Anda di halaman 1dari 43

Analisa Harga Satuan Pekerjaan

Pekerjaan :
Lokasi :
Tahun :

Total
Harga Satuan (Rp)
Harga
No Jenis Pekerjaan Sat Indeks
Satuan
Bahan Upah
(Rp)
I PEKERJAAN PERSIAPAN
6.8 A. Pembersihan Lahan (m²)
SNI 03-2835-2002 Tenaga
Pekerja Oh 0.100 36,000.00 3,600.00 Tukang Kayu
Mandor Oh 0.050 40,000.00 2,000.00 Pekerja
Sub Total 5,600.00 Kepala Tukang
6.1 B. Pemasangan Pagar Sementara dari Kayu tinggi 2 m (m¹) Mandor
SNI 03-2835-2002 Bahan Tukang Batu
Dolken Kayu Ø 8-10/400 cm Btg 1.250 25,000.00 31,250.00 Tukang Cat
Semen Portland Kg 2.500 1,050.00 2,625.00
Pasir Beton M³ 0.005 125,000.00 625.00 Tukang Batu
Koral Beton M³ 0.009 135,000.00 1,215.00 Tukang Cat
Kayu 5/7 M³ 0.072 ### 122,400.00 Pekerja
Paku Biasa 2"-5" Kg 0.060 10,000.00 600.00 Mandor
Residu Lt 0.400 11,000.00 4,400.00 Residu
Tenaga Tenaga
Tukang Kayu Oh 0.200 47,500.00 9,500.00 Tukang Kayu
Pekerja Oh 0.400 36,000.00 14,400.00 Pekerja
Kepala Tukang Oh 0.020 45,000.00 900.00 Kepala Tukang
Mandor Oh 0.020 40,000.00 800.00 Mandor
Sub Total 188,715.00 Sub Total
6.4 C. Memasang Bouwplank (m¹) C. Memasang Bouwplank (m
SNI 03-2835-2002 Bahan Bahan
Kayu 5/7 M³ 0.012 ### 20,400.00 Kayu 5/7
Paku Biasa 2"-5" Kg 0.020 10,000.00 200.00 Paku Biasa 2"-5"
Kayu Papan Bengkirai 3/20 M³ 0.007 ### 24,791.66 Kayu Papan Bengkirai 3/20
Tenaga Tenaga
Tukang Kayu Oh 0.100 47,500.00 4,750.00 Tukang Kayu
Pekerja Oh 0.100 36,000.00 3,600.00 Pekerja
Kepala Tukang Oh 0.010 45,000.00 450.00 Kepala Tukang
Mandor Oh 0.005 40,000.00 200.00 Mandor
Sub Total 54,391.66 Sub Total
ALS D. Memasang Papan Nama Proyek 80x120 cm (Bh) D. Memasang Papan Nama P
Bahan Bahan
Kayu Meranti Btg 0.035 ### 59,045.00 Kayu Meranti
Paku Biasa 2"-5" Kg 0.600 10,000.00 6,000.00 Paku Biasa 2"-5"
Seng Lembaran 90 cm M¹ 1.400 27,000.00 37,800.00 Seng Lembaran 90 cm
Cat kayu Kg 1.500 38,000.00 57,000.00 Cat kayu
Semen Portland Kg 16.800 1,050.00 17,640.00 Semen Portland
Pasir Beton M³ 0.027 125,000.00 3,375.00 Pasir Beton
Koral Beton M³ 0.041 135,000.00 5,535.00 Koral Beton
Tenaga Tenaga
Tukang Kayu Oh 1.000 47,500.00 47,500.00 Tukang Kayu
Tukang Batu Oh 0.018 42,500.00 765.00 Tukang Batu
Tukang Cat Oh 1.000 42,500.00 42,500.00 Tukang Cat
Pekerja Oh 2.100 36,000.00 75,600.00 Pekerja
Mandor Oh 1.005 40,000.00 40,200.00 Mandor
Sub Total 392,960.00 Sub Total
6.5 E. Membuat direksi keet & Gudang Sementara (m²) E. Membuat direksi keet & Gudang Sementara (m
SNI 03-2835-2002 Bahan Bahan
Dolken Kayu Ø 8-10/400 cm Btg 1.250 25,000.00 31,250.00 Dolken Kayu Ø 8-10/400 cm
Kayu 5/7 M³ 0.180 ### 306,000.00 Kayu 5/7
Paku Biasa 2"-5" Kg 0.850 10,000.00 8,500.00 Paku Biasa 2"-5"
Besi Strip Kg 1.100 11,000.00 12,100.00 Besi Strip
Semen Portland Kg 35.000 1,050.00 36,750.00 Semen Portland
Pasir Pasang M³ 0.150 125,000.00 18,750.00 Pasir Pasang
Pasir Beton M³ 0.100 125,000.00 12,500.00 Pasir Beton
Koral Beton M³ 0.150 135,000.00 20,250.00 Koral Beton
Bata Merah Bh 30.000 500.00 15,000.00 Bata Merah
Seng Plat Lbr 0.250 27,000.00 6,750.00 Seng Plat
Jendela Nako Bh 2.0000 12,500.00 25,000.00 Jendela Nako
Kaca Polos 3 mm M² 0.080 50,000.00 4,000.00 Kaca Polos 3 mm
Kunci Tanam Bh 0.150 25,000.00 3,750.00 Kunci Tanam
Plywood 4 mm Lbr 0.060 50,000.00 3,000.00 Plywood 4 mm
Tenaga Tenaga
Tukang Kayu Oh 2.000 47,500.00 95,000.00 Tukang Kayu
Tukang Batu Oh 1.000 42,500.00 42,500.00 Tukang Batu
Pekerja Oh 2.000 36,000.00 72,000.00 Pekerja
Kepala Tukang Oh 0.800 45,000.00 36,000.00 Kepala Tukang
Mandor Oh 0.050 40,000.00 2,000.00 Mandor
Sub Total 751,100.00 Sub Total
II PEKERJAAN TANAH PEKERJAAN TANAH
6.1 A. Galian Tanah Biasa sedalam 1 m (m³) A. Galian Tanah Biasa sedalam 1 m (m
SNI 03-2835-2002 Tenaga Tenaga
Pekerja Oh 0.400 36,000.00 14,400.00 Pekerja
Mandor Oh 0.040 40,000.00 1,600.00 Mandor
Sub Total 16,000.00 Sub Total
6.9 B. Urugan Kembali (m³) B. Urugan Kembali (m³)
SNI 03-2835-2002 Tenaga Tenaga
Pekerja Oh 0.192 36,000.00 6,912.00 Pekerja
Mandor Oh 0.019 40,000.00 760.00 Mandor
Sub Total 7,672.00 Sub Total
6.11 C. Urugan Pasir Bawah Pondasi (m³) C. Urugan Pasir Bawah Pondasi (m
SNI 03-2835-2002 Bahan Bahan
Pasir Urug M³ 1.200 100,000.00 120,000.00 Pasir Urug
Tenaga Tenaga
Pekerja Oh 0.300 36,000.00 10,800.00 Pekerja
Mandor Oh 0.010 40,000.00 400.00 Mandor
Sub Total 131,200.00 Sub Total

III PEKERJAAN PONDASI PEKERJAAN PONDASI


6.6 D. Pasangan Pondasi Batu Kali 1 Pc: 5 Ps (m³) D. Pasangan Pondasi Batu Kali 1 Pc: 5 Ps (m
SNI 03-2835-2002 Bahan Bahan
Batu Belah 15/20 cm M³ 1.100 85,000.00 93,500.00 Batu Belah 15/20 cm
Semen Portland Kg 136.000 1,050.00 142,800.00 Semen Portland
Pasir Pasang M³ 0.544 125,000.00 68,000.00 Pasir Pasang
Tenaga Tenaga
Pekerja Oh 1.500 36,000.00 54,000.00 Pekerja
Tukang Batu Oh 0.600 42,500.00 25,500.00 Tukang Batu
Kepala Tukang Oh 0.060 45,000.00 2,700.00 Kepala Tukang
Mandor Oh 0.075 40,000.00 3,000.00 Mandor
Sub Total 389,500.00 Sub Total

