DAFTAR ANALISA

HARGA SATUAN PEKERJAAN


NO. KOEF. URAIAN PEKERJAAN SAT. HARGA
1 2 3 4 5

1 Pengukuran dan Pemasangan Bouwplank Talud


0.1000 Pekerja O/H 120,000.00
0.0050 Mandor O/H 180,000.00
0.0100 Kepala Tukang Kayu. O/H 160,000.00
0.1000 Tukang Kayu. O/H 200,000.00
0.0200 Paku Kg 30,000.00
0.0070 Papan (3x20) cm M3 3,984,852.49
0.0120 Usuk : 5/7 M3 3,984,852.49
Jumlah

2 Papan Nama Proyek 80 x 120 cm (bh)


2.1000 Pekerja O/H 120,000.00
1.0050 Mandor O/H 180,000.00
0.0175 Tukang Batu O/H 200,000.00
0.1000 Tukang Kayu O/H 200,000.00
1.0000 Tukang Cat O/H 200,000.00
0.0350 Kayu kelas III M3 3,984,852.49
1.4000 Plat seng tebal 0.050 cm lebar 0.90m m' 227,600.00
0.6000 Paku Kg 30,000.00
1.5000 Cat Kg 45,000.00
16.8000 Semen PC Kg 5,951.76
0.0270 Pasir beton m3 1,922,109.98
0.0175 Koral/krikil m3 2,037,974.98
Jumlah
3 Penerangan, Keamanan, Dan Keselematan Kerja (Ls/Hari)
2.4000 Pekerja O/H 200,000.00
15.2780 Solar Ltr 25,000.00
0.0060 Genset 1,5 KVA Unit 17,689,000.00
0.0060 Perlengkapan Keamanan Ls 100,000.00
0.0060 Perlengkapan Keselamtan Ls 90,000.00
Jumlah
4 Kantor Sementara
1.0000 Pekerja O/H 120,000.00
2.0000 Tukang Kayu O/H 200,000.00
0.3000 Kepala Tukang Kayu O/H 160,000.00
0.0500 Mandor O/H 180,000.00
1.7000 Dolken Kayu (8-10) cm, L=4m Btg 30,000.00
0.1800 Kayu Kelas II M3 3,984,852.49
1.1000 Besi Strip Tebal 5mm Kg 58,000.00
0.3000 Paku 5 cm-10 cm Kg 30,000.00
35.0000 Semen Pc Kg 5,951.76
0.1000 Pasir Beton M3 1,922,109.98
0.1500 Kerikil M3 2,037,974.98
0.1500 Pasir Pasang M3 1,922,109.98
13.0000 Batako Bh 26,543.44
1.5000 Seng Gelombang BJLS 30 Lbr 227,600.00
0.2000 Jendela Nako ( Rangka+ Kaca 5 mm) M2 611,800.00
0.0800 Kaca Polos 5 mm M2 1,500,000.00
0.0600 Tripleks tebal 6 mm Lbr 290,000.00
1.0000 Kunci Tanam Bh 370,000.00
Jumlah

5 GUDANG SEMEN DAN ALAT-ALAT


1.0000 Pekerja O/H 120,000.00
2.0000 Tukang Kayu O/H 200,000.00
0.2000 Kepala Tukang Kayu O/H 160,000.00
0.0500 Mandor O/H 180,000.00
1.7000 Dolken Kayu (8-10) cm, L=4m Btg 30,000.00
0.2100 Kayu Kelas III M3 3,984,852.49
0.3000 Paku 5 cm-10 cm Kg 30,000.00
10.5000 Semen Pc Kg 5,951.76
0.0300 Pasir Beton M3 1,922,109.98
0.0500 Kerikil M3 2,037,974.98
1.5000 Seng Gelombang BJLS 30 Lbr 227,600.00
Jumlah

6 1 M3 PASANGAN PONDASI BATU GUNUNG 1 Pc : 2 Ps


1.1000 Batu Gunung M3 2,037,974.98
267.0000 Semen PC Kg 5,951.76
0.4270 Pasir Pasang / Beton M3 2,037,974.98
1.5000 Pekerja O/H 120,000.00
0.6000 Tukang O/H 200,000.00
0.0600 Kepala Tukang O/H 160,000.00
0.0750 Mandor O/H 180,000.00
Jumlah

7 1 M3 GALIAN TANAH BIASA ( MANUAL )


0.4000 Pekerja O/H 120,000.00
0.0750 Mandor O/H 180,000.00
Jumlah

8 1 M3 URUGAN TANAH
0.5000 Pekerja O/H 120,000.00
0.0500 Mandor O/H 180,000.00
1.2000 Tanah Timbunan M3 2,269,704.98
Jumlah

9 1 M3 URUGAN PASIR
0.5000 Pekerja O/H 120,000.00
0.0500 Mandor O/H 180,000.00
1.2000 Pasir Urug M3 1,922,109.98
Jumlah

10 1 M3 PEKERJAAN PENGECORAN BETON K 300 EXPOSE


A. BETON K 300 EXPOSE
450.0000 Semen PC Kg 5,951.76
0.6800 Pasir Pasang / Beton M3 1,922,109.98
0.5800 Pasir Abu Batu M3 2,672,109.98
1.1000 Batu Kerikil / Split 1 - 2 cm M3 2,037,974.98
6.0000 Pekerja O/H 120,000.00
1.0000 Tukang O/H 200,000.00
0.1000 Kepala Tukang O/H 160,000.00
0.3000 Mandor O/H 180,000.00
A……………..
B. CETAKAN BEKESTING
0.2000 Kayu Klas II Papan M3 3,984,852.49
0.2000 Kayu Klas II Balok M3 3,984,852.49
4.0000 Paku Campuran Kg 30,000.00
2.0000 Pekerja O/H 120,000.00
5.0000 Tukang O/H 200,000.00
0.5000 Kepala Tukang O/H 160,000.00
0.1000 Mandor O/H 180,000.00
4.0000 Pekerja Bongkar Bekisting O/H 120,000.00
B……………..
C……………..
D. PEMBUATAN STELLING
0.5000 Kayu Klas II Balok M3 3,984,852.49
5.0000 Paku Campuran Kg 30,000.00
2.5000 Pekerja O/H 120,000.00
6.0000 Tukang O/H 200,000.00
0.5000 Kepala Tukang O/H 160,000.00
0.1500 Mandor O/H 180,000.00
D……………..
E……………..

