Abu Batu m3 259,000.00
8 Batu Gosok ( Apung ) kg 29,600.00
9 Batu Pecah Mesin 1/2 m3 223,600.00
10 Batu Pecah Mesin 2/3 m3 211,100.00
11 Batu Pecah Mesin 3/5 m3 205,000.00
12 Batu Pecah Mesin 5/7 m3 196,000.00
13 Batu Belah Pondasi m3 205,500.00
Batu Bronjol ( Untuk
14 m3 180,800.00
Bronjong )
15 Batu Koral Beton Kali m3 172,600.00
16 Batu Tempel Hitam m3 96,600.00
Batu Pinggir Beton 10 x 20 x
17 bh 14,100.00
35
Batu Pinggir Beton 15 x 35 x
18 bh 73,700.00
50 ( K-225 )
19 Batu Telor m3 97,800.00
20 Batako Kecil 8 x 10 x 20 bh 2,000.00
21 Batako Besar 8 x 20 x 30 bh 2,400.00
22 Con Blok 8 x 20 x 40 bh 5,400.00
23 Bata Merah Bakar kelas I bh 775
24 Bata Merah Bakar kelas II bh 675
25 Bata Merah Oven ( Klingker ) bh 1,800.00
26 Roster Beton 20 x 20 bh 14,800.00
27 Roster Beton 30 x 30 bh 15,500.00
28 Grass Blok 20 x 20 bh 9,700.00
29 Grass Blok 30 x 30 bh 22,500.00
30 Paving Blok Natural 8 cm m2 81,100.00
31 Paving Blok Warna 8 cm m2 108,600.00
32 Paving Blok Natural 6 cm m2 76,000.00
33 Paving Blok Warna 6 cm m2 86,000.00
34 Canstin Paving Blok m1 34,900.00
35 Semen PC /50 kg zak 70,300.00
1,406.00
36 Semen Putih zak 92,700.00
Kanstin Jalan Ukuran Besar
37 bh 58,900.00
( Bina Marga ) 1bh =60cm
Readymix Beton K500, Tanpa
38 m3 1,105,000.00
Pompa ( Selang )
Readymix Beton K400, Tanpa
39 m3 903,500.00
Pompa ( Selang )
Readymix Beton K350, Tanpa
40 m3 877,500.00
Pompa ( Selang )
Readymix Beton K300, Tanpa
41 m3 925,000.00
Pompa ( Selang )
Readymix Beton K225, Tanpa
42 m3 850,000.00
Pompa ( Selang )
Readymix Beton K175, Tanpa
43 m3 825,000.00
Pompa ( Selang )
Kapur Pasang / Kapur
44 m3 353,300.00
Tembok
45 Kapur Sirih kg 18,300.00
46 Semen Warna kg 15,700.00
47 Tanah liat m3 31,300.00
48 Air ltr 3
49 Formite/spacer bh 2,500.00
50 Hollow/Con Blok 8 x 20 x 40 bh 5,000.00
51 Hollow/Con Blok 8 x 15 x 40 bh 4,000.00
52 Hollow/Con Blok 8 x 10 x 40 bh 3,000.00

LABURAN,PENGISI DAN
B
ALATNYA
1 Plamir Tembok kg 25,000.00
Cat Tembok ICI Eksterior
2 lt 120,000.00
( Beton )
Cat Tembok ICI Interior
3 lt 75,000.00
( Plafon Dan Dinding )
4 Cat Tembok Vinilex kg 25,000.00
Cat Dasar ICI untuk Interior
5 lt 75,000.00
( 2 Pelapis )
6 Cat Tembok Sanlek kg 20,000.00
7 Cat Dasar kg 30,000.00
8 Cat Tahan Asam lt 40,000.00
Pelapis Alkali ICI ( Cat Dasar
9 kg 90,000.00
Beton Ekterior )
10 Cat Marka / Spotlight kg 185,000.00
11 Water Profing Emulsion ml 70,000.00
12 Water Profing Membrance bh 62,500.00
13 Rool Cat Tembok bh 32,500.00
14 Kape Tembok bh 8,500.00
15 Kape Kayu 5 lt 10,000.00
16 Soligneum 1 Blek kg 25,000.00
17 Plincote m3 29,000.00
18 Penawetan Kayu m3 382,600.00
19 Pegopenan Kayu bh 370,000.00
20 Kwas 3" bh 16,000.00
21 Oker bks 22,000.00
22 Oyan bks 5,200.00
23 Oten ( Pewarna Plitur ) lt 5,500.00
24 Spirtus kg 15,000.00
Bahan Pelitur Kripik ( Sirlak
25 kg 110,000.00
India )
26 Dempul Lilin kg 34,200.00
27 Dempul Plitur kg 37,700.00
Dempul Halus / Imfra ( Wood
28 lt 37,700.00
Filler )
29 Dempul Jadi kg 35,800.00
30 Politur lt 48,000.00
31 Politur Jadi lt 112,700.00
32 Terpentin kg 19,500.00
33 Tiner A kg 23,900.00
34 Tiner B kg 21,400.00
35 Kumpon lbr 30,800.00
36 Melamik kg 52,500.00
37 Dempul Plastik kg 39,200.00
38 Dempul Duco kg 35,800.00
39 Ampelas lbr 5,000.00
40 Dempul Kayu Cap Kucing kg 24,400.00
41 Meni Kayu / Besi kg 30,400.00
42 Sincromat kg 40,900.00
43 Cat Kayu Sieve lt 41,700.00
44 Cat Besi lt 44,000.00
45 Cat Besi Duco Danaglos / ICI bh 76,300.00
46 Cat Bron kg 67,700.00
47 Karet lis bh 3,300.00
48 Minyak cat kg 38,400.00
49 Glass beet kg 50,100.00
50 Residu lt 8,100.00

BAHAN KAYU BERIKUT


C
BAHAN JADINYA
1 Bambu 5 s.d 7 bt 17,700.00
2 Bambu 7 s.d 10 bt 25,000.00
3 Bambu Gombong bt 37,200.00
Kayu Kamper Singkil / Kapur (
4 m3 7,094,450.00
Kayu Samarinda kls II )

