I. 3 1 M' Pagar sementara dari kawat duri tinggi 1,8 meter 222,874.50
SNI Bahan 222,874.50
03-2835-2002 - Kayu dolken Ø 8-10 / 400 cm 1.0000 Btg 16,500.00 16,500.00
- Semen PC ( Portland Cement ) 40 kg 2.0000 Kg 1,100.00 2,200.00
- Kawat Duri 25.0000 Kg 8,066.00 201,650.00
- Pasir pasang (kaliworo) 0.0050 M3 115,500.00 577.50
- Koral Beton 0.0090 M3 143,000.00 1,287.00
- Paku usuk 0.0600 Kg 11,000.00 660.00
Tenaga 18,535.00
- Pekerja 0.3000 Oh 30,250.00 9,075.00
- Tukang Kayu 0.2000 Oh 38,500.00 7,700.00
- Kepala Tukang Kayu 0.0200 Oh 44,000.00 880.00
- Mandor 0.0200 Oh 44,000.00 880.00
Tenaga 7,535.00
- Pekerja 0.1000 Oh 30,250.00 3,025.00
- Tukang Kayu 0.1000 Oh 38,500.00 3,850.00
- Kepala Tukang Kayu 0.0100 Oh 44,000.00 440.00
Tenaga 118,250.00
- Pekerja 1.0000 Oh 30,250.00 30,250.00
- Tukang Kayu 2.0000 Oh 38,500.00 77,000.00
- Kepala Tukang Kayu 0.2000 Oh 44,000.00 8,800.00
- Mandor 0.0500 Oh 44,000.00 2,200.00
Tenaga 96,800.00
- Pekerja 1.0000 Oh 30,250.00 30,250.00
- Tukang Kayu 1.5000 Oh 38,500.00 57,750.00
- Kepala Tukang Kayu 0.1500 Oh 44,000.00 6,600.00
- Mandor 0.0500 Oh 44,000.00 2,200.00
Tenaga 118,250.00
- Pekerja 1.0000 Oh 30,250.00 30,250.00
- Tukang Kayu 2.0000 Oh 38,500.00 77,000.00
- Kepala Tukang Kayu 0.2000 Oh 44,000.00 8,800.00
- Mandor 0.0500 Oh 44,000.00 2,200.00
I.10 1 M2 Pembuatan bak adukan dari kayu tahun ukuran (40 x 50 x 20) cm 94,666.00
SNI Bahan 83,050.00
03-2835-2002 - Papan 3/20 kayu tahun 0.0360 M3 1,320,000.00 47,520.00
- Paku usuk 0.0800 Kg 11,000.00 880.00
- Kayu 5/7 meranti 0.0105 M3 3,300,000.00 34,650.00
Tenaga 11,616.00
- Tukang Kayu 0.3000 Oh 38,500.00 11,550.00
Tenaga 8,877.00
- Pekerja 0.2500 Oh 30,250.00 7,562.50
- Tukang Kayu 0.0170 Oh 38,500.00 654.50
- Kepala Tukang Kayu 0.0020 Oh 44,000.00 88.00
- Mandor 0.0130 Oh 44,000.00 572.00
Tenaga 3,360.50
- Pekerja 0.0420 Oh 30,250.00 1,270.50
- Tukang Kayu 0.0040 Oh 38,500.00 154.00
- Kepala Tukang Kayu 0.0420 Oh 44,000.00 1,848.00
- Mandor 0.0020 Oh 44,000.00 88.00
Tenaga 17,520.25
- Tukang Batu 0.1250 Oh 38,500.00 4,812.50
- Pekerja 0.3750 Oh 30,250.00 11,343.75
- Kepala Tukang Batu 0.0120 Oh 44,000.00 528.00
- Mandor 0.0190 Oh 44,000.00 836.00
Tenaga 9,515.00
- Mandor 0.0100 Oh 44,000.00 440.00
- Pekerja 0.3000 Oh 30,250.00 9,075.00
Tenaga 51,975.00
- Mandor 0.1500 Oh 44,000.00 6,600.00
- Pekerja 1.5000 Oh 30,250.00 45,375.00
Tenaga 8,662.50
- Mandor 0.0250 Oh 44,000.00 1,100.00
- Pekerja 0.2500 Oh 30,250.00 7,562.50
Tenaga 9,515.00
- Mandor 0.0100 Oh 44,000.00 440.00
- Pekerja 0.3000 Oh 30,250.00 9,075.00
Tenaga 80,850.00
- Pekerja 1.5000 Oh 30,250.00 45,375.00
- Tukang Batu 0.7500 Oh 38,500.00 28,875.00
- Kepala Tukang Batu 0.0750 Oh 44,000.00 3,300.00
- Mandor 0.0750 Oh 44,000.00 3,300.00
Tenaga 80,850.00
- Pekerja 1.5000 Oh 30,250.00 45,375.00
- Tukang Batu 0.7500 Oh 38,500.00 28,875.00
- Kepala Tukang Batu 0.0750 Oh 44,000.00 3,300.00
- Mandor 0.0750 Oh 44,000.00 3,300.00
Tenaga 80,850.00
- Pekerja 1.5000 Oh 30,250.00 45,375.00
- Tukang Batu 0.7500 Oh 38,500.00 28,875.00
- Kepala Tukang Batu 0.0750 Oh 44,000.00 3,300.00
- Mandor 0.0750 Oh 44,000.00 3,300.00
Tenaga 80,850.00
- Pekerja 1.5000 Oh 30,250.00 45,375.00
- Tukang Batu 0.7500 Oh 38,500.00 28,875.00
- Kepala Tukang Batu 0.0750 Oh 44,000.00 3,300.00
- Mandor 0.0750 Oh 44,000.00 3,300.00
Tenaga 80,850.00
- Pekerja 1.5000 Oh 30,250.00 45,375.00
- Tukang Batu 0.7500 Oh 38,500.00 28,875.00
- Kepala Tukang Batu 0.0750 Oh 44,000.00 3,300.00
- Mandor 0.0750 Oh 44,000.00 3,300.00
Tenaga 80,850.00
- Pekerja 1.5000 Oh 30,250.00 45,375.00
- Tukang Batu 0.7500 Oh 38,500.00 28,875.00
- Kepala Tukang Batu 0.0750 Oh 44,000.00 3,300.00
- Mandor 0.0750 Oh 44,000.00 3,300.00
Tenaga 80,850.00
- Pekerja 1.5000 Oh 30,250.00 45,375.00
- Tukang Batu 0.7500 Oh 38,500.00 28,875.00
- Kepala Tukang Batu 0.0750 Oh 44,000.00 3,300.00
- Mandor 0.0750 Oh 44,000.00 3,300.00
Tenaga 80,850.00
- Pekerja 1.5000 Oh 30,250.00 45,375.00
- Tukang Batu 0.7500 Oh 38,500.00 28,875.00
- Kepala Tukang Batu 0.0750 Oh 44,000.00 3,300.00
- Mandor 0.0750 Oh 44,000.00 3,300.00
Tenaga 80,850.00
- Pekerja 1.5000 Oh 30,250.00 45,375.00
- Tukang Batu 0.7500 Oh 38,500.00 28,875.00
- Kepala Tukang Batu 0.0750 Oh 44,000.00 3,300.00
- Mandor 0.0750 Oh 44,000.00 3,300.00
Tenaga 80,850.00
- Pekerja 1.5000 Oh 30,250.00 45,375.00
- Tukang Batu 0.7500 Oh 38,500.00 28,875.00
- Kepala Tukang Batu 0.0750 Oh 44,000.00 3,300.00
- Mandor 0.0750 Oh 44,000.00 3,300.00
Tenaga 80,850.00
- Pekerja 1.5000 Oh 30,250.00 45,375.00
- Tukang Batu 0.7500 Oh 38,500.00 28,875.00
- Kepala Tukang Batu 0.0750 Oh 44,000.00 3,300.00
- Mandor 0.0750 Oh 44,000.00 3,300.00
Tenaga 42,042.00
- Pekerja 0.7800 Oh 30,250.00 23,595.00
- Tukang Batu 0.3900 Oh 38,500.00 15,015.00
- Kepala Tukang Batu 0.0390 Oh 44,000.00 1,716.00
- Mandor 0.0390 Oh 44,000.00 1,716.00
Tenaga 112,156.00
- Pekerja 2.4000 Oh 30,250.00 72,600.00
- Tukang Batu 0.8000 Oh 38,500.00 30,800.00
- Kepala Tukang Batu 0.0800 Oh 44,000.00 3,520.00
- Mandor 0.1190 Oh 44,000.00 5,236.00
Tenaga 61,193.00
- Pekerja 1.0000 Oh 30,250.00 30,250.00
- Tukang Batu 0.6700 Oh 38,500.00 25,795.00
- Kepala Tukang Batu 0.0670 Oh 44,000.00 2,948.00
- Mandor 0.0500 Oh 44,000.00 2,200.00
Tenaga 47,410.00
- Pekerja 0.8000 oh 30,250.00 24,200.00
- Tukang Batu 0.5000 oh 38,500.00 19,250.00
- Kepala Tukang Batu 0.0500 oh 44,000.00 2,200.00
- Mandor 0.0400 oh 44,000.00 1,760.00
III. 16 1 M3 Membuat bronjong dari kawat galvanis/bronjong 3 mm diisi batu belah 316,781.67
BOW Bahan 218,533.33
G.5a - Kawat Bronjong 8.3333 Kg 12,100.00 100,833.33
- Batu Belah 1.0000 m3 117,700.00 117,700.00
III. 17 1 M3 Membuat bronjong dari kawat galvanis/bronjong 4 mm diisi batu belah 400,381.67
BOW Bahan 299,200.00
G.5b - Kawat Bronjong 15.0000 Kg 12,100.00 181,500.00
- Batu Belah 1.0000 m3 117,700.00 117,700.00
Tenaga 101,181.67
- Pekerja 1.5000 oh 30,250.00 45,375.00
- Tukang Batu 0.7333 oh 38,500.00 28,233.33
- Kepala Tukang Batu 0.6000 oh 44,000.00 26,400.00
- Mandor 0.0267 oh 44,000.00 1,173.33
Tenaga 107,965.00
- Pekerja 1.5000 oh 30,250.00 45,375.00
- Tukang Batu 0.8333 oh 38,500.00 32,083.33
- Kepala Tukang Batu 0.6667 oh 44,000.00 29,333.33
- Mandor 0.0267 oh 44,000.00 1,173.33
Tenaga 28,050.00
- Pekerja 0.6000 Oh 30,250.00 18,150.00
- Tukang Batu 0.2000 Oh 38,500.00 7,700.00
- Kepala Tukang Batu 0.0200 Oh 44,000.00 880.00
- Mandor 0.0300 Oh 44,000.00 1,320.00
Tenaga 28,050.00
- Pekerja 0.6000 Oh 30,250.00 18,150.00
- Tukang Batu 0.2000 Oh 38,500.00 7,700.00
- Kepala Tukang Batu 0.0200 Oh 44,000.00 880.00
- Mandor 0.0300 Oh 44,000.00 1,320.00
Tenaga 28,050.00
- Pekerja 0.6000 Oh 30,250.00 18,150.00
- Tukang Batu 0.2000 Oh 38,500.00 7,700.00
- Kepala Tukang Batu 0.0200 Oh 44,000.00 880.00
- Mandor 0.0300 Oh 44,000.00 1,320.00
Tenaga 28,050.00
- Pekerja 0.6000 Oh 30,250.00 18,150.00
- Tukang Batu 0.2000 Oh 38,500.00 7,700.00
- Kepala Tukang Batu 0.0200 Oh 44,000.00 880.00
- Mandor 0.0300 Oh 44,000.00 1,320.00
Tenaga 28,050.00
Tenaga 28,050.00
- Pekerja 0.6000 Oh 30,250.00 18,150.00
- Tukang Batu 0.2000 Oh 38,500.00 7,700.00
- Kepala Tukang Batu 0.0200 Oh 44,000.00 880.00
- Mandor 0.0300 Oh 44,000.00 1,320.00
Tenaga 28,050.00
- Pekerja 0.6000 Oh 30,250.00 18,150.00
- Tukang Batu 0.2000 Oh 38,500.00 7,700.00
- Kepala Tukang Batu 0.0200 Oh 44,000.00 880.00
- Mandor 0.0300 Oh 44,000.00 1,320.00
Tenaga 14,025.00
- Pekerja 0.3000 Oh 30,250.00 9,075.00
- Tukang Batu 0.1000 Oh 38,500.00 3,850.00
- Kepala Tukang Batu 0.0100 Oh 44,000.00 440.00
- Mandor 0.0150 Oh 44,000.00 660.00
Tenaga 14,025.00
- Pekerja 0.3000 Oh 30,250.00 9,075.00
- Tukang Batu 0.1000 Oh 38,500.00 3,850.00
- Kepala Tukang Batu 0.0100 Oh 44,000.00 440.00
- Mandor 0.0150 Oh 44,000.00 660.00
Tenaga 14,025.00
- Pekerja 0.3000 Oh 30,250.00 9,075.00
- Tukang Batu 0.1000 Oh 38,500.00 3,850.00
- Kepala Tukang Batu 0.0100 Oh 44,000.00 440.00
- Mandor 0.0150 Oh 44,000.00 660.00
Tenaga 14,025.00
- Pekerja 0.3000 Oh 30,250.00 9,075.00
- Tukang Batu 0.1000 Oh 38,500.00 3,850.00
- Kepala Tukang Batu 0.0100 Oh 44,000.00 440.00
- Mandor 0.0150 Oh 44,000.00 660.00
Tenaga 14,025.00
- Pekerja 0.3000 Oh 30,250.00 9,075.00
- Tukang Batu 0.1000 Oh 38,500.00 3,850.00
- Kepala Tukang Batu 0.0100 Oh 44,000.00 440.00
- Mandor 0.0150 Oh 44,000.00 660.00
Tenaga 14,025.00
- Pekerja 0.3000 Oh 30,250.00 9,075.00
- Tukang Batu 0.1000 Oh 38,500.00 3,850.00
- Kepala Tukang Batu 0.0100 Oh 44,000.00 440.00
- Mandor 0.0150 Oh 44,000.00 660.00
Tenaga 14,025.00
- Pekerja 0.3000 Oh 30,250.00 9,075.00
- Tukang Batu 0.1000 Oh 38,500.00 3,850.00
- Kepala Tukang Batu 0.0100 Oh 44,000.00 440.00
- Mandor 0.0150 Oh 44,000.00 660.00
Tenaga 14,025.00
- Pekerja 0.3000 Oh 30,250.00 9,075.00
- Tukang Batu 0.1000 Oh 38,500.00 3,850.00
- Kepala Tukang Batu 0.0100 Oh 44,000.00 440.00
- Mandor 0.0150 Oh 44,000.00 660.00
Tenaga 20,515.00
- Pekerja 0.5000 Oh 30,250.00 15,125.00
- Tukang Batu 0.1000 Oh 38,500.00 3,850.00
- Kepala Tukang Batu 0.0100 Oh 44,000.00 440.00
- Mandor 0.0250 Oh 44,000.00 1,100.00
V. PEKERJAAN PLESTERAN
V. 1 1 M2 Plesteran 1 Pc : 1 Ps, tebal 15 mm 35,072.40
SNI Bahan 18,902.40
03-2837-2008 - Semen PC ( Portland Cement ) 40 kg 15.5040 Kg 1,100.00 17,054.40
- Pasir pasang (kaliworo) 0.0160 M3 115,500.00 1,848.00
Tenaga 16,170.00
- Pekerja 0.3000 Oh 30,250.00 9,075.00
- Tukang Batu 0.1500 Oh 38,500.00 5,775.00
- Kepala Tukang Batu 0.0150 Oh 44,000.00 660.00
- Mandor 0.0150 Oh 44,000.00 660.00
Tenaga 16,170.00
Tenaga 16,170.00
- Pekerja 0.3000 Oh 30,250.00 9,075.00
- Tukang Batu 0.1500 Oh 38,500.00 5,775.00
- Kepala Tukang Batu 0.0150 Oh 44,000.00 660.00
- Mandor 0.0150 Oh 44,000.00 660.00
Tenaga 16,170.00
- Pekerja 0.3000 Oh 30,250.00 9,075.00
- Tukang Batu 0.1500 Oh 38,500.00 5,775.00
- Kepala Tukang Batu 0.0150 Oh 44,000.00 660.00
- Mandor 0.0150 Oh 44,000.00 660.00
Tenaga 16,170.00
- Pekerja 0.3000 Oh 30,250.00 9,075.00
- Tukang Batu 0.1500 Oh 38,500.00 5,775.00
- Kepala Tukang Batu 0.0150 Oh 44,000.00 660.00
- Mandor 0.0150 Oh 44,000.00 660.00
Tenaga 16,170.00
- Pekerja 0.3000 Oh 30,250.00 9,075.00
- Tukang Batu 0.1500 Oh 38,500.00 5,775.00
- Kepala Tukang Batu 0.0150 Oh 44,000.00 660.00
- Mandor 0.0150 Oh 44,000.00 660.00
Tenaga 16,170.00
- Pekerja 0.3000 Oh 30,250.00 9,075.00
- Tukang Batu 0.1500 Oh 38,500.00 5,775.00
- Kepala Tukang Batu 0.0150 Oh 44,000.00 660.00
- Mandor 0.0150 Oh 44,000.00 660.00
Tenaga 16,830.00
- Pekerja 0.3600 Oh 30,250.00 10,890.00
- Tukang Batu 0.1200 Oh 38,500.00 4,620.00
- Kepala Tukang Batu 0.0120 Oh 44,000.00 528.00
- Mandor 0.0180 Oh 44,000.00 792.00
Tenaga 21,648.00
- Pekerja 0.4000 Oh 30,250.00 12,100.00
- Tukang Batu 0.2000 Oh 38,500.00 7,700.00
- Kepala Tukang Batu 0.0200 Oh 44,000.00 880.00
- Mandor 0.0220 Oh 44,000.00 968.00
Tenaga 21,648.00
- Pekerja 0.4000 Oh 30,250.00 12,100.00
- Tukang Batu 0.2000 Oh 38,500.00 7,700.00
- Kepala Tukang Batu 0.0200 Oh 44,000.00 880.00
- Mandor 0.0220 Oh 44,000.00 968.00
Tenaga 21,648.00
- Pekerja 0.4000 Oh 30,250.00 12,100.00
- Tukang Batu 0.2000 Oh 38,500.00 7,700.00
- Kepala Tukang Batu 0.0200 Oh 44,000.00 880.00
- Mandor 0.0220 Oh 44,000.00 968.00
Tenaga 21,648.00
- Pekerja 0.4000 Oh 30,250.00 12,100.00
- Tukang Batu 0.2000 Oh 38,500.00 7,700.00
- Kepala Tukang Batu 0.0200 Oh 44,000.00 880.00
- Mandor 0.0220 Oh 44,000.00 968.00
Tenaga 17,017.00
- Pekerja 0.2600 Oh 30,250.00 7,865.00
- Tukang Batu 0.2000 Oh 38,500.00 7,700.00
- Kepala Tukang Batu 0.0200 Oh 44,000.00 880.00
- Mandor 0.0130 Oh 44,000.00 572.00
Tenaga 17,017.00
- Pekerja 0.2600 Oh 30,250.00 7,865.00
- Tukang Batu 0.2000 Oh 38,500.00 7,700.00
- Kepala Tukang Batu 0.0200 Oh 44,000.00 880.00
- Mandor 0.0130 Oh 44,000.00 572.00
Tenaga 19,756.00
- Pekerja 0.0800 Oh 30,250.00 2,420.00
- Tukang Batu 0.4000 Oh 38,500.00 15,400.00
- Kepala Tukang Batu 0.0400 Oh 44,000.00 1,760.00
- Mandor 0.0040 Oh 44,000.00 176.00
Tenaga 14,025.00
- Pekerja 0.3000 Oh 30,250.00 9,075.00
- Tukang Batu 0.1000 Oh 38,500.00 3,850.00
- Kepala Tukang Batu 0.0100 Oh 44,000.00 440.00
- Mandor 0.0150 Oh 44,000.00 660.00
Tenaga 16,170.00
- Pekerja 0.3000 Oh 30,250.00 9,075.00
- Tukang Batu 0.1500 Oh 38,500.00 5,775.00
- Kepala Tukang Batu 0.0150 Oh 44,000.00 660.00
- Mandor 0.0150 Oh 44,000.00 660.00
Tenaga 4,207.50
- Pekerja 0.0900 Oh 30,250.00 2,722.50
- Tukang Batu 0.0300 Oh 38,500.00 1,155.00
- Kepala Tukang Batu 0.0030 Oh 44,000.00 132.00
- Mandor 0.0045 Oh 44,000.00 198.00
Tenaga 10,780.00
- Pekerja 0.2000 Oh 30,250.00 6,050.00
- Tukang Batu 0.1000 Oh 38,500.00 3,850.00
- Kepala Tukang Batu 0.0100 Oh 44,000.00 440.00
- Mandor 0.0100 Oh 44,000.00 440.00
Tenaga 966,900.00
- Pekerja 6.0000 Oh 30,250.00 181,500.00
- Tukang Kayu 18.0000 Oh 38,500.00 693,000.00
- Kepala Tukang Kayu 1.8000 Oh 44,000.00 79,200.00
- Mandor 0.3000 Oh 44,000.00 13,200.00
Tenaga 966,900.00
- Pekerja 6.0000 Oh 30,250.00 181,500.00
- Tukang Kayu 18.0000 Oh 38,500.00 693,000.00
- Kepala Tukang Kayu 1.8000 Oh 44,000.00 79,200.00
- Mandor 0.3000 Oh 44,000.00 13,200.00
Tenaga 966,900.00
- Pekerja 6.0000 Oh 30,250.00 181,500.00
- Tukang Kayu 18.0000 Oh 38,500.00 693,000.00
- Kepala Tukang Kayu 1.8000 Oh 44,000.00 79,200.00
- Mandor 0.3000 Oh 44,000.00 13,200.00
Tenaga 966,900.00
- Pekerja 6.0000 Oh 30,250.00 181,500.00
