Anda di halaman 1dari 203

Analisa Harga Satuan Pekerjaan Persiapan

Diposkan : 31 Mei 2014


Oleh : Endang Kusman

HARGA
No. URAIAN SATUAN VOLUME SATUAN
(Rp)

A-01 1 M' Pagar Sementara Dari Kayu Tinggi 2 m


- Dolken Kayu Ø 8-10 / 400 cm Btg 1.25 28,000.00
- Semen Portland Kg 2.5 1,406.00
- Pasir beton M3 0.005 255,400.00
- Koral Beton 2/3 M3 0.009 211,100.00
- Kayu balok terentang M3 0.072 2,640,000.00
- Paku Biasa 2" - 5" Kg 0.06 23,400.00
- Residu Kg 0.4 8,100.00
- Pekerja Oh 0.4 42,000.00
- Tukang Kayu Oh 0.2 65,000.00
- Kepala Tukang Oh 0.02 75,000.00
- Mandor Oh 0.02 80,000.00
Jumlah
Dibulatkan

A-02 1 M' Pagar Sementara Seng Gelombang Tinggi 2 m


- Dolken Kayu Ø 8-10 / 400 cm Btg 1.25 28,000.00
- Semen Portland Kg 2.5 1,406.00
- Seng Gelombang BJLS-30 Lbr 1.2 62,900.00
- Pasir beton M3 0.005 255,400.00
- Koral Beton 2/3 M3 0.009 211,100.00
- Kayu balok terentang M3 0.072 2,640,000.00
- Paku Biasa 2" - 5" Kg 0.06 23,400.00
- Meni Besi Kg 0.45 30,400.00
- Pekerja Oh 0.4 42,000.00
- Tukang Kayu Oh 0.2 65,000.00
- Kepala Tukang Oh 0.02 75,000.00
- Mandor Oh 0.02 80,000.00
Jumlah
Dibulatkan

A-03 1 M' Pagar SementaraKawat Duri Tinggi 1,80 m


- Dolken Kayu Ø 8-10 / 400 cm Btg 1 28,000.00
- Semen Portland Kg 2 1,406.00
- Kawat Duri Kg 2.5 63,500.00
- Pasir beton M3 0.005 255,400.00
- Koral Beton 2/3 M3 0.009 211,100.00
- Paku Biasa 2" - 5" Kg 0.06 23,400.00
- Pekerja Oh 0.3 42,000.00
- Tukang Kayu Oh 0.2 65,000.00
- Kepala Tukang Oh 0.02 75,000.00
- Mandor Oh 0.02 80,000.00
Jumlah
Dibulatkan

A-04 1 M2 Pengukuran Dan Pasang Bouwplank


- Kayu kaso 5/7 M3 0.012 1,870,500.00
- Paku Biasa 2" - 5" Kg 0.02 23,400.00
- Kayu papan albasia M3 0.007 2,071,700.00
- Pekerja Oh 0.1 42,000.00
- Tukang Kayu Oh 0.1 65,000.00
- Kepala Tukang Oh 0.01 75,000.00
- Mandor Oh 0.005 80,000.00
Jumlah
Dibulatkan

A-05 1 M2 Pembuatan Kantor Sementara dgn Lantai Diplester


- Dolken Kayu Ø 8-10 / 400 cm Btg 1.25 28,000.00
- Kayu Balok terentang M3 0.18 2,640,000.00
- Paku Biasa Kg 0.85 23,400.00
- Besi Strip Kg 1.1 26,800.00
- Semen Portland Kg 35 1,406.00
- Pasir Pasang M3 0.15 233,400.00
- Pasir beton M3 0.1 255,400.00
- Koral Beton2/3 M3 0.15 211,100.00
- Bata Merah Bh 30 775
- Seng Plat m' 0.25 15,815.00
- Kawat harmonika M2 2 35,900.00
- Kaca Polos 3mm M2 0.08 87,400.00
- Kunci Tanam Bh 0.15 94,500.00
- Plywood 120 x 240 x 0,4 cm Lbr 0.06 140,000.00
- Pekerja Oh 2 42,000.00
- Tukang Kayu Oh 2 65,000.00
- Tukang Batu Oh 1 65,000.00
- Kepala Tukang Oh 0.3 75,000.00
- Mandor Oh 0.05 80,000.00
Jumlah
Dibulatkan

A-06 1 M2 Pembuatan Gudang Semen dan Alat-alat


- Dolken Kayu Ø 8-10 / 400 cm Btg 1.7 28,000.00
- Kayu balok terentang M3 0.21 2,640,000.00
- Paku Biasa Kg 0.3 23,400.00
- Semen Portland Kg 10.5 1,406.00
- Pasir Beton M3 0.03 255,400.00
- Koral Beton 2/3 M3 0.05 211,100.00
- Seng Gelombang BJLS 30 Lbr 1.5 62,900.00
- Pekerja Oh 1 42,000.00
- Tukang Kayu Oh 2 65,000.00
- Kepala Tukang Oh 0.2 75,000.00
- Mandor Oh 0.05 80,000.00
Jumlah
Dibulatkan

A-07 1 M2 Pembuatan Bedeng Buruh


- Dolken Kayu Ø 8-10 / 400 cm Btg 1.25 28,000.00
- Kayu balok terentang M3 0.186 2,640,000.00
- Paku Biasa Kg 0.3 23,400.00
- Semen Portland Kg 18 1,406.00
- Pasir Beton M3 0.03 255,400.00
- Koral Beton 2/3 M3 0.05 211,100.00
- Seng Gelombang BJLS 30 Lbr 1.5 62,900.00
- Pekerja Oh 1 42,000.00
- Tukang Kayu Oh 2 65,000.00
- Kepala Tukang Oh 0.2 75,000.00
- Mandor Oh 0.05 80,000.00
Jumlah
Dibulatkan

A-08 1 M2 Membersihkan Lapangan dan Perataan


- Pekerja Oh 0.1 42,000.00
- Mandor Oh 0.05 80,000.00
Jumlah
Dibulatkan

A-09 1M2 Pembuatan Jalan Sementara


- Batu Belah 15/20 M3 0.15 205,500.00
- Batu Pecah 5/7 M3 0.09 196,000.00
- Pasir Pasang M3 0.01 233,400.00
- Pekerja Oh 1 42,000.00
- Mandor Oh 0.05 80,000.00
Jumlah
Dibulatkan

A-10 1 M3 Bongkaran Beton Bertulang


- Pekerja Oh 6.667 42,000.00
- Mandor Oh 0.333 80,000.00
Jumlah
Dibulatka
n

A-11 1 M3 Bongkaran Dinding Tembok Bata Merah


- Pekerja Oh 6.667 42,000.00
- Mandor Oh 0.033 80,000.00
Jumlah
Dibulatkan

A-12 1 M¹ Pagar beton Pracetak ( 5 x 50 x 213 ) cm


- Panel Beton Pracetak Lbr 0.986 199,200.00
- Kolom Beton Pracetak Btg 0.525 264,000.00
- Pasir Beton M3 0.074 255,400.00
- Koral 2/3 M3 0.146 211,100.00
- Semen abu - abu Kg 45 1,406.00
- Pekerja Oh 0.375 42,000.00
- Tukang Batu Oh 0.125 65,000.00
- Kepala Tukang Oh 0.012 75,000.00
- Mandor Oh 0.019 80,000.00
Jumlah
Dibulatkan

A-13 1 M¹ Pagar kawat ayam tiang besi L50.50.5, tinggi 1 m'


- Kawat ram ayam Lbr 0.434 14,900.00
- Besi siku L 50.50.5 Kg 6.786 18,300.00
- Besi pelat (1,2 x 3) mm Kg 0.0424 18,300.00
- Baut bh 4 600
- Semen Portland Kg 2.5 1,406.00
- Pasir beton M3 0.005 255,400.00
- Koral Beton 2/3 M3 0.009 211,100.00
- Pekerja Oh 0.375 42,000.00
- Tukang Batu Oh 0.125 65,000.00
- Kepala Tukang Oh 0.012 75,000.00
- Mandor Oh 0.019 80,000.00
Jumlah
Dibulatkan
A-14 1 M2 Pagar BRC lengkap dengan tiang
- BRC lengkap dengan tiang Lbr 0.434 171,300.00
- Semen Portland Kg 2 1,406.00
- Kawat Duri Kg 2.5 63,500.00
- Pasir beton M3 0.005 255,400.00
- Koral Beton 2/3 M3 0.009 211,100.00
- Pekerja Oh 0.375 42,000.00
- Tukang Batu Oh 0.125 65,000.00
- Kepala Tukang Oh 0.012 75,000.00
- Mandor Oh 0.019 80,000.00
Jumlah
Dibulatkan

A-15 1 M2 Steiger Werk / perancah dari Bambu


- Bambu Ø 6 - 10 (600) cm btng 1 25,000.00
- Tali ijuk kg 0.25 23,400.00
- Pekerja org 0.25 42,000.00
- Tukang kayu org 0.017 65,000.00
- Kepala tukang org 0.002 75,000.00
- Mandor org 0.013 80,000.00
Jumlah
Dibulatkan

A-16 1 M' Cerucuk Bambu


- Bambu Ø 7 -10 (400) cm btng 1.25 25,000.00
- Pekerja org 0.5 42,000.00
- Mandor org 0.025 80,000.00
Jumlah
Dibulatkan

Kembali ke Analisa AHS SNI


HARGA
(Rp)

35,000.00
3,515.00
1,277.00
1,899.90
190,080.00
1,404.00
3,240.00
16,800.00
13,000.00
1,500.00
1,600.00
269,315.90
269,316.00

35,000.00
3,515.00
75,480.00
1,277.00
1,899.90
190,080.00
1,404.00
13,680.00
16,800.00
13,000.00
1,500.00
1,600.00
355,235.90
355,236.00
28,000.00
2,812.00
158,750.00
1,277.00
1,899.90
1,404.00
12,600.00
13,000.00
1,500.00
1,600.00
222,842.90
222,843.00

22,446.00
468
14,501.90
4,200.00
6,500.00
750
400
49,265.90
49,266.00

35,000.00
475,200.00
19,890.00
29,480.00
49,210.00
35,010.00
25,540.00
31,665.00
23,250.00
3,953.75
71,800.00
6,992.00
14,175.00
8,400.00
84,000.00
130,000.00
65,000.00
22,500.00
4,000.00
1,135,065.75
1,135,066.00

47,600.00
554,400.00
7,020.00
14,763.00
7,662.00
10,555.00
94,350.00
42,000.00
130,000.00
15,000.00
4,000.00
927,350.00
927,350.00

35,000.00
491,040.00
7,020.00
25,308.00
7,662.00
10,555.00
94,350.00
42,000.00
130,000.00
15,000.00
4,000.00
861,935.00
861,935.00

4,200.00
4,000.00
8,200.00
8,200.00

30,825.00
17,640.00
2,334.00
42,000.00
4,000.00
96,799.00
96,799.00

280,014.00
26,640.00
306,654.00

306,654.00

280,014.00
2,640.00
282,654.00
282,654.00

196,411.20
138,600.00
18,899.60
30,820.60
63,270.00
15,750.00
8,125.00
900
1,520.00
474,296.40
474,296.00

6,466.60
124,183.80
775.92
2,400.00
3,515.00
1,277.00
1,899.90
15,750.00
8,125.00
900
1,520.00
166,813.22
166,813.00
74,344.20
2,812.00
158,750.00
1,277.00
1,899.90
15,750.00
8,125.00
900
1,520.00
265,378.10
265,378.00

25,000.00
5,850.00
10,500.00
1,105.00
150
1,040.00
43,645.00
43,645.00

31,250.00
21,000.00
2,000.00
54,250.00
54,250.00
Analisa Harga Satuan Pekerjaan Tanah
Berkut ini adalah contoh Analisa Harga Satuan (AHS) SNI tahun 2011 untuk pekerjaan tanah yang sering digunakan untuk peke

B. ANALISA HARGA SATUAN PEKERJAAN TANAH

HARGA
No. URAIAN SATUAN VOLUME SATUAN HARGA
(Rp) (Rp)

1 M3
Galian
Tanah
Biasa
sedalam 1
B-01 m
- Pekerja Oh 0.4 42,000.00 16,800.00
- Mandor Oh 0.04 80,000.00 3,200.00
Jumlah 20,000.00
Dibulatkan 20,000.00

1 M3
Galian
Tanah
Biasa
Sedalam
B-02 2m
- Pekerja Oh 0.526 42,000.00 22,092.00
- Mandor Oh 0.052 80,000.00 4,160.00
Jumlah 26,252.00
Dibulatkan 26,252.00

1 M3
Galian
Tanah
Biasa
Sedalam
B-03 3m
- Pekerja Oh 0.735 42,000.00 30,870.00
- Mandor Oh 0.073 80,000.00 5,840.00
Jumlah 36,710.00
Dibulatkan 36,710.00

1 M3
Galian
Tanah
Keras
Sedalam
B-04 1m
- Pekerja Oh 0.625 42,000.00 26,250.00
- Mandor Oh 0.062 80,000.00 4,960.00
Jumlah 31,210.00
Dibulatkan 31,210.00

1 M3
Galian
Tanah
Lumpur
Sedalam
B-05 1m
- Pekerja Oh 0.823 42,000.00 34,566.00
- Mandor Oh 0.083 80,000.00 6,640.00
Jumlah 41,206.00
Dibulatkan 41,206.00

Materi Terkait :

Analisa Harga Satuan Pekerjaan Konstruksi


Analisa Pekerjaan Tanah
Analisa Pekerjaan Pondasi
Analisa Pekerjaan Beton
Analisa Pekerjaan Dinding
Analisa Pekerjaan Plesteran-Acian
Analisa HArga Satuan Pekerjaan Penutup Atap
Analisa Harga Satuan Pekerjaan Tutup Plapond
Analisa Harga Satuan Pekerjaan Lantai
Analisa Harga Satuan Pekerjaan Kayu
g sering digunakan untuk pekerjaan bangunan rumah.
Analisa Harga Satuan Pekerjaan Pondasi
(AHS SNI 2011)
Untuk menghitung biaya pekerjaan pondasi bagunan rumah Anda diperlukan Analisa Harga Satuan Pekerjaaan Pondasi. Beriku

C. ANALISA HARGA SATUAN PEKERJAAN PONDASI

HARGA
No. URAIAN SATUAN VOLUME SATUAN HARGA
(Rp) (Rp)

1 M3
Pasanag
Pondasi
batu Kali
adk 1pc :
C-01 3 ps
Batu
- Belah M3 1.1 205,500.00 226,050.00
Semen
- Portland Kg 202 1,406.00 284,012.00
Pasir
- Pasang M3 0.485 233,400.00 113,199.00
- Pekerja Oh 1.5 42,000.00 63,000.00
Tukang
- Batu Oh 0.6 65,000.00 39,000.00
Kepala
- Tukang Oh 0.06 75,000.00 4,500.00
- Mandor Oh 0.075 80,000.00 6,000.00
Jumlah 735,761.00
Dibulatkan 735,761.00

1 M3
Pasang
Pondasi
Batu kali
adk 1pc :
C-02 4ps
Batu
- Belah M3 1.1 205,500.00 226,050.00
Semen
- Portland Kg 163 1,406.00 229,178.00
Pasir
- Pasang M3 0.52 233,400.00 121,368.00
- Pekerja Oh 1.5 42,000.00 63,000.00
Tukang
- Batu Oh 0.6 65,000.00 39,000.00
Kepala
- Tukang Oh 0.06 75,000.00 4,500.00
- Mandor Oh 0.075 80,000.00 6,000.00
Jumlah 689,096.00
Dibulatkan 689,096.00

1 M3
Pasang
Pondasi
Batu kali
adk 1pc :
C-03 5ps
Batu
- Belah M3 1.1 205,500.00 226,050.00
Semen
- Portland Kg 136 1,406.00 191,216.00
Pasir
- Pasang M3 0.544 233,400.00 126,969.60
- Pekerja Oh 1.5 42,000.00 63,000.00
Tukang
- Batu Oh 0.6 65,000.00 39,000.00
Kepala
- Tukang Oh 0.06 75,000.00 4,500.00
- Mandor Oh 0.075 80,000.00 6,000.00
Jumlah 656,735.60
Dibulatkan 656,736.00

1 M3
Pasang
Pondasi
Batu
Kosong
(aanstam
C-04 ping)
Batu
- Belah M3 1.2 205,500.00 246,600.00

- Pasir Urug M3 0.3 175,300.00 52,590.00


- Pekerja Oh 0.78 42,000.00 32,760.00
Tukang
- Batu Oh 0.39 65,000.00 25,350.00
Kepala
- Tukang Oh 0.039 75,000.00 2,925.00
- Mandor Oh 0.039 80,000.00 3,120.00
Jumlah 363,345.00
Dibulatkan 363,345.00

Materi Terkait :

Analisa Harga Satuan Pekerjaan Konstruksi


Analisa Pekerjaan Tanah
Analisa Pekerjaan Pondasi
Analisa Pekerjaan Beton
Analisa Pekerjaan Dinding
Analisa Pekerjaan Plesteran-Acian
Analisa HArga Satuan Pekerjaan Penutup Atap
Analisa Harga Satuan Pekerjaan Tutup Plapond
Analisa Harga Satuan Pekerjaan Lantai
Analisa Harga Satuan Pekerjaan Kayu
Pekerjaaan Pondasi. Berikut adalah contoh analisa pekerjaan pondasi (AHS SNI tahun 2011). Pada dasarnya yang selalu berubah setiap tah
yang selalu berubah setiap tahun pada analisa harga satuan, adalah harga bahan dan upah, sedangkan koefisien (volume pek.) tetap.
sien (volume pek.) tetap.
Harga Satuan Pekerjaan Beton
Untuk menghitung biaya pekerjaan beton diperlukan analisa harga satuan beton. Berikut adalah tabel analisa hargasatuan bet

NO URAIAN SAT VOLUME HRG.SAT JUMLAH

1 M3
Sloof
Beton
Tulang
15/20
(180 kg
besi +
bekisting)
4dia. 12
D-17r2 ring 8-15

Kayu
papan
terentang M3 0.27 2,850,000 769,500

Paku
Biasa 2" -
5" Kg 2 23,400 46,800
Besi
Beton Kg 180 16,500 2,970,000
Kawat
Beton Kg 3 27,700 83,100
Semen
Portland Kg 323 1,200 387,600
Pasir
Beton M3 0.52 225,000 117,000

Koral
Beton 2/3 M3 0.78 200,000 156,000
Pekerja Oh 4.85 55,000 266,750
Tukang
Batu Oh 0.35 70,000 24,500
Tukang
Kayu Oh 1.56 70,000 109,200
Tukang
Besi Oh 1.4 70,000 98,000
Kepala
Tukang Oh 0.331 80,000 26,480
Mandor Oh 0.17 85,000 14,450
Jumlah 5,069,380
Dibulatka
n 5,069,380

1 M3
Kolom
Beton
Tulang
15/20
(180 kg
besi +
bekisting)
4dia.12 8-
15

Kayu
papan
terentang M3 0.4 2,850,000 1,140,000

Paku
Biasa 2" -
5" Kg 4 23,400 93,600
Minyak
Bekisting Ltr 40,500 -
Besi
Beton Kg 180 16,500 2,970,000
Kawat
Beton Kg 1.8 27,700 49,860
Semen
Portland Kg 323 1,200 387,600
Pasir
Beton M3 0.52 225,000 117,000

Koral
Beton 2/3 M3 0.78 200,000 156,000

Kayu
Balok
Terentang M3 0.15 2,640,000 396,000
Dolken Ø-
8-10/4m Btg 20 15,000 300,000
Pekerja Oh 7.3 55,000 401,500
Tukang
Batu Oh 0.35 70,000 24,500
Tukang
Kayu Oh 3.3 70,000 231,000
Tukang
Besi Oh 2.1 70,000 147,000
Kepala
Tukang Oh 0.57 80,000 45,600
Mandor Oh 0.25 85,000 21,250
Jumlah 6.480.910
Dibulatka
n 6.481.000

1 M3
Balok
Beton
Tulang
15/20
sofi-sofi,
ring balk
+ balok
poratl
(180 kg
besi +
bekisting)
4dia. 12,
8-15

Kayu
papan
terentang M3 0.32 2,850,000 912,000

Paku
Biasa 2" -
5" Kg 3.2 23,400 74,880
Besi
Beton Kg 180 16,500 2,970,000
Kawat
Beton Kg 2.25 27,700 62,325
Semen
Portland Kg 323 1,200 387,600
Pasir
Beton M3 0.52 225,000 117,000

Koral
Beton 2/3 M3 0.78 200,000 156,000

Kayu
Balok
Terentang M3 0.14 2,640,000 369,600
Dolken Ø-
8-10/4m Btg 16 15,000 240,000
Pekerja Oh 5.96 55,000 327,800
Tukang
Batu Oh 0.35 70,000 24,500
Tukang
Kayu Oh 2.8 70,000 196,000
Tukang
Besi Oh 1.4 70,000 98,000
Kepala
Tukang Oh 0.455 80,000 36,400
Mandor Oh 0.208 85,000 17,680
Jumlah 6.412.865
Dibulatka
n 6,413,000

1 M3
Tangga
Beton
Tulang
(90 kg
besi +
D-29 bekisting)

Kayu
papan
terentang M3 0.25 2,850,000 712,500

Paku
Biasa 2" -
5" Kg 3 23,400 70,200
Minyak
Bekisting Ltr 1.2 40,500 48,600
Besi
Beton Kg 90 16,500 1,485,000
Kawat
Beton Kg 3 27,700 83,100
Semen
Portland Kg 323 1,200 387,600
Pasir
Beton M3 0.52 225,000 117,000

Koral
Beton 2/3 M3 0.78 200,000 156,000
Kayu
Balok
Terentang M3 0.105 2,640,000 277,200
Dolken Ø-
8-10/4m Btg 14 15,000 210,000
Pekerja Oh 5.6 55,000 308,000
Tukang
Batu Oh 0.35 70,000 24,500
Tukang
Kayu Oh 2.3 70,000 161,000
Tukang
Besi Oh 1.4 70,000 98,000
Kepala
Tukang Oh 0.405 80,000 32,400
Mandor Oh 0.202 85,000 17,170
Jumlah 4,188,720
Dibulatka
n 4,189,000

1 M3
Membuat
Plat
Lantai Tb.
10 Cm
Beton
Bertulang
( 90 Kg
Besi +
Bekisting
3)

Kayu
Terentang M3 0.4 2,850,000 1,140,000

Paku
Biasa 2" -
5" Kg 4 23,400 93,600
Minyak
Bekisting Ltr 2 40,500 81,000

Besi
Beton
Polos Kg 90 16,500 1,485,000
Kawat
Beton Kg 3 27,700 83,100
Kayu
Balok
Terentang M3 0.105 151,100 15,866

Plywood
Tebal 9
mm Lbr 3.5 151,100 528,850

Dolken
kayu
Galam o -
8-10/4 m Btg 60 15,000 900,000
Semen
Portland Kg 323 1,200 387,600
Pasir
Beton M3 0.52 225,000 117,000

Koral
Beton 2/3 M3 0.78 200,000 156,000
Pekerja Oh 5.2 55,000 286,000
Tukang
Batu Oh 0.35 70,000 24,500
Tukang
Kayu Oh 3.3 70,000 231,000
Kepala
Tukang Oh 0.365 80,000 29,200
Mandor Oh 1.06 85,000 90,100
Jumlah 5,648,816
Dibulatka
n 5,649,000

Materi Terkait :

Analisa Harga Satuan Pekerjaan Konstruksi


Analisa Pekerjaan Tanah
Analisa Pekerjaan Pondasi
Analisa Pekerjaan Beton
Analisa Pekerjaan Dinding
Analisa Pekerjaan Plesteran-Acian
Analisa HArga Satuan Pekerjaan Penutup Atap
Analisa Harga Satuan Pekerjaan Tutup Plapond
Analisa Harga Satuan Pekerjaan Lantai
Analisa Harga Satuan Pekerjaan Kayu
tabel analisa hargasatuan beton (penggalan AHS SNI 2011).
Analisa Harga Satuan Pekerjaan Dinding
(AHS-SNI 2011)
Berikut adalah penggalan analisa harga satuan (AHS-SNI 2011) untuk pekerjaan dinding yang biasa digunakan untuk menghitu

E. ANALISA HARGA SATUAN PEKERJAAN DINDING


HARGA
No. URAIAN SATUAN VOLUME SATUAN HARGA
(Rp) (Rp)
M2 Pasang Bata Merah Tebal 1
E-01 1 Bata, 1pc : 3ps
Bata
- Merah Bh 140 775 108,500.00
Semen
- Portland Kg 32.95 1,406.00 46,327.70
Pasir
- Pasang M3 0.091 233,400.00 21,239.40
- Pekerja Oh 0.65 42,000.00 27,300.00
Tukang
- Batu Oh 0.2 65,000.00 13,000.00
Kepala
- Tukang Oh 0.02 75,000.00 1,500.00
- Mandor Oh 0.03 80,000.00 2,400.00
Jumlah 220,267.10
Dibulatka
n 220,267.00

M2
Pasang
Bata
Merah
Tebal 1
Bata,
E-02 1 1pc : 4ps
Bata
- Merah Bh 140 775 108,500.00
Semen
- Portland Kg 26.55 1,406.00 37,329.30
Pasir
- Pasang M3 0.093 233,400.00 21,706.20
- Pekerja Oh 0.65 42,000.00 27,300.00
Tukang
- Batu Oh 0.2 65,000.00 13,000.00
Kepala
- Tukang Oh 0.02 75,000.00 1,500.00
- Mandor Oh 0.03 80,000.00 2,400.00
Jumlah 211,735.50
Dibulatka
n 211,736.00

M2
Pasang
Bata
Merah
Tebal 1
Bata,
E-03 1 1pc : 5ps
Bata
- Merah Bh 140 775 108,500.00
Semen
- Portland Kg 22.2 1,406.00 31,213.20
Pasir
- Pasang M3 0.102 233,400.00 23,806.80
- Pekerja Oh 0.65 42,000.00 27,300.00
Tukang
- Batu Oh 0.2 65,000.00 13,000.00
Kepala
- Tukang Oh 0.02 75,000.00 1,500.00
- Mandor Oh 0.03 80,000.00 2,400.00
Jumlah 207,720.00
Dibulatka
n 207,720.00
M2 Pasang Bata Merah Tebal
E-04 1 1/2 Bata, 1pc : 3ps
Bata
- Merah Bh 70 775 54,250.00
Semen
- Portland Kg 14.37 1,406.00 20,204.22
Pasir
- Pasang M3 0.04 233,400.00 9,336.00
- Pekerja Oh 0.32 42,000.00 13,440.00
Tukang
- Batu Oh 0.1 65,000.00 6,500.00
Kepala
- Tukang Oh 0.01 75,000.00 750
- Mandor Oh 0.015 80,000.00 1,200.00
Jumlah 105,680.22
Dibulatka
n 105,680.00
M2 Pasang Bata Merah Tebal
E-05 1 1/2 Bata, 1pc : 4ps
Bata
- Merah Bh 70 775 54,250.00
Semen
- Portland Kg 11.5 1,406.00 16,169.00
Pasir
- Pasang M3 0.043 233,400.00 10,036.20
- Pekerja Oh 0.32 42,000.00 13,440.00
Tukang
- Batu Oh 0.1 65,000.00 6,500.00
Kepala
- Tukang Oh 0.01 75,000.00 750
- Mandor Oh 0.015 80,000.00 1,200.00
Jumlah 102,345.20
Dibulatka
n 102,345.00
M2 Pasang Bata Merah Tebal
E-06 1 1/2 Bata, 1pc : 5ps
Bata
- Merah Bh 70 775 54,250.00
Semen
- Portland Kg 9.68 1,406.00 13,610.08
Pasir
- Pasang M3 0.045 233,400.00 10,503.00
- Pekerja Oh 0.32 42,000.00 13,440.00
Tukang
- Batu Oh 0.1 65,000.00 6,500.00
Kepala
- Tukang Oh 0.01 75,000.00 750
- Mandor Oh 0.015 80,000.00 1,200.00
Jumlah 100,253.08
Dibulatka
n 100,253.00

Materi Terkait :

Analisa Harga Satuan Pekerjaan Konstruksi


Analisa Pekerjaan Tanah
Analisa Pekerjaan Pondasi
Analisa Pekerjaan Beton
Analisa Pekerjaan Dinding
Analisa Pekerjaan Plesteran-Acian
Analisa HArga Satuan Pekerjaan Penutup Atap
Analisa Harga Satuan Pekerjaan Tutup Plapond
Analisa Harga Satuan Pekerjaan Lantai
Analisa Harga Satuan Pekerjaan Kayu
digunakan untuk menghitung biaya pekerjaan dinding pada rumah tinggal. Keseluruhan analisa pekerjaan dinding untuk berbagai ukuran k
nding untuk berbagai ukuran ketebalan dinding dan komposisi adukan pada AHS-SNI ada sekitar 40 analisa.
Analisa Harga Satuan Pekerjaan Plesteran
(AHS SNI 2011)
Inilah penggalan analisa pekerjaan plesteran yang paling banyak digunakan untuk menghitung biaya bangunan rumah tinggal.