11 1 KG MENGERJAKAN BESI TULANGAN BETON


1.0000 Besi Beton Ulir Ø 16 Kg 16,086.50
0.0150 Kawat Beton Kg 50,000.00
0.0197 Pekerja O/H 120,000.00
0.0197 Tukang Besi O/H 200,000.00
0.0020 Kepala Tukang O/H 160,000.00
0.0008 Mandor O/H 180,000.00
Jumlah
447,519.95
12 1 KG MENGERJAKAN BESI TULANGAN BETON
1.0000 Besi Beton Ulir Ø 8 Kg 20,240.16
0.0150 Kawat Beton Kg 50,000.00
0.0197 Pekerja O/H 120,000.00
0.0197 Tukang Besi O/H 200,000.00
0.0020 Kepala Tukang O/H 160,000.00
0.0008 Mandor O/H 180,000.00
Jumlah
132,567.60

13 1 KG MENGERJAKAN BESI TULANGAN BETON


1.0000 Besi Beton Ulir Ø 19 Kg 29,035.87
0.0150 Kawat Beton Kg 50,000.00
0.0197 Pekerja O/H 120,000.00
0.0197 Tukang Besi O/H 200,000.00
0.0020 Kepala Tukang O/H 160,000.00
0.0008 Mandor O/H 180,000.00
Jumlah
978,151.58

14 1 KG MENGERJAKAN BESI TULANGAN BETON


1.0000 Besi Beton Polos Ø 12 Kg 14,227.67
0.0150 Kawat Beton Kg 50,000.00
0.0197 Pekerja O/H 120,000.00
0.0197 Tukang Besi O/H 200,000.00
0.0020 Kepala Tukang O/H 160,000.00
0.0008 Mandor O/H 180,000.00
Jumlah
103,938.94
15 1 M' PEKERJAAN RELLING TANGGA
1.5000 Besi Piva Galvanis 2" Btg 2,400,000.00
0.2500 Kawat Las Bks 400,000.00
1.5000 Pekerja O/H 120,000.00
2.1500 Tukang Las O/H 200,000.00
0.0150 Kepala Tukang O/H 160,000.00
0.0015 Mandor O/H 180,000.00
Jumlah
16 1 M' CAT KILAP UNTUK BIDANG BESI BARU 3 x SAPU
0.5000 Cat Kilap / Besi Kg 75,000.00
0.5700 Tenner ltr 50,000.00
0.0500 Kuas Cat 3" Bh 71,700.00
4.0000 Kertas Amplas lbr 37,500.00
0.4500 Pekerja O/H 120,000.00
1.4175 Tukang cat O/H 200,000.00
0.1418 Kepala tukang O/H 160,000.00
0.0563 Mandor O/H 180,000.00
1 M'
Jadi 1 M'
17 1 M' CAT DASAR / MENI
0.5000 Cat Dasar / Meni Kg 75,000.00
0.2000 Tenner ltr 50,000.00
1.0000 Kertas Amplas lbr 37,500.00
0.4500 Pekerja O/H 120,000.00
1.4175 Tukang cat O/H 200,000.00
0.1418 Kepala tukang O/H 160,000.00
0.0563 Mandor O/H 180,000.00
1 M'
17 PEK. SAMBUNGAN TIANG PANCANG
1.0000 Pek Sambungan Tiang Pancang Ls 544,500.00
Ls
Ls

18 1 Unit Pekerjaan Besi Plat Fleb


450.0000 Semen PC Kg 5,951.76
0.6800 Pasir Pasang / Beton M3 1,922,109.98
1.1000 Batu Kerikil / Split 1 - 2 cm M3 2,037,974.98
3.0000 Besi Plat Baja 20 mm x 400 mm x 800 mm Btg 10,437,000.00
2.0000 Manual Winch 2 Ton Bh 7,500,000.00
1,128.0000 Besi Baja H Beam L 300 x 300 x 10 x 15 (1128 Kg)/Btg Kg 52,500.00
672.0000 Besi Baja WF 150 x 75 x 5 x 7 (168 Kg)/ Btg Kg 46,500.00
40.0000 Tali Sling M' 125,000.00
1.0000 Besi Siku Btg 600,000.00
300.0000 Baut Bh 19,500.00
20.0000 Wire Rope Clip Bh 142,500.00
6.0000 Roda Rell Bh 1,350,000.00
115.0000 Baut Angkur Bh 216,750.00
35.0000 Kawat Las Bks 400,000.00
21.0000 Pekerja O/H 120,000.00
21.0000 Tukang O/H 200,000.00
21.0000 Tukang Las O/H 200,000.00
0.0150 Kepala Tukang O/H 160,000.00
0.0015 Mandor O/H 180,000.00
Jumlah

19 1 m3 Pengerukan Tanah Menggunakan alat berat + urugan tanggul diratakan dan dipadatkan
0.0140 Pekerja O/H 120,000.00
0.0070 Mandor O/H 180,000.00
0.0982 Excavator Jam 1,060,423.57
0.1000 Ponton Jam 2,205,770.00
0.0112 Buldozer Jam 859,353.43
0.0435 Dump Truck Jam 587,631.78
1.0000 Alat bantu Ls 1,000.00
Jumlah

20 6 M' Pekerjaan Pagar Pengaman


150.0000 Semen PC Kg 5,951.76
0.6800 Pasir Pasang / Beton M3 1,922,109.98
1.1000 Batu Kerikil / Split 1 - 2 cm M3 2,037,974.98
2.0000 Besi Piva Galvanis 2" Btg 2,400,000.00
0.5000 Kawat Las Bks 400,000.00
1.5000 Pekerja O/H 120,000.00
2.0000 Tukang O/H 200,000.00
2.0000 Tukang Las O/H 200,000.00
0.0150 Kepala Tukang O/H 160,000.00
0.0015 Mandor O/H 180,000.00
Jumlah

21 1 M' CAT ANTI LUMUT UNTUK BIDANG LUAR DINDING BARU 3 x SAPU
0.2500 Cat Anti Lumut Kg 75,000.00
0.0500 Kuas Cat 3" Bh 71,700.00
0.4500 Pekerja O/H 120,000.00
0.1500 Tukang cat O/H 200,000.00
0.1418 Kepala tukang O/H 160,000.00
0.0563 Mandor O/H 180,000.00

22 1 M' CAT DASAR / MENI


0.5000 Cat Dasar / Meni Kg 75,000.00
0.2000 Tenner ltr 50,000.00
1.0000 Kertas Amplas lbr 37,500.00
0.4500 Pekerja O/H 120,000.00
1.4175 Tukang cat O/H 200,000.00
0.1418 Kepala tukang O/H 160,000.00
0.0563 Mandor O/H 180,000.00
1 M'