- Tukang Kayu 18.0000 Oh 38,500.00 693,000.00
- Kepala Tukang Kayu 1.8000 Oh 44,000.00 79,200.00
- Mandor 0.3000 Oh 44,000.00 13,200.00
Tenaga 966,900.00
- Pekerja 6.0000 Oh 30,250.00 181,500.00
Tenaga 56,424.50
- Pekerja 0.3500 Oh 30,250.00 10,587.50
- Tukang Kayu 1.0500 Oh 38,500.00 40,425.00
- Kepala Tukang Kayu 0.1050 Oh 44,000.00 4,620.00
- Mandor 0.0180 Oh 44,000.00 792.00
Tenaga 161,150.00
- Pekerja 1.0000 Oh 30,250.00 30,250.00
- Tukang Kayu 3.0000 Oh 38,500.00 115,500.00
- Kepala Tukang Kayu 0.3000 Oh 44,000.00 13,200.00
- Mandor 0.0500 Oh 44,000.00 2,200.00
VI. 9 1 M2 Pasang pintu panel kayu kamper 496,650.00
SNI Bahan 335,500.00
03-3434-2008 - Papan kayu kamper 0.0400 M3 8,250,000.00 330,000.00
- Lem kayu "fox" 0.5000 kg 11,000.00 5,500.00
Tenaga 161,150.00
- Pekerja 1.0000 Oh 30,250.00 30,250.00
- Tukang Kayu 3.0000 Oh 38,500.00 115,500.00
- Kepala Tukang Kayu 0.3000 Oh 44,000.00 13,200.00
- Mandor 0.0500 Oh 44,000.00 2,200.00
Tenaga 161,150.00
- Pekerja 1.0000 Oh 30,250.00 30,250.00
- Tukang Kayu 3.0000 Oh 38,500.00 115,500.00
- Kepala Tukang Kayu 0.3000 Oh 44,000.00 13,200.00
- Mandor 0.0500 Oh 44,000.00 2,200.00
Tenaga 161,150.00
- Pekerja 1.0000 Oh 30,250.00 30,250.00
- Tukang Kayu 3.0000 Oh 38,500.00 115,500.00
- Kepala Tukang Kayu 0.3000 Oh 44,000.00 13,200.00
- Mandor 0.0500 Oh 44,000.00 2,200.00
Tenaga 161,150.00
- Pekerja 1.0000 Oh 30,250.00 30,250.00
- Tukang Kayu 3.0000 Oh 38,500.00 115,500.00
- Kepala Tukang Kayu 0.3000 Oh 44,000.00 13,200.00
- Mandor 0.0500 Oh 44,000.00 2,200.00
VI. 13 1 M2 Pasang pintu dan jendela kaca kayu jati lokal 303,820.00
SNI Bahan 174,900.00
03-3434-2008 - Papan kayu jati lokal 0.0240 M3 7,150,000.00 171,600.00
- Lem kayu "fox" 0.3000 kg 11,000.00 3,300.00
Tenaga 128,920.00
- Pekerja 0.8000 Oh 30,250.00 24,200.00
Tenaga 128,920.00
- Pekerja 0.8000 Oh 30,250.00 24,200.00
- Tukang Kayu 2.4000 Oh 38,500.00 92,400.00
- Kepala Tukang Kayu 0.2400 Oh 44,000.00 10,560.00
- Mandor 0.0400 Oh 44,000.00 1,760.00
Tenaga 128,920.00
- Pekerja 0.8000 Oh 30,250.00 24,200.00
- Tukang Kayu 2.4000 Oh 38,500.00 92,400.00
- Kepala Tukang Kayu 0.2400 Oh 44,000.00 10,560.00
- Mandor 0.0400 Oh 44,000.00 1,760.00
Tenaga 128,920.00
- Pekerja 0.8000 Oh 30,250.00 24,200.00
- Tukang Kayu 2.4000 Oh 38,500.00 92,400.00
- Kepala Tukang Kayu 0.2400 Oh 44,000.00 10,560.00
- Mandor 0.0400 Oh 44,000.00 1,760.00
VI. 18 1 M2 Pasang daun pintu/ jendela kaca 3 mm rangka kayu jati 304,755.00
SNI Bahan 156,475.00
T-11-1993-03 - Kayu jati lokal 0.0180 M3 6,600,000.00 118,800.00
- Kaca bening 3 mm 0.7500 M2 49,500.00 37,125.00
- Paku reng 0.0500 Kg 11,000.00 550.00
Tenaga 148,280.00
- Pekerja 1.0000 Oh 30,250.00 30,250.00
- Tukang Kayu 2.7000 Oh 38,500.00 103,950.00
- Kepala Tukang Kayu 0.2700 Oh 44,000.00 11,880.00
- Mandor 0.0500 Oh 44,000.00 2,200.00
VI. 19 1 M2 Pasang daun pintu/ jendela kaca 3 mm rangka kayu kamper 314,655.00
SNI Bahan 166,375.00
T-11-1993-03 - Kayu Kamper 0.0180 M3 7,150,000.00 128,700.00
- Kaca bening 3 mm 0.7500 M2 49,500.00 37,125.00
- Paku reng 0.0500 Kg 11,000.00 550.00
Tenaga 148,280.00
- Pekerja 1.0000 Oh 30,250.00 30,250.00
- Tukang Kayu 2.7000 Oh 38,500.00 103,950.00
- Kepala Tukang Kayu 0.2700 Oh 44,000.00 11,880.00
- Mandor 0.0500 Oh 44,000.00 2,200.00
VI. 20 1 M2 Pasang daun pintu/ jendela kaca 3 mm rangka kayu meranti 245,355.00
SNI Bahan 97,075.00
T-11-1993-03 - Kayu meranti 0.0180 M3 3,300,000.00 59,400.00
- Kaca bening 3 mm 0.7500 M2 49,500.00 37,125.00
- Paku reng 0.0500 Kg 11,000.00 550.00
Tenaga 148,280.00
- Pekerja 1.0000 Oh 30,250.00 30,250.00
- Tukang Kayu 2.7000 Oh 38,500.00 103,950.00
- Kepala Tukang Kayu 0.2700 Oh 44,000.00 11,880.00
- Mandor 0.0500 Oh 44,000.00 2,200.00
VI. 21 1 M2 Pasang daun pintu/ jendela kaca 3 mm rangka kayu kruing 275,055.00
SNI Bahan 126,775.00
T-11-1993-03 - Kayu kruing 0.0180 M3 4,950,000.00 89,100.00
Tenaga 148,280.00
- Pekerja 1.0000 Oh 30,250.00 30,250.00
- Tukang Kayu 2.7000 Oh 38,500.00 103,950.00
- Kepala Tukang Kayu 0.2700 Oh 44,000.00 11,880.00
- Mandor 0.0500 Oh 44,000.00 2,200.00
VI. 22 1 M2 Pasang daun pintu/ jendela kaca 3 mm rangka kayu bengkirai 341,385.00
SNI Bahan 193,105.00
T-11-1993-03 - Kayu bengkirai 0.0180 M3 8,635,000.00 155,430.00
- Kaca bening 3 mm 0.7500 M2 49,500.00 37,125.00
- Paku reng 0.0500 Kg 11,000.00 550.00
Tenaga 148,280.00
- Pekerja 1.0000 Oh 30,250.00 30,250.00
- Tukang Kayu 2.7000 Oh 38,500.00 103,950.00
- Kepala Tukang Kayu 0.2700 Oh 44,000.00 11,880.00
- Mandor 0.0500 Oh 44,000.00 2,200.00
Tenaga 161,150.00
- Pekerja 1.0000 Oh 30,250.00 30,250.00
- Tukang Kayu 3.0000 Oh 38,500.00 115,500.00
- Kepala Tukang Kayu 0.3000 Oh 44,000.00 13,200.00
- Mandor 0.0500 Oh 44,000.00 2,200.00
Tenaga 161,150.00
- Pekerja 1.0000 Oh 30,250.00 30,250.00
- Tukang Kayu 3.0000 Oh 38,500.00 115,500.00
- Kepala Tukang Kayu 0.3000 Oh 44,000.00 13,200.00
- Mandor 0.0500 Oh 44,000.00 2,200.00
Tenaga 161,150.00
- Pekerja 1.0000 Oh 30,250.00 30,250.00
- Tukang Kayu 3.0000 Oh 38,500.00 115,500.00
- Kepala Tukang Kayu 0.3000 Oh 44,000.00 13,200.00
- Mandor 0.0500 Oh 44,000.00 2,200.00
Tenaga 161,150.00
- Pekerja 1.0000 Oh 30,250.00 30,250.00
- Tukang Kayu 3.0000 Oh 38,500.00 115,500.00
- Kepala Tukang Kayu 0.3000 Oh 44,000.00 13,200.00
- Mandor 0.0500 Oh 44,000.00 2,200.00
Tenaga 161,150.00
- Pekerja 1.0000 Oh 30,250.00 30,250.00
- Tukang Kayu 3.0000 Oh 38,500.00 115,500.00
- Kepala Tukang Kayu 0.3000 Oh 44,000.00 13,200.00
- Mandor 0.0500 Oh 44,000.00 2,200.00
VI. 28 1 M2 Pasang pintu plywood rangkap, rangka kayu jati lokal 355,135.00
SNI Bahan 242,330.00
03-3434-2008 - Papan kayu jati lokal 0.0250 M3 7,150,000.00 178,750.00
- Paku plepet 0.0300 Kg 11,000.00 330.00
- Lem kayu "fox" 0.5000 Kg 11,000.00 5,500.00
- Plywood 4 mm 1.0000 Lbr 57,750.00 57,750.00
Tenaga 112,805.00
- Pekerja 0.7000 Oh 30,250.00 21,175.00
- Tukang Kayu 2.1000 Oh 38,500.00 80,850.00
- Kepala Tukang Kayu 0.2100 Oh 44,000.00 9,240.00
- Mandor 0.0350 Oh 44,000.00 1,540.00
Tenaga 112,805.00
- Pekerja 0.7000 Oh 30,250.00 21,175.00
- Tukang Kayu 2.1000 Oh 38,500.00 80,850.00
- Kepala Tukang Kayu 0.2100 Oh 44,000.00 9,240.00
- Mandor 0.0350 Oh 44,000.00 1,540.00
Tenaga 112,805.00
- Pekerja 0.7000 Oh 30,250.00 21,175.00
- Tukang Kayu 2.1000 Oh 38,500.00 80,850.00
- Kepala Tukang Kayu 0.2100 Oh 44,000.00 9,240.00
- Mandor 0.0350 Oh 44,000.00 1,540.00
Tenaga 107,541.50
- Pekerja 0.6700 Oh 30,250.00 20,267.50
- Tukang Kayu 2.0000 Oh 38,500.00 77,000.00
- Kepala Tukang Kayu 0.2000 Oh 44,000.00 8,800.00
- Mandor 0.0335 Oh 44,000.00 1,474.00
Tenaga 107,541.50
- Pekerja 0.6700 Oh 30,250.00 20,267.50
- Tukang Kayu 2.0000 Oh 38,500.00 77,000.00
- Kepala Tukang Kayu 0.2000 Oh 44,000.00 8,800.00
- Mandor 0.0335 Oh 44,000.00 1,474.00
Tenaga 107,541.50
- Pekerja 0.6700 Oh 30,250.00 20,267.50
- Tukang Kayu 2.0000 Oh 38,500.00 77,000.00
- Kepala Tukang Kayu 0.2000 Oh 44,000.00 8,800.00
- Mandor 0.0335 Oh 44,000.00 1,474.00
Tenaga 107,541.50
Tenaga 107,541.50
- Pekerja 0.6700 Oh 30,250.00 20,267.50
- Tukang Kayu 2.0000 Oh 38,500.00 77,000.00
- Kepala Tukang Kayu 0.2000 Oh 44,000.00 8,800.00
- Mandor 0.0335 Oh 44,000.00 1,474.00
Tenaga 128,920.00
- Pekerja 0.8000 Oh 30,250.00 24,200.00
- Tukang Kayu 2.4000 Oh 38,500.00 92,400.00
- Kepala Tukang Kayu 0.2400 Oh 44,000.00 10,560.00
- Mandor 0.0400 Oh 44,000.00 1,760.00
VI. 39 1 M2 Pasang pintu teakwood rangkap, rangka expose kayu jati lokal 393,800.00
SNI Bahan 264,880.00
03-3434-2008 - Papan kayu jati lokal 0.0250 M3 7,150,000.00 178,750.00
- Paku plepet 0.0300 Kg 11,000.00 330.00
- Lem kayu "fox" 0.3000 Kg 11,000.00 3,300.00
- Teakwood 3 mm 120 x 240 cm 1.0000 Lbr 82,500.00 82,500.00
x Tenaga 128,920.00
- Pekerja 0.8000 Oh 30,250.00 24,200.00
- Tukang Kayu 2.4000 Oh 38,500.00 92,400.00
- Kepala Tukang Kayu 0.2400 Oh 44,000.00 10,560.00
- Mandor 0.0400 Oh 44,000.00 1,760.00
VI. 40 1 M2 Pasang pintu teakwood rangkap, rangka expose kayu kamper 421,300.00
SNI Bahan 292,380.00
03-3434-2008 - Papan kayu kamper 0.0250 M3 8,250,000.00 206,250.00
- Paku plepet 0.0300 Kg 11,000.00 330.00
- Lem kayu "fox" 0.3000 Kg 11,000.00 3,300.00
- Teakwood 3 mm 120 x 240 cm 1.0000 Lbr 82,500.00 82,500.00
Tenaga 128,920.00
- Pekerja 0.8000 Oh 30,250.00 24,200.00
- Tukang Kayu 2.4000 Oh 38,500.00 92,400.00
- Kepala Tukang Kayu 0.2400 Oh 44,000.00 10,560.00
- Mandor 0.0400 Oh 44,000.00 1,760.00
VI. 41 1 M2 Pasang pintu plywood & formika, rangkap rangka expose kayu jati lokal 423,879.50
SNI Bahan 286,880.00
03-3434-2008 - Papan kayu jati lokal 0.0250 M3 7,150,000.00 178,750.00
- Paku plepet 0.0300 Kg 11,000.00 330.00
- Lem kayu "fox" 0.8000 Kg 11,000.00 8,800.00
- Plywood 4 mm 1.0000 Lbr 57,750.00 57,750.00
- Formika 4" x 8" x 0,3 cm 0.5000 Lbr 82,500.00 41,250.00
Tenaga 136,999.50
- Pekerja 0.8500 Oh 30,250.00 25,712.50
- Tukang Kayu 2.5500 Oh 38,500.00 98,175.00
- Kepala Tukang Kayu 0.2550 Oh 44,000.00 11,220.00
- Mandor 0.0430 Oh 44,000.00 1,892.00
VI. 42 1 M2 Pasang pintu plywood & formika, rangkap rangka expose kayu kamper 451,379.50
SNI Bahan 314,380.00
03-3434-2008 - Papan kayu kamper 0.0250 M3 8,250,000.00 206,250.00
- Paku plepet 0.0300 Kg 11,000.00 330.00
- Lem kayu "fox" 0.8000 Kg 11,000.00 8,800.00
- Plywood 4 mm 1.0000 Lbr 57,750.00 57,750.00
- Formika 4" x 8" x 0,3 cm 0.5000 Lbr 82,500.00 41,250.00
Tenaga 136,999.50
- Pekerja 0.8500 Oh 30,250.00 25,712.50
- Tukang Kayu 2.5500 Oh 38,500.00 98,175.00
- Kepala Tukang Kayu 0.2550 Oh 44,000.00 11,220.00
- Mandor 0.0430 Oh 44,000.00 1,892.00
Tenaga 136,999.50
- Pekerja 0.8500 Oh 30,250.00 25,712.50
- Tukang Kayu 2.5500 Oh 38,500.00 98,175.00
- Kepala Tukang Kayu 0.2550 Oh 44,000.00 11,220.00
- Mandor 0.0430 Oh 44,000.00 1,892.00
VI. 44 1 M2 Pasang pintu plywood & formika, rangkap rangka expose kayu kruing 382,629.50
SNI Bahan 245,630.00
03-3434-2008 - Papan kayu kruing 0.0250 M3 5,500,000.00 137,500.00
- Paku plepet 0.0300 Kg 11,000.00 330.00
- Lem kayu "fox" 0.8000 Kg 11,000.00 8,800.00
- Plywood 4 mm 1.0000 Lbr 57,750.00 57,750.00
- Formika 4" x 8" x 0,3 cm 0.5000 Lbr 82,500.00 41,250.00
VI. 45 1 M2 Pasang pintu plywood & formika, rangkap rangka expose kayu bengkirai 492,629.50
SNI Bahan 355,630.00
03-3434-2008 - Papan kayu bengkirai 0.0250 M3 9,900,000.00 247,500.00
- Paku plepet 0.0300 Kg 11,000.00 330.00
- Lem kayu "fox" 0.8000 Kg 11,000.00 8,800.00
- Plywood 4 mm 1.0000 Lbr 57,750.00 57,750.00
- Formika 4" x 8" x 0,3 cm 0.5000 Lbr 82,500.00 41,250.00
Tenaga 136,999.50
- Pekerja 0.8500 Oh 30,250.00 25,712.50
- Tukang Kayu 2.5500 Oh 38,500.00 98,175.00
- Kepala Tukang Kayu 0.2550 Oh 44,000.00 11,220.00
- Mandor 0.0430 Oh 44,000.00 1,892.00
VI. 46 1 M2 Pasang pintu plywood & formika rangka kayu kamper (divernis) 430,754.50
SNI Bahan 293,755.00
03-3434-2008 - Papan kayu kamper 0.0250 M3 8,250,000.00 206,250.00
- Paku plepet 0.0300 Kg 11,000.00 330.00
- Lem kayu "fox" 0.8000 Kg 11,000.00 8,800.00
- Plywood 4 mm 0.5000 Lbr 57,750.00 28,875.00
- Pernis 0.5000 Lt 16,500.00 8,250.00
- Formika 4" x 8" x 0,3 cm 0.5000 Lbr 82,500.00 41,250.00
Tenaga 136,999.50
- Pekerja 0.8500 Oh 30,250.00 25,712.50
- Tukang Kayu 2.5500 Oh 38,500.00 98,175.00
- Kepala Tukang Kayu 0.2550 Oh 44,000.00 11,220.00
- Mandor 0.0430 Oh 44,000.00 1,892.00
VI. 47 1 M2 Pasang pintu plywood & formika rangka kayu meranti (divernis) 318,004.50
SNI Bahan 181,005.00
03-3434-2008 - Papan kayu meranti 0.0250 M3 3,740,000.00 93,500.00
- Paku plepet 0.0300 Kg 11,000.00 330.00
- Lem kayu "fox" 0.8000 Kg 11,000.00 8,800.00
- Plywood 4 mm 0.5000 Lbr 57,750.00 28,875.00
- Pernis 0.5000 Lt 16,500.00 8,250.00
- Formika 4" x 8" x 0,3 cm 0.5000 Lbr 82,500.00 41,250.00
Tenaga 136,999.50
- Pekerja 0.8500 Oh 30,250.00 25,712.50
- Tukang Kayu 2.5500 Oh 38,500.00 98,175.00
- Kepala Tukang Kayu 0.2550 Oh 44,000.00 11,220.00
- Mandor 0.0430 Oh 44,000.00 1,892.00
VI. 48 1 M2 Pasang pintu plywood & formika rangka kayu kruing (divernis) 362,004.50
SNI Bahan 225,005.00
03-3434-2008 - Papan kayu kruing 0.0250 M3 5,500,000.00 137,500.00
- Paku plepet 0.0300 Kg 11,000.00 330.00
- Lem kayu "fox" 0.8000 Kg 11,000.00 8,800.00
- Plywood 4 mm 0.5000 Lbr 57,750.00 28,875.00
- Pernis 0.5000 Lt 16,500.00 8,250.00
- Formika 4" x 8" x 0,3 cm 0.5000 Lbr 82,500.00 41,250.00
Tenaga 136,999.50
- Pekerja 0.8500 Oh 30,250.00 25,712.50
- Tukang Kayu 2.5500 Oh 38,500.00 98,175.00
- Kepala Tukang Kayu 0.2550 Oh 44,000.00 11,220.00
- Mandor 0.0430 Oh 44,000.00 1,892.00
Tenaga 644,600.00
- Pekerja 4.0000 Oh 30,250.00 121,000.00
- Tukang Kayu 12.0000 Oh 38,500.00 462,000.00
- Kepala Tukang Kayu 1.2000 Oh 44,000.00 52,800.00
- Mandor 0.2000 Oh 44,000.00 8,800.00
Tenaga 644,600.00
- Pekerja 4.0000 Oh 30,250.00 121,000.00
- Tukang Kayu 12.0000 Oh 38,500.00 462,000.00
- Kepala Tukang Kayu 1.2000 Oh 44,000.00 52,800.00
- Mandor 0.2000 Oh 44,000.00 8,800.00
Tenaga 644,600.00
- Pekerja 4.0000 Oh 30,250.00 121,000.00
- Tukang Kayu 12.0000 Oh 38,500.00 462,000.00
- Kepala Tukang Kayu 1.2000 Oh 44,000.00 52,800.00
- Mandor 0.2000 Oh 44,000.00 8,800.00
Tenaga 644,600.00
- Pekerja 4.0000 Oh 30,250.00 121,000.00
- Tukang Kayu 12.0000 Oh 38,500.00 462,000.00
- Kepala Tukang Kayu 1.2000 Oh 44,000.00 52,800.00
- Mandor 0.2000 Oh 44,000.00 8,800.00
Tenaga 644,600.00
- Pekerja 4.0000 Oh 30,250.00 121,000.00
- Tukang Kayu 12.0000 Oh 38,500.00 462,000.00