F. ANALISA HARGA SATUAN PEKERJAAN PLESTERAN


HARGA
No. URAIAN SATUAN VOLUME SATUAN HARGA
(Rp) (Rp)

1 M2
Plesteran
adk. 1pc :
2ps Tebal
F-01 15 mm
Semen
- Portland Kg 8.52 1,406.00 11,979.12
Pasir
- Pasang M3 0.017 233,400.00 3,967.80
- Pekerja Oh 0.2 42,000.00 8,400.00
Tukang
- Batu Oh 0.15 65,000.00 9,750.00
Kepala
- Tukang Oh 0.015 75,000.00 1,125.00
- Mandor Oh 0.01 80,000.00 800
Jumlah 36,021.92
Dibulatkan 36,022.00

1 M2
Plesteran
adk. 1pc :
3ps Tebal
F-02 15 mm
Semen
- Portland Kg 6.48 1,406.00 9,110.88
Pasir
- Pasang M3 0.019 233,400.00 4,434.60
- Pekerja Oh 0.2 42,000.00 8,400.00
Tukang
- Batu Oh 0.15 65,000.00 9,750.00
Kepala
- Tukang Oh 0.015 75,000.00 1,125.00
- Mandor Oh 0.01 80,000.00 800
Jumlah 33,620.48
Dibulatkan 33,620.00

1 M2
Plesteran
adk. 1pc :
4ps Tebal
F-03 15 mm
Semen
- Portland Kg 5.2 1,406.00 7,311.20
Pasir
- Pasang M3 0.02 233,400.00 4,668.00
- Pekerja Oh 0.2 42,000.00 8,400.00
Tukang
- Batu Oh 0.15 65,000.00 9,750.00
Kepala
- Tukang Oh 0.015 75,000.00 1,125.00
- Mandor Oh 0.01 80,000.00 800
Jumlah 32,054.20
Dibulatkan 32,054.00

1 M2
Plesteran
adk. 1pc :
3ps Tebal
F-04 20 mm
Semen
- Portland Kg 10.8 1,406.00 15,184.80
Pasir
- Pasang M3 0.026 233,400.00 6,068.40
- Pekerja Oh 0.25 42,000.00 10,500.00
Tukang
- Batu Oh 0.2 65,000.00 13,000.00
Kepala
- Tukang Oh 0.02 75,000.00 1,500.00
- Mandor Oh 0.0125 80,000.00 1,000.00
Jumlah 47,253.20
Dibulatkan 47,253.00

1 M2
Plesteran
adk. 1pc :
4ps Tebal
F-05 20 mm
Semen
- Portland Kg 8.68 1,406.00 12,204.08
Pasir
- Pasang M3 0.028 233,400.00 6,535.20
- Pekerja Oh 0.25 42,000.00 10,500.00
Tukang
- Batu Oh 0.2 65,000.00 13,000.00
Kepala
- Tukang Oh 0.02 75,000.00 1,500.00
- Mandor Oh 0.0125 80,000.00 1,000.00
Jumlah 44,739.28
Dibulatkan 44,739.00

1 M2
Plesteran
adk.
1pc:5ps
tebal 20
F-06 mm
Semen
- Portland Kg 7.29 1,406.00 10,249.74
Pasir
- Pasang M3 0.026 233,400.00 6,068.40
- Pekerja Oh 0.25 42,000.00 10,500.00
Tukang
- Batu Oh 0.2 65,000.00 13,000.00
Kepala
- Tukang Oh 0.02 75,000.00 1,500.00
- Mandor Oh 0.0125 80,000.00 1,000.00
Jumlah 42,318.14
Dibulatkan 42,318.00

1 M2
Acian
F-11 Plesteran
Semen
- Portland Kg 4 1,406.00 5,624.00
- Pekerja Oh 0.143 42,000.00 6,006.00
Tukang
- batu Oh 0.107 65,000.00 6,955.00
Kepala
- Tukang Oh 0.0105 75,000.00 787.5
- Mandor Oh 0.0105 80,000.00 840
Jumlah 20,212.50
Dibulatkan 20,213.00

Materi Terkait :
Analisa Harga Satuan Pekerjaan Konstruksi
Analisa Pekerjaan Tanah
Analisa Pekerjaan Pondasi
Analisa Pekerjaan Beton
Analisa Pekerjaan Dinding
Analisa Pekerjaan Plesteran-Acian
Analisa HArga Satuan Pekerjaan Penutup Atap
Analisa Harga Satuan Pekerjaan Tutup Plapond
Analisa Harga Satuan Pekerjaan Lantai
Analisa Harga Satuan Pekerjaan Kayu
ya bangunan rumah tinggal.
Penggalan Analisa Harga Satuan Penutup Atap
(AHS SNI 2011)
Untuk menghitung pekerjaan penutup atap seperti genting plentong, genting morando, genting keramik, genting beton dll. dip

G. ANALISA HARGA SATUAN PEKERJAAN PENUTUP ATAP


HARGA
No. URAIAN SATUAN VOLUME SATUAN HARGA
(Rp) (Rp)

M2
Pasang
Atap
Genteng
G-01 1 Palentong

Genteng
- palentong Bh 25 1,900.00 47,500.00
- Pekerja Oh 0.15 42,000.00 6,300.00
Tukang
- kayu Oh 0.075 65,000.00 4,875.00
Kepala
- tukang Oh 0.008 75,000.00 600
- Mandor Oh 0.008 80,000.00 640
Jumlah 59,915.00
Dibulatka
n 59,915.00

1 M2 Pasang
Genteng Bubung
G-02 Palentong

Genteng
bubung
- palentong Bh 5 6,000.00 30,000.00
Semen
- Portland Kg 8 1,406.00 11,248.00
Pasir
- pasang M3 0.032 ### 7,468.80
- Pekerja Oh 0.4 42,000.00 16,800.00
Tukang
- kayu Oh 0.2 65,000.00 13,000.00
Kepala
- tukang Oh 0.02 75,000.00 1,500.00
- Mandor Oh 0.002 80,000.00 160
Jumlah 80,176.80
Dibulatka
n 80,177.00
1 M2 Pasang Roof Light
G-03 Fibreglass ( 180 x 90 ) cm

Roof light
- fibreglass Lbr 0.6 ### 60,000.00

Paku
biasa ½" -
- 1" Kg 0.05 23,800.00 1,190.00
- Pekerja Oh 0.14 42,000.00 5,880.00
Tukang
- kayu Oh 0.067 65,000.00 4,355.00
Kepala
- tukang Oh 0.007 75,000.00 525
- Mandor Oh 0.007 80,000.00 560
Jumlah 72,510.00
Dibulatka
n 72,510.00

1 M2 Pasang Atap
Asbes Gelombang
( 3,00 x 1,05 m ) x 4
G-04 mm

Asbes
gelomban
- g Lbr 0.35 80,000.00 28,000.00

- Paku seng Kg 0.12 23,800.00 2,856.00


- Pekerja Oh 0.14 42,000.00 5,880.00
Tukang
- kayu Oh 0.07 65,000.00 4,550.00
Kepala
- tukang Oh 0.007 75,000.00 525
- Mandor Oh 0.007 80,000.00 560
Jumlah 42,371.00
Dibulatkan 42,371.00
1 M2 Pasang Atap Asbes Gelombang ( 2,70 x 1,05 m )
G-05 x 4 mm

Asbes
gelomban
- g Lbr 0.42 73,300.00 30,786.00

- Paku seng Kg 0.12 23,800.00 2,856.00


- Pekerja Oh 0.14 42,000.00 5,880.00
Tukang
- kayu Oh 0.07 65,000.00 4,550.00
Kepala
- tukang Oh 0.007 75,000.00 525
- Mandor Oh 0.007 80,000.00 560
Jumlah 45,157.00
Dibulatka
n 45,157.00

1 M2 Pasang Atap
Asbes Gelombang
( 2,40 x 1,05 m ) x 4
G-06 mm

Asbes
gelomban
- g Lbr 0.44 65,900.00 28,996.00

- Paku seng Kg 0.12 23,800.00 2,856.00


- Pekerja Oh 0.14 42,000.00 5,880.00
Tukang
- kayu Oh 0.067 65,000.00 4,355.00
Kepala
- tukang Oh 0.007 75,000.00 525
- Mandor Oh 0.007 80,000.00 560
Jumlah 43,172.00
Dibulatka
n 43,172.00

M2
Pasang
Atap
Asbes
Gelomba
ng ( 2,10 x
1,05 m ) x
G-07 1 4 mm

Asbes
gelomban
- g Lbr 0.51 58,500.00 29,835.00

- Paku seng Kg 0.12 23,800.00 2,856.00


- Pekerja Oh 0.14 42,000.00 5,880.00
Tukang
- kayu Oh 0.067 65,000.00 4,355.00
Kepala
- tukang Oh 0.007 75,000.00 525
- Mandor Oh 0.007 80,000.00 560
Jumlah 44,011.00
Dibulatka
n 44,011.00

1 M2 Pasang Atap
Asbes Gelombang
( 1,50 x 1,05 m ) x 4
G-08 mm

Asbes
gelomban
- g Lbr 0.8 42,300.00 33,840.00

- Paku seng Kg 0.12 23,800.00 2,856.00


- Pekerja Oh 0.14 42,000.00 5,880.00
Tukang
- kayu Oh 0.067 65,000.00 4,355.00
Kepala
- tukang Oh 0.007 75,000.00 525
- Mandor Oh 0.007 80,000.00 560
Jumlah 48,016.00
Dibulatka
n 48,016.00

1 M¹ Pasang Nok Stel


G-09 Gelombang 1,05 m

Nok stel
gelomban
- g Lbr 2.1 38,100.00 80,010.00

Paku
sekrup
- 3,5" Bh 6 800 4,800.00
- Pekerja Oh 0.084 42,000.00 3,528.00
Tukang
- kayu Oh 0.125 65,000.00 8,125.00
Kepala
- tukang Oh 0.013 75,000.00 975
- Mandor Oh 0.004 80,000.00 320
Jumlah 97,758.00
Dibulatka
n 97,758.00
1 M2 Pasang Atap
G-10 Genteng Beton
Genteng
- beton bh 11 8,500.00 93,500.00
Paku
biasa 2" -
- 5" Kg 0.03 23,400.00 702
- Pekerja Oh 0.2 42,000.00 8,400.00
Tukang
- kayu Oh 0.1 65,000.00 6,500.00
Kepala
- tukang Oh 0.01 75,000.00 750
- Mandor Oh 0.01 80,000.00 800
Jumlah ###
Dibulatkan ###

1 M2 Pasang Atap
Genteng Murando
G-11 Natural

Genteng
murando
- natural bh 18 2,700.00 48,600.00
- Pekerja Oh 0.15 42,000.00 6,300.00
Tukang
- kayu Oh 0.075 65,000.00 4,875.00
Kepala
- tukang Oh 0.008 75,000.00 600
- Mandor Oh 0.008 80,000.00 640
Jumlah 61,015.00
Dibulatka
n 61,015.00

1 M2 Pasang Atap
Genteng Murando
G-12 Glazur

Genteng
murando
- glazur bh 18 4,000.00 72,000.00
- Pekerja Oh 0.15 42,000.00 6,300.00
Tukang
- kayu Oh 0.075 65,000.00 4,875.00
Kepala
- tukang Oh 0.008 75,000.00 600
- Mandor Oh 0.008 80,000.00 640
Jumlah 84,415.00
Dibulatka
n 84,415.00

Materi Terkait :

Analisa Harga Satuan Pekerjaan Konstruksi


Analisa Pekerjaan Tanah
Analisa Pekerjaan Pondasi
Analisa Pekerjaan Beton
Analisa Pekerjaan Dinding
Analisa Pekerjaan Plesteran-Acian
Analisa HArga Satuan Pekerjaan Penutup Atap
Analisa Harga Satuan Pekerjaan Tutup Plapond
Analisa Harga Satuan Pekerjaan Lantai
Analisa Harga Satuan Pekerjaan Kayu
keramik, genting beton dll. diperlukan analisa harga satuan penutup atap. Berikut adalah penggalan AHS SNI 2011 penutup atap yang bias
I 2011 penutup atap yang biasa digunakan untuk menghitung RAB Rumah tinggal.
Analisa Harga Satuan Pekerjaan Penutup Langit-langit
(AHS SNI 2011)
Berikut ini adalah penggalan Analisa Harga Satuan Pekerjaan untuk menghitung biaya pekerjaan langit-langit: asbes, akustik, t

H. ANALISA HARGA SATUAN PEKERJAAN PENUTUP LANGIT-LANGIT


HARGA
No. URAIAN SATUAN VOLUME SATUAN HARGA
(Rp) (Rp)
(Rp) (Rp)

1 M2 Langit-langit
Asbes ( 1,00 x 1,00 )
H-01 m, tebal 5 mm

Pelat
asbes
tebal 4
- mm m2 1.1 22,500.00 24,750.00

- Paku seng Kg 0.01 23,800.00 238


- Pekerja Oh 0.03 42,000.00 1,260.00
Tukang
- kayu Oh 0.07 65,000.00 4,550.00
Kepala
- tukang Oh 0.007 75,000.00 525
- Mandor Oh 0.0015 80,000.00 120
Jumlah 31,443.00
Dibulatkan 31,443.00

1 M2 Langit-langit
Asbes ( 1,00 x 1,00 )
H-02 m, tebal 3,5 mm

Pelat
asbes
tebal 3,5
- mm Lbr 1.1 19,500.00 21,450.00

- Paku seng Kg 0.01 23,800.00 238


- Pekerja Oh 0.03 42,000.00 1,260.00
Tukang
- kayu Oh 0.07 65,000.00 4,550.00
Kepala
- tukang Oh 0.007 75,000.00 525
- Mandor Oh 0.0015 80,000.00 120
Jumlah 28,143.00
Dibulatkan 28,143.00
1 M2 Langit-langit Akustik ( 60
H-03 x 120 ) cm

Akustik
600 x
- 1200 Lbr 1.5 ### ###
- Paku Kg 0.05 23,800.00 1,190.00
- Pekerja Oh 0.06 42,000.00 2,520.00
Tukang
- kayu Oh 0.1 65,000.00 6,500.00
Kepala
- tukang Oh 0.01 75,000.00 750
- Mandor Oh 0.003 80,000.00 240
Jumlah ###
Dibulatkan ###
1 M2 Langit-langit Akustik ( 60 x 120 ) cm + Rangka
H-04 Alluminium

Profil
Alluminiu
- m "T" M¹ 3.6 12,200.00 43,920.00
Kawat f 4
- mm Kg 0.15 28,200.00 4,230.00
Ramset /
- dina bolt Bh 1.05 7,200.00 7,560.00

Akustik
600 x
- 1200 Lbr 1.5 ### ###
- Pekerja Oh 0.15 42,000.00 6,300.00
Tukang
- kayu Oh 0.5 65,000.00 32,500.00
Kepala
- tukang Oh 0.05 75,000.00 3,750.00
- Mandor Oh 0.0075 80,000.00 600
Jumlah ###
Dibulatkan ###
1 M2 Langit-langit teakwood (60 x 120) cm, t = 4 mm + rangka
H-05 kayu borneo super

Kayu
Balok
Borneo
- Super M3 0.023 ### 60,720.00

Paku
biasa 2" -
- 5" Kg 0.06 23,400.00 1,404.00
Teakwoo
d 120 cm
x 240 cm
- x 0,4 cm Lbr 0.39 ### 51,363.00
- Pekerja Oh 0.27 42,000.00 11,340.00
Tukang
- kayu Oh 0.4 65,000.00 26,000.00
Kepala
- tukang Oh 0.04 75,000.00 3,000.00
- Mandor Oh 0.0135 80,000.00 1,080.00
Jumlah ###
Dibulatkan ###
1 M2 Langit-langit Teakwood 3 mm + Rangka Kayu
H-06 Borneo Super

Kayu
Balok
Borneo
- Super M3 0.023 ### 60,720.00

Paku
biasa 2" -
- 5" Kg 0.06 23,400.00 1,404.00

Teakwoo
d (120 x
240x 0,3)
- cm Lbr 0.39 ### 50,349.00
- Pekerja Oh 0.27 42,000.00 11,340.00
Tukang
- kayu Oh 0.4 65,000.00 26,000.00
Kepala
- tukang Oh 0.04 75,000.00 3,000.00
- Mandor Oh 0.0135 80,000.00 1,080.00
Jumlah ###
Dibulatkan ###
1 M2 Langit-langit Triplek 4 mm + Rangka Kayu
H-07 Borneo Super

Kayu
Balok
Borneo
- Super M3 0.023 ### 60,720.00

Paku
biasa 2" -
- 5" Kg 0.06 23,800.00 1,428.00
Triplek
120 cm x
240 cm x
- 0,4 cm Lbr 0.39 64,400.00 25,116.00
- Pekerja Oh 0.27 42,000.00 11,340.00
Tukang
- kayu Oh 0.4 65,000.00 26,000.00
Kepala
- tukang Oh 0.04 75,000.00 3,000.00
- Mandor Oh 0.0135 80,000.00 1,080.00
Jumlah ###
Dibulatkan ###
1 M2 Langit-langit Gypsum Board, tebal 9 mm +
H-08 rangka besi hollow

Hollow
4/4
Zincromat
- e Btg 0.415 29,200.00 12,118.00

Hollow
2/4
Zincromat
- e Btg 0.15 22,600.00 3,390.00
Gypsum
board
( 120 x
240 x 9 )
- mm Lbr 0.364 79,800.00 29,047.20
Paku
- gypsum kg 0.11 17,500.00 1,925.00
Ramset /
- dina bolt Bh 4 7,200.00 28,800.00
Cotton
- plaster Bh 0.072 15,000.00 1,080.00

- Compoun Zak 0.125 75,000.00 9,375.00


- Pekerja Oh 0.1 42,000.00 4,200.00
Tukang
- kayu Oh 0.05 65,000.00 3,250.00
Kepala
- tukang Oh 0.005 75,000.00 375
- Mandor Oh 0.005 80,000.00 400
Jumlah 93,960.20
Dibulatkan 93,960.00
1 M2 Langit-langit GRC t = 4 mm + rangka
H-09 besi hollow
Hollow
4/4
Zincromat
- e Btg 0.415 29,200.00 12,118.00

Hollow
2/4
Zincromat
- e Btg 0.15 22,600.00 3,390.00

GRC ( 120
x 240 x 4 )
- mm Lbr 0.364 67,500.00 24,570.00

- Paku GRC kg 0.11 35,000.00 3,850.00


Ramset /
- dina bolt Bh 4 7,200.00 28,800.00
Cotton
- plaster Bh 0.072 15,000.00 1,080.00

- Compoun Zak 0.125 75,000.00 9,375.00


- Pekerja Oh 0.1 42,000.00 4,200.00
Tukang
- kayu Oh 0.05 65,000.00 3,250.00
Kepala
- tukang Oh 0.005 75,000.00 375
- Mandor Oh 0.005 80,000.00 400
Jumlah 91,408.00
Dibulatkan 91,408.00
1 M2 Langit-langit gypsum t = 9 mm + Rangka Kayu
H-10 Borneo Super

Kayu
Balok
Borneo
- Super M3 0.023 ### 60,720.00

Paku
biasa 2" -
- 5" Kg 0.06 23,800.00 1,428.00
Gypsum
board
( 120 x
240 x 9 )
- mm Lbr 0.39 79,800.00 31,122.00
Paku
- sekrup kg 0.11 17,500.00 1,925.00
- Pekerja Oh 0.27 42,000.00 11,340.00
Tukang
- kayu Oh 0.4 65,000.00 26,000.00
Kepala
- tukang Oh 0.04 75,000.00 3,000.00
- Mandor Oh 0.0135 80,000.00 1,080.00
Jumlah ###
Dibulatkan ###
1 M2 Langit-langit GRC t = 4 mm + Rangka Kayu
H-11 Borneo Super

Kayu
Balok
Borneo
- Super M3 0.023 ### 60,720.00

Paku
biasa 2" -
- 5" Kg 0.06 23,800.00 1,428.00

GRC ( 120
x 240 x 4 )
- mm Lbr 0.39 67,500.00 26,325.00

- Paku GRC kg 0.11 35,000.00 3,850.00


- Pekerja Oh 0.27 42,000.00 11,340.00
Tukang
- kayu Oh 0.4 65,000.00 26,000.00
Kepala
- tukang Oh 0.04 75,000.00 3,000.00
- Mandor Oh 0.0135 80,000.00 1,080.00
Jumlah ###
Dibulatkan ###

1 M¹ List Langit-
langit Kayu Profil 10
H-12 cm
List Kayu
- profil M¹ 1.05 29,400.00 30,870.00
- Paku Kg 0.01 23,800.00 238
- Pekerja Oh 0.05 42,000.00 2,100.00
Tukang
- kayu Oh 0.05 65,000.00 3,250.00
Kepala
- tukang Oh 0.005 75,000.00 375
- Mandor Oh 0.003 80,000.00 240
Jumlah 37,073.00
Dibulatkan 37,073.00

1 M¹ List Langit-
H-13 langit Gypsum 10 cm
List
- gypsum M¹ 1.05 8,500.00 8,925.00
Tepung
- gypsum Kg 0.15 12,500.00 1,875.00
- Pekerja Oh 0.05 42,000.00 2,100.00
Tukang
- kayu Oh 0.05 65,000.00 3,250.00
Kepala
- tukang Oh 0.005 75,000.00 375
- Mandor Oh 0.003 80,000.00 240
Jumlah 16,765.00
Dibulatkan 16,765.00

Materi Terkait :

Analisa Harga Satuan Pekerjaan Konstruksi


Analisa Pekerjaan Tanah
Analisa Pekerjaan Pondasi
Analisa Pekerjaan Beton
Analisa Pekerjaan Dinding
Analisa Pekerjaan Plesteran-Acian
Analisa HArga Satuan Pekerjaan Penutup Atap
Analisa Harga Satuan Pekerjaan Tutup Plapond
Analisa Harga Satuan Pekerjaan Lantai
Analisa Harga Satuan Pekerjaan Kayu
langit-langit: asbes, akustik, tekwood, gypsum, dan GRC.
Analisa Harga Satuan Pekerjaan Penutup Lantai dan Dinding
(AHS SNI 2011)
Berikut adalah analisa harga satuan pekerjaan penutup landat dan dinding untuk menghitung biaaya penutup lantai per meter

HARGA
No. URAIAN SATUAN VOLUME SATUAN HARGA
(Rp) (Rp)

1 M2 Lantai Ubin
Granito ukuran 40 x
40 cm Setara
I-01 Essenza

Granito
40 x 40
- cm m2 1.05 345,000.00 362,250.00
Semen
- portland Kg 9.8 1,406.00 13,778.80
Pasir
- pasang M3 0.0215 233,400.00 5,018.10
Semen
- warna Kg 1.3 15,700.00 20,410.00
- Pekerja Oh 0.25 42,000.00 10,500.00
Tukang
- batu Oh 0.12 65,000.00 7,800.00
Kepala
- tukang Oh 0.012 75,000.00 900
- Mandor Oh 0.0125 80,000.00 1,000.00
Jumlah 421,656.90
Dibulatkan 421,657.00

1 M2 Lantai Ubin
Granito ukuran 30 x
30 cm Setara
I-02 Essenza

Granito
30 x 30
- cm m2 1.05 322,800.00 338,940.00
Semen
- portland Kg 10 1,406.00 14,060.00
Pasir
- pasang M3 0.0215 233,400.00 5,018.10
Semen
- warna Kg 1.5 15,700.00 23,550.00
- Pekerja Oh 0.26 42,000.00 10,920.00
Tukang
- batu Oh 0.125 65,000.00 8,125.00
Kepala
- tukang Oh 0.0125 75,000.00 937.5
- Mandor Oh 0.013 80,000.00 1,040.00
Jumlah 402,590.60
Dibulatkan 402,591.00

1 M¹ Plint Ubin
Granito ukuran 10 x
40 cm Setara
I-03 Essenza

Plint
granito 10
- x 40 cm Bh 2.65 27,600.00 73,140.00
Semen
- portland Kg 1.2 1,406.00 1,687.20
Pasir
- pasang M3 0.003 233,400.00 700.2
Semen
- warna Kg 0.1 15,700.00 1,570.00
- Pekerja Oh 0.06 42,000.00 2,520.00
Tukang
- batu Oh 0.03 65,000.00 1,950.00
Kepala
- tukang Oh 0.003 75,000.00 225
- Mandor Oh 0.003 80,000.00 240
Jumlah 82,032.40
Dibulatkan 82,032.00

1 M¹ Plint Ubin
Granito ukuran 10 x
30 cm Setara
I-04 Essenza

Plint
granito 10
- x 30 cm Bh 3.33 25,900.00 86,247.00
Semen
- portland Kg 1.65 1,406.00 2,319.90
Pasir
- pasang M3 0.0032 233,400.00 746.88
Semen
- warna Kg 0.1 15,700.00 1,570.00
- Pekerja Oh 0.09 42,000.00 3,780.00
Tukang
- batu Oh 0.09 65,000.00 5,850.00
Kepala
- tukang Oh 0.009 75,000.00 675
- Mandor Oh 0.0045 80,000.00 360
Jumlah 101,548.78
Dibulatkan 101,549.00
1 M2 Lantai Keramik Corak 10 x 20 cm
I-05 setara Mulia

Keramik
corak 10 x
- 20 cm m2 1 56,000.00 56,000.00
Semen
- portland Kg 8 1,406.00 11,248.00
Pasir
- pasang M3 0.0215 233,400.00 5,018.10
Semen
- warna Kg 0.013 15,700.00 204.1
- Pekerja Oh 0.25 42,000.00 10,500.00
Tukang
- batu Oh 0.12 65,000.00 7,800.00
Kepala
- tukang Oh 0.012 75,000.00 900
- Mandor Oh 0.0125 80,000.00 1,000.00
Jumlah 92,670.20
Dibulatkan 92,670.00

1 M2 Lantai Keramik
corak 20 x 20 cm
I-06 setara Mulia

Keramik
corak 20 x
- 20 cm m2 1 62,500.00 62,500.00
Semen
- portland Kg 8 1,406.00 11,248.00
Pasir
- pasang M3 0.0215 233,400.00 5,018.10
Semen
- warna Kg 0.013 15,700.00 204.1
- Pekerja Oh 0.25 42,000.00 10,500.00
Tukang
- batu Oh 0.12 65,000.00 7,800.00
Kepala
- tukang Oh 0.012 75,000.00 900
- Mandor Oh 0.0125 80,000.00 1,000.00
Jumlah 99,170.20
Dibulatkan 99,170.00

1 M2 Lantai Keramik
polos 30 x 30 cm
I-07 setara Mulia

Keramik
polos 30 x
- 30 cm m2 1 53,000.00 53,000.00
Semen
- portland Kg 8 1,406.00 11,248.00
Pasir
- pasang M3 0.0215 233,400.00 5,018.10
Semen
- warna Kg 0.013 15,700.00 204.1
- Pekerja Oh 0.25 42,000.00 10,500.00
Tukang
- batu Oh 0.12 65,000.00 7,800.00
Kepala
- tukang Oh 0.012 75,000.00 900
- Mandor Oh 0.0125 80,000.00 1,000.00
Jumlah 89,670.20
Dibulatkan 89,670.00

1 M2 Lantai Keramik
corak 30 x 30 cm
I-08 Setara Mulia

Keramik
corak 30 x
- 30 cm m2 1 58,000.00 58,000.00
Semen
- portland Kg 8 1,406.00 11,248.00
Pasir
- pasang M3 0.0215 233,400.00 5,018.10
Semen
- warna Kg 0.013 15,700.00 204.1
- Pekerja Oh 0.25 42,000.00 10,500.00
Tukang
- batu Oh 0.12 65,000.00 7,800.00
Kepala
- tukang Oh 0.012 75,000.00 900
- Mandor Oh 0.0125 80,000.00 1,000.00
Jumlah 94,670.20
Dibulatkan 94,670.00