IV PEKERJAAN DINDING PEKERJAAN DINDING


6.11 A. Pasangan Tembok ½ Bata 1Pc:4Ps (Trasraam) (m²) A. Pasangan Tembok ½ Bata 1Pc:4Ps (Trasraam) (m
SNI 03-2835-2002 Bahan Bahan
Bata Merah 5 X 11 X 22 cm Bh 70.000 500.00 35,000.00 Bata Merah 5 X 11 X 22 cm
Semen Portland Kg 11.500 1,050.00 12,075.00 Semen Portland
Pasir Pasang M³ 0.043 125,000.00 5,375.00 Pasir Pasang
Tenaga Tenaga
Pekerja Oh 0.320 36,000.00 11,520.00 Pekerja
Tukang Batu Oh 0.100 42,500.00 4,250.00 Tukang Batu
Kepala Tukang Oh 0.010 45,000.00 450.00 Kepala Tukang
Mandor Oh 0.015 40,000.00 600.00 Mandor
Sub Total 69,270.00 Sub Total
6.15 B. Pasangan Tembok ½ Bata 1Pc:3Kp:10Ps (m²) B. Pasangan Tembok ½ Bata 1Pc:3Kp:10Ps (m
SNI 03-2835-2002 Bahan Bahan
Bata Merah 5 X 11 X 22 cm Bh 70.000 500.00 35,000.00 Bata Merah 5 X 11 X 22 cm
Semen Portland Kg 4.500 1,050.00 4,725.00 Semen Portland
Pasir Pasang M³ 0.050 125,000.00 6,250.00 Pasir Pasang
Kapur Padam M³ 0.015 45,000.00 675.00 Kapur Padam
Tenaga Tenaga
Pekerja Oh 0.320 36,000.00 11,520.00 Pekerja
Tukang Batu Oh 0.100 42,500.00 4,250.00 Tukang Batu
Kepala Tukang Oh 0.010 45,000.00 450.00 Kepala Tukang
Mandor Oh 0.015 40,000.00 600.00 Mandor
Sub Total 63,470.00 Sub Total

V PEKERJAAN PLESTERAN DINDING PEKERJAAN PLESTERAN DINDING


6.14 A. Plesteran Dinding 1Pc:3Ps (m²) tebal 20 mm A. Plesteran Dinding 1Pc:3Ps (m
SNI 03-2835-2002 Bahan Bahan
Semen Portland Kg 10.800 1,050.00 11,340.00 Semen Portland
Pasir Pasang M³ 0.026 125,000.00 3,250.00 Pasir Pasang
Tenaga Tenaga
Pekerja Oh 0.250 36,000.00 9,000.00 Pekerja
Tukang Batu Oh 0.200 42,500.00 8,500.00 Tukang Batu
Kepala Tukang Oh 0.020 45,000.00 900.00 Kepala Tukang
Mandor Oh 0.013 40,000.00 500.00 Mandor
Sub Total 33,490.00 Sub Total
6.9 B. Plesteran Dinding 1Pc:3Kp:10Ps (m²) tebal 15 mm B. Plesteran Dinding 1Pc:3Kp:10Ps (m
SNI 03-2835-2002 Bahan Bahan
Semen Portland Kg 1.840 1,050.00 1,932.00 Semen Portland
Kapur Padam M³ 0.006 45,000.00 270.00 Kapur Padam
Pasir Pasang M³ 0.014 125,000.00 1,750.00 Pasir Pasang
Tenaga Tenaga
Pekerja Oh 0.200 36,000.00 7,200.00 Pekerja
Tukang Batu Oh 0.150 42,500.00 6,375.00 Tukang Batu
Kepala Tukang Oh 0.015 45,000.00 675.00 Kepala Tukang
Mandor Oh 0.010 40,000.00 400.00 Mandor
Sub Total 18,602.00 Sub Total

VI PEKERJAAN KAYU PEKERJAAN KAYU


6.1 A. Pasang Kusen Pintu dan Jendela Kayu Jati (m³) A. Pasang Kusen Pintu dan Jendela Kayu Jati (m
SNI 03-2835-2002 Bahan Bahan
Kayu jati, balok M³ 1.100 ### ### Kayu jati, balok
Tenaga Tenaga
Pekerja Oh 6.000 36,000.00 216,000.00 Pekerja
Tukang Kayu Oh 20.000 47,500.00 950,000.00 Tukang Kayu
Kepala Tukang Oh 2.000 45,000.00 90,000.00 Kepala Tukang
Mandor Oh 0.300 40,000.00 12,000.00 Mandor
Sub Total ### Sub Total
6.7 B. Pasang Pintu Panel Kayu Jati (m²) B. Pasang Pintu Panel Kayu Jati (m
SNI 03-2835-2002 Bahan Bahan
Kayu Jati, papan M³ 0.040 ### 720,000.00 Kayu Jati, papan
Tenaga Tenaga
Pekerja Oh 1.000 36,000.00 36,000.00 Pekerja
Tukang Kayu Oh 2.500 47,500.00 118,750.00 Tukang Kayu
Kepala Tukang Oh 0.250 45,000.00 11,250.00 Kepala Tukang
Mandor Oh 0.050 40,000.00 2,000.00 Mandor
Sub Total 888,000.00 Sub Total
ALS C. Pasang Nook, Gording, Murplat, Nook Kayu Bengkirai (m³) C. Pasang Nook, Gording, Murplat, Nook Kayu Bengkirai (m
Bahan Bahan
Kayu Bengkirai, balok M³ 1.100 ### ### Kayu Bengkirai, balok
Tenaga Tenaga
Pekerja Oh 2.000 36,000.00 72,000.00 Pekerja
Tukang Kayu Oh 8.000 47,500.00 380,000.00 Tukang Kayu
Kepala Tukang Oh 1.200 45,000.00 54,000.00 Kepala Tukang
Mandor Oh 0.200 40,000.00 8,000.00 Mandor
Sub Total ### Sub Total
6.35 D. Pasang Kaso+Reng Genteng Beton Kayu Borneo (m²) D. Pasang Kaso+Reng Genteng Beton Kayu Borneo (m
SNI 03-2835-2002 Bahan Bahan
Kayu Borneo, balok M³ 0.014 ### 119,000.00 Kayu Borneo, balok
Paku Biasa 2"-5" Kg 0.150 10,000.00 1,500.00 Paku Biasa 2"-5"
Tenaga Tenaga
Pekerja Oh 0.100 36,000.00 3,600.00 Pekerja
Tukang Kayu Oh 0.100 47,500.00 4,750.00 Tukang Kayu
Kepala Tukang Oh 0.010 45,000.00 450.00 Kepala Tukang
Mandor Oh 0.005 40,000.00 200.00 Mandor
Sub Total 129,500.00 Sub Total
6.53 E. Pasang Listplank, Reuter 2X (2X20) cm, kayu borneo (m³) E. Pasang Listplank, Reuter 2X (2X20) cm, kayu borneo (m
SNI 03-2835-2002 Bahan Bahan
Kayu Borneo,Papan M³ 0.009 ### 88,000.00 Kayu Borneo,Papan
Paku Biasa 2"-5" Kg 0.060 10,000.00 600.00 Paku Biasa 2"-5"
Tenaga Tenaga
Pekerja Oh 0.100 36,000.00 3,600.00 Pekerja
Tukang Kayu Oh 0.100 47,500.00 4,750.00 Tukang Kayu
Kepala Tukang Oh 0.010 45,000.00 450.00 Kepala Tukang
Mandor Oh 0.050 40,000.00 2,000.00 Mandor
Sub Total 99,400.00 Sub Total
6.40 F. Pasang Rangka Langit-langit 1X1 m Kayu Borneo (m²) F. Pasang Rangka Langit-langit 1X1 m Kayu Borneo (m
SNI 03-2835-2002 Bahan Bahan
Kayu borneo, balok M³ 0.012 ### 102,000.00 Kayu borneo, balok
Paku biasa 2"-5" Kg 0.100 10,000.00 1,000.00 Paku biasa 2"-5"
Tenaga Tenaga
Pekerja Oh 0.150 36,000.00 5,400.00 Pekerja
Tukang Kayu Oh 0.250 47,500.00 11,875.00 Tukang Kayu
Kepala Tukang Oh 0.025 45,000.00 1,125.00 Kepala Tukang
Mandor Oh 0.075 40,000.00 3,000.00 Mandor
Sub Total 124,400.00 Sub Total