- Kepala Tukang Kayu 1.2000 Oh 44,000.00 52,800.00
- Mandor 0.2000 Oh 44,000.00 8,800.00
Tenaga 386,760.00
- Pekerja 2.4000 Oh 30,250.00 72,600.00
- Tukang Kayu 7.2000 Oh 38,500.00 277,200.00
- Kepala Tukang Kayu 0.7200 Oh 44,000.00 31,680.00
- Mandor 0.1200 Oh 44,000.00 5,280.00
Tenaga 386,760.00
- Pekerja 2.4000 Oh 30,250.00 72,600.00
- Tukang Kayu 7.2000 Oh 38,500.00 277,200.00
- Kepala Tukang Kayu 0.7200 Oh 44,000.00 31,680.00
- Mandor 0.1200 Oh 44,000.00 5,280.00
Tenaga 386,760.00
- Pekerja 2.4000 Oh 30,250.00 72,600.00
- Tukang Kayu 7.2000 Oh 38,500.00 277,200.00
- Kepala Tukang Kayu 0.7200 Oh 44,000.00 31,680.00
Tenaga 386,760.00
- Pekerja 2.4000 Oh 30,250.00 72,600.00
- Tukang Kayu 7.2000 Oh 38,500.00 277,200.00
- Kepala Tukang Kayu 0.7200 Oh 44,000.00 31,680.00
- Mandor 0.1200 Oh 44,000.00 5,280.00
Tenaga 386,760.00
- Pekerja 2.4000 Oh 30,250.00 72,600.00
- Tukang Kayu 7.2000 Oh 38,500.00 277,200.00
- Kepala Tukang Kayu 0.7200 Oh 44,000.00 31,680.00
- Mandor 0.1200 Oh 44,000.00 5,280.00
Tenaga 9,157.50
- Pekerja 0.1500 Oh 30,250.00 4,537.50
- Tukang Kayu 0.1000 Oh 38,500.00 3,850.00
- Kepala Tukang Kayu 0.0100 Oh 44,000.00 440.00
- Mandor 0.0075 Oh 44,000.00 330.00
Tenaga 9,157.50
- Pekerja 0.1500 Oh 30,250.00 4,537.50
- Tukang Kayu 0.1000 Oh 38,500.00 3,850.00
- Kepala Tukang Kayu 0.0100 Oh 44,000.00 440.00
- Mandor 0.0075 Oh 44,000.00 330.00
Tenaga 9,157.50
- Pekerja 0.1500 Oh 30,250.00 4,537.50
- Tukang Kayu 0.1000 Oh 38,500.00 3,850.00
- Kepala Tukang Kayu 0.0100 Oh 44,000.00 440.00
- Mandor 0.0075 Oh 44,000.00 330.00
Tenaga 9,157.50
- Pekerja 0.1500 Oh 30,250.00 4,537.50
- Tukang Kayu 0.1000 Oh 38,500.00 3,850.00
- Kepala Tukang Kayu 0.0100 Oh 44,000.00 440.00
- Mandor 0.0075 Oh 44,000.00 330.00
VI. 64 1 M2 Pekerjaan usuk 5/7 dan reng 2/3 kayu jati lokal 126,445.00
SNI Bahan 118,910.00
03-3434-2008 - Kayu jati lokal 0.0176 M3 6,600,000.00 116,160.00
- Paku usuk 0.2500 Kg 11,000.00 2,750.00
Tenaga 7,535.00
- Pekerja 0.1000 Oh 30,250.00 3,025.00
- Tukang Kayu 0.1000 Oh 38,500.00 3,850.00
- Kepala Tukang Kayu 0.0100 Oh 44,000.00 440.00
- Mandor 0.0050 Oh 44,000.00 220.00
VI. 65 1 M2 Pekerjaan usuk 5/7 dan reng 2/3 kayu kamper 136,125.00
SNI Bahan 128,590.00
03-3434-2008 - Kayu Kamper 0.0176 M3 7,150,000.00 125,840.00
- Paku usuk 0.2500 Kg 11,000.00 2,750.00
Tenaga 7,535.00
- Pekerja 0.1000 Oh 30,250.00 3,025.00
- Tukang Kayu 0.1000 Oh 38,500.00 3,850.00
- Kepala Tukang Kayu 0.0100 Oh 44,000.00 440.00
- Mandor 0.0050 Oh 44,000.00 220.00
VI. 66 1 M2 Pekerjaan usuk 5/7 dan reng 2/3 kayu meranti 68,365.00
SNI Bahan 60,830.00
03-3434-2008 - Kayu meranti 0.0176 M3 3,300,000.00 58,080.00
- Paku usuk 0.2500 Kg 11,000.00 2,750.00
Tenaga 7,535.00
- Pekerja 0.1000 Oh 30,250.00 3,025.00
- Tukang Kayu 0.1000 Oh 38,500.00 3,850.00
- Kepala Tukang Kayu 0.0100 Oh 44,000.00 440.00
- Mandor 0.0050 Oh 44,000.00 220.00
Tenaga 7,535.00
- Pekerja 0.1000 Oh 30,250.00 3,025.00
- Tukang Kayu 0.1000 Oh 38,500.00 3,850.00
- Kepala Tukang Kayu 0.0100 Oh 44,000.00 440.00
- Mandor 0.0050 Oh 44,000.00 220.00
VI. 68 1 M2 Pekerjaan usuk 5/7 dan reng 2/3 kayu bengkirai 162,261.00
SNI Bahan 154,726.00
03-3434-2008 - Kayu bengkirai 0.0176 M3 8,635,000.00 151,976.00
- Paku usuk 0.2500 Kg 11,000.00 2,750.00
Tenaga 7,535.00
- Pekerja 0.1000 Oh 30,250.00 3,025.00
- Tukang Kayu 0.1000 Oh 38,500.00 3,850.00
- Kepala Tukang Kayu 0.0100 Oh 44,000.00 440.00
- Mandor 0.0050 Oh 44,000.00 220.00
VI. 69 1 M2 Pekerjaan usuk 5/7 dan reng 3/4 kayu jati lokal untuk genteng beton 150,205.00
SNI Bahan 142,670.00
03-3434-2008 - Kayu jati lokal 0.0212 M3 6,600,000.00 139,920.00
- Paku usuk 0.2500 Kg 11,000.00 2,750.00
Tenaga 7,535.00
- Pekerja 0.1000 Oh 30,250.00 3,025.00
- Tukang Kayu 0.1000 Oh 38,500.00 3,850.00
- Kepala Tukang Kayu 0.0100 Oh 44,000.00 440.00
- Mandor 0.0050 Oh 44,000.00 220.00
VI. 70 1 M2 Pekerjaan usuk 5/7 dan reng 3/4 kayu kamper untuk genteng beton 161,865.00
SNI Bahan 154,330.00
03-3434-2008 - Kayu Kamper 0.0212 M3 7,150,000.00 151,580.00
- Paku usuk 0.2500 Kg 11,000.00 2,750.00
Tenaga 7,535.00
- Pekerja 0.1000 Oh 30,250.00 3,025.00
- Tukang Kayu 0.1000 Oh 38,500.00 3,850.00
- Kepala Tukang Kayu 0.0100 Oh 44,000.00 440.00
- Mandor 0.0050 Oh 44,000.00 220.00
VI. 71 1 M2 Pekerjaan usuk 5/7 dan reng 3/4 kayu meranti untuk genteng beton 80,245.00
SNI Bahan 72,710.00
03-3434-2008 - Kayu meranti 0.0212 M3 3,300,000.00 69,960.00
- Paku usuk 0.2500 Kg 11,000.00 2,750.00
Tenaga 7,535.00
- Pekerja 0.1000 Oh 30,250.00 3,025.00
- Tukang Kayu 0.1000 Oh 38,500.00 3,850.00
- Kepala Tukang Kayu 0.0100 Oh 44,000.00 440.00
- Mandor 0.0050 Oh 44,000.00 220.00
VI. 72 1 M2 Pekerjaan usuk 5/7 dan reng 3/4 kayu kruing untuk genteng beton 115,225.00
SNI Bahan 107,690.00
03-3434-2008 - Kayu kruing 0.0212 M3 4,950,000.00 104,940.00
- Paku usuk 0.2500 Kg 11,000.00 2,750.00
Tenaga 7,535.00
- Pekerja 0.1000 Oh 30,250.00 3,025.00
- Tukang Kayu 0.1000 Oh 38,500.00 3,850.00
- Kepala Tukang Kayu 0.0100 Oh 44,000.00 440.00
- Mandor 0.0050 Oh 44,000.00 220.00
VI. 73 1 M2 Pekerjaan usuk 5/7 dan reng 3/4 kayu bengkirai untuk genteng beton 193,347.00
Tenaga 7,535.00
- Pekerja 0.1000 Oh 30,250.00 3,025.00
- Tukang Kayu 0.1000 Oh 38,500.00 3,850.00
- Kepala Tukang Kayu 0.0100 Oh 44,000.00 440.00
- Mandor 0.0050 Oh 44,000.00 220.00
VI. 74 1 M2 Pasang rangka langit-langit (0.50 x 1.00) m, kayu jati lokal 124,547.50
SNI Bahan 103,840.00
03-3434-2008 - Kayu jati lokal 0.0154 M3 6,600,000.00 101,640.00
- Paku usuk 0.2000 Kg 11,000.00 2,200.00
Tenaga 20,707.50
- Pekerja 0.1500 Oh 30,250.00 4,537.50
- Tukang Kayu 0.3000 Oh 38,500.00 11,550.00
- Kepala Tukang Kayu 0.0300 Oh 44,000.00 1,320.00
- Mandor 0.0750 Oh 44,000.00 3,300.00
Tenaga 20,707.50
- Pekerja 0.1500 Oh 30,250.00 4,537.50
- Tukang Kayu 0.3000 Oh 38,500.00 11,550.00
- Kepala Tukang Kayu 0.0300 Oh 44,000.00 1,320.00
- Mandor 0.0750 Oh 44,000.00 3,300.00
Tenaga 20,707.50
- Pekerja 0.1500 Oh 30,250.00 4,537.50
- Tukang Kayu 0.3000 Oh 38,500.00 11,550.00
- Kepala Tukang Kayu 0.0300 Oh 44,000.00 1,320.00
- Mandor 0.0750 Oh 44,000.00 3,300.00
Tenaga 20,707.50
- Pekerja 0.1500 Oh 30,250.00 4,537.50
- Tukang Kayu 0.3000 Oh 38,500.00 11,550.00
- Kepala Tukang Kayu 0.0300 Oh 44,000.00 1,320.00
- Mandor 0.0750 Oh 44,000.00 3,300.00
Tenaga 20,707.50
- Pekerja 0.1500 Oh 30,250.00 4,537.50
- Tukang Kayu 0.3000 Oh 38,500.00 11,550.00
- Kepala Tukang Kayu 0.0300 Oh 44,000.00 1,320.00
- Mandor 0.0750 Oh 44,000.00 3,300.00
VI. 79 1 M2 Pasang rangka langit-langit (0.60 x 0.60) m, kayu jati lokal 129,690.00
SNI Bahan 110,330.00
03-3434-2008 - Kayu jati lokal 0.0163 M3 6,600,000.00 107,580.00
- Paku usuk 0.2500 Kg 11,000.00 2,750.00
Tenaga 19,360.00
- Pekerja 0.2000 Oh 30,250.00 6,050.00
- Tukang Kayu 0.3000 Oh 38,500.00 11,550.00
- Kepala Tukang Kayu 0.0300 Oh 44,000.00 1,320.00
- Mandor 0.0100 Oh 44,000.00 440.00
Tenaga 19,360.00
- Pekerja 0.2000 Oh 30,250.00 6,050.00
- Tukang Kayu 0.3000 Oh 38,500.00 11,550.00
- Kepala Tukang Kayu 0.0300 Oh 44,000.00 1,320.00
- Mandor 0.0100 Oh 44,000.00 440.00
Tenaga 19,360.00
- Pekerja 0.2000 Oh 30,250.00 6,050.00
- Tukang Kayu 0.3000 Oh 38,500.00 11,550.00
- Kepala Tukang Kayu 0.0300 Oh 44,000.00 1,320.00
- Mandor 0.0100 Oh 44,000.00 440.00
Tenaga 19,360.00
- Pekerja 0.2000 Oh 30,250.00 6,050.00
- Tukang Kayu 0.3000 Oh 38,500.00 11,550.00
- Kepala Tukang Kayu 0.0300 Oh 44,000.00 1,320.00
- Mandor 0.0100 Oh 44,000.00 440.00
Tenaga 19,360.00
- Pekerja 0.2000 Oh 30,250.00 6,050.00
- Tukang Kayu 0.3000 Oh 38,500.00 11,550.00
- Kepala Tukang Kayu 0.0300 Oh 44,000.00 1,320.00
- Mandor 0.0100 Oh 44,000.00 440.00
Tenaga 805,750.00
- Pekerja 5.0000 Oh 30,250.00 151,250.00
- Tukang Kayu 15.0000 Oh 38,500.00 577,500.00
- Kepala Tukang Kayu 1.5000 Oh 44,000.00 66,000.00
- Mandor 0.2500 Oh 44,000.00 11,000.00
Tenaga 805,750.00
- Pekerja 5.0000 Oh 30,250.00 151,250.00
- Tukang Kayu 15.0000 Oh 38,500.00 577,500.00
- Kepala Tukang Kayu 1.5000 Oh 44,000.00 66,000.00
- Mandor 0.2500 Oh 44,000.00 11,000.00
Tenaga 805,750.00
- Pekerja 5.0000 Oh 30,250.00 151,250.00
- Tukang Kayu 15.0000 Oh 38,500.00 577,500.00
- Kepala Tukang Kayu 1.5000 Oh 44,000.00 66,000.00
- Mandor 0.2500 Oh 44,000.00 11,000.00
Tenaga 805,750.00
- Pekerja 5.0000 Oh 30,250.00 151,250.00
- Tukang Kayu 15.0000 Oh 38,500.00 577,500.00
- Kepala Tukang Kayu 1.5000 Oh 44,000.00 66,000.00
- Mandor 0.2500 Oh 44,000.00 11,000.00
Tenaga 805,750.00
- Pekerja 5.0000 Oh 30,250.00 151,250.00
- Tukang Kayu 15.0000 Oh 38,500.00 577,500.00
- Kepala Tukang Kayu 1.5000 Oh 44,000.00 66,000.00
- Mandor 0.2500 Oh 44,000.00 11,000.00
VI. 89 1 M2 Pasang lisplang ukuran (3 x 20) cm, kayu jati lokal 63,855.00
SNI Bahan 52,030.00
03-3434-2008 - Papan kayu jati lokal 0.0072 M3 7,150,000.00 51,480.00
- Paku reng 0.0500 Kg 11,000.00 550.00
Tenaga 11,825.00
Tenaga 11,825.00
- Pekerja 0.1000 Oh 30,250.00 3,025.00
- Tukang Kayu 0.2000 Oh 38,500.00 7,700.00
- Kepala Tukang Kayu 0.0200 Oh 44,000.00 880.00
- Mandor 0.0050 Oh 44,000.00 220.00
Tenaga 9,017.80
- Pekerja 0.0072 Oh 30,250.00 217.80
- Tukang Kayu 0.2000 Oh 38,500.00 7,700.00
- Kepala Tukang Kayu 0.0200 Oh 44,000.00 880.00
- Mandor 0.0050 Oh 44,000.00 220.00
Tenaga 11,825.00
- Pekerja 0.1000 Oh 30,250.00 3,025.00
- Tukang Kayu 0.2000 Oh 38,500.00 7,700.00
- Kepala Tukang Kayu 0.0200 Oh 44,000.00 880.00
- Mandor 0.0050 Oh 44,000.00 220.00
Tenaga 11,825.00
- Pekerja 0.1000 Oh 30,250.00 3,025.00
- Tukang Kayu 0.2000 Oh 38,500.00 7,700.00
- Kepala Tukang Kayu 0.0200 Oh 44,000.00 880.00
- Mandor 0.0050 Oh 44,000.00 220.00
Tenaga 11,825.00
- Pekerja 0.1000 Oh 30,250.00 3,025.00
- Tukang Kayu 0.2000 Oh 38,500.00 7,700.00
- Kepala Tukang Kayu 0.0200 Oh 44,000.00 880.00
- Mandor 0.0050 Oh 44,000.00 220.00
Tenaga 11,825.00
- Pekerja 0.1000 Oh 30,250.00 3,025.00
- Tukang Kayu 0.2000 Oh 38,500.00 7,700.00
- Kepala Tukang Kayu 0.0200 Oh 44,000.00 880.00
- Mandor 0.0050 Oh 44,000.00 220.00
Tenaga 11,825.00
Tenaga 11,825.00
- Pekerja 0.1000 Oh 30,250.00 3,025.00
- Tukang Kayu 0.2000 Oh 38,500.00 7,700.00
- Kepala Tukang Kayu 0.0200 Oh 44,000.00 880.00
- Mandor 0.0050 Oh 44,000.00 220.00
VI. 100 1 M2 Pasang lisplang ukuran 2 x (3 x 20) cm, kayu meranti 78,606.00
SNI Bahan 54,956.00
03-3434-2008 - Papan kayu meranti 0.0144 M3 3,740,000.00 53,856.00
- Paku reng 0.1000 Kg 11,000.00 1,100.00
Tenaga 23,650.00
- Pekerja 0.2000 Oh 30,250.00 6,050.00
- Tukang Kayu 0.4000 Oh 38,500.00 15,400.00
- Kepala Tukang Kayu 0.0400 Oh 44,000.00 1,760.00
- Mandor 0.0100 Oh 44,000.00 440.00
VI. 101 1 M2 Pasang lisplang ukuran 2 x (3 x 20) cm, kayu kruing 103,950.00
SNI Bahan 80,300.00
03-3434-2008 - Papan kayu kruing 0.0144 M3 5,500,000.00 79,200.00
- Paku reng 0.1000 Kg 11,000.00 1,100.00
Tenaga 23,650.00
- Pekerja 0.2000 Oh 30,250.00 6,050.00
- Tukang Kayu 0.4000 Oh 38,500.00 15,400.00
- Kepala Tukang Kayu 0.0400 Oh 44,000.00 1,760.00
- Mandor 0.0100 Oh 44,000.00 440.00
VI. 102 1 M2 Pasang lisplang ukuran 2 x (3 x 20) cm, kayu bengkirai 167,310.00
SNI Bahan 143,660.00
03-3434-2008 - Papan kayu bengkirai 0.0144 M3 9,900,000.00 142,560.00
- Paku reng 0.1000 Kg 11,000.00 1,100.00
Tenaga 23,650.00
- Pekerja 0.2000 Oh 30,250.00 6,050.00
- Tukang Kayu 0.4000 Oh 38,500.00 15,400.00
- Kepala Tukang Kayu 0.0400 Oh 44,000.00 1,760.00
- Mandor 0.0100 Oh 44,000.00 440.00
VI. 103 1 M2 Pasang lisplang ukuran 2 x (2 x 20) cm, kayu kamper 103,950.00
SNI Bahan 80,300.00
03-3434-2008 - Papan kayu kamper 0.0096 M3 8,250,000.00 79,200.00
- Paku reng 0.1000 Kg 11,000.00 1,100.00
Tenaga 23,650.00
- Pekerja 0.2000 Oh 30,250.00 6,050.00
- Tukang Kayu 0.4000 Oh 38,500.00 15,400.00
- Kepala Tukang Kayu 0.0400 Oh 44,000.00 1,760.00
- Mandor 0.0100 Oh 44,000.00 440.00
VI. 104 1 M2 Pasang lisplang ukuran 2 x (2 x 20) cm, kayu meranti 60,654.00
SNI Bahan 37,004.00
03-3434-2008 - Papan kayu meranti 0.0096 M3 3,740,000.00 35,904.00
- Paku reng 0.1000 Kg 11,000.00 1,100.00
Tenaga 23,650.00
- Pekerja 0.2000 Oh 30,250.00 6,050.00
- Tukang Kayu 0.4000 Oh 38,500.00 15,400.00
- Kepala Tukang Kayu 0.0400 Oh 44,000.00 1,760.00
- Mandor 0.0100 Oh 44,000.00 440.00
VI. 105 1 M2 Pasang lisplang ukuran 2 x (2 x 20) cm, kayu kruing 77,550.00
SNI Bahan 53,900.00
03-3434-2008 - Papan kayu kruing 0.0096 M3 5,500,000.00 52,800.00
- Paku reng 0.1000 Kg 11,000.00 1,100.00
Tenaga 23,650.00
VI. 106 1 M2 Pasang lisplang ukuran 2 x (2 x 20) cm, kayu bengkirai 119,790.00
SNI Bahan 96,140.00
03-3434-2008 - Papan kayu bengkirai 0.0096 M3 9,900,000.00 95,040.00
- Paku reng 0.1000 Kg 11,000.00 1,100.00
Tenaga 23,650.00
- Pekerja 0.2000 Oh 30,250.00 6,050.00
- Tukang Kayu 0.4000 Oh 38,500.00 15,400.00
- Kepala Tukang Kayu 0.0400 Oh 44,000.00 1,760.00
- Mandor 0.0100 Oh 44,000.00 440.00
VI. 107 1 M2 Pasang rangka dinding pemisah (60x120)cm kayu kamper 6/12 226,044.50
SNI Bahan 201,850.00
03-3434-2008 - Kayu Kamper 0.0280 M3 7,150,000.00 200,200.00
- Paku reng 0.1500 Kg 11,000.00 1,650.00
VI. 108 1 M2 Pasang rangka dinding pemisah (60x120)cm kayu meranti 6/12 118,244.50
SNI Bahan 94,050.00
03-3434-2008 - Kayu meranti 0.0280 M3 3,300,000.00 92,400.00
- Paku reng 0.1500 Kg 11,000.00 1,650.00
Tenaga 24,194.50
- Pekerja 0.1500 Oh 30,250.00 4,537.50
- Tukang Kayu 0.4500 Oh 38,500.00 17,325.00
- Kepala Tukang Kayu 0.0450 Oh 44,000.00 1,980.00