1 M2 Lantai Keramik
polos 40 x 40 cm
I-09 Setara Mulia
Keramik
polos 40 x
- 40 cm m2 1 56,800.00 56,800.00
Semen
- portland Kg 8 1,406.00 11,248.00
Pasir
- pasang M3 0.0215 233,400.00 5,018.10
Semen
- warna Kg 0.013 15,700.00 204.1
- Pekerja Oh 0.25 42,000.00 10,500.00
Tukang
- batu Oh 0.12 65,000.00 7,800.00
Kepala
- tukang Oh 0.012 75,000.00 900
- Mandor Oh 0.0125 80,000.00 1,000.00
Jumlah 93,470.20
Dibulatkan 93,470.00

1 M2 Lantai Keramik
corak 40 x 40 cm
I-10 Setara Mulia

Keramik
corak 40 x
- 40 cm m2 1 65,500.00 65,500.00
Semen
- portland Kg 8 1,406.00 11,248.00
Pasir
- pasang M3 0.0215 233,400.00 5,018.10
Semen
- warna Kg 0.013 15,700.00 204.1
- Pekerja Oh 0.25 42,000.00 10,500.00
Tukang
- batu Oh 0.12 65,000.00 7,800.00
Kepala
- tukang Oh 0.012 75,000.00 900
- Mandor Oh 0.0125 80,000.00 1,000.00
Jumlah 102,170.20
Dibulatkan 102,170.00
1 M2 Lantai Keramik Corak 10 x 20 cm
I-11 setara Roman

Keramik
corak 10 x
- 20 cm m2 1 72,200.00 72,200.00
Semen
- portland Kg 8 1,406.00 11,248.00
Pasir
- pasang M3 0.0215 233,400.00 5,018.10
Semen
- warna Kg 0.013 15,700.00 204.1
- Pekerja Oh 0.25 42,000.00 10,500.00
Tukang
- batu Oh 0.12 65,000.00 7,800.00
Kepala
- tukang Oh 0.012 75,000.00 900
- Mandor Oh 0.0125 80,000.00 1,000.00
Jumlah 108,870.20
Dibulatkan 108,870.00

1 M2 Lantai Keramik
corak 20 x 20 cm
I-12 setara Roman

Keramik
corak 20 x
- 20 cm m2 1 75,200.00 75,200.00
Semen
- portland Kg 8 1,406.00 11,248.00
Pasir
- pasang M3 0.0215 233,400.00 5,018.10
Semen
- warna Kg 0.013 15,700.00 204.1
- Pekerja Oh 0.25 42,000.00 10,500.00
Tukang
- batu Oh 0.12 65,000.00 7,800.00
Kepala
- tukang Oh 0.012 75,000.00 900
- Mandor Oh 0.0125 80,000.00 1,000.00
Jumlah 111,870.20
Dibulatkan 111,870.00

1 M2 Lantai Keramik
polos 30 x 30 cm
I-13 setara Roman

Keramik
polos 30 x
- 30 cm m2 1 68,900.00 68,900.00
Semen
- portland Kg 8 1,406.00 11,248.00
Pasir
- pasang M3 0.0215 233,400.00 5,018.10
Semen
- warna Kg 0.013 15,700.00 204.1
- Pekerja Oh 0.25 42,000.00 10,500.00
Tukang
- batu Oh 0.12 65,000.00 7,800.00
Kepala
- tukang Oh 0.012 75,000.00 900
- Mandor Oh 0.0125 80,000.00 1,000.00
Jumlah 105,570.20
Dibulatkan 105,570.00

1 M2 Lantai Keramik
corak 30 x 30 cm
I-14 Setara Roman

Keramik
corak 30 x
- 30 cm M2 1 76,600.00 76,600.00
Semen
- portland Kg 8 1,406.00 11,248.00
Pasir
- pasang M3 0.0215 233,400.00 5,018.10
Semen
- warna Kg 0.013 15,700.00 204.1
- Pekerja Oh 0.25 42,000.00 10,500.00
Tukang
- batu Oh 0.12 65,000.00 7,800.00
Kepala
- tukang Oh 0.012 75,000.00 900
- Mandor Oh 0.0125 80,000.00 1,000.00
Jumlah 113,270.20
Dibulatkan 113,270.00

1 M2 Lantai Keramik
polos 40 x 40 cm
I-15 setara Roman

Keramik
polos 40 x
- 40 cm m2 1 72,500.00 72,500.00
Semen
- portland Kg 8 1,406.00 11,248.00
Pasir
- pasang M3 0.0215 233,400.00 5,018.10
Semen
- warna Kg 0.013 15,700.00 204.1
- Pekerja Oh 0.25 42,000.00 10,500.00
Tukang
- batu Oh 0.12 65,000.00 7,800.00
Kepala
- tukang Oh 0.012 75,000.00 900
- Mandor Oh 0.0125 80,000.00 1,000.00
Jumlah 109,170.20
Dibulatkan 109,170.00

1 M2 Lantai Keramik
corak 40 x 40 cm
I-16 Setara Roman

Keramik
corak 40 x
- 40 cm m2 1 77,000.00 77,000.00
Semen
- portland Kg 8 1,406.00 11,248.00
Pasir
- pasang M3 0.0215 233,400.00 5,018.10
Semen
- warna Kg 0.013 15,700.00 204.1
- Pekerja Oh 0.25 42,000.00 10,500.00
Tukang
- batu Oh 0.12 65,000.00 7,800.00
Kepala
- tukang Oh 0.012 75,000.00 900
- Mandor Oh 0.0125 80,000.00 1,000.00
Jumlah 113,670.20
Dibulatkan 113,670.00
I-17 1 M2 Lantai Marmer
- Marmer m2 1.06 550,000.00 583,000.00
Semen
- portland Kg 8.19 1,406.00 11,515.14
Pasir
- pasang M3 0.045 233,400.00 10,503.00
Semen
- warna Kg 0.65 15,700.00 10,205.00
- Pekerja Oh 0.7 42,000.00 29,400.00
Tukang
- batu Oh 0.35 65,000.00 22,750.00
Kepala
- tukang Oh 0.035 75,000.00 2,625.00
- Mandor Oh 0.035 80,000.00 2,800.00
Jumlah 672,798.14
Dibulatkan 672,798.00
1 M2 Lantai Parquet
I-18 Jati
Parquet
- jati M2 1.05 375,400.00 394,170.00

- Lem vinyl Kg 0.6 44,000.00 26,400.00


- Pekerja Oh 0.65 42,000.00 27,300.00
- Tukang Oh 0.35 65,000.00 22,750.00
Kepala
- tukang Oh 0.035 75,000.00 2,625.00
- Mandor Oh 0.0325 80,000.00 2,600.00
Jumlah 475,845.00
Dibulatkan 475,845.00

Materi Terkait :

Analisa Harga Satuan Pekerjaan Konstruksi


Analisa Pekerjaan Tanah
Analisa Pekerjaan Pondasi
Analisa Pekerjaan Beton
Analisa Pekerjaan Dinding
Analisa Pekerjaan Plesteran-Acian
Analisa HArga Satuan Pekerjaan Penutup Atap
Analisa Harga Satuan Pekerjaan Tutup Plapond
Analisa Harga Satuan Pekerjaan Lantai
Analisa Harga Satuan Pekerjaan Kayu
penutup lantai per meter persegi, seperti lantai keramik, lantai marmer dll.
atuan Pekerjaan Kayu - AHS SNI 2011
Berikut adalah penggalan analisa harga satuan pekerjaan kayu, untuk menghitung harga satuan pekerjaan kayu per m3, seper

J. ANALISA HARGA SATUAN PEKERJAAN KAYU


HARGA
No. URAIAN SATUAN VOLUME SATUAN HARGA

1 M3 Kusen Pintu &


jendela kayu Kamper
J-01 Samarinda

Kayu
Balok
Kamper
Samarind
- a m3 1.2 8,633,700.00 10,360,440.00
- Pekerja Oh 6 42,000.00 252,000.00
Tukang
- Kayu Oh 18 65,000.00 1,170,000.00
Kepala
- Tukang Oh 2 75,000.00 150,000.00
- Mandor Oh 0.3 80,000.00 24,000.00
Jumlah 11,956,440.00
Dibulatkan 11,956,440.00

M3 Kusen
Pintu &
jendela
kayu
Kamper
Medan/Kr
J-02 1 uing

Kayu
Balok
Kamper
- Medan M3 1.2 5,692,600.00 6,831,120.00
- Pekerja Oh 6 42,000.00 252,000.00
Tukang
- Kayu Oh 18 65,000.00 1,170,000.00
Kepala
- Tukang Oh 2 75,000.00 150,000.00
- Mandor Oh 0.3 80,000.00 24,000.00
Jumlah 8,427,120.00
Dibulatkan 8,427,120.00
M3 Kusen
Pintu &
jendela
kayu
Borneo
J-03 1 Super

Kayu
Borneo
Balok
- Super M3 1.2 5,280,000.00 6,336,000.00
- Pekerja Oh 6 42,000.00 252,000.00
Tukang
- Kayu Oh 18 65,000.00 1,170,000.00
Kepala
- Tukang Oh 2 75,000.00 150,000.00
- Mandor Oh 0.3 80,000.00 24,000.00
Jumlah 7,932,000.00
Dibulatkan 7,932,000.00
1 M2 Pintu Panel Kayu Kamper
J-04 Samarinda

Kayu
Papan
Kamper
Samarind
- a M3 0.04 8,633,700.00 345,348.00

Paku
Biasa 2" -
- 5" Kg 0.05 23,400.00 1,170.00
- Pekerja Oh 1 42,000.00 42,000.00
Tukang
- Kayu Oh 2.5 65,000.00 162,500.00
Kepala
- Tukang Oh 0.25 75,000.00 18,750.00
- Mandor Oh 0.05 80,000.00 4,000.00
Jumlah 573,768.00
Dibulatkan 573,768.00
1 M2 Pintu Panel Kayu Kamper
J-05 Medan/Kruing

Kayu
Papan
Kamper
- Medan M3 0.04 5,692,600.00 227,704.00
Paku
Biasa 2" -
- 5" Kg 0.05 23,400.00 1,170.00
- Pekerja Oh 1 42,000.00 42,000.00
Tukang
- Kayu Oh 2.5 65,000.00 162,500.00
Kepala
- Tukang Oh 0.25 75,000.00 18,750.00
- Mandor Oh 0.05 80,000.00 4,000.00
Jumlah 456,124.00
Dibulatkan 456,124.00
1 M2 Pintu & Jendela Kaca Kayu Kamper
J-06 Medan

Kayu
Papan
Kamper
- Medan M3 0.035 5,692,600.00 199,241.00
- Pekerja Oh 0.8 42,000.00 33,600.00
Tukang
- Kayu Oh 2 65,000.00 130,000.00
Kepala
- Tukang Oh 0.2 75,000.00 15,000.00
- Mandor Oh 0.04 80,000.00 3,200.00
Jumlah 381,041.00
Dibulatkan 381,041.00

M2 Pintu
& Jendela
Kaca Kayu
J-07 1 Borneo

Kayu
Papan
Borneo
- Super M3 0.035 5,595,800.00 195,853.00
- Pekerja Oh 0.8 42,000.00 33,600.00
Tukang
- Kayu Oh 2 65,000.00 130,000.00
Kepala
- Tukang Oh 0.2 75,000.00 15,000.00
- Mandor Oh 0.04 80,000.00 3,200.00
Jumlah 377,653.00
Dibulatkan 377,653.00
M2 Pintu
& Jendela
Jalusi
Kayu
Kamper
J-08 1 Medan

Kayu
Papan
Kamper
- Medan M3 0.064 5,692,600.00 364,326.40
- Pekerja Oh 1 42,000.00 42,000.00
Tukang
- Kayu Oh 3 65,000.00 195,000.00
Kepala
- Tukang Oh 0.3 75,000.00 22,500.00
- Mandor Oh 0.5 80,000.00 40,000.00
Jumlah 663,826.40
Dibulatkan 663,826.00

M2 Pintu
Triplek
Rangkap,
Rangka
Tertutup
Kayu
Kamper
J-09 1 Medan

Kayu
Papan
Kamper
- Medan M3 0.0196 5,692,600.00 111,574.96

Paku
Biasa ½" -
- 1" Kg 0.03 23,800.00 714

- Lem Kayu Ltr 0.3 23,900.00 7,170.00

Triplek
120 x 240
- x 0,4 cm Lbr 1 64,400.00 64,400.00
- Pekerja Oh 0.6 42,000.00 25,200.00
Tukang
- Kayu Oh 2 65,000.00 130,000.00
Kepala
- Tukang Oh 0.2 75,000.00 15,000.00
- Mandor Oh 0.03 80,000.00 2,400.00
Jumlah 356,458.96
Dibulatkan 356,459.00
1 M2 Jalusi Mati Kusen Kayu kamper
J-10 Medan

Kayu
Papan
Kamper
- Medan M3 0.06 5,692,600.00 341,556.00

Paku
Biasa ½" -
- 1" Kg 0.15 23,800.00 3,570.00
- Pekerja Oh 0.5 42,000.00 21,000.00
Tukang
- Kayu Oh 2 65,000.00 130,000.00
Kepala
- Tukang Oh 0.2 75,000.00 15,000.00
- Mandor Oh 0.025 80,000.00 2,000.00
Jumlah 513,126.00
Dibulatkan 513,126.00

J-11 1 M2 Pintu Triplek Rangkap, Rangka Kayu Borneo Super

Kayu
Papan
Borneo
- Super M3 0.0196 5,595,800.00 109,677.68

Paku
Biasa ½" -
- 1" Kg 0.03 23,800.00 714

- Lem Kayu Ltr 0.3 23,900.00 7,170.00

Triplek
120 x 240
- x 0,4 cm Lbr 1 64,400.00 64,400.00
- Pekerja Oh 0.6 42,000.00 25,200.00
Tukang
- Kayu Oh 2 65,000.00 130,000.00
Kepala
- Tukang Oh 0.2 75,000.00 15,000.00
- Mandor Oh 0.03 80,000.00 2,400.00
Jumlah 354,561.68
Dibulatkan 354,562.00
M2 Pintu
Teakwoo
d
Rangkap,
rangka
Kayu
Kamper
J-12 1 Medan

Kayu
Papan
Kamper
- Medan M3 0.0196 5,692,600.00 111,574.96

Paku
Biasa ½" -
- 1" Kg 0.3 23,800.00 7,140.00

- Lem Kayu Ltr 0.3 23,900.00 7,170.00


Teakwoo
- d 4 mm Lbr 1 131,700.00 131,700.00
- Pekerja Oh 0.6 42,000.00 25,200.00
Tukang
- Kayu Oh 2 65,000.00 130,000.00
Kepala
- Tukang Oh 0.2 75,000.00 15,000.00
- Mandor Oh 0.03 80,000.00 2,400.00
Jumlah 430,184.96
Dibulatkan 430,185.00

M2 Pintu
Triplek &
Formika,
Rangka
Kayu
Kamper
J-13 1 Medan

Kayu
Papan
Kamper
- Medan M3 0.0196 5,692,600.00 111,574.96

Paku
Biasa ½" -
- 1" Kg 0.3 23,800.00 7,140.00

- Lem Kayu Ltr 0.8 23,900.00 19,120.00


Triplek
120 x 240
- x 0,4 cm Lbr 1 64,400.00 64,400.00
Formica
- 3" x 6" Lbr 0.5 132,900.00 66,450.00
- Pekerja Oh 0.8 42,000.00 33,600.00
Tukang
- Kayu Oh 2.5 65,000.00 162,500.00
Kepala
- Tukang Oh 0.25 75,000.00 18,750.00
- Mandor Oh 0.04 80,000.00 3,200.00
Jumlah 486,734.96
Dibulatkan 486,735.00

M2 Pintu
Teakwoo
d&
Formika,
Rangka
Kayu
Kamper
Medan
J-14 1 (dipolitur)

Kayu
Papan
Kamper
- Medan M3 0.0196 5,692,600.00 111,574.96

Paku
Biasa ½" -
- 1" Kg 0.3 23,800.00 7,140.00

- Lem Kayu Ltr 0.8 23,900.00 19,120.00

Teakwoo
d 120 x
240 x 0,4
- cm Lbr 1 131,700.00 131,700.00
Formica
- 4" x 8" Lbr 0.5 238,100.00 119,050.00
- Pekerja Oh 0.8 42,000.00 33,600.00
Tukang
- Kayu Oh 2.5 65,000.00 162,500.00
Kepala
- Tukang Oh 0.25 75,000.00 18,750.00
- Mandor Oh 0.04 80,000.00 3,200.00
Jumlah 606,634.96
Dibulatkan 606,635.00
1 M3 Kuda-kuda Kayu Kamper
J-15 Medan

Kayu
Balok
Kamper
- Medan M3 1.1 5,692,600.00 6,261,860.00

- Besi Strip Kg 15 26,800.00 402,000.00

Paku
Biasa 2" -
- 5" Kg 0.8 23,800.00 19,040.00
- Pekerja Oh 4 42,000.00 168,000.00
Tukang
- Kayu Oh 12 65,000.00 780,000.00
Kepala
- Tukang Oh 1.2 75,000.00 90,000.00
- Mandor Oh 0.2 80,000.00 16,000.00
Jumlah 7,736,900.00
Dibulatkan 7,736,900.00

M3 Kuda-
kuda
Kayu
Borneo
J-16 1 Super

Kayu
balok
Borneo
- super M3 1.1 5,280,000.00 5,808,000.00

- Besi Strip Kg 15 26,800.00 402,000.00

Paku
Biasa 2" -
- 5" Kg 0.8 23,800.00 19,040.00
- Pekerja Oh 4 42,000.00 168,000.00
Tukang
- Kayu Oh 12 65,000.00 780,000.00
Kepala
- Tukang Oh 1.2 75,000.00 90,000.00
- Mandor Oh 0.2 80,000.00 16,000.00
Jumlah 7,283,040.00
Dibulatkan 7,283,040.00
M2 Kaso
+ Reng
Genteng
Plentong
Kayu
Borneo
J-17 1 Super

Kayu
balok
Borneo
- super m3 0.012 5,280,000.00 63,360.00

Paku
Biasa 2" -
- 5" Kg 0.15 23,800.00 3,570.00
- Pekerja Oh 0.1 42,000.00 4,200.00
Tukang
- Kayu Oh 0.1 65,000.00 6,500.00
Kepala
- Tukang Oh 0.01 75,000.00 750
- Mandor Oh 0.005 80,000.00 400
Jumlah 78,780.00
Dibulatkan 78,780.00

M2 Kaso
+ Reng
Genteng
Beton
Kayu
Borneo
J-18 1 Super

Kayu
balok
Borneo
- super M3 0.014 5,280,000.00 73,920.00

Paku
Biasa 2" -
- 5" Kg 0.15 23,800.00 3,570.00
- Pekerja Oh 0.1 42,000.00 4,200.00
Tukang
- Kayu Oh 0.1 65,000.00 6,500.00
Kepala
- Tukang Oh 0.01 75,000.00 750
- Mandor Oh 0.005 80,000.00 400
Jumlah 89,340.00
Dibulatkan 89,340.00
M'
Lisplang
uk
(3x20)cm,
Kayu
Kamper
J-19 1 Medan

Kayu
Papan
Kamper
- Medan M3 0.0072 5,823,400.00 41,928.48

Paku
Biasa 2" -
- 5" Kg 0.05 23,800.00 1,190.00
- Pekerja Oh 0.1 42,000.00 4,200.00
Tukang
- Kayu Oh 0.2 65,000.00 13,000.00
Kepala
- Tukang Oh 0.02 75,000.00 1,500.00
- Mandor Oh 0.005 80,000.00 400
Jumlah 62,218.48
Dibulatkan 62,218.00
1 M' Lisplang uk (3x30)cm, Kayu Kamper
J-20 Medan

Kayu
Papan
Kamper
- Medan M3 0.011 5,692,600.00 62,618.60

Paku
Biasa 2" -
- 5" Kg 0.05 23,800.00 1,190.00
- Pekerja Oh 0.11 42,000.00 4,620.00
Tukang
- Kayu Oh 0.22 65,000.00 14,300.00
Kepala
- Tukang Oh 0.022 75,000.00 1,650.00
- Mandor Oh 0.005 80,000.00 400
Jumlah 84,778.60
Dibulatkan 84,779.00
1 M¹ List Plafond + kayu Profil
J-21 10 cm

Kayu
Profil 10
- cm M' 1.05 29,400.00 30,870.00
- Pekerja Oh 0.021 42,000.00 882
Tukang
- Kayu Oh 0.021 65,000.00 1,365.00
Kepala
- Tukang Oh 0.002 75,000.00 150
- Mandor Oh 0.001 80,000.00 80
Jumlah 33,347.00
Dibulatkan 33,347.00

Materi Terkait :

Analisa Harga Satuan Pekerjaan Konstruksi


Analisa Pekerjaan Tanah
Analisa Pekerjaan Pondasi
Analisa Pekerjaan Beton
Analisa Pekerjaan Dinding
Analisa Pekerjaan Plesteran-Acian
Analisa HArga Satuan Pekerjaan Penutup Atap
Analisa Harga Satuan Pekerjaan Tutup Plapond
Analisa Harga Satuan Pekerjaan Lantai
Analisa Harga Satuan Pekerjaan Kayu
n pekerjaan kayu per m3, seperti pekerjaan kusen dan jendela, pekerjaan plapond, dan pekerjaan atap.
Analisa Harga Satuan Pekerjaan Penutup Besi dan Alumin
Diposkan : 01 Juni 2014
Oleh : Endang Kusman

HARGA
No. URAIAN SAT VOLUME SAT HARGA
(Rp) (Rp)

K-01 1 Kg Besi profil


Besi profil
- WF Kg 1.1 24,000.00 26,400.00

- Meni besi Kg 0.08 30,400.00 2,432.00


- Pekerja Oh 0.06 42,000.00 2,520.00
Tukang
- besi Oh 0.006 65,000.00 390
Kepala
- tukang Oh 0.006 75,000.00 450
- Mandor Oh 0.0003 80,000.00 24
Jumlah 32,216.00
Dibulatkan 32,216.00
Perakitan
K-02 1 Kg baja
- Solar m' 0.01 7,150.00 71.5
Minyak
- pelumas m' 0.001 55,000.00 55

- Sewa alat jam 0.008 ### 800


- Pekerja Oh 0.001 42,000.00 42
Tukang
- besi Oh 0.00001 65,000.00 0.65
Kepala
- tukang Oh 0.00001 75,000.00 0.75
- Mandor Oh 0.00005 80,000.00 4
Jumlah 973.9
Dibulatkan 974
1 Cm Pengelasan
K-03 dengan las listrik
- kawat las kg 0.04 23,600.00 944
- Solar ltr 0.03 7,150.00 214.5
Minyak
- pelumas ltr 0.004 55,000.00 220
- Sewa alat jam 0.017 ### 1,700.00
- Pekerja org 0.004 42,000.00 168
- Tukang org 0.002 65,000.00 130
Kepala
- Tukang org 0.0002 75,000.00 15
- Mandor org 0.0002 80,000.00 16
Jumlah 2,463.50
Dibulatkan 2,464.00
1 m2 Pintu Rolling
K-04 Door
Rolling
- door M2 1 ### ###
- Pekerja Oh 1.05 42,000.00 44,100.00
Tukang
- besi Oh 1.5 65,000.00 97,500.00
Kepala
- tukang Oh 0.105 75,000.00 7,875.00
- Mandor Oh 0.0052 80,000.00 416
Jumlah ###
Dibulatkan ###
1 m2 Pintu
K-05 Alluminium Natural

Pintu
alluminiu
- m natural m2 1 ### ###
- Pekerja Oh 1.05 42,000.00 44,100.00
Tukang
- besi Oh 1.05 65,000.00 68,250.00
Kepala
- tukang Oh 0.105 75,000.00 7,875.00
- Mandor Oh 0.0052 80,000.00 416
Jumlah ###
Dibulatkan ###
K-06 1 m2 Terali Besi
Besi strip
- 2x3 m' 11.5 5,500.00 63,250.00
- Pekerja Oh 1.2 42,000.00 50,400.00
Tukang
- las Oh 1.2 65,000.00 78,000.00
Kepala
- tukang Oh 0.012 75,000.00 900
- Mandor Oh 0.0006 80,000.00 48
Jumlah ###
Dibulatkan ###
1 m2 Kawat
K-07 Harmonika 4 cm

Kawat
harmonik
- a M2 1.1 35,900.00 39,490.00

Paku
biasa ½" -
- 1" kg 0.02 23,800.00 476

Papan
kayu
- kamper M2 0.0018 ### 10,246.68
- Pekerja Oh 0.1 42,000.00 4,200.00
Tukang
- kayu Oh 0.1 65,000.00 6,500.00
Kepala
- tukang Oh 0.01 75,000.00 750
- Mandor Oh 0.005 80,000.00 400
Jumlah 62,062.68
Dibulatkan 62,063.00

1 m' Talang Datar,


Seng BJLS 28 lebar
K-08 90 cm

Seng plat
3' x 6'
- BJLS 30 m' 1.05 20,801.00 21,841.05

Paku
biasa ½" -
- 1" Kg 0.015 23,800.00 357

Kayu
papan
borneo
- super M3 0.0096 ### 53,719.68

Flincote /
- meni besi Kg 0.25 30,400.00 7,600.00
- Pekerja Oh 0.15 42,000.00 6,300.00
Tukang
- kayu Oh 0.4 65,000.00 26,000.00
Kepala
- tukang Oh 0.025 75,000.00 1,875.00
- Mandor Oh 0.0013 80,000.00 104
Jumlah ###
Dibulatkan ###
1 m' Talang Miring,
Seng BJLS 28 lebar
K-09 90 cm

Seng plat
3' x 6'
- BJLS 30 m' 1.05 20,801.00 21,841.05

Paku
biasa ½" -
- 1" Kg 0.015 23,800.00 357

Kayu
papan
borneo
- super M3 0.019 ### ###

Flincote /
- meni besi Kg 0.3 30,400.00 9,120.00
- Pekerja Oh 0.2 42,000.00 8,400.00
Tukang
- kayu Oh 0.4 65,000.00 26,000.00
Kepala
- tukang Oh 0.025 75,000.00 1,875.00
- Mandor Oh 0.0013 80,000.00 100
Jumlah ###
Dibulatkan ###

1 m' Talang 1/2


lingkaran D-15 cm,
seng pelat BJLS 28
K-10 lebar 90 cm

Seng plat
3' x 6'
- BJLS 30 m' 1.05 20,801.00 21,841.05

Paku
biasa ½" -
- 1" Kg 0.1 23,800.00 2,380.00

Kayu
papan
borneo
- super kg 0.019 ### ###
- Besi strip Kg 0.5 26,800.00 13,400.00
- Pekerja Oh 0.15 42,000.00 6,300.00
Tukang
- kayu Oh 0.3 65,000.00 19,500.00
Kepala
- tukang Oh 0.03 75,000.00 2,250.00
- Mandor Oh 0.008 80,000.00 640
Jumlah ###
Dibulatkan ###

1 m' Pasang kusen


pintu/jendela
alluminium natural
K-11 4"

Alumuniu
m profil
- natural 4" m' 1.1 ### ###
Skrup
- fixer bh 2 250 500
- Sealant m' 1 7,500.00 7,500.00
- Pekerja Oh 0.043 42,000.00 1,806.00
Tukang
- kayu Oh 0.043 65,000.00 2,795.00
Kepala
- tukang Oh 0.0043 75,000.00 322.5
- Mandor Oh 0.0021 80,000.00 168
Jumlah ###
Dibulatkan ###

1 m' Pasang kusen


pintu/jendela
K-12 alluminium warna 4"

Alumuniu
m profil
- warna 4" m' 1.1 ### ###
Skrup
- fixer bh 2 250 500
- Sealant m' 1 7,500.00 7,500.00
- Pekerja Oh 0.043 42,000.00 1,806.00
Tukang
- kayu Oh 0.043 65,000.00 2,795.00
Kepala
- tukang Oh 0.0043 75,000.00 322.5
- Mandor Oh 0.0021 80,000.00 168
Jumlah ###
Dibulatkan ###

1 m' Pasang kusen


pintu/jendela
alluminium natural
K-13 3"
Alumuniu
m profil
- natural 3" m' 1.1 81,000.00 89,100.00
Skrup
- fixer bh 2 250 500
- Sealant m' 1 7,500.00 7,500.00
- Pekerja Oh 0.043 42,000.00 1,806.00
Tukang
- kayu Oh 0.043 65,000.00 2,795.00
Kepala
- tukang Oh 0.0043 75,000.00 322.5
- Mandor Oh 0.0021 80,000.00 168
Jumlah ###
Dibulatkan ###