VII PEKERJAAN BETON PEKERJAAN BETON


6.39 A. Membuat sloof Beton Bertulang (200Kg besi+bekisting) (m³) A. Membuat sloof Beton Bertulang (200Kg besi+bekisting) (m
SNI 03-2835-2002 Bahan Bahan
Kayu Terentang M³ 0.270 ### 540,000.00 Kayu Terentang
Paku Biasa 2"-5" Kg 2.000 10,000.00 20,000.00 Paku Biasa 2"-5"
Minyak Bekisting Lt 0.600 10,000.00 6,000.00 Minyak Bekisting
Besi Beton polos Kg 200.000 12,000.00 ### Besi Beton polos
Kawat Beton Kg 3.000 13,000.00 39,000.00 Kawat Beton
Semen Portland Kg 323.000 1,050.00 339,150.00 Semen Portland
Pasir Beton M³ 0.520 125,000.00 65,000.00 Pasir Beton
Koral Beton M³ 0.780 135,000.00 105,300.00 Koral Beton
Tenaga Tenaga
Pekerja Oh 4.850 36,000.00 174,600.00 Pekerja
Tukang Batu Oh 0.350 42,500.00 14,875.00 Tukang Batu
Tukang Kayu Oh 1.560 47,500.00 74,100.00 Tukang Kayu
Tukang Besi Oh 1.400 45,000.00 63,000.00 Tukang Besi
Kepala Tukang Oh 0.331 45,000.00 14,895.00 Kepala Tukang
Mandor Oh 0.170 40,000.00 6,800.00 Mandor
Sub Total ### Sub Total
6.40 B. Membuat Kolom Beton Bertulang (300Kg besi+bekisting) (m³) B. Membuat Kolom Beton Bertulang (300Kg besi+bekisting) (
SNI 03-2835-2002 Bahan Bahan
Kayu Terentang M³ 0.400 ### 800,000.00 Kayu Terentang
Paku Biasa 2"-5" Kg 4.000 10,000.00 40,000.00 Paku Biasa 2"-5"
Minyak Bekisting Lt 2.000 10,000.00 20,000.00 Minyak Bekisting
Besi Beton polos Kg 300.000 12,000.00 ### Besi Beton polos
Kawat Beton Kg 4.500 13,000.00 58,500.00 Kawat Beton
Semen Portland Kg 323.000 1,050.00 339,150.00 Semen Portland
Pasir Beton M³ 0.520 125,000.00 65,000.00 Pasir Beton
Koral Beton M³ 0.780 135,000.00 105,300.00 Koral Beton
Kayu Borneo Balok M³ 0.150 ### ### Kayu Borneo Balok
Plywood 9 mm Lbr 3.500 95,000.00 332,500.00 Plywood 9 mm
Dolken Kayu Ø 8-10/400 cm Btg 20.000 25,000.00 500,000.00 Dolken Kayu Ø 8-10/400 cm
Tenaga Tenaga
Pekerja Oh 7.300 36,000.00 262,800.00 Pekerja
Tukang Batu Oh 0.350 42,500.00 14,875.00 Tukang Batu
Tukang Kayu Oh 3.300 47,500.00 156,750.00 Tukang Kayu
Tukang Besi Oh 2.100 45,000.00 94,500.00 Tukang Besi
Kepala Tukang Oh 0.570 45,000.00 25,650.00 Kepala Tukang
Mandor Oh 0.250 40,000.00 10,000.00 Mandor
Sub Total ### Sub Total
6.46 C. Membuat Ring Balok Beton Bertulang (10X15cm) (m³) C. Membuat Ring Balok Beton Bertulang (10X15cm) (m
SNI 03-2835-2002 Bahan Bahan
Kayu Albasiah M³ 0.003 ### 9,000.00 Kayu Albasiah
Paku Biasa 2"-5" Kg 0.020 10,000.00 200.00 Paku Biasa 2"-5"
Besi Beton polos Kg 3.600 13,000.00 46,800.00 Besi Beton polos
Kawat Beton Kg 0.050 13,000.00 650.00 Kawat Beton
Semen Portland Kg 5.500 1,050.00 5,775.00 Semen Portland
Pasir Beton M³ 0.009 125,000.00 1,125.00 Pasir Beton
Koral Beton M³ 0.015 135,000.00 2,025.00 Koral Beton
Tenaga Tenaga
Pekerja Oh 0.100 36,000.00 3,600.00 Pekerja
Tukang Batu Oh 0.033 42,500.00 1,402.50 Tukang Batu
Tukang Kayu Oh 0.033 47,500.00 1,567.50 Tukang Kayu
Tukang Besi Oh 0.033 45,000.00 1,485.00 Tukang Besi
Kepala Tukang Oh 0.010 45,000.00 450.00 Kepala Tukang
Mandor Oh 0.005 40,000.00 200.00 Mandor
Sub Total 74,280.00 Sub Total
6.46 D. Membuat Kuda-Kuda Beton Bertulang (10X15cm) (m³) D. Membuat Kuda-Kuda Beton Bertulang (10X15cm) (m
SNI 03-2835-2002 Bahan Bahan
Kayu Albasiah M³ 0.003 ### 9,000.00 Kayu Albasiah
Paku Biasa 2"-5" Kg 0.020 10,000.00 200.00 Paku Biasa 2"-5"
Besi Beton polos Lt 3.600 13,000.00 46,800.00 Besi Beton polos
Kawat Beton Kg 0.050 13,000.00 650.00 Kawat Beton
Semen Portland Kg 5.500 1,050.00 5,775.00 Semen Portland
Pasir Beton Kg 0.009 125,000.00 1,125.00 Pasir Beton
Koral Beton M³ 0.015 135,000.00 2,025.00 Koral Beton
Tenaga Tenaga
Pekerja Oh 0.100 36,000.00 3,600.00 Pekerja
Tukang Batu Oh 0.033 42,500.00 1,402.50 Tukang Batu
Tukang Kayu Oh 0.033 47,500.00 1,567.50 Tukang Kayu
Tukang Besi Oh 0.033 45,000.00 1,485.00 Tukang Besi
Kepala Tukang Oh 0.010 45,000.00 450.00 Kepala Tukang
Mandor Oh 0.005 40,000.00 200.00 Mandor
Sub Total 74,280.00 Sub Total
6.5 E. Membuat Plat Beton 1Pc:2Ps:3Kr (m³) E. Membuat Plat Beton 1Pc:2Ps:3Kr (m
SNI 03-2835-2002 Bahan Bahan
Semen Portland Kg 232.000 1,050.00 243,600.00 Semen Portland
Pasir Beton M³ 0.520 125,000.00 65,000.00 Pasir Beton
Koral Beton M³ 0.780 135,000.00 105,300.00 Koral Beton
Tenaga Tenaga
Pekerja Oh 1.650 36,000.00 59,400.00 Pekerja
Tukang Batu Oh 0.250 42,500.00 10,625.00 Tukang Batu
Kepala Tukang Oh 0.025 45,000.00 1,125.00 Kepala Tukang
Mandor Oh 0.080 40,000.00 3,200.00 Mandor
Sub Total 488,250.00 Sub Total
6.25 F. Pembesian Besi Polos dan Ulir plat beton(Kg) F. Pembesian Besi Polos dan Ulir plat beton(Kg)
SNI 03-2835-2002 Bahan Bahan
Besi Beton (Polos/Ulir) Kg 1.050 12,000.00 12,600.00 Besi Beton (Polos/Ulir)
Kawat Beton Kg 0.015 13,000.00 195.00 Kawat Beton
Tenaga Tenaga
Pekerja Oh 0.007 36,000.00 252.00 Pekerja
Tukang Besi Oh 0.007 45,000.00 315.00 Tukang Besi
Kepala Tukang Oh 0.001 45,000.00 31.50 Kepala Tukang
Mandor Oh 0.000 40,000.00 12.00 Mandor
Sub Total 13,405.50 Sub Total
6.32 G. Pasang Bekisting untuk Plat Beton (m²) G. Pasang Bekisting untuk Plat Beton (m
SNI 03-2835-2002 Bahan Bahan
Kayu Terentang M³ 0.040 ### 80,000.00 Kayu Terentang
Paku Biasa 2"-5" Kg 0.400 10,000.00 4,000.00 Paku Biasa 2"-5"
Minyak Bekisting Lt 0.200 10,000.00 2,000.00 Minyak Bekisting
Balok Kayu borneo M³ 0.015 ### 127,500.00 Balok Kayu borneo
Plywood tebal 9 mm Lbr 0.350 95,000.00 33,250.00 Plywood tebal 9 mm
Dolken Kayu galam Ø 8-10/4 m Btg 6.000 25,000.00 150,000.00 Dolken Kayu galam Ø 8-10/4 m
Tenaga Tenaga
Pekerja Oh 0.320 36,000.00 11,520.00 Pekerja
Tukang kayu Oh 0.330 47,500.00 15,675.00 Tukang kayu
Kepala Tukang Oh 0.033 45,000.00 1,485.00 Kepala Tukang
Mandor Oh 0.006 40,000.00 240.00 Mandor
Sub Total 425,670.00 Sub Total