- Mandor 0.0080 Oh 44,000.00 352.00
VI. 109 1 M2 Pasang rangka dinding pemisah (60x120)cm kayu kruing 6/12 164,444.50
SNI Bahan 140,250.00
03-3434-2008 - Kayu kruing 0.0280 M3 4,950,000.00 138,600.00
- Paku reng 0.1500 Kg 11,000.00 1,650.00
Tenaga 24,194.50
- Pekerja 0.1500 Oh 30,250.00 4,537.50
- Tukang Kayu 0.4500 Oh 38,500.00 17,325.00
- Kepala Tukang Kayu 0.0450 Oh 44,000.00 1,980.00
- Mandor 0.0080 Oh 44,000.00 352.00
VI. 110 1 M2 Pasang rangka dinding pemisah (60x120)cm kayu bengkirai 6/12 267,624.50
SNI Bahan 243,430.00
03-3434-2008 - Kayu bengkirai 0.0280 M3 8,635,000.00 241,780.00
- Paku reng 0.1500 Kg 11,000.00 1,650.00
Tenaga 24,194.50
- Pekerja 0.1500 Oh 30,250.00 4,537.50
- Tukang Kayu 0.4500 Oh 38,500.00 17,325.00
- Kepala Tukang Kayu 0.0450 Oh 44,000.00 1,980.00
- Mandor 0.0080 Oh 44,000.00 352.00
VI. 111 1 M2 Pasang dinding pemisah plywood rangkap, rangka (60x120)cm kayu kamper 6/12 289,905.00
SNI Bahan 257,675.00
03-3434-2008 - Kayu Kamper 0.0280 M3 7,150,000.00 200,200.00
- Paku reng 0.1500 Kg 11,000.00 1,650.00
- Lem kayu "fox" 0.5600 Kg 11,000.00 6,160.00
- Plywood 4 mm 0.8600 Lbr 57,750.00 49,665.00
Tenaga 32,230.00
- Pekerja 0.2000 Oh 30,250.00 6,050.00
- Tukang Kayu 0.6000 Oh 38,500.00 23,100.00
- Kepala Tukang Kayu 0.0600 Oh 44,000.00 2,640.00
- Mandor 0.0100 Oh 44,000.00 440.00
VI. 112 1 M2 Pasang dinding pemisah plywood rangkap, rangka (60x120)cm kayu kruing 6/12 228,305.00
SNI Bahan 196,075.00
03-3434-2008 - Kayu kruing 0.0280 M3 4,950,000.00 138,600.00
- Paku reng 0.1500 Kg 11,000.00 1,650.00
- Lem kayu "fox" 0.5600 Kg 11,000.00 6,160.00
- Plywood 4 mm 0.8600 Lbr 57,750.00 49,665.00
Tenaga 32,230.00
- Pekerja 0.2000 Oh 30,250.00 6,050.00
- Tukang Kayu 0.6000 Oh 38,500.00 23,100.00
- Kepala Tukang Kayu 0.0600 Oh 44,000.00 2,640.00
- Mandor 0.0100 Oh 44,000.00 440.00
VI. 113 1 M2 Pasang dinding pemisah plywood rangkap, rangka (60x120)cm kayu meranti 6/12 182,105.00
SNI Bahan 149,875.00
Tenaga 32,230.00
- Pekerja 0.2000 Oh 30,250.00 6,050.00
- Tukang Kayu 0.6000 Oh 38,500.00 23,100.00
- Kepala Tukang Kayu 0.0600 Oh 44,000.00 2,640.00
- Mandor 0.0100 Oh 44,000.00 440.00
VI. 114 1 M2 Pasang dinding pemisah teakwood rangkap, rangka (60x120)cm kayu kamper 6/12 303,154.50
SNI Bahan 278,960.00
03-3434-2008 - Kayu Kamper 0.0280 M3 7,150,000.00 200,200.00
- Paku reng 0.1500 Kg 11,000.00 1,650.00
- Lem kayu "fox" 0.5600 Kg 11,000.00 6,160.00
- Teakwood 3 mm 120 x 240 cm 0.8600 Lbr 82,500.00 70,950.00
VI. 115 1 M2 Pasang dinding pemisah teakwood rangkap, rangka (60x120)cm kayu kruing 6/12 241,554.50
SNI Bahan 217,360.00
03-3434-2008 - Kayu kruing 0.0280 M3 4,950,000.00 138,600.00
- Paku reng 0.1500 Kg 11,000.00 1,650.00
- Lem kayu "fox" 0.5600 Kg 11,000.00 6,160.00
- Teakwood 3 mm 120 x 240 cm 0.8600 Lbr 82,500.00 70,950.00
Tenaga 24,194.50
- Pekerja 0.1500 Oh 30,250.00 4,537.50
- Tukang Kayu 0.4500 Oh 38,500.00 17,325.00
- Kepala Tukang Kayu 0.0450 Oh 44,000.00 1,980.00
- Mandor 0.0080 Oh 44,000.00 352.00
VI. 116 1 M2 Pasang dinding pemisah teakwood rangkap, rangka (60x120)cm kayu meranti 6/12 195,354.50
SNI Bahan 171,160.00
03-3434-2008 - Kayu meranti 0.0280 M3 3,300,000.00 92,400.00
- Paku reng 0.1500 Kg 11,000.00 1,650.00
- Lem kayu "fox" 0.5600 Kg 11,000.00 6,160.00
- Teakwood 3 mm 120 x 240 cm 0.8600 Lbr 82,500.00 70,950.00
Tenaga 24,194.50
- Pekerja 0.1500 Oh 30,250.00 4,537.50
- Tukang Kayu 0.4500 Oh 38,500.00 17,325.00
- Kepala Tukang Kayu 0.0450 Oh 44,000.00 1,980.00
- Mandor 0.0080 Oh 44,000.00 352.00
Tenaga 4,039.75
- Pekerja 0.0250 Oh 30,250.00 756.25
- Tukang Kayu 0.0750 Oh 38,500.00 2,887.50
- Kepala Tukang Kayu 0.0080 Oh 44,000.00 352.00
- Mandor 0.0010 Oh 44,000.00 44.00
VI. 118 1 M' Pasang list plafond kayu profil jadi 12,452.00
SNI Bahan 8,662.50
03-2839-2008 - List profil kayu 1.0500 M' 8,250.00 8,662.50
Tenaga 3,789.50
- Pekerja 0.0500 Oh 30,250.00 1,512.50
- Tukang Kayu 0.0500 Oh 38,500.00 1,925.00
- Kepala Tukang Kayu 0.0050 Oh 44,000.00 220.00
- Mandor 0.0030 Oh 44,000.00 132.00
VI. 119 1 M' Pasang list profil cornice gypsum lebar sampai 5 cm 15,041.76
Bahan 9,746.08
- List profile cornice gypsum 5 cm 1.1000 M' 7,000.00 7,700.00
- Cornice adhesive (tepung gypsum) @ 20 kg "A-plus" 0.7000 Kg 2,915.00 2,040.50
- Casting @ 20 kg "A-plus" 0.0035 Kg 1,595.00 5.58
Tenaga 5,295.68
- Pekerja 0.1125 Oh 30,250.00 3,403.13
- Tukang Kayu 0.0375 Oh 38,500.00 1,443.75
- Kepala Tukang Kayu 0.0037 Oh 44,000.00 162.80
- Mandor 0.0065 Oh 44,000.00 286.00
VI. 120 1 M' Pasang list profil cornice gypsum lebar sampai 5 - 10 cm 17,791.76
Bahan 12,496.08
Tenaga 5,295.68
- Pekerja 0.1125 Oh 30,250.00 3,403.13
- Tukang Kayu 0.0375 Oh 38,500.00 1,443.75
- Kepala Tukang Kayu 0.0037 Oh 44,000.00 162.80
- Mandor 0.0065 Oh 44,000.00 286.00
VI. 121 1 M' Pasang list profil cornice gypsum lebar lebih dari 10 cm 23,841.76
Bahan 18,546.08
- List profile cornice gypsum lebih dari 10 cm 1.1000 M' 15,000.00 16,500.00
- Cornice adhesive (tepung gypsum) @ 20 kg "A-plus" 0.7000 Kg 2,915.00 2,040.50
- Casting @ 20 kg "A-plus" 0.0035 Kg 1,595.00 5.58
Tenaga 64,157.50
- Pekerja 1.6500 Oh 30,250.00 49,912.50
- Tukang Batu 0.2500 Oh 38,500.00 9,625.00
- Kepala Tukang Batu 0.0250 Oh 44,000.00 1,100.00
- Mandor 0.0800 Oh 44,000.00 3,520.00
Tenaga 64,157.50
- Pekerja 1.6500 Oh 30,250.00 49,912.50
- Tukang Batu 0.2500 Oh 38,500.00 9,625.00
- Kepala Tukang Batu 0.0250 Oh 44,000.00 1,100.00
- Mandor 0.0800 Oh 44,000.00 3,520.00
Tenaga 64,157.50
- Pekerja 1.6500 Oh 30,250.00 49,912.50
- Tukang Batu 0.2500 Oh 38,500.00 9,625.00
- Kepala Tukang Batu 0.0250 Oh 44,000.00 1,100.00
- Mandor 0.0800 Oh 44,000.00 3,520.00
VII. 4 1 M2 Membuat lantai kerja beton tumbuk, 1Pc : 3 Ps : 5 Kr, tebal 5 cm 56,562.00
SNI Bahan 20,652.50
03-2495-1991/ - Semen PC ( Portland Cement ) 40 kg 10.0000 Kg 1,100.00 11,000.00
SK SNI - Pasir beton (muntilan) 0.0260 M3 129,250.00 3,360.50
S-05-1990-F - Koral Beton 0.0440 M3 143,000.00 6,292.00
Tenaga 35,909.50
- Pekerja 1.1500 Oh 30,250.00 34,787.50
- Tukang Batu 0.0200 Oh 38,500.00 770.00
- Kepala Tukang Batu 0.0020 Oh 44,000.00 88.00
- Mandor 0.0060 Oh 44,000.00 264.00
Tenaga 119,515.00
- Pekerja 2.0000 Oh 30,250.00 60,500.00
- Tukang Batu 0.3500 Oh 38,500.00 13,475.00
- Kepala Tukang Batu 0.0350 Oh 44,000.00 1,540.00
- Mandor 1.0000 Oh 44,000.00 44,000.00
Tenaga 119,515.00
- Pekerja 2.0000 Oh 30,250.00 60,500.00
- Tukang Batu 0.3500 Oh 38,500.00 13,475.00
- Kepala Tukang Batu 0.0350 Oh 44,000.00 1,540.00
- Mandor 1.0000 Oh 44,000.00 44,000.00
VII. 8 1 Kg Pembesian / kabel presstressed dengan besi polos atau besi ulir 9,942.90
SNI Bahan 9,413.25
7394-2008 - Besi Beton (polos / ulir) 1.0500 Kg 8,800.00 9,240.00
- Kawat Beton / Bendrat 0.0150 Kg 11,550.00 173.25
Tenaga 529.65
- Pekerja 0.0070 Oh 30,250.00 211.75
- Tukang Besi 0.0070 Oh 38,500.00 269.50
- Kepala Tukang Besi 0.0007 Oh 44,000.00 30.80
- Mandor 0.0004 Oh 44,000.00 17.60
Tenaga 279,400.00
- Pekerja 2.0000 Oh 30,250.00 60,500.00
- Tukang Kayu 5.0000 Oh 38,500.00 192,500.00
- Kepala Tukang Kayu 0.5000 Oh 44,000.00 22,000.00
- Mandor 0.1000 Oh 44,000.00 4,400.00
Tenaga 564,025.00
- Pekerja 3.5000 Oh 30,250.00 105,875.00
- Tukang Kayu 10.5000 Oh 38,500.00 404,250.00
- Kepala Tukang Kayu 1.0500 Oh 44,000.00 46,200.00
- Mandor 0.1750 Oh 44,000.00 7,700.00
Tenaga 564,025.00
- Pekerja 3.5000 Oh 30,250.00 105,875.00
- Tukang Kayu 10.5000 Oh 38,500.00 404,250.00
- Kepala Tukang Kayu 1.0500 Oh 44,000.00 46,200.00
- Mandor 0.1750 Oh 44,000.00 7,700.00
Tenaga 221,980.00
- Pekerja 2.2000 Oh 30,250.00 66,550.00
- Tukang Kayu 3.5000 Oh 38,500.00 134,750.00
- Kepala Tukang Kayu 0.3500 Oh 44,000.00 15,400.00
- Mandor 0.1200 Oh 44,000.00 5,280.00
VII. 14 1 M' Membuat kolom praktis/ kolom penguat beton bertulang (11 x 11) cm 44,547.25
SNI Bahan 36,132.25
7394-2008 - Papan 3/20 kayu tahun 0.0020 M3 1,320,000.00 2,640.00
- Paku usuk 0.0100 Kg 11,000.00 110.00
- Besi Beton polos 3.0000 Kg 8,800.00 26,400.00
Tenaga 8,415.00
- Pekerja 0.1800 Oh 30,250.00 5,445.00
- Tukang Batu 0.0200 Oh 38,500.00 770.00
- Tukang Kayu 0.0200 Oh 38,500.00 770.00
- Tukang Besi 0.0200 Oh 38,500.00 770.00
- Kepala Tukang Batu 0.0060 Oh 44,000.00 264.00
- Mandor 0.0090 Oh 44,000.00 396.00
VII. 15 1 M' Membuat ring balok beton bertulang (10 x 15) cm 59,691.50
SNI Bahan 45,795.75
7394-2008 - Papan 3/20 kayu tahun 0.0030 M3 1,320,000.00 3,960.00
- Paku usuk 0.0200 Kg 11,000.00 220.00
- Besi Beton polos 3.6000 Kg 8,800.00 31,680.00
- Kawat Beton / Bendrat 0.0500 Kg 11,550.00 577.50
- Semen PC ( Portland Cement ) 40 kg 5.5000 Kg 1,100.00 6,050.00
- Pasir beton (muntilan) 0.0090 M3 129,250.00 1,163.25
- Koral Beton 0.0150 M3 143,000.00 2,145.00
Tenaga 13,895.75
- Pekerja 0.2970 Oh 30,250.00 8,984.25
- Tukang Batu 0.0330 Oh 38,500.00 1,270.50
- Tukang Kayu 0.0330 Oh 38,500.00 1,270.50
- Tukang Besi 0.0330 Oh 38,500.00 1,270.50
- Kepala Tukang Batu 0.0100 Oh 44,000.00 440.00
- Mandor 0.0150 Oh 44,000.00 660.00
Tenaga 8,129.00
- Pekerja 0.1500 Oh 30,250.00 4,537.50
- Tukang Kayu 0.0750 Oh 38,500.00 2,887.50
- Kepala Tukang Kayu 0.0080 Oh 44,000.00 352.00
- Mandor 0.0080 Oh 44,000.00 352.00
Tenaga 8,129.00
- Pekerja 0.1500 Oh 30,250.00 4,537.50
- Tukang Kayu 0.0750 Oh 38,500.00 2,887.50
- Kepala Tukang Kayu 0.0080 Oh 44,000.00 352.00
- Mandor 0.0080 Oh 44,000.00 352.00
Tenaga 7,463.50
- Pekerja 0.1500 Oh 30,250.00 4,537.50
- Tukang Kayu 0.0600 Oh 38,500.00 2,310.00
- Kepala Tukang Kayu 0.0060 Oh 44,000.00 264.00
- Mandor 0.0080 Oh 44,000.00 352.00
VIII. 5 1 M' Pasang atap genteng bubung palentong/ vlampress kecil 58,014.00
SNI Bahan 37,246.00
03-3436-2002 - Nok Genteng Plenthong / Vlampress kecil kebumen 5.0000 Bh 4,950.00 24,750.00
- Semen PC ( Portland Cement ) 40 kg 8.0000 Kg 1,100.00 8,800.00
- Pasir pasang (kaliworo) 0.0320 M3 115,500.00 3,696.00
Tenaga 20,768.00
- Pekerja 0.4000 Oh 30,250.00 12,100.00
- Tukang Kayu 0.2000 Oh 38,500.00 7,700.00
- Kepala Tukang Kayu 0.0200 Oh 44,000.00 880.00
- Mandor 0.0020 Oh 44,000.00 88.00
Tenaga 20,768.00
- Pekerja 0.4000 Oh 30,250.00 12,100.00
- Tukang Kayu 0.2000 Oh 38,500.00 7,700.00
- Kepala Tukang Kayu 0.0200 Oh 44,000.00 880.00
- Mandor 0.0020 Oh 44,000.00 88.00
VIII. 7 1 M' Pasang atap genteng bubung palentong/ vlampress super/ besar 53,064.00
SNI Bahan 32,296.00
03-3436-2002 - Nok Genteng Plenthong / Vlampress besar kebumen 4.0000 Bh 4,950.00 19,800.00
- Semen PC ( Portland Cement ) 40 kg 8.0000 Kg 1,100.00 8,800.00
- Pasir pasang (kaliworo) 0.0320 M3 115,500.00 3,696.00
Tenaga 20,768.00
- Pekerja 0.4000 Oh 30,250.00 12,100.00
- Tukang Kayu 0.2000 Oh 38,500.00 7,700.00
- Kepala Tukang Kayu 0.0200 Oh 44,000.00 880.00
- Mandor 0.0020 Oh 44,000.00 88.00
Tenaga 20,768.00
- Pekerja 0.4000 Oh 30,250.00 12,100.00
- Tukang Kayu 0.2000 Oh 38,500.00 7,700.00
- Kepala Tukang Kayu 0.0200 Oh 44,000.00 880.00
- Mandor 0.0020 Oh 44,000.00 88.00
VIII. 9 1 M2 Pasang atap asbes gelombang gelombang besar (300 x 102 x 5 mm) 36,774.10
SNI Bahan 28,947.60
03-3436-2002 - Asbes Gelombang besar (300 x 102 x 0,5) 0.3600 Lbr 80,300.00 28,908.00
- Paku asbes 0.1200 Kg 330.00 39.60
Tenaga 7,826.50
- Pekerja 0.1400 Oh 30,250.00 4,235.00
- Tukang Kayu 0.0750 Oh 38,500.00 2,887.50
- Kepala Tukang Kayu 0.0080 Oh 44,000.00 352.00
- Mandor 0.0080 Oh 44,000.00 352.00
VIII. 10 1 M2 Pasang atas asbes gelombang gelombang besar (200 x 102 x 5 mm) 42,565.60
SNI Bahan 35,019.60
03-3436-2002 - Asbes Gelombang besar (200 x 102 x 0,5) 0.6000 Lbr 58,300.00 34,980.00
- Paku asbes 0.1200 Kg 330.00 39.60
Tenaga 7,546.00
- Pekerja 0.1400 Oh 30,250.00 4,235.00
- Tukang Kayu 0.0700 Oh 38,500.00 2,695.00
- Kepala Tukang Kayu 0.0070 Oh 44,000.00 308.00
- Mandor 0.0070 Oh 44,000.00 308.00
VIII. 11 1 M2 Pasang atas asbes gelombang gelombang besar (180 x 102 x 5 mm) 48,010.60
SNI Bahan 40,464.60
03-3436-2002 - Asbes Gelombang besar (180 x 102 x 0,5) 0.7500 Lbr 53,900.00 40,425.00
- Paku asbes 0.1200 Kg 330.00 39.60
Tenaga 7,546.00
- Pekerja 0.1400 Oh 30,250.00 4,235.00
- Tukang Kayu 0.0700 Oh 38,500.00 2,695.00
- Kepala Tukang Kayu 0.0070 Oh 44,000.00 308.00
- Mandor 0.0070 Oh 44,000.00 308.00
VIII. 12 1 M2 Pasang atas asbes gelombang gelombang kecil (300 x 105 x 4 mm) 30,685.60
SNI Bahan 23,139.60
03-3436-2002 - Asbes Gelombang kecil (300 x 105 x 0,4) Djabes 0.3500 Lbr 66,000.00 23,100.00
- Paku asbes 0.1200 Kg 330.00 39.60
Tenaga 7,546.00
- Pekerja 0.1400 Oh 30,250.00 4,235.00
- Tukang Kayu 0.0700 Oh 38,500.00 2,695.00
- Kepala Tukang Kayu 0.0070 Oh 44,000.00 308.00
- Mandor 0.0070 Oh 44,000.00 308.00
VIII. 13 1 M2 Pasang atas asbes gelombang gelombang kecil (270 x 105 x 4 mm) 35,074.60
SNI Bahan 27,528.60
03-3436-2002 - Asbes Gelombang kecil (270 x 105 x 0,4) Djabes 0.4200 Lbr 65,450.00 27,489.00
- Paku asbes 0.1200 Kg 330.00 39.60
Tenaga 7,546.00
- Pekerja 0.1400 Oh 30,250.00 4,235.00
- Tukang Kayu 0.0700 Oh 38,500.00 2,695.00
- Kepala Tukang Kayu 0.0070 Oh 44,000.00 308.00
- Mandor 0.0070 Oh 44,000.00 308.00
VIII. 14 1 M2 Pasang atas asbes gelombang gelombang kecil (240 x 105 x 4 mm) 30,702.10
SNI Bahan 23,271.60
03-3436-2002 - Asbes Gelombang kecil (240 x 105 x 0,4) Djabes 0.4400 Lbr 52,800.00 23,232.00
- Paku asbes 0.1200 Kg 330.00 39.60
Tenaga 7,430.50
- Pekerja 0.1400 Oh 30,250.00 4,235.00