1 m' Pasang kusen


pintu/jendela
K-14 alluminium warna 3"

Alumuniu
m profil
- warna 3" m' 1.1 ### ###
Skrup
- fixer bh 2 250 500
- Sealant m' 1 7,500.00 7,500.00
- Pekerja Oh 0.043 42,000.00 1,806.00
Tukang
- kayu Oh 0.043 65,000.00 2,795.00
Kepala
- tukang Oh 0.0043 75,000.00 322.5
- Mandor Oh 0.0021 80,000.00 168
Jumlah ###
Dibulatkan ###

1 m2 Pintu
alluminium strip
K-15 lebar 8 cm

Alumuniu
m profil
- 4" natural m' 4.4 ### ###

Alumuniu
m strip
- 6mm m2 1.05 ### ###
- Pekerja Oh 0.085 42,000.00 3,570.00
Tukang
- kayu Oh 0.085 65,000.00 5,525.00
Kepala
- tukang Oh 0.0085 75,000.00 637.5
- Mandor Oh 0.0042 80,000.00 336
Jumlah ###
Dibulatkan ###

1 m2 Pintu/jendela
kaca rangka
alluminium natural
K-16 4"

Alumuniu
m profil
- natural 4" m' 4.4 ### ###

Profil
alluminiu
- mT m' 4.5 12,200.00 54,900.00
- Sealant tube 0.27 7,500.00 2,025.00
- Pekerja Oh 0.085 42,000.00 3,570.00
Tukang
- kayu Oh 0.085 65,000.00 5,525.00
Kepala
- tukang Oh 0.0085 75,000.00 637.5
- Mandor Oh 0.005 80,000.00 400
Jumlah ###
Dibulatkan ###

1 m2 Pintu/jendela
kaca rangka
K-17 alluminium warna 4"

Alumuniu
m profil
- warna 4" m' 4.4 ### ###

Profil
alluminiu
- mT m' 4.5 12,200.00 54,900.00
- Sealant tube 0.27 7,500.00 2,025.00
- Pekerja Oh 0.085 42,000.00 3,570.00
Tukang
- kayu Oh 0.085 65,000.00 5,525.00
Kepala
- tukang Oh 0.0085 75,000.00 637.5
- Mandor Oh 0.005 80,000.00 400
Jumlah ###
Dibulatkan ###
1 m2 Jendela nako &
K-18 teralis (10 klips)

Jendela
nako
(rangka +
kaca 5
- mm) m2 1.1 ### ###

Paku
skrup
1cm -
- 2,5cm bh 10 250 2,500.00
- Besi strip m' 7 5,500.00 38,500.00
- Pekerja Oh 0.2 42,000.00 8,400.00
Tukang
- kayu Oh 0.2 65,000.00 13,000.00
Kepala
- tukang Oh 0.02 75,000.00 1,500.00
- Mandor Oh 0.001 80,000.00 80
Jumlah ###
Dibulatkan ###
1 m2 Pintu pelat baja tebal 2mm rangkap,
K-19 rangka baja siku
Besi siku L
- 30.30.3 Kg 15 24,000.00 ###

- Baja pelat Kg 32.8 24,000.00 ###


- kawat las Kg 0.05 23,600.00 1,180.00
- Pekerja Oh 0.2 42,000.00 8,400.00
Tukang
- kayu Oh 0.2 65,000.00 13,000.00
Kepala
- tukang Oh 0.02 75,000.00 1,500.00
- Mandor Oh 0.001 80,000.00 80
Jumlah ###
Dibulatkan ###

1 m2 Rangka jendela
besi square tube (5 x
K-20 5) cm

Besi
square
- tube M 4.76 7,300.00 34,748.00

Besi lis
kaca (1 x
- 1) cm Kg 4.522 24,000.00 ###
Pengelasa
- n Cm 20 2,464.00 49,280.00
- Pekerja Oh 0.65 42,000.00 27,300.00
Tukang
- kayu Oh 0.65 65,000.00 42,250.00
Kepala
- tukang Oh 0.065 75,000.00 4,875.00
- Mandor Oh 0.032 80,000.00 2,560.00
Jumlah ###
Dibulatkan ###

1 m2 Pintu lipat
(folding door) bahan
K-21 besi

- Pintu lipat M2 1 ### ###


- Pekerja Oh 1.05 42,000.00 44,100.00
Tukang
- kayu Oh 1.05 65,000.00 68,250.00
Kepala
- tukang Oh 0.105 75,000.00 7,875.00
- Mandor Oh 0.0052 80,000.00 416
Jumlah ###
Dibulatkan ###

1 m2 Tirai (venetions
blinds and vertical
K-22 blinds)
- Tirai M2 1 ### ###
- Pekerja Oh 0.35 42,000.00 14,700.00
Tukang
- kayu Oh 0.35 65,000.00 22,750.00
Kepala
- tukang Oh 0.035 75,000.00 2,625.00
- Mandor Oh 0.0018 80,000.00 144
Jumlah ###
Dibulatkan ###

Kembali Ke Analisa AHS SNI


esi dan Aluminium
Analisa Harga Satuan Pekerjaan Kusen Aluminium
Diposkan : 02 Juni 2014
Oleh : Endang Kusman

1 UNIT Pasang partisi Alumunium, Daun partisi Multiplek rangka kayu


1 Kamper

Kusen
Alumuniu
m Natural
Uk 4" +
Bahan 7.62 m' upah 20% ### ###
Multiplek
1.35 lbr 9 mm ### ###

Kayu
papan
kamper
0.03 m3 medan ### ###

List kayu
profil 1
11.7 m' cm 8,900.00 ###

Paku
biasa ½" -
0.1 kg 1" 23,800.00 2,380.00

Lem putih
0.25 kg FOX 23,900.00 5,975.00

Grendel
4 bh jendela 2" 5,500.00 22,000.00
Handle
2 bh partisi 33,000.00 66,000.00
1.54 m2 Cat kayu 39,790.00 61,276.60
Cat
4.86 m2 tembok 17,608.00 85,574.88
Jumlah I ###

Tenaga 0.3 Oh Pekerja Terampil 42,000.00 12,600.00


Tukang kayu
1.3 Oh Terampil 65,000.00 84,500.00
0.13 Oh Kepla Tukang Kayu 75,000.00 9,750.00
0.013 Oh Mandor 80,000.00 1,040.00
Jumlah II ###
Jumlah I +
II ###

1 UNIT Pek. Kusen Jendela Alumunium uk. 2 X 1,50 M' ( 3 lubang ) dgn 2
2 Daun Jendela
Profil aluminium 4"
Bahan 12 m' natural + upah 20% ### ###
Profil daun jendela
5.4 m' alm. + upah 20% ### ###
1.81 m2 Kaca polos 5 mm ### ###
2 ps Engsel jendela 3" 15,000.00 30,000.00
2 bh Slot Handle jendela 33,000.00 66,000.00
Hak Kait angin
2 bh jendela biasa 7,100.00 14,200.00
0 ls Acesories ( 5 % ) ### ###
###

1 UNIT Pek. Kusen Pintu Jendela Alumunium uk. 2,2 X 2,70 M' ( 2 lb.
3 Jendela + 1 lb. Pintu )

Profil
aluminiu
m 4"
natural +
Bahan 14.1 m' upah 20% ### ###

Profil
daun
jendela
alm. +
2.7 m' upah 20% ### ###

Kaca
polos 5
1.65 m2 mm ### ###

Daun
pintu
panel
Multiplek
1.68 m2 9 mm ### ###
rangka ky. Kamper
Medan/Kruing
1 ps Engsel jendela 3" 15,000.00 15,000.00
1 bh Slot Handle jendela 33,000.00 33,000.00
Hak Kait angin
2 bh jendela biasa 7,100.00 14,200.00
1.5 ps Engsel pintu 4" 21,000.00 31,500.00
1 bh Grendel pintu 2" 5,500.00 5,500.00
Kunci tanam 2
1 bh slaagh (Royal) ### ###
0 ls Acesories ( 5 % ) ### ###
###

4 1 UNIT Pekerjaan Kusen Pintu Alumunium uk. 0,8 X 2,70 M'


Profil aluminium 4"
Bahan 7 m' natural + upah 20% ### ###
0.37 m2 Kaca polos 5 mm ### 41,070.00
Daun pintu panel
1.68 m2 Multiplek 9 mm ### ###
rangka ky. Kamper
Medan/Kruing
1.5 ps Engsel pintu 4" 21,000.00 31,500.00
1 bh Grendel pintu 2" 5,500.00 5,500.00
Kunci tanam 2
1 bh slaagh (Royal) ### ###
0 ls Acesories ( 5 % ) 95,458.06 95,458.06
###

1 UNIT Pek. Kusen Jendela Alumunium uk. 2,65 X 1,50 M' ( 4 lubang ) dgn
5 2 Daun Jendela
Profil aluminium 4"
Bahan 15.45 m' natural + upah 20% ### ###
Profil daun jendela
5.4 m' alm. + upah 20% ### ###
2.55 m2 Kaca polos 5 mm ### ###
2 ps Engsel jendela 3" 15,000.00 30,000.00
2 bh Slot Handle jendela 33,000.00 66,000.00
Hak Kait angin
2 bh jendela biasa 7,100.00 14,200.00
0 ls Acesories ( 5 % ) ### ###
###

1 UNIT Pek. Kusen Pintu & Jendela Alumunium uk. 2,85 X 2,70 M' ( 3 lb.
6 Jendela + 1 lb. Pintu )
Profil aluminium 4"
Bahan 17.55 m' natural + upah 20% ### ###
Profil daun jendela
5.4 m' alm. + upah 20% ### ###
2.4 m2 Kaca polos 5 mm ### ###
Daun pintu panel
1.68 m2 Multiplek 9 mm ### ###
rangka ky. Kamper
Medan/Kruing
2 ps Engsel jendela 3" 15,000.00 30,000.00
2 bh Slot Handle jendela 33,000.00 66,000.00
Hak Kait angin
2 bh jendela biasa 7,100.00 14,200.00
1.5 ps Engsel pintu 4" 21,000.00 31,500.00
1 bh Grendel pintu 2" 5,500.00 5,500.00
Kunci tanam 2
1 bh slaagh (Royal) ### ###
0 ls Acesories ( 5 % ) ### ###
###

1 UNIT Pek. Kusen Pintu Alumunium + Kaca uk. 1,30 X 2,80 M' ( 2 Daun
7 Pintu )
Profil aluminium 4"
Bahan 8.9 m' natural + upah 20% ### ###
0.65 m2 Kaca polos 5 mm ### 72,150.00
Daun pintu panel
2.73 m2 Multiplek 9 mm ### ###
rangka ky. Kamper
Medan/Kruing
1.5 ps Engsel pintu 4" 21,000.00 31,500.00
1 ps spagnolet tanam 51,600.00 51,600.00
Kunci tanam 2
1 bh slaagh (Royal) ### ###
0 ls Acesories ( 5 % ) ### ###
###

1 UNIT Pek. Kusen Pintu Alumunium + Kaca uk. 1,50 X 2,70 M' ( 2 Daun
8 Pintu )
Profil aluminium 4"
Bahan 8.8 m' natural + upah 20% ### ###
0.7 m2 Kaca polos 5 mm ### 77,700.00
Daun pintu panel
2.94 m2 Multiplek 9 mm ### ###
rangka ky. Kamper
Medan/Kruing
1.5 ps Engsel pintu 4" 21,000.00 31,500.00
1 ps spagnolet tanam 51,600.00 51,600.00
Kunci tanam 2
1 bh slaagh (Royal) ### ###
0 ls Acesories ( 5 % ) ### ###
###

1 UNIT Pek. Kusen Pintu & Jendela Alumunium uk.1,55 X 2,70 M' ( 1 lb.
9 Jendela + 1 lb. Pintu )
Profil aluminium 4"
Bahan 10.75 m' natural + upah 20% ### ###
1.07 m2 Kaca polos 5 mm ### ###
Daun pintu panel
1.68 m2 Multiplek 9 mm ### ###
rangka ky. Kamper
Medan/Kruing
1.5 ps Engsel pintu 4" 21,000.00 31,500.00
1 ps spagnolet tanam 51,600.00 51,600.00
Kunci tanam 2
1 bh slaagh (Royal) ### ###
0 ls Acesories ( 5 % ) ### ###
###

10 1 UNIT Pekerjaan Jalusi Alumunium Sofi-sofi


Profil aluminium 4"
Bahan 5.1 m' natural + upah 20% ### ###

8 m2 Jalusi Alm 35,000.00 ###


0 ls Acesories ( 5 % ) 60,236.60 60,236.60
###

11 1 UNIT Pek. Kusen Bouvenlight Alumunium ( 1 lubang ) uk. 0,70 x 0,60 m


Profil aluminium 4"
Bahan 4 m' natural + upah 20% ### ###
0.24 m2 Kaca polos 5 mm ### 26,640.00
0 ls Acesories ( 5 % ) 37,596.00 37,596.00
###

12 1 UNIT Pek. Kusen Bouvenlight Alumunium ( 2 lubang ) uk. 1,35 x 0,60 m


Profil aluminium 4"
Bahan 4.5 m' natural + upah 20% ### ###
0.48 m2 Kaca polos 5 mm ### 53,280.00
0 ls Acesories ( 5 % ) 43,461.00 43,461.00
###

13 1 UNIT Pek. Kusen Bouvenlight Alumunium ( 3 lubang ) uk. 2,00 x 0,60 m


Profil aluminium 4"
Bahan 6.4 m' natural + upah 20% ### ###
0.72 m2 Kaca polos 5 mm ### 79,920.00
0 ls Acesories ( 5 % ) 62,018.40 62,018.40
###

14 1 UNIT Pek. Kusen Bouvenlight Alumunium ( 4 lubang ) uk. 2,65 x 0,60 m


Profil aluminium 4"
Bahan 8.3 m' natural + upah 20% ### ###
0.96 m2 Kaca polos 5 mm ### ###
0 ls Acesories ( 5 % ) 80,575.80 80,575.80
###

Kembali ke AHS-SNI
minium
Analisa Harga Satuan Pekerjaan Kunci dan Kaca
Diposkan : 03 Juni 2014
Oleh : Endang Kusman

HARGA
No. URAIAN SAT VOLUME SAT HARGA
(Rp) (Rp)
L-01 1 Buah Pasang Kunci Tanam 2 slaag
Kunci
- tanam Bh 1 ### ###
- Pekerja Oh 0.06 42,000.00 2,520.00
Tukang
- kayu Oh 0.6 65,000.00 39,000.00
Kepala
- tukang Oh 0.06 75,000.00 4,500.00
- Mandor Oh 0.003 80,000.00 240
Jumlah ###
Dibulatkan ###
L-02 1 Buah Pasang Kunci Tanam Biasa

Kunci
tanam
- biasa Bh 1 ### ###
- Pekerja Oh 0.01 42,000.00 420
Tukang
- kayu Oh 0.5 65,000.00 32,500.00
Kepala
- tukang Oh 0.01 75,000.00 750
- Mandor Oh 0.005 80,000.00 400
Jumlah ###
Dibulatkan ###
L-03 1 Buah Pasang Kunci Tanam Kamar Mandi

Kunci
tanam km
- mandi Bh 1 94,500.00 94,500.00
- Pekerja Oh 0.005 42,000.00 210
Tukang
- kayu Oh 0.5 65,000.00 32,500.00
Kepala
- tukang Oh 0.005 75,000.00 375
- Mandor Oh 0.0025 80,000.00 200
Jumlah ###
Dibulatkan ###
L-04 1 Buah Pasang Engsel Pintu
Engsel
- pintu Bh 1 21,000.00 21,000.00
- Pekerja Oh 0.015 42,000.00 630
Tukang
- kayu Oh 0.15 65,000.00 9,750.00
Kepala
- tukang Oh 0.015 75,000.00 1,125.00
- Mandor Oh 0.0008 80,000.00 64
Jumlah 32,569.00
Dibulatkan 32,569.00
L-05 1 Buah Pasang Engsel Jendela Kupu-kupu
Engsel
- jendela Bh 1 15,000.00 15,000.00
- Pekerja Oh 0.01 42,000.00 420
Tukang
- kayu Oh 0.1 65,000.00 6,500.00
Kepala
- tukang Oh 0.01 75,000.00 750
- Mandor Oh 0.0005 80,000.00 40
Jumlah 22,710.00
Dibulatkan 22,710.00
L-06 1 Buah Pasang Kait Angin

- Kait angin Bh 1 3,550.00 3,550.00


- Pekerja Oh 0.015 42,000.00 630
Tukang
- kayu Oh 0.15 65,000.00 9,750.00
Kepala
- tukang Oh 0.015 75,000.00 1,125.00
- Mandor Oh 0.0008 80,000.00 64
Jumlah 15,119.00
Dibulatkan 15,119.00
L-07 1 Buah Pasang Door Closer
Door
- closer Bh 1 ### ###
- Pekerja Oh 0.05 42,000.00 2,100.00
Tukang
- kayu Oh 0.5 65,000.00 32,500.00
Kepala
- tukang Oh 0.05 75,000.00 3,750.00
- Mandor Oh 0.0025 80,000.00 200
Jumlah ###
Dibulatkan ###
L-08 1 Buah Pasang Pegangan Pintu / Door Holder
Door
- holder Bh 1 ### ###
- Pekerja Oh 0.05 42,000.00 2,100.00
Tukang
- kayu Oh 0.5 65,000.00 32,500.00
Kepala
- tukang Oh 0.05 75,000.00 3,750.00
- Mandor Oh 0.0025 80,000.00 200
Jumlah ###
Dibulatkan ###
L-09 1 M2 Pasang Kaca , tebal 3 mm
- Kaca M2 1.1 87,400.00 96,140.00
- Pekerja Oh 0.015 42,000.00 630
Tukang
- kayu Oh 0.15 65,000.00 9,750.00
Kepala
- tukang Oh 0.015 75,000.00 1,125.00
- Mandor Oh 0.0008 80,000.00 60
Jumlah ###
Dibulatkan ###
L-10 1 M2 Pasang Kaca , tebal 5 mm
- Kaca M2 1.1 ### ###
- Pekerja Oh 0.015 42,000.00 630
Tukang
- kayu Oh 0.15 65,000.00 9,750.00
Kepala
- tukang Oh 0.015 75,000.00 1,125.00
- Mandor Oh 0.0008 80,000.00 64
Jumlah ###
Dibulatkan ###

Kembali ke AHS-SNI
Analisa Harga Satuan Pekerjaan
Sanitasi
Diposkan : 04 Juni 2014
Oleh : Endang Kusman

No. URAIAN SAT VOLUME HARGA SAT HARGA


(Rp) (Rp)
M-01 1 Buah Closet jongkok Porselen Standar
Closet
jongkok bh 1 188,200.00 188,200.00
P.C (50
gk) Kg 6 1,406.00 8,436.00
Pasir
pasang m3 0.01 233,400.00 2,334.00
Pekerja org 1 42,000.00 42,000.00
Tukang
batu org 1.5 65,000.00 97,500.00
Kepala
Tukang org 1.5 75,000.00 112,500.00
Mandor org 0.16 80,000.00 12,800.00
Jumlah 463,770.00
Dibulatka
n 463,770.00
1 Buah
M-02 Urinoir
Urinoir bh 1 1,773,400.00 1,773,400.00
P.C (50
gk) Kg 6 1,406.00 8,436.00
Pasir
pasang m3 0.01 233,400.00 2,334.00
Pekerja org 1 42,000.00 42,000.00
Tukang
batu org 1 65,000.00 65,000.00
Kepala
Tukang org 0.1 75,000.00 7,500.00
Mandor org 0.001 80,000.00 80

Perlengka
pan 30 %
harga
urinoir lot 0.3 1,773,400.00 532,020.00
Jumlah 2,430,770.00
Dibulatka
n 2,430,770.00
1 Buah
M-03 Wastafel
wastafel
standar unit 1 1,012,700.00 1,012,700.00
P.C (50
gk) Kg 6 1,406.00 8,436.00
Pasir
pasang m3 0.01 233,400.00 2,334.00
Pekerja org 1.2 42,000.00 50,400.00
Tukang
batu org 1.45 65,000.00 94,250.00
Kepala
Tukang org 0.15 75,000.00 11,250.00
Mandor org 0.1 80,000.00 8,000.00

Perlengka
pan 12 %
harga
wastafel lot 0.12 1,773,400.00 212,808.00
Jumlah 1,400,178.00
Dibulatka
n 1,400,178.00
M-04 1 Buah bak Mandi Fibreglass Volume 0,30 m3

Bak
fibreglass
0.60m x
0.60m bh 1 255,300.00 255,300.00
Pekerja org 1.8 42,000.00 75,600.00
Tukang
batu org 2.7 65,000.00 175,500.00
Kepala
Tukang org 0.54 75,000.00 40,500.00
Mandor org 0.11 80,000.00 8,800.00

Perlengka
pan 18 %
harga bak lot 0.18 255,300.00 45,954.00
Jumlah 601,654.00
Dibulatka
n 601,654.00

M-05 1 M' Saluran Air Limbah Buis beton d = 30 cm - 60 cm


Buis
beton Ø
30 cm bh 1.1 61,700.00 67,870.00
Bata
merah bh 25 775 19,375.00
P.C (50
gk) Kg 10.3 1,406.00 14,481.80
Pasir
pasang m3 0.061 233,400.00 14,237.40

Pasir urug m3 0.069 175,300.00 12,095.70


Pekerja org 0.38 42,000.00 15,960.00
Tukang
batu org 0.19 65,000.00 12,350.00
Kepala
Tukang org 0.019 75,000.00 1,425.00
Mandor org 0.019 80,000.00 1,520.00
Jumlah 159,314.90
Dibulatka
n 159,315.00
M-06 1 Buah Bak Kontrol Pas Bata Merah Uk (60 x 60) cm
Bata
merah bh 186 775 144,150.00
P.C (50
gk) Kg 114 1,406.00 160,284.00
Pasir
pasang m3 0.184 233,400.00 42,945.60

Batu
pecah 2/3 m3 0.033 211,100.00 6,966.30
Besi
beton m3 4.85 16,500.00 80,025.00
Pasir
beton m3 0.12 255,400.00 30,648.00
Pekerja org 2.16 42,000.00 90,720.00
Tukang
batu org 0.72 65,000.00 46,800.00
Kepala
Tukang org 0.072 75,000.00 5,400.00
Mandor org 0.108 80,000.00 8,640.00
Tukang
gali org 0.1 42,000.00 4,200.00
Jumlah 620,778.90
Dibulatka
n 620,779.00
M-07 1 Buah Bak Kontrol Pas Bata Merah Uk (30 x 30) cm
Bata
merah bh 53 775 41,075.00
P.C (50
gk) Kg 44 1,406.00 61,864.00
Pasir
pasang m3 0.07 233,400.00 16,338.00

Batu
pecah 2/3 m3 0.07 211,100.00 14,777.00
Besi
beton m3 1.6 16,500.00 26,400.00
Pasir
beton m3 0.06 255,400.00 15,324.00
Pekerja org 3.2 42,000.00 134,400.00
Tukang
batu org 1.015 65,000.00 65,975.00
Kepala
Tukang org 0.0015 75,000.00 112.5
Mandor org 0.016 80,000.00 1,280.00
Jumlah 377,545.50
Dibulatka
n 377,546.00

1 M' Pipa
PVC Ø
M-08 1/2" (AW)
Pipa pvc
Ø 1/2" m' 1.2 10,025.00 12,030.00
Pekerja org 0.036 42,000.00 1,512.00
Tukang
batu org 0.06 65,000.00 3,900.00
Kepala
Tukang org 0.006 75,000.00 450
Mandor org 0.0018 80,000.00 144

Perlengka
pan 35 %
harga
pipa lot 0.35 12,030.00 4,210.50
Jumlah 22,246.50
Dibulatka
n 22,247.00

1 M' Pipa
PVC Ø 1"
M-09 (AW)
Pipa pvc
Ø 1" m' 1.2 15,800.00 18,960.00
Pekerja org 0.036 42,000.00 1,512.00
Tukang
batu org 0.06 65,000.00 3,900.00
Kepala
Tukang org 0.006 75,000.00 450
Mandor org 0.0018 80,000.00 144

Perlengka
pan 35 %
harga
pipa lot 0.35 18,960.00 6,636.00
Jumlah 31,602.00
Dibulatka
n 31,602.00

1 M' Pipa
PVC Ø
11/2"
M-10 (AW)
Pipa pvc
Ø 11/2" m' 1.2 26,475.00 31,770.00
Pekerja org 0.036 42,000.00 1,512.00
Tukang
batu org 0.06 65,000.00 3,900.00
Kepala
Tukang org 0.006 75,000.00 450
Mandor org 0.0018 80,000.00 144

Perlengka
pan 35 %
harga
pipa lot 0.35 31,770.00 11,119.50
Jumlah 48,895.50
Dibulatka
n 48,896.00

1 M' Pipa
PVC Ø 2"
M-11 (AW)
Pipa pvc
Ø 2" m' 1.2 27,675.00 33,210.00
Pekerja org 0.036 42,000.00 1,512.00
Tukang
batu org 0.06 65,000.00 3,900.00
Kepala
Tukang org 0.006 75,000.00 450
Mandor org 0.0018 80,000.00 144
Perlengka
pan 35 %
harga
pipa lot 0.35 31,770.00 11,119.50
Jumlah 50,335.50
Dibulatka
n 50,336.00

1 M' Pipa
PVC Ø 4"
M-12 (AW)
Pipa pvc
Ø 4" m' 1.2 86,975.00 104,370.00
Pekerja org 0.081 42,000.00 3,402.00
Tukang
batu org 0.135 65,000.00 8,775.00
Kepala
Tukang org 0.0135 75,000.00 1,012.50
Mandor org 0.0041 80,000.00 328

Perlengka
pan 35 %
harga
pipa lot 0.35 104,370.00 36,529.50
Jumlah 154,417.00
Dibulatka
n 154,417.00

1 M' Pipa
PVC Ø
M-13 3/4" (AW)
Pipa pvc
Ø 3/4" m' 1.2 13,050.00 15,660.00
Pekerja org 0.081 42,000.00 3,402.00
Tukang
batu org 0.135 65,000.00 8,775.00
Kepala
Tukang org 0.0135 75,000.00 1,012.50
Mandor org 0.0041 80,000.00 328

Perlengka
pan 35 %
harga
pipa lot 0.35 15,660.00 5,481.00
Jumlah 34,658.50
Dibulatka
n 34,659.00
M-14 1 Buah Bak Cuci piring Stainless steel
Bak cuci
stainless
steel +
asesoris
lengkap bh 1 397,800.00 397,800.00
Pekerja org 0.03 42,000.00 1,260.00
Tukang
batu org 0.3 65,000.00 19,500.00
Kepala
Tukang org 0.03 75,000.00 2,250.00
Mandor org 0.0015 80,000.00 120
Jumlah 420,930.00
Dibulatka
n 420,930.00

1 Buah
Kran Ø
1/2" -
M-15 3/4"
Kran air bh 1 40,900.00 40,900.00
Seal tape bh 0.025 4,200.00 105
Pekerja org 0.01 42,000.00 420
Tukang
batu org 0.1 65,000.00 6,500.00
Kepala
Tukang org 0.01 75,000.00 750
Mandor org 0.005 80,000.00 400
Jumlah 49,075.00
Dibulatka
n 49,075.00

1 Buah
Floor
M-16 Drain
Floor
drain bh 1 66,600.00 66,600.00
Pekerja org 0.01 42,000.00 420
Tukang
batu org 0.1 65,000.00 6,500.00
Kepala
Tukang org 0.01 75,000.00 750
Mandor org 0.005 80,000.00 400
Jumlah 74,670.00
Dibulatka
n 74,670.00
1 M' Grafel beton U 20 cm -60
M-17 cm
Pipa
beton U bh 1.1 44,300.00 48,730.00
Bata
merah bh 12 775 9,300.00
P.C (50
gk) zak 0.103 1,406.00 144.82
Pasir
pasang m3 0.0305 233,400.00 7,118.70

Pasir urug m3 0.0345 175,300.00 6,047.85


Pekerja org 0.01 42,000.00 420
Tukang
batu org 0.1 65,000.00 6,500.00
Kepala
Tukang org 0.01 75,000.00 750
Mandor org 0.005 80,000.00 400
Jumlah 79,411.37
Dibulatka
n 79,411.00
M-18 1 M' Pasang Talang Plastik PVC U 15 cm (AW)