5 Kayu Balok Borneo Super m3 5,280,000.00


6 Kayu Papan Borneo Super m3 5,595,800.00
Kayu Balok Kamper Medan
7 m3 5,692,600.00
(Kruing )
Kayu Papan Kamper Medan
8 m3 5,823,400.00
(Kruing )
9 Kayu Balok Kamper Banjar m3 6,363,600.00
10 Kayu Papan Kamper Banjar m3 6,645,300.00
Kayu Balok Kamper
11 m3 8,633,700.00
Samarinda
Kayu Papan Kamper
12 m3 8,724,300.00
Samarinda
13 Kayu Balok Rasamala m3 2,658,000.00
Kayu Jati Jatim Tua dia. 40
14 m3 20,772,000.00
cm
Kayu Jati Jateng Tua dia. 40
15 m3 22,188,400.00
cm
Kayu Jati Jabar Tua dia. 40
16 m3 13,625,400.00
cm
Kayu Jati Jabar Tua dia. 40
17 m3 12,736,100.00
cm kebawah
Kayu Hutan Kelas I
18 m3 2,069,800.00
( Segeng,Mahoni, Laban )
19 Kayu Balok Albasia m3 1,870,500.00
20 Kayu Papan Albasia m3 2,071,700.00
21 Dolken 5 s/d 7 bt 22,600.00
22 Dolken 7 s/d 10 bt 28,000.00
23 List Profil Kamper 1 cm m1 8,900.00
24 List Profil Kamper 2 cm m1 10,000.00
25 List Profil Kamper 4 cm m1 14,300.00
26 List Profil Kamper 5 cm m1 17,200.00
27 List Profil Kamper 10 cm m1 29,400.00
28 Pegangan Tangga Profil Jati m1 160,100.00

Pegangan Tangga Profil


29 m1 122,500.00
Kamper
30 Kayu Kaso 4/6 m3 2,772,000.00
Kayu Kaso 5/7 Kamper
31 m3 3,356,800.00
Medan

32 Kayu Reng 2/3 Borneo Super m1 2,500.00

Kayu Reng 2/3 Kamper


33 m1 3,300.00
Banjar
Kayu Reng 3/4 Kamper
34 m3 4,000.00
Medan
35 Kayu Papan Terentang m3 2,850,000.00
36 Kayu Balok Terentang m3 2,640,000.00
37 Batang Kelapa bt 139,500.00
38 Tali Ijuk kg 23,400.00
39 lapisan Ijuk tebal 10 cm m2 22,000.00
40 Venetion Blind m2 537,300.00
41 Vertikal Blind m2 351,200.00

BAHAN PENUTUP RANGKA


D
PLAFOND
1 Plafond Enternit 4 mm m2 17,400.00
Plafond hardpleks 5 mm 120 x
2 lbr 62,400.00
240

3 Plafond Asbes Semen 5 mm m2 22,500.00

4 Plafond Asbes Semen 3,5 mm m2 19,500.00

Gypsum 120 x 240 t= 9 mm


5 lbr 79,800.00
ex DN
Gypsum 120 x 240 t= 9 mm
6 lbr 83,800.00
ex Luar
7 Tepung gypsum kg 12,500.00
8 Acustik Amstrong 60 x 120 lbr 132,800.00
9 Cotton Plester bh 15,000.00
GRC (120 x 240) cm, t = 4
10 lbr 67,500.00
mm
11 Cornice Coumpound zak 75,000.00
12 List gypsum m' 8,500.00

E BAHAN KAYU LAPIS


1 Triplek 3 mm 120 x 240 lbr 61,700.00
2 Triplek 4 mm 120 x 240 lbr 64,400.00
3 Triplek 4 mm ukuran Pintu lbr 56,200.00
4 Triplek 6 mm 120 x 240 lbr 92,000.00
5 Triplek 9 mm 120 x 240 lbr 166,600.00
6 Jabar Wood 4 mm lbr 119,000.00
7 Bilik Bambu ( tanpa kulit ) m2 19,800.00
8 Bilik Bambu ( dengan kulit ) m2 22,700.00
9 Bilik Bambu Hitam Variasi m2 34,200.00
10 Wall paper m2 55,700.00
11 MultiPlek 9 mm 120 x 240 lbr 151,100.00
12 MultiPlek 12 mm 120 x 240 lbr 195,000.00
13 MultiPlek 18 mm 120 x 240 lbr 255,400.00
14 Ply Wood 18 mm 120 x 240 lbr 323,900.00
15 Ply Wood 9 mm 120 x 240 lbr 235,000.00
16 Ply Wood 4 mm 120 x 240 lbr 140,000.00
17 Teak Wood 3 mm 120 x 240 lbr 129,100.00

18 Teak Wood 4 mm 120 x 240 lbr 131,700.00

Teak Wood 3 mm 120 x 240


19 lbr 127,200.00
ukuran Pintu
Teak Wood ukuran Pintu 4
20 lbr 114,700.00
mm
21 Tacon ( Tahan Bakar ) m2 128,200.00
22 Supercon m2 57,900.00
23 Melamin 4 mm 120 x 240 lbr 89,200.00
24 Melamin TOK 4 mm lbr 133,400.00
25 Formika 120 x 240 lbr 170,000.00
26 Formika ukuran Pintu lbr 132,900.00
27 Formika Warna 4" x 8" lbr 238,100.00

BAHAN LANTAI DAN


F
PELAPIS DINDING
1 Tegel PC 20 x 20 bh 3,400.00
2 Plin Tegel PC 10 x 20 bh 2,400.00
3 Tegel PC 30 x 30 bh 3,400.00
4 Plin Tegel PC 15 x 30 bh 2,800.00
5 Tegel Warna 20 x 20 bh 3,600.00
6 Plin Tegel Warna 10 x 20 bh 3,400.00
7 Tegel Warna 30 x 30 bh 5,700.00
8 Plin Tegel Warna 15 x 30 bh 6,300.00
9 Tegel Wafel PC 20 x 20 bh 3,200.00
10 Tegel Wafel Warna 20 x 20 bh 2,500.00
11 Tegel Badak PC 30 x 30 bh 4,100.00
Poslin 11 x 11 Warna Standar
12 m2 63,300.00
DN
Poslin 11 x 11 Warna khusus
13 m2 67,300.00
DN

Keramik 10 x 20 dan 20 x 20
14 m2 54,500.00
KW I DN Putih / Polos Mulia

Keramik 10 x 20 KW I DN
15 m2 56,000.00
Corak/Warna/Anti Slip Mulia
Keramik 20 x 20 (KM) KW I
16 DN Corak/Warna /Anti Slip m2 62,500.00
Mulia
Keramik 20 x 20 (KM) KW I
17 m2 54,500.00
DN Putih Polos Mulia
Keramik 20 x 25 Dinding KM
18 m2 62,500.00
KW I DN Corak Mulia
Keramik 30 x 30 KWI DN
19 m2 53,000.00
Putih Polos Mulia
Keramik 30 x 30 KWI DN
20 Warna/Corak (ANTI SLIP) m2 58,000.00
Mulia
Keramik 40 x 40 KWI DN
21 m2 56,800.00
Putih Polos Mulia
Keramik 40 x 40 KWI DN
22 Warna/Corak (ANTI SLIP) m2 65,500.00
Mulia