- Tukang Kayu 0.0670 Oh 38,500.00 2,579.50
- Kepala Tukang Kayu 0.0070 Oh 44,000.00 308.00
- Mandor 0.0070 Oh 44,000.00 308.00
VIII. 15 1 M2 Pasang atas asbes gelombang gelombang kecil (210 x 105 x 4 mm) 31,032.10
SNI Bahan 23,601.60
03-3436-2002 - Asbes Gelombang kecil (210 x 105 x 0,4) Djabes 0.5100 Lbr 46,200.00 23,562.00
- Paku asbes 0.1200 Kg 330.00 39.60
VIII. 16 1 M2 Pasang atas asbes gelombang gelombang kecil (150 x 105 x 4 mm) 36,070.10
SNI Bahan 28,639.60
03-3436-2002 - Asbes Gelombang kecil (150 x 105 x 0,4) Djabes 0.8000 Lbr 35,750.00 28,600.00
- Paku asbes 0.1200 Kg 330.00 39.60
Tenaga 7,430.50
- Pekerja 0.1400 Oh 30,250.00 4,235.00
- Tukang Kayu 0.0670 Oh 38,500.00 2,579.50
- Kepala Tukang Kayu 0.0070 Oh 44,000.00 308.00
- Mandor 0.0070 Oh 44,000.00 308.00
Tenaga 6,468.00
- Pekerja 0.1200 Oh 30,250.00 3,630.00
- Tukang Kayu 0.0600 Oh 38,500.00 2,310.00
- Kepala Tukang Kayu 0.0060 Oh 44,000.00 264.00
- Mandor 0.0060 Oh 44,000.00 264.00
Tenaga 6,468.00
- Pekerja 0.1200 Oh 30,250.00 3,630.00
- Tukang Kayu 0.0600 Oh 38,500.00 2,310.00
- Kepala Tukang Kayu 0.0060 Oh 44,000.00 264.00
- Mandor 0.0060 Oh 44,000.00 264.00
Tenaga 6,468.00
- Pekerja 0.1200 Oh 30,250.00 3,630.00
- Tukang Kayu 0.0600 Oh 38,500.00 2,310.00
- Kepala Tukang Kayu 0.0060 Oh 44,000.00 264.00
- Mandor 0.0060 Oh 44,000.00 264.00
Tenaga 6,468.00
- Pekerja 0.1200 Oh 30,250.00 3,630.00
- Tukang Kayu 0.0600 Oh 38,500.00 2,310.00
- Kepala Tukang Kayu 0.0060 Oh 44,000.00 264.00
- Mandor 0.0060 Oh 44,000.00 264.00
Tenaga 8,101.50
- Pekerja 0.0840 Oh 30,250.00 2,541.00
- Tukang Kayu 0.1250 Oh 38,500.00 4,812.50
- Kepala Tukang Kayu 0.0130 Oh 44,000.00 572.00
- Mandor 0.0040 Oh 44,000.00 176.00
Tenaga 21,092.50
- Pekerja 0.1500 Oh 30,250.00 4,537.50
- Tukang Kayu 0.4000 Oh 38,500.00 15,400.00
- Kepala Tukang Kayu 0.0250 Oh 44,000.00 1,100.00
- Mandor 0.0013 Oh 44,000.00 55.00
Tenaga 17,765.00
- Pekerja 0.0400 Oh 30,250.00 1,210.00
- Tukang Kayu 0.4000 Oh 38,500.00 15,400.00
- Kepala Tukang Kayu 0.0250 Oh 44,000.00 1,100.00
- Mandor 0.0013 Oh 44,000.00 55.00
VIII. 26 1 M' Pasang talang 1/2 lingkaran D-10 cm, seng bjls 28 99,687.50
Bahan 84,370.00
- Seng BJLS 0,30 lembaran L = 90 cm 0.3000 Lbr 24,200.00 7,260.00
- Paku usuk 0.1000 Kg 11,000.00 1,100.00
- Papan kayu meranti 0.0190 M3 3,740,000.00 71,060.00
- Besi Strip 0.5000 Kg 9,900.00 4,950.00
Tenaga 15,317.50
- Pekerja 0.1500 Oh 30,250.00 4,537.50
- Tukang Kayu 0.2500 Oh 38,500.00 9,625.00
- Kepala Tukang Kayu 0.0250 Oh 44,000.00 1,100.00
- Mandor 0.0013 Oh 44,000.00 55.00
VIII. 27 1 M' Pasang talang 1/2 lingkaran D-10 cm, seng bjls 24 99,357.50
Bahan 84,040.00
- Seng BJLS 0,20 lembaran L = 90 cm 0.3000 Lbr 23,100.00 6,930.00
- Paku usuk 0.1000 Kg 11,000.00 1,100.00
- Papan kayu meranti 0.0190 M3 3,740,000.00 71,060.00
- Besi Strip 0.5000 Kg 9,900.00 4,950.00
Tenaga 15,317.50
- Pekerja 0.1500 Oh 30,250.00 4,537.50
- Tukang Kayu 0.2500 Oh 38,500.00 9,625.00
- Kepala Tukang Kayu 0.0250 Oh 44,000.00 1,100.00
- Mandor 0.0013 Oh 44,000.00 55.00
Tenaga 4,086.50
- Pekerja 0.0300 Oh 30,250.00 907.50
- Tukang Kayu 0.0700 Oh 38,500.00 2,695.00
Tenaga 4,086.50
- Pekerja 0.0300 Oh 30,250.00 907.50
- Tukang Kayu 0.0700 Oh 38,500.00 2,695.00
- Kepala Tukang Kayu 0.0070 Oh 44,000.00 308.00
- Mandor 0.0040 Oh 44,000.00 176.00
IX. 3 1 M2 Pasang langit-langit asbes "Kerang super" (1,00 x 1,00) m, tebal 3 mm 13,304.50
SNI Bahan 9,218.00
03-2839-2008 - Asbes plat (100 x 100 x 0,3) Kerang super 1.1000 Lbr 8,250.00 9,075.00
- Paku eternit 0.0100 Kg 14,300.00 143.00
Tenaga 4,086.50
- Pekerja 0.0300 Oh 30,250.00 907.50
- Tukang Kayu 0.0700 Oh 38,500.00 2,695.00
- Kepala Tukang Kayu 0.0070 Oh 44,000.00 308.00
- Mandor 0.0040 Oh 44,000.00 176.00
Tenaga 7,535.00
- Pekerja 0.1000 Oh 30,250.00 3,025.00
- Tukang Kayu 0.1000 Oh 38,500.00 3,850.00
- Kepala Tukang Kayu 0.0100 Oh 44,000.00 440.00
- Mandor 0.0050 Oh 44,000.00 220.00
Tenaga 7,535.00
- Pekerja 0.1000 Oh 30,250.00 3,025.00
- Tukang Kayu 0.1000 Oh 38,500.00 3,850.00
- Kepala Tukang Kayu 0.0100 Oh 44,000.00 440.00
- Mandor 0.0050 Oh 44,000.00 220.00
Tenaga 7,535.00
- Pekerja 0.1000 Oh 30,250.00 3,025.00
- Tukang Kayu 0.1000 Oh 38,500.00 3,850.00
- Kepala Tukang Kayu 0.0100 Oh 44,000.00 440.00
- Mandor 0.0050 Oh 44,000.00 220.00
Tenaga 7,535.00
- Pekerja 0.1000 Oh 30,250.00 3,025.00
- Tukang Kayu 0.1000 Oh 38,500.00 3,850.00
- Kepala Tukang Kayu 0.0100 Oh 44,000.00 440.00
- Mandor 0.0050 Oh 44,000.00 220.00
Tenaga 7,535.00
Tenaga 7,535.00
- Pekerja 0.1000 Oh 30,250.00 3,025.00
- Tukang Kayu 0.1000 Oh 38,500.00 3,850.00
- Kepala Tukang Kayu 0.0100 Oh 44,000.00 440.00
- Mandor 0.0050 Oh 44,000.00 220.00
Tenaga 32,230.00
- Pekerja 0.2000 Oh 30,250.00 6,050.00
- Tukang Kayu 0.6000 Oh 38,500.00 23,100.00
- Kepala Tukang Kayu 0.0600 Oh 44,000.00 2,640.00
- Mandor 0.0100 Oh 44,000.00 440.00
Tenaga 3,789.50
- Pekerja 0.0500 Oh 30,250.00 1,512.50
- Tukang Kayu 0.0500 Oh 38,500.00 1,925.00
- Kepala Tukang Kayu 0.0050 Oh 44,000.00 220.00
- Mandor 0.0030 Oh 44,000.00 132.00
IX. 14 1 M2 Pasang langit-langit asbes "Kerang super" (1,00 x 1,00) m, tebal 3 mm, rangka kayu meranti 68,904.00
SNI Bahan 49,335.00
03-2838-2002 - Kayu meranti 0.0120 M3 3,300,000.00 39,600.00
- Paku reng 0.0600 Kg 11,000.00 660.00
- Asbes plat (100 x 100 x 0,3) Kerang super 1.1000 Lbr 8,250.00 9,075.00
Tenaga 19,569.00
- Pekerja 0.1800 Oh 30,250.00 5,445.00
- Tukang Kayu 0.3200 Oh 38,500.00 12,320.00
- Kepala Tukang Kayu 0.0320 Oh 44,000.00 1,408.00
- Mandor 0.0090 Oh 44,000.00 396.00
Tenaga 25,921.50
- Pekerja 0.2700 Oh 30,250.00 8,167.50
- Tukang Kayu 0.4000 Oh 38,500.00 15,400.00
- Kepala Tukang Kayu 0.0400 Oh 44,000.00 1,760.00
- Mandor 0.0135 Oh 44,000.00 594.00
Tenaga 5,390.00
- Pekerja 0.1000 Oh 30,250.00 3,025.00
- Tukang Kayu 0.0500 Oh 38,500.00 1,925.00
- Kepala Tukang Kayu 0.0050 Oh 44,000.00 220.00
- Mandor 0.0050 Oh 44,000.00 220.00
IX. 17 1 M2 Pasang langit-langit gypsum board tebal 9 mm, rangka 60 x 120 kayu kamper 140,877.94
Bahan 117,216.94
- Kayu Kamper 0.0130 M3 7,150,000.00 92,950.00
- Gypsum Board 9 mm " Elephant " 0.3640 Lbr 56,100.00 20,420.40
Tenaga 23,661.00
- Pekerja 0.2400 Oh 30,250.00 7,260.00
- Tukang Kayu 0.3700 Oh 38,500.00 14,245.00
- Kepala Tukang Kayu 0.0370 Oh 44,000.00 1,628.00
- Mandor 0.0120 Oh 44,000.00 528.00
IX. 18 1 M2 Pasang langit-langit gypsum board tebal 9 mm, rangka 60 x 120 kayu meranti 90,827.94
Bahan 67,166.94
- Kayu meranti 0.0130 M3 3,300,000.00 42,900.00
- Gypsum Board 9 mm " Elephant " 0.3640 Lbr 56,100.00 20,420.40
- Kassa gypsum 0.0500 Roll 7,700.00 385.00
- Cornice adhesive (tepung gypsum) @ 20 kg "A-plus" 0.4500 Kg 2,915.00 1,311.75
- Casting @ 20 kg "A-plus" 0.0030 Kg 1,595.00 4.79
- Paku Gypsum 0.0500 Kg 16,500.00 825.00
- Paku usuk 0.1200 Kg 11,000.00 1,320.00
Tenaga 23,661.00
- Pekerja 0.2400 Oh 30,250.00 7,260.00
- Tukang Kayu 0.3700 Oh 38,500.00 14,245.00
- Kepala Tukang Kayu 0.0370 Oh 44,000.00 1,628.00
- Mandor 0.0120 Oh 44,000.00 528.00
IX. 19 1 M2 Pasang langit-langit gypsum board tebal 9 mm, rangka 60 x 120 kayu kruing 112,277.94
Bahan 88,616.94
- Kayu kruing 0.0130 M3 4,950,000.00 64,350.00
- Gypsum Board 9 mm " Elephant " 0.3640 Lbr 56,100.00 20,420.40
- Kassa gypsum 0.0500 Roll 7,700.00 385.00
- Cornice adhesive (tepung gypsum) @ 20 kg "A-plus" 0.4500 Kg 2,915.00 1,311.75
- Casting @ 20 kg "A-plus" 0.0030 Kg 1,595.00 4.79
- Paku Gypsum 0.0500 Kg 16,500.00 825.00
- Paku usuk 0.1200 Kg 11,000.00 1,320.00
Tenaga 23,661.00
- Pekerja 0.2400 Oh 30,250.00 7,260.00
- Tukang Kayu 0.3700 Oh 38,500.00 14,245.00
- Kepala Tukang Kayu 0.0370 Oh 44,000.00 1,628.00
- Mandor 0.0120 Oh 44,000.00 528.00
IX. 20 1 M2 Pasang langit-langit gypsum board tebal 9 mm, rangka 60 x 120 kayu bengkirai 160,182.94
Bahan 136,521.94
- Kayu bengkirai 0.0130 M3 8,635,000.00 112,255.00
- Gypsum Board 9 mm " Elephant " 0.3640 Lbr 56,100.00 20,420.40
- Kassa gypsum 0.0500 Roll 7,700.00 385.00
- Cornice adhesive (tepung gypsum) @ 20 kg "A-plus" 0.4500 Kg 2,915.00 1,311.75
- Casting @ 20 kg "A-plus" 0.0030 Kg 1,595.00 4.79
- Paku Gypsum 0.0500 Kg 16,500.00 825.00
- Paku usuk 0.1200 Kg 11,000.00 1,320.00
Tenaga 23,661.00
- Pekerja 0.2400 Oh 30,250.00 7,260.00
- Tukang Kayu 0.3700 Oh 38,500.00 14,245.00
- Kepala Tukang Kayu 0.0370 Oh 44,000.00 1,628.00
- Mandor 0.0120 Oh 44,000.00 528.00
IX. 21 1 M2 Pasang langit-langit kalsiboard tebal 3,5 mm, rangka 60 x 120 kayu kamper 137,089.54
Bahan 113,428.54
- Kayu Kamper 0.0130 M3 7,150,000.00 92,950.00
- Kalsiboard 3,5 mm 0.3600 Lbr 46,200.00 16,632.00
- Kassa gypsum 0.0500 Roll 7,700.00 385.00
- Cornice adhesive (tepung gypsum) @ 20 kg "A-plus" 0.4500 Kg 2,915.00 1,311.75
- Casting @ 20 kg "A-plus" 0.0030 Kg 1,595.00 4.79
- Paku Gypsum 0.0500 Kg 16,500.00 825.00
Tenaga 23,661.00
- Pekerja 0.2400 Oh 30,250.00 7,260.00
- Tukang Kayu 0.3700 Oh 38,500.00 14,245.00
- Kepala Tukang Kayu 0.0370 Oh 44,000.00 1,628.00
- Mandor 0.0120 Oh 44,000.00 528.00
IX. 22 1 M2 Pasang langit-langit kalsiboard tebal 3,5 mm, rangka 60 x 120 kayu meranti 87,404.54
Bahan 63,743.54
- Kayu meranti 0.0130 M3 3,300,000.00 42,900.00
- Kalsiboard 3,5 mm 0.3600 Lbr 46,200.00 16,632.00
- Kassa gypsum 0.0500 Roll 15,000.00 750.00
- Cornice adhesive (tepung gypsum) @ 20 kg "A-plus" 0.4500 Kg 2,915.00 1,311.75
- Casting @ 20 kg "A-plus" 0.0030 Kg 1,595.00 4.79
- Paku Gypsum 0.0500 Kg 16,500.00 825.00
- Paku usuk 0.1200 Kg 11,000.00 1,320.00
Tenaga 23,661.00
- Pekerja 0.2400 Oh 30,250.00 7,260.00
- Tukang Kayu 0.3700 Oh 38,500.00 14,245.00
- Kepala Tukang Kayu 0.0370 Oh 44,000.00 1,628.00
- Mandor 0.0120 Oh 44,000.00 528.00
IX. 23 1 M2 Pasang langit-langit kalsiboard tebal 3,5 mm, rangka 60 x 120 kayu kruing 108,489.54
Bahan 84,828.54
- Kayu kruing 0.0130 M3 4,950,000.00 64,350.00
- Kalsiboard 3,5 mm 0.3600 Lbr 46,200.00 16,632.00
- Kassa gypsum 0.0500 Roll 7,700.00 385.00
- Cornice adhesive (tepung gypsum) @ 20 kg "A-plus" 0.4500 Kg 2,915.00 1,311.75
- Casting @ 20 kg "A-plus" 0.0030 Kg 1,595.00 4.79
- Paku Gypsum 0.0500 Kg 16,500.00 825.00
- Paku usuk 0.1200 Kg 11,000.00 1,320.00
Tenaga 23,661.00
- Pekerja 0.2400 Oh 30,250.00 7,260.00
- Tukang Kayu 0.3700 Oh 38,500.00 14,245.00
- Kepala Tukang Kayu 0.0370 Oh 44,000.00 1,628.00
- Mandor 0.0120 Oh 44,000.00 528.00
Tenaga 23,661.00
- Pekerja 0.2400 Oh 30,250.00 7,260.00
- Tukang Kayu 0.3700 Oh 38,500.00 14,245.00
- Kepala Tukang Kayu 0.0370 Oh 44,000.00 1,628.00
- Mandor 0.0120 Oh 44,000.00 528.00
X. PEKERJAAN SANITASI
X. 1 Memasang 1 buah kloset duduk/monoblok 1,018,105.00
Bahan 932,800.00
- Closet duduk standar INA lengkap warna muda 1.0000 Bh 880,000.00 880,000.00
- Perlengkapan 6% 52,800.00
Tenaga 85,305.00
- Pekerja 1.1000 Oh 30,250.00 33,275.00
- Tukang Batu 1.1000 Oh 38,500.00 42,350.00
- Kepala Tukang Batu 0.1100 Oh 44,000.00 4,840.00
- Mandor 0.1100 Oh 44,000.00 4,840.00
Tenaga 42,652.50
- Pekerja 0.5500 Oh 30,250.00 16,637.50
- Tukang Batu 0.5500 Oh 38,500.00 21,175.00
- Kepala Tukang Batu 0.0550 Oh 44,000.00 2,420.00
- Mandor 0.0550 Oh 44,000.00 2,420.00
Tenaga 77,550.00
- Pekerja 1.0000 Oh 30,250.00 30,250.00
- Tukang Batu 1.0000 Oh 38,500.00 38,500.00
- Kepala Tukang Batu 0.1000 Oh 44,000.00 4,400.00
- Mandor 0.1000 Oh 44,000.00 4,400.00
Tenaga 103,125.00
- Pekerja 1.2000 Oh 30,250.00 36,300.00
- Tukang Batu 1.4500 Oh 38,500.00 55,825.00
- Kepala Tukang Batu 0.1500 Oh 44,000.00 6,600.00
- Mandor 0.1000 Oh 44,000.00 4,400.00
Tenaga 103,125.00
- Pekerja 1.2000 Oh 30,250.00 36,300.00
- Tukang Batu 1.4500 Oh 38,500.00 55,825.00
- Kepala Tukang Batu 0.1500 Oh 44,000.00 6,600.00
- Mandor 0.1000 Oh 44,000.00 4,400.00
Tenaga 100,320.00
- Pekerja 2.1000 Oh 30,250.00 63,525.00
- Tukang Batu 0.7500 Oh 38,500.00 28,875.00
- Kepala Tukang Batu 0.0700 Oh 44,000.00 3,080.00
- Mandor 0.1100 Oh 44,000.00 4,840.00
Tenaga 187,000.00
- Pekerja 1.8000 Oh 30,250.00 54,450.00
- Tukang Batu 2.7000 Oh 38,500.00 103,950.00
- Kepala Tukang Batu 0.5400 Oh 44,000.00 23,760.00
- Mandor 0.1100 Oh 44,000.00 4,840.00
Tenaga 323,400.00
- Pekerja 6.0000 Oh 30,250.00 181,500.00
- Tukang Batu 3.0000 Oh 38,500.00 115,500.00
- Kepala Tukang Batu 0.3000 Oh 44,000.00 13,200.00
- Mandor 0.3000 Oh 44,000.00 13,200.00
Tenaga 3,611.58
- Pekerja 0.0075 Oh 30,250.00 226.88
- Tukang Batu 0.0750 Oh 38,500.00 2,887.50
- Kepala Tukang Batu 0.0075 Oh 44,000.00 330.00
- Mandor 0.0038 Oh 44,000.00 167.20
Tenaga 358,325.00
- Pekerja 3.5000 Oh 30,250.00 105,875.00
- Tukang Batu 4.5000 Oh 38,500.00 173,250.00
- Kepala Tukang Batu 0.9000 Oh 44,000.00 39,600.00
- Mandor 0.9000 Oh 44,000.00 39,600.00
Tenaga 30,000.00
- Upah 1.0000 30,000.00 30,000.00
Tenaga 30,000.00
- Upah 1.0000 30,000.00 30,000.00
Tenaga 30,000.00
- Upah 1.0000 30,000.00 30,000.00
X. 14 Memasang 1 buah bak kontrol pasangan batu bata ukuran (30 x 30) cm, tinggi 35 cm 274,345.50
Bahan 137,698.00
- Batu Bata lokal 102.0000 Bh 484.00 49,368.00
- Semen PC ( Portland Cement ) 40 kg 44.0000 Kg 1,100.00 48,400.00
- Pasir pasang (kaliworo) 0.0700 M3 115,500.00 8,085.00
- Koral Beton 0.0700 M3 143,000.00 10,010.00
- Besi Beton polos 1.6000 Kg 8,800.00 14,080.00
- Pasir beton (muntilan) 0.0600 M3 129,250.00 7,755.00
Tenaga 136,647.50
- Pekerja 3.2000 Oh 30,250.00 96,800.00
- Tukang Batu 1.0150 Oh 38,500.00 39,077.50
- Kepala Tukang Batu 0.0015 Oh 44,000.00 66.00