Talang
plastik
PVC m' 1.05 60,000.00 63,000.00

Perlengka
pan 35 %
harga
talang lot 0.35 63,000.00 22,050.00
Pekerja org 0.15 42,000.00 6,300.00
Tukang
batu org 0.4 65,000.00 26,000.00
Kepala
Tukang org 0.025 75,000.00 1,875.00
Mandor org 0.0013 80,000.00 100
Jumlah 119,325.00
Dibulatka
n 119,325.00
1 M' Saluran Air Limbah Buis
M-19 Beton Ø 60 cm

Buis
beton Ø
60 cm bh 1.1 130,900.00 143,990.00
Bata
merah bh 25 775 19,375.00
P.C (50
gk) zak 0.206 1,406.00 289.64
Pasir
pasang m3 0.061 233,400.00 14,237.40

Pasir urug m3 0.069 175,300.00 12,095.70


Pekerja org 0.38 42,000.00 15,960.00
Tukang
batu org 0.19 65,000.00 12,350.00
Kepala
Tukang org 0.019 75,000.00 1,425.00
Mandor org 0.019 80,000.00 1,520.00
Jumlah 221,242.74
Dibulatka
n 221,243.00

1 M'
Pasang
Talang
Seng
M-20 Datar

Seng
pelat 3" x
6" lbr 0.5 20,801.00 10,400.50
Paku kg 0.015 23,400.00 351
Kayu
kelas II m3 0.0096 2,850,000.00 27,360.00

Meni besi kg 0.25 30,400.00 7,600.00


Pekerja org 0.15 42,000.00 6,300.00
Tukang
batu org 0.4 65,000.00 26,000.00
Kepala
Tukang org 0.025 75,000.00 1,875.00
Mandor org 0.0013 80,000.00 100
Jumlah 79,986.50
Dibulatka
n 79,987.00

1 Buah
Closet
M-21 Duduk
Closet
duduk bh 1 1,724,700.00 1,724,700.00
Pekerja org 3.3 42,000.00 138,600.00
Tukang
batu org 1.1 65,000.00 71,500.00
Kepala
Tukang org 0.001 75,000.00 75
Mandor org 0.16 80,000.00 12,800.00

Perlengka
pan 6 %
harga
closet lot 0.06 1,724,700.00 103,482.00
Jumlah 2,051,157.00
Dibulatka
n 2,051,157.00
M-22 1 Buah Tangki Air fibreglass Volume 1 m3

Bak
fibreglass
kapasitas
1 m3 bh 1 1,316,400.00 1,316,400.00
Pekerja org 3.3 42,000.00 138,600.00
Tukang
batu org 1.1 65,000.00 71,500.00
Kepala
Tukang org 0.001 75,000.00 75
Mandor org 0.16 80,000.00 12,800.00

Perlengka
pan 6 %
harga bak lot 0.06 1,316,400.00 78,984.00
Jumlah 1,618,359.00
Dibulatka
n 1,618,359.00
M-23 1 Unit Septictank 2x1,50x1,50 m + Rembesan
Galian
tanah m3 4.5 26,252.00 118,134.00

Pasir urug m3 0.214 175,300.00 37,514.20


lantai
kerja m3 2.25 716,798.00 1,612,795.50

Pas bata
adk 1pc :
3ps m2 15 220,267.10 3,304,006.50

Pelat
beton K-
225 m3 0.3 6,438,864.00 1,931,659.20

Plesteran
adk 1pc :
3ps m2 15 41,301.82 619,527.30
Pipa PVC
4" jenis
AW m' 5.4 256,800.00 1,386,720.00
Pipa GIP 1
1/2" m' 5 46,750.00 233,750.00

Galian
tanah
untuk
rembesan m3 3.375 20,000.00 67,500.00
Pas ijuk kg 5.4 23,400.00 126,360.00

Urugan
kerikil 3/5 m3 1.05 205,000.00 215,250.00

Pipa PVC
4"
berlubang
jenis AW m' 9 36,700.00 330,300.00

Urugan
dan
perataan
tanah m3 1.125 34,584.00 38,907.00
Jumlah 10,022,423.70
Dibulatka
n 10,022,424.00
M-24 1 Unit Septictank 1x1,50x1,50 m + Rembesan
Galian
tanah m3 2.25 20,000.00 45,000.00

Pasir urug m3 0.107 175,300.00 18,757.10


lantai
kerja m3 1.125 716,798.00 806,397.75

Pas bata
adk 1pc :
3ps m2 7.5 220,267.10 1,652,003.25

Pelat
beton K-
225 m3 0.15 6,438,864.00 965,829.60

Plesteran
adk 1pc :
3ps m2 7.5 41,301.82 309,763.65

Pipa PVC
4" jenis
AW m' 9 256,800.00 2,311,200.00
Pipa GIP 1
1/2" m' 2.5 46,750.00 116,875.00

Galian
tanah
untuk
rembesan m3 1.688 20,000.00 33,760.00
Pas ijuk kg 2.7 23,400.00 63,180.00

Urugan
kerikil 3/5 m3 0.525 205,000.00 107,625.00

Pipa PVC
4"
berlubang
jenis AW m' 9 36,700.00 330,300.00

Urugan
dan
perataan
tanah m3 0.563 34,584.00 19,470.79
Jumlah 6,780,162.14
Dibulatka
n 6,780,162.00

Kembali ke Analisa SNI

Copyright @ 2014 softwarerab.com. All rights reserved

Contact | About | Sitemap | Privacy | XHTML- Feed | G+ | G++ | Valid RSS


Analisa Harga Satuan Pekerjaan Pengecatan
Diposkan : 05 Juni 2014
Oleh : Endang Kusman

HARGA
No. URAIAN SAT VOLUME SAT HARGA

N-01 1 M2 Mengikis / Mengerok Permukaan Cat Tembok Lama


- Soda api Kg 0.05 35,600.00 1,780.00
- Pekerja Oh 0.15 42,000.00 6,300.00
- Mandor Oh 0.0025 80,000.00 200
Jumlah 8,280.00
Dibulatkan 8,280.00
N-02 1 M2 Mendempul Dan Menggosok Kayu
- Dempul Kg 0.08 35,800.00 2,864.00
Minyak
- cat Kg 0.02 38,400.00 768
Batu
- apung Kg 0.01 29,600.00 296
- Pekerja Oh 0.04 42,000.00 1,680.00
Tukang
- cat Oh 0.04 65,000.00 2,600.00
Kepala
- tukang Oh 0.004 75,000.00 300
- Mandor Oh 0.0025 80,000.00 200
Jumlah 8,708.00
Dibulatkan 8,708.00
N-03 1 M2 Pengecatan Bidang Kayu Lama Setara Sieve
- Plamir Kg 0.15 25,000.00 3,750.00
- Cat dasar Kg 0.17 30,000.00 5,100.00

Cat
penutup
setara
- sieve 2x Kg 0.17 41,700.00 7,089.00
- Pekerja Oh 0.07 42,000.00 2,940.00
Tukang
- cat Oh 0.075 65,000.00 4,875.00
Kepala
- tukang Oh 0.0075 75,000.00 562.5
- Mandor Oh 0.0025 80,000.00 200
Jumlah 24,516.50
Dibulatkan 24,517.00
N-04 1 M2 Pengecatan Bidang Kayu Baru Setara Sieve
- Cat meni Kg 0.2 30,400.00 6,080.00
- Plamir Kg 0.15 25,000.00 3,750.00
- Cat dasar Kg 0.17 30,000.00 5,100.00

Cat
penutup
3x setara
- sieve Kg 0.35 41,700.00 14,595.00
- Pekerja Oh 0.07 42,000.00 2,940.00
Tukang
- cat Oh 0.105 65,000.00 6,825.00
Kepala
- tukang Oh 0.004 75,000.00 300
- Mandor Oh 0.0025 80,000.00 200
Jumlah 39,790.00
Dibulatkan 39,790.00
1 M2 Pelaburan Bidang Kayu dengan
N-05 Politur
- Politur Ltr 0.15 48,000.00 7,200.00
Politur
- jadi Ltr 0.372 ### 41,924.40
- Ampelas Lbr 2 5,000.00 10,000.00
Tukang
- cat Oh 0.06 65,000.00 3,900.00
Kepala
- tukang Oh 0.016 75,000.00 1,200.00
- Mandor Oh 0.0025 80,000.00 200
Jumlah 64,424.40
Dibulatkan 64,424.00
N-06 1 M2 Pelaburan Bidang Kayu dengan Cat Residu dan Ter
Residu
- atau ter Ltr 0.35 8,100.00 2,835.00
- Pekerja Oh 0.1 42,000.00 4,200.00
- Mandor Oh 0.006 80,000.00 480
Jumlah 7,515.00
Dibulatkan 7,515.00
1 M2 Pengecatan Tembok Baru
N-07 Setara ICI
Plamir
- tembok Kg 0.1 25,000.00 2,500.00
- Cat dasar Kg 0.1 30,000.00 3,000.00

Cat
penutup
2x setara
- ICI Kg 0.26 75,000.00 19,500.00
- Pekerja Oh 0.02 42,000.00 840
Tukang
- cat Oh 0.063 65,000.00 4,095.00
Kepala
- tukang Oh 0.0063 75,000.00 472.5
- Mandor Oh 0.0025 80,000.00 200
Jumlah 30,607.50
Dibulatkan 30,608.00
N-08 1 M2 Pengecatan Tembok Lama Setara ICI
- Cat dasar Kg 0.12 30,000.00 3,600.00

Cat
penutup
- 2x Kg 0.18 75,000.00 13,500.00
- Pekerja Oh 0.028 42,000.00 1,176.00
Tukang
- cat Oh 0.042 65,000.00 2,730.00
Kepala
- tukang Oh 0.0042 75,000.00 315
- Mandor Oh 0.0025 80,000.00 200
Jumlah 21,521.00
Dibulatkan 21,521.00
N-09 1 M2 Pengecatan Plafond ( 3x ) Setara ICI

Cat
tembok
- setara ICI Kg 0.2 75,000.00 15,000.00
Plamir
- tembok Kg 0.16 25,000.00 4,000.00
- Rol cat Bh 0.01 32,500.00 325
Steger
- werk Ls 1 1,000.00 1,000.00
- Ampelas Lbr 0.5 5,000.00 2,500.00
- Pekerja Oh 0.2 42,000.00 8,400.00
Tukang
- cat Oh 0.3 65,000.00 19,500.00
Kepala
- tukang Oh 0.03 75,000.00 2,250.00
- Mandor Oh 0.01 80,000.00 800
Jumlah 53,775.00
Dibulatkan 53,775.00
N-10 1 M2 Pengecatan Plafond ( 3x ) Setara Vinilex

Cat
tembok
setara
- Vinilex Kg 0.2 25,000.00 5,000.00
Plamir
- tembok Kg 0.16 25,000.00 4,000.00
- Rol cat Bh 0.01 32,500.00 325
Steger
- werk Ls 1 1,000.00 1,000.00
- Ampelas Lbr 0.5 5,000.00 2,500.00
- Pekerja Oh 0.2 42,000.00 8,400.00
Tukang
- cat Oh 0.3 65,000.00 19,500.00
Kepala
- tukang Oh 0.03 75,000.00 2,250.00
- Mandor Oh 0.01 80,000.00 800
Jumlah 43,775.00
Dibulatkan 43,775.00
N-10-r' 1 M2 Pengecatan Plafond ( 2x ) Setara Vinilex

Cat
tembok
setara
- Vinilex Kg 0.13 25,000.00 3,250.00
Plamir
- tembok Kg 0.11 25,000.00 2,750.00
- Rol cat Bh 0.1 32,500.00 3,250.00
Steger
- werk Ls 0.67 1,000.00 670
- Ampelas Lbr 0.33 5,000.00 1,650.00
- Pekerja Oh 0.13 42,000.00 5,460.00
Tukang
- cat Oh 0.2 65,000.00 13,000.00
Kepala
- tukang Oh 0.02 75,000.00 1,500.00
- Mandor Oh 0.01 80,000.00 800
Jumlah 32,330.00
Dibulatkan 32,330.00
N-11 1 M2 Memasang Wallpaper
Wallpape
- r m2 1.2 55,700.00 66,840.00
Lem
- Perekat Kg 0.25 35,700.00 8,925.00
- Pekerja Oh 0.35 42,000.00 14,700.00
Tukang
- cat Oh 0.175 65,000.00 11,375.00
Kepala
- tukang Oh 0.017 75,000.00 1,275.00
- Mandor Oh 0.0017 80,000.00 136
Jumlah ###
Dibulatkan ###
N-12 1 M2 Pengecatan Permukaan Baja dengan Meni Besi
- Meni besi Kg 0.1 30,400.00 3,040.00
- Kuas 3" Bh 0.01 16,000.00 160
- Pekerja Oh 0.02 42,000.00 840
Tukang
- cat Oh 0.2 65,000.00 13,000.00
Kepala
- tukang Oh 0.02 75,000.00 1,500.00
- Mandor Oh 0.01 80,000.00 800
Jumlah 19,340.00
Dibulatkan 19,340.00
1 M2 Pengecatan Permukaan Baja dengan Meni Besi dan
N-13 Perancah

- Meni besi Kg 0.1 30,400.00 3,040.00


- Kuas 3" Bh 0.01 16,000.00 160
Kayu
- perancah m3 0.002 ### 4,139.60
- Pekerja Oh 0.25 42,000.00 10,500.00
Tukang
- cat Oh 0.225 65,000.00 14,625.00
Kepala
- tukang Oh 0.0225 75,000.00 1,687.50
- Mandor Oh 0.0075 80,000.00 600
Jumlah 34,752.10
Dibulatkan 34,752.00
1 M2 Pengecatan Permukaan Baja Lapis seng (galbani) secara
N-14 manual 1 lps cat 2 um
Cat besi
- setara ICI Kg 0.3 67,700.00 20,310.00
- Pekerja Oh 0.006 42,000.00 252
Tukang
- cat Oh 0.06 65,000.00 3,900.00
Kepala
- tukang Oh 0.012 75,000.00 900
- Mandor Oh 0.006 80,000.00 480
Jumlah 25,842.00
Dibulatkan 25,842.00
N-15 1 M2 Pengecatan Tembok Baru Setara Vinilex (2 x laburan)
Plamir
- tembok Kg 0.1 25,000.00 2,500.00
- Cat dasar Kg 0.1 30,000.00 3,000.00
Cat
penutup
2x setara
- vinilex Kg 0.26 25,000.00 6,500.00
- Pekerja Oh 0.02 42,000.00 840
Tukang
- cat Oh 0.063 65,000.00 4,095.00
Kepala
- tukang Oh 0.0063 75,000.00 472.5
- Mandor Oh 0.0025 80,000.00 200
Jumlah 17,607.50
Dibulatkan 17,608.00
N-15r' 1 M2 Pengecatan Tembok Baru Setara Vinilex (3 x laburan)
Plamir
- tembok Kg 0.1 25,000.00 2,500.00
- Cat dasar Kg 0.1 30,000.00 3,000.00

Cat
penutup
3x setara
- vinilex Kg 0.39 25,000.00 9,750.00
- Pekerja Oh 0.03 42,000.00 1,260.00
Tukang
- cat Oh 0.0945 65,000.00 6,142.50
Kepala
- tukang Oh 0.0095 75,000.00 712.5
- Mandor Oh 0.0038 80,000.00 304
Jumlah 23,669.00
Dibulatkan 23,669.00
N-16 1 M2 Pengecatan Tembok Lama Setara Vinilex
- Cat dasar Kg 0.12 30,000.00 3,600.00

Cat
penutup
- 2x Kg 0.18 25,000.00 4,500.00
- Pekerja Oh 0.028 42,000.00 1,176.00
Tukang
- cat Oh 0.042 65,000.00 2,730.00
Kepala
- tukang Oh 0.0042 75,000.00 315
- Mandor Oh 0.0025 80,000.00 200
Jumlah 12,521.00
Dibulatkan 12,521.00

Kembali ke AHS-SNI
Analisa Harga Satuan Pekerjaan Penanaman Pohon
Diposkan : o6 Juni2014
Oleh : Endang Kusman

HARGA HARGA
NO. URAIAN KOEF SAT. SAT. (Rp) (Rp)
O-01 1 Lubang (70x70x70) cm, tanam pohon pelindung tinggi 2m
Pupuk kandang 0.08 krg 25,000.00 2,000.00
Furadan 0.001 kg 24,000.00 24
Pohon pelindung 1 btng 25,000.00 25,000.00
Pekerja 0.025 org 42,000.00 1,050.00
Mandor 0.0025 org 80,000.00 200
Jumlah 28,274.00
Dibulatkan 28,274.00
O-02 1 Lubang (70x70x70) cm, tanam bambu krisik/jepang
Pupuk kandang 0.08 krg 25,000.00 2,000.00
Furadan 0.001 kg 24,000.00 24
Bambu krisik/jepang 1 btng 50,000.00 50,000.00
Pekerja 0.025 org 42,000.00 1,050.00
Mandor 0.0025 org 80,000.00 200
Jumlah 53,274.00
Dibulatkan 53,274.00
O-03 1 Lubang (40x40x40) cm, tanam pohon perdu (polibag)
Pupuk kandang 0.04 krg 25,000.00 1,000.00
Furadan 0.001 kg 24,000.00 24
Pohon perdu 1 btng 10,000.00 10,000.00
Pekerja 0.02 org 42,000.00 840
Mandor 0.002 org 80,000.00 160
Jumlah 12,024.00
Dibulatkan 12,024.00
O-04 1 M2 Tanam rumput gajah (silang papan catur)
Pupuk kandang 0.04 krg 25,000.00 1,000.00
Rumput gajah mini 0.5 m2 15,000.00 7,500.00
Pekerja 0.04 org 42,000.00 1,680.00
Mandor 0.004 org 80,000.00 320
Jumlah 10,500.00
Dibulatkan 10,500.00

Kembali ke AHA-SNI
n Pohon
Harga Satuan Pekerjaan Konstruksi
Diposkan : 06 Junii 2014
Oleh : Endang Kusman

URAIAN
PEKERJAA
NO N HARGA (RP)

PEKERJAA
N
PERSIAPA
A. N

1 M'
Pagar
Sementar
a Dari
Kayu
1 Tinggi 2 m 269,316.00

1 M'
Pagar
Sementar
a Seng
Gelomba
ng Tinggi
22m 355,236.00

1 M'
Pagar
Sementar
aKawat
Duri
Tinggi
3 1,80 m 222,843.00

1 M2
Pengukur
an Dan
Pasang
Bouwplan
4k 49,266.00
1 M2
Pembuata
n Kantor
Sementar
a dgn
Lantai
5 Diplester 1,135,066.00

1 M2
Pembuata
n Gudang
Semen
dan Alat-
6 alat 927,350.00

1 M2
Pembuata
n Bedeng
7 Buruh 861,935.00

1 M2
Membersi
hkan
Lapangan
dan
8 Perataan 8,200.00

1M2
Pembuata
n Jalan
Sementar
9a 96,799.00

1 M3
Bongkara
n Beton
10 Bertulang 306,654.00

1 M3
Bongkara
n Dinding
Tembok
Bata
11 Merah 282,654.00
1 M¹
Pagar
beton
Pracetak (
5 x 50 x
12 213 ) cm 474,296.00

1 M¹
Pagar
kawat
ayam
tiang besi
L50.50.5,
tinggi 1
13 m' 166,813.00

1 M2
Pagar BRC
lengkap
dengan
14 tiang 265,378.00

1 M2
Steiger
Werk /
perancah
dari
15 Bambu 43,645.00

1 M'
Cerucuk
16 Bambu 54,250.00

PEKERJAA
B. N TANAH

1 M3
Galian
Tanah
Biasa
sedalam 1
1m 20,000.00
1 M3
Galian
Tanah
Biasa
Sedalam
22m 26,252.00

1 M3
Galian
Tanah
Biasa
Sedalam
33m 36,710.00

1 M3
Galian
Tanah
Keras
Sedalam
41m 31,210.00

1 M3
Galian
Tanah
Lumpur
Sedalam
51m 41,206.00

1 M2
Pekerjaan
Stripping
Setinggi
6 10 cm 2,500.00

1 M3
Pembuan
gan
Tanah
sejauh
7 150 m 25,672.00

1 M3
Urugan
8 Kembali 9,584.00

1 M3
Pemadata
9 n Tanah 25,000.00

1 M3
Urugaan
10 Pasir 223,760.00
1 M2
Pemasang
an
Lapisan
Ijuk Tebal
11 10 cm 33,900.00

1 M3
Urugan
12 Sirtu 256,700.00

1 M3
Urugan
Tanah
13 Pilihan 119,540.00

1 M2
Pembuata
n jalan
sementar
a, tebal
14 25 cm 120,456.00

PEKERJAA
N
C. PONDASI

1 M3
Pasanag
Pondasi
batu Kali
adk 1pc :
1 3 ps 735,761.00

1 M3
Pasang
Pondasi
Batu kali
adk 1pc :
2 4ps 689,096.00

1 M3
Pasang
Pondasi
Batu kali
adk 1pc :
3 5ps 656,736.00
1 M3
Pasang
Pondasi
Batu
Kosong
(aanstam
4 ping) 363,345.00

1 M3
Beton
siklop adk
1pc : 2ps :
3kr + 40
% Batu
Belah dgn
besi
5 tulangan 2,020,939.00

1 M3
Pasang
Pondasi
Sumuran
adk
1pc:2ps:3
kr + 40 %
Batu
Belah (D=
6 1m) 870,632.00

1 M3
Pondasi
siklop adk
1pc:2ps:3
kr + 40 %
Batu
7 Belah 761,279.00

1 M'
Pembuata
n Tiang
Pancang
(40x40)
cm, Beton
8 Tulang 1,104,309.00
1 M'
Pembuata
n Tiang
Pancang
(35x35)
cm, Beton
9 Tulang 864,246.00

1 M'
Pembuata
n Tiang
Pancang f
40 cm,
Beton
10 Tulang 1,073,335.00

1 M'
Memanca
ng Tiang
Pancang
Beton
11 Tulang 128,057.00

1 Buah
Memoton
g Tiang
Pancang
(40x40)
cm Beton
12 Tulang 216,932.00

1 M'
Menyamb
ung Tiang
Pancang
Beton
13 Bertulang 628,577.00

PEKERJAA
D. N BETON
1 M3
Membuat
Beton
Tumbuk
adk
1pc:3ps:5
1 kr 716,798.00

1 M3
Membuat
Beton
Tumbuk
adk
1pc:3ps:6
2 kr 689,279.00

1 M3
Membuat
Beton
Tumbuk
1pc:2ps:3
3 kr 970,698.00

1 M3
Membuat
Tiang
Pancang
Beton
Prestress
4 ed 1,047,667.00

1 M3
Membuat
Beton
Tumbuk
adk
1pc:2ps:4
5 kr 914,882.00

1 M¹
Memasan
g PVC
Watersto
p Lebar
6 200 mm 65,593.00
1 Kg
Pembesia
n Dengan
Besi
7 Polos/ulir 18,566.00

1 M2
Pasang
Bekesting
Untuk
8 Pondasi 152,870.00

1 M2
Pasang
Bekisting
Untuk
9 Sloof 167,120.00

1 M2
Pasang
Bekesting
Untuk
10 Kolom 308,850.00

1 M2
Pasang
Bekesting
Untuk
11 Balok 316,770.00

1 M2
Pasang
Bekesting
Untuk
12 Lantai 431,850.00

1 M2
Pasang
Bekesting
Untuk
13 Tangga 289,440.00

1 M3
Membuat
Beton Cor
Mutu K-
14 225 1,197,898.00
1 M3
Membuat
Beton Cor
Mutu K-
15 275 1,186,807.00

1 M3
Pondasi
Beton
Tulang
(150 kg
besi +
16 bekisting) 4,248,004.00

1 M3
Sloof
Beton
Tulang
(200 kg
besi +
17 bekisting) 5,441,279.00

1 M3
Sloof
Beton
Tulang
15/20
(150 kg
besi +
bekisting) 4,616,279.00

1 M3
Sloof
Beton
Tulang
15/20
(180 kg
besi +
bekisting)
4dia. 12
ring 8-15 5,078,279.00
1 M3
Sloof
Beton
Tulang
20/30
(150 kg
besi +
bekisting)
Struktur
bertingka
t 4dia.16
8-15 4,583,279.00

1 M3
Sloof
Beton
Tulang
20/30
(200 kg
besi +
bekisting)
Struktur
bertingka
t 6dia.16
8-15 5,408,279.00

1 M3
Sloof
Beton
Tulang
20/40
(240 kg
besi +
bekisting)
Struktur
bertingka
t 6,101,279.00
1 M3
Kolom
Beton
Tulang
(120 kg
besi +
18 bekisting) 6,646,664.00

1 M3
Kolom
Beton
Tulang
20/20
(140 kg
besi +
bekisting)
4dia. 12
8-15 6,573,014.00

1 M3
Kolom
Beton
Tulang
15/20
(180 kg
besi +
bekisting)
4dia.12 8-
15 7,233,014.00

1 M3
Kolom
Beton
Tulang
Praktis
12/12
(175 kg
besi +
bekisting) 6,225,664.00
1 M3
Kolom
Beton
Tulang
Praktis
12/12
(210 kg
besi +
bekisting) 6,803,164.00

1 M3
Kolom
Beton
Tulang
20/20
(210 kg
besi +
bekisting)
Struktur
bertingka
t 4dia.16
8-15 7,728,014.00

1 M3
Kolom
Beton
Tulang
20/30
(230 kg
besi +
bekisting)
Struktur
bertingka
t 6dia.16
+2dia.12,
8-15 8,058,014.00
1 M3
Kolom
Beton
Tulang
20/40
(250 kg
besi +
bekisting)
Struktur
bertingka
t 8,498,014.00

1 M3
Kolom
Beton
Tulang
30/30
(175 kg
besi +
bekisting)
Struktur
bertingka
t 8dia.16,
8-15 7,150,514.00

1 M3
Kolom
Beton
Tulang
30/40
(200 kg
besi +
bekisting)
Struktur
bertingka
t 7,673,014.00
1 M3
Kolom
Beton
Tulang
(140 kg
besi +
19 bekisting) 6,691,324.00

1 M3
Kolom
Beton
Tulang
(150 kg
besi +
20 bekisting) 6,864,634.00

1 M3
Kolom
Beton
Tulang
(180 kg
besi +
21 bekisting) 7,367,944.00

1 M3
Kolom
Beton
Tulang
(200 kg
besi +
22 bekisting) 7,706,254.00

1 M3
Kolom
Beton
Tulang
(250 kg
besi +
23 bekisting) 8,552,029.00
1 M3
Kolom
Beton
Tulang
(300 kg
besi +
24 bekisting) 9,397,804.00

1 M3
Balok
Beton
Tulang
(120 kg
besi +
25 bekisting) 5,693,859.00

1 M3
Balok
Beton
Tulang
15/20
(150 kg
besi +
26 bekisting) 6,201,324.00

1 M3
Balok
Beton
Lintel
11/11
(300 kg
besi +
bekisting)
4dia.10 8-
15 8,288,164.00

1 M3
Balok
Beton
Lintel
11/15
(234 kg
besi +
bekisting)
4dia.10 8-
15 7,199,164.00
1 M3
Balok
Beton
Tulang
15/20
(180 kg
besi +
bekisting)
4dia. 12,
8-15 6,608,324.00

1 M3
Balok
Beton
Tulang
15/30
(190 kg
besi +
bekisting)
Struktur
bertingka
t 4dia. 16,
8-15 6,773,324.00

1 M3
Balok
Beton
Tulang
20/40
(200 kg
besi +
bekisting)
Struktur
bertingka
t
7dia.16+2
dia.12, 8-
27 15 6,959,099.00
1 M3
Balok
Beton
Tulang
20/30
(200 kg
besi +
bekisting)
Struktur
bertingka
t 6dia. 16,
8-15 6,959,099.00

1 M3
Balok
Beton
Tulang
20/30
(175 kg
besi +
bekisting)
Struktur
bertingka
t 5dia. 16,
8-15 6,628,499.00

1 M3
Balok
Beton
Tulang
25/55
(140 kg
besi +
bekisting)
Struktur
bertingka
t 8dia.16
+2dia.12,
8-15 5,969,099.00
1 M3
Balok
Beton
Tulang
(230 kg
besi +
28 bekisting) 7,554,564.00