Keramik 10 x 20 dan 20 x 20
23 m2 64,400.00
KW I DN Putih / Polos Roman

Keramik 10 x 20 KW I DN
24 m2 72,200.00
Corak/Warna/Anti Slip Roman

Keramik 20 x 20 (KM) KW I
25 DN Corak/Warna/Anti Slip m2 75,200.00
Roman
Keramik 20 x 20 (KM) KW I
26 m2 72,900.00
DN Putih Polos Roman
Keramik 20 x 25 Dinding KM
27 m2 75,200.00
KW I DN Corak Roman
Keramik 20 x 25 KW I DN
28 m2 72,900.00
Putih Polos Roman
Keramik 30 x 30 KW I DN
29 m2 68,900.00
Polos Roman
Keramik 30 x 30 KW I DN
30 Warna/Corak (ANTI SLIP) m2 76,600.00
Roman
Keramik 40 x 40 KW I DN
31 m2 72,500.00
Polos Roman
Keramik 40 x 40 KW I DN
32 Warna/Corak (ANTI SLIP) m2 77,000.00
Roman
33 Vinyl Lantai Standar m2 56,000.00
34 Karpet Kelas Baik LN m2 1,025,500.00
35 Karpet Kelas Sedang LN m2 353,500.00
36 Parquet Jati m2 375,400.00
37 Stairnosing Keramik 10/20 bh 13,700.00
38 Stairnosing Fiber m 25,000.00
39 Taraso Kerang 30 x 30 m2 31,800.00
40 Plin Taraso 10 x 30 bh 13,500.00
41 Granit Alam LN Ukuran Besar m2 1,848,400.00
42 Granit Alam LN Ukuran Kecil m2 1,612,900.00

43 Granit Alam DN Ukuran Besar m2 1,331,100.00

44 Granit Alam DN Ukuran Kecil m2 1,299,400.00

Granito Tile Essenza Ukuran


45 m2 345,000.00
40 x 40 Polis
Granito Tile Essenza Ukuran
46 m2 322,800.00
30 x 30
Granito Tile Essenza Ukuran
47 m2 204,900.00
40 x 40 UnPolis
48 Marmer m2 550,000.00
Marmer Alam Lampung
49 m2 550,200.00
Ukuran Besar
Marmer Alam Lampung
50 m2 345,700.00
Ukuran kecil
Marmer Alam Citatah Ukuran
51 m2 340,800.00
Besar
Marmer Alam Citatah Ukuran
52 m2 237,600.00
Kecil
53 Marmer Sintetis m2 157,900.00
Granito Tile Essenza 60 x 60
54 m2 358,100.00
Polis
Granito Tile Essenza 60 x 60
55 m2 231,800.00
UnPolis
56 Batu Tempel Hitam m2 96,500.00
57 Bata Karawang bh 600
Campuran untuk Kedap Air
58 ltr 37,600.00
( AM )
59 Plint keramik 10 x 20 bh 3,000.00
60 Plint keramik 10 x 25 bh 3,250.00
61 Plint keramik 10 x 30 bh 3,500.00
62 Plint keramik 10 x 40 bh 4,000.00
63 Plint keramik 15 x 30 bh 4,500.00
64 Plint keramik 15 x 40 bh 5,250.00
65 Plint granito 10 x 30 bh 25,900.00
66 Plint granito 10 x 40 bh 27,600.00
67 Plint granito 15 x 30 bh 31,100.00
68 Plint granito 15 x 40 bh 41,300.00

BAHAN SALURAN AIR


G
KOTOR / BERSIH
1 Grafel U 20 cm' m1 44,300.00
2 Grafel U 30 cm' m1 56,400.00
3 Grafel U 40 cm' m1 74,200.00
4 Buis Beton 20 cm ( 1 M' ) m1 49,200.00
5 Buis Beton 30 cm ( 1 M' ) m1 61,700.00
6 Buis Beton 40 cm ( 1 M' ) m1 80,900.00
7 Buis Beton 50 cm ( 1 M' ) stk 94,300.00
8 Buis Beton 60 cm ( 1 M' ) stk 130,900.00
9 Buis Beton 100 cm ( 0.50 M' ) stk 299,800.00