23 Bollard Dermaga Mooring Dolphin


5.0000 Angkur diameter 25 mm Bh 216,750.00
1.0000 Bollard 25 ton Bh 29,215,000.00
2.0000 Pekerja. O/H 120,000.00
0.5000 Tukang. O/H 200,000.00
0.1000 Mandor. O/H 160,000.00
0.4000 Mesin las 40 Amp Jam 737,373.57
1.0000 Alat bantu pengelasan/pemotongan Jam 81,401.32

24 Bitt Bollard
5.0000 Angkur diameter 25 mm Bh 216,750.00
1.0000 Bollard 25 ton Bh 29,215,000.00
2.0000 Pekerja. O/H 120,000.00
0.5000 Tukang. O/H 200,000.00
0.1000 Mandor. O/H 160,000.00
0.4000 Mesin las 40 Amp Jam 737,373.57
1.0000 Alat bantu pengelasan/pemotongan Jam 81,401.32

25 Plesteran 1 Pc : 2 Ps tebal 15 mm
0.3000 Pekerja. O/H 120,000.00
0.0150 Mandor. O/H 180,000.00
0.0150 Kepala tukang O/H 160,000.00
0.1500 Tukang batu O/H 200,000.00
10.2000 Semen Pc Kg 5,951.76
0.0200 Pasir Pasang M3 1,922,109.98
ALISA
PEKERJAAN
BAHAN ALAT UPAH JUMLAH
6=2x5 7=2x5 8= 2x5 9=6+7+8

- - 12,000.00 12,000.00
- - 900.00 900.00
- - 1,600.00 1,600.00
- - 20,000.00 20,000.00
600.00 - - 600.00
27,893.97 - - 27,893.97
47,818.23 - - 47,818.23
76,312.20 - 34,500.00 110,812.20

- - 252,000.00 252,000.00
- - 180,900.00 180,900.00
- - 3,500.00 3,500.00
- - 20,000.00 20,000.00
- - 200,000.00 200,000.00
139,469.84 - - 139,469.84
318,640.00 - - 318,640.00
18,000.00 - - 18,000.00
67,500.00 - - 67,500.00
99,989.54 - - 99,989.54
51,896.97 - - 51,896.97
35,664.56 - - 35,664.56
731,160.91 - 656,400.00 1,387,560.91

- - 480,000.00 480,000.00
381,950.00 - - 381,950.00
106,134.00 - - 106,134.00
600.00 - - 600.00
540.00 - - 540.00
489,224.00 - 480,000.00 969,224.00

- - 120,000.00 120,000.00
- - 400,000.00 400,000.00
- - 48,000.00 48,000.00
- - 9,000.00 9,000.00
51,000.00 - 51,000.00
717,273.45 - 717,273.45
63,800.00 - 63,800.00
9,000.00 - 9,000.00
208,311.54 - 208,311.54
192,211.00 - 192,211.00
305,696.25 - 305,696.25
288,316.50 - 288,316.50
345,064.71 - 345,064.71
341,400.00 - 341,400.00
122,360.00 - 122,360.00
120,000.00 - 120,000.00
17,400.00 - 17,400.00
370,000.00 - 370,000.00
3,151,833.45 - 577,000.00 3,728,833.45

- - 120,000.00 120,000.00
- - 400,000.00 400,000.00
- - 32,000.00 32,000.00
- - 9,000.00 9,000.00
51,000.00 - 51,000.00
836,819.02 - 836,819.02
9,000.00 - 9,000.00
62,493.46 - 62,493.46
57,663.30 - 57,663.30
101,898.75 - 101,898.75
341,400.00 - 341,400.00
1,460,274.53 - 561,000.00 2,021,274.53

2,241,772.48 - - 2,241,772.48
1,589,119.47 - - 1,589,119.47
870,215.32 - - 870,215.32
- - 180,000.00 180,000.00
- - 120,000.00 120,000.00
- - 9,600.00 9,600.00
- - 13,500.00 13,500.00
4,701,107.27 - 323,100.00 5,024,207.27

- - 48,000.00 48,000.00
- - 13,500.00 13,500.00
- - 61,500.00 61,500.00

- - 60,000.00 60,000.00
- - 9,000.00 9,000.00
2,723,645.98 - - 2,723,645.98
- - 69,000.00 2,792,645.98

- - 60,000.00 60,000.00
- - 9,000.00 9,000.00
2,306,531.98 - - 2,306,531.98
- - 69,000.00 2,375,531.98

2,678,291.24 - - 2,678,291.24
1,307,034.79 - - 1,307,034.79
1,549,823.79 - - 1,549,823.79
2,241,772.48 - - 2,241,772.48
- - 720,000.00 720,000.00
- - 200,000.00 200,000.00
- - 16,000.00 16,000.00
- - 54,000.00 54,000.00
7,776,922.30 - 990,000.00 8,766,922.30

796,970.50 - - 796,970.50
796,970.50 - - 796,970.50
120,000.00 - - 120,000.00
- - 240,000.00 240,000.00
- - 1,000,000.00 1,000,000.00
- - 80,000.00 80,000.00
- - 18,000.00 18,000.00
- - 480,000.00 480,000.00
1,713,941.00 - 1,818,000.00 3,531,941.00
1/2 x B 1,765,970.50

1,992,426.24 - - 1,992,426.24
150,000.00 - - 150,000.00
- - 300,000.00 300,000.00
- - 1,200,000.00 1,200,000.00
- - 80,000.00 80,000.00
- - 27,000.00 27,000.00
2,142,426.24 - 1,607,000.00 3,749,426.24
1/2 x D 1,874,713.12
Untuk BETON tanpa CETAKAN = A 8,766,922.30
Untuk POER, SLOEF = A + C 10,532,892.80
Untuk KOLOM = A + B + E 14,173,576.42
Untuk BALOK, PLAT & RING-BALK = A + B + D 16,048,289.54

16,086.50 - - 16,086.50
750.00 - - 750.00
- - 2,362.50 2,362.50
- - 3,937.50 3,937.50
- - 315.00 315.00
- - 151.88 151.88
16,836.50 - 6,766.88 23,603.37

20,240.16 - - 20,240.16
750.00 - - 750.00
- - 2,362.50 2,362.50
- - 3,937.50 3,937.50
- - 315.00 315.00
- - 151.88 151.88
20,990.16 - 6,766.88 27,757.03

29,035.87 - - 29,035.87
750.00 - - 750.00
- - 2,362.50 2,362.50
- - 3,937.50 3,937.50
- - 315.00 315.00
- - 151.88 151.88
29,785.87 - 6,766.88 36,552.75
14,227.67 - - 14,227.67
750.00 - - 750.00
- - 2,362.50 2,362.50
- - 3,937.50 3,937.50
- - 315.00 315.00
- - 151.88 151.88
14,977.67 - 6,766.88 21,744.55