VIII PEKERJAAN PENUTUP ATAP PEKERJAAN PENUTUP ATAP


6.4 A. Pasang Genteng Bubung Palentong (m¹) A. Pasang Genteng Bubung Palentong (m
SNI 03-2835-2002 Bahan Bahan
Genteng Bubung Palentong Bh 5.000 7,500.00 37,500.00 Genteng Bubung Palentong
Semen Portland Kg 8.000 1,050.00 8,400.00 Semen Portland
Pasir Pasang M3 0.032 125,000.00 4,000.00 Pasir Pasang
Tenaga Tenaga
Pekerja Oh 0.400 36,000.00 14,400.00 Pekerja
Tukang Kayu Oh 0.200 47,500.00 9,500.00 Tukang Kayu
Kepala Tukang Oh 0.020 45,000.00 900.00 Kepala Tukang
Mandor Oh 0.002 40,000.00 80.00 Mandor
Sub Total 74,780.00 Sub Total
6.30 B. Pasang Atap Genteng Beton (m²) B. Pasang Atap Genteng Beton (m
SNI 03-2835-2002 Bahan Bahan
Genteng Beton Bh 11.000 5,500.00 60,500.00 Genteng Beton
Paku Biasa 2" - 5" Kg 0.030 10,000.00 300.00 Paku Biasa 2" - 5"
Tenaga Tenaga
Pekerja Oh 0.200 36,000.00 7,200.00 Pekerja
Tukang Kayu Oh 0.100 47,500.00 4,750.00 Tukang Kayu
Kepala Tukang Oh 0.010 45,000.00 450.00 Kepala Tukang
Mandor Oh 0.010 40,000.00 400.00 Mandor
Sub Total 73,600.00 Sub Total

IX PEKERJAAN PLAFON PEKERJAAN PLAFON


6.19 A. Pasang List Langit-langit Kayu Profil (m¹) A. Pasang List Langit-langit Kayu Profil (m
SNI 03-2835-2002 Bahan Bahan
Kayu Profil M¹ 1.100 3,333.33 3,666.67 Kayu Profil
Paku plafon Kg 0.010 10,000.00 Paku plafon
Tenaga Tenaga
Pekerja Oh 0.050 36,000.00 1,800.00 Pekerja
Tukang Kayu Oh 0.050 47,500.00 2,375.00 Tukang Kayu
Kepala Tukang Oh 0.005 45,000.00 225.00 Kepala Tukang
Mandor Oh 0.003 40,000.00 120.00 Mandor
Sub Total 8,186.67 Sub Total
6.1 B. Langit-langit Asbes (m²) B. Langit-langit Asbes (m²)
SNI 03-2835-2002 Bahan Bahan
Pelat Asbes tebal 6mm M² 1.100 32,000.00 35,200.00 Pelat Asbes tebal 6mm
Paku plafon Kg 0.010 10,000.00 Paku plafon
Tenaga Tenaga
Pekerja Oh 0.030 36,000.00 1,080.00 Pekerja
Tukang Kayu Oh 0.070 47,500.00 3,325.00 Tukang Kayu
Kepala Tukang Oh 0.007 45,000.00 315.00 Kepala Tukang
Mandor Oh 0.002 40,000.00 60.00 Mandor
Sub Total 39,980.00 Sub Total

X PEKERJAAN PENUTUP LANTAI DAN DINDING PEKERJAAN PENUTUP LANTAI DAN DINDING
Pek Tanah 6.11 A. Pekerjaan Urug Pasir Bawah Lantai (m³) A. Pekerjaan Urug Pasir Bawah Lantai (m
SNI 03-2835-2002 Bahan Bahan
Pasir Urug M³ 1.200 100,000.00 120,000.00 Pasir Urug
Tenaga Tenaga
Pekerja Oh 0.300 36,000.00 10,800.00 Pekerja
Tukang Gali Oh 0.000 42,500.00 - Tukang Gali
Kepala Tukang Oh 0.000 45,000.00 - Kepala Tukang
Mandor Oh 0.010 40,000.00 400.00 Mandor
Sub Total 131,200.00 Sub Total
6.47 B. Pasang Lantai Keramik 33X33 cm (m²) B. Pasang Lantai Keramik 33X33 cm (m
SNI 03-2835-2002 Bahan Bahan
Ubin Keramik 33X33 cm Bh 10.000 4,000.00 40,000.00 Ubin Keramik 33X33 cm
Semen Portland Kg 11.380 1,050.00 11,949.00 Semen Portland
Pasir Pasang M³ 0.042 125,000.00 5,250.00 Pasir Pasang
Semen Warna Kg 1.500 13,000.00 19,500.00 Semen Warna
Tenaga Tenaga
Pekerja Oh 0.620 36,000.00 22,320.00 Pekerja
Tukang Batu Oh 0.350 42,500.00 14,875.00 Tukang Batu
Kepala Tukang Oh 0.035 45,000.00 1,575.00 Kepala Tukang
Mandor Oh 0.030 40,000.00 1,200.00 Mandor
Sub Total 116,669.00 Sub Total
6.42 C. Pasang Lantai Keramik 10X20 cm (m²) C. Pasang Lantai Keramik 10X20 cm (m
SNI 03-2835-2002 Bahan Bahan
Ubin Keramik Artistik 10X20 cm Bh 50.000 4,444.44 222,222.22 Ubin Keramik Artistik 10X20 cm
Semen Portland Kg 11.380 1,050.00 11,949.00 Semen Portland
Pasir Pasang M³ 0.042 125,000.00 5,250.00 Pasir Pasang
Semen Warna Kg 1.500 13,000.00 19,500.00 Semen Warna
Tenaga Tenaga
Pekerja Oh 0.620 36,000.00 22,320.00 Pekerja
Tukang Batu Oh 0.350 42,500.00 14,875.00 Tukang Batu
Kepala Tukang Oh 0.035 45,000.00 1,575.00 Kepala Tukang
Mandor Oh 0.030 40,000.00 1,200.00 Mandor
Sub Total 298,891.22 Sub Total
6.3 D. Pasang Lantai Ubin Pc Abu-Abu 20X20 cm (m²) D. Pasang Lantai Ubin Pc Abu-Abu 20X20 cm (m
SNI 03-2835-2002 Bahan Bahan
Ubin Abu-Abu 20X20 cm Bh 26.500 3,888.89 103,055.56 Ubin Abu-Abu 20X20 cm
Semen Portland Kg 10.400 1,050.00 10,920.00 Semen Portland
Pasir Pasang M³ 0.014 125,000.00 1,687.50 Pasir Pasang
Tenaga Tenaga
Pekerja Oh 0.270 36,000.00 9,720.00 Pekerja
Tukang Batu Oh 0.130 42,500.00 5,525.00 Tukang Batu
Kepala Tukang Oh 0.013 45,000.00 585.00 Kepala Tukang
Mandor Oh 0.014 40,000.00 540.00 Mandor
Sub Total 132,033.06 Sub Total
6.17 E. Pasang plint ubin pc abu-abu ukuran 10x30 cm (m²) E. Pasang plint ubin pc abu-abu ukuran 10x30 cm (m
SNI 03-2835-2002 Bahan Bahan
Plint Ubin 10x30 cm Bh 3.530 2,700.00 9,531.00 Plint Ubin 10x30 cm
Semen Portland Kg 1.560 1,050.00 1,638.00 Semen Portland
Pasir Pasang M³ 0.003 125,000.00 375.00 Pasir Pasang
Tenaga Tenaga
Pekerja Oh 0.060 36,000.00 2,160.00 Pekerja
Tukang Batu Oh 0.030 42,500.00 1,275.00 Tukang Batu
Kepala Tukang Oh 0.003 45,000.00 135.00 Kepala Tukang
Mandor Oh 0.003 40,000.00 120.00 Mandor
Sub Total 15,234.00 Sub Total