1 M3
Tangga
Beton
Tulang
(200 kg
besi +
29 bekisting) 6,575,339.00

1 M3
Pelat
Lantai
Beton
Tulang T=
10 cm (90
kg besi +
30 bekisting) 6,904,322.00

1 M3
Lisplang
Beton
Tulang T=
8 cm
(77,5 kg
besi +
bekisting) 6,672,247.00
1 M3
Pelat
Lantai
Beton
Tulang T=
12 cm
(110 kg
besi +
bekisting)
31 dia.8-12,5 6,554,453.00

1 M3
Pelat
Lantai
Beton
Tulang T=
12 cm
(130 kg
besi +
32 bekisting) 6,925,773.00

1 M3
Pelat
Lantai
Beton
Tulang T=
15 cm (90
kg besi +
33 bekisting) 5,466,262.00

1 M3
Pelat
Lantai
Beton
Tulang T=
15 cm
(115 kg
besi +
34 bekisting) 5,930,412.00
1 M'
Kolom
Praktis
Beton
Tulang
(11x11)
35 cm 72,847.00

1 M' Ring
Balok
Beton
Tulang
(10x15)
36 cm 94,786.00

1 M2
Pasang
Bekesting
Untuk
37 Dinding 315,287.00

1 M3
Pelat
Beton
Tulang
(150 kg
besi +
38 bekisting) 6,438,864.00

1 M3
Dinding
Beton
Tulang
(150 kg
besi +
39 bekisting) 6,196,529.00

1 M3
Dinding
Beton
Tulang
(200 kg
besi +
40 bekisting) 6,574,999.00
1 M3
Membuat
Beton Cor
Mutu K-
41 300 928,986.00

1 M3
Membuat
Beton Cor
Mutu K-
42 200 852,609.00

1 M3
Membuat
Beton Cor
Mutu K-
43 250 892,501.00

PEKERJAA
N
PASANGA
N
E. DINDING

1 M2
Pasang
Bata
Merah
Tebal 1
Bata,
1 1pc : 3ps 220,267.00

1 M2
Pasang
Bata
Merah
Tebal 1
Bata,
2 1pc : 4ps 211,736.00

1 M2
Pasang
Bata
Merah
Tebal 1
Bata,
3 1pc : 5ps 207,720.00
1 M2
Pasang
Bata
Merah
Tebal 1/2
Bata,
4 1pc : 3ps 105,680.00

1 M2
Pasang
Bata
Merah
Tebal 1/2
Bata,
5 1pc : 4ps 102,345.00

1 M2
Pasang
Bata
Merah
Tebal 1/2
Bata,
6 1pc : 5ps 100,253.00

1 M2
Pasang
Dinding
Roster
Beton 20
x 20 adk
7 1pc : 3ps 580,016.00

1 M2
Pasang
Dinding
Roster
Beton 20
x 20 adk
8 1pc : 4ps 577,485.00

1 M2
Pasang
Dinding
Roster/te
rawng (12
x 11 x 24)
9 cm 580,016.00
1 M2
Pasang
Dinding
Batako
Besar
Pres uk.
8x20x30
adk.
10 1pc:4ps 46,791.00

1 M2
Pasang
Dinding
hollowblo
ck (HB-
11 20) 151,794.00

1 M2
Pasang
Dinding
hollowblo
ck (HB-
12 15) 129,077.00

1 M2
Pasang
Dinding
hollowblo
ck (HB-
13 10) 109,862.00

1 M2
Pasang
Dinding
Conblock
14 (CB-20) 190,791.00

1 M2
Pasang
Dinding
Conblock
15 (CB-15) 117,281.00

1 M2
Pasang
Dinding
Conblock
16 (CB-10) 104,781.00
1 M2
Dinding
Keramik
Corak 10
x 20 cm
Setara
17 Mulia 108,782.00

1 M2
Dinding
Keramik
polos 10 x
20 cm
Setara
18 Mulia 107,282.00

1 M2
Dinding
Keramik
corak 20 x
20 cm
setara
19 Mulia 115,282.00

1 M2
Dinding
Keramik
polos 20 x
20 cm
Setara
20 Mulia 107,282.00

1 M2
Dinding
Keramik
polos 20 x
25 cm
Setara
21 Mulia 107,282.00

1 M2
Dinding
Keramik
Corak 20
x 25 cm
Setara
22 Mulia 115,282.00
1 M2
Dinding
Keramik
Polos 30 x
30 cm
Setara
23 Mulia 105,782.00

1 M2
Dinding
Keramik
Corak 30
x 30 cm
Setara
24 Mulia 110,782.00

1 M2
Dinding
Keramik
Polos 40 x
40 cm
Setara
25 Mulia 109,582.00

1 M2
Dinding
Keramik
Corak 40
x 40 cm
Setara
26 Mulia 118,282.00

1 M2
Dinding
Keramik
Corak 10
x 20 cm
Setara
27 Roman 124,982.00

1 M2
Dinding
Keramik
polos 10 x
20 cm
Setara
28 Roman 117,182.00
1 M2
Dinding
Keramik
corak 20 x
20 cm
setara
29 Roman 127,982.00

1 M2
Dinding
Keramik
polos 20 x
20 cm
Setara
30 Roman 117,182.00

1 M2
Dinding
Keramik
polos 20 x
25 cm
Setara
31 Roman 125,682.00

1 M2
Dinding
Keramik
Corak 20
x 25 cm
Setara
32 Roman 127,982.00

1 M2
Dinding
Keramik
Polos 30 x
30 cm
Setara
33 Roman 121,682.00

1 M2
Dinding
Keramik
Corak 30
x 30 cm
Setara
34 Roman 129,382.00
1 M2
Dinding
Keramik
Polos 40 x
40 cm
Setara
35 Roman 125,282.00

1 M2
Dinding
Keramik
Corak 40
x 40 cm
Setara
36 Roman 129,782.00

1 M2
Dinding
37 Marmer 689,841.00

1 M2
Dinding
Batu
Tempel
38 Hitam 179,935.00

1 M2
Dinding
Porselen
(11 x 11)
39 cm 116,082.00

1 M2 Wall
40 paper 94,920.00

1 M2
Dinding
Pemisah
Teakwoo
d
Rangkap,
Rangka
Kayu
Kamper
41 Medan 329,174.00
1 M2
Dinding
Pemisah
Plywood
Rangkap,
Rangka
Kayu
Kamper
42 Medan 431,147.00

1 M2
Dinding
Pemisah
Triplek 4
mm
Rangkap,
Rangka
Kayu
Kamper
43 Medan 284,431.00

1 M2
Dinding
Pemisah
GRC t = 4
mm +
rangka
besi
44 hollow 92,049.00

1 M2
Dinding
Pemisah
Plywood t
= 4 mm +
rangka
besi
45 hollow 140,691.00

1 M2
Dinding
Pemisah
teakwood
t = 4 mm
+ rangka
besi
46 hollow 103,090.00
1 M2
Pasang
Dinding
Glass
Block 20 x
20 adk
47 1pc : 4ps 836,685.00

1 M2
Pasang
Dinding
anyaman
bambu,
rangka
48 kayu 105,137.00

PEKERJAA
N
PLESTERA
N DAN
F. SIARAN

1 M2
Plesteran
adk. 1pc :
2ps Tebal
17 15 mm 36,022.00

1 M2
Plesteran
adk. 1pc :
3ps Tebal
18 15 mm 33,620.00

1 M2
Plesteran
adk. 1pc :
4ps Tebal
19 15 mm 32,054.00

1 M2
Plesteran
adk. 1pc :
3ps Tebal
20 20 mm 47,253.00
1 M2
Plesteran
adk. 1pc :
4ps Tebal
21 20 mm 44,739.00

1 M2
Plesteran
adk.
1pc:5ps
tebal 20
22 mm 42,318.00

1 M2
Plesteran
adk.
1pc:5ps
tebal 15
mm +
Acian 31,284.00

1 M2
Berapen
adk. 1pc :
5ps Tebal
23 15 mm 25,355.00

1 M2
Plesteran
Beton
adk. 1pc :
2ps Tebal
24 15 mm 43,737.00

1 M2
Plesteran
Beton
adk. 1pc :
3ps Tebal
25 15 mm 41,302.00
1 M2
Plesteran
Skoning
adk. 1pc :
2ps, tebal
26 10mm 36,417.00

1 M2
Acian
27 Plesteran 20,213.00

1 M2
Plesteran
Siar adk.
1pc : 2ps
batu
28 belah 36,390.00

1 M2
Plesteran
Siar adk.
1pc : 2ps
dinding
bata
29 merah 21,823.00

PEKERJAA
G. N ATAP

1 M2
Pasang
Atap
Genteng
1 Palentong 59,915.00

1 M2
Pasang
Genteng
Bubung
2 Palentong 80,177.00
1 M2
Pasang
Roof Light
Fibreglass
( 180 x
3 90 ) cm 72,510.00

1 M2
Pasang
Atap
Asbes
Gelomba
ng ( 3,00 x
1,05 m ) x
4 4 mm 42,371.00

1 M2
Pasang
Atap
Asbes
Gelomba
ng ( 2,70 x
1,05 m ) x
5 4 mm 45,157.00

1 M2
Pasang
Atap
Asbes
Gelomba
ng ( 2,40 x
1,05 m ) x
6 4 mm 43,172.00

1 M2
Pasang
Atap
Asbes
Gelomba
ng ( 2,10 x
1,05 m ) x
7 4 mm 44,011.00
1 M2
Pasang
Atap
Asbes
Gelomba
ng ( 1,50 x
1,05 m ) x
8 4 mm 48,016.00

1 M¹
Pasang
Nok Stel
Gelomba
9 ng 1,05 m 97,758.00

1 M2
Pasang
Atap
Genteng
10 Beton 110,652.00

1 M2
Pasang
Atap
Genteng
Murando
11 Natural 61,015.00

1 M2
Pasang
Atap
Genteng
Murando
12 Glazur 84,415.00

1 M2
Pasang
Atap
Genteng
13 Metal 227,572.00

1 M¹
Pasang
Nok
Genteng
14 Beton 109,174.00
1 M¹
Pasang
Nok
Genteng
15 Metal 175,955.00

1 M2
Pasang
Atap Seng
Gelomba
16 ng 68,516.00

1 M2
Pasang
Atap Nok
17 Seng 24,132.00

1 M2
Pasang
Alluminiu
m Foil /
18 Sisalation 31,145.00

1 M2
Pasang
Atap
Alluminiu
19 m Natural 204,160.00

1 M2
Pasang
Atap
Alluminiu
20 m warna 229,465.00

1 M2
Pasang
Nok
Alluminiu
21 m 161,550.00

1 M'
Pasang
Lisplank
GRC
ukuran 30
22 cm 43,125.00
1 M'
Pasang
Nok
Pinggir 30,000.00

PEKERJAA
N
LANGIT-
H. LANGIT

1 M2
Langit-
langit
Asbes
( 1,00 x
1,00 ) m,
tebal 5
1 mm 31,443.00

1 M2
Langit-
langit
Asbes
( 1,00 x
1,00 ) m,
tebal 3,5
2 mm 28,143.00

1 M2
Langit-
langit
Akustik
( 60 x
3 120 ) cm 210,400.00

1 M2
Langit-
langit
Akustik
( 60 x
120 ) cm
+ Rangka
Alluminiu
4m 298,060.00
1 M2
Langit-
langit
teakwood
(60 x 120)
cm, t = 4
mm +
rangka
kayu
borneo
5 super 154,907.00

1 M2
Langit-
langit
Teakwoo
d 3 mm +
Rangka
Kayu
Borneo
6 Super 153,893.00

1 M2
Langit-
langit
Triplek 4
mm +
Rangka
Kayu
Borneo
7 Super 128,684.00

1 M2
Langit-
langit
Gypsum
Board,
tebal 9
mm +
rangka
besi
8 hollow 93,960.00
1 M2
Langit-
langit
GRC t = 4
mm +
rangka
besi
9 hollow 91,408.00

1 M2
Langit-
langit
gypsum t
= 9 mm +
Rangka
Kayu
Borneo
10 Super 136,615.00

1 M2
Langit-
langit
GRC t = 4
mm +
Rangka
Kayu
Borneo
11 Super 133,743.00

1 M¹ List
Langit-
langit
Kayu
Profil 10
12 cm 37,073.00

1 M¹ List
Langit-
langit
Gypsum
13 10 cm 16,765.00

1 M¹ List
Langit-
langit
Kayu 1/4
cm 7,500.00
PEKERJAA
I. N LANTAI

1 M2
Lantai
Ubin
Granito
ukuran 40
x 40 cm
Setara
1 Essenza 421,657.00

1 M2
Lantai
Ubin
Granito
ukuran 30
x 30 cm
Setara
2 Essenza 402,591.00

1 M¹ Plint
Ubin
Granito
ukuran 10
x 40 cm
Setara
3 Essenza 82,032.00

1 M¹ Plint
Ubin
Granito
ukuran 10
x 30 cm
Setara
4 Essenza 101,549.00
1 M2
Lantai
Keramik
Corak 10
x 20 cm
setara
5 Mulia 92,670.00

1 M2
Lantai
Keramik
corak 20 x
20 cm
setara
6 Mulia 99,170.00

1 M2
Lantai
Keramik
polos 30 x
30 cm
setara
7 Mulia 89,670.00

1 M2
Lantai
Keramik
corak 30 x
30 cm
Setara
8 Mulia 94,670.00

1 M2
Lantai
Keramik
polos 40 x
40 cm
Setara
9 Mulia 93,470.00

1 M2
Lantai
Keramik
corak 40 x
40 cm
Setara
10 Mulia 102,170.00
1 M2
Lantai
Keramik
Corak 10
x 20 cm
setara
11 Roman 108,870.00

1 M2
Lantai
Keramik
corak 20 x
20 cm
setara
12 Roman 111,870.00

1 M2
Lantai
Keramik
polos 30 x
30 cm
setara
13 Roman 105,570.00

1 M2
Lantai
Keramik
corak 30 x
30 cm
Setara
14 Roman 113,270.00

1 M2
Lantai
Keramik
polos 40 x
40 cm
setara
15 Roman 109,170.00

1 M2
Lantai
Keramik
corak 40 x
40 cm
Setara
16 Roman 113,670.00

1 M2
Lantai
17 Marmer 672,798.00
1 M2
Lantai
Parquet
18 Jati 475,845.00

1 M¹ Plint
Keramik
ukuran
(10 x 40)
19 cm 19,492.00

1 M¹ Plint
Keramik
ukuran
(10 x 30)
20 cm 27,552.00

1 M' Plint
kayu
kamper
Samarind
a (2 x 10)
21 cm 36,348.00

1 M' Plint
keramik
ukuran
(10 x 20)
22 cm 29,301.00

1 M2
Lantai
23 karpet 403,815.00

1 M2
Paving
block
natural 8
24 cm 153,570.00

1 M2
Paving
block
warna 8
25 cm 182,445.00

1 M2
Paving
block
natural 6
26 cm 148,215.00
1 M2
Paving
block
warna 6
27 cm 158,715.00

1 M2
Grass
Block 20 x
28 20 323,040.00

1 M2
Grass
Block 30 x
29 30 330,990.00

PEKERJAA
J. N KAYU

1 M3
Kusen
Pintu &
jendela
kayu
Kamper
Samarind
1a 11,956,440.00

1 M3
Kusen
Pintu &
jendela
kayu
Kamper
Medan/Kr
2 uing 8,427,120.00

1 M3
Kusen
Pintu &
jendela
kayu
Borneo
3 Super 7,932,000.00
1 M2
Pintu
Panel
Kayu
Kamper
Samarind
4a 573,768.00

1 M2
Pintu
Panel
Kayu
Kamper
Medan/Kr
5 uing 456,124.00

1 M2
Pintu &
Jendela
Kaca Kayu
Kamper
6 Medan 381,041.00

1 M2
Pintu &
Jendela
Kaca Kayu
7 Borneo 377,653.00

1 M2
Pintu &
Jendela
Jalusi
Kayu
Kamper
8 Medan 663,826.00

1 M2
Pintu
Triplek
Rangkap,
Rangka
Tertutup
Kayu
Kamper
9 Medan 356,459.00
1 M2
Jalusi
Mati
Kusen
Kayu
kamper
10 Medan 513,126.00

1 M2
Pintu
Triplek
Rangkap,
Rangka
Kayu
Borneo
11 Super 354,562.00

1 M2
Pintu
Teakwoo
d
Rangkap,
rangka
Kayu
Kamper
12 Medan 430,185.00

1 M2
Pintu
Triplek &
Formika,
Rangka
Kayu
Kamper
13 Medan 486,735.00

1 M2
Pintu
Teakwoo
d&
Formika,
Rangka
Kayu
Kamper
Medan
14 (dipolitur) 606,635.00
1 M3
Kuda-
kuda
Kayu
Kamper
15 Medan 7,736,900.00

1 M3
Kuda-
kuda
Kayu
Borneo
16 Super 7,283,040.00

1 M2
Kaso +
Reng
Genteng
Plentong
Kayu
Borneo
17 Super 78,780.00

1 M2
Kaso +
Reng
Genteng
Beton
Kayu
Borneo
18 Super 89,340.00

1 M'
Lisplang
uk
(3x20)cm,
Kayu
Kamper
19 Medan 62,218.00

1 M'
Lisplang
uk
(3x30)cm,
Kayu
Kamper
20 Medan 84,779.00
1 M¹ List
Plafond +
kayu
Profil 10
21 cm 33,347.00

1 M2
Pekerjaan
22 partisi 172,437.00

1 M2
Rangka
Langit-
langit
(1,00 x
1,00) m,
Kayu
borneo
23 super 64,485.00

1 M2
Rangka
langit-
langit
( 0,50 x
1,00 ) m,
Kayu
Borneo
24 Super 79,466.00

1 M'
Reuter
Kayu
kamper
25 Medan 29,660.00

1 M3
Gording
kayu
26 kelas II 7,367,660.00

1 M2
Dinding
bilik,
rangka
kayu
27 borneo 70,471.00
PEKERJAA
N BESI
DAN
ALLUMINI
K. UM
1 Kg Besi
1 profil 32,216.00

1 Kg
Perakitan
2 baja 974

1 Cm
Pengelasa
n dengan
3 las listrik 2,464.00

1 m2
Pintu
Rolling
4 Door 456,491.00

1 m2
Pintu
Alluminiu
5 m Natural 332,441.00

1 m2
6 Terali Besi 192,598.00

1 m2
Kawat
Harmonik
7 a 4 cm 62,063.00

1 m'
Talang
Datar,
Seng BJLS
28 lebar
8 90 cm 117,797.00

1 m'
Talang
Miring,
Seng BJLS
28 lebar
9 90 cm 174,013.00
1 m'
Talang
1/2
lingkaran
D-15 cm,
seng pelat
BJLS 28
lebar 90
10 cm 172,631.00

1 m'
Pasang
kusen
pintu/jen
dela
alluminiu
m natural
11 4" 179,302.00

1 m'
Pasang
kusen
pintu/jen
dela
alluminiu
m warna
12 4" 192,392.00

1 m'
Pasang
kusen
pintu/jen
dela
alluminiu
m natural
13 3" 102,192.00

1 m'
Pasang
kusen
pintu/jen
dela
alluminiu
m warna
14 3" 125,292.00
1 m2
Pintu
alluminiu
m strip
lebar 8
15 cm 855,299.00

1 m2
Pintu/jen
dela kaca
rangka
alluminiu
m natural
16 4" 731,898.00

1 m2
Pintu/jen
dela kaca
rangka
alluminiu
m warna
17 4" 784,258.00

1 m2
Jendela
nako &
teralis (10
18 klips) 393,980.00

1 m2
Pintu
pelat baja
tebal
2mm
rangkap,
rangka
19 baja siku 1,171,360.00

1 m2
Rangka
jendela
besi
square
tube (5 x
20 5) cm 269,541.00
1 m2
Pintu lipat
(folding
door)bah
21 an besi 622,341.00

1 m2 Tirai
(venetion
s blinds
and
vertical
22 blinds) 577,519.00

1 m2
Rangka
atap baja
23 ringan 196,000.00

1 UNIT
Pasang
partisi
Alumuniu
m, Daun
partisi
Multiplek
rangka
kayu
24 Kamper 2,215,571.88

1 UNIT
Pek.
Kusen
Jendela
Alumuniu
m uk. 2 X
1,50 M'
( 3 lubang
) dgn 2
Daun
25 Jendela 3,278,022.70
1 UNIT
Pek.
Kusen
Pintu
Jendela
Alumuniu
m uk. 2,2
X 2,70 M'
( 2 lb.
Jendela +
1 lb. Pintu
26 ) 4,037,418.82

1 UNIT
Pekerjaan
Kusen
Pintu
Alumuniu
m uk. 0,8
27 X 2,70 M' 2,168,119.18

1 UNIT
Pek.
Kusen
Jendela
Alumuniu
m uk.
2,65 X
1,50 M'
( 4 lubang
) dgn 2
Daun
28 Jendela 4,021,101.40

1 UNIT
Pek.
Kusen
Pintu &
Jendela
Alumuniu
m uk.
2,85 X
2,70 M'
( 3 lb.
Jendela +
1 lb. Pintu
29 ) 5,165,780.62
1 UNIT
Pek.
Kusen
Pintu
Alumuniu
m + Kaca
uk. 1,30 X
2,80 M'
( 2 Daun
30 Pintu ) 3,001,582.62

1 UNIT
Pek.
Kusen
Pintu
Alumuniu
m + Kaca
uk. 1,50 X
2,70 M'
( 2 Daun
31 Pintu ) 3,066,970.73

1 UNIT
Pek.
Kusen
Pintu &
Jendela
Alumuniu
m uk.1,55
X 2,70 M'
( 1 lb.
Jendela +
1 lb. Pintu
32 ) 3,009,751.68

1 UNIT
Pekerjaan
Jalusi
Alumuniu
m Sofi-
33 sofi 1,264,968.60
1 UNIT
Pek.
Kusen
Bouvenlig
ht
Alumuniu
m(1
lubang )
uk. 0,70 x
34 0,60 m 789,516.00

1 UNIT
Pek.
Kusen
Bouvenlig
ht
Alumuniu
m(2
lubang )
uk. 1,35 x
35 0,60 m 912,681.00

1 UNIT
Pek.
Kusen
Bouvenlig
ht
Alumuniu
m(3
lubang )
uk. 2,00 x
36 0,60 m 1,302,386.40

1 UNIT
Pek.
Kusen
Bouvenlig
ht
Alumuniu
m(4
lubang )
uk. 2,65 x
37 0,60 m 1,692,091.80

PEKERJAA
N KACA
DAN
L. KUNCI
1 Buah
Pasang
Kunci
Tanam 2
1 slaag 382,160.00

1 Buah
Pasang
Kunci
Tanam
2 Biasa 199,370.00

1 Buah
Pasang
Kunci
Tanam
Kamar
3 Mandi 127,785.00

1 Buah
Pasang
Engsel
4 Pintu 32,569.00

1 Buah
Pasang
Engsel
Jendela
Kupu-
5 kupu 22,710.00

1 Buah
Pasang
6 Kait Angin 15,119.00

1 Buah
Pasang
Door
7 Closer 458,550.00

1 Buah
Pasang
Pegangan
Pintu /
Door
8 Holder 243,950.00

1 M2
Pasang
Kaca ,
tebal 3
9 mm 107,705.00
1 M2
Pasang
Kaca ,
tebal 5
10 mm 133,669.00

PEKERJAA
N
M. SANITASI

1 Buah
Closet
jongkok
Porselen
1 Standar 463,770.00
1 Buah
2 Urinoir 2,430,770.00
1 Buah
3 Wastafel 1,400,178.00

1 Buah
bak
Mandi
Fibreglass
Volume
4 0,30 m3 601,654.00

1 M'
Saluran
Air
Limbah
Buis
beton d =
30 cm -
5 60 cm 159,315.00

1 Buah
Bak
Kontrol
Pas Bata
Merah Uk
(60 x 60)
6 cm 620,779.00
1 Buah
Bak
Kontrol
Pas Bata
Merah Uk
(30 x 30)
7 cm 377,546.00

1 M' Pipa
PVC Ø
8 1/2" (AW) 22,247.00

1 M' Pipa
PVC Ø 1"
9 (AW) 31,602.00

1 M' Pipa
PVC Ø
11/2"
10 (AW) 48,896.00

1 M' Pipa
PVC Ø 2"
11 (AW) 50,336.00

1 M' Pipa
PVC Ø 4"
12 (AW) 154,417.00

1 M' Pipa
PVC Ø
13 3/4" (AW) 34,659.00

1 Buah
Bak Cuci
piring
Stainless
14 steel 420,930.00

1 Buah
Kran Ø
1/2" -
15 3/4" 49,075.00

1 Buah
Floor
16 Drain 74,670.00

1 M'
Grafel
beton U
20 cm -60
17 cm 79,411.00
1 M'
Pasang
Talang
Plastik
PVC U 15
18 cm (AW) 119,325.00

1 M'
Saluran
Air
Limbah
Buis
Beton Ø
19 60 cm 221,243.00

1 M'
Pasang
Talang
Seng
20 Datar 79,987.00

1 Buah
Closet
21 Duduk 2,051,157.00

1 Buah
Tangki Air
fibreglass
Volume 1
22 m3 1,618,359.00

1 Unit
Septictan
k
2x1,50x1,
50 m +
Rembesa
23 n 10,022,424.00

1 Unit
Septictan
k
1x1,50x1,
50 m +
Rembesa
24 n 6,780,162.00
PEKERJAA
N
PENGECA
N TAN

1 M2
Mengikis
/
Mengerok
Permukaa
n Cat
Tembok
1 Lama 8,280.00

1 M2
Mendem
pul Dan
Menggos
2 ok Kayu 8,708.00

1 M2
Pengecat
an Bidang
Kayu
Lama
Setara
3 Sieve 24,517.00

1 M2
Pengecat
an Bidang
Kayu Baru
Setara
4 Sieve 39,790.00

1 M2
Pelaburan
Bidang
Kayu
dengan
5 Politur 64,424.00
1 M2
Pelaburan
Bidang
Kayu
dengan
Cat
Residu
6 dan Ter 7,515.00

1 M2
Pengecat
an
Tembok
Baru
7 Setara ICI 30,608.00

1 M2
Pengecat
an
Tembok
Lama
8 Setara ICI 21,521.00

1 M2
Pengecat
an
Plafond
( 3x )
9 Setara ICI 53,775.00

1 M2
Pengecat
an
Plafond
( 3x )
Setara
10 Vinilex 43,775.00

1 M2
Pengecat
an
Plafond
( 2x )
Setara
Vinilex 32,330.00
1 M2
Memasan
g
Wallpape
11 r 103,251.00

1 M2
Pengecat
an
Permukaa
n Baja
dengan
12 Meni Besi 19,340.00

1 M2
Pengecat
an
Permukaa
n Baja
dengan
Meni Besi
dan
13 Perancah 34,752.00

1 M2
Pengecat
an
Permukaa
n Baja
Lapis seng
(galbani)
secara
manual 1
lps cat 2
14 um 25,842.00

1 M2
Pengecat
an
Tembok
Baru
Setara
Vinilex (2
15 x laburan) 17,608.00
1 M2
Pengecat
an
Tembok
Baru
Setara
Vinilex (3
x laburan) 23,669.00

1 M2
Pengecat
an
Tembok
Lama
Setara
16 Vinilex 12,521.00

PEKERJAA
N
PERTAMA
O. NAN

1 Lubang
(70x70x7
0) cm,
tanam
pohon
pelindung
1 tinggi 2m 28,274.00

1 Lubang
(70x70x7
0) cm,
tanam
bambu
krisik/jep
2 ang 53,274.00

1 Lubang
(40x40x4
0) cm,
tanam
pohon
perdu
3 (polibag) 12,024.00
1 M2
Tanam
rumput
gajah
(silang
papan
4 catur) 10,500.00

PEKERJAA
N KUSEN
K(2) SD

1 UNIT
Pasang
partisi
Alumuniu
m, Daun
partisi
Multiplek
rangka
kayu
1 Kamper 2,215,572

1 UNIT
Pek.
Kusen
Jendela
Alumuniu
m uk. 2 X
1,50 M'
( 3 lubang
) dgn 2
Daun
2 Jendela 3,278,023
1 UNIT
Pek.
Kusen
Pintu
Jendela
Alumuniu
m uk. 2,2
X 2,70 M'
( 2 lb.
Jendela +
1 lb. Pintu
2) 4,037,419

1 UNIT
Pekerjaan
Kusen
Pintu
Alumuniu
m uk. 0,8
3 X 2,70 M' 2,168,119

1 UNIT
Pek.
Kusen
Jendela
Alumuniu
m uk.
2,65 X
1,50 M'
( 4 lubang
) dgn 2
Daun
3 Jendela 4,021,101

1 UNIT
Pek.
Kusen
Pintu &
Jendela
Alumuniu
m uk.
2,85 X
2,70 M'
( 3 lb.
Jendela +
1 lb. Pintu
4) 5,165,781
1 UNIT
Pek.
Kusen
Pintu
Alumuniu
m + Kaca
uk. 1,30 X
2,80 M'
( 2 Daun
4 Pintu ) 3,001,583

1 UNIT
Pek.
Kusen
Pintu
Alumuniu
m + Kaca
uk. 1,50 X
2,70 M'
( 2 Daun
5 Pintu ) 3,066,971

1 UNIT
Pek.
Kusen
Pintu &
Jendela
Alumuniu
m uk.1,55
X 2,70 M'
( 1 lb.
Jendela +
1 lb. Pintu
5) 3,009,752

1 UNIT
Pekerjaan
Jalusi
Alumuniu
m Sofi-
6 sofi 1,264,969
1 UNIT
Pek.
Kusen
Bouvenlig
ht
Alumuniu
m(1
lubang )
uk. 0,70 x
6 0,60 m 789,516

1 UNIT
Pek.
Kusen
Bouvenlig
ht
Alumuniu
m(2
lubang )
uk. 1,35 x
0,60 m 912,681

1 UNIT
Pek.
Kusen
Bouvenlig
ht
Alumuniu
m(3
lubang )
uk. 2,00 x
7 0,60 m 1,302,386

1 UNIT
Pek.
Kusen
Bouvenlig
ht
Alumuniu
m(4
lubang )
uk. 2,65 x
7 0,60 m 1,692,092
Harga Satuan Upah Kerja Bangunan - AHS 2011

UPAH
NO URAIAN SATUAN (Rp.)