3,600,000.00 - - 3,600,000.00
100,000.00 - - 100,000.00
- - 180,000.00 180,000.00
- - 430,000.00 430,000.00
- - 2,400.00 2,400.00
- - 270.00 270.00
3,700,000.00 - 612,670.00 4,312,670.00

37,500.00 - - 37,500.00
28,500.00 - - 28,500.00
3,585.00 - - 3,585.00
150,000.00 - - 150,000.00
- - 54,000.00 54,000.00
- - 283,500.00 283,500.00
- - 22,680.00 22,680.00
- - 10,125.00 10,125.00
219,585.00 - 370,305.00 589,890.00
1,045,195.00

37,500.00 - - 37,500.00
10,000.00 - - 10,000.00
37,500.00 - - 37,500.00
- - 54,000.00 54,000.00
- - 283,500.00 283,500.00
- - 22,680.00 22,680.00
- - 10,125.00 10,125.00
85,000.00 - 370,305.00 455,305.00

544,500.00 - - 544,500.00
544,500.00 - - 544,500.00
544,500.00

2,678,291.24 - - 2,678,291.24
1,307,034.79 - - 1,307,034.79
2,241,772.48 - - 2,241,772.48
31,311,000.00 - - 31,311,000.00
15,000,000.00 - - 15,000,000.00
59,220,000.00 - - 59,220,000.00
31,248,000.00 - - 31,248,000.00
5,000,000.00 - - 5,000,000.00
600,000.00 - - 600,000.00
5,850,000.00 - - 5,850,000.00
2,850,000.00 - - 2,850,000.00
8,100,000.00 - - 8,100,000.00
24,926,250.00 - - 24,926,250.00
14,000,000.00 - - 14,000,000.00
- - 2,520,000.00 2,520,000.00
- - 4,200,000.00 4,200,000.00
- - 4,200,000.00 4,200,000.00
- - 2,400.00 2,400.00
- - 270.00 270.00
198,105,250.00 - 10,922,670.00 215,255,018.51

- - 1,680.00
- - 1,260.00 1,260.00
- 104,133.59 - 104,133.59
- 220,577.00 - 220,577.00
9,656.24 9,656.24
25,560.10 25,560.10
- 1,000.00 - 1,000.00
- 360,926.94 2,940.00 363,866.94

892,763.75 - - 892,763.75
1,307,034.79 - - 1,307,034.79
2,241,772.48 - - 2,241,772.48
4,800,000.00 - - 4,800,000.00
200,000.00 - - 200,000.00
- - 180,000.00 180,000.00
- - 400,000.00 400,000.00
- - 400,000.00 400,000.00
- - 2,400.00 2,400.00
- - 270.00 270.00
5,000,000.00 - 982,670.00 10,424,241.02
1,737,373.50

18,750.00 - - 18,750.00
3,585.00 - - 3,585.00
- - 54,000.00 54,000.00
- - 30,000.00 30,000.00
- - 22,680.00 22,680.00
- - 10,125.00 10,125.00
22,335.00 - 116,805.00 139,140.00

37,500.00 - - 37,500.00
10,000.00 - - 10,000.00
37,500.00 - - 37,500.00
- - 54,000.00 54,000.00
- - 283,500.00 283,500.00
- - 22,680.00 22,680.00
- - 10,125.00 10,125.00
85,000.00 - 370,305.00 455,305.00

1,083,750.00 - - 1,083,750.00
29,215,000.00 - - 29,215,000.00
- - 240,000.00 240,000.00
- - 100,000.00 100,000.00
- - 16,000.00 16,000.00
- 294,949.43 - 294,949.43
- 81,401.32 - 81,401.32
29,215,000.00 376,350.75 356,000.00 29,947,350.75

1,083,750.00 - - 1,083,750.00
29,215,000.00 - - 29,215,000.00
- - 240,000.00 240,000.00
- - 100,000.00 100,000.00
- - 16,000.00 16,000.00
- 294,949.43 - 294,949.43
- 81,401.32 - 81,401.32
29,215,000.00 376,350.75 356,000.00 29,947,350.75

- - 36,000.00 36,000.00
- - 2,700.00 2,700.00
- - 2,400.00 2,400.00
- - 30,000.00 30,000.00
60,707.93 - - 60,707.93
38,442.20 - - 38,442.20
99,150.13 - 71,100.00 170,250.13
DAFTAR HARGA
UPAH KERJA - BAHAN / MATERIAL
NO. URAIAN / JENIS SAT. HARGA ( RP )

A. UPAH KERJA
1 Pekerja O/H 120,000.00
2 Tukang O/H 200,000.00
3 Tukan Las O/H 200,000.00
4 Tukan Cat O/H 200,000.00
5 Kepala Tukang O/H 160,000.00
6 Mandor O/H 180,000.00
7 Satpam O/H 200,000.00
B. BAHAN / MATERIAL
1 Semen PC 50 Zak 297,587.92
2 Batu Bata Merah Bj 3,800.00
3 Batu Batako Bj 26,543.44
4 Batu Gunung / Kali (import) M³ 2,037,974.98
5 Tanah Timbunan (import) M³ 2,269,704.98
6 Abu Batu (import) M³ 2,672,109.98
7 Pasir Pasangan / Beton (import) M³ 1,922,109.98
8 Pasir Urug (import) M³ 1,922,109.98
9 Paving - Block M² 375,000.00
10 Batu Kerikil / Split 1 - 2 cm (import) M³ 2,037,974.98
11 Besi Beton Polos Ø 8 mm Btg 96,667.00
12 Besi Beton Polos Ø 10 mm Btg 118,333.00
13 Besi Beton Polos Ø 12 mm Btg 151,667.00
14 Besi Beton Ulir Ø 16 mm Btg 305,000.00
15 Besi Beton Polos Ø 19 mm Btg 777,000.00
16 Kawat Beton Kg 50,000.00
17 Minyak Bekesting / Oli Kotor Kg 29,450.00
18 Paku Kg 30,000.00
19 Cat Besi Kg 75,000.00
20 Cat Tembok Kg 45,000.00
21 Cat Anti Lumut Kg 75,000.00
22 Tenner / Minyak Cat Ltr 50,000.00
23 Kertas Amplas Lbr 37,500.00
24 Kuas Cat Bh 71,700.00
25 Atap Spandek M 315,000.00
26 Seng Plat BJLS 30 M' 227,600.00
27 Paku Sekrup Dos 152,700.00
28 Piva GLP 2" Btg 2,400,000.00
29 Kayu Kls II Balok M³ 3,984,852.49
30 Kayu Kls II Papan M³ 3,984,852.49
31 Sheet Pile Btg 3,900,600.00
32 Tiang Ø500 mm Bottom K-600 kg/cm2 L= 6 Btg 4,666,200.00
33 Tiang Ø500 mm Bottom K-600 kg/cm2 L= 8 Btg 6,476,800.00
34 Besi Siku Btg 600,000.00
35 Baut Bh 19,500.00
36 Angkur 25 mm Bh 216,750.00
37 Tempat Penambat Tali Kapal (Bitt Bollard) 25 Ton Bh 29,215,000.00
38 Besi Baja Ringan Btg 300,000.00
39 Kawat Las Dos 400,000.00
40 Wire Rope Clip Bh 142,500.00
41 Solar Ltr 25,000.00
42 Genset 1,5 kVA Unit 17,689,000.00
43 Perlengkapan Keselamatan Ls 90,000.00
44 Perlengkapan Keamaanan Ls 100,000.00
45 Dolken Kayu 8-10 cm, L=4m Btg 30,000.00
46 Besi Strip t=5 mm Kg 58,000.00
47 Jendela Nako (rangka + Kaca 5 mm) M2 611,800.00
48 Kaca Polos 5 mm M2 1,500,000.00
49 Polywood Tebal 6 mm M2 290,000.00
50 Kunci Tanam Bh 370,000.00
51 Besi Plat Baja 20 mm x 400 mm x 800 mm Lbr 10,437,000.00
52 Manual Winch 2 Ton Bh 7,500,000.00
53 Besi Baja H Beam L 300 x 300 x 10 x 15 (1128 Kg)/Btg Kg 52,500.00
54 Besi Baja WF 150 x 75 x 5 x 7 (168 Kg)/ Btg Kg 46,500.00
55 Tali Sling 16 MM 6x37 IWRC x 500 M M 125,000.00
56 Roda Rell Bh 1,350,000.00