XI PEKERJAAN KUNCI DAN KACA PEKERJAAN KUNCI DAN KACA


6.2 A. Pasang Kunci Tanam Biasa (Bh) A. Pasang Kunci Tanam Biasa (Bh)
SNI 03-2835-2002 Bahan Bahan
Kunci Tanam Biasa Bh 1.000 25,000.00 25,000.00 Kunci Tanam Biasa
Tenaga Tenaga
Pekerja Oh 0.010 36,000.00 360.00 Pekerja
Tukang Kayu Oh 0.500 47,500.00 23,750.00 Tukang Kayu
Kepala Tukang Oh 0.010 45,000.00 450.00 Kepala Tukang
Mandor Oh 0.005 40,000.00 200.00 Mandor
Sub Total 49,760.00 Sub Total
6.5 B. Pasang Engsel pintu (Bh) B. Pasang Engsel pintu (Bh)
SNI 03-2835-2002 Bahan Bahan
Engsel Pintu Bh 1.000 8,000.00 8,000.00 Engsel Pintu
Tenaga Tenaga
Pekerja Oh 0.005 36,000.00 180.00 Pekerja
Tukang Kayu Oh 0.500 47,500.00 23,750.00 Tukang Kayu
Kepala Tukang Oh 0.005 45,000.00 225.00 Kepala Tukang
Mandor Oh 0.000 40,000.00 10.00 Mandor
Sub Total 32,165.00 Sub Total
6.6 C. Pasang Engsel Jendela Kupu-kupu (Bh) C. Pasang Engsel Jendela Kupu-kupu (Bh)
SNI 03-2835-2002 Bahan Bahan
Engsel Jendela Bh 1.000 7,000.00 7,000.00 Engsel Jendela
Tenaga Tenaga
Pekerja Oh 0.010 36,000.00 360.00 Pekerja
Tukang Kayu Oh 0.100 47,500.00 4,750.00 Tukang Kayu
Kepala Tukang Oh 0.010 45,000.00 450.00 Kepala Tukang
Mandor Oh 0.001 40,000.00 20.00 Mandor
Sub Total 12,580.00 Sub Total
6.12 D. Pasang Pegangan Pintu/Door holder (Bh) D. Pasang Pegangan Pintu/Door holder (Bh)
SNI 03-2835-2002 Bahan Bahan
Door holder Bh 1.000 5,000.00 5,000.00 Door holder
Tenaga Tenaga
Pekerja Oh 0.050 36,000.00 1,800.00 Pekerja
Tukang Kayu Oh 0.500 47,500.00 23,750.00 Tukang Kayu
Kepala Tukang Oh 0.050 45,000.00 2,250.00 Kepala Tukang
Mandor Oh 0.003 40,000.00 100.00 Mandor
Sub Total 32,900.00 Sub Total
6.16 E. Pasang Kaca tebal 3 mm (m²) E. Pasang Kaca tebal 3 mm (m
SNI 03-2835-2002 Bahan Bahan
Kaca tebal 3 mm M² 1.100 50,000.00 55,000.00 Kaca tebal 3 mm
Tenaga Tenaga
Pekerja Oh 0.015 36,000.00 - Pekerja
Tukang Kayu Oh 0.150 47,500.00 - Tukang Kayu
Kepala Tukang Oh 0.015 45,000.00 - Kepala Tukang
Mandor Oh 0.001 40,000.00 - Mandor
Sub Total 55,000.00 Sub Total
6.23 F. Pasang Kaca wireglass tebal 5 mm (m²) F. Pasang Kaca wireglass tebal 5 mm (m
SNI 03-2835-2002 Bahan Bahan
Kaca Wireglass 5 mm M² 1.100 90,000.00 99,000.00 Kaca Wireglass 5 mm
Tenaga Tenaga
Pekerja Oh 0.015 36,000.00 540.00 Pekerja
Tukang Kayu Oh 0.150 47,500.00 7,125.00 Tukang Kayu
Kepala Tukang Oh 0.015 45,000.00 675.00 Kepala Tukang
Mandor Oh 0.001 40,000.00 30.00 Mandor
Sub Total 107,370.00 Sub Total

XII PEKERJAAN PENGECATAN PEKERJAAN PENGECATAN


ALS A. Pengecatan Kayu (m²) A. Pengecatan Kayu (m²)
Bahan Bahan
Cat Meni Kg 0.200 18,000.00 3,600.00 Cat Meni
Kertas Gosok Lbr 0.400 3,000.00 1,200.00 Kertas Gosok
Plamir Kg 0.150 18,000.00 2,700.00 Plamir
Cat dasar Kg 0.170 20,000.00 3,400.00 Cat dasar
Cat penutup 2 kali Kg 0.260 38,000.00 9,880.00 Cat penutup 2 kali
Minyak Cat Ltr 0.150 12,000.00 1,800.00 Minyak Cat
Kuas 3" Bh 0.050 10,000.00 500.00 Kuas 3"
Tenaga Tenaga
Pekerja Oh 0.070 36,000.00 2,520.00 Pekerja
Tukang Cat Oh 0.009 42,500.00 382.50 Tukang Cat
Kepala Tukang Oh 0.006 45,000.00 270.00 Kepala Tukang
Mandor Oh 0.003 40,000.00 100.00 Mandor
Sub Total 26,352.50 Sub Total
ALS B. Pengecatan Tembok Baru (m²) B. Pengecatan Tembok Baru (m
Bahan Bahan
Plamir Kg 0.100 12,000.00 1,200.00 Plamir
Kertas gosok LBR 1.000 3,000.00 3,000.00 Kertas gosok
Cat Dasar Kg 0.100 35,000.00 3,500.00 Cat Dasar
Cat Penutup 2x Kg 0.260 60,000.00 15,600.00 Cat Penutup 2x
Tenaga Tenaga
Pekerja Oh 0.020 36,000.00 720.00 Pekerja
Tukang Cat Oh 0.063 42,500.00 2,677.50 Tukang Cat
Kepala Tukang Oh 0.006 45,000.00 270.00 Kepala Tukang
Mandor Oh 0.003 40,000.00 100.00 Mandor
Sub Total 27,067.50 Sub Total

XIII PEKERJAAN INSTALASI LISTRIK PEKERJAAN INSTALASI LISTRIK


ALS A. Penyambungan Listrik PLN 2400 watt (LS) A. Penyambungan Listrik PLN 2400 watt (LS)
Penyambungan PLN LS 1.000 ### ### Penyambungan PLN
ALS B. Pemasangan Lampu SL 25 Watt (Bh) B. Pemasangan Lampu SL 25 Watt (Bh)
Lampu SL 25 Watt Bh 1.000 30,000.00 30,000.00 Lampu SL 25 Watt
ALS C. Pemasangan Sekering Group (Bh) C. Pemasangan Sekering Group (Bh)
Sekering Group Bh 1.000 17,500.00 17,500.00 Sekering Group
ALS D. Pemasangan Stop Kontak (Bh) D. Pemasangan Stop Kontak (Bh)
Stop kontak Bh 1.000 12,500.00 12,500.00 Stop kontak
ALS E. Pemasangan Sakelar Tunggal (Bh) E. Pemasangan Sakelar Tunggal (Bh)
Sakelar Tunggal Bh 1.000 17,500.00 17,500.00 Sakelar Tunggal
ALS F. Pemasangan Sakelar Ganda (Bh) F. Pemasangan Sakelar Ganda (Bh)
Sakelar Ganda Bh 1.000 12,500.00 12,500.00 Sakelar Ganda