Rp
1 Mandor Org/hr 80,000.00

Kepala
Tukang Rp
2 Batu Org/hr 75,000.00

Kepala
Tukang Rp
3 Kayu Org/hr 75,000.00

Kepala
Tukang Rp
4 Besi Org/hr 75,000.00

Kepala
Tukang Rp
5 Cat Org/hr 75,000.00

Kepala
Tukang Rp
6 Listrik Org/hr 75,000.00
Kepala Rp
7 Tukang Org/hr 75,000.00
Tukang Rp
8 Batu Org/hr 65,000.00
Tukang Rp
9 Kayu Org/hr 65,000.00

Tukang Rp
10 Besi/Baja Org/hr 65,000.00
Tukang Rp
11 Cat Org/hr 65,000.00
Tukang Rp
12 Listrik Org/hr 65,000.00
Tukang Rp
13 Pipa Org/hr 65,000.00
Tukang Rp
14 Plitur Org/hr 65,000.00
Tukang Rp
15 Taman Org/hr 65,000.00
Rp
16 Tukang Org/hr 65,000.00
Pembant Rp
17 u Tukang Org/hr 42,000.00
Pekerja Rp
18 Biasa Org/hr 42,000.00
Penjaga Rp
19 Malam Org/hr 42,000.00
Rp
20 Sopir Org/hr 65,000.00
Rp
21 Operator Org/hr 75,000.00
Rp
22 Mekanik Org/hr 65,000.00
Pembant Rp
23 u Sopir Org/hr 42,000.00

Pembant
u Rp
24 Operator Org/hr 50,000.00

Pembant
u Rp
25 Mekanik Org/hr 42,000.00

harga sudah
termasuk PPN dan
keuntungan
Harga Satuan Bahan Bangunan - AHS 2011
NO MATERIAL SAT HARGA (Rp)

A. AGREGAT KASAR,BAHAN PEREKAT & BAHAN JADINYA

1 Pasir Urug m3 175,300.00


2 Tanah Urug Pilihan m3 89,200.00
3 Sirtu m3 203,500.00
4 Pasir Teras m3 174,200.00
5 Pasir Pasang Kali m3 233,400.00
6 Pasir Beton m3 255,400.00
7 Abu Batu m3 259,000.00
8 Batu Gosok ( Apung ) kg 29,600.00
9 Batu Pecah Mesin 1/2 m3 223,600.00
10 Batu Pecah Mesin 2/3 m3 211,100.00
11 Batu Pecah Mesin 3/5 m3 205,000.00
12 Batu Pecah Mesin 5/7 m3 196,000.00
13 Batu Belah Pondasi m3 205,500.00
14 Batu Bronjol ( Untuk Bronjong ) m3 180,800.00
15 Batu Koral Beton Kali m3 172,600.00
16 Batu Tempel Hitam m3 96,600.00
17 Batu Pinggir Beton 10 x 20 x 35 bh 14,100.00
18 Batu Pinggir Beton 15 x 35 x 50 ( K-225 ) bh 73,700.00
19 Batu Telor m3 97,800.00
20 Batako Kecil 8 x 10 x 20 bh 2,000.00
21 Batako Besar 8 x 20 x 30 bh 2,400.00
22 Con Blok 8 x 20 x 40 bh 5,400.00
23 Bata Merah Bakar kelas I bh 775
24 Bata Merah Bakar kelas II bh 675
25 Bata Merah Oven ( Klingker ) bh 1,800.00
26 Roster Beton 20 x 20 bh 14,800.00
27 Roster Beton 30 x 30 bh 15,500.00
28 Grass Blok 20 x 20 bh 9,700.00
29 Grass Blok 30 x 30 bh 22,500.00
30 Paving Blok Natural 8 cm m2 81,100.00
31 Paving Blok Warna 8 cm m2 108,600.00
32 Paving Blok Natural 6 cm m2 76,000.00
33 Paving Blok Warna 6 cm m2 86,000.00
34 Canstin Paving Blok m1 34,900.00
35 Semen PC /50 kg zak 70,300.00
1,406.00
36 Semen Putih zak 92,700.00
37 Kanstin Jalan Ukuran Besar ( Bina Marga ) 1bh =60cm bh 58,900.00
38 Readymix Beton K500, Tanpa Pompa ( Selang ) m3 1,105,000.00
39 Readymix Beton K400, Tanpa Pompa ( Selang ) m3 903,500.00
40 Readymix Beton K350, Tanpa Pompa ( Selang ) m3 877,500.00
41 Readymix Beton K300, Tanpa Pompa ( Selang ) m3 925,000.00
42 Readymix Beton K225, Tanpa Pompa ( Selang ) m3 850,000.00
43 Readymix Beton K175, Tanpa Pompa ( Selang ) m3 825,000.00
44 Kapur Pasang / Kapur Tembok m3 353,300.00
45 Kapur Sirih kg 18,300.00
46 Semen Warna kg 15,700.00
47 Tanah liat m3 31,300.00
48 Air ltr 3
49 Formite/spacer bh 2,500.00
50 Hollow/Con Blok 8 x 20 x 40 bh 5,000.00
51 Hollow/Con Blok 8 x 15 x 40 bh 4,000.00
52 Hollow/Con Blok 8 x 10 x 40 bh 3,000.00

B LABURAN,PENGISI DAN ALATNYA


1 Plamir Tembok kg 25,000.00
2 Cat Tembok ICI Eksterior ( Beton ) lt 120,000.00
3 Cat Tembok ICI Interior ( Plafon Dan Dinding ) lt 75,000.00
4 Cat Tembok Vinilex kg 25,000.00
5 Cat Dasar ICI untuk Interior ( 2 Pelapis ) lt 75,000.00
6 Cat Tembok Sanlek kg 20,000.00
7 Cat Dasar kg 30,000.00
8 Cat Tahan Asam lt 40,000.00
9 Pelapis Alkali ICI ( Cat Dasar Beton Ekterior ) kg 90,000.00
10 Cat Marka / Spotlight kg 185,000.00
11 Water Profing Emulsion ml 70,000.00
12 Water Profing Membrance bh 62,500.00
13 Rool Cat Tembok bh 32,500.00
14 Kape Tembok bh 8,500.00
15 Kape Kayu 5 lt 10,000.00
16 Soligneum 1 Blek kg 25,000.00
17 Plincote m3 29,000.00
18 Penawetan Kayu m3 382,600.00
19 Pegopenan Kayu bh 370,000.00
20 Kwas 3" bh 16,000.00
21 Oker bks 22,000.00
22 Oyan bks 5,200.00
23 Oten ( Pewarna Plitur ) lt 5,500.00
24 Spirtus kg 15,000.00
25 Bahan Pelitur Kripik ( Sirlak India ) kg 110,000.00
26 Dempul Lilin kg 34,200.00
27 Dempul Plitur kg 37,700.00
28 Dempul Halus / Imfra ( Wood Filler ) lt 37,700.00
29 Dempul Jadi kg 35,800.00
30 Politur lt 48,000.00
31 Politur Jadi lt 112,700.00
32 Terpentin kg 19,500.00
33 Tiner A kg 23,900.00
34 Tiner B kg 21,400.00
35 Kumpon lbr 30,800.00
36 Melamik kg 52,500.00
37 Dempul Plastik kg 39,200.00
38 Dempul Duco kg 35,800.00
39 Ampelas lbr 5,000.00
40 Dempul Kayu Cap Kucing kg 24,400.00
41 Meni Kayu / Besi kg 30,400.00
42 Sincromat kg 40,900.00
43 Cat Kayu Sieve lt 41,700.00
44 Cat Besi lt 44,000.00
45 Cat Besi Duco Danaglos / ICI bh 76,300.00
46 Cat Bron kg 67,700.00
47 Karet lis bh 3,300.00
48 Minyak cat kg 38,400.00
49 Glass beet kg 50,100.00
50 Residu lt 8,100.00

C BAHAN KAYU BERIKUT BAHAN JADINYA


1 Bambu 5 s.d 7 bt 17,700.00
2 Bambu 7 s.d 10 bt 25,000.00
3 Bambu Gombong bt 37,200.00
4 Kayu Kamper Singkil / Kapur ( Kayu Samarinda kls II ) m3 7,094,450.00
5 Kayu Balok Borneo Super m3 5,280,000.00
6 Kayu Papan Borneo Super m3 5,595,800.00
7 Kayu Balok Kamper Medan (Kruing ) m3 5,692,600.00
8 Kayu Papan Kamper Medan (Kruing ) m3 5,823,400.00
9 Kayu Balok Kamper Banjar m3 6,363,600.00
10 Kayu Papan Kamper Banjar m3 6,645,300.00
11 Kayu Balok Kamper Samarinda m3 8,633,700.00
12 Kayu Papan Kamper Samarinda m3 8,724,300.00
13 Kayu Balok Rasamala m3 2,658,000.00
14 Kayu Jati Jatim Tua dia. 40 cm m3 20,772,000.00
15 Kayu Jati Jateng Tua dia. 40 cm m3 22,188,400.00
16 Kayu Jati Jabar Tua dia. 40 cm m3 13,625,400.00
17 Kayu Jati Jabar Tua dia. 40 cm kebawah m3 12,736,100.00
18 Kayu Hutan Kelas I ( Segeng,Mahoni, Laban ) m3 2,069,800.00
19 Kayu Balok Albasia m3 1,870,500.00
20 Kayu Papan Albasia m3 2,071,700.00
21 Dolken 5 s/d 7 bt 22,600.00
22 Dolken 7 s/d 10 bt 28,000.00
23 List Profil Kamper 1 cm m1 8,900.00
24 List Profil Kamper 2 cm m1 10,000.00
25 List Profil Kamper 4 cm m1 14,300.00
26 List Profil Kamper 5 cm m1 17,200.00
27 List Profil Kamper 10 cm m1 29,400.00
28 Pegangan Tangga Profil Jati m1 160,100.00
29 Pegangan Tangga Profil Kamper m1 122,500.00
30 Kayu Kaso 4/6 m3 2,772,000.00
31 Kayu Kaso 5/7 Kamper Medan m3 3,356,800.00
32 Kayu Reng 2/3 Borneo Super m1 2,500.00
33 Kayu Reng 2/3 Kamper Banjar m1 3,300.00
34 Kayu Reng 3/4 Kamper Medan m3 4,000.00
35 Kayu Papan Terentang m3 2,850,000.00
36 Kayu Balok Terentang m3 2,640,000.00
37 Batang Kelapa bt 139,500.00
38 Tali Ijuk kg 23,400.00
39 lapisan Ijuk tebal 10 cm m2 22,000.00
40 Venetion Blind m2 537,300.00
41 Vertikal Blind m2 351,200.00
D BAHAN PENUTUP RANGKA PLAFOND
1 Plafond Enternit 4 mm m2 17,400.00
2 Plafond hardpleks 5 mm 120 x 240 lbr 62,400.00
3 Plafond Asbes Semen 5 mm m2 22,500.00
4 Plafond Asbes Semen 3,5 mm m2 19,500.00
5 Gypsum 120 x 240 t= 9 mm ex DN lbr 79,800.00
6 Gypsum 120 x 240 t= 9 mm ex Luar lbr 83,800.00
7 Tepung gypsum kg 12,500.00
8 Acustik Amstrong 60 x 120 lbr 132,800.00
9 Cotton Plester bh 15,000.00
10 GRC (120 x 240) cm, t = 4 mm lbr 67,500.00
11 Cornice Coumpound zak 75,000.00
12 List gypsum m' 8,500.00

E BAHAN KAYU LAPIS


1 Triplek 3 mm 120 x 240 lbr 61,700.00
2 Triplek 4 mm 120 x 240 lbr 64,400.00
3 Triplek 4 mm ukuran Pintu lbr 56,200.00
4 Triplek 6 mm 120 x 240 lbr 92,000.00
5 Triplek 9 mm 120 x 240 lbr 166,600.00
6 Jabar Wood 4 mm lbr 119,000.00
7 Bilik Bambu ( tanpa kulit ) m2 19,800.00
8 Bilik Bambu ( dengan kulit ) m2 22,700.00
9 Bilik Bambu Hitam Variasi m2 34,200.00
10 Wall paper m2 55,700.00
11 MultiPlek 9 mm 120 x 240 lbr 151,100.00
12 MultiPlek 12 mm 120 x 240 lbr 195,000.00
13 MultiPlek 18 mm 120 x 240 lbr 255,400.00
14 Ply Wood 18 mm 120 x 240 lbr 323,900.00
15 Ply Wood 9 mm 120 x 240 lbr 235,000.00
16 Ply Wood 4 mm 120 x 240 lbr 140,000.00
17 Teak Wood 3 mm 120 x 240 lbr 129,100.00
18 Teak Wood 4 mm 120 x 240 lbr 131,700.00
19 Teak Wood 3 mm 120 x 240 ukuran Pintu lbr 127,200.00
20 Teak Wood ukuran Pintu 4 mm lbr 114,700.00
21 Tacon ( Tahan Bakar ) m2 128,200.00
22 Supercon m2 57,900.00
23 Melamin 4 mm 120 x 240 lbr 89,200.00
24 Melamin TOK 4 mm lbr 133,400.00
25 Formika 120 x 240 lbr 170,000.00
26 Formika ukuran Pintu lbr 132,900.00
27 Formika Warna 4" x 8" lbr 238,100.00

F BAHAN LANTAI DAN PELAPIS DINDING


1 Tegel PC 20 x 20 bh 3,400.00
2 Plin Tegel PC 10 x 20 bh 2,400.00
3 Tegel PC 30 x 30 bh 3,400.00
4 Plin Tegel PC 15 x 30 bh 2,800.00
5 Tegel Warna 20 x 20 bh 3,600.00
6 Plin Tegel Warna 10 x 20 bh 3,400.00
7 Tegel Warna 30 x 30 bh 5,700.00
8 Plin Tegel Warna 15 x 30 bh 6,300.00
9 Tegel Wafel PC 20 x 20 bh 3,200.00
10 Tegel Wafel Warna 20 x 20 bh 2,500.00
11 Tegel Badak PC 30 x 30 bh 4,100.00
12 Poslin 11 x 11 Warna Standar DN m2 63,300.00
13 Poslin 11 x 11 Warna khusus DN m2 67,300.00
14 Keramik 10 x 20 dan 20 x 20 KW I DN Putih / Polos Mulia m2 54,500.00
15 Keramik 10 x 20 KW I DN Corak/Warna/Anti Slip Mulia m2 56,000.00
16 Keramik 20 x 20 (KM) KW I DN Corak/Warna /Anti Slip Mulia m2 62,500.00
17 Keramik 20 x 20 (KM) KW I DN Putih Polos Mulia m2 54,500.00
18 Keramik 20 x 25 Dinding KM KW I DN Corak Mulia m2 62,500.00
19 Keramik 30 x 30 KWI DN Putih Polos Mulia m2 53,000.00
20 Keramik 30 x 30 KWI DN Warna/Corak (ANTI SLIP) Mulia m2 58,000.00
21 Keramik 40 x 40 KWI DN Putih Polos Mulia m2 56,800.00
22 Keramik 40 x 40 KWI DN Warna/Corak (ANTI SLIP) Mulia m2 65,500.00
23 Keramik 10 x 20 dan 20 x 20 KW I DN Putih / Polos Roman m2 64,400.00
24 Keramik 10 x 20 KW I DN Corak/Warna/Anti Slip Roman m2 72,200.00
25 Keramik 20 x 20 (KM) KW I DN Corak/Warna/Anti Slip Roman m2 75,200.00
26 Keramik 20 x 20 (KM) KW I DN Putih Polos Roman m2 72,900.00
27 Keramik 20 x 25 Dinding KM KW I DN Corak Roman m2 75,200.00
28 Keramik 20 x 25 KW I DN Putih Polos Roman m2 72,900.00
29 Keramik 30 x 30 KW I DN Polos Roman m2 68,900.00
30 Keramik 30 x 30 KW I DN Warna/Corak (ANTI SLIP) Roman m2 76,600.00
31 Keramik 40 x 40 KW I DN Polos Roman m2 72,500.00
32 Keramik 40 x 40 KW I DN Warna/Corak (ANTI SLIP) Roman m2 77,000.00
33 Vinyl Lantai Standar m2 56,000.00
34 Karpet Kelas Baik LN m2 1,025,500.00
35 Karpet Kelas Sedang LN m2 353,500.00
36 Parquet Jati m2 375,400.00
37 Stairnosing Keramik 10/20 bh 13,700.00
38 Stairnosing Fiber m 25,000.00
39 Taraso Kerang 30 x 30 m2 31,800.00
40 Plin Taraso 10 x 30 bh 13,500.00
41 Granit Alam LN Ukuran Besar m2 1,848,400.00
42 Granit Alam LN Ukuran Kecil m2 1,612,900.00
43 Granit Alam DN Ukuran Besar m2 1,331,100.00
44 Granit Alam DN Ukuran Kecil m2 1,299,400.00
45 Granito Tile Essenza Ukuran 40 x 40 Polis m2 345,000.00
46 Granito Tile Essenza Ukuran 30 x 30 m2 322,800.00
47 Granito Tile Essenza Ukuran 40 x 40 UnPolis m2 204,900.00
48 Marmer m2 550,000.00
49 Marmer Alam Lampung Ukuran Besar m2 550,200.00
50 Marmer Alam Lampung Ukuran kecil m2 345,700.00
51 Marmer Alam Citatah Ukuran Besar m2 340,800.00
52 Marmer Alam Citatah Ukuran Kecil m2 237,600.00
53 Marmer Sintetis m2 157,900.00
54 Granito Tile Essenza 60 x 60 Polis m2 358,100.00
55 Granito Tile Essenza 60 x 60 UnPolis m2 231,800.00
56 Batu Tempel Hitam m2 96,500.00
57 Bata Karawang bh 600
58 Campuran untuk Kedap Air ( AM ) ltr 37,600.00
59 Plint keramik 10 x 20 bh 3,000.00
60 Plint keramik 10 x 25 bh 3,250.00
61 Plint keramik 10 x 30 bh 3,500.00
62 Plint keramik 10 x 40 bh 4,000.00
63 Plint keramik 15 x 30 bh 4,500.00
64 Plint keramik 15 x 40 bh 5,250.00
65 Plint granito 10 x 30 bh 25,900.00
66 Plint granito 10 x 40 bh 27,600.00
67 Plint granito 15 x 30 bh 31,100.00
68 Plint granito 15 x 40 bh 41,300.00

G BAHAN SALURAN AIR KOTOR / BERSIH


1 Grafel U 20 cm' m1 44,300.00
2 Grafel U 30 cm' m1 56,400.00
3 Grafel U 40 cm' m1 74,200.00
4 Buis Beton 20 cm ( 1 M' ) m1 49,200.00
5 Buis Beton 30 cm ( 1 M' ) m1 61,700.00
6 Buis Beton 40 cm ( 1 M' ) m1 80,900.00
7 Buis Beton 50 cm ( 1 M' ) stk 94,300.00
8 Buis Beton 60 cm ( 1 M' ) stk 130,900.00
9 Buis Beton 100 cm ( 0.50 M' ) stk 299,800.00
10 Buis Beton 80 cm ( 0.50 M' ) stk 298,500.00
11 BuisTanah 10 cm ( 0.50 M' ) stk 9,600.00
12 BuisTanah 15 cm ( 0.50 M' ) stk 12,700.00
13 BuisTanah 20 cm ( 0.50 M' ) stk 16,800.00
14 BuisTanah 25 cm ( 0.50 M' ) stk 22,800.00
15 Injuk kg 17,400.00

H BAHAN LOGAM DAN BAHAN JADINYA


1 Besi Beton U-24 Rata-rata kg 16,500.00
2 Besi Beton U-39 / U-32 Rata-rata kg 20,700.00
3 Pagar BRC lengkap tiang ( Tanpa Pondasi ) m2 171,300.00
4 Bondek m2 185,000.00
5 Besi WF Ex DN SII kg 24,000.00
6 Besi WF Ex Jepang kg 23,900.00
7 Besi Profil DN SII kg 18,300.00
8 Besi Profil Ex LN kg 21,600.00
9 Besi C Lip Chanel kg 19,200.00
10 Ongkos Galfanis Besi kg 10,600.00
11 Kawat Beton kg 27,700.00
12 Kawat Duri kg 63,500.00
13 Kawat Pengikat m1 1,000.00
14 Kawat Bronjong 4 mm kg 28,200.00
15 Kawat Tembaga kg 41,400.00
16 Ram Nyamuk Hijau m2 13,400.00
17 Ram Kawat 1 x 1 cm m2 15,300.00
18 Ram Ayam m2 14,900.00
19 Kawat Kasa 1 x 1 ( Putih ) m2 32,100.00
20 Kawat Harmonika 4 cm m2 35,900.00
21 Kawat Harmonika 2 cm m2 28,600.00
22 Kawat Las Listrik kg 23,600.00
23 Wiremesh M8 m2 51,900.00
24 Wiremesh M6 m2 38,700.00
25 Timah kg 46,300.00
26 Timah Hitam kg 43,300.00
27 Ram nyamuk Alumunium m2 32,400.00
28 Plat Srip Ø 2 x 30 mm ( 6 m1 ) bt 33,000.00
29 Plat Srip Ø 3 x 30 mm ( 6 m1 ) bt 33,100.00
30 Plat Strip bt 18,200.00
31 Besi Strip kg 26,800.00
32 Plat Alumunium 0.2 mm m2 89,800.00
33 Plat Alumunium 0.3 mm m2 110,500.00
34 Plat Alumunium 0.4 mm m2 141,400.00
35 Plat Alumunium 0.5 mm m2 143,100.00
36 Plat Alumunium 0.6 mm m2 171,800.00
37 Plat Alumunium 0.1 mm m2 56,300.00
38 Kusen Alumunium Natural 1.3 mm t= 1,3 mm ( 4 " ) m1 151,100.00
39 Kusen Alumunium Warna 1.3 mm t= 1,3 mm ( 4 " ) m1 163,000.00
40 Kusen Alumunium Natural 1.3 mm t= 1,3 mm ( 3 " ) m1 81,000.00
41 Kusen Alumunium Warna 1.3 mm t= 1,3 mm ( 3 " ) m1 102,000.00
42 Daun Jendela Alumunium Natural ( tanpa kaca dan accessories ) m2 98,800.00
43 Daun Jendela Alumunium Warna ( tanpa kaca dan accessories ) m2 148,800.00
44 Daun Pintu Alumunium Natural ( tanpa kaca dan accessories ) m2 211,800.00
45 Daun Pintu Alumunium Warna ( tanpa kaca dan accessories ) m2 207,500.00
46 Handle Alumunium ( Tarikan Pintu Alumunium ) bh 345,200.00
47 Kait Angin Alumunium ps 104,500.00
48 Karet Asisoris Kusen / Pintu Alumunium m1 7,500.00
49 Jalusi Alluminium m' 35,000.00
50 Sunscreen Almunium m2 380,200.00
51 Seng Plat BJLS 30 60 cm ( 100 m1 ) roll 1,581,500.00
52 Seng Plat BJLS 30 90 cm ( 100 m1 ) roll 2,080,100.00
53 Plat Besi Tipis 1 mm kg 16,800.00
54 Plat Besi Tipis 0.5 mm kg 17,700.00
55 Plat Besi 2 mm s/d 5 mm kg 14,100.00
56 Plat Besi 6 mms/d 10 mm kg 14,100.00
57 Plat Besi 10 mm keatas kg 14,700.00
58 Kabel presstressed polos kg 26,700.00
59 Jaring Kawat Baja kg 28,900.00
60 Lem Kuning ( Aibond ) kg 35,700.00
61 Lem Fox kg 23,900.00
62 Lem Vinyl kg 44,000.00
63 Besi Strip Kaca Nako kg 11,000.00
64 Profil alumunium "T" m1 12,200.00
65 Besi Hallow ( 2 x 4 x 4) cm (400cm) btg 22,600.00
66 Besi Hallow ( 4 x 4) cm (400 cm) btg 29,200.00
67 Besi Rail Pengamanan kg 459,300.00
68 Jendela Besi m2 390,200.00
69 Jendela Besi tahan api m2 501,700.00
70 Pintu gulung besi m2 501,700.00
71 Pintu Roliing Door m2 306,600.00
72 Jendela nako kaca ryben + tralis 6 klips set 170,000.00
73 Jendela nako kaca ryben + tralis 7 klips set 200,000.00
74 Jendela nako kaca ryben + tralis 8 klips set 230,000.00
75 Jendela nako kaca ryben + tralis 10 klips set 290,000.00
76 Jendela nako kaca bening + tralis 4 klips set 120,000.00
77 Jendela nako kaca bening + tralis 5 klips set 140,000.00
78 Jendela nako kaca bening + tralis 6 klips set 170,000.00
79 Jendela nako kaca bening + tralis 7 klips set 210,000.00
80 Jendela nako kaca bening + tralis 8 klips set 230,000.00
81 Jendela nako kaca bening + tralis 10 klips set 300,000.00

I BAHAN KACA
1 Kaca Polos 2 mm ( ASAHI ) m2 69,000.00
2 Kaca Polos 3 mm ( ASAHI ) m2 87,400.00
3 Kaca Polos 5 mm ( ASAHI ) m2 111,000.00
4 Kaca Polos 8 mm ( ASAHI ) m2 183,100.00
5 Kaca Rayband 5 mm ( ASAHI ) m2 148,700.00
6 Kaca Rayband 8 mm ( ASAHI ) m2 323,400.00
7 Kaca Rayband 12 mm ( ASAHI ) m2 627,000.00
8 Kaca cermin 5 mm m2 150,500.00
9 Kaca cermin 6 mm m2 186,400.00
10 Kaca cermin 8 mm m2 234,300.00
11 Kaca Patri Lokal Terpasang ( ASAHI ) m2 1,621,100.00
12 Kaca Patri Ex Luar Negeri Terpasang m2 3,425,700.00
13 Kaca 6 mm Gravver m2 1,263,900.00
14 Glass Block DN 20 x 20 ( Kedawung ) bh 22,000.00
15 Glass Block DN 20 x 20 Ex LN bh 125,700.00
16 Sealant kg 211,800.00
17 Jendela Nako bh 109,200.00