- 13 -
A. UPAH KERJA
1 Pekerja O/H 120,000.00
2 Tukang O/H 200,000.00
3 Tukan Las O/H 200,000.00
4 Tukan Cat O/H 200,000.00
5 Kepala Tukang O/H 160,000.00
6 Mandor O/H 180,000.00
7 Satpam O/H 200,000.00

………………………………………..
DIPERIKSA/DISETUJUI DIBUAT

………………………. ……………………….
………………………… ……………………

- 14 -
` Jenis Pekerjaan : Pemancangan Tiang Pancang
Satuan Pembayaran : M'
No. U R A I A N KODE KOEF
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : Distrik Kolfe Braza Kampung Papera
3 Menggunakan ponton ditarik tag boat
4 Pengangkutan dan pengangkatan sheet pile menggunakan crane
5 Jam kerja efektif per-hari Tk 7.000
6 Panjang Pemancangan L 14.000
7 Berat per M Tiang W 290.000

II URUTAN KERJA
1 Dibutuhkan ponton dalam pelaksanaan pemancangan
2 Dengan bantuan Crane, sheet pile diangkut diatas ponton kemudian ponton
ditarik tug boat ke titik pemancangan
3 Pemancangan menggunakan vibro hammer diesel
3 Ponton menunggu hingga tiang selesai dipancangkan

III PEMAKAIAN BAHAN, ALAT DAN TENAGA


1 BAHAN
2 ALAT
2.a PONTON + TUG BOAT
Kapasitas muatan ponton (sesuai kapasitas pemancangan) V 46.000
Kapasitas produksi pemancangan/jam Qa 6.640
Waktu siklus :
- Waktu memuat tiang pancang Ts2 20.000
- Waktu tempuh muatan ketitik pemancangan Ts1 15.000
- Waktu tunggu pemancangan = ( V x 60 ) / Q3 T1 436.850
- Waktu tempuh kosong T2 10.000
- Lain-Lain ( bongkar dan muat) T3 11.820
Ts1 493.670
Kap. Prod. / jam = V x 60
Q1 5.591
Ts1
Koefisien Alat / M¹ = 1 : Q1 0.179
2.b CRANE
Kapasitas V 1.000
Faktor Efisiensi alat Fa 0.830
Waktu siklus
- Waktu memuat dan memancang T1 52.000
- dan lain-lain ( termasuk mengatur dan menggeser) T2 10.000
Ts2 62.000
Kap. Prod. / jam = V x Fa x L x 60
Q2 11.245
Ts2
Koefisien Alat / M¹ = 1 : Q2 0.089
2.c VIBRO HAMMER DIESEL
Kapasitas V 1.000
Faktor Efisiensi alat Fa 0.830
Waktu siklus
- Waktu penggeseran dan penyetelan tiang T1 35.000
- Waktu pemancangan T2 32.000
Ts3 67.000
Kap. Prod. / jam = V x Fa x L x 60
Q3 6.318
Ts3
Koefisien Alat / M¹ = 1 : Q3 0.158
2.d WELDING SET
Diasumsi panjang tiang L 14.000
Pembuatan sepatu/peruncing Ts4 1.000
Koefisien Alat / M¹ = 1 : ( L x W : Ts4 ) 0.000
2.e GENSET
Koefisien Alat / M¹ = Vibro Hammer Diesel 0.158
2.f ALAT BANTU
Diperlukan alat bantu untuk pek. Tiang Pancang Baja
- Techkel
- Tambang, seling, rantai dan alat kecil lainnya
3 TENAGA
Produksi Pemancangan dalam 1 hari = Tk x Q1 Qt 39.135
Kebutuhan tenaga = - Mandor M 1.000
= - Tukang Tb 4.000
= - Pekerja P 12.000
Koef. Tenaga / M¹ = - Mandor = (Tk x M) : Qt 0.179
= - Tukang = (Tk x Tb) : Qt 0.715
= - Pekerja = (Tk x P) : Qt 2.146

IV HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

V ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam ANALISA HARGA SATUAN PEKERJAN Didapat Harga Satuan Pekerjaan :

Rp 819,760 /m'

Jenis Pekerjaan : PENIMBUNAN DAN PERATAAN


Satuan Pembayaran : M3
No. U R A I A N KODE KOEF
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : Distrik Kolfe Braza Kampung Papera
5 Jam kerja efektif per-hari Tk 7.000
Faktor Pengembangan Fk 1.200
II URUTAN KERJA
1 Tanah yang di gali berada di bank penyimpanan
2 Penggalian dilakukan dengan menggunakan Excavator dan memuat ke dalam dump truck
3 Dump Truck mengangkut material hasil galian ke lokasi timbunan L 0.250
4 Penggalian menggunakan excavator dilakukan dai tumpahan dump truck dan memuat ke dalam timbunan
5 Bulldozer meratakan tanah di area timbunan
III PEMAKAIAN BAHAN, ALAT DAN TENAGA
1 BAHAN Tanah 1.200
2 ALAT