- Mandor 0.0160 Oh 44,000.00 704.00
X. 15 Memasang 1 buah bak kontrol pasangan batu bata ukuran (45 x 45) cm, tinggi 50 cm 288,145.00
Bahan 221,787.50
- Batu Bata lokal 175.0000 Bh 484.00 84,700.00
- Semen PC ( Portland Cement ) 40 kg 77.0000 Kg 1,100.00 84,700.00
- Pasir pasang (kaliworo) 0.1300 M3 115,500.00 15,015.00
- Koral Beton 0.0200 M3 143,000.00 2,860.00
- Besi Beton polos 2.6000 Kg 8,800.00 22,880.00
- Pasir beton (muntilan) 0.0900 M3 129,250.00 11,632.50
Tenaga 66,357.50
- Pekerja 1.4200 Oh 30,250.00 42,955.00
- Tukang Batu 0.4730 Oh 38,500.00 18,210.50
- Kepala Tukang Batu 0.0470 Oh 44,000.00 2,068.00
- Mandor 0.0710 Oh 44,000.00 3,124.00
X. 16 Memasang 1 buah bak kontrol pasangan batu bata ukuran (60 x 60) cm, tinggi 65 cm 440,231.00
Bahan 335,401.00
- Batu Bata lokal 260.0000 Bh 484.00 125,840.00
- Semen PC ( Portland Cement ) 40 kg 114.0000 Kg 1,100.00 125,400.00
- Pasir pasang (kaliworo) 0.1840 M3 115,500.00 21,252.00
- Koral Beton 0.0330 M3 143,000.00 4,719.00
- Besi Beton polos 4.8500 Kg 8,800.00 42,680.00
- Pasir beton (muntilan) 0.1200 M3 129,250.00 15,510.00
Tenaga 104,830.00
- Pekerja 2.1600 Oh 30,250.00 65,340.00
- Tukang Batu 0.7200 Oh 38,500.00 27,720.00
- Kepala Tukang Batu 0.0720 Oh 44,000.00 3,168.00
- Mandor 0.1080 Oh 44,000.00 4,752.00
- Tukang gali 0.1000 Oh 38,500.00 3,850.00
Tenaga 6,682.50
- Tukang Gali 0.0540 Oh 30,250.00 1,633.50
- Tukang Leideng 0.0900 Oh 38,500.00 3,465.00
- Kepala Tukang Batu 0.0090 Oh 44,000.00 396.00
- Mandor 0.0270 Oh 44,000.00 1,188.00
Tenaga 6,682.50
- Tukang Gali 0.0540 Oh 30,250.00 1,633.50
- Tukang Leideng 0.0900 Oh 38,500.00 3,465.00
- Kepala Tukang Batu 0.0090 Oh 44,000.00 396.00
- Mandor 0.0270 Oh 44,000.00 1,188.00
Tenaga 6,682.50
- Tukang Gali 0.0540 Oh 30,250.00 1,633.50
- Tukang Leideng 0.0900 Oh 38,500.00 3,465.00
- Kepala Tukang Batu 0.0090 Oh 44,000.00 396.00
- Mandor 0.0270 Oh 44,000.00 1,188.00
Tenaga 11,226.60
- Tukang Gali 0.1080 Oh 30,250.00 3,267.00
- Tukang Leideng 0.1800 Oh 38,500.00 6,930.00
- Kepala Tukang Batu 0.0180 Oh 44,000.00 792.00
- Mandor 0.0054 Oh 44,000.00 237.60
Tenaga 11,226.60
- Tukang Gali 0.1080 Oh 30,250.00 3,267.00
- Tukang Leideng 0.1800 Oh 38,500.00 6,930.00
- Kepala Tukang Batu 0.0180 Oh 44,000.00 792.00
- Mandor 0.0054 Oh 44,000.00 237.60
Tenaga 14,035.45
- Tukang Gali 0.1350 Oh 30,250.00 4,083.75
- Tukang Leideng 0.2250 Oh 38,500.00 8,662.50
- Kepala Tukang Batu 0.0225 Oh 44,000.00 990.00
- Mandor 0.0068 Oh 44,000.00 299.20
Tenaga 3,742.20
- Tukang Gali 0.0360 Oh 30,250.00 1,089.00
- Tukang Leideng 0.0600 Oh 38,500.00 2,310.00
- Kepala Tukang Batu 0.0060 Oh 44,000.00 264.00
- Mandor 0.0018 Oh 44,000.00 79.20
Tenaga 3,742.20
- Tukang Gali 0.0360 Oh 30,250.00 1,089.00
- Tukang Leideng 0.0600 Oh 38,500.00 2,310.00
- Kepala Tukang Batu 0.0060 Oh 44,000.00 264.00
- Mandor 0.0018 Oh 44,000.00 79.20
Tenaga 3,742.20
- Tukang Gali 0.0360 Oh 30,250.00 1,089.00
- Tukang Leideng 0.0600 Oh 38,500.00 2,310.00
- Kepala Tukang Batu 0.0060 Oh 44,000.00 264.00
- Mandor 0.0018 Oh 44,000.00 79.20
Tenaga 5,613.30
- Tukang Gali 0.0540 Oh 30,250.00 1,633.50
- Tukang Leideng 0.0900 Oh 38,500.00 3,465.00
- Kepala Tukang Batu 0.0090 Oh 44,000.00 396.00
- Mandor 0.0027 Oh 44,000.00 118.80
Tenaga 3,742.20
- Tukang Gali 0.0360 Oh 30,250.00 1,089.00
- Tukang Leideng 0.0600 Oh 38,500.00 2,310.00
- Kepala Tukang Batu 0.0060 Oh 44,000.00 264.00
- Mandor 0.0018 Oh 44,000.00 79.20
Tenaga 8,422.15
- Tukang Gali 0.0810 Oh 30,250.00 2,450.25
- Tukang Leideng 0.1350 Oh 38,500.00 5,197.50
- Kepala Tukang Batu 0.0135 Oh 44,000.00 594.00
- Mandor 0.0041 Oh 44,000.00 180.40
Tenaga 8,422.15
- Tukang Gali 0.0810 Oh 30,250.00 2,450.25
- Tukang Leideng 0.1350 Oh 38,500.00 5,197.50
- Kepala Tukang Batu 0.0135 Oh 44,000.00 594.00
- Mandor 0.0041 Oh 44,000.00 180.40
Tenaga 13,843.50
- Tukang Gali 0.0300 Oh 30,250.00 907.50
- Tukang Leideng 0.3000 Oh 38,500.00 11,550.00
- Kepala Tukang Batu 0.0300 Oh 44,000.00 1,320.00
- Mandor 0.0015 Oh 44,000.00 66.00
Tenaga 4,812.50
- Tukang Gali 0.0100 Oh 30,250.00 302.50
- Tukang Leideng 0.1000 Oh 38,500.00 3,850.00
- Kepala Tukang Batu 0.0100 Oh 44,000.00 440.00
- Mandor 0.0050 Oh 44,000.00 220.00
Tenaga 4,812.50
- Tukang Gali 0.0100 Oh 30,250.00 302.50
- Tukang Leideng 0.1000 Oh 38,500.00 3,850.00
- Kepala Tukang Batu 0.0100 Oh 44,000.00 440.00
- Mandor 0.0050 Oh 44,000.00 220.00
Tenaga 4,521.00
- Tukang Besi 0.0600 Oh 38,500.00 2,310.00
- Pekerja 0.0600 Oh 30,250.00 1,815.00
- Kepala Tukang Besi 0.0060 Oh 44,000.00 264.00
- Mandor 0.0030 Oh 44,000.00 132.00
Tenaga 48,955.50
- Tukang Besi 0.6500 Oh 38,500.00 25,025.00
- Pekerja 0.6500 Oh 30,250.00 19,662.50
- Kepala Tukang Besi 0.0650 Oh 44,000.00 2,860.00
- Mandor 0.0320 Oh 44,000.00 1,408.00
Tenaga 77,038.50
- Tukang Besi 1.0500 Oh 38,500.00 40,425.00
- Pekerja 1.0500 Oh 30,250.00 31,762.50
- Kepala Tukang Besi 0.1050 Oh 44,000.00 4,620.00
- Mandor 0.0053 Oh 44,000.00 231.00
Tenaga 82,659.50
- Tukang Besi 1.2000 Oh 38,500.00 46,200.00
- Pekerja 1.0220 Oh 30,250.00 30,915.50
- Kepala Tukang Besi 0.1200 Oh 44,000.00 5,280.00
- Mandor 0.0060 Oh 44,000.00 264.00
Tenaga 82,659.50
- Tukang Besi 1.2000 Oh 38,500.00 46,200.00
- Pekerja 1.0220 Oh 30,250.00 30,915.50
- Kepala Tukang Besi 0.1200 Oh 44,000.00 5,280.00
- Mandor 0.0060 Oh 44,000.00 264.00
Tenaga 77,036.30
- Tukang Besi 1.0500 Oh 38,500.00 40,425.00
- Pekerja 1.0500 Oh 30,250.00 31,762.50
- Kepala Tukang Besi 0.1050 Oh 44,000.00 4,620.00
- Mandor 0.0052 Oh 44,000.00 228.80
Tenaga 36,916.00
- Tukang Besi 0.8000 Oh 38,500.00 30,800.00
- Pekerja 0.0800 Oh 30,250.00 2,420.00
- Kepala Tukang Besi 0.0800 Oh 44,000.00 3,520.00
- Mandor 0.0040 Oh 44,000.00 176.00
XI. 8 1 M2 Pasang Rolling door bahan alumunium 377,850.00
Bahan 302,500.00
- Rolling door bahan alumunium 1.0000 M2 302,500.00 302,500.00
Tenaga 75,350.00
- Tukang Besi 1.0000 Oh 38,500.00 38,500.00
- Pekerja 1.0000 Oh 30,250.00 30,250.00
- Kepala Tukang Besi 0.1000 Oh 44,000.00 4,400.00
- Mandor 0.0500 Oh 44,000.00 2,200.00
Tenaga 77,036.30
- Tukang Besi 1.0500 Oh 38,500.00 40,425.00
- Pekerja 1.0500 Oh 30,250.00 31,762.50
- Kepala Tukang Besi 0.1050 Oh 44,000.00 4,620.00
- Mandor 0.0052 Oh 44,000.00 228.80
Tenaga 25,679.50
- Tukang Kayu 0.3500 Oh 38,500.00 13,475.00
- Pekerja 0.3500 Oh 30,250.00 10,587.50
- Kepala Tukang Kayu 0.0350 Oh 44,000.00 1,540.00
- Mandor 0.0018 Oh 44,000.00 77.00
Tenaga 83,054.40
- Tukang Las 1.2000 Oh 38,500.00 46,200.00
- Pekerja 1.2000 Oh 30,250.00 36,300.00
- Kepala Tukang Besi 0.0120 Oh 44,000.00 528.00
Tenaga 7,337.00
- Pekerja 0.1000 Oh 30,250.00 3,025.00
- Tukang Kayu 0.1000 Oh 38,500.00 3,850.00
- Kepala Tukang Kayu 0.0100 Oh 44,000.00 440.00
- Mandor 0.0005 Oh 44,000.00 22.00
Tenaga 7,337.00
- Pekerja 0.1000 Oh 30,250.00 3,025.00
- Tukang Kayu 0.1000 Oh 38,500.00 3,850.00
- Kepala Tukang Kayu 0.0100 Oh 44,000.00 440.00
- Mandor 0.0005 Oh 44,000.00 22.00
Tenaga 7,337.00
- Pekerja 0.1000 Oh 30,250.00 3,025.00
- Tukang Kayu 0.1000 Oh 38,500.00 3,850.00
- Kepala Tukang Kayu 0.0100 Oh 44,000.00 440.00
- Mandor 0.0005 Oh 44,000.00 22.00
Tenaga 14,674.00
- Pekerja 0.2000 Oh 30,250.00 6,050.00
- Tukang Kayu 0.2000 Oh 38,500.00 7,700.00
- Kepala Tukang Kayu 0.0200 Oh 44,000.00 880.00
- Mandor 0.0010 Oh 44,000.00 44.00
Tenaga 27,687.00
- Pekerja 0.060 Oh 30,250.00 1,815.00
- Tukang Kayu 0.600 Oh 38,500.00 23,100.00
- Kepala Tukang Kayu 0.060 Oh 44,000.00 2,640.00
- Mandor 0.003 Oh 44,000.00 132.00
Tenaga 20,212.50
- Pekerja 0.010 Oh 30,250.00 302.50
- Tukang Kayu 0.500 Oh 38,500.00 19,250.00
- Kepala Tukang Kayu 0.010 Oh 44,000.00 440.00
- Mandor 0.005 Oh 44,000.00 220.00
Tenaga 19,731.25
- Pekerja 0.005 Oh 30,250.00 151.25
- Tukang Kayu 0.500 Oh 38,500.00 19,250.00
- Kepala Tukang Kayu 0.005 Oh 44,000.00 220.00
- Mandor 0.0025 Oh 44,000.00 110.00
Tenaga 19,632.25
- Pekerja 0.005 Oh 30,250.00 151.25
- Tukang Kayu 0.500 Oh 38,500.00 19,250.00
- Kepala Tukang Kayu 0.005 Oh 44,000.00 220.00
- Mandor 0.00025 Oh 44,000.00 11.00
Tenaga 6,921.75
- Pekerja 0.015 Oh 30,250.00 453.75
- Tukang Kayu 0.150 Oh 38,500.00 5,775.00
- Kepala Tukang Kayu 0.015 Oh 44,000.00 660.00
- Mandor 0.00075 Oh 44,000.00 33.00
Tenaga 4,614.50
- Pekerja 0.010 Oh 30,250.00 302.50
- Tukang Kayu 0.100 Oh 38,500.00 3,850.00
- Kepala Tukang Kayu 0.010 Oh 44,000.00 440.00
- Mandor 0.0005 Oh 44,000.00 22.00
Tenaga 9,625.00
- Pekerja 0.020 Oh 30,250.00 605.00
- Tukang Kayu 0.200 Oh 38,500.00 7,700.00
- Kepala Tukang Kayu 0.020 Oh 44,000.00 880.00
- Mandor 0.010 Oh 44,000.00 440.00
XII. 8 1 Buah pasang spring knip 13,521.75
Bahan 6,600.00
- Spring knip 1.000 Bh 6,600.00 6,600.00
Tenaga 6,921.75
- Pekerja 0.015 Oh 30,250.00 453.75
- Tukang Kayu 0.150 Oh 38,500.00 5,775.00
- Kepala Tukang Kayu 0.015 Oh 44,000.00 660.00
- Mandor 0.00075 Oh 44,000.00 33.00
Tenaga 6,921.75
- Pekerja 0.015 Oh 30,250.00 453.75
- Tukang Kayu 0.150 Oh 38,500.00 5,775.00
- Kepala Tukang Kayu 0.015 Oh 44,000.00 660.00
- Mandor 0.00075 Oh 44,000.00 33.00
Tenaga 23,072.50
- Pekerja 0.050 Oh 30,250.00 1,512.50
- Tukang Kayu 0.500 Oh 38,500.00 19,250.00
- Kepala Tukang Kayu 0.050 Oh 44,000.00 2,200.00
- Mandor 0.0025 Oh 44,000.00 110.00
Tenaga 9,625.00
- Pekerja 0.020 Oh 30,250.00 605.00
- Tukang Kayu 0.200 Oh 38,500.00 7,700.00
- Kepala Tukang Kayu 0.020 Oh 44,000.00 880.00
- Mandor 0.010 Oh 44,000.00 440.00
Tenaga 23,072.50
- Pekerja 0.050 Oh 30,250.00 1,512.50
- Tukang Kayu 0.500 Oh 38,500.00 19,250.00
- Kepala Tukang Kayu 0.050 Oh 44,000.00 2,200.00
Tenaga 4,614.50
- Pekerja 0.010 Oh 30,250.00 302.50
- Tukang Kayu 0.100 Oh 38,500.00 3,850.00
- Kepala Tukang Kayu 0.010 Oh 44,000.00 440.00
- Mandor 0.0005 Oh 44,000.00 22.00
Tenaga 27,687.00
- Pekerja 0.060 Oh 30,250.00 1,815.00
- Tukang Kayu 0.600 Oh 38,500.00 23,100.00
- Kepala Tukang Kayu 0.060 Oh 44,000.00 2,640.00
- Mandor 0.003 Oh 44,000.00 132.00
Tenaga 11,536.25
- Pekerja 0.025 Oh 30,250.00 756.25
- Tukang Kayu 0.250 Oh 38,500.00 9,625.00
- Kepala Tukang Kayu 0.025 Oh 44,000.00 1,100.00
- Mandor 0.00125 Oh 44,000.00 55.00
Tenaga 6,921.75
- Pekerja 0.015 Oh 30,250.00 453.75
- Tukang Kayu 0.150 Oh 38,500.00 5,775.00
- Kepala Tukang Kayu 0.015 Oh 44,000.00 660.00
- Mandor 0.00075 Oh 44,000.00 33.00
Tenaga 6,921.75
- Pekerja 0.015 Oh 30,250.00 453.75
- Tukang Kayu 0.150 Oh 38,500.00 5,775.00
- Kepala Tukang Kayu 0.015 Oh 44,000.00 660.00
- Mandor 0.00075 Oh 44,000.00 33.00
Tenaga 6,921.75
- Pekerja 0.015 Oh 30,250.00 453.75
- Tukang Kayu 0.150 Oh 38,500.00 5,775.00
- Kepala Tukang Kayu 0.015 Oh 44,000.00 660.00
- Mandor 0.00075 Oh 44,000.00 33.00
Tenaga 6,921.75
- Pekerja 0.015 Oh 30,250.00 453.75
- Tukang Kayu 0.150 Oh 38,500.00 5,775.00
- Kepala Tukang Kayu 0.015 Oh 44,000.00 660.00
- Mandor 0.00075 Oh 44,000.00 33.00
Tenaga 29,562.50
- Pekerja 0.2500 Oh 30,250.00 7,562.50
- Tukang Batu 0.5000 Oh 38,500.00 19,250.00
- Kepala Tukang Batu 0.0500 Oh 44,000.00 2,200.00
- Mandor 0.0125 Oh 44,000.00 550.00
Tenaga 29,562.50
- Pekerja 0.2500 Oh 30,250.00 7,562.50
- Tukang Batu 0.5000 Oh 38,500.00 19,250.00
- Kepala Tukang Batu 0.0500 Oh 44,000.00 2,200.00
- Mandor 0.0125 Oh 44,000.00 550.00
Tenaga 29,562.50
- Pekerja 0.2500 Oh 30,250.00 7,562.50
- Tukang Batu 0.5000 Oh 38,500.00 19,250.00
- Kepala Tukang Batu 0.0500 Oh 44,000.00 2,200.00
- Mandor 0.0125 Oh 44,000.00 550.00
Tenaga 29,562.50
- Pekerja 0.2500 Oh 30,250.00 7,562.50
- Tukang Batu 0.5000 Oh 38,500.00 19,250.00
- Kepala Tukang Batu 0.0500 Oh 44,000.00 2,200.00
- Mandor 0.0125 Oh 44,000.00 550.00
Tenaga 29,562.50
- Pekerja 0.2500 Oh 30,250.00 7,562.50
- Tukang Batu 0.5000 Oh 38,500.00 19,250.00
- Kepala Tukang Batu 0.0500 Oh 44,000.00 2,200.00
- Mandor 0.0125 Oh 44,000.00 550.00
Tenaga 29,562.50
- Pekerja 0.2500 Oh 30,250.00 7,562.50
- Tukang Batu 0.5000 Oh 38,500.00 19,250.00
- Kepala Tukang Batu 0.0500 Oh 44,000.00 2,200.00
- Mandor 0.0125 Oh 44,000.00 550.00
Tenaga 29,562.50
- Pekerja 0.2500 Oh 30,250.00 7,562.50
- Tukang Batu 0.5000 Oh 38,500.00 19,250.00
- Kepala Tukang Batu 0.0500 Oh 44,000.00 2,200.00
- Mandor 0.0125 Oh 44,000.00 550.00
Tenaga 29,562.50
- Pekerja 0.2500 Oh 30,250.00 7,562.50
- Tukang Batu 0.5000 Oh 38,500.00 19,250.00
- Kepala Tukang Batu 0.0500 Oh 44,000.00 2,200.00
- Mandor 0.0125 Oh 44,000.00 550.00
XIII. 9 1 M2 Pasang keramik teras/ garasi bermotif warna tua 30x30 cm 91,525.50
Bahan 61,963.00
- Keramik teras / garasi 30 x 30 "masterina" 1.0000 m2 44,000.00 44,000.00
Tenaga 29,562.50
- Pekerja 0.2500 Oh 30,250.00 7,562.50
- Tukang Batu 0.5000 Oh 38,500.00 19,250.00
- Kepala Tukang Batu 0.0500 Oh 44,000.00 2,200.00
- Mandor 0.0125 Oh 44,000.00 550.00
Tenaga 29,562.50
- Pekerja 0.2500 Oh 30,250.00 7,562.50
- Tukang Batu 0.5000 Oh 38,500.00 19,250.00
- Kepala Tukang Batu 0.0500 Oh 44,000.00 2,200.00
- Mandor 0.0125 Oh 44,000.00 550.00
Tenaga 29,562.50
- Pekerja 0.2500 Oh 30,250.00 7,562.50
- Tukang Batu 0.5000 Oh 38,500.00 19,250.00
- Kepala Tukang Batu 0.0500 Oh 44,000.00 2,200.00
- Mandor 0.0125 Oh 44,000.00 550.00
Tenaga 29,562.50
- Pekerja 0.2500 Oh 30,250.00 7,562.50
- Tukang Batu 0.5000 Oh 38,500.00 19,250.00
- Kepala Tukang Batu 0.0500 Oh 44,000.00 2,200.00
- Mandor 0.0125 Oh 44,000.00 550.00
Tenaga 29,562.50
- Pekerja 0.2500 Oh 30,250.00 7,562.50