10 Buis Beton 80 cm ( 0.50 M' ) stk 298,500.00

11 BuisTanah 10 cm ( 0.50 M' ) stk 9,600.00

12 BuisTanah 15 cm ( 0.50 M' ) stk 12,700.00

13 BuisTanah 20 cm ( 0.50 M' ) stk 16,800.00

14 BuisTanah 25 cm ( 0.50 M' ) stk 22,800.00


15 Injuk kg 17,400.00

BAHAN LOGAM DAN BAHAN


H
JADINYA
1 Besi Beton U-24 Rata-rata kg 16,500.00
Besi Beton U-39 / U-32 Rata-
2 kg 20,700.00
rata
Pagar BRC lengkap tiang
3 m2 171,300.00
( Tanpa Pondasi )
4 Bondek m2 185,000.00
5 Besi WF Ex DN SII kg 24,000.00
6 Besi WF Ex Jepang kg 23,900.00
7 Besi Profil DN SII kg 18,300.00
8 Besi Profil Ex LN kg 21,600.00
9 Besi C Lip Chanel kg 19,200.00
10 Ongkos Galfanis Besi kg 10,600.00
11 Kawat Beton kg 27,700.00
12 Kawat Duri kg 63,500.00
13 Kawat Pengikat m1 1,000.00
14 Kawat Bronjong 4 mm kg 28,200.00
15 Kawat Tembaga kg 41,400.00
16 Ram Nyamuk Hijau m2 13,400.00
17 Ram Kawat 1 x 1 cm m2 15,300.00
18 Ram Ayam m2 14,900.00
19 Kawat Kasa 1 x 1 ( Putih ) m2 32,100.00
20 Kawat Harmonika 4 cm m2 35,900.00
21 Kawat Harmonika 2 cm m2 28,600.00
22 Kawat Las Listrik kg 23,600.00
23 Wiremesh M8 m2 51,900.00
24 Wiremesh M6 m2 38,700.00
25 Timah kg 46,300.00
26 Timah Hitam kg 43,300.00
27 Ram nyamuk Alumunium m2 32,400.00
Plat Srip Ø 2 x 30 mm ( 6
28 bt 33,000.00
m1 )
Plat Srip Ø 3 x 30 mm ( 6
29 bt 33,100.00
m1 )
30 Plat Strip bt 18,200.00
31 Besi Strip kg 26,800.00
32 Plat Alumunium 0.2 mm m2 89,800.00
33 Plat Alumunium 0.3 mm m2 110,500.00
34 Plat Alumunium 0.4 mm m2 141,400.00
35 Plat Alumunium 0.5 mm m2 143,100.00
36 Plat Alumunium 0.6 mm m2 171,800.00
37 Plat Alumunium 0.1 mm m2 56,300.00
Kusen Alumunium Natural 1.3
38 m1 151,100.00
mm t= 1,3 mm ( 4 " )
Kusen Alumunium Warna 1.3
39 m1 163,000.00
mm t= 1,3 mm ( 4 " )
Kusen Alumunium Natural 1.3
40 m1 81,000.00
mm t= 1,3 mm ( 3 " )
Kusen Alumunium Warna 1.3
41 m1 102,000.00
mm t= 1,3 mm ( 3 " )
Daun Jendela Alumunium
42 Natural ( tanpa kaca dan m2 98,800.00
accessories )
Daun Jendela Alumunium
43 Warna ( tanpa kaca dan m2 148,800.00
accessories )
Daun Pintu Alumunium
44 Natural ( tanpa kaca dan m2 211,800.00
accessories )
Daun Pintu Alumunium Warna
45 ( tanpa kaca dan m2 207,500.00
accessories )
Handle Alumunium ( Tarikan
46 bh 345,200.00
Pintu Alumunium )
47 Kait Angin Alumunium ps 104,500.00
Karet Asisoris Kusen / Pintu
48 m1 7,500.00
Alumunium
49 Jalusi Alluminium m' 35,000.00
50 Sunscreen Almunium m2 380,200.00
Seng Plat BJLS 30 60 cm
51 roll 1,581,500.00
( 100 m1 )
Seng Plat BJLS 30 90 cm
52 roll 2,080,100.00
( 100 m1 )
53 Plat Besi Tipis 1 mm kg 16,800.00
54 Plat Besi Tipis 0.5 mm kg 17,700.00
55 Plat Besi 2 mm s/d 5 mm kg 14,100.00
56 Plat Besi 6 mms/d 10 mm kg 14,100.00
57 Plat Besi 10 mm keatas kg 14,700.00
58 Kabel presstressed polos kg 26,700.00
59 Jaring Kawat Baja kg 28,900.00
60 Lem Kuning ( Aibond ) kg 35,700.00
61 Lem Fox kg 23,900.00
62 Lem Vinyl kg 44,000.00
63 Besi Strip Kaca Nako kg 11,000.00
64 Profil alumunium "T" m1 12,200.00
Besi Hallow ( 2 x 4 x 4) cm
65 btg 22,600.00
(400cm)
Besi Hallow ( 4 x 4) cm (400
66 btg 29,200.00
cm)
67 Besi Rail Pengamanan kg 459,300.00
68 Jendela Besi m2 390,200.00
69 Jendela Besi tahan api m2 501,700.00
70 Pintu gulung besi m2 501,700.00
71 Pintu Roliing Door m2 306,600.00
Jendela nako kaca ryben +
72 set 170,000.00
tralis 6 klips
Jendela nako kaca ryben +
73 set 200,000.00
tralis 7 klips
Jendela nako kaca ryben +
74 set 230,000.00
tralis 8 klips
Jendela nako kaca ryben +
75 set 290,000.00
tralis 10 klips
Jendela nako kaca bening +
76 set 120,000.00
tralis 4 klips
Jendela nako kaca bening +
77 set 140,000.00
tralis 5 klips
Jendela nako kaca bening +
78 set 170,000.00
tralis 6 klips
Jendela nako kaca bening +
79 set 210,000.00
tralis 7 klips
Jendela nako kaca bening +
80 set 230,000.00
tralis 8 klips
Jendela nako kaca bening +
81 set 300,000.00
tralis 10 klips

I BAHAN KACA
1 Kaca Polos 2 mm ( ASAHI ) m2 69,000.00
2 Kaca Polos 3 mm ( ASAHI ) m2 87,400.00
3 Kaca Polos 5 mm ( ASAHI ) m2 111,000.00
4 Kaca Polos 8 mm ( ASAHI ) m2 183,100.00
Kaca Rayband 5 mm
5 m2 148,700.00
( ASAHI )
Kaca Rayband 8 mm
6 m2 323,400.00
( ASAHI )
Kaca Rayband 12 mm
7 m2 627,000.00
( ASAHI )
8 Kaca cermin 5 mm m2 150,500.00
9 Kaca cermin 6 mm m2 186,400.00
10 Kaca cermin 8 mm m2 234,300.00
Kaca Patri Lokal Terpasang
11 m2 1,621,100.00
( ASAHI )
Kaca Patri Ex Luar Negeri
12 m2 3,425,700.00
Terpasang
13 Kaca 6 mm Gravver m2 1,263,900.00
Glass Block DN 20 x 20
14 bh 22,000.00
( Kedawung )
Glass Block DN 20 x 20 Ex
15 bh 125,700.00
LN
16 Sealant kg 211,800.00
17 Jendela Nako bh 109,200.00

BAHAN PAKU DAN MUR


J
BAUT
1 Paku 1/2" s/d 2" kg 23,800.00
2 Paku 2" s/d 5" kg 23,400.00
3 Paku 8 cm s/d 15 cm kg 20,000.00
4 Paku Beton 2 cm s/d 5 cm bh 1,600.00
5 Paku Kait Lengkap bh 900
6 Paku Cacing kg 57,100.00
7 Besi Beugel Kuda - Kuda kg 21,700.00
8 Duk Angker bh 7,500.00
Angker Mur Baut dia. 19 /
9 bh 71,800.00
Panjang 60 cm
Mur Baut HTB dia. 19 s/d 16 (
10 bh 15,900.00
5 cm )
Mur Baut Biasa dia. 19 s/d 16
11 bh 9,300.00
( 5 cm )
12 Piser dia.12 s/d 20 cm bh 5,300.00
13 Paku skrup 3" bh 800
14 Ramset / Dinabolt bh 7,200.00
15 Baut Besar bh 600
16 Baut Kecil bh 300
17 Paku GRC kg 35,000.00
18 Paku gypsum kg 17,500.00
19 Sekrup fixer bh 250
K BAHAN PERPIPAAN
Besi Pipa Untuk Hydrant BSP
1 bt 166,700.00
1"
Besi Pipa Untuk Hydrant BSP
2 bt 210,200.00
1.25"
Besi Pipa Untuk Hydrant BSP
3 bt 298,000.00
1.5"
Besi Pipa Untuk Hydrant BSP
4 bt 351,800.00
2"
Besi Pipa Untuk Hydrant BSP
5 bt 439,300.00
2.5"
Besi Pipa Untuk Hydrant BSP
6 bt 595,000.00
3"
Besi Pipa Untuk Hydrant BSP
7 bt 869,600.00
4"
Besi Pipa Untuk Hydrant BSP
8 bt 1,423,400.00
6"