2.a Excavator
Kapasitas V 0.600
Faktor Efisiensi Fe 0.547
- Efisiensi Alat (Baik) Fa 0.81
- Efisiensi Natural Fn 0.75
- Efisiensi Operator (trampil) Fo 0.9
Faktor Bucket Fb 1.100
Waktu siklus
- Waktu Gali T1 0.167
- Waktu putar T2x2 0.117
- Waktu Memuat / membuang T3 0.117
- lain-lain T4 0.117
Ts1 0.517
- Produksi persiklus Qb x Fb Q 0.660
- Kap. Prod. / jam = V x FB x Fe x 60
Q1 34.921
Ts1 x Fk
- Koefeisiensi alat 1 : QE1 0.029

2.b DUMP TRUCK 8 TON


Kapasitas V 6.000
Fakttor eff kerja Fe 0.83
Kecepatan isi V1 20000.000
Kecepatan kosong V2 25000.000
Jarak Angkut D 250.000
Waktu siklus
- Waktu Muat T1 10.309
- Waktu angkut T2 0.750
- Waktu Kembali T3 0.600
- Waktu Tetap T4 2.000
- Waktu Buang T5 2.000
Ts2 15.659
Kap. Prod. / jam =
Q2 0.261

Koefisien Alat / M3 = Q2 : 6 0.043

2.c Excavator
Kapasitas V 0.600
Faktor Efisiensi Fe 0.547
- Efisiensi Alat (Baik) Fa 0.81
- Efisiensi Natural Fn 0.75
- Efisiensi Operator (trampil) Fo 0.9
Faktor Bucket Fb 1.100
Waktu siklus
- Waktu Gali T1 0.167
- Waktu putar T2x2 0.117
- Waktu Memuat / membuang T3 0.117
- lain-lain T4 0.117
Ts1 0.517
- Produksi persiklus Qb x Fb Q 0.660
- Kap. Prod. / jam = V x FB x FE x 60
Q3 34.921
Ts1 X Fk
- Koefeisiensi alat 1 : QE1 0.029

2.d Bulldozer, Kap 11 ton


Kapasitas Blade V 3.400
Faktor Blade Fb 0.830
Jarak Gusur D 10.000
Faktor Efisiensi = Fa x Fn x Fo Fe 0.730
- Efisiensi Alat Fa 0.900
- Efisiensi Natural Fn 0.900
- Efisiensi Operator Fo 0.900
Kecepatan Maju F 20.000
Kecepatan Mundur R 15.000
Waktu Ganti Persneling Z 0.500

Kapasitas Produksi / Jam = ( V x Fb x Fe x 60 ) xFk Q4 88.995


(D / F) + (D / R) + Z
Koefisien Alat / m3 = 1 : QB1 0.011

3 TENAGA
Produksi menentukan excavator = Tk x (Q1+Q3) Qt 488.900
Produksi galian per hari Qt1 3422.302
Kebutuhan tenaga = - Mandor M 1.000
= - Pekerja P 4.000
Koef. Tenaga / M¹ = - Mandor = (Tk x M) : Qt 0.014
= - Pekerja = (Tk x P) : Qt 0.057

IV HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

V ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam ANALISA HARGA SATUAN PEKERJAN Didapat Harga Satuan Pekerjaan :

Rp 2,811,288 /m'

Jenis Pekerjaan : Harga Satuan dasar Material dari Quariy ke Lokasi


penyebrangan
Satuan Pembayaran : M'
No. U R A I A N KODE KOEF
I. ASUMSI
1 Menggunakan Dump Truck
2 Lokasi pekerjaan : Distrik Kolfe Braza Kampung Papera
3 Pengangkutan dan pengangkatan material dengan tenaga pekerja
4 Jarak Rata-rata Base camp ke lokasi pekerjaan L 20.000
5 Jam kerja efektif per-hari Tk 7.000
6 Kapasitas Bawaat V 6.000
7 Berat Volume Tampungan W 10.000

II URUTAN KERJA
1 Material diangkat dengan Pekerja
2 Memuat Material ke dalm truck
3 Dump truck mengangkut Material ke Lokasi

III PEMAKAIAN BAHAN, ALAT DAN TENAGA


1 BAHAN
2 ALAT
2.a TENAGA
Kapasitas produksi angkat material/jam Qa 6.000
Waktu siklus :
- Waktu memuat Pasir Ts1 90.000
Kap. Prod. / jam = V x 60
Q1 4.000
Ts1
Kap. Prod/ Hari= Tk x Q1 Qt1 28.000
Koefisien Tenaga / M3 = 1 : Q1 E1 0.250

2.b DUMP TRUCK


Kapasitas V 6.000
Faktor isi Fa 0.860
Fakttor eff kerja 0.83
Kecepatan isi V1 20000.000
Kecepatan kosong V2 25000.000
Jarak Angkut D 18000.000
Waktu siklus
- Waktu Muat T1 110.000
- Waktu angkut T2 54.000
- Waktu Kembali T3 43.200
- Waktu Tetap T4 2.000
- Waktu Buang T5 2.000
Ts2 211.200
Kap. Prod. / jam =
Q2 3.520

Koefisien Alat / M3 = Q2 : 6 0.587


3 TENAGA
Produksi Pengantaran dalam 1 hari = Tk x Q1 Qt 28.000
Kebutuhan tenaga = - Mandor M 1.000
= - Tukang Tb 1.000
= - Pekerja P 4.000
Koef. Tenaga / M3 = - Mandor = (Tk x M) : Qt 0.250
= - Tukang = (Tk x Tb) : Qt 0.250
= - Pekerja = (Tk x P) : Qt 1.000

IV HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

V ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam ANALISA HARGA SATUAN PEKERJAN Didapat Harga Satuan Pekerjaan :

Rp 425,458 /m3
Rp 2,552,750 6

Rp 2,552,750 Total mobilisasi truck tnpa kapal'


-

Catatan Mobilisasi alat menggunakan Kapal GT 35 Ton Sebelum smpe ke lokasi pengerjaan
Rp 40,000,000 /Transport pulang balik
SATUAN UPAH JUMLAH HARGA

Jam
M
Kg

M'
M'

Menit
Menit
Menit
Menit
Menit
Menit

Jam Rp 2,205,770 Rp 394,537.13

Btg

Menit
Menit
Menit

Jam Rp 691,567 Rp 61,499.05

Btg

Menit
Menit
Menit


Jam Rp 1,210,000 Rp 191,519.02

M
Jam
Jam Rp 906,322 Rp 223.23

Jam Rp 695,889 Rp 110,145.40


orang
orang
orang
Jam Rp 25,714 Rp 4,599.41
Jam Rp 28,571 Rp 20,441.82
Jam Rp 17,143 Rp 36,795.28