XIV PEKERJAAN SANITASI PEKERJAAN SANITASI


6.2 A. Memasang Kloset Jongkok Porselen (Bh) A. Memasang Kloset Jongkok Porselen (Bh)
SNI 03-2835-2002 Bahan Bahan
Kloset Jongkok Porselen Bh 1.000 90,000.00 90,000.00 Kloset Jongkok Porselen
Semen Portland Kg 6.000 1,050.00 6,300.00 Semen Portland
Pasir Pasang M3 0.010 125,000.00 1,250.00 Pasir Pasang
Tenaga Tenaga
Pekerja Oh 1.000 36,000.00 36,000.00 Pekerja
Tukang Batu Oh 1.500 42,500.00 63,750.00 Tukang Batu
Kepala Tukang Oh 1.500 45,000.00 67,500.00 Kepala Tukang
Mandor Oh 0.160 40,000.00 6,400.00 Mandor
Sub Total 271,200.00 Sub Total
6.8 B. Memasang Bak Mandi Bata Bata, Vol 0.3 M³ (Bh) B. Memasang Bak Mandi Bata Bata, Vol 0.3 M
SNI 03-2835-2002 Bahan Bahan
Batu Bata Bh 250.000 500.00 125,000.00 Batu Bata
Semen Portland Kg 120.000 1,050.00 126,000.00 Semen Portland
Pasir Pasang M3 0.300 125,000.00 37,500.00 Pasir Pasang
Porselen (11x11) Cm Bh 360.000 2,500.00 900,000.00 Porselen (11x11) Cm
Semen Nat Kg 6.000 13,000.00 78,000.00 Semen Nat
Tenaga Tenaga
Pekerja Oh 6.000 36,000.00 216,000.00 Pekerja
Tukang Batu Oh 3.000 42,500.00 127,500.00 Tukang Batu
Kepala Tukang Oh 0.300 45,000.00 13,500.00 Kepala Tukang
Mandor Oh 0.300 40,000.00 12,000.00 Mandor
Sub Total ### Sub Total
6.35 C. Memasang Kran Air Ø ½" atau ¾" (Bh) C. Memasang Kran Air Ø ½" atau ¾"
SNI 03-2835-2002 Bahan Bahan
Kran Air bh 1.000 15,000.00 15,000.00 Kran Air
Sealm Tape Bh 0.500 1,000.00 500.00 Sealm Tape
Tenaga Tenaga
Pekerja Oh 0.010 36,000.00 360.00 Pekerja
Tukang Batu Oh 0.100 42,500.00 4,250.00 Tukang Batu
Kepala Tukang Oh 0.010 45,000.00 450.00 Kepala Tukang
Mandor Oh 0.005 40,000.00 200.00 Mandor
Sub Total 20,760.00 Sub Total
6.27 D. Memasang pipa PVC tipe AW Ø 1" (m¹) D. Memasang pipa PVC tipe AW
SNI 03-2835-2002 Bahan Bahan
Pipa PVC m¹ 1.200 6,250.00 7,500.00 Pipa PVC
Perlengkapan 35 % harga pipa 0.350 7,500.00 2,625.00 Perlengkapan 35 % harga pipa
Tenaga Tenaga
Pekerja Oh 0.081 36,000.00 2,916.00 Pekerja
Tukang Batu Oh 0.135 42,500.00 5,737.50 Tukang Batu
Kepala Tukang Oh 0.014 45,000.00 607.50 Kepala Tukang
Mandor Oh 0.004 40,000.00 164.00 Mandor
Sub Total 19,550.00 Sub Total
6.32 E. Memasang pipa PVC tipe AW Ø 4" (m¹) E. Memasang pipa PVC tipe AW
SNI 03-2835-2002 Bahan Bahan
Pipa PVC m¹ 1.200 21,250.00 25,500.00 Pipa PVC
Perlengkapan 35 % harga pipa 0.350 25,500.00 8,925.00 Perlengkapan 35 % harga pipa
Tenaga Tenaga
Pekerja Oh 0.081 36,000.00 2,916.00 Pekerja
Tukang Batu Oh 0.135 42,500.00 5,737.50 Tukang Batu
Kepala Tukang Oh 0.014 45,000.00 607.50 Kepala Tukang
Mandor Oh 0.004 40,000.00 164.00 Mandor
Sub Total 43,850.00 Sub Total
6.17 F. Memasang Bak kontrol Pas Batu Bata 45X45 cm (Bh) F. Memasang Bak kontrol Pas Batu Bata 45X45 cm (Bh)
SNI 03-2835-2002 Bahan Bahan
Batu Bata M3 0.250 500.00 125.00 Batu Bata
Semen Portland Kg 77.000 1,050.00 80,850.00 Semen Portland
Pasir Pasang M3 0.130 125,000.00 16,250.00 Pasir Pasang
Batu Kerikil M3 0.020 125,000.00 2,500.00 Batu Kerikil
Besi Beton Kg 2.600 10,000.00 26,000.00 Besi Beton
Pasir Beton M3 0.090 125,000.00 11,250.00 Pasir Beton
Tenaga Tenaga
Pekerja Oh 1.420 36,000.00 51,120.00 Pekerja
Tukang Batu Oh 0.473 42,500.00 20,102.50 Tukang Batu
Kepala Tukang Oh 0.047 45,000.00 2,115.00 Kepala Tukang
Mandor Oh 0.071 40,000.00 2,840.00 Mandor
Sub Total 213,152.50 Sub Total
41.826
43.196
7.5487
3.18475
9.387
1
0
9.387
1
43.196
3.18475
0.4
0
41.826
43.196
7.5487
3.18475
0
0
0
0.264
8.28
0.007
0
41.826
43.196
7.5487
3.18475
0
0
0
0.035
8.28
1.4
1.5
1353.66
1.8
2.57
0
41.826
9.387
1
43.196
3.18475
0
0
0
22.5
0.264
8.28
1.1
1353.66
1.3995
1.8
2.57
30
0.25
2
0.08
0.15
0.06
0
41.826
9.387
43.196
7.5487
3.18475
asa sedalam 1 m (m³)

awah Pondasi (m³)

asi Batu Kali 1 Pc: 5 Ps (m³)

bok ½ Bata 1Pc:4Ps (Trasraam) (m²)


bok ½ Bata 1Pc:3Kp:10Ps (m²)

ESTERAN DINDING
ng 1Pc:3Ps (m²) tebal 20 mm

ng 1Pc:3Kp:10Ps (m²) tebal 15 mm

Pintu dan Jendela Kayu Jati (m³)


anel Kayu Jati (m²)

Gording, Murplat, Nook Kayu Bengkirai (m³)

Reng Genteng Beton Kayu Borneo (m²)

nk, Reuter 2X (2X20) cm, kayu borneo (m³)


Langit-langit 1X1 m Kayu Borneo (m²)

Beton Bertulang (200Kg besi+bekisting) (m³)

m Beton Bertulang (300Kg besi+bekisting) (m³)


Balok Beton Bertulang (10X15cm) (m³)

Kuda Beton Bertulang (10X15cm) (m³)


eton 1Pc:2Ps:3Kr (m³)

i Polos dan Ulir plat beton(Kg)

ng untuk Plat Beton (m²)

Ø 8-10/4 m

NUTUP ATAP
g Bubung Palentong (m¹)
enteng Beton (m²)

ngit-langit Kayu Profil (m¹)

sbes (m²)
NUTUP LANTAI DAN DINDING
Pasir Bawah Lantai (m³)

Keramik 33X33 cm (m²)

Keramik 10X20 cm (m²)

k 10X20 cm

Ubin Pc Abu-Abu 20X20 cm (m²)


in pc abu-abu ukuran 10x30 cm (m²)

NCI DAN KACA


anam Biasa (Bh)

pintu (Bh)

Jendela Kupu-kupu (Bh)


an Pintu/Door holder (Bh)

bal 3 mm (m²)

reglass tebal 5 mm (m²)

NGECATAN
mbok Baru (m²)

STALASI LISTRIK
Listrik PLN 2400 watt (LS)

ampu SL 25 Watt (Bh)

ekering Group (Bh)

op Kontak (Bh)

akelar Tunggal (Bh)

akelar Ganda (Bh)

set Jongkok Porselen (Bh)


Mandi Bata Bata, Vol 0.3 M³ (Bh)

n Air Ø ½" atau ¾" (Bh)

PVC tipe AW Ø 1" (m¹)

harga pipa

PVC tipe AW Ø 4" (m¹)

harga pipa
kontrol Pas Batu Bata 45X45 cm (Bh)
Daftar Rekapitulasi Rencanana Anggaran Biaya
Pekerjaan :
Lokasi :
Tahun :

No Jenis Pekerjaan Harga (Rp)


I PEKERJAAN PERSIAPAN Rp -
II PEKERJAAN TANAH
III #REF! #REF!
IV PEKERJAAN BETON Rp -
V #REF! #REF!
VI #REF! #REF!
VII #REF! #REF!
VIII PEKERJAAN PENUTUP ATAP Rp -
IX #REF! #REF!
X PEKERJAAN PENUTUP LANTAI DAN DINDING Rp -
XI #REF! #REF!
XII PEKERJAAN PENGECATAN Rp -
XIII PEKERJAAN INSTALASI LISTRIK Rp -
XIV PEKERJAAN SANITASI Rp -
TOTAL JUMLAH #REF!
dibulatkan #REF!
Daftar Harga Bahan
Pekerjaan :
Lokasi :
Tahun :