- Tukang Batu 0.5000 Oh 38,500.00 19,250.00
- Kepala Tukang Batu 0.0500 Oh 44,000.00 2,200.00
- Mandor 0.0125 Oh 44,000.00 550.00
Tenaga 6,781.50
- Pekerja 0.0900 Oh 30,250.00 2,722.50
- Tukang Batu 0.0900 Oh 38,500.00 3,465.00
- Kepala Tukang Batu 0.0090 Oh 44,000.00 396.00
- Mandor 0.0045 Oh 44,000.00 198.00
Tenaga 6,781.50
- Pekerja 0.0900 Oh 30,250.00 2,722.50
- Tukang Batu 0.0900 Oh 38,500.00 3,465.00
- Kepala Tukang Batu 0.0090 Oh 44,000.00 396.00
- Mandor 0.0045 Oh 44,000.00 198.00
Tenaga 5,912.50
- Pekerja 0.0500 Oh 30,250.00 1,512.50
- Tukang Batu 0.1000 Oh 38,500.00 3,850.00
- Kepala Tukang Batu 0.0100 Oh 44,000.00 440.00
- Mandor 0.0025 Oh 44,000.00 110.00
Tenaga 35,090.00
- Pekerja 0.6200 Oh 30,250.00 18,755.00
- Tukang Batu 0.3500 Oh 38,500.00 13,475.00
- Kepala Tukang Batu 0.0350 Oh 44,000.00 1,540.00
- Mandor 0.0300 Oh 44,000.00 1,320.00
Tenaga 33,770.00
- Pekerja 0.6200 Oh 30,250.00 18,755.00
- Tukang Batu 0.3500 Oh 38,500.00 13,475.00
- Kepala Tukang Batu 0.0350 Oh 44,000.00 1,540.00
Tenaga 4,647.50
- Pekerja 0.1500 Oh 30,250.00 4,537.50
- Tukang Cat 38,500.00 -
- Kepala Tukang Cat 44,000.00 -
- Mandor 0.0025 Oh 44,000.00 110.00
Tenaga 4,647.50
- Pekerja 0.1500 Oh 30,250.00 4,537.50
- Tukang Cat 38,500.00 -
- Kepala Tukang Cat 44,000.00 -
- Mandor 0.0025 Oh 44,000.00 110.00
XIV. 3 1 M2 Mengerok karat cat lama permukaan baja dengan cara manual 5,472.50
Bahan 825.00
- Sabun 0.0500 Kg 16,500.00 825.00
Tenaga 4,647.50
- Pekerja 0.1500 Oh 30,250.00 4,537.50
Tenaga 4,647.50
- Pekerja 0.1500 Oh 30,250.00 4,537.50
- Tukang Cat 38,500.00 -
- Kepala Tukang Cat 44,000.00 -
- Mandor 0.0025 Oh 44,000.00 110.00
Tenaga 5,445.00
- Pekerja 0.0700 Oh 30,250.00 2,117.50
- Tukang Cat 0.0750 Oh 38,500.00 2,887.50
- Kepala Tukang Cat 0.0075 Oh 44,000.00 330.00
- Mandor 0.0025 Oh 44,000.00 110.00
XIV. 7 1 M2 Pengecatan bidang kayu baru (1 lapis plamir), 1 lapis cat dasar, 2 lapis cat penutup 28,325.00
Bahan 25,487.00
- Cat Meni Kayu "altex" 0.2000 Kg 18,700.00 3,740.00
- Plamur Kayu jago 0.1500 Kg 22,000.00 3,300.00
- Cat dasar 0.1700 Kg 42,900.00 7,293.00
- Cat Besi/ Kayu "Emco" warna standar 0.2600 Kg 42,900.00 11,154.00
Tenaga 2,838.00
- Pekerja 0.0700 Oh 30,250.00 2,117.50
- Tukang Cat 0.0090 Oh 38,500.00 346.50
- Kepala Tukang Cat 0.0060 Oh 44,000.00 264.00
- Mandor 0.0025 Oh 44,000.00 110.00
XIV. 8 1 M2 Pengecatan bidang kayu baru (1 lapis plamir), 1 lapis cat dasar, 3 lapis cat penutup 35,794.00
Bahan 29,348.00
- Cat Meni Kayu "altex" 0.2000 Kg 18,700.00 3,740.00
- Plamur Kayu jago 0.1500 Kg 22,000.00 3,300.00
- Cat dasar 0.1700 Kg 42,900.00 7,293.00
- Cat Besi/ Kayu "Emco" warna standar 0.3500 Kg 42,900.00 15,015.00
Tenaga 6,446.00
- Pekerja 0.0700 Oh 30,250.00 2,117.50
- Tukang Cat 0.1050 Oh 38,500.00 4,042.50
- Kepala Tukang Cat 0.0040 Oh 44,000.00 176.00
- Mandor 0.0025 Oh 44,000.00 110.00
Tenaga 6,517.50
- Pekerja 0.0400 Oh 30,250.00 1,210.00
- Tukang Cat 0.0630 Oh 38,500.00 2,425.50
- Kepala Tukang Cat 0.0630 Oh 44,000.00 2,772.00
- Mandor 0.0025 Oh 44,000.00 110.00
Tenaga 4,334.00
- Pekerja 0.0400 Oh 30,250.00 1,210.00
- Tukang Cat 0.0600 Oh 38,500.00 2,310.00
- Kepala Tukang Cat 0.0160 Oh 44,000.00 704.00
- Mandor 0.0025 Oh 44,000.00 110.00
XIV. 11 1 M2 Pelaburan bidang kayu dengan cat residu dan ter 5,021.50
Bahan 1,732.50
Tenaga 3,289.00
- Pekerja 0.1000 Oh 30,250.00 3,025.00
- Tukang Cat - Oh 38,500.00 -
- Kepala Tukang Cat - Oh 44,000.00 -
- Mandor 0.0060 Oh 44,000.00 264.00
Tenaga 11,814.00
- Pekerja 0.1600 Oh 30,250.00 4,840.00
- Tukang Cat 0.1600 Oh 38,500.00 6,160.00
- Kepala Tukang Cat 0.0160 Oh 44,000.00 704.00
- Mandor 0.0025 Oh 44,000.00 110.00
Tenaga 3,417.70
- Pekerja 0.0200 Oh 30,250.00 605.00
- Tukang Cat 0.0630 Oh 38,500.00 2,425.50
- Kepala Tukang Cat 0.0063 Oh 44,000.00 277.20
- Mandor 0.0025 Oh 44,000.00 110.00
XIV. 14 1 M2 Pengecatan tembok lama (1 lapis cat dasar, 2 lapis cat penutup) 6,652.80
Bahan 3,894.00
- Cat dasar 0.1200 Kg 12,980.00 1,557.60
- Cat tembok "Decolith" warna standar 0.1800 Kg 12,980.00 2,336.40
Tenaga 2,758.80
- Pekerja 0.0280 Oh 30,250.00 847.00
- Tukang Cat 0.0420 Oh 38,500.00 1,617.00
- Kepala Tukang Cat 0.0042 Oh 44,000.00 184.80
- Mandor 0.0025 Oh 44,000.00 110.00
Tenaga 9,625.00
- Pekerja 0.0200 Oh 30,250.00 605.00
- Tukang Cat 0.2000 Oh 38,500.00 7,700.00
- Kepala Tukang Cat 0.0200 Oh 44,000.00 880.00
- Mandor 0.0100 Oh 44,000.00 440.00
XIV. 16 1 M2 Pengecatan permukaan baja dengan meni besi dan perancah 22,116.05
Bahan 4,571.05
- Cat Meni Besi "altex" 0.1000 Kg 18,700.00 1,870.00
- Kuas 2,5 " 0.0100 Bh 3,300.00 33.00
- Perancah kayu 0.0020 M3 1,334,025.00 2,668.05
Tenaga 17,545.00
- Pekerja 0.2500 Oh 30,250.00 7,562.50
- Tukang Cat 0.2250 Oh 38,500.00 8,662.50
- Kepala Tukang Cat 0.0225 Oh 44,000.00 990.00
- Mandor 0.0075 Oh 44,000.00 330.00
XV. 10 1 M3 Membongkar kayu balok loteng/ kuda-kuda/ dlurung/ jembatan untuk dipakai lagi 387,200.00
Bahan -
Tenaga 387,200.00
- Pekerja 4.0000 Oh 30,250.00 121,000.00
- Tukang Kayu 6.0000 Oh 38,500.00 231,000.00
- Kepala Tukang Kayu 0.6000 Oh 44,000.00 26,400.00
- Mandor 0.2000 Oh 44,000.00 8,800.00
Tenaga 35,000.00
- Upah 1.0000 Ls 35,000.00 35,000.00
Tenaga 35,000.00
- Upah 1.0000 Ls 35,000.00 35,000.00
Tenaga 26,180.00
- Tukang Batu 0.2000 Oh 38,500.00 7,700.00
- Kepala Tukang Batu 0.4000 Oh 44,000.00 17,600.00
- Mandor 0.0200 Oh 44,000.00 880.00
Tenaga 21,560.00
- Mandor 0.0200 Oh 44,000.00 880.00
- Kepala Tukang Batu 0.0200 Oh 44,000.00 880.00
- Tukang Batu 0.2000 Oh 38,500.00 7,700.00
Tenaga 21,560.00
- Mandor 0.0200 Oh 44,000.00 880.00
- Kepala Tukang Batu 0.0200 Oh 44,000.00 880.00
- Tukang Batu 0.2000 Oh 38,500.00 7,700.00
- Pekerja 0.4000 Oh 30,250.00 12,100.00
Tenaga 21,560.00
- Mandor 0.0200 Oh 44,000.00 880.00
- Kepala Tukang Batu 0.0200 Oh 44,000.00 880.00
- Tukang Batu 0.2000 Oh 38,500.00 7,700.00
- Pekerja 0.4000 Oh 30,250.00 12,100.00
Tenaga 21,560.00
- Mandor 0.0200 Oh 44,000.00 880.00
- Kepala Tukang Batu 0.0200 Oh 44,000.00 880.00
- Tukang Batu 0.2000 Oh 38,500.00 7,700.00
- Pekerja 0.4000 Oh 30,250.00 12,100.00
a. b.
I. PEKERJAAN PERSIAPAN
I.1 1 M' Pagar sementara dari kayu tinggi 2 meter
I. 2 1 M' Pagar sementara dari seng gelombang tinggi 2 meter
I. 3 1 M' Pagar sementara dari kawat duri tinggi 1,8 meter
I. 4 1 M2 Pengukuran dan pemasangan bouwplank
I .5 1 M2 Pembuatan kantor sementara, dengan lantai plesteran
I. 6 1 M2 Pembuatan gudang semen dan alat-alat
I. 7 1 M2 Pembuatan rumah jaga/konstruksi kayu
I. 8 1 M2 Membersihkan lapangan dan perataan
I. 9 1 M2 Pembuatan bedeng buruh
I.10 1 M2 Pembuatan bak adukan dari kayu tahun ukuran (40 x 50 x 20) cm
I. 11 1 M2 Pembuatan bak adukan dari bambu ukuran (40 x 50 x 20) cm
I. 12 1 M2 Pembuatan jalan sementara
I. 13 1 M2 Pasang pagar kawat jaring galvanis tinggi 1,00 m
I. 14 1 M2 Pasang pagar beton pracetak (5 x 50 x 213) cm
HSPK-Swakelola Page 99
NO. URAIAN / MACAM PEKERJAAN
a. b.
III. 11 1 m3 Pasang Pondasi Batu kali 1/4 Pc : 1 Kp : 4 Ps
III. 12 1 m3 Pasang Pondasi Batu Kosong
III. 13 1 m3 Pasang Pondasi sumuran diameter 100 cm
III. 14 1 m' Pembuatan Tiang pancang ( 40 x 40 ) cm, Beton bertulang
III. 15 1 m' Pembuatan Tiang pancang ( 35 x 35 ) cm, Beton bertulang
III. 16 1 M3 Membuat bronjong dari kawat galvanis/bronjong 3 mm diisi batu belah
III. 17 1 M3 Membuat bronjong dari kawat galvanis/bronjong 4 mm diisi batu belah
III. 18 1 M3 Membuat bronjong dari kawat galvanis/bronjong 5 mm diisi batu belah
V. PEKERJAAN PLESTERAN
V. 1 1 M2 Plesteran 1 Pc : 1 Ps, tebal 15 mm
V. 2 1 M2 Plesteran 1 Pc : 2 Ps, tebal 15 mm
V. 3 1 M2 Plesteran 1 Pc : 3 Ps, tebal 15 mm
V. 4 1 M2 Plesteran 1 Pc : 4 Ps, tebal 15 mm
V. 5 1 M2 Plesteran 1 Pc : 5 Ps, tebal 15 mm
V. 6 1 M2 Plesteran 1 Pc : 6 Ps, tebal 15 mm
V. 7 1 M2 Plesteran 1 Pc : 8 Ps, tebal 15 mm
V. 8 1 M2 Plesteran 1 Pc : 2 Kp : 8 Ps, tebal 15 mm
V. 9 1 M2 Plesteran 1 Pc : 2 Ps, tebal 20 mm
V. 10 1 M2 Plesteran 1 Pc : 3 Ps, tebal 20 mm
V. 11 1 M2 Plesteran 1 Pc : 4 Ps, tebal 20 mm
V. 12 1 M2 Plesteran 1 Pc : 5 Ps, tebal 20 mm
V. 13 1 M2 Plesteran 1 Pc : 6 Ps, tebal 20 mm
V. 14 1 M2 Plesteran Beton 1 Pc : 2 Ps, tebal 15 mm
V. 15 1 M2 Plesteran Beton 1 Pc : 3 Ps, tebal 15 mm
V. 16 1 M' Plesteran Skoning 1 Pc : 2 Ps lebar 10 cm'
V. 17 1 M2 Plesteran Ciprat 1 Pc : 2 Ps
V. 18 1 M2 Plesteran Siar Pasangan Batu Kali, adukan 1 PC : 2 PS
V. 19 1 M' Sponengan ( untuk saluran dan sejenisnya )
a. b.
V. 20 1 M2 Acian
a. b.
VI. 46 1 M2 Pasang pintu plywood & formika rangka kayu kamper (divernis)
VI. 47 1 M2 Pasang pintu plywood & formika rangka kayu meranti (divernis)
VI. 48 1 M2 Pasang pintu plywood & formika rangka kayu kruing (divernis)
VI. 49 1 M3 Pasang konstruksi kuda-kuda kayu jati lokal
VI. 50 1 M3 Pasang konstruksi kuda-kuda kayu kamper
VI. 51 1 M3 Pasang konstruksi kuda-kuda kayu meranti
VI. 52 1 M3 Pasang konstruksi kuda-kuda kayu kruing
VI. 53 1 M3 Pasang konstruksi kuda-kuda kayu bengkirai
VI. 54 1 M3 Pasang gording kayu jati lokal
VI. 55 1 M3 Pasang gording kayu kamper
VI. 56 1 M3 Pasang gording kayu meranti
VI. 57 1 M3 Pasang gording kayu kruing
VI. 58 1 M3 Pasang gording kayu bengkirai
VI. 59 1 M2 Rangka atap kayu jati lokal untuk seng
VI. 60 1 M2 Rangka atap kayu kamper untuk seng
VI. 61 1 M2 Rangka atap kayu meranti untuk seng
VI. 62 1 M2 Rangka atap kayu kruing untuk seng
VI. 63 1 M2 Rangka atap kayu bengkirai untuk seng
VI. 64 1 M2 Pekerjaan usuk 5/7 dan reng 2/3 kayu jati lokal
VI. 65 1 M2 Pekerjaan usuk 5/7 dan reng 2/3 kayu kamper
VI. 66 1 M2 Pekerjaan usuk 5/7 dan reng 2/3 kayu meranti
VI. 67 1 M2 Pekerjaan usuk 5/7 dan reng 2/3 kayu kruing
VI. 68 1 M2 Pekerjaan usuk 5/7 dan reng 2/3 kayu bengkirai
VI. 69 1 M2 Pekerjaan usuk 5/7 dan reng 3/4 kayu jati lokal untuk genteng beton
VI. 70 1 M2 Pekerjaan usuk 5/7 dan reng 3/4 kayu kamper untuk genteng beton
VI. 71 1 M2 Pekerjaan usuk 5/7 dan reng 3/4 kayu meranti untuk genteng beton
VI. 72 1 M2 Pekerjaan usuk 5/7 dan reng 3/4 kayu kruing untuk genteng beton
VI. 73 1 M2 Pekerjaan usuk 5/7 dan reng 3/4 kayu bengkirai untuk genteng beton
VI. 74 1 M2 Pasang rangka langit-langit (0.50 x 1.00) m, kayu jati lokal
VI. 75 1 M2 Pasang rangka langit-langit (0.50 x 1.00) m, kayu kamper
VI. 76 1 M2 Pasang rangka langit-langit (0.50 x 1.00) m, kayu meranti
VI. 77 1 M2 Pasang rangka langit-langit (0.50 x 1.00) m, kayu kruing
VI. 78 1 M2 Pasang rangka langit-langit (0.50 x 1.00) m, kayu bengkirai
VI. 79 1 M2 Pasang rangka langit-langit (0.60 x 0.60) m, kayu jati lokal
VI. 80 1 M2 Pasang rangka langit-langit (0.60 x 0.60) m, kayu meranti
VI. 81 1 M2 Pasang rangka langit-langit (0.60 x 0.60) m, kayu kamper
VI. 82 1 M2 Pasang rangka langit-langit (0.60 x 0.60) m, kayu kruing
VI. 83 1 M2 Pasang rangka langit-langit (0.60 x 0.60) m, kayu bengkirai
VI. 84 1 M3 Pasang plafond hanger kayu jati lokal
VI. 85 1 M3 Pasang plafond hanger kayu kamper
VI. 86 1 M3 Pasang plafond hanger kayu meranti
VI. 87 1 M3 Pasang plafond hanger kayu kruing
VI. 88 1 M3 Pasang plafond hanger kayu bengkirai
VI. 89 1 M2 Pasang lisplang ukuran (3 x 20) cm, kayu jati lokal
VI. 90 1 M2 Pasang lisplang ukuran (3 x 20) cm, kayu kamper
VI. 91 1 M2 Pasang lisplang ukuran (3 x 20) cm, kayu meranti
VI. 92 1 M2 Pasang lisplang ukuran (3 x 20) cm, kayu kruing
VI. 93 1 M2 Pasang lisplang ukuran (3 x 20) cm, kayu bengkirai
a. b.
VI. 94 1 M2 Pasang lisplang ukuran (3 x 30) cm, kayu jati
VI. 95 1 M2 Pasang lisplang ukuran (3 x 30) cm, kayu kamper
VI. 96 1 M2 Pasang lisplang ukuran (3 x 30) cm, kayu meranti
VI. 97 1 M2 Pasang lisplang ukuran (3 x 30) cm, kayu kruing
VI. 98 1 M2 Pasang lisplang ukuran (3 x 30) cm, kayu bengkirai
VI. 99 1 M2 Pasang lisplang ukuran 2 x (3 x 20) cm, kayu kamper
VI. 100 1 M2 Pasang lisplang ukuran 2 x (3 x 20) cm, kayu meranti
VI. 101 1 M2 Pasang lisplang ukuran 2 x (3 x 20) cm, kayu kruing
VI. 102 1 M2 Pasang lisplang ukuran 2 x (3 x 20) cm, kayu bengkirai
VI. 103 1 M2 Pasang lisplang ukuran 2 x (2 x 20) cm, kayu kamper
VI. 104 1 M2 Pasang lisplang ukuran 2 x (2 x 20) cm, kayu meranti
VI. 105 1 M2 Pasang lisplang ukuran 2 x (2 x 20) cm, kayu kruing
VI. 106 1 M2 Pasang lisplang ukuran 2 x (2 x 20) cm, kayu bengkirai
VI. 107 1 M2 Pasang rangka dinding pemisah (60x120)cm kayu kamper 6/12
VI. 108 1 M2 Pasang rangka dinding pemisah (60x120)cm kayu meranti 6/12
VI. 109 1 M2 Pasang rangka dinding pemisah (60x120)cm kayu kruing 6/12
VI. 110 1 M2 Pasang rangka dinding pemisah (60x120)cm kayu bengkirai 6/12
VI. 111 1 M2 Pasang dinding pemisah plywood rangkap, rangka (60x120)cm kayu kamper 6/12
VI. 112 1 M2 Pasang dinding pemisah plywood rangkap, rangka (60x120)cm kayu kruing 6/12
VI. 113 1 M2 Pasang dinding pemisah plywood rangkap, rangka (60x120)cm kayu meranti 6/12
VI. 114 1 M2 Pasang dinding pemisah teakwood rangkap, rangka (60x120)cm kayu kamper 6/12
VI. 115 1 M2 Pasang dinding pemisah teakwood rangkap, rangka (60x120)cm kayu kruing 6/12
VI. 116 1 M2 Pasang dinding pemisah teakwood rangkap, rangka (60x120)cm kayu meranti 6/12
VI. 117 1 M2 Pasang plywood tebal 4 mm, untuk dinding
VI. 118 1 M' Pasang list plafond kayu profil jadi
VI. 119 1 M' Pasang list profil cornice gypsum lebar sampai 5 cm
VI. 120 1 M' Pasang list profil cornice gypsum lebar sampai 5 - 10 cm
VI. 121 1 M' Pasang list profil cornice gypsum lebar lebih dari 10 cm
a. b.