9 Besi Pipa Hitam 1" t = 2 mm bt 172,300.00

10 Besi Pipa Hitam 2" t = 2 mm bt 227,900.00


11 Besi Pipa Hitam 3" t = 2mm bt 365,800.00
12 Besi Pipa Hitam 4" t = 2 mm bt 573,100.00

13 Besi Pipa Hitam 6" t = 2 mm bt 772,400.00

Pipa GIP Medium A 1/2" ( 6


14 bt 109,100.00
m1 )
Pipa GIP Medium A 3/4" ( 6
15 bt 159,400.00
m1 )
Pipa GIP Medium A 1" ( 6
16 bt 181,500.00
m1 )
Pipa GIP Medium A 1 1/4" ( 6
17 bt 259,300.00
m1 )
Pipa GIP Medium A 1 1/2" ( 6
18 bt 280,500.00
m1 )
Pipa GIP Medium A 1 3/4" ( 6
19 bt 326,400.00
m1 )
Pipa GIP Medium A 2" ( 6
20 bt 467,400.00
m1 )
Pipa GIP Medium A 2 1/2" ( 6
21 bt 672,100.00
m1 )
Pipa GIP Medium A 3" ( 6
22 bt 849,900.00
m1 )
Pipa GIP Medium A 4" ( 6
23 bt 920,300.00
m1 )
24 Macam2 Sambungan GIP 1/2" bh 6,300.00

25 Macam2 Sambungan GIP 3/4" bh 8,600.00

26 Macam2 Sambungan GIP 1" bh 16,700.00

Macam2 Sambungan GIP 1


27 bh 19,800.00
1/4"
Macam2 Sambungan GIP 1
28 bh 20,700.00
1/2"
Macam2 Sambungan GIP 1
29 bh 22,700.00
3/4"

30 Macam2 Sambungan GIP 2" bh 51,200.00

Macam2 Sambungan GIP 2


31 bh 60,400.00
1/2"

32 Macam2 Sambungan GIP 3" bh 75,900.00

33 Macam2 Sambungan GIP 4" bh 118,600.00

Pipa PVC RUCIKA type AW


34 bt 40,100.00
1/2"
Pipa PVC RUCIKA type AW
35 bt 52,200.00
3/4"

36 Pipa PVC RUCIKA type AW 1" bt 63,200.00

Pipa PVC RUCIKA type AW 1


37 bt 79,900.00
1/4"
Pipa PVC RUCIKA type AW 1
38 bt 105,900.00
1/2"

39 Pipa PVC RUCIKA type AW 2" bt 110,700.00

Pipa PVC RUCIKA type AW 2


40 bt 167,100.00
1/2"

41 Pipa PVC RUCIKA type AW 3" bt 205,100.00

42 Pipa PVC RUCIKA type AW 4" bt 347,900.00

43 Pipa PVC RUCIKA type AW 6" bt 640,000.00

44 Pipa PVC RUCIKA type AW 8" bt 818,300.00

Pipa PVC MASPION ABU


45 bt 22,500.00
( AW ) 1/2"
Pipa PVC MASPION ABU
46 bt 27,800.00
( AW ) 3/4"
Pipa PVC MASPION ABU
47 bt 40,500.00
( AW ) 1"
Pipa PVC MASPION ABU
48 bt 58,500.00
( AW ) 1 1/4"
Pipa PVC MASPION ABU
49 bt 60,200.00
( AW ) 1 1/2"
Pipa PVC MASPION ABU
50 bt 75,800.00
( AW ) 2"
Pipa PVC MASPION ABU
51 bt 126,300.00
( AW ) 2 1/2"
Pipa PVC MASPION ABU
52 bt 145,700.00
( AW ) 3"
Pipa PVC MASPION ABU
53 bt 256,800.00
( AW ) 4"
Macam2 Sambungan Paralon
54 bh 4,400.00
1/2"
Macam2 Sambungan Paralon
55 bh 4,700.00
3/4"
Macam2 Sambungan Paralon
56 bh 4,900.00
1"
Macam2 Sambungan Paralon
57 bh 7,200.00
1 1/4"
Macam2 Sambungan Paralon
58 bh 9,500.00
1 1/2"
Macam2 Sambungan Paralon
59 bh 13,500.00
1 3/4"
Macam2 Sambungan Paralon
60 bh 15,800.00
2"
Macam2 Sambungan Paralon
61 bh 26,400.00
2 1/2"
Macam2 Sambungan Paralon
62 bh 29,700.00
3"
Macam2 Sambungan Paralon
63 bh 34,000.00
4"
Sambungan Pipa PVC Jenis
64 bh 89,900.00
AW 4" TY
65 Lem Paralon tb 10,100.00
66 Solatip Ledeng gl 4,200.00
Pipa PVC 4" Berlobang Jenis
67 m1 36,700.00
AW
68 PVC Waterstop lebar 150 m1 53,500.00
69 PVC Waterstop lebar 200 m1 57,900.00
70 PVC Waterstop lebar 230 m1 65,700.00
71 PVC Waterstop lebar 250 m1 74,700.00
72 PVC Waterstop lebar 300 m1 83,600.00
73 PVC Waterstop lebar 320 m1 92,500.00

L BAHAN SANITAIR
1 Stop Kran 3/4" KIT bh 103,900.00
2 Stop Kran 1" KIT bh 124,200.00
3 Stop Kran 1 1/2" KIT bh 208,000.00
4 Stop Kran 2" KIT bh 267,900.00
5 Stop Kran 2 1/2" KIT bh 713,200.00
6 Stop Kran 3" KIT bh 830,300.00
7 Check Valve 1/2" bh 86,400.00
8 Double Neple 1/2" bh 32,400.00
9 Water Mur 1/2" bh 40,200.00
10 Gate walve 1/2" bh 55,500.00
Saringan Air Lt. KM Stainless
11 bh 66,600.00
Steel
12 Apooer Bath Tube bh 267,800.00
13 Kran Stainless Lokal Kait bh 46,100.00
14 Shower Dengan Tiang bh 221,000.00
15 Shower Tanpa Tiang bh 134,800.00
Kran Tembok Sun Eui dia.
16 bh 86,900.00
1/2"
17 Kran Tembok ITAP dia. 1/2" bh 40,900.00
18 Kran Bebek Sun Eui 1/2" bh 144,600.00
19 Kran Bebek ITAP 1/2" bh 51,500.00
Kran Panas Dingin San Eui
20 bh 228,400.00
Standard
21 Bath Cape Washteren unit 2,098,700.00
22 Tempat Sabun Poslin bh 46,300.00
Wastafel Lengkap TOTO LW
23 unit 1,012,700.00
230
24 Wastafel Lengkap INA unit 699,900.00
Closet Jongkok Poslin Warna
25 unit 205,600.00
TOTO
Closet Jongkok Standard
26 unit 188,200.00
Putih Poslin TOTO
Closet Jongkok Lengkap
27 unit 2,032,900.00
Sistem Jet TOTO