No Bahan Satuan Harga (Rp) Stok di pasaran


1 Dolken Kayu Ø 8-10/400 cm Btg Rp 25,000.00
2 Semen Portland Kg Rp 1,050.00 40kg/holcim 42,000.00
3 Pasir Beton M³ Rp 125,000.00
4 Koral Beton M³ Rp 135,000.00
5 Kayu 5/7 M³ Rp 1,700,000.00
6 Paku Biasa 2"-5" Kg Rp 10,000.00
7 Residu Lt Rp 11,000.00
8 Kayu Papan Bengkirai 3/20 M³ Rp 3,541,666.00 4m 85,000.00
9 Besi Strip Kg Rp 11,000.00
10 Pasir Pasang M³ Rp 125,000.00
11 Seng Plat Lbr Rp 27,000.00
12 Jendela Nako 12 kaca/1m Bh Rp 12,500.00
13 Kaca Polos 3 mm M² Rp 50,000.00
14 Kunci Tanam Bh Rp 25,000.00
15 Plywood 4 mm Lbr Rp 50,000.00
16 Pasir Urug M³ Rp 100,000.00
17 Batu Belah 15/20 cm M³ Rp 85,000.00
18 Bata Merah 5 X 11 X 22 cm Bh Rp 500.00
19 Kapur Padam M³ Rp 45,000.00
20 Kayu jati, balok M³ Rp 15,000,000.00
21 Kayu Jati, papan M³ Rp 18,000,000.00
22 Kayu Bengkirai, balok M³ Rp 8,500,000.00
23 Kayu Borneo, balok M³ Rp 8,500,000.00
24 Kayu Borneo,Papan M³ Rp 10,000,000.00
25 Kayu Meranti Btg Rp 1,687,000.00
26 Kayu Terentang M³ Rp 2,000,000.00
27 Minyak Bekisting Lt Rp 10,000.00
28 Besi Beton polos Kg Rp 12,000.00
29 Kawat Beton Kg Rp 13,000.00
30 Kayu Albasiah M³ Rp 3,000,000.00
31 Plywood tebal 9 mm Lbr Rp 95,000.00
32 Ubin Abu-Abu 20X20 cm Bh Rp 3,888.89 9bh 35,000.00
33 Plint Ubin 10x30 cm Bh Rp 2,700.00
34 Kunci Tanam Biasa Bh Rp 25,000.00
35 Engsel Pintu Bh Rp 8,000.00
36 Engsel Jendela Bh Rp 7,000.00
37 Door holder Bh Rp 5,000.00
38 Kaca Wireglass 5 mm M² Rp 90,000.00
39 Cat Meni Kg Rp 18,000.00
40 Kertas Gosok kayu Lbr Rp 3,000.00
41 Plamir Kg Rp 18,000.00
42 Cat dasar kayu Kg Rp 20,000.00
43 Cat penutup 2 kali Kg Rp 38,000.00
44 Minyak Cat Ltr Rp 12,000.00
45 Kuas 3" Bh Rp 10,000.00
46 Plamir Kg Rp 12,000.00
47 Kertas gosok tembok Lbr Rp 3,000.00
48 Cat Dasar tembok Kg Rp 35,000.00
49 Cat Penutup 2x Kg Rp 60,000.00
50 Kloset Jongkok Porselen Bh Rp 90,000.00
51 Porselen (11x11) Cm Bh Rp 2,500.00
52 Semen Nat Kg Rp 13,000.00
53 Kran Air bh Rp 15,000.00
54 Sealm Tape Kg Rp - bh 1,000.00
55 Pipa PVC 1" m¹ Rp 6,250.00 4m 25,000.00
56 Pipa PVC 4" m¹ Rp 21,250.00 4m 85,000.00
57 Batu Kerikil M3 Rp 125,000.00
58 Besi Beton Kg Rp 10,000.00
59 Genteng Bubung Palentong Bh Rp 7,500.00
60 Genteng Beton Bh Rp 5,500.00
61 Kayu Profil M¹ Rp 3,333.33 3m 10,000.00
62 Paku plafon Kg Rp 10,000.00
63 Pelat Asbes tebal 6mm M² Rp 32,000.00
64 Ubin Keramik 33X33 cm Bh Rp 4,000.00 9bh 36,000.00
65 Semen Warna Kg Rp 13,000.00
66 Ubin Keramik Artistik 10X20 cm Bh Rp 4,444.44 9bh 40,000.00
67 Septic tank + Resapan Bh Rp 2,500,000.00

No Tenaga Sat Harga


1 Pekerja Oh Rp 36,000.00
2 Tukang Batu Oh Rp 42,500.00
3 Tukang Kayu Oh Rp 47,500.00
4 Tukang Besi Oh Rp 45,000.00
5 Tukang Gali Oh Rp 42,500.00
6 Tukang Cat Oh Rp 42,500.00
7 Tukang Politur Oh Rp 45,000.00
8 Kepala Tukang Oh Rp 45,000.00
9 Mandor Oh Rp 40,000.00
10 Masinis/operator Oh Rp 60,000.00
11 Kernet Oh Rp 40,000.00
12 Penyemprot Oh Rp 40,000.00
13 Pekerja malam Oh Rp 40,000.00
k di pasaran

0.024
41.666666667
3,541,666.67

3,888.89
6,250.00
21,250.00

4,000.00

4,444.44
Rencanana Anggaran Biaya
Pekerjaan :
Lokasi :
Tahun :

No Jenis Pekerjaan durasi predes sumber daya


1 PEKERJAAN PERSIAPAN
2 Pembersihan Lahan C pek1
3 Pemasangan Pagar Semen 3 2fs-1 tk1,pek2
4 Membuat direksi keet & 4 3fs tk2,pek4
5 Listrik dan Air Kerja 1 4fs-2 tk1,pek2
6 Mob & Demob Alat 1 2fs-1 subcon,pek2
7
8 PEKERJAAN TANAH
9 Galian Tanah Biasa sed 2 6fs pek2
10 Pasangan Pondasi Batu K 4 9fs-1 tk2,pek4,semen 5
11 Urugan Pasir Bawah Pon 1 9fs-1 pek2
12 Urugan Kembali 2 10fs pek2
13
14 PEKERJAAN BETON
15 Membuat sloof Beton Ber 4 10fs tk2,pek4,besi10
16 Membuat Kolom Beton Be 4 15fs tk2,pek4,besi10
17 Membuat Ring Balok (200 5 16fs tk2,pek4,besi10
18 Membuat Kuda-Kuda Beto 5 17fs tk2,pek4,besi10,semen 10
19
20 PASANG TEMBOK
21 Pasangan Tembok ½ Bat 3 18fs+2 tk2,pek2,sem 5
22 Pasangan Tembok ½ Bat 4 21fs tk2,pek2,sem 5
23 Plesteran Dinding 1Pc:3 5 10000001000.000 tk2,pek2,sem 5
24
25 PEKERJAAN PENUTUP ATAP
26 Pasang Genteng Beton 5 18fs+2 tk2,pek4
27 Pasang Lantai Keramik 5 18fs+2 tk2,pek5,ubin 1000,sem5
28 Pasang kaca dan orname 3 27fs tk2,pek6
29
30 PEKERJAAN INSTALASI LISTRIK
31 Penyambungan Listrik P 1 26fs subcon
32 Pemasangan Lampu len 3 31fs subcon
33
34
35 sumber daya jml sat harga
36 tukang 5 oh 150,000
37 pekerja 10 oh 100,000
38 subkon 1 ls 2,000,000
39 semen cor m3 1,000,000
40 besi buah 100,000
41 kayu buah 200,000
42 ubin buah 75,000
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
Rencanana Anggaran Biaya
Pekerjaan :
Lokasi :
Tahun :

Harga Jumlah Harga Bobor


No Jenis Pekerjaan Volume Satuan
Satuan (Rp) (Rp) (%)