VIII. 2 1 M2 Pasang atap genteng kodok
VIII. 3 1 M2 Pasang atap genteng palentong/ vlampress super/besar
VIII. 4 1 M2 Pasang atap genteng beton warna natural
VIII. 5 1 M' Pasang atap genteng bubung palentong/ vlampress kecil
VIII. 6 1 M' Pasang atap genteng bubung kodok
VIII. 7 1 M' Pasang atap genteng bubung palentong/ vlampress super/ besar
VIII. 8 1 M' Pasang atap bubungan genteng beton warna natural
VIII. 9 1 M2 Pasang atap asbes gelombang gelombang besar (300 x 102 x 5 mm)
VIII. 10 1 M2 Pasang atas asbes gelombang gelombang besar (200 x 102 x 5 mm)
VIII. 11 1 M2 Pasang atas asbes gelombang gelombang besar (180 x 102 x 5 mm)
V.III. 12 1 M2 Pasang atas asbes gelombang gelombang kecil (300 x 105 x 4 mm)
VIII. 13 1 M2 Pasang atas asbes gelombang gelombang kecil (270 x 105 x 4 mm)
VIII. 14 1 M2 Pasang atas asbes gelombang gelombang kecil (240 x 105 x 4 mm)
VIII. 15 1 M2 Pasang atas asbes gelombang gelombang kecil (210 x 105 x 4 mm)
VIII. 16 1 M2 Pasang atas asbes gelombang gelombang kecil (150 x 105 x 4 mm)
VIII. 17 1 M2 Pasang atap seng BJLS 0,2 gelombang P = 300 cm
VIII. 18 1 M2 Pasang atap seng BJLS 0,2 gelombang P = 240 cm
VIII. 19 1 M2 Pasang atap seng BJLS 0,2 gelombang P = 210 cm
VIII. 20 1 M2 Pasang atap seng BJLS 0,2 gelombang P = 180 cm
VIII. 21 1 M' Pasang nok paten 1,05 m
VIII. 22 1 M' Pasang nok paten 1,08 m
VIII. 23 1 M2 pasang alluminium foil/sisalation
VIII. 24 1 M' Pasang talang datar, seng bjls 28
VIII. 25 1 M' Pasang talang miring, seng bjls 28
VIII. 26 1 M' Pasang talang 1/2 lingkaran D-10 cm, seng bjls 28
VIII. 27 1 M' Pasang talang 1/2 lingkaran D-10 cm, seng bjls 24
a. b.
IX. 21 1 M2 Pasang langit-langit kalsiboard tebal 3,5 mm, rangka 60 x 120 kayu kamper
IX. 22 1 M2 Pasang langit-langit kalsiboard tebal 3,5 mm, rangka 60 x 120 kayu meranti
IX. 23 1 M2 Pasang langit-langit kalsiboard tebal 3,5 mm, rangka 60 x 120 kayu kruing
IX. 24 1 M2 Pasang langit-langit kalsiboard tebal 3,5 mm, rangka 60 x 120 kayu bengkirai
X. PEKERJAAN SANITASI
X. 1 Memasang 1 buah kloset duduk/monoblok
X. 2 Memasang 1 buah kloset jongkok
X. 3 Memasang 1 buah urinoir
X. 4 Memasang 1 buah wastafel kecil
X. 5 Memasang 1 buah wastafel besar
X. 6 Memasang 1 buah bak mandi buthtub fiber
X. 7 Memasang 1 buah bak mandi fiberglass volume 0,30 m3
X. 8 Memasang 1 buah bak mandi batu bata volume 0,30 m3
X. 9 Memasang 1 buah badkip fiber
X. 10 Membuat 1 buah bak beton volume 1 M3 air
X. 11 Memasang 1 M' Got U-15
X. 12 Memasang 1 M' Got U-20
X. 13 Memasang 1 M' Got U-30
X. 14 Memasang 1 buah bak kontrol pasangan batu bata ukuran (30 x 30) cm, tinggi 35 cm
X. 15 Memasang 1 buah bak kontrol pasangan batu bata ukuran (45 x 45) cm, tinggi 50 cm
X. 16 Memasang 1 buah bak kontrol pasangan batu bata ukuran (60 x 60) cm, tinggi 65 cm
X. 17 Memasang 1 M' pipa galvanis diameter 1/2"
X. 18 Memasang 1 M' pipa galvanis diameter 3/4"
X. 19 Memasang 1 M' pipa galvanis diameter 1"
X. 20 Memasang 1 M' pipa galvanis diameter 1 1/2"
X. 21 Memasang 1 M' pipa galvanis diameter 2"
X. 22 Memasang 1 M' pipa galvanis diameter 3"
X. 23 Memasang 1 M' pipa PVC tipe AW diameter 1/2"
X. 24 Memasang 1 M' pipa PVC tipe AW diameter 3/4"
X. 25 Memasang 1 M' pipa PVC tipe AW diameter 1"
X. 26 Memasang 1 M' pipa PVC tipe AW diameter 1 1/2"
X. 27 Memasang 1 M' pipa PVC tipe AW diameter 2"
X. 28 Memasang 1 M' pipa PVC tipe AW diameter 2 1/2"
X. 29 Memasang 1 M' pipa PVC tipe AW diameter 3"
X. 30 Memasang 1 M' pipa PVC tipe AW diameter 4"
X. 31 Memasang 1 bh bak cuci piring / Kitchen zinc
X. 32 Memasang 1 bh kran diameter 3/4" atau 1/2"
X. 33 Memasang 1 bh Floor drain
a. b.
XI. 8 1 M2 Pasang Rolling door bahan alumunium
XI. 9 1 M2 Pasang pintu alluminium
XI. 10 1 M2 Pasang Vertikals blinds
XI. 11 1 M2 Pasang terali besi
XI. 12 1 M2 Pasang kawat harmonika
XI. 13 1 M2 Pasang kawat kassa almunium
XI. 14 1 M2 Pasang kawat kassa plastik
XI. 15 1 M2 Pasang jendela nako & tralis
a. b.
XIII. 18 1 M2 Pasang dinding batu palimanan
XIII. 19 1 M2 Pasang dinding batu tempel hitam
XIII. 20 1 M2 Pasang dinding batu candi
HARGA SAT.
(Rp.)
c.
128,639.50
126,934.50
222,874.50
30,195.00
605,770.00
338,965.00
512,050.00
5,225.00
509,602.50
94,666.00
17,539.50
58,685.00
18,550.50
530,637.25
23,787.50
29,205.00
25,445.75
33,858.00
48,015.00
38,280.00
38,280.00
10,422.50
7,929.17
17,325.00
103,235.00
282,975.00
134,062.50
88,715.00
689,557.00
565,108.50
528,220.00
500,307.50
461,450.00
434,522.00
415,585.50
389,642.00
464,662.00
362,186.00
c.
338,426.00
217,021.20
485,771.00
679,276.40
535,739.60
316,781.67
430,576.67
507,998.33
173,057.50
152,900.00
142,565.50
135,756.50
132,011.00
130,251.00
120,606.75
81,719.00
73,139.00
68,332.00
65,521.50
63,750.50
62,716.50
60,830.00
60,280.00
132,121.00
60,885.00
35,072.40
29,726.40
27,380.10
25,806.00
24,875.40
24,146.10
23,321.10
22,990.00
39,761.70
36,633.30
34,496.00
33,293.70
32,282.80
29,326.00
27,219.50
21,807.50
19,470.00
24,530.00
4,707.45
c.
14,355.00
8,911,650.00
9,571,650.00
4,951,650.00
6,931,650.00
11,353,650.00
386,974.50
206,574.50
452,650.00
496,650.00
316,250.00
386,650.00
562,650.00
303,820.00
330,220.00
221,980.00
264,220.00
369,820.00
304,755.00
314,655.00
245,355.00
275,055.00
341,385.00
624,250.00
694,650.00
406,010.00
518,650.00
800,250.00
355,135.00
382,635.00
269,885.00
313,885.00
423,885.00
538,191.50
604,191.50
333,591.50
439,191.50
703,191.50
308,550.00
393,800.00
421,300.00
423,879.50
451,379.50
338,629.50
382,629.50
492,629.50
c.
430,754.50
318,004.50
362,004.50
8,114,700.00
8,719,700.00
4,484,700.00
6,299,700.00
10,353,200.00
7,679,760.00
8,284,760.00
4,049,760.00
5,864,760.00
9,918,260.00
82,857.50
88,907.50
46,557.50
64,707.50
105,242.50
126,445.00
136,125.00
68,365.00
97,405.00
162,261.00
150,205.00
161,865.00
80,245.00
115,225.00
193,347.00
124,547.50
133,017.50
73,727.50
99,137.50
155,886.50
129,690.00
75,900.00
138,655.00
102,795.00
162,860.50
8,065,750.00
8,670,750.00
4,435,750.00
6,250,750.00
10,304,250.00
63,855.00
71,775.00
39,303.00
49,167.80
83,655.00
c.
89,595.00
101,475.00
52,767.00
71,775.00
119,295.00
143,550.00
78,606.00
103,950.00
167,310.00
103,950.00
60,654.00
77,550.00
119,790.00
226,044.50
118,244.50
164,444.50
267,624.50
289,905.00
228,305.00
182,105.00
303,154.50
241,554.50
195,354.50
27,689.75
12,452.00
15,041.76
17,791.76
23,841.76
495,577.50
476,025.00
452,540.00
56,562.00
719,290.00
684,502.50
779,955.00
9,942.90
763,400.00
121,000.00
1,334,025.00
748,825.00
1,341,980.00
44,547.25
59,691.50
42,504.00
c.
38,379.00
25,283.50
44,660.00
58,014.00
52,514.00
53,064.00
59,444.00
36,774.10
42,565.60
48,010.60
30,685.60
35,074.60
30,702.10
31,032.10
36,070.10
35,514.60
35,998.60
36,119.60
36,603.60
43,081.50
72,781.50
16,852.00
71,186.50
103,950.00
99,687.50
99,357.50
19,354.50
19,354.50
13,304.50
18,749.50
29,620.25
36,839.00
29,620.25
36,839.00
38,901.50
38,901.50
204,523.00
230,890.00
12,562.00
68,904.00
125,004.00
27,625.40
140,877.94
90,827.94
112,277.94
160,182.94
c.
137,089.54
87,404.54
108,489.54
156,394.54
1,018,105.00
146,657.50
1,368,604.00
313,005.00
347,985.00
658,075.00
361,900.00
908,815.60
644,911.58
4,687,449.80
46,895.03
52,395.03
55,145.03
274,345.50
288,145.00
440,231.00
35,099.17
40,782.50
50,728.33
75,164.10
93,634.93
210,110.45
9,283.45
11,201.58
13,972.20
22,497.20
28,204.55
29,743.45
52,752.15
82,163.40
225,843.50
16,940.00
18,562.50
18,843.00
983,955.50
1,012,038.50
1,897,659.50
385,159.50
324,536.30
366,916.00
c.
377,850.00
198,036.30
163,179.50
314,054.40
38,489.00
32,439.00
20,339.00
38,104.00
209,187.00
80,712.50
63,731.25
63,632.25
15,171.75
10,664.50
17,875.00
13,521.75
9,121.75
133,072.50
59,125.00
160,572.50
12,864.50
165,187.00
19,236.25
61,371.75
79,521.75
103,721.75
91,621.75
76,059.50
91,459.50
87,059.50
75,025.50
83,275.50
89,875.50
90,975.50
93,725.50
91,525.50
89,259.50
92,559.50
99,775.50
105,275.50
27,528.60
25,878.60
13,131.80
65,381.80
c.
151,057.50
131,807.50
149,737.50
4,757.50
5,472.50
5,472.50
5,472.50
5,148.00
23,331.00
28,325.00
35,794.00
16,417.50
18,293.00
5,021.50
15,587.00
8,778.00
6,652.80
11,528.00
22,116.05
166,100.00
193,600.00
80,025.00
6,490.00
1,622.50
6,490.00
4,950.00
9,064.00
6,490.00
387,200.00
39,050.00
55,307.91
53,270.49
76,780.00
72,160.00
83,160.00
80,410.00
85,910.00
Harga
No Pekerja Sat. Upah Tenaga Keterangan
(Rp.)
(1) (2) (3) (4) (5)
1 Mandor Hari 44,000.00
2 Kepala Tukang Batu Hari 44,000.00
3 Kepala Tukang Besi Hari 44,000.00
4 Kepala Tukang Cat Hari 44,000.00
5 Kepala Tukang Kayu Hari 44,000.00
6 Kepala Tukang Listrik Hari 44,000.00
7 Tukang Batu Hari 38,500.00
8 Tukang Besi Hari 38,500.00
9 Tukang Cat Hari 38,500.00
10 Tukang Plitur Hari 38,500.00
11 Tukang Kayu Hari 38,500.00
12 Tukang Listrik Hari 38,500.00
13 Tukang Las Hari 38,500.00
14 Tukang Leideng Hari 38,500.00
15 Tukang Gali Hari 30,250.00
16 Pekerja Hari 30,250.00
17 Masinis Hari 38,500.00
18 Pembantu Masinis Hari 33,000.00
19 Pemasak Aspal Hari 33,000.00
20 Penjaga Malam Hari 30,250.00
V KAWAT
1 Kawat Beton / Bendrat kg 11,550.00
2 Kawat Ayakan m2 11,000.00
3 Kawat Bronjong kg 12,100.00
4 Kawat Nyamuk Kasa Almunium m2 16,500.00
5 Kawat Nyamuk Kasa Plastik m2 5,500.00
6 Kawat Las kg 20,900.00
7 Kawat seng polos kg 19,250.00
8 Kawat Duri kg 8,066.00
9 Kawat Galvanis m2 19,250.00
10 Kawat Harmonika 12 x 24 mm m2 22,000.00
11 Kawat Harmonika 12 x 45 mm m2 15,400.00
12 Kawat Harmonika 14 x 30 mm m2 27,500.00
13 Kawat Harmonika 14 x 35 mm m2 18,700.00
IX ASBES
1 Asbes plat (100 x 100 x 0,3) Atrisco lbr 13,750.00
2 Asbes plat (100 x 100 x 0,3) Kerang super lbr 8,250.00
3 Asbes plat (100 x 100 x 0,3) Indoplek lbr 12,100.00
4 Asbes plat (100 x 100 x 0,3) Elephant lbr 13,750.00
5 Asbes plat (100 x 100 x 0,3) Djabes lbr 13,200.00
6 Asbes Gelombang besar (300 x 102 x 0,5) lbr 80,300.00
7 Asbes Gelombang besar (200 x 102 x 0,5) lbr 58,300.00
8 Asbes Gelombang besar (180 x 102 x 0,5) lbr 53,900.00
9 Asbes Gelombang kecil (300 x 105 x 0,4) Djabes lbr 66,000.00
10 Asbes Gelombang kecil (270 x 105 x 0,4) Djabes lbr 65,450.00
11 Asbes Gelombang kecil (210 x 105 x 0,4) Djabes lbr 46,200.00
12 Asbes Gelombang kecil (180 x 105 x 0,4) Djabes lbr 39,600.00
13 Asbes Gelombang kecil (150 x 105 x 0,4) Djabes lbr 35,750.00
14 Asbes Gelombang kecil (240 x 105 x 0,4) Djabes lbr 52,800.00
15 Asbes nok gelombang besar lbr 52,250.00
16 Asbes nok gelombang kecil lbr 27,500.00
XI GENTENG
1 Genteng beton besar natural isi 9 biji "monier" bh 3,300.00
2 Genteng beton besar warna isi 9 biji "monier" bh 4,950.00
3 Genteng beton kecil natural isi 11 biji "RA" bh 3,080.00
4 Genteng beton bubungan natural bh 4,950.00
XII PAKU
1 Paku usuk kg 11,000.00
2 Paku reng kg 11,000.00
3 Paku plepet kg 11,000.00
4 Paku eternit kg 14,300.00
5 Paku asbes bh 330.00
6 Paku sekrup 3,5" (dos) bh 165.00
7 Paku gypsum kg 16,500.00
8 Paku ramset/ dinabolt kg 1,100.00
9 Paku beton kecil bh 110.00
10 Paku beton besar bh 495.00
11 Angkur/ Beugel kg 17,600.00
XIII KAYU
1 Kayu jati m3 18,700,000.00
2 Papan kayu jati m3 22,000,000.00
3 Kayu jati lokal m3 6,600,000.00
4 Papan kayu jati lokal m3 7,150,000.00
5 Kayu bengkirai m3 8,635,000.00
6 Papan kayu bengkirai m3 9,900,000.00
7 Kayu Kamper m3 7,150,000.00
8 Papan kayu kamper m3 8,250,000.00
9 Kayu kruing m3 4,950,000.00
10 Papan kayu kruing m3 5,500,000.00
11 Kayu 5/7 meranti m3 3,300,000.00
12 Kayu meranti m3 3,300,000.00
13 Papan kayu meranti m3 3,740,000.00
14 List profil kayu m' 8,250.00
15 Kayu tahun/ lanan m3 1,100,000.00
XV BAHAN KACA
1 Genteng kaca vlam cekung 2 mm bh 7,150.00
2 Genteng kaca vlam cekung 3 mm bh 8,250.00
3 Genteng kaca kodok cekung 2 mm bh 7,700.00
4 Genteng kaca kodok cekung 3 mm bh 8,250.00
5 Kaca bening 3 mm m2 49,500.00
6 Kaca bening 5 mm m2 66,000.00
7 Kaca bening 8 mm m2 132,000.00
8 Kaca riben 3 mm m2 60,500.00
9 Kaca riben 5 mm m2 77,000.00
10 Kaca riben 8 mm m2 313,500.00
11 Kaca es 3 mm m2 55,000.00
12 Kaca es 5 mm m2 88,000.00
13 Kaca cermin 3 mm m2 77,000.00
14 Kaca cermin 5 mm m2 99,000.00
15 Rangka nako + besi tralis nako bh 20,900.00
16 Kaca nako polos 5 mm uk. 14 x 100 cm bh 9,900.00
XX PENGGANTUNG / PENGUNCI
1 Kunci tanam double slag/ Selot pintu kuda terbang bh 60,500.00
2 Kunci tanam double slag/ Selot pintu SES bh 275,000.00
3 Kunci tanam double slag/ Selot pintu Yale bh 71,500.00
4 Kunci tanam double slag/ Selot pintu Union bh 49,500.00
5 Kunci tanam/ selot pintu ex RRT bh 275,000.00
6 Kunci tanam antik bh 181,500.00
7 Kunci lemari bh 7,700.00
8 Door holder bh 137,500.00
9 Kunci tanam slinder bh 44,000.00
10 Kunci Kamar mandi "alpha" bh 44,000.00
11 Engsel pintu kuningan 3" bh 19,250.00
12 Engsel pintu kuningan 4" bh 22,000.00
13 Engsel pintu nilon 3" bh 7,150.00
14 Engsel pintu nilon 4" bh 8,250.00
15 Engsel Stainless steel 3" bh 19,250.00
16 Engsel Stainless steel 4" bh 22,000.00
17 Engsel Piano m' 8,250.00
18 Grendel ukuran 5 - 10 cm bh 8,525.00
19 Grendel ukuran 11 - 15 cm bh 13,750.00
20 Grendel ukuran 16 - 20 cm bh 13,750.00
21 Kait Angin kuningan ukuran 10 - 20 cm bh 8,250.00
22 Kait Angin kuningan ukuran 21 - 30 cm bh 22,000.00
HARGA
NO JENIS PEKERJAAN ANALIS VOL JUMLAH
SATUAN
A PEKERJAAN PEMBONGKARAN
1. Pembongkaran lantai tegel XV.4 434.00 m² 6,490.00 2,816,660.00
2. Pek. Dokumen proyek Ls Ls 500,000.00 500,000.00
3. Tanah diangkut sejauh 150 m II.8 21.70 m³ 10,422.50 226,168.25
B PEKERJAAN LANTAI
1. Pekerjaan Lantai keramik 30 x 30 cm XIII.4 434.00 75,025.05 32,560,871.70
JUMLAH 36,103,699.95
DIBULATKAN
B. RENCANA ANGGARAN DAN BIAYA ( RAB)
B PEKERJAAN PEMBONGKARAN
1. Pembongkaran lantai 1014.00 m2 6,490.00
2. Pek. Pembuatan alat-alat kerja Ls 400,000.00
3. Pek. Dokumen proyek Ls 500,000.00
C PEKERJAAN LANTAI
1. Pekerjaan Lantai keramik 30 x 30 cm 1041.00 75,025.05
JUMLAH
46,643,198.80
116,427,712.50
192,116,525.32
27,953,704.35
4,061,029.50
55,430,789.70
515,162.34
6,580,860.00
400,000.00
500,000.00
78,101,077.05