Closet Duduk Warna Standard


28 unit 1,724,700.00
TOTO C 240 Lengkap

Wastafel Bulat Warna


29 unit 910,800.00
Standard Lengkap
Closet Duduk Warna Standard
30 bh 1,272,100.00
INA Lengkap
Urinoir Lengkap TOTO Warna
31 unit 1,773,400.00
Standard Lengkap
Penyekat Poslin Urinoar
32 lbr 495,900.00
TOTO
Kitchen Zink Stainless
33 bh 397,800.00
Standard Lokal ( 1 Lubang )
Kitchen Zink Stainless Non
34 bh 1,272,300.00
Standard Franke ( 1 Lubang )

Kitchen Zink Stainless Non


35 bh 1,650,200.00
Standard Franke ( 2 Lubang )

36 Talang PVC U - 15 cm btng 60,000.00

M BAHAN PENUTUP ATAP


Atap Plastik Gelombang 80 x
1 lbr 33,100.00
180
Atap Fiber Glass Tipis 80 x
2 lbr 47,100.00
180 ( Gelombang )
Atap Fiber Glass Tebal 80 x
3 lbr 100,000.00
180 ( Gelombang )
Atap Alumunium Natural USR
4 m2 140,600.00
26 ( JAINDO )
Atap Alumunium Warna USR
5 m2 164,700.00
26 ( JAINDO )
Atap Asbes Gel. Kecil 80 x
6 lbr 77,200.00
180 x 4 mm
Atap Asbes Gel. Besar 80 x
7 lbr 111,100.00
180 x 5 mm
Atap Seng Gelombang 80 cm
8 lbr 62,900.00
x 180 cm x 3 mm
Atap Seng Gelombang 80 cm
9 lbr 83,100.00
x 180 cm x 5 mm
Atap Seng Gelombang 270
10 lbr 73,300.00
cm x 105 cm x 4mm
Atap Seng Gelombang 240
11 lbr 65,900.00
cm x 105 cm x 4mm
Atap Seng Gelombang 210
12 lbr 58,500.00
cm x 105 cm x 4mm
Atap Seng Gelombang 150
13 lbr 42,300.00
cm x 105 cm x 4mm
Atap Seng Gelombang 150
14 lbr 78,500.00
cm x 102 cm x 5mm
Atap Seng Gelombang 180
15 lbr 97,200.00
cm x 102 cm x 5mm
Atap Asbes Gelombang 300
16 lbr 80,000.00
cm x 105 cm x 4 mm

17 Atap Tegola Kubota, lengkap m2 487,100.00

18 Atap Tegola Kwalitas Sedang m2 283,600.00


19 Alumunium Foile m2 19,600.00
Atap Genteng Plentong pres
20 bh 1,900.00
Bakar KW I
Atap Genteng Plentong pres
21 bh 2,700.00
Molen Oven KW I
Atap Genteng Flam pres
22 bh 2,300.00
Molen Oven Jatiwangi
Bubung Genteng pres Bulat
23 bh 7,500.00
Ex Jatiwangi
Genteng Bubungan Ex
24 bh 4,800.00
Jatiwangi Segi Tiga
25 Genteng Bubungan Beton bh 10,500.00
Genteng Metal ( Rainbow
26 m2 203,100.00
Roof )
27 Genteng Metal Hana m2 172,700.00
Nok Atas Metal ( Rainbow
28 lbr 138,500.00
Roof )
29 Nok Atas Metal Hana lbr 80,900.00
Nok Pingir Metal ( Rainbow
30 lbr 105,300.00
Roof )
31 Nok Pingir Metal Hana lbr 100,800.00
32 Wall Flasing ( Rainbow Roof ) lbr 83,900.00
33 Wall Flasing Hana lbr 88,700.00
Atap Genteng Beton Warna
34 m2 96,700.00
14.5/m2
35 Genteng Beton Natural bh 8,500.00
36 Sirap Kelas I ( 80 / m2 ) m2 26,400.00
Genteng Keramik Natural
37 m2 112,400.00
Intan 14.5 / m2
Genteng Keramik Glasur
38 m2 142,200.00
Standard 14.5 /m2
Genteng Keramik Glasur
39 m2 139,300.00
Special 14.5 /m2
Genteng Keramik Glasur
40 m2 145,100.00
Premium 14.5 /m2
Genteng Murando Natural
41 bh 2,700.00
1m2 = 18 bh
Genteng Murando Glasur 1m2
42 bh 4,000.00
= 18 bh
43 Bubung Murando Natural bh 7,500.00
44 Bubung Murando Glasur bh 10,700.00
45 Bubungan Genteng Keramik bh 10,000.00
46 Atap Genteng Kodok bh 3,000.00
47 Bubungan Genteng Kodok bh 4,500.00
48 Bubungan Genteng Plentong bh 6,000.00
49 Bubungan Stel Gelombang bh 7,500.00
50 Nok Stel Gelombang lbr 38,100.00
51 Nok Atap Seng lbr 37,500.00
Nok standar 40 cm 18, SWG
52 m2 75,000.00
22
53 Pelat Asbes tebal 4 mm lbr 21,000.00
54 Pelat Asbes tebal 3.5 mm lbr 16,400.00
Trusses ZAM-75 t=0.8
55 m1 34,500.00
Rangka Utama
Trusses ZAM-75 t=0.5
56 m1 22,000.00
Rangka Utama
Reng 16-DB Roof Battens
57 m1 11,000.00
t=0.48 mm
58 Foot Plate t= 1.22 mm m1 7,200.00
59 PLD - Diafragma Plate bh 2,200.00
60 WIND Bracing m1 1,700.00
Tensioner ( Pengaku Tali
61 bh 7,200.00
angin )

N BAHAN MEKANIKAL

Jockey Pump kap. 80


1 unit 71,396,400.00
gln/menit 100 m1 ( 18.6 kW )

Electrical Pump kap. 750


2 unit 216,358,900.00
gln/menit 120 m1 ( 90 kW )

Diesel Pump kap. 750


3 unit 591,647,100.00
gln/menit 120 m1 ( 105 kW )