1 PEKERJAAN PERSIAPAN - 43,697,900.00


2 Pembersihan Lahan 500 m² 5,600.00 2,800,000.00 1.75% Pembersihan Lahan[500]
3 Pemasangan Pagar Sementara dari Kay 100 m¹ 188,715.00 18,871,500.00 11.81% Pemasangan Pagar Sementara dari Kayu tinggi 2 m[100]
4 Membuat direksi keet & Gudang Seme 24 m² 751,100.00 18,026,400.00 11.28% Membuat direksi keet & Gudang Sementara[24]
5 Listrik dan Air Kerja 1 Ls 2,000,000.00 2,000,000.00 1.25% Listrik dan Air Kerja[1]
6 Mob & Demob Alat 1 Ls 2,000,000.00 2,000,000.00 1.25% Mob & Demob Alat[1]
7 PEKERJAAN TANAH - 12,277,600.00 PEKERJAAN TANAH[0]
8 Galian Tanah Biasa sedalam 1 m 53 m³ 16,000.00 848,000.00 0.53% Galian Tanah Biasa sedalam 1 m[53]
9 Pasangan Pondasi Batu Kali 1 Pc: 5 P 28 m³ 389,500.00 10,906,000.00 6.82% Pasangan Pondasi Batu Kali 1 Pc: 5 Ps[28]
10 Urugan Pasir Bawah Pondasi 3 m³ 131,200.00 393,600.00 0.25% Urugan Pasir Bawah Pondasi[3]
11 Urugan Kembali 13 m³ 10,000.00 130,000.00 0.08% Urugan Kembali[13]
12 PEKERJAAN BETON - 4,888,650.00 PEKERJAAN BETON[0]
13 Membuat sloof Beton Bertulang (200Kg 3 m³ 339,150.00 1,017,450.00 0.64% Membuat sloof Beton Bertulang (200Kg besi+bekisting)[3]
14 Membuat Kolom Beton Bertulang (300K 3 m³ 1,275,000.00 3,825,000.00 2.39% Membuat Kolom Beton Bertulang (300Kg besi+bekisting)[3]
15 Membuat Ring Balok (200Kg besi+beki 3 m³ 5,775.00 17,325.00 0.01% Membuat Ring Balok (200Kg besi+bekisting)[3]
16 Membuat Kuda-Kuda Beton (200Kg bes 5 m³ 5,775.00 28,875.00 0.02% Membuat Kuda-Kuda Beton (200Kg besi+bekisting)[5]
17 PASANG TEMBOK - 3,768,750.00 PASANG TEMBOK[0]
18 Pasangan Tembok ½ Bata 1Pc:4Ps (T 38 m² 675.00 25,650.00 0.02% Pasangan Tembok ½ Bata 1Pc:4Ps (Trasraam)[38]
19 Pasangan Tembok ½ Bata 1Pc:3Kp:1 270 m² 3,250.00 877,500.00 0.55% Pasangan Tembok ½ Bata 1Pc:3Kp:10Ps[270]
20 Plesteran Dinding 1Pc:3Kp:10Ps teba 398 m² 7,200.00 2,865,600.00 1.79% Plesteran Dinding 1Pc:3Kp:10Ps tebal 15 mm[398]
21 TUKANG KAYU - 18,056,250.00 TUKANG KAYU[0]
22 Pasang Kusen Pintu dan Jendela Kayu 3 m³ 118,750.00 356,250.00 0.22% Pasang Kusen Pintu dan Jendela Kayu Jati[3]
23 Pasang Pintu Panel Kayu Jati 35 m² 380,000.00 13,300,000.00 8.32% Pasang Pintu Panel Kayu Jati[35]
24 Pasang Rangka Langit-langit 1X1 m K 220 m² 20,000.00 4,400,000.00 2.75% Pasang Rangka Langit-langit 1X1 m Kayu Borneo[220]
25 PEKERJAAN PENUTUP ATAP - 21,045,620.00 PEKERJAAN PENUTUP ATAP[0]
26 Pasang Genteng Kerpus 59 m¹ 74,780.00 4,412,020.00 2.76% Pasang Genteng Kerpus[59]
27 Pasang Genteng Beton 226 m² 73,600.00 16,633,600.00 10.41% Pasang Genteng Beton[226]
28 PEKERJAAN PENUTUP LANTAI DAN - 20,182,660.00 PEKERJAAN PENUTUP LANTAI DAN DINDING[0]
29 Pekerjaan Urug Pasir Bawah Lantai 20 m³ 131,200.00 2,624,000.00 1.64% Pekerjaan Urug Pasir Bawah Lantai[20]
30 Pasang Lantai Keramik 33X33 cm 140 m² 116,669.00 16,333,660.00 10.22% Pasang Lantai Keramik 33X33 cm[140]
31 Pasang kaca dan ornamen lain 35 m² 35,000.00 1,225,000.00 0.77% Pasang kaca dan ornamen lain[35]
32 PEKERJAAN PENGECATAN - 21,343,487.50 PEKERJAAN PENGECATAN[0]
33 Pengecatan Kayu 245 m² 26,352.50 6,456,362.50 4.04% Pengecatan Kayu[245]
34 Pengecatan Tembok Baru 550 m² 27,067.50 14,887,125.00 9.31% Pengecatan Tembok Baru[550]
35 PEKERJAAN INSTALASI LISTRIK - 5,000,000.00 PEKERJAAN INSTALASI LISTRIK[0]
36 Penyambungan Listrik PLN 2400 watt 1 LS 2,000,000.00 2,000,000.00 1.25% Penyambungan Listrik PLN 2400 watt[1]
37 Pemasangan Lampu lengkap 30 Bh 100,000.00 3,000,000.00 1.88% Pemasangan Lampu lengkap[30]
38 PEKERJAAN SANITASI - 9,584,400.00 PEKERJAAN SANITASI[0]
39 Memasang Kloset Jongkok Porselen 2 Bh 271,200.00 542,400.00 0.34% Memasang Kloset Jongkok Porselen [2]
40 Memasang Bak Mandi Bata Bata, Vol 4 Bh 1,635,500.00 6,542,000.00 4.09% Memasang Bak Mandi Bata Bata, Vol 0.3 m³[4]
41 Membuat Septictank 1.5x2x2 m + Per 1 Bh 2,500,000.00 2,500,000.00 1.56% Membuat Septictank 1.5x2x2 m + Peresapan[1]
TOTAL 159,845,317.50 100.00%
day predecessor

2
3 2fs-1
4 3fs
1 4fs-2
1 2fs-1

2 5fs
4 6fs
1 9fs-1
2 9fs-1

4 11fs
4 13fs
5 14fs
5 15fs

3 16fs+3
4 18fs
5 19fs

5 20fs+2
5 22fs
3 23fs

2 24fs
3 26fs

1 24fs
3 29fs
2 30fs
3 31fs
4 33fs

2 31fs
3 36fs

2 31fs
2 39fs
3 40fs
Task Name volume

Project4 masukkan rab 0


PEKERJAAN PERSIAPAN 0
Pembersihan Lahan 500
Pemasangan Pagar Sementara dari Kayu tinggi 2 m 100
Membuat direksi keet & Gudang Sementara 24
Listrik dan Air Kerja 1
Mob & Demob Alat 1
PEKERJAAN TANAH 0
Galian Tanah Biasa sedalam 1 m 53
Pasangan Pondasi Batu Kali 1 Pc: 5 Ps 28
Urugan Pasir Bawah Pondasi 3
Urugan Kembali 13
PEKERJAAN BETON 0
Membuat sloof Beton Bertulang (200Kg besi+bekisting) 3
Membuat Kolom Beton Bertulang (300Kg besi+bekisting) 3
Membuat Ring Balok (200Kg besi+bekisting) 3
Membuat Kuda-Kuda Beton (200Kg besi+bekisting) 5
PASANG TEMBOK 0
Pasangan Tembok ½ Bata 1Pc:4Ps (Trasraam) 38
Pasangan Tembok ½ Bata 1Pc:3Kp:10Ps 270
Plesteran Dinding 1Pc:3Kp:10Ps tebal 15 mm 398
TUKANG KAYU 0
Pasang Kusen Pintu dan Jendela Kayu Jati 3
Pasang Pintu Panel Kayu Jati 35
Pasang Rangka Langit-langit 1X1 m Kayu Borneo 220
PEKERJAAN PENUTUP ATAP 0
Pasang Genteng Kerpus 59
Pasang Genteng Beton 226
PEKERJAAN PENUTUP LANTAI DAN DINDING 0
Pekerjaan Urug Pasir Bawah Lantai 20
Pasang Lantai Keramik 33X33 cm 140
Pasang kaca dan ornamen lain 35
PEKERJAAN PENGECATAN 0
Pengecatan Kayu 245
Pengecatan Tembok Baru 550
PEKERJAAN INSTALASI LISTRIK 0
Penyambungan Listrik PLN 2400 watt 1
Pemasangan Lampu lengkap 30
PEKERJAAN SANITASI 0
Memasang Kloset Jongkok Porselen 2
Memasang Bak Mandi Bata Bata, Vol 0.3 m³ 4
Membuat Septictank 1.5x2x2 m + Peresapan 1
1
Project4 masukkan rab[0]
PEKERJAAN PERSIAPAN[0]
Pembersihan Lahan[500]
Pemasangan Pagar Sementara dari Kayu tinggi 2 m[100]
Membuat direksi keet & Gudang Sementara[24]
Listrik dan Air Kerja[1]
Mob & Demob Alat[1]
PEKERJAAN TANAH[0]
Galian Tanah Biasa sedalam 1 m[53]
Pasangan Pondasi Batu Kali 1 Pc: 5 Ps[28]
Urugan Pasir Bawah Pondasi[3]
Urugan Kembali[13]
PEKERJAAN BETON[0]
Membuat sloof Beton Bertulang (200Kg besi+bekisting)[3]

Membuat Kolom Beton Bertulang (300Kg besi+bekisting)[3]


Membuat Ring Balok (200Kg besi+bekisting)[3]
Membuat Kuda-Kuda Beton (200Kg besi+bekisting)[5]
PASANG TEMBOK[0]
Pasangan Tembok ½ Bata 1Pc:4Ps (Trasraam)[38]
Pasangan Tembok ½ Bata 1Pc:3Kp:10Ps[270]
Plesteran Dinding 1Pc:3Kp:10Ps tebal 15 mm[398]
TUKANG KAYU[0]
Pasang Kusen Pintu dan Jendela Kayu Jati[3]
Pasang Pintu Panel Kayu Jati[35]
Pasang Rangka Langit-langit 1X1 m Kayu Borneo[220]
PEKERJAAN PENUTUP ATAP[0]
Pasang Genteng Kerpus[59]
Pasang Genteng Beton[226]
PEKERJAAN PENUTUP LANTAI DAN DINDING[0]
Pekerjaan Urug Pasir Bawah Lantai[20]
Pasang Lantai Keramik 33X33 cm[140]
Pasang kaca dan ornamen lain[35]
PEKERJAAN PENGECATAN[0]
Pengecatan Kayu[245]
Pengecatan Tembok Baru[550]
PEKERJAAN INSTALASI LISTRIK[0]
Penyambungan Listrik PLN 2400 watt[1]
Pemasangan Lampu lengkap[30]
PEKERJAAN SANITASI[0]
Memasang Kloset Jongkok Porselen[2]
Memasang Bak Mandi Bata Bata, Vol 0.3 m³[4]
Membuat Septictank 1.5x2x2 m + Peresapan[1]