Rp 819,760.33
9141000
Rp 9,141,000

SATUAN UPAH JUMLAH HARGA

Jam

Bank

Km

m3 Rp 2,269,705 Rp 2,723,645.98

M3

(baik)

(terampil)

Detik
Detik
Detik
Detik
Detik
M3/detik

M3

Jam Rp 1,060,424 Rp 30,365.96

191360 27337.1428571429
m3

m/jam
m/jam
m

Menit
Menit
Menit
Menit
Menit
Menit

m3/jam

Jam Rp 587,632 Rp 25,560.10 0

M3

(baik)

(terampil)

Detik
Detik
Detik
Detik
Detik
M3/detik

M3

Jam Rp 1,060,424 Rp 30,365.96

m3

m/menit
m/menit
menit

m3/jam
Jam

m3/jam
m3/hari
orang
orang
Jam Rp 25,714 Rp 368.17
Jam Rp 17,143 Rp 981.80

Rp 2,811,287.98

SATUAN UPAH JUMLAH HARGA

Km
Jam
m3
Ton

426930

m3

0.03333705357143
Menit 0.04169791666667
m3

m3
Jam Rp 200,000 Rp 50,000.00

3328 475.428571428571
m3

m/jam
m/jam
m
Menit
Menit
Menit
Menit
Menit
Menit

m3/jam

Jam Rp 587,632 Rp 344,743.98 0


orang
orang
orang
Jam Rp 25,714 Rp 6,428.57
Jam Rp 28,571 Rp 7,142.86
Jam Rp 17,143 Rp 17,142.86

Rp 425,458.26 Rp 12,434,400
Rp 14,987,150
8811000
Rp -
Rp -
15,216,654.87
15,216,654.87
4,260,663,363.60

208
41.6046428571429 1248
69.3853333333333 1664
RENCANA ANGGARAN BIAYA (RAB)
NO URAIAN PEKERJAAN VOL. SAT. HARGA SAT JML. HARGA KET.
A PEKERJAAN DERMAGA
1 Pekerjaan Persiapan
a. Mobilisasi demobilisasi 1.00 ls 240,000,000.00 240,000,000.00
2 Pekerjaan Sheet Pile (Pengadaan dan Pemasangan) 738.00 btg 15,216,654.87 11,229,891,294.06
3 Pekerjaan Caping Beam Sheet Pile
a. Pembesian Tulangan Pokok Caping Beam (D16) 83.00 Btg 447,519.95 37,144,155.85
b. Pekerjaan Besi Beugel Caping Beam (D8) 123.00 Btg 132,567.60 16,305,814.19
c. Pengecoran Balok Caping Beam 46.03 M3 16,048,289.54 738,622,526.25
4 Pekerjaan Pengadaan Tiang Pancang
a. Pekerjaan Tiang Ø500 mm Bottom K-600 kg/cm2 L= 6 200.00 btg 9,141,000.00 1,828,200,000.00
b. Pekerjaan Tiang Ø500 mm Middle K-600 kg/cm2 L= 8 200.00 btg 12,434,400.00 2,486,880,000.00
Pemasangan
a. Pekerjaan Tiang Ø500 mm Middle K-600 kg/cm2 2,800.00 m' 819,760.33 2,295,328,930.74
b. Pekerjaan Sambungan Tiang pancang 200.00 bh 544,500.00 108,900,000.00
5 Pekerjaan Kepala Tiang Pancang Dermaga
a. Pekerjan Pembesian Kepala Tiang Pancang Dermaga 400.00 Btg 447,519.95 179,007,980.00
b. Pekerjaan Pengecoran Kepala Tiang Pancang Dermaga 101.00 M3 16,048,289.54 1,620,877,243.92
6 Pekerjaan Pondasi Dinding Talud
a. Pekerjaan Galian Tanah Pondasi Talud 556.14 M3 61,500.00 34,202,836.76
b. Pekerjaan Pasangan Batu Kali 1 : 2 PS 1,286.11 M3 5,024,207.27 6,461,679,632.89
c. Pelesteran 1 : 2 PS 1,961.18 M3 170,250.13 333,891,073.53
7 Pekerjan Plat Dermaga
a. Pekerjan Pembesian Plat Dermaga 1,850.00 Btg 978,151.58 1,809,580,413.75
b. Pekerjaan Pengecoran Plat Dermaga 253.80 M3 16,048,289.54 4,073,055,886.22
8 Pekerjan Balok Bentangan Dermaga
a. Pekerjan Pembesian Balok Bentangan Dermaga 300.00 Btg 978,151.58 293,445,472.50
b. Pekerjan Besi Behel Balok Bentangan Dermaga 210.00 Btg 132,567.60 27,839,194.95
c. Pekerjaan Pengecoran Balok Bentangan Dermaga 100.00 M3 16,048,289.54 1,604,828,954.38
9 Pekerjan Balok Melintang Dermaga
a. Pekerjan Pembesian Balok Melintang Dermaga 175.00 Btg 978,151.58 171,176,525.63
b. Pekerjan Besi Behel Balok Melintang Dermaga 110.00 Btg 132,567.60 14,582,435.45
c. Pekerjaan Pengecoran Balok Melintang Dermaga 40.00 M3 16,048,289.54 641,931,581.75
10 Pekejaan Plat Jembatan
a. Pekerjan Pembesian Plat Jembatan 85.00 Btg 447,519.95 38,039,195.75
b. Pekerjaan Pengecoran Plat Jembatan 9.00 M3 16,048,289.54 144,434,605.89
-
11 Pekerjan Balok Bentangan Jembatan
a. Pekerjan Pembesian Balok Bentangan Jembatan 16.00 Btg 447,519.95 7,160,319.20
b. Pekerjan Besi Behel Balok Bentangan Jembatan 11.00 Btg 132,567.60 1,458,243.55
c. Pekerjaan Pengecoran Balok Bentangan Jembatan 2.80 M3 16,048,289.54 44,935,210.72
-
12 Pekerjan Balok Melintang Jembatan
a. Pekerjan Pembesian Balok Melintang Jembatan 6.00 Btg 447,519.95 2,685,119.70
b. Pekerjan Besi Behel Balok Melintang Jembatan 4.00 Btg 132,567.60 530,270.38
c. Pekerjaan Pengecoran Balok Melintang Jembatan 0.75 M3 16,048,289.54 12,036,217.16
-
13 Pekerjaan Tangga
a. Pembesian Tangga 71.00 Btg 103,938.94 7,379,664.89
b. Pengecoran Tangga 7.58 M3 10,532,892.80 79,839,327.43
c. Pekerjaan Relling Tangga 28.00 M' 4,312,670.00 120,754,760.00
d. Pekerjaan Pengecatan Relling Tangga 28.00 M' 1,045,195.00 29,265,460.00
14 Pekerjaan Besi Plat Fleb 2.00 Unit 215,255,018.51 430,510,037.03