Presure Tank kap. 500 liter


4 unit 36,997,300.00
lengkap
Hydran Box dlm Gedung
5 unit 6,854,400.00
( Lengkap )

6 Fire House 1.5 x 30 m + nose unit 4,866,100.00

Exhose Fan H 360 W 60 x 60


7 unit 6,862,900.00
cm
Exhose Fan H 380 W CFM 55
8 unit 5,491,100.00
x 55 cm
Exhose Fan H 100 W 40 x 40
9 unit 1,092,600.00
cm
AC Split 3 PK Setara
10 unit 30,791,800.00
TOSHIBA
AC Split 2 PK Setara
11 unit 21,926,500.00
TOSHIBA
AC Split 1 PK Setara
12 unit 5,174,100.00
TOSHIBA
Mesin AC Split DAIKIN
13 1 BTU 4,200,000.00
( Indoor / Outdoor Unit )

O BAHAN ELEKTRIKAL
Kabel NYA 1 x 1.5 Prima ( 1
1 ROLL 102,700.00
rol = 50 m' )
Kabel NYA 1 x 2.5 Prima ( 1
2 ROLL 151,700.00
rol = 50 m' )
Kabel NYM 2 x 1.5 Prima ( 1
3 m' 6,600.00
rol = 50 m' )
Kabel NYM 3 x 1.5 Prima ( 1
4 m' 7,600.00
rol = 50 m' )
Kabel NYM 2 x 2.5 Prima ( 1
5 m' 4,900.00
rol = 50 m' )
Kabel NYM 3 x 2.5 Prima ( 1
6 m' 10,900.00
rol = 50 m' )
Kabel NYM 4 x 2.5 Prima ( 1
7 m' 7,600.00
rol = 50 m' )
Kabel NYM 2 x 4 Prima ( 1 rol
8 m' 6,300.00
= 50 m' )
Kabel NYM 3 x 4 Prima ( 1 rol
9 m' 15,400.00
= 50 m' )
Kabel NYM 4 x 4 Prima ( 1 rol
10 m' 20,700.00
= 50 m' )
Kabel NYM 2 x 6 Supreme ( 1
11 m' 11,800.00
rol = 50 m' )
Kabel NYM 3 x 6 Supreme ( 1
12 m' 13,700.00
rol = 50 m' )
Kabel NYM 4 x 6 Supreme ( 1
13 m' 18,600.00
rol = 50 m' )
Kabel NYM 2 x 10 Supreme
14 m' 17,600.00
( 1 rol = 50 m' )
Kabel NYM 3 x 10 Supreme
15 m' 119,700.00
( 1 rol = 50 m' )
Kabel NYM 4 x 10 Supreme
16 m' 26,500.00
( 1 rol = 50 m' )
Kabel NYM 4 x 16 Supreme
17 m' 29,700.00
( 1 rol = 50 m' )
Kabel NYY 2 x 4 Supreme ( 1
18 m' 12,000.00
rol = 50 m' )
Kabel NYY 3 x 4 Supreme ( 1
19 m' 19,300.00
rol = 50 m' )
Kabel NYY 4 x 4 Supreme ( 1
20 m' 23,800.00
rol = 50 m' )
Kabel NYY 2 x 6 Supreme ( 1
21 m' 14,500.00
rol = 50 m' )
Kabel NYY 3 x 6 Supreme ( 1
22 m' 19,200.00
rol = 50 m' )
Kabel NYY 4 x 6 Supreme ( 1
23 m' 18,500.00
rol = 50 m' )
Kabel NYY 2 x 10 Supreme
24 m' 20,400.00
( 1 rol = 50 m' )
Kabel NYY 3 x 10 Supreme
25 m' 25,800.00
( 1 rol = 50 m' )
Kabel NYY 4 x 10 Supreme
26 m' 35,500.00
( 1 rol = 50 m' )
Kabel NYY 4 x 16 Supreme
27 m' 41,900.00
( 1 rol = 50 m' )
28 NSFB FUJI EA - 100 A bh 841,900.00
29 NSFB FUJI EA - 150 A bh 2,182,600.00
Rumah Panel 30 x 60 cm
30 unt 153,500.00
( Kosong )
31 Skring Kas 2 grop Biasa unt 204,800.00
32 Skring Kas 3 grop Biasa unt 222,600.00
33 Skring Kas 5 grop Biasa unt 468,800.00
34 MCB 1 PAS bh 55,100.00
35 MCB 3 PAS bh 106,000.00
36 Tahanan 50 A Merk Fuji bh 521,100.00
Saklar Broko Tunggal
37 bh 23,800.00
Standard ( 1 Phase )
Saklar Broko Seri Standard
38 bh 26,300.00
( 1 Phase )
Stop Kontak Broko Standard (
39 bh 23,800.00
1 Phase )
Stop Kontak Broko 3 Phase
40 bh 87,700.00
(Out Bow)
Stop Kontak Broko 3 Phase
41 bh 144,900.00
( In Bow)

42 Stop Kontak Handle 3 Phase bh 87,800.00

Instalas Titik Lampu / Stop


43 ttk 179,600.00
Kontak (Upah dan Alat)
Lampu pijar 25 Watt s/d 100
44 bh 61,200.00
Watt

45 Lampu Neon Phillips 20 Watt bh 29,700.00

46 Lampu Neon Phillips 40 Watt bh 35,200.00


47 Trapo TL 20 W (Phillips) bh 41,800.00
48 Trapo TL 40 W (Phillips) bh 37,900.00
49 Trapo TL 20 W (Sinar) bh 40,600.00
50 Trapo TL 40 W (sinar) bh 41,300.00
51 Stater Neon Phillips bh 8,300.00
52 Stater Neon Biasa bh 6,500.00
Rumah TL In Bow / Out Bow 2
53 bh 144,000.00
x 20 W (kosongan)
54 Down Light + SL 25 W bh 306,900.00
55 Lampu SL Philip 25 W bh 306,900.00
Lampu Sirkel TL 20 W
56 bh 67,900.00
Lengkap
57 Lampu Mercuri 80 W bh 147,400.00
Lampu Taman + Tiang +
58 bh 307,600.00
Lampu 1 Buah
59 Lampu Baret 30 cm + Neon bh 221,700.00
Lampu Neon Arcrilik 2 x 40 W
60 bh 738,000.00
Lengkap
61 Jarum Penangkal Petir 16 bh 101,500.00
62 Kawat BC ( Tembaga ) kg 65,100.00
63 Pentanahan Penangkal Petir ttk 423,700.00
64 Pentanahan Panel ttk 296,100.00