J BAHAN PAKU DAN MUR BAUT


1 Paku 1/2" s/d 2" kg 23,800.00
2 Paku 2" s/d 5" kg 23,400.00
3 Paku 8 cm s/d 15 cm kg 20,000.00
4 Paku Beton 2 cm s/d 5 cm bh 1,600.00
5 Paku Kait Lengkap bh 900
6 Paku Cacing kg 57,100.00
7 Besi Beugel Kuda - Kuda kg 21,700.00
8 Duk Angker bh 7,500.00
9 Angker Mur Baut dia. 19 / Panjang 60 cm bh 71,800.00
10 Mur Baut HTB dia. 19 s/d 16 ( 5 cm ) bh 15,900.00
11 Mur Baut Biasa dia. 19 s/d 16 ( 5 cm ) bh 9,300.00
12 Piser dia.12 s/d 20 cm bh 5,300.00
13 Paku skrup 3" bh 800
14 Ramset / Dinabolt bh 7,200.00
15 Baut Besar bh 600
16 Baut Kecil bh 300
17 Paku GRC kg 35,000.00
18 Paku gypsum kg 17,500.00
19 Sekrup fixer bh 250

K BAHAN PERPIPAAN
1 Besi Pipa Untuk Hydrant BSP 1" bt 166,700.00
2 Besi Pipa Untuk Hydrant BSP 1.25" bt 210,200.00
3 Besi Pipa Untuk Hydrant BSP 1.5" bt 298,000.00
4 Besi Pipa Untuk Hydrant BSP 2" bt 351,800.00
5 Besi Pipa Untuk Hydrant BSP 2.5" bt 439,300.00
6 Besi Pipa Untuk Hydrant BSP 3" bt 595,000.00
7 Besi Pipa Untuk Hydrant BSP 4" bt 869,600.00
8 Besi Pipa Untuk Hydrant BSP 6" bt 1,423,400.00
9 Besi Pipa Hitam 1" t = 2 mm bt 172,300.00
10 Besi Pipa Hitam 2" t = 2 mm bt 227,900.00
11 Besi Pipa Hitam 3" t = 2mm bt 365,800.00
12 Besi Pipa Hitam 4" t = 2 mm bt 573,100.00
13 Besi Pipa Hitam 6" t = 2 mm bt 772,400.00
14 Pipa GIP Medium A 1/2" ( 6 m1 ) bt 109,100.00
15 Pipa GIP Medium A 3/4" ( 6 m1 ) bt 159,400.00
16 Pipa GIP Medium A 1" ( 6 m1 ) bt 181,500.00
17 Pipa GIP Medium A 1 1/4" ( 6 m1 ) bt 259,300.00
18 Pipa GIP Medium A 1 1/2" ( 6 m1 ) bt 280,500.00
19 Pipa GIP Medium A 1 3/4" ( 6 m1 ) bt 326,400.00
20 Pipa GIP Medium A 2" ( 6 m1 ) bt 467,400.00
21 Pipa GIP Medium A 2 1/2" ( 6 m1 ) bt 672,100.00
22 Pipa GIP Medium A 3" ( 6 m1 ) bt 849,900.00
23 Pipa GIP Medium A 4" ( 6 m1 ) bt 920,300.00
24 Macam2 Sambungan GIP 1/2" bh 6,300.00
25 Macam2 Sambungan GIP 3/4" bh 8,600.00
26 Macam2 Sambungan GIP 1" bh 16,700.00
27 Macam2 Sambungan GIP 1 1/4" bh 19,800.00
28 Macam2 Sambungan GIP 1 1/2" bh 20,700.00
29 Macam2 Sambungan GIP 1 3/4" bh 22,700.00
30 Macam2 Sambungan GIP 2" bh 51,200.00
31 Macam2 Sambungan GIP 2 1/2" bh 60,400.00
32 Macam2 Sambungan GIP 3" bh 75,900.00
33 Macam2 Sambungan GIP 4" bh 118,600.00
34 Pipa PVC RUCIKA type AW 1/2" bt 40,100.00
35 Pipa PVC RUCIKA type AW 3/4" bt 52,200.00
36 Pipa PVC RUCIKA type AW 1" bt 63,200.00
37 Pipa PVC RUCIKA type AW 1 1/4" bt 79,900.00
38 Pipa PVC RUCIKA type AW 1 1/2" bt 105,900.00
39 Pipa PVC RUCIKA type AW 2" bt 110,700.00
40 Pipa PVC RUCIKA type AW 2 1/2" bt 167,100.00
41 Pipa PVC RUCIKA type AW 3" bt 205,100.00
42 Pipa PVC RUCIKA type AW 4" bt 347,900.00
43 Pipa PVC RUCIKA type AW 6" bt 640,000.00
44 Pipa PVC RUCIKA type AW 8" bt 818,300.00
45 Pipa PVC MASPION ABU ( AW ) 1/2" bt 22,500.00
46 Pipa PVC MASPION ABU ( AW ) 3/4" bt 27,800.00
47 Pipa PVC MASPION ABU ( AW ) 1" bt 40,500.00
48 Pipa PVC MASPION ABU ( AW ) 1 1/4" bt 58,500.00
49 Pipa PVC MASPION ABU ( AW ) 1 1/2" bt 60,200.00
50 Pipa PVC MASPION ABU ( AW ) 2" bt 75,800.00
51 Pipa PVC MASPION ABU ( AW ) 2 1/2" bt 126,300.00
52 Pipa PVC MASPION ABU ( AW ) 3" bt 145,700.00
53 Pipa PVC MASPION ABU ( AW ) 4" bt 256,800.00
54 Macam2 Sambungan Paralon 1/2" bh 4,400.00
55 Macam2 Sambungan Paralon 3/4" bh 4,700.00
56 Macam2 Sambungan Paralon 1" bh 4,900.00
57 Macam2 Sambungan Paralon 1 1/4" bh 7,200.00
58 Macam2 Sambungan Paralon 1 1/2" bh 9,500.00
59 Macam2 Sambungan Paralon 1 3/4" bh 13,500.00
60 Macam2 Sambungan Paralon 2" bh 15,800.00
61 Macam2 Sambungan Paralon 2 1/2" bh 26,400.00
62 Macam2 Sambungan Paralon 3" bh 29,700.00
63 Macam2 Sambungan Paralon 4" bh 34,000.00
64 Sambungan Pipa PVC Jenis AW 4" TY bh 89,900.00
65 Lem Paralon tb 10,100.00
66 Solatip Ledeng gl 4,200.00
67 Pipa PVC 4" Berlobang Jenis AW m1 36,700.00
68 PVC Waterstop lebar 150 m1 53,500.00
69 PVC Waterstop lebar 200 m1 57,900.00
70 PVC Waterstop lebar 230 m1 65,700.00
71 PVC Waterstop lebar 250 m1 74,700.00
72 PVC Waterstop lebar 300 m1 83,600.00
73 PVC Waterstop lebar 320 m1 92,500.00

L BAHAN SANITAIR
1 Stop Kran 3/4" KIT bh 103,900.00
2 Stop Kran 1" KIT bh 124,200.00
3 Stop Kran 1 1/2" KIT bh 208,000.00
4 Stop Kran 2" KIT bh 267,900.00
5 Stop Kran 2 1/2" KIT bh 713,200.00
6 Stop Kran 3" KIT bh 830,300.00
7 Check Valve 1/2" bh 86,400.00
8 Double Neple 1/2" bh 32,400.00
9 Water Mur 1/2" bh 40,200.00
10 Gate walve 1/2" bh 55,500.00
11 Saringan Air Lt. KM Stainless Steel bh 66,600.00
12 Apooer Bath Tube bh 267,800.00
13 Kran Stainless Lokal Kait bh 46,100.00
14 Shower Dengan Tiang bh 221,000.00
15 Shower Tanpa Tiang bh 134,800.00
16 Kran Tembok Sun Eui dia. 1/2" bh 86,900.00
17 Kran Tembok ITAP dia. 1/2" bh 40,900.00
18 Kran Bebek Sun Eui 1/2" bh 144,600.00
19 Kran Bebek ITAP 1/2" bh 51,500.00
20 Kran Panas Dingin San Eui Standard bh 228,400.00
21 Bath Cape Washteren unit 2,098,700.00
22 Tempat Sabun Poslin bh 46,300.00
23 Wastafel Lengkap TOTO LW 230 unit 1,012,700.00
24 Wastafel Lengkap INA unit 699,900.00
25 Closet Jongkok Poslin Warna TOTO unit 205,600.00
26 Closet Jongkok Standard Putih Poslin TOTO unit 188,200.00
27 Closet Jongkok Lengkap Sistem Jet TOTO unit 2,032,900.00
28 Closet Duduk Warna Standard TOTO C 240 Lengkap unit 1,724,700.00
29 Wastafel Bulat Warna Standard Lengkap unit 910,800.00
30 Closet Duduk Warna Standard INA Lengkap bh 1,272,100.00
31 Urinoir Lengkap TOTO Warna Standard Lengkap unit 1,773,400.00
32 Penyekat Poslin Urinoar TOTO lbr 495,900.00
33 Kitchen Zink Stainless Standard Lokal ( 1 Lubang ) bh 397,800.00
34 Kitchen Zink Stainless Non Standard Franke ( 1 Lubang ) bh 1,272,300.00
35 Kitchen Zink Stainless Non Standard Franke ( 2 Lubang ) bh 1,650,200.00
36 Talang PVC U - 15 cm btng 60,000.00

M BAHAN PENUTUP ATAP


1 Atap Plastik Gelombang 80 x 180 lbr 33,100.00
2 Atap Fiber Glass Tipis 80 x 180 ( Gelombang ) lbr 47,100.00
3 Atap Fiber Glass Tebal 80 x 180 ( Gelombang ) lbr 100,000.00
4 Atap Alumunium Natural USR 26 ( JAINDO ) m2 140,600.00
5 Atap Alumunium Warna USR 26 ( JAINDO ) m2 164,700.00
6 Atap Asbes Gel. Kecil 80 x 180 x 4 mm lbr 77,200.00
7 Atap Asbes Gel. Besar 80 x 180 x 5 mm lbr 111,100.00
8 Atap Seng Gelombang 80 cm x 180 cm x 3 mm lbr 62,900.00
9 Atap Seng Gelombang 80 cm x 180 cm x 5 mm lbr 83,100.00
10 Atap Seng Gelombang 270 cm x 105 cm x 4mm lbr 73,300.00
11 Atap Seng Gelombang 240 cm x 105 cm x 4mm lbr 65,900.00
12 Atap Seng Gelombang 210 cm x 105 cm x 4mm lbr 58,500.00
13 Atap Seng Gelombang 150 cm x 105 cm x 4mm lbr 42,300.00
14 Atap Seng Gelombang 150 cm x 102 cm x 5mm lbr 78,500.00
15 Atap Seng Gelombang 180 cm x 102 cm x 5mm lbr 97,200.00
16 Atap Asbes Gelombang 300 cm x 105 cm x 4 mm lbr 80,000.00
17 Atap Tegola Kubota, lengkap m2 487,100.00
18 Atap Tegola Kwalitas Sedang m2 283,600.00
19 Alumunium Foile m2 19,600.00
20 Atap Genteng Plentong pres Bakar KW I bh 1,900.00
21 Atap Genteng Plentong pres Molen Oven KW I bh 2,700.00
22 Atap Genteng Flam pres Molen Oven Jatiwangi bh 2,300.00
23 Bubung Genteng pres Bulat Ex Jatiwangi bh 7,500.00
24 Genteng Bubungan Ex Jatiwangi Segi Tiga bh 4,800.00
25 Genteng Bubungan Beton bh 10,500.00
26 Genteng Metal ( Rainbow Roof ) m2 203,100.00
27 Genteng Metal Hana m2 172,700.00
28 Nok Atas Metal ( Rainbow Roof ) lbr 138,500.00
29 Nok Atas Metal Hana lbr 80,900.00
30 Nok Pingir Metal ( Rainbow Roof ) lbr 105,300.00
31 Nok Pingir Metal Hana lbr 100,800.00
32 Wall Flasing ( Rainbow Roof ) lbr 83,900.00
33 Wall Flasing Hana lbr 88,700.00
34 Atap Genteng Beton Warna 14.5/m2 m2 96,700.00
35 Genteng Beton Natural bh 8,500.00
36 Sirap Kelas I ( 80 / m2 ) m2 26,400.00
37 Genteng Keramik Natural Intan 14.5 / m2 m2 112,400.00
38 Genteng Keramik Glasur Standard 14.5 /m2 m2 142,200.00
39 Genteng Keramik Glasur Special 14.5 /m2 m2 139,300.00
40 Genteng Keramik Glasur Premium 14.5 /m2 m2 145,100.00
41 Genteng Murando Natural 1m2 = 18 bh bh 2,700.00
42 Genteng Murando Glasur 1m2 = 18 bh bh 4,000.00
43 Bubung Murando Natural bh 7,500.00
44 Bubung Murando Glasur bh 10,700.00
45 Bubungan Genteng Keramik bh 10,000.00
46 Atap Genteng Kodok bh 3,000.00
47 Bubungan Genteng Kodok bh 4,500.00
48 Bubungan Genteng Plentong bh 6,000.00
49 Bubungan Stel Gelombang bh 7,500.00
50 Nok Stel Gelombang lbr 38,100.00
51 Nok Atap Seng lbr 37,500.00
52 Nok standar 40 cm 18, SWG 22 m2 75,000.00
53 Pelat Asbes tebal 4 mm lbr 21,000.00
54 Pelat Asbes tebal 3.5 mm lbr 16,400.00
55 Trusses ZAM-75 t=0.8 Rangka Utama m1 34,500.00
56 Trusses ZAM-75 t=0.5 Rangka Utama m1 22,000.00
57 Reng 16-DB Roof Battens t=0.48 mm m1 11,000.00
58 Foot Plate t= 1.22 mm m1 7,200.00
59 PLD - Diafragma Plate bh 2,200.00
60 WIND Bracing m1 1,700.00
61 Tensioner ( Pengaku Tali angin ) bh 7,200.00

N BAHAN MEKANIKAL
1 Jockey Pump kap. 80 gln/menit 100 m1 ( 18.6 kW ) unit 71,396,400.00
2 Electrical Pump kap. 750 gln/menit 120 m1 ( 90 kW ) unit 216,358,900.00
3 Diesel Pump kap. 750 gln/menit 120 m1 ( 105 kW ) unit 591,647,100.00
4 Presure Tank kap. 500 liter lengkap unit 36,997,300.00
5 Hydran Box dlm Gedung ( Lengkap ) unit 6,854,400.00
6 Fire House 1.5 x 30 m + nose unit 4,866,100.00
7 Exhose Fan H 360 W 60 x 60 cm unit 6,862,900.00
8 Exhose Fan H 380 W CFM 55 x 55 cm unit 5,491,100.00
9 Exhose Fan H 100 W 40 x 40 cm unit 1,092,600.00
10 AC Split 3 PK Setara TOSHIBA unit 30,791,800.00
11 AC Split 2 PK Setara TOSHIBA unit 21,926,500.00
12 AC Split 1 PK Setara TOSHIBA unit 5,174,100.00
13 Mesin AC Split DAIKIN ( Indoor / Outdoor Unit ) 1 BTU 4,200,000.00

O BAHAN ELEKTRIKAL
1 Kabel NYA 1 x 1.5 Prima ( 1 rol = 50 m' ) ROLL 102,700.00
2 Kabel NYA 1 x 2.5 Prima ( 1 rol = 50 m' ) ROLL 151,700.00
3 Kabel NYM 2 x 1.5 Prima ( 1 rol = 50 m' ) m' 6,600.00
4 Kabel NYM 3 x 1.5 Prima ( 1 rol = 50 m' ) m' 7,600.00
5 Kabel NYM 2 x 2.5 Prima ( 1 rol = 50 m' ) m' 4,900.00
6 Kabel NYM 3 x 2.5 Prima ( 1 rol = 50 m' ) m' 10,900.00
7 Kabel NYM 4 x 2.5 Prima ( 1 rol = 50 m' ) m' 7,600.00
8 Kabel NYM 2 x 4 Prima ( 1 rol = 50 m' ) m' 6,300.00
9 Kabel NYM 3 x 4 Prima ( 1 rol = 50 m' ) m' 15,400.00
10 Kabel NYM 4 x 4 Prima ( 1 rol = 50 m' ) m' 20,700.00
11 Kabel NYM 2 x 6 Supreme ( 1 rol = 50 m' ) m' 11,800.00
12 Kabel NYM 3 x 6 Supreme ( 1 rol = 50 m' ) m' 13,700.00
13 Kabel NYM 4 x 6 Supreme ( 1 rol = 50 m' ) m' 18,600.00
14 Kabel NYM 2 x 10 Supreme ( 1 rol = 50 m' ) m' 17,600.00
15 Kabel NYM 3 x 10 Supreme ( 1 rol = 50 m' ) m' 119,700.00
16 Kabel NYM 4 x 10 Supreme ( 1 rol = 50 m' ) m' 26,500.00
17 Kabel NYM 4 x 16 Supreme ( 1 rol = 50 m' ) m' 29,700.00
18 Kabel NYY 2 x 4 Supreme ( 1 rol = 50 m' ) m' 12,000.00
19 Kabel NYY 3 x 4 Supreme ( 1 rol = 50 m' ) m' 19,300.00
20 Kabel NYY 4 x 4 Supreme ( 1 rol = 50 m' ) m' 23,800.00
21 Kabel NYY 2 x 6 Supreme ( 1 rol = 50 m' ) m' 14,500.00
22 Kabel NYY 3 x 6 Supreme ( 1 rol = 50 m' ) m' 19,200.00
23 Kabel NYY 4 x 6 Supreme ( 1 rol = 50 m' ) m' 18,500.00
24 Kabel NYY 2 x 10 Supreme ( 1 rol = 50 m' ) m' 20,400.00
25 Kabel NYY 3 x 10 Supreme ( 1 rol = 50 m' ) m' 25,800.00
26 Kabel NYY 4 x 10 Supreme ( 1 rol = 50 m' ) m' 35,500.00
27 Kabel NYY 4 x 16 Supreme ( 1 rol = 50 m' ) m' 41,900.00
28 NSFB FUJI EA - 100 A bh 841,900.00
29 NSFB FUJI EA - 150 A bh 2,182,600.00
30 Rumah Panel 30 x 60 cm ( Kosong ) unt 153,500.00
31 Skring Kas 2 grop Biasa unt 204,800.00
32 Skring Kas 3 grop Biasa unt 222,600.00
33 Skring Kas 5 grop Biasa unt 468,800.00
34 MCB 1 PAS bh 55,100.00
35 MCB 3 PAS bh 106,000.00
36 Tahanan 50 A Merk Fuji bh 521,100.00
37 Saklar Broko Tunggal Standard ( 1 Phase ) bh 23,800.00
38 Saklar Broko Seri Standard ( 1 Phase ) bh 26,300.00
39 Stop Kontak Broko Standard ( 1 Phase ) bh 23,800.00
40 Stop Kontak Broko 3 Phase (Out Bow) bh 87,700.00
41 Stop Kontak Broko 3 Phase ( In Bow) bh 144,900.00
42 Stop Kontak Handle 3 Phase bh 87,800.00
43 Instalas Titik Lampu / Stop Kontak (Upah dan Alat) ttk 179,600.00
44 Lampu pijar 25 Watt s/d 100 Watt bh 61,200.00
45 Lampu Neon Phillips 20 Watt bh 29,700.00
46 Lampu Neon Phillips 40 Watt bh 35,200.00
47 Trapo TL 20 W (Phillips) bh 41,800.00
48 Trapo TL 40 W (Phillips) bh 37,900.00
49 Trapo TL 20 W (Sinar) bh 40,600.00
50 Trapo TL 40 W (sinar) bh 41,300.00
51 Stater Neon Phillips bh 8,300.00
52 Stater Neon Biasa bh 6,500.00
53 Rumah TL In Bow / Out Bow 2 x 20 W (kosongan) bh 144,000.00
54 Down Light + SL 25 W bh 306,900.00
55 Lampu SL Philip 25 W bh 306,900.00
56 Lampu Sirkel TL 20 W Lengkap bh 67,900.00
57 Lampu Mercuri 80 W bh 147,400.00
58 Lampu Taman + Tiang + Lampu 1 Buah bh 307,600.00
59 Lampu Baret 30 cm + Neon bh 221,700.00
60 Lampu Neon Arcrilik 2 x 40 W Lengkap bh 738,000.00
61 Jarum Penangkal Petir 16 bh 101,500.00
62 Kawat BC ( Tembaga ) kg 65,100.00
63 Pentanahan Penangkal Petir ttk 423,700.00
64 Pentanahan Panel ttk 296,100.00

P BAHAN ALAT PENGANTUNG DAN KUNCI


1 Kunci Silinder ALFA untuk Pintu Alumunium bh 410,900.00
2 Tarikan Pintu Alumunium bh 408,600.00
3 Kunci 2 Slaag ROYAL bh 126,500.00
4 Rel Henderson Lengkap bh 864,300.00
5 Rel maraton I Pintu unt 193,100.00
6 Kunci 2 Slaag Silinder SEIS Asli type 210 s/d type 226 bh 335,900.00
7 Kunci 2 Slaag Ancor Asli bh 165,300.00
8 Kunci 2 Slaag ISO bh 207,300.00
9 Kunci KM Bulat Kualitas Biasa bh 54,400.00
10 Kunci kM Bulat ALFA bh 102,700.00
11 Kunci 2 Slaag Silinder Utama Standard bh 586,600.00
12 Kunci Gembok Besar bh 85,200.00
13 Kunci 2 Slaag Kuda Terbang bh 94,500.00
14 Kunci Lemari bh 46,800.00
15 Espangolet ps 51,600.00
16 Grendel 15 cm bh 49,800.00
17 Grendel 5 cm bh 5,500.00
18 Hak Angin Kait Jendela Biasa ps 7,100.00
19 Hak Angin Jendela Antik ps 29,000.00
20 Hak Angin Sendok Stainless / Kuningan bh 32,200.00
21 Sloot Pintu Berikut Rantai bh 31,500.00
22 Sloot Jendela Tunggal bh 33,000.00
23 Engsel Pintu Unilon Standard ps 21,000.00
24 Engsel Jendela Unilon ps 15,000.00
25 Engsel Patrun ps 13,700.00
26 Engsel Harmonika m1 9,100.00
27 Door Closer Kelas Standard ( Kelas Sedang ) unt 420,000.00
28 Door Closer Kelas Standard ( Kelas Baik ) unt 597,500.00
29 Door Closer Kelas Rendah unt 200,000.00
30 Door Holder unt 205,400.00
31 Door Stoper unt 255,500.00
32 Tarikan Almari Rata-rata bh 19,500.00
33 Seng BJLS 30 Lebar 60 cm ( 1 rol 50 m' ) m1 43,500.00
34 Seng BJLS 30 Lebar 90 cm ( 1 rol 50 m' ) m1 53,500.00
35 Seng BJLS 30 / 3 x 0.3 mm lbr 86,900.00
36 Seng Plat lbr 50,100.00
37 Waterstop Lebar 200 mm m1 57,900.00

Q BAHAN PENGIKAT UNTUK KONSTRUKSI JALAN


1 Aspal Bitumen kg 12,459.00
2 Aspal Emulsi kg 12,459.00
3 Aspal Curah kg 10,890.00
4 Aspal Concrete / Laston( AC -WC) ton 1,348,300.00
5 Aspal Threated Base ( ATB ) ton 1,200,200.00
6 Lataston /Hot Rolls Sheet ( HRS ) ton 1,666,900.00

R BAHAN PENGISAP AIR SUMUR DALAM


1 Pompa Kodok unit 172,600.00
2 Pompa Dragon Tegal unit 243,800.00
3 Pompa Dragon Asli unit 718,500.00
4 Mesin Pompa Air 100 W - Sanyo unit 1,100,200.00
5 Mesin Pompa Air 150 W - Sanyo unit 1,890,700.00
6 Pompa Zet Pump 250 W - Sanyo unit 4,961,500.00
7 Pompa Zet Pump 450 W - Sanyo unit 7,878,000.00
8 Pompa Submersible kap. 150 liter / menit 3 KW unit 27,151,200.00
9 Gear Pump Kap. 60 liter / menit unit 15,702,700.00
10 Deep Well dengan kelengkapannya kap. 150 liter / menit unit 172,052,500.00
11 Hand Oil Pump unit 5,195,300.00

S BAHAN PENAMPUNG AIR


1 Tangki Air Fiber Glass 0.5 m3 ( Excel ) bh 1,172,500.00
2 Tangki Air Fiber Glass 1 m3 ( Excel ) bh 1,316,400.00
3 Tangki Air Fiber Glass 2 m3 ( Excel ) bh 1,954,200.00
4 Bak KM Fiber 60 x 60 bh 255,300.00
5 Bak Taraso WC 40 x 40 bh 118,500.00
6 Bak KM Taraso 60 x 60 bh 161,100.00

T ALAT TUKANG
1 Palu 0.5 kg bh 39,300.00
2 Cangkul bh 24,500.00
3 Singkup bh 41,400.00
4 Sekrop bh 50,100.00
5 Pengki bh 12,300.00
6 Linggis bh 41,700.00
7 Rool Meter 30 meter ( Bahan Plastik ) bh 101,000.00
8 Rool Meter 5 meter ( Bahan Besi ) bh 37,800.00
9 Selang Plastik untuk Water Pas dia. 0.5 cm m 1,600.00
10 Water Pas Alumunium 60 cm bh 88,200.00

U BAHAN BAKAR DAN PELUMAS


1 Minyak Tanah lt 18,000.00
2 Kayu Bakar dari Kayu Karet m3 151,100.00
3 Bahan Bakar Residu lt 28,435.00
4 Minyak Solar lt 7,150.00
5 Bensin Premium lt 7,800.00
6 Plus Oil lt 3,300.00
7 Oil Mesran 40 SAE lt 55,000.00
8 Elpiji / botol 15 kg
15.1 kg 104,600.00
9 Asitilin / Botol btl 88,900.00
10 Angin ( O2 ) / botol btl 66,400.00
11 Karbit kg 19,400.00
12 Minyak Bekisting ltr 40,500.00
13 Rapidrant Gln 15,700.00
14 Soda Api kg 35,600.00
15 Sabun kg 2,400.00
16 Arang Kayu kg 11,100.00
17 Kawat Las bh 1,400.00

V BAHAN PAGAR
1 Panel Beton Pracetak lbr 199,200.00
2 Kolom Beton Pracetak btg 264,000.00

B. BIDANG PERTAMANAN
1 Aglonema batang 50,000.00
2 Bambu krisik/jepang batang 50,000.00
3 Furadan kg 24,000.00
4 Kompos/pupuk kandang karung 25,000.00
5 M atoa (2 m) batang 40,000.00
6 Palm (botol, ekor tupai, putri, dll) tinggi 2 m batang 100,000.00
7 Philo batang 75,000.00
8 Pohon pelindung (angsana, mahoni, kamboja dll) tinggi 2m batang 25,000.00
9 Pohon perdu (kaca piring, puring, mawar, melati, dll) batang 10,000.00
10 Rumput gajah mini m2 15,000.00

harga sudah termasuk PPN dan keuntungan


Analisa Harga Satuan Pekerjaan Rangka Atap Baja Ringan
Diposkan : 21 Junii 2014
Oleh : Endang Kusman

Untuk analisa harga satuan pekerjaan rangka atap baja ringan saya belum menemukannya di AHS-SNI, tapi ini saya menemuka

HARGA
VOLUME SATUAN
No. URAIAN SATUAN (Rp) (Rp) HARGA

1 m2 Pek.
Pasangan
Baja
Ringan
(Bersertifi
kat dan
bergarans
i 10
tahun)

Mobilisasi Ls 1 9,000.00 9,000.00

Main
truss C-
75-75 m' 2.8 14,870.00 41,636.00

Roof
Bottom/R
eng R 33-
0.45 m' 5.1 8,500.00 43,350.00

Self
drilling
screw dia
6 x 20
mm (truss
Screw) bh 25 375 9,375.00
Self
drilling
screw dia
4 x 16
mm (Roof
Bottom
Screw) bh 35 350 12,250.00

Dynabol
dia 12 x
120 mm bh 1 1,500.00 1,500.00
Tukang oh 0.247 45,000.00 11,115.00

Tukang
Besi Profil Oh 0.176 50,000.00 8,800.00

Kepala
Tukang
Besi Profil Oh 0.117 52,500.00 6,142.50

Alat
Bantu
(Mesin
Bor
Listrik)/G
enset Ls 1 4,500.00 4,500.00
Gambar
Desain m2 1 2,340.00 2,340.00
Total ###

Keuntung
an Max
10% 15,000.85
Total
Harga ###
Dibulatka
n ###

Sumber : http://bit.ly/1rixKVE
ap Baja Ringan

S-SNI, tapi ini saya menemukan di salah satu blog yang sepertinya memiliki hubungan dengan salah satu produsen baja ringan, inilah anal
odusen baja ringan, inilah analisanya:

Anda mungkin juga menyukai