- 28 -
RENCANA ANGGARAN BIAYA (RAB)
NO URAIAN PEKERJAAN VOL. SAT. HARGA SAT JML. HARGA KET.
a. Pekerjaan Pengecatan 2 Unit Fleb 177.00 M2 1,045,195.00 184,999,515.00
15 Pekerjaan Pagar Pengaman
a. Pagar Pengaman Dermaga 40.00 M' 1,737,373.50 69,494,940.11
b. Pagar Pengaman Jembatan 24.00 M' 1,737,373.50 41,696,964.07
c. Pagar Pengaman Tangga 24.32 M' 1,737,373.50 42,256,398.34
d. Pengecatan Pagar Pengaman 88.32 M' 594,445.00 52,502,571.29
16 Pekerjaan Lantai Kerja
Pekerjaan Cor beton 14.76 m3 16,048,289.54 236,923,273.68
Pekerjaan Urugan pasir 43.43 m3 2,375,531.98 103,170,115.72
17 Pekerjaan Bollard
Bollard Mooring dolphin
a. Pekerjaan Bollard 4.00 Bh 29,947,350.75 119,789,403.00
b. Pekerjaan Pengecatan 4 Unit Bitt Bollard 2.40 m' 594,445.00 1,426,668.00
c. Pengadaan Tiang Ø500 mm Bottom K-600 kg/cm2 L= 6 8.00 Bh 9,141,000.00 73,128,000.00
d. Pengadaan Tiang Ø500 mm Bottom K-600 kg/cm2 L= 8 8.00 Bh 12,434,400.00 99,475,200.00
e. Pemasangan Tiang Ø500 mm Bottom K-600 kg/cm2 112.00 M' 819,760.33 91,813,157.23
f. Pekerjaan Sambungan Tiang Pancang 8.00 Bh 544,500.00 4,356,000.00
g. Pekerjaan Lantai beton
Pekerjaan Pembesian D16 10.00 Btg 447,519.95 4,475,199.50
Pekerjaan Pengecoran 0.63 M3 16,048,289.54 10,062,277.54
Bitt Bollard
a. Pekerjaan Bollard 4.00 Bh 29,947,350.75 119,789,403.00
b. Pekerjaan Pengecatan 4 Unit Bitt Bollard 2.40 m' 594,445.00 1,426,668.00
18 Pekerjaan Pengerukan 22,005.18 M3 363,866.94 8,006,957,901.61

JUMLAH TOTAL 46,430,144,040.59

………………………………………….
DIPERIKSA/DISETUJUI DIBUAT

…………………… ………………………
………………………………….. …………………………

- 29 -
REKAPITULASI ESTIMASI ANGGARAN

PEKERJAAN:
……………………………………………
…………………………………………..

NO URAIAN PEKERJAAN JUMLAH HARGA

1 PEKERJAAN DERMAGA 46,430,144,040.59


2 KANTOR PENGELOLA
3 BBM

JUMLAH HARGA = Rp. 46,430,144,040.59


PPN 10 % = Rp. 4,643,014,404.06
JUMLAH HARGA TOTAL = Rp. 51,073,158,444.65
DIBULATKAN = Rp. 51,073,150,000.00

TERBILANG :

………………….
Mengetahui,
BAPEDA KAB. YAHUKIMO

FRANGKY G. LILIHATA, ST, M.SI …………………


Nip. 19700604 200312 1004 …………………

MENYETUJUI :
PT. KORIDOR ADICITA

……………………………………………
ITULASI ESTIMASI ANGGARAN

PEKERJAAN:
……………………………………
………………………………………..

KETERANGAN

…………..
DIBUAT

…………………………
…………………..……..

MENYETUJUI :
PT. KORIDOR ADICITA

………………………………………
556.143687
L Area Galian
Cross 1 0.8271
Cross 2 3.7746
Cross 3 1.3026
Cross 4 3.3768
Cross 5 2.0245
Cross 6 9.5731

Total

Jalan besar

Jalan kecil

#REF!

#REF!

Luas Dire 24
Gudang 50
Bangsal k 21

-
TALUD

Galian
Panjang Luas Area Pon
Lebar pleater Luas pleasterVolume
13.7497104 16.624 3.3264 4.4 73.1456 55.2980736 Dinding Batu Kali
164.610306 43.61 6.2152 4.897 213.55817 271.044872
71.8996122 55.197 3.3571 3.652 201.579444 185.3018487 Dinding Batu Kali Jumlah Total
27.0144 8 12.8742 6.204 49.632 102.9936
253.9795985 125.453 5.2312 11.345 1423.264285 656.2697336 Dinding Batu Kali 368.2 736.4
24.89006 2.6 5.8466 0 0 15.20116 Dinding Batu Kali 738
251.484 1961.179499

556.1436871 1286.109288

102
25.6
26
21
191
26
391.6 #REF! m2 0.2 #REF!
100
8
100.7
6.3
215 #REF! m2

m2
m2
Pengerukan
L Area GalianL area timbun Panjang Timbunan
Cross 1 0 8.6509 0 16.624 143.8125616
Cross 2 100.4585 8.6497 4380.995185 43.61 377.213417
Jarak Sheet Pile Cross 3 188.4334 91.6497 10400.95838 55.197 5058.788491
Cross 4 38.0534 112.3527 304.4272 8 898.8216
184.1 Cross 5 32.9662 76.7858 4135.708689 125.453 9633.008967
Cross 6 73.4997 54.5693 191.09922 2.6 141.88018
Cross 7 76.4374 20.8715 2591.992234 33.91 707.752565
22005.18091 m3 16961.27778 m3

22005.18
Cor L Area GalianVolume rabat Cor L Area GalianV Pasir L Area Galian
Cross 1 0 Cross 1 0 Cross 1 8.7
Cross 2 0 Cross 2 0 Cross 2 6.16
Cross 3 0 Cross 3 0 Cross 3 0
Cross 4 0 Cross 4 0 Cross 4 0
Cross 5 0.116 14.55255 Cross 5 0.3419 42.89238 Cross 5 0
Cross 6 0.081 0.2106 Cross 6 0.2069 0.53794 Cross 6 0
Cross 7 0 Cross 7 0 Cross 7 0
Panjang Galian
16.624 144.6288
43.61 268.6376
0
0
0
0
0
m3 413.2664 m3