BAHAN ALAT PENGANTUNG


P
DAN KUNCI

Kunci Silinder ALFA untuk


1 bh 410,900.00
Pintu Alumunium
2 Tarikan Pintu Alumunium bh 408,600.00
3 Kunci 2 Slaag ROYAL bh 126,500.00
4 Rel Henderson Lengkap bh 864,300.00
5 Rel maraton I Pintu unt 193,100.00
Kunci 2 Slaag Silinder SEIS
6 bh 335,900.00
Asli type 210 s/d type 226
7 Kunci 2 Slaag Ancor Asli bh 165,300.00
8 Kunci 2 Slaag ISO bh 207,300.00
9 Kunci KM Bulat Kualitas Biasa bh 54,400.00
10 Kunci kM Bulat ALFA bh 102,700.00
Kunci 2 Slaag Silinder Utama
11 bh 586,600.00
Standard
12 Kunci Gembok Besar bh 85,200.00
13 Kunci 2 Slaag Kuda Terbang bh 94,500.00
14 Kunci Lemari bh 46,800.00
15 Espangolet ps 51,600.00
16 Grendel 15 cm bh 49,800.00
17 Grendel 5 cm bh 5,500.00
18 Hak Angin Kait Jendela Biasa ps 7,100.00
19 Hak Angin Jendela Antik ps 29,000.00
Hak Angin Sendok Stainless /
20 bh 32,200.00
Kuningan
21 Sloot Pintu Berikut Rantai bh 31,500.00
22 Sloot Jendela Tunggal bh 33,000.00
23 Engsel Pintu Unilon Standard ps 21,000.00
24 Engsel Jendela Unilon ps 15,000.00
25 Engsel Patrun ps 13,700.00
26 Engsel Harmonika m1 9,100.00
Door Closer Kelas Standard
27 unt 420,000.00
( Kelas Sedang )
Door Closer Kelas Standard
28 unt 597,500.00
( Kelas Baik )
29 Door Closer Kelas Rendah unt 200,000.00
30 Door Holder unt 205,400.00
31 Door Stoper unt 255,500.00
32 Tarikan Almari Rata-rata bh 19,500.00
Seng BJLS 30 Lebar 60 cm
33 m1 43,500.00
( 1 rol 50 m' )
Seng BJLS 30 Lebar 90 cm
34 m1 53,500.00
( 1 rol 50 m' )
35 Seng BJLS 30 / 3 x 0.3 mm lbr 86,900.00
36 Seng Plat lbr 50,100.00
37 Waterstop Lebar 200 mm m1 57,900.00

BAHAN PENGIKAT UNTUK


Q
KONSTRUKSI JALAN
1 Aspal Bitumen kg 12,459.00
2 Aspal Emulsi kg 12,459.00
3 Aspal Curah kg 10,890.00
Aspal Concrete / Laston( AC
4 ton 1,348,300.00
-WC)

5 Aspal Threated Base ( ATB ) ton 1,200,200.00

Lataston /Hot Rolls Sheet


6 ton 1,666,900.00
( HRS )

BAHAN PENGISAP AIR


R
SUMUR DALAM
1 Pompa Kodok unit 172,600.00
2 Pompa Dragon Tegal unit 243,800.00
3 Pompa Dragon Asli unit 718,500.00
Mesin Pompa Air 100 W -
4 unit 1,100,200.00
Sanyo
Mesin Pompa Air 150 W -
5 unit 1,890,700.00
Sanyo
Pompa Zet Pump 250 W -
6 unit 4,961,500.00
Sanyo
Pompa Zet Pump 450 W -
7 unit 7,878,000.00
Sanyo
Pompa Submersible kap. 150
8 unit 27,151,200.00
liter / menit 3 KW
Gear Pump Kap. 60 liter /
9 unit 15,702,700.00
menit
Deep Well dengan
10 kelengkapannya kap. 150 liter unit 172,052,500.00
/ menit
11 Hand Oil Pump unit 5,195,300.00

S BAHAN PENAMPUNG AIR


Tangki Air Fiber Glass 0.5 m3
1 bh 1,172,500.00
( Excel )
Tangki Air Fiber Glass 1 m3
2 bh 1,316,400.00
( Excel )
Tangki Air Fiber Glass 2 m3
3 bh 1,954,200.00
( Excel )
4 Bak KM Fiber 60 x 60 bh 255,300.00
5 Bak Taraso WC 40 x 40 bh 118,500.00
6 Bak KM Taraso 60 x 60 bh 161,100.00

T ALAT TUKANG
1 Palu 0.5 kg bh 39,300.00
2 Cangkul bh 24,500.00
3 Singkup bh 41,400.00
4 Sekrop bh 50,100.00
5 Pengki bh 12,300.00
6 Linggis bh 41,700.00
Rool Meter 30 meter ( Bahan
7 bh 101,000.00
Plastik )
Rool Meter 5 meter ( Bahan
8 bh 37,800.00
Besi )
Selang Plastik untuk Water
9 m 1,600.00
Pas dia. 0.5 cm

10 Water Pas Alumunium 60 cm bh 88,200.00

BAHAN BAKAR DAN


U
PELUMAS
1 Minyak Tanah lt 18,000.00
2 Kayu Bakar dari Kayu Karet m3 151,100.00
3 Bahan Bakar Residu lt 28,435.00
4 Minyak Solar lt 7,150.00
5 Bensin Premium lt 7,800.00
6 Plus Oil lt 3,300.00
7 Oil Mesran 40 SAE lt 55,000.00
8 Elpiji / botol 15 kg 104,600.00
15.1 kg
9 Asitilin / Botol 88,900.00
btl
10 Angin ( O2 ) / botol btl 66,400.00
11 Karbit kg 19,400.00
12 Minyak Bekisting ltr 40,500.00
13 Rapidrant Gln 15,700.00
14 Soda Api kg 35,600.00
15 Sabun kg 2,400.00
16 Arang Kayu kg 11,100.00
17 Kawat Las bh 1,400.00

V BAHAN PAGAR
1 Panel Beton Pracetak lbr 199,200.00
2 Kolom Beton Pracetak btg 264,000.00

B. BIDANG PERTAMANAN
1 Aglonema batang 50,000.00
2 Bambu krisik/jepang batang 50,000.00
3 Furadan kg 24,000.00
4 Kompos/pupuk kandang karung 25,000.00
5 M atoa (2 m) batang 40,000.00
Palm (botol, ekor tupai, putri,
6 batang 100,000.00
dll) tinggi 2 m
7 Philo batang 75,000.00
Pohon pelindung (angsana,
8 mahoni, kamboja dll) tinggi batang 25,000.00
2m
Pohon perdu (kaca piring,
9 batang 10,000.00
puring, mawar, melati, dll)
10 Rumput gajah mini m2 15,000.00

Anda mungkin juga